Sales Meeting Objectives
Communication Channels
Organisational structure
Sales & Operations Planning
Interaction between Sales & Engineering / Operations
Engineering / Operations Strategy
Product Rationalisation

MTC
MTC
MTC
SU / MTC
SU
Overview of Woking Presentation –
Relative to Operations / Engineering
Request from Acteon, Level sales in 2014, Increase in EBITDA
to 22%. Overheads tasking required.
Pulse strategy:
Maintain Rental Delivery, Offer quick & guaranteed response
Increase efficiencies / Drive Up Margins
Continuous review of Make / Buy in production & Engineering.
Investigate further scope for Outsourcing
Risk Assessments – Review & Re-categorise
Use JSA cards – Offshore
Toolbox talks for all Operations

Sales meeting
Communication Channels
Organisational structure
QHSE
Develop KPI’s that are aligned to Shareholder / Customer
expectations covering:
Quality
Delivery
Factory / Overhead Costs

Health & Safety
Recruit QHSE Manager (Action Complete)
Review and update all Risk assessments, Train all staff on use and
implications
Create HSE policy document defining responsibilities
Implement JSA (Job Safety Analysis) form and train all staff on use (RK,
Q4 13)

Field failures
Create fast response team to perform route cause analysis on field
failures, and respond efficiently to client
Project Management
Project Management to take full ownership of Quality,
Delivery, Cost (MTC)
Develop hand over process between Sales & PM (MTC, Q1 14)
PM to consider acceptance of QDC at handover
Concerns / issues to be raised at earliest point

Training on project Cost Module (DK/BP, Q1 2014)
Prioritise QDC over “Hands On” (Project managers, Q1 2014)
Project Engineers transferred to Engineering to facilitate hands
off PM (Action Complete)
Project Engineer training to improve support from Engineering
(SU Q1, 2014)
Project Management
Sales & PM training on Contract Law (MTC, Q2 14)
Intent to avoid unnecessary risk with Customer Contracts

Project controls / gates (MTC, Q2 14)
Rules relating to Type / Qty of work with no contract / LOI

Financial targets (MTC, Q2 14)
Payment milestones
Variation Order opportunities
Kick back / Back to back terms on suppliers
Forecasted cost to complete for all projects every month
PM’s to be held accountable for contract financial performance
Project Management
Delivery performance / Workload (MTC, DK, BP, Q1 14)
Define roles / responsibilities and reporting structure of
Program Manager and Technical Manager (Sharing of Project
managers and Off Shore Support Team)
Create Process for Program Management that considers
capacity & capabilities of PM’s

Project Control (MTC Q3 2014)
Investigate opportunity to focus individual PM’s on market
segments
Develop tools to assess PM ability to manage multiple projects
Investigate opportunity to use “Top Solutions” as integrated PM
tool
Supply Chain
Visit, assess and discuss partnership sourcing with
Strategic Suppliers (MTC, EZ Q2 2014)
Draft and agree non-compete / non disclosure contract for
suppliers and seek Acteon approval
Update Purchase T&C to consider extended payment terms,
LD’s, etc (MTC, EZ Q4 2013)
Assess if existing supply base is able to support PSM growth
Identify new suppliers, develop strong partnerships aimed at
improving working capital, total costs, ownership of Quality
and sharing workload (design capabilities)
Consider kanban supply tools for stock control
Challenge make / buy decisions on Design and Production
(Ongoing)
Supply Chain
Fasteners / High Volume / Low Value products
Enter into agreement with suppliers for breadman (bin filling)
system – Linked with rationalisation of fasteners – See engineering

Low labour Cost Countries (MTC, Low priority)
Explore opportunities and risks associated with LLCC
Consider China / Mexico production to support Asia and North
/ South America growth, and reduce shipping costs
PCB , Machining, Fabrication, Design Expertise to be
considered
Production
Conduct Training on Lean Manufacturing (MTC, Q1 2014)
Conduct 5S exercise in Prod’n and FAT areas (MS, Q1.2014)
Shadow Boards
A place for everything, everything in its’ place

Stabilise Designs (SU / MTC, Ongoing through 2014)
Address quality issues in TIU, hardwired loggers, INTEGRIstick,
Mk 2 Loggers (Cross Calibration)
Create user friendly work instructions

Investigate / improve Goods In / Goods Out process
Production
Lean manufacturing (SU / MTC, Through 2014)
Automate calibration / Documentation (Birth Certs) process
Start Design for Manufacture / Calibration process
Conduct Lean / Quality Kaizen events including stakeholders
ERP

Production

Implement ERP system for Supply Chain and Production
Establish Part Number protocol for all parts
Use MRPII for creation and management of Item Masters and BOM
Production

Dashboard (MS Q1 2014)
Create Dashboards in production showing KPI’s, workload and
performance metrics

Investigate fit for purpose on production / calibration
equipment.
Toolbox Talks (MS, Ongoing)

Production

Regular toolbox talks with all personnel, covering HSE, Customer
satisfaction, workload, lean
R&D / Engineering
Design for Manufacture
Develop Modular concept on Mk3 Loggers to offer bespoke feel for
minimal costs

Make / Buy design activities through Sub-Contract base
Are sub-contractors able to share design burden for minimal costs?
Get PCB contractors to FAT & deliver 100% quality

