SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
Workplaces of
the Future
Effective, expressive & exciting




In this Info Data, Davis Langdon reviews the issues surrounding the future
direction of office fit-outs.
Introduction                                              With a new office development cycle
                                                          underway and a buoyant leasing market
                                                          led by tenants seeking a ‘flight to quality’,
                                                          the office fit-out sector is alive and well.
                                                          Many cities are in fact recording vacancy
                                                          levels that have not been seen for 20 years.
                                                          In this Info Data, Davis Langdon reviews
                                                          the issues surrounding the future direction
                                                          of office fit-outs and examines the costs of
                                                          various projects in Melbourne, Sydney and
                                                          London.




Office fit-out                                            In a survey* by Colliers International, staff   › providing an appropriate density of small
                                                          retention and environmental performance           power and data points to enable simple

sector                                                    were predicated to be the two biggest             reconfiguration
                                                          drivers affecting building requirements over
                                                                                                          Increasing the intensity with which
                                                          the coming years – 91% of respondents
                                                                                                          workstations are used
                                                          indicating that workplace design had an
                                                                                                          The use of workstations within many
                                                          impact on business success.

91% of respondents                                                                                        organisations can be as low as 50%.
                                                          This shift in thinking has come at a            Methods such as hot-desking have been
                                                          time when many companies are paying             used to counter this, however this will only
indicate that                                             increased attention to the triple bottom line   suit an organisation with a highly mobile
                                                          – the financial, social and environmental       workforce.
workplace design                                          aspects of their business. From this, a new
                                                                                                          Effectiveness
                                                          generation of office designs are evolving

has an impact on                                                                                          – getting the most from employees by
                                                          that recognise the need for improved
                                                                                                          providing space that supports the way they
                                                          environmental performance and respond to
                                                                                                          do work
business success.*                                        the evolving workplace and organisational
                                                          behaviour.                                      The types of space that may be included
                                                                                                          are:

                                                          Objectives                                      › open plan space with a combination of
                                                                                                            shared and owned desks
                                                          The creation of office space incorporates       › limited cellular office space
                                                          many design variables including the             › ‘touch down’ facilities
                                                          buildings themselves and their internal and     › break-out areas
                                                          external environments.                          › study booths for concentrated work
                                                                                                          › flexible meeting rooms
                                                          The way these variables affect an
                                                                                                          › service areas for printing, photocopying,
                                                          organisation are many and varied and
                                                                                                            and the like
                                                          can be structured under the following
                                                          objectives, any combination of which might      Expression
                                                          define an organisation’s priorities:            – the use of premises as an internal and
                                                                                                          external expression of corporate values
                                                          Efficiency
                                                          – highest and best use of space                 The value of good design includes the way
                                                                                                          that occupants respond to workplaces
                                                          Floor plate efficiency
                                                                                                          that have strong expression and a relaxed
                                                          Selecting floor plates that have well
                                                                                                          atmosphere. Corporations are using this
                                                          planned cores and a layout that permits
                                                                                                          approach to connect their values to their
Description of user needs within                          efficient circulation.
workspace (DEGW)                                                                                          people, to create a workplace that has
                                                          Space planning efficiency                       energy and excitement, resulting in a
                       Den                  Club          Optimising occupation densities by:             happier and more productive workforce.
 High




                                                          ›   greater use of open plan office space
                                                          ›   rationalising space standards
                                                          ›   actively managing on-floor storage          The challenge is therefore to maintain the
                                                          ›   minimising requirements for secondary       overall efficiency of space planning while
                                                              on-floor circulation                        increasing effectiveness by providing
Interaction




                                                                                                          appropriate work settings, segregating
                                                          Minimising cost of churn
                                                                                                          incompatible spaces and incorporating the
                                                          Office churn has become a significant cost
                                                                                                          corporate values of the organisation into
                                                          for many companies. The cost of moving
                      Hive                  Cell                                                          the space.
                                                          staff can be minimised by:
                                                          › adopting universal space planning             Typically the cost of providing a workplace
                                                            standards – having the ability to move        is the second largest business cost after
                                                            people without the need to reconfigure        employees so it makes commercial sense
                                                            workspaces is vital in reducing the cost      to link office design to an organisation’s
 Low




                                                            of churn                                      performance. Improved working
                                                          › use of interchangeable furniture and          efficiencies are now being costed to justify
                                                            partition systems                             increased fit-out budgets.
                Low                                High
                             Autonomy




