With a new office development cycle
underway and a buoyant leasing market
led by tenants seeking a ‘flight to quality’,
the office fit-out sector is alive and well.
Many cities are in fact recording vacancy
levels that have not been seen for 20 years.
In this Info Data, Davis Langdon reviews
the issues surrounding the future direction
of office fit-outs and examines the costs of
various projects in Melbourne, Sydney and
London.
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Workplaces Of The Future
1. Workplaces of
the Future
Effective, expressive & exciting
In this Info Data, Davis Langdon reviews the issues surrounding the future
direction of office fit-outs.
2. Introduction With a new office development cycle
underway and a buoyant leasing market
led by tenants seeking a ‘flight to quality’,
the office fit-out sector is alive and well.
Many cities are in fact recording vacancy
levels that have not been seen for 20 years.
In this Info Data, Davis Langdon reviews
the issues surrounding the future direction
of office fit-outs and examines the costs of
various projects in Melbourne, Sydney and
London.
Office fit-out In a survey* by Colliers International, staff › providing an appropriate density of small
retention and environmental performance power and data points to enable simple
sector were predicated to be the two biggest reconfiguration
drivers affecting building requirements over
Increasing the intensity with which
the coming years – 91% of respondents
workstations are used
indicating that workplace design had an
The use of workstations within many
impact on business success.
91% of respondents organisations can be as low as 50%.
This shift in thinking has come at a Methods such as hot-desking have been
time when many companies are paying used to counter this, however this will only
indicate that increased attention to the triple bottom line suit an organisation with a highly mobile
– the financial, social and environmental workforce.
workplace design aspects of their business. From this, a new
Effectiveness
generation of office designs are evolving
has an impact on – getting the most from employees by
that recognise the need for improved
providing space that supports the way they
environmental performance and respond to
do work
business success.* the evolving workplace and organisational
behaviour. The types of space that may be included
are:
Objectives › open plan space with a combination of
shared and owned desks
The creation of office space incorporates › limited cellular office space
many design variables including the › ‘touch down’ facilities
buildings themselves and their internal and › break-out areas
external environments. › study booths for concentrated work
› flexible meeting rooms
The way these variables affect an
› service areas for printing, photocopying,
organisation are many and varied and
and the like
can be structured under the following
objectives, any combination of which might Expression
define an organisation’s priorities: – the use of premises as an internal and
external expression of corporate values
Efficiency
– highest and best use of space The value of good design includes the way
that occupants respond to workplaces
Floor plate efficiency
that have strong expression and a relaxed
Selecting floor plates that have well
atmosphere. Corporations are using this
planned cores and a layout that permits
approach to connect their values to their
Description of user needs within efficient circulation.
workspace (DEGW) people, to create a workplace that has
Space planning efficiency energy and excitement, resulting in a
Den Club Optimising occupation densities by: happier and more productive workforce.
High
› greater use of open plan office space
› rationalising space standards
› actively managing on-floor storage The challenge is therefore to maintain the
› minimising requirements for secondary overall efficiency of space planning while
on-floor circulation increasing effectiveness by providing
Interaction
appropriate work settings, segregating
Minimising cost of churn
incompatible spaces and incorporating the
Office churn has become a significant cost
corporate values of the organisation into
for many companies. The cost of moving
Hive Cell the space.
staff can be minimised by:
› adopting universal space planning Typically the cost of providing a workplace
standards – having the ability to move is the second largest business cost after
people without the need to reconfigure employees so it makes commercial sense
workspaces is vital in reducing the cost to link office design to an organisation’s
Low
of churn performance. Improved working
› use of interchangeable furniture and efficiencies are now being costed to justify
partition systems increased fit-out budgets.
Low High
Autonomy
2 Workplaces of the Future – effective, expressive & exciting
Davis Langdon | Info Data |
3. Key cost drivers The key cost drivers associated with an Space requirements
Although general office space will take up
office fit-out will include the following:
the bulk of the floor plate, as described
Type of business and their space
earlier, the move towards more effective
requirements
designs will now see fit-out projects include
The differing requirements of tenants such
additional facilities such as breakout areas
as corporations, government departments
and ‘touch down’ facilities which have
and professional firms will have a major
different cost profiles.
impact on staff densities, floor plan (cellular
offices versus open plan), quality, flexibility The extent of services installation
The key cost drivers associated with
and servicing requirements.
services are as follows:
State of completion and suitability of
› level of density in open plan areas
base building
› amount of cellular space (ie offices,
The base building will typically be
meeting rooms)
complete to either of the following two
› level of security
standards when the tenant signs the lease:
› extent of AV installation
› finishes to landlord’s areas only, with
› IT requirements including redundancy
services distribution capped off at risers
for power and IT
to each of the floors (shell & core)
› as per above but including floor finishes, Overall programme
The overall project programme will
suspended ceilings and extension of
affect cost, particularly the amount of
mechanical and electrical services
acceleration required to meet client needs.