2                                           Workplaces of the Future – effective, expressive & exciting
              Davis Langdon | Info Data |
Key cost drivers                              The key cost drivers associated with an                     Space requirements
                                                                                                          Although general office space will take up
                                              office fit-out will include the following:
                                                                                                          the bulk of the floor plate, as described
                                              Type of business and their space
                                                                                                          earlier, the move towards more effective
                                              requirements
                                                                                                          designs will now see fit-out projects include
                                              The differing requirements of tenants such
                                                                                                          additional facilities such as breakout areas
                                              as corporations, government departments
                                                                                                          and ‘touch down’ facilities which have
                                              and professional firms will have a major
                                                                                                          different cost profiles.
                                              impact on staff densities, floor plan (cellular
                                              offices versus open plan), quality, flexibility             The extent of services installation
                                                                                                          The key cost drivers associated with
                                              and servicing requirements.
                                                                                                          services are as follows:
                                              State of completion and suitability of
                                                                                                          › level of density in open plan areas
                                              base building
                                                                                                          › amount of cellular space (ie offices,
                                              The base building will typically be
                                                                                                            meeting rooms)
                                              complete to either of the following two
                                                                                                          › level of security
                                              standards when the tenant signs the lease:
                                                                                                          › extent of AV installation
                                              › finishes to landlord’s areas only, with
                                                                                                          › IT requirements including redundancy
                                                services distribution capped off at risers
                                                                                                            for power and IT
                                                to each of the floors (shell & core)
                                              › as per above but including floor finishes,                Overall programme
                                                                                                          The overall project programme will
                                                suspended ceilings and extension of
                                                                                                          affect cost, particularly the amount of
                                                mechanical and electrical services
                                                                                                          acceleration required to meet client needs.
                                              There is no standard definition of either and
                                                                                                          Fast tracking the overall project programme
                                              the works included will differ from building
                                                                                                          can be achieved by:
                                              to building.
                                                                                                          › overlapping the design, procurement
                                              The tenant can realise the following
                                                                                                            and construction processes
                                              potential benefits when leasing office
                                                                                                          › shortening the tender period
                                              space in the first condition particularly as a
                                                                                                          › integrating the fit-out with the base
                                              pre-let with integrated fit-out:
                                                                                                            building works
                                              › avoiding demolition and alteration costs
                                                                                                          Cost penalties may be incurred for fast
                                              › opportunities to change the base
                                                                                                          tracking when compared to traditional
                                                building specification without incurring
                                                                                                          procurement methods although the
                                                significant on-costs
                                                                                                          benefits of faster occupation can offset
                                              › potential for reduced programme
                                                                                                          these additional costs.
                                                durations
                                                                                                          Incentives
                                                                                                          The negotiation of any lease incentives,
                                                                                                          such as landlord contribution to the fit-out
                                                                                                          cost, rent free period, or similar, needs to
                                                                                                          be considered.




Indicative                                    The following should be used as a guide
                                              only. Please note that the figures are based

building costs                                on the fit-out of a Melbourne CBD office
                                              building with the base building works
                                              having been completed to include floor
                                              finishes, suspended ceilings and extension
                                              of mechanical, fire and electrical services.
                                              For regional or refurbishment variances,
Typical breakdown of elemental cost           please contact Davis Langdon direct to
                                              assess your specific requirements.
                                              The below costs are current as at the first
                                              quarter 2008.
                      Internal walls,
                        screens &
     Workstations &
                          doors
       furniture                              Business sector                                                 Cost per Net Lettable Area (NLA)
                           26%
         26%
                                                                                                              $1,000 – $1,300/m2
                                              Government departments
                                 Finishes
                                                                                                              $1,200 – $1,400+/m2
                                              Professional firms
                                    8%
                                                                                                              $1,200 – $1,600+/m2
                                              Corporations
                                 Fittings
                                  12%
                                              Typical professional fees cost                                  4.0% – 6.0+%
           Services
                                                                                                              14 – 17m2
                                              Typical workspace per employee
            34%

                                              Exclusions: GST, AV equipment, IT equipment, removalist costs




                                                                                Workplaces of the Future – effective, expressive & exciting 3
                                            Davis Langdon | Info Data |
Managing risk on                                                                                                  Fast track approaches such as
                                                The office fit-out sector is complex and
                                                challenging. Due to tight programmes and                          Construction Management or Two Stage

fit-out projects                                budgets the risk profiles can be high when                        Tendering can themselves be a significant
                                                compared to other projects. As one of the                         source of risk if the design information
                                                keys to delivering a successful project is                        does not keep pace with the construction
                                                remaining flexible, it is important to have                       works. Because of this it is important that
                                                the contracts, contingencies and change                           consultants and contractors with specialist
                                                management procedures in place to allow                           expertise are selected.

If the programme                                this flexibility.
                                                                                                                  If the programme is particularly tight then

is particularly
                                                Time is usually the most significant factor                       negotiation with a single contractor may be
                                                for the client when choosing a procurement                        the best option. Some cost competitiveness
                                                route. The overall programme will usually                         will be lost when compared to a single
tight then                                      be dictated by business needs or lease                            stage tender. However the benefits of
                                                dates. Lump Sum contracts, where the                              having contractor input into buildability,

negotiation with                                programme allows, can often deliver the                           value engineering and ordering of long
                                                best results. To achieve this the design                          lead time items may well offset the premium

a single contractor                             information must be complete before                               paid. Through the benchmarking of project
                                                construction starts.                                              costs, competitiveness can be verified to

may be the best                                                                                                   ensure value for money.



option.
                                                                                                        Influence on cost

                                                                                              65%                                      25%             10%




                                                                                                                                           Phase 3
                                                                 Phase 1                                            Phase 2
                                                                                                                                           Construction
                                                                 Consideration of                                   Design
                                                                                                                                           procurement
                                                                 options and project
                                                                 definition




                                                        5%             10%                                                 85%
                                                                                                                   Year:
                                                                                             Actual expenditure during each stage




                                                Major decision-makers’ influence on risk




                                                                          Owner requirements
                                                                          Standards & criteria
                                                Risk influence




                                                                               Consultants
                                                                               Design



                                                                                                    Operation &
                                                                                   Contractor
                                                                                                    maintenance
                                                                                                    personnel




                                                                              Project time




4                                 Workplaces of the Future – effective, expressive & exciting
    Davis Langdon | Info Data |
Green fit-out            The popularity of green/sustainable office
                         fit-outs is evidenced by the number of
                         projects registered for certification under
                         Green Star Office Interiors#. Through an
                         innovative and life-cycle approach to
                         design, these projects are demonstrating

... additional costs     the sizeable business and environmental
                         benefits that can be achieved – without

are in the order of      compromising commercial viability.
                         Projects are indicating that the additional
0–5% for a Five          costs (above a comparable non green
                         project) are in the order of 0 – 5% for a Five

Star Green Star          Star Green Star certified fit-out. However,
                         over time we would expect the perception

certified fit-out.       of ‘extra’ cost to diminish as innovative
                         design becomes the norm and companies
                         realise the cost benefits of going green.
                         Some of the green initiatives that have
                         been used in green fit-out projects are as
                         follows:
                         › extensive commissioning and building
                           tuning
                         › providing tenant guides to enable the
                           fit-out to perform to its potential
                         › re-use and recycling of construction
                           waste
                         › provision of outside air exceeding the
                           requirements of the Australian Standard
                         › indoor air quality improved through:
                           - use of low-level off-gassing materials
                             such as paint, carpet and adhesives/
                             sealants
                           - minimising formaldehyde in composite
                             wood products
                           - minimising PVC
                         › external views and natural daylighting
                           provided to a significant proportion of the
                           work area
                         › efficient lighting zoning and power
                           density, equipment, controls and building
                                                                          Registered Green Star
                           design enabling fit-outs to achieve the
                                                                          office interiors projects#
                           Five Star Australian Building Greenhouse
                           Rating (ABGR)                                             70
                         › provision of tenancy sub-meters                           60
                         › peak energy demand reduction methods
                                                                                     50
                           including on-site renewable technologies
                                                                          Projects




                         › use of workstations, floor finishes, chairs,              40
                           tables and storage units that have a high                 30
                           proportion of recycled content and the
                                                                                     20
                           ability to be re-used or recycled
                                                                                     10
                         › use of Forest Stewardship Council (FSC)
                                                                                     0
                           certified timber and composite wood
                                                                                                                      2007
                                                                                          2004   2005          2006
                           products
                                                                                                        Year
                         › large areas for recycling collection
                           provided throughout the office space           Source: Green Building Council Australia




                                                     Workplaces of the Future – effective, expressive & exciting 5
                       Davis Langdon | Info Data |
Case study                                                            Concepts currently at the forefront of office    The open plan layout at 1 Bligh Street
                                                                      design and fit-out are represented by the 1      provides the following:
                                                                      Bligh Street development in Sydney.
                                                                                                                       Flexibility – easily modified layout to suit
                                                                      The building distances itself from               expansion or contraction of existing space
1 Bligh Street Sydney
                                                                      conventional design standards by                 or through acquisition of neighbouring
Architect             Achitectus
                                                                      achieving several complex and modern             tenancies
Office levels         29                                              building initiatives and an increased desire
                                                                                                                       Mobility – workstations that are adaptable
                                                                      for improved Indoor Environment Quality
                      1,600m2
Average office
                                                                                                                       in size and location to manage differential
                                                                      (IEQ).
level (NLA)
                                                                                                                       growth between various service delivery
Unique features Six Star Green Star                                                                                    lines of the organisation
                                                                      Initiatives
                      Double glazed façade
                                                                                                                       Communication – faster interaction
                      Passive cooling/air circulation                 › Double glazed skin façade providing            between colleagues through immediate
                                                                        mixed mode ventilation (ie optional
                      Elliptical plan 12% more
                                                                                                                       awareness and contact, thereby
                      efficient than a rectangular                      natural ventilation) drawing the               addressing queries, discussion and
                      building
                                                                        air through the inner façade using             conclusions faster
                                                                        convective currents generated by the
Source: Architectus
                                                                                                                       Materials – reduction in construction
                                                                        northern exposure
                                                                                                                       materials (socially and environmentally
                                                                      › Natural ventilation system utilising an
                                                                                                                       responsible)
                                                                        atrium at the southern end of the building
                                                                        to exhaust ‘used’ air and allow cleaner
                                                                                                                       Environment – improved IEQ, reducing
                                                                        non-recycled air to be passed through
                                                                                                                       sick leave, improving productivity,
                                                                        the office space
                                                                                                                       improving employee sentiment
Passive circulation
                                                                      This fundamental concept of designing
                                                                                                                       Variations in office fit-out design practices
                                                                      more intelligent office spaces moves closer
                                                                                                                       can also yield variations in floor space
                                                                      to limiting ‘sick building syndrome’ from
                                                                                                                       occupancy.
                                                                      workplaces and is the basis for reducing
                                                                      staff sick days and improving overall            With current demand for office space
                                                                      productivity. Building designers are now         exceeding supply and the imminent
                                                                      recognising this and constructing buildings      introduction of an emissions trading
                                                                      to suit the flexibility desired by prospective   scheme, adding to the costs of conducting
                                                                      tenants and employees to more open,              business either directly or indirectly,
                                                                      collaborative and inviting work spaces.          organisations will be seeking to improve
                                                                                                                       productivity within the constraints of their
                                                                      The 1 Bligh Street development has
                                                                                                                       environment.
                                                                      anticipated the increasing demand for
                                                                      improved working environments. Unlike            Moving away from the traditional cellular
                                                                      traditional buildings where the office fit-      office system to open plan systems can
                                                                      out was restricted by the base building          achieve a reduction in greenhouse gas
                                                                      design, this development has been driven         (GHG) output per occupant. Although
                                                                      by the realisation that tenants desire more      current leading environmental rating
                                                                      collaborative and open environments.             systems do not credit points for such
                                                                      Therefore the buildings function has been        initiatives, the financial impact on
                                                                      designed to accommodate this trend to            businesses not utilising their work-space
                                                                      open plan indicating the future of office        effectively and efficiently will become
Source: Architectus
                                                                      fit-outs.                                        increasingly burdened by the rising cost of
                                                                                                                       energy.
Open plan design                                                                                                       The table below is based on alternative
                                                                                                                       architectural office fit-outs for the 1 Canada
                                                                                                                       Square development in London:


                                                                                                                       Typical office area types
                                                                                                                                                                                         (person/sqm)
                                                                                                                                                                                         Occupancy
                                                                                                                                          Circulation




                                                                                                                                                                   Open plan


                                                                                                                                                                               Support
                                                                                                                                                        Cellular
                                                                                                                                          zone




                                                                                                                                                                                          19.8
                                                                                                                       Cellular           21%           40%        15%         24%
                                                                                                                       (single offices)
                                                                                                                                                                                          12.6
                                                                                                                       Intermediate       20%           20%        35%         25%
                                      HR LIFT 11




                                                                                                                       layout
        Male
                           HR Lifts




                                                                                                                                                                                          10.6
                                                                                                                       Open plan          16%           12%        45%         27%
                                                   Atrium




                                       Balcony


                                                                  Female
Source: Architectus




6                                                      Workplaces of the Future – effective, expressive & exciting
    Davis Langdon | Info Data |
The future of      The changing needs of individuals are                                    Design
                   impacting on office fit-out designs.
                                                                                            Designers and manufacturers are
office fit-out     Employees are exhibiting changing
                                                                                            becoming increasingly aware of the impact
                   expectations about the nature of work, and
                                                                                            that fit-out lighting can have on occupants.
                   as the work/life balance of staff becomes
                                                                                            Light temperatures at the blue end of the
                   more valued a growing sophistication in the
                                                                                            spectrum between 6,000K and 8,000K
                   design of office fit-out is emerging.
                                                                                            increase activity and stimulate occupants,
                                                                                            while colours at the warmer end of the
                                                                                            spectrum (around 2,700K) help to increase
                   The drivers of change
                                                                                            concentration, relaxation and help soothe
                   Global skills shortage                                                   workers.
                   With the lowest levels of unemployment                                   Aroma and sound are also being used
                   on record, corporations are increasingly                                 internationally to produce desired effects
                   concerned about retaining staff and this                                 from occupants – to enliven, to invigorate
                   in itself is becoming a persuasive factor in                             and to reduce stress.
                   fit-out decisions.
                                                                                            Technology
                   Skilled employees are sought after, highly
                                                                                            The much touted ‘virtual office’ has long
                   mobile and exert a considerable amount
                                                                                            been considered as the next step in the
                   of employment power. Smart firms know
                                                                                            evolution of our workplaces. While we have
                   that their office’s fit-out has the potential
                                                                                            yet to see the virtual office take hold in any
                   to attract and retain staff – a competitive
                                                                                            significant manner, we acknowledge that
                   advantage in this tight market.
                                                                                            employees are certainly less dependent on
                   Changing demographics                                                    the office itself.
                   Boundaries between family and career are                                 The internet, wireless technology
                   set to blur further.                                                     and mobile computing have allowed
                                                                                            employees to work in a less structured
                   Smart employers have already recognised
                                                                                            way and become increasingly mobile.
                   that providing workplace crèches as a
                                                                                            Simultaneously technology has allowed
                   part of office fit-outs can set them aside in
                                                                                            companies to track and monitor their
                   attracting working mothers to remain in the
                                                                                            employees more easily.
                   workforce.
                   At the other end of the spectrum there are
                                                                                            In conclusion
                   predictions that a similar groundswell of
                   changing demographics will change the
                                                                                            With all of these considerations in mind, the
                   way we work. The aging population will see
                                                                                            role of the office space itself is undergoing
                   increased need for people to care for aging
                                                                                            its own evolution.
                   relatives at home – which in turn will see
                                                                                            The office has become more of a cultural
                   more home-based workers.
                                                                                            centre, with workspaces, meeting spaces,
                   The 24 hour workspace
                                                                                            private spaces and chill out spaces –
                                                                                            everything required for employees to meet
                   In workplaces where long hours are de
                                                                                            and socialise with their associates.
                   rigueur, employers are recognising that
                   a ‘rest space’ (where employees can
                                                                                            Futurologists, looking into the nature of
                   intermittently nap) can make productivity
                                                                                            employment in 2018^, are still predicting an
                   sense.
                                                                                            exodus from the traditional workplace.
                   Parents of newborns who have returned to
                                                                                            However, with offices in most cases being
                   work are better armed to cope with stress
                                                                                            occupied more intensely for longer periods
                   and deliver better productivity given the
                                                                                            than ever before, it remains to be seen if
                   opportunity for a lunchtime rest.
                                                                                            this is a utopian dream or the future of our
                                                                                            workspaces.
                   The Journal of Sleep Research uncovered
                   that short naps between 6 minutes and
                   50 minutes can substantially improve a
                   worker’s ability to do work.
                   Daytime naps improve procedural and
                   motor memory.