There is no standard definition of either and
Fast tracking the overall project programme
the works included will differ from building
can be achieved by:
to building.
› overlapping the design, procurement
The tenant can realise the following
and construction processes
potential benefits when leasing office
› shortening the tender period
space in the first condition particularly as a
› integrating the fit-out with the base
pre-let with integrated fit-out:
building works
› avoiding demolition and alteration costs
Cost penalties may be incurred for fast
› opportunities to change the base
tracking when compared to traditional
building specification without incurring
procurement methods although the
significant on-costs
benefits of faster occupation can offset
› potential for reduced programme
these additional costs.
durations
Incentives
The negotiation of any lease incentives,
such as landlord contribution to the fit-out
cost, rent free period, or similar, needs to
be considered.
Indicative The following should be used as a guide
only. Please note that the figures are based
building costs on the fit-out of a Melbourne CBD office
building with the base building works
having been completed to include floor
finishes, suspended ceilings and extension
of mechanical, fire and electrical services.
For regional or refurbishment variances,
Typical breakdown of elemental cost please contact Davis Langdon direct to
assess your specific requirements.
The below costs are current as at the first
quarter 2008.
Internal walls,
screens &
Workstations &
doors
furniture Business sector Cost per Net Lettable Area (NLA)
26%
26%
$1,000 – $1,300/m2
Government departments
Finishes
$1,200 – $1,400+/m2
Professional firms
8%
$1,200 – $1,600+/m2
Corporations
Fittings
12%
Typical professional fees cost 4.0% – 6.0+%
Services
14 – 17m2
Typical workspace per employee
34%
Exclusions: GST, AV equipment, IT equipment, removalist costs
Workplaces of the Future – effective, expressive & exciting 3
Davis Langdon | Info Data |
4. Managing risk on Fast track approaches such as
The office fit-out sector is complex and
challenging. Due to tight programmes and Construction Management or Two Stage
fit-out projects budgets the risk profiles can be high when Tendering can themselves be a significant
compared to other projects. As one of the source of risk if the design information
keys to delivering a successful project is does not keep pace with the construction
remaining flexible, it is important to have works. Because of this it is important that
the contracts, contingencies and change consultants and contractors with specialist
management procedures in place to allow expertise are selected.
If the programme this flexibility.
If the programme is particularly tight then
is particularly
Time is usually the most significant factor negotiation with a single contractor may be
for the client when choosing a procurement the best option. Some cost competitiveness
route. The overall programme will usually will be lost when compared to a single
tight then be dictated by business needs or lease stage tender. However the benefits of
dates. Lump Sum contracts, where the having contractor input into buildability,
negotiation with programme allows, can often deliver the value engineering and ordering of long
best results. To achieve this the design lead time items may well offset the premium
a single contractor information must be complete before paid. Through the benchmarking of project
construction starts. costs, competitiveness can be verified to
may be the best ensure value for money.
option.
Influence on cost
65% 25% 10%
Phase 3
Phase 1 Phase 2
Construction
Consideration of Design
procurement
options and project
definition
5% 10% 85%
Year:
Actual expenditure during each stage
Major decision-makers’ influence on risk
Owner requirements
Standards & criteria
Risk influence
Consultants
Design
Operation &
Contractor
maintenance
personnel
Project time
4 Workplaces of the Future – effective, expressive & exciting
Davis Langdon | Info Data |
5. Green fit-out The popularity of green/sustainable office
fit-outs is evidenced by the number of
projects registered for certification under
Green Star Office Interiors#. Through an
innovative and life-cycle approach to
design, these projects are demonstrating
... additional costs the sizeable business and environmental
benefits that can be achieved – without
are in the order of compromising commercial viability.
Projects are indicating that the additional
0–5% for a Five costs (above a comparable non green
project) are in the order of 0 – 5% for a Five
Star Green Star Star Green Star certified fit-out. However,
over time we would expect the perception
certified fit-out. of ‘extra’ cost to diminish as innovative
design becomes the norm and companies
realise the cost benefits of going green.