                   Endnotes:
                   * Colliers International Office Tenant Survey (Colliers International 2006)
                   # Green Building Council of Australia
                   ^ Environmental Scanning – Trends affecting the world of work in 2018 (Chartered Management Institute March 2008)



                   Copyright © Davis Langdon 2008
                   Printed stock: 55% recycled and 45% FSC approved, with ISO 14001 Environmental Accreditation
                   Disclaimer: Davis Langdon does not give any warranty, nor accept any contractual, tortuous or other form of liability for any
                   consequences, loss or damage which may occur as a result of others acting upon or using information contained in this report.




                                                            Workplaces of the Future – effective, expressive & exciting 7
                 Davis Langdon | Info Data |
Our Offices
Australia        Adelaide           +61 8 8410 4044
                 Brisbane           +61 7 3221 1788
                 Cairns             +61 7 4051 7511
                 Canberra           +61 2 6257 4428
                 Darwin             +61 8 8981 8020
                 Hobart             +61 3 6234 8788
                 Melbourne          +61 3 9933 8800
                 Perth              +61 8 9221 8870
                 Sunshine Coast     +61 7 5479 2005
                 Sydney             +61 2 9956 8822
                 Townsville         +61 7 4721 2788

New Zealand Auckland                +64 9 379 9903
                 Christchurch       +64 3 366 2669
                 Wellington         +64 4 472 7505


Our Services
Project Services – Project Management, Cost Management, Building Surveying, Urban Planning,
Specification Services
Assurance Services – Infrastructure Verification Services, Technical Due Diligence, Property Performance
Reporting, Make Good Assessments, Management System Development
Certification Services – Third Party Certification to National and International Standards
Sustainability Services – Strategies for New and Existing Buildings


DAVIS LANGDON & SEAH INTERNATIONAL
Arabian Gulf, Botswana, Brunei, China, England, Hong Kong, India, Indonesia, Ireland, Japan, Korea,
Lebanon, Malaysia, Pakistan, Philippines, Russia, Saudi Arabia, Scotland, Singapore, South Africa, Spain,
Thailand, United States of America, Vietnam and Wales




www.davislangdon.com                |

Contenu connexe

Dernier

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 

Dernier (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 

En vedette

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

En vedette (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Workplaces Of The Future

  • 1. Workplaces of the Future Effective, expressive & exciting In this Info Data, Davis Langdon reviews the issues surrounding the future direction of office fit-outs.
  • 2. Introduction With a new office development cycle underway and a buoyant leasing market led by tenants seeking a ‘flight to quality’, the office fit-out sector is alive and well. Many cities are in fact recording vacancy levels that have not been seen for 20 years. In this Info Data, Davis Langdon reviews the issues surrounding the future direction of office fit-outs and examines the costs of various projects in Melbourne, Sydney and London. Office fit-out In a survey* by Colliers International, staff › providing an appropriate density of small retention and environmental performance power and data points to enable simple sector were predicated to be the two biggest reconfiguration drivers affecting building requirements over Increasing the intensity with which the coming years – 91% of respondents workstations are used indicating that workplace design had an The use of workstations within many impact on business success. 91% of respondents organisations can be as low as 50%. This shift in thinking has come at a Methods such as hot-desking have been time when many companies are paying used to counter this, however this will only indicate that increased attention to the triple bottom line suit an organisation with a highly mobile – the financial, social and environmental workforce. workplace design aspects of their business. From this, a new Effectiveness generation of office designs are evolving has an impact on – getting the most from employees by that recognise the need for improved providing space that supports the way they environmental performance and respond to do work business success.* the evolving workplace and organisational behaviour. The types of space that may be included are: Objectives › open plan space with a combination of shared and owned desks The creation of office space incorporates › limited cellular office space many design variables including the › ‘touch down’ facilities buildings themselves and their internal and › break-out areas external environments. › study booths for concentrated work › flexible meeting rooms The way these variables affect an › service areas for printing, photocopying, organisation are many and varied and and the like can be structured under the following objectives, any combination of which might Expression define an organisation’s priorities: – the use of premises as an internal and external expression of corporate values Efficiency – highest and best use of space The value of good design includes the way that occupants respond to workplaces Floor plate efficiency that have strong expression and a relaxed Selecting floor plates that have well atmosphere. Corporations are using this planned cores and a layout that permits approach to connect their values to their Description of user needs within efficient circulation. workspace (DEGW) people, to create a workplace that has Space planning efficiency energy and excitement, resulting in a Den Club Optimising occupation densities by: happier and more productive workforce. High › greater use of open plan office space › rationalising space standards › actively managing on-floor storage The challenge is therefore to maintain the › minimising requirements for secondary overall efficiency of space planning while on-floor circulation increasing effectiveness by providing Interaction appropriate work settings, segregating Minimising cost of churn incompatible spaces and incorporating the Office churn has become a significant cost corporate values of the organisation into for many companies. The cost of moving Hive Cell the space. staff can be minimised by: › adopting universal space planning Typically the cost of providing a workplace standards – having the ability to move is the second largest business cost after people without the need to reconfigure employees so it makes commercial sense workspaces is vital in reducing the cost to link office design to an organisation’s Low of churn performance. Improved working › use of interchangeable furniture and efficiencies are now being costed to justify partition systems increased fit-out budgets. Low High Autonomy 2 Workplaces of the Future – effective, expressive & exciting Davis Langdon | Info Data |
  • 3. Key cost drivers The key cost drivers associated with an Space requirements Although general office space will take up office fit-out will include the following: the bulk of the floor plate, as described Type of business and their space earlier, the move towards more effective requirements designs will now see fit-out projects include The differing requirements of tenants such additional facilities such as breakout areas as corporations, government departments and ‘touch down’ facilities which have and professional firms will have a major different cost profiles. impact on staff densities, floor plan (cellular offices versus open plan), quality, flexibility The extent of services installation The key cost drivers associated with and servicing requirements. services are as follows: State of completion and suitability of › level of density in open plan areas base building › amount of cellular space (ie offices, The base building will typically be meeting rooms) complete to either of the following two › level of security standards when the tenant signs the lease: › extent of AV installation › finishes to landlord’s areas only, with › IT requirements including redundancy services distribution capped off at risers for power and IT to each of the floors (shell & core) › as per above but including floor finishes, Overall programme The overall project programme will suspended ceilings and extension of affect cost, particularly the amount of mechanical and electrical services acceleration required to meet client needs. There is no standard definition of either and Fast tracking the overall project programme the works included will differ from building can be achieved by: to building. › overlapping the design, procurement The tenant can realise the following and construction processes potential benefits when leasing office › shortening the tender period space in the first condition particularly as a › integrating the fit-out with the base pre-let with integrated fit-out: building works › avoiding demolition and alteration costs Cost penalties may be incurred for fast › opportunities to change the base tracking when compared to traditional building specification without incurring procurement methods although the significant on-costs benefits of faster occupation can offset › potential for reduced programme these additional costs. durations Incentives The negotiation of any lease incentives, such as landlord contribution to the fit-out cost, rent free period, or similar, needs to be considered. Indicative The following should be used as a guide only. Please note that the figures are based building costs on the fit-out of a Melbourne CBD office building with the base building works having been completed to include floor finishes, suspended ceilings and extension of mechanical, fire and electrical services. For regional or refurbishment variances, Typical breakdown of elemental cost please contact Davis Langdon direct to assess your specific requirements. The below costs are current as at the first quarter 2008. Internal walls, screens & Workstations & doors furniture Business sector Cost per Net Lettable Area (NLA) 26% 26% $1,000 – $1,300/m2 Government departments Finishes $1,200 – $1,400+/m2 Professional firms 8% $1,200 – $1,600+/m2 Corporations Fittings 12% Typical professional fees cost 4.0% – 6.0+% Services 14 – 17m2 Typical workspace per employee 34% Exclusions: GST, AV equipment, IT equipment, removalist costs Workplaces of the Future – effective, expressive & exciting 3 Davis Langdon | Info Data |