Some of the green initiatives that have
been used in green fit-out projects are as
follows:
› extensive commissioning and building
tuning
› providing tenant guides to enable the
fit-out to perform to its potential
› re-use and recycling of construction
waste
› provision of outside air exceeding the
requirements of the Australian Standard
› indoor air quality improved through:
- use of low-level off-gassing materials
such as paint, carpet and adhesives/
sealants
- minimising formaldehyde in composite
wood products
- minimising PVC
› external views and natural daylighting
provided to a significant proportion of the
work area
› efficient lighting zoning and power
density, equipment, controls and building
Registered Green Star
design enabling fit-outs to achieve the
office interiors projects#
Five Star Australian Building Greenhouse
Rating (ABGR) 70
› provision of tenancy sub-meters 60
› peak energy demand reduction methods
50
including on-site renewable technologies
Projects
› use of workstations, floor finishes, chairs, 40
tables and storage units that have a high 30
proportion of recycled content and the
20
ability to be re-used or recycled
10
› use of Forest Stewardship Council (FSC)
0
certified timber and composite wood
2007
2004 2005 2006
products
Year
› large areas for recycling collection
provided throughout the office space Source: Green Building Council Australia
Workplaces of the Future – effective, expressive & exciting 5
Davis Langdon | Info Data |
6. Case study Concepts currently at the forefront of office The open plan layout at 1 Bligh Street
design and fit-out are represented by the 1 provides the following:
Bligh Street development in Sydney.
Flexibility – easily modified layout to suit
The building distances itself from expansion or contraction of existing space
1 Bligh Street Sydney
conventional design standards by or through acquisition of neighbouring
Architect Achitectus
achieving several complex and modern tenancies
Office levels 29 building initiatives and an increased desire
Mobility – workstations that are adaptable
for improved Indoor Environment Quality
1,600m2
Average office
in size and location to manage differential
(IEQ).
level (NLA)
growth between various service delivery
Unique features Six Star Green Star lines of the organisation
Initiatives
Double glazed façade
Communication – faster interaction
Passive cooling/air circulation › Double glazed skin façade providing between colleagues through immediate
mixed mode ventilation (ie optional
Elliptical plan 12% more
awareness and contact, thereby
efficient than a rectangular natural ventilation) drawing the addressing queries, discussion and
building
air through the inner façade using conclusions faster
convective currents generated by the
Source: Architectus
Materials – reduction in construction
northern exposure
materials (socially and environmentally
› Natural ventilation system utilising an
responsible)
atrium at the southern end of the building
to exhaust ‘used’ air and allow cleaner
Environment – improved IEQ, reducing
non-recycled air to be passed through
sick leave, improving productivity,
the office space
improving employee sentiment
Passive circulation
This fundamental concept of designing
Variations in office fit-out design practices
more intelligent office spaces moves closer
can also yield variations in floor space
to limiting ‘sick building syndrome’ from
occupancy.
workplaces and is the basis for reducing
staff sick days and improving overall With current demand for office space
productivity. Building designers are now exceeding supply and the imminent
recognising this and constructing buildings introduction of an emissions trading
to suit the flexibility desired by prospective scheme, adding to the costs of conducting
tenants and employees to more open, business either directly or indirectly,
collaborative and inviting work spaces. organisations will be seeking to improve
productivity within the constraints of their
The 1 Bligh Street development has
environment.
anticipated the increasing demand for
improved working environments. Unlike Moving away from the traditional cellular
traditional buildings where the office fit- office system to open plan systems can
out was restricted by the base building achieve a reduction in greenhouse gas
design, this development has been driven (GHG) output per occupant. Although
by the realisation that tenants desire more current leading environmental rating
collaborative and open environments. systems do not credit points for such
Therefore the buildings function has been initiatives, the financial impact on
designed to accommodate this trend to businesses not utilising their work-space
open plan indicating the future of office effectively and efficiently will become
Source: Architectus
fit-outs. increasingly burdened by the rising cost of
energy.
Open plan design The table below is based on alternative
architectural office fit-outs for the 1 Canada
Square development in London:
Typical office area types
(person/sqm)
Occupancy
Circulation
Open plan
Support
Cellular
zone
19.8
Cellular 21% 40% 15% 24%
(single offices)
12.6
Intermediate 20% 20% 35% 25%
HR LIFT 11
layout
Male
HR Lifts
10.6
Open plan 16% 12% 45% 27%
Atrium
Balcony
Female
Source: Architectus
6 Workplaces of the Future – effective, expressive & exciting
Davis Langdon | Info Data |