  • 4. Managing risk on Fast track approaches such as The office fit-out sector is complex and challenging. Due to tight programmes and Construction Management or Two Stage fit-out projects budgets the risk profiles can be high when Tendering can themselves be a significant compared to other projects. As one of the source of risk if the design information keys to delivering a successful project is does not keep pace with the construction remaining flexible, it is important to have works. Because of this it is important that the contracts, contingencies and change consultants and contractors with specialist management procedures in place to allow expertise are selected. If the programme this flexibility. If the programme is particularly tight then is particularly Time is usually the most significant factor negotiation with a single contractor may be for the client when choosing a procurement the best option. Some cost competitiveness route. The overall programme will usually will be lost when compared to a single tight then be dictated by business needs or lease stage tender. However the benefits of dates. Lump Sum contracts, where the having contractor input into buildability, negotiation with programme allows, can often deliver the value engineering and ordering of long best results. To achieve this the design lead time items may well offset the premium a single contractor information must be complete before paid. Through the benchmarking of project construction starts. costs, competitiveness can be verified to may be the best ensure value for money. option. Influence on cost 65% 25% 10% Phase 3 Phase 1 Phase 2 Construction Consideration of Design procurement options and project definition 5% 10% 85% Year: Actual expenditure during each stage Major decision-makers’ influence on risk Owner requirements Standards & criteria Risk influence Consultants Design Operation & Contractor maintenance personnel Project time 4 Workplaces of the Future – effective, expressive & exciting Davis Langdon | Info Data |
  • 5. Green fit-out The popularity of green/sustainable office fit-outs is evidenced by the number of projects registered for certification under Green Star Office Interiors#. Through an innovative and life-cycle approach to design, these projects are demonstrating ... additional costs the sizeable business and environmental benefits that can be achieved – without are in the order of compromising commercial viability. Projects are indicating that the additional 0–5% for a Five costs (above a comparable non green project) are in the order of 0 – 5% for a Five Star Green Star Star Green Star certified fit-out. However, over time we would expect the perception certified fit-out. of ‘extra’ cost to diminish as innovative design becomes the norm and companies realise the cost benefits of going green. Some of the green initiatives that have been used in green fit-out projects are as follows: › extensive commissioning and building tuning › providing tenant guides to enable the fit-out to perform to its potential › re-use and recycling of construction waste › provision of outside air exceeding the requirements of the Australian Standard › indoor air quality improved through: - use of low-level off-gassing materials such as paint, carpet and adhesives/ sealants - minimising formaldehyde in composite wood products - minimising PVC › external views and natural daylighting provided to a significant proportion of the work area › efficient lighting zoning and power density, equipment, controls and building Registered Green Star design enabling fit-outs to achieve the office interiors projects# Five Star Australian Building Greenhouse Rating (ABGR) 70 › provision of tenancy sub-meters 60 › peak energy demand reduction methods 50 including on-site renewable technologies Projects › use of workstations, floor finishes, chairs, 40 tables and storage units that have a high 30 proportion of recycled content and the 20 ability to be re-used or recycled 10 › use of Forest Stewardship Council (FSC) 0 certified timber and composite wood 2007 2004 2005 2006 products Year › large areas for recycling collection provided throughout the office space Source: Green Building Council Australia Workplaces of the Future – effective, expressive & exciting 5 Davis Langdon | Info Data |
  • 6. Case study Concepts currently at the forefront of office The open plan layout at 1 Bligh Street design and fit-out are represented by the 1 provides the following: Bligh Street development in Sydney. Flexibility – easily modified layout to suit The building distances itself from expansion or contraction of existing space 1 Bligh Street Sydney conventional design standards by or through acquisition of neighbouring Architect Achitectus achieving several complex and modern tenancies Office levels 29 building initiatives and an increased desire Mobility – workstations that are adaptable for improved Indoor Environment Quality 1,600m2 Average office in size and location to manage differential (IEQ). level (NLA) growth between various service delivery Unique features Six Star Green Star lines of the organisation Initiatives Double glazed façade Communication – faster interaction Passive cooling/air circulation › Double glazed skin façade providing between colleagues through immediate mixed mode ventilation (ie optional Elliptical plan 12% more awareness and contact, thereby efficient than a rectangular natural ventilation) drawing the addressing queries, discussion and building air through the inner façade using conclusions faster convective currents generated by the Source: Architectus Materials – reduction in construction northern exposure materials (socially and environmentally › Natural ventilation system utilising an responsible) atrium at the southern end of the building to exhaust ‘used’ air and allow cleaner Environment – improved IEQ, reducing non-recycled air to be passed through sick leave, improving productivity, the office space improving employee sentiment Passive circulation This fundamental concept of designing Variations in office fit-out design practices more intelligent office spaces moves closer can also yield variations in floor space to limiting ‘sick building syndrome’ from occupancy. workplaces and is the basis for reducing staff sick days and improving overall With current demand for office space productivity. Building designers are now exceeding supply and the imminent recognising this and constructing buildings introduction of an emissions trading to suit the flexibility desired by prospective scheme, adding to the costs of conducting tenants and employees to more open, business either directly or indirectly, collaborative and inviting work spaces. organisations will be seeking to improve productivity within the constraints of their The 1 Bligh Street development has environment. anticipated the increasing demand for improved working environments. Unlike Moving away from the traditional cellular traditional buildings where the office fit- office system to open plan systems can out was restricted by the base building achieve a reduction in greenhouse gas design, this development has been driven (GHG) output per occupant. Although by the realisation that tenants desire more current leading environmental rating collaborative and open environments. systems do not credit points for such Therefore the buildings function has been initiatives, the financial impact on designed to accommodate this trend to businesses not utilising their work-space open plan indicating the future of office effectively and efficiently will become Source: Architectus fit-outs. increasingly burdened by the rising cost of energy. Open plan design The table below is based on alternative architectural office fit-outs for the 1 Canada Square development in London: Typical office area types (person/sqm) Occupancy Circulation Open plan Support Cellular zone 19.8 Cellular 21% 40% 15% 24% (single offices) 12.6 Intermediate 20% 20% 35% 25% HR LIFT 11 layout Male HR Lifts 10.6 Open plan 16% 12% 45% 27% Atrium Balcony Female Source: Architectus 6 Workplaces of the Future – effective, expressive & exciting Davis Langdon | Info Data |
  • 7. The future of The changing needs of individuals are Design impacting on office fit-out designs. Designers and manufacturers are office fit-out Employees are exhibiting changing becoming increasingly aware of the impact expectations about the nature of work, and that fit-out lighting can have on occupants. as the work/life balance of staff becomes Light temperatures at the blue end of the more valued a growing sophistication in the spectrum between 6,000K and 8,000K design of office fit-out is emerging. increase activity and stimulate occupants, while colours at the warmer end of the spectrum (around 2,700K) help to increase The drivers of change concentration, relaxation and help soothe Global skills shortage workers. With the lowest levels of unemployment Aroma and sound are also being used on record, corporations are increasingly internationally to produce desired effects concerned about retaining staff and this from occupants – to enliven, to invigorate in itself is becoming a persuasive factor in and to reduce stress. fit-out decisions. Technology Skilled employees are sought after, highly The much touted ‘virtual office’ has long mobile and exert a considerable amount been considered as the next step in the of employment power. Smart firms know evolution of our workplaces. While we have that their office’s fit-out has the potential yet to see the virtual office take hold in any to attract and retain staff – a competitive significant manner, we acknowledge that advantage in this tight market. employees are certainly less dependent on Changing demographics the office itself. Boundaries between family and career are The internet, wireless technology set to blur further. and mobile computing have allowed employees to work in a less structured Smart employers have already recognised way and become increasingly mobile. that providing workplace crèches as a Simultaneously technology has allowed part of office fit-outs can set them aside in companies to track and monitor their attracting working mothers to remain in the employees more easily. workforce. At the other end of the spectrum there are In conclusion predictions that a similar groundswell of changing demographics will change the With all of these considerations in mind, the way we work. The aging population will see role of the office space itself is undergoing increased need for people to care for aging its own evolution. relatives at home – which in turn will see The office has become more of a cultural more home-based workers. centre, with workspaces, meeting spaces, The 24 hour workspace private spaces and chill out spaces – everything required for employees to meet In workplaces where long hours are de and socialise with their associates. rigueur, employers are recognising that a ‘rest space’ (where employees can Futurologists, looking into the nature of intermittently nap) can make productivity employment in 2018^, are still predicting an sense. exodus from the traditional workplace. Parents of newborns who have returned to However, with offices in most cases being work are better armed to cope with stress occupied more intensely for longer periods and deliver better productivity given the than ever before, it remains to be seen if opportunity for a lunchtime rest. this is a utopian dream or the future of our workspaces. The Journal of Sleep Research uncovered that short naps between 6 minutes and 50 minutes can substantially improve a worker’s ability to do work. Daytime naps improve procedural and motor memory. Endnotes: * Colliers International Office Tenant Survey (Colliers International 2006) # Green Building Council of Australia ^ Environmental Scanning – Trends affecting the world of work in 2018 (Chartered Management Institute March 2008) Copyright © Davis Langdon 2008 Printed stock: 55% recycled and 45% FSC approved, with ISO 14001 Environmental Accreditation Disclaimer: Davis Langdon does not give any warranty, nor accept any contractual, tortuous or other form of liability for any consequences, loss or damage which may occur as a result of others acting upon or using information contained in this report. Workplaces of the Future – effective, expressive & exciting 7 Davis Langdon | Info Data |
  • 8. Our Offices Australia Adelaide +61 8 8410 4044 Brisbane +61 7 3221 1788 Cairns +61 7 4051 7511 Canberra +61 2 6257 4428 Darwin +61 8 8981 8020 Hobart +61 3 6234 8788 Melbourne +61 3 9933 8800 Perth +61 8 9221 8870 Sunshine Coast +61 7 5479 2005 Sydney +61 2 9956 8822 Townsville +61 7 4721 2788 New Zealand Auckland +64 9 379 9903 Christchurch +64 3 366 2669 Wellington +64 4 472 7505 Our Services Project Services – Project Management, Cost Management, Building Surveying, Urban Planning, Specification Services Assurance Services – Infrastructure Verification Services, Technical Due Diligence, Property Performance Reporting, Make Good Assessments, Management System Development Certification Services – Third Party Certification to National and International Standards Sustainability Services – Strategies for New and Existing Buildings DAVIS LANGDON & SEAH INTERNATIONAL Arabian Gulf, Botswana, Brunei, China, England, Hong Kong, India, Indonesia, Ireland, Japan, Korea, Lebanon, Malaysia, Pakistan, Philippines, Russia, Saudi Arabia, Scotland, Singapore, South Africa, Spain, Thailand, United States of America, Vietnam and Wales www.davislangdon.com |