Environmentally test all standard equipment for compliance
with ISO13628 Subsea Equipment
Product Rationalisation Plan
R&D / Engineering
Develop design protocol that uses agreed / reduced range of
standard fasteners and products
Investigate process for configuration and revision control (as
built drawings, Solid Works revision control)
CE approval / Other International specifications. Review of
legal compliance and develop a plan to meet regulations?
Other
Move to new factory
Consider increased costs & Acteon requirement for 2014 BP
Consider 5 Year growth plan
Are we able to short term sub-let?
Consider quiet room / Do Not Disturb offices to allow personnel
under pressure to concentrate

Personnel
Investigate new contract terms with temporary contractor
agencies – Tender to different agencies for competitive costs
Request free transfer from temp to perm after set period
Establish skills matrix and training plan to improve competency
and interest within the team
Site survey training for offshore technicians
2014 business plan Assumptions
Drilling market (Predominantly rental) increase will utilise
existing rental fleet so growth of 55% will not impact
Production Capacity
Production market reducing by 45%, will reduce Engineering
and PM workload.
Subsea Infrastructure
Thank You
www.pulse-monitoring.com

Contenu connexe

Tendances

Project cost control techniques
Project cost control techniquesProject cost control techniques
Project cost control techniquesWissem Amara
 
Car design, Project Management, MBA,
Car design, Project Management, MBA, Car design, Project Management, MBA,
Car design, Project Management, MBA, Shahnama Rasul
 
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...Nesma
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)Avijeet Suryavanshi
 
Us gsa (1992) value engineering program guide for design and construction -...
Us gsa (1992)   value engineering program guide for design and construction -...Us gsa (1992)   value engineering program guide for design and construction -...
Us gsa (1992) value engineering program guide for design and construction -...Wan Yusoff Wan Mahmood
 
Purchasing & Value Analysis
Purchasing & Value AnalysisPurchasing & Value Analysis
Purchasing & Value AnalysisThomas Tanel
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plantVikram Bakshi
 
Cost management
Cost managementCost management
Cost managementshkadry
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practicalAbada Saad
 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measuresPavan Kumar
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET Journal
 
Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#siliverseyr
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineeringajithsrc
 
Tatget Costing In Brief
Tatget Costing In BriefTatget Costing In Brief
Tatget Costing In Briefsunilrajpawar
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..smumbahelp
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJTapesh Ajmera
 

Tendances (20)

Project cost control techniques
Project cost control techniquesProject cost control techniques
Project cost control techniques
 
Car design, Project Management, MBA,
Car design, Project Management, MBA, Car design, Project Management, MBA,
Car design, Project Management, MBA,
 
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)
 
Us gsa (1992) value engineering program guide for design and construction -...
Us gsa (1992)   value engineering program guide for design and construction -...Us gsa (1992)   value engineering program guide for design and construction -...
Us gsa (1992) value engineering program guide for design and construction -...
 
133 whole life costing
133 whole life costing133 whole life costing
133 whole life costing
 
132 whole life costing (2)
132 whole life costing (2)132 whole life costing (2)
132 whole life costing (2)
 
Purchasing & Value Analysis
Purchasing & Value AnalysisPurchasing & Value Analysis
Purchasing & Value Analysis
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plant
 
Cost management
Cost managementCost management
Cost management
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practical
 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measures
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
 
Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
Tatget Costing In Brief
Tatget Costing In BriefTatget Costing In Brief
Tatget Costing In Brief
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..
 
Vave nttf- tech talk
Vave nttf- tech talk Vave nttf- tech talk
Vave nttf- tech talk
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 

Similaire à Operations & engineering presentation to sales meeting

Architecture presentation 9
Architecture presentation 9Architecture presentation 9
Architecture presentation 9Anoush Ghamsari
 
Whole life performance lecture south bank university
Whole life performance lecture   south bank universityWhole life performance lecture   south bank university
Whole life performance lecture south bank universityKim Newman
 
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)JiWoon Yi
 
Value Adds for City of Fayetteville
Value Adds for City of FayettevilleValue Adds for City of Fayetteville
Value Adds for City of FayettevilleKaren McIsaac
 
Resume_Jerry_Yang - 20170109
Resume_Jerry_Yang - 20170109Resume_Jerry_Yang - 20170109
Resume_Jerry_Yang - 20170109Jerry Yang
 
Resume - Sumit Jindal
Resume - Sumit JindalResume - Sumit Jindal
Resume - Sumit JindalSUMIT JINDAL
 
RESUME_difronzo_2016
RESUME_difronzo_2016RESUME_difronzo_2016
RESUME_difronzo_2016john difronzo
 
om ch 2.1 product & service design.ppt
om ch 2.1 product & service design.pptom ch 2.1 product & service design.ppt
om ch 2.1 product & service design.pptYosefSisay3
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )S. Ravi Shankar
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERShafeek Nazar
 

Similaire à Operations & engineering presentation to sales meeting (20)

Architecture presentation 9
Architecture presentation 9Architecture presentation 9
Architecture presentation 9
 
Whole life performance lecture south bank university
Whole life performance lecture   south bank universityWhole life performance lecture   south bank university
Whole life performance lecture south bank university
 
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
 
Value Adds for City of Fayetteville
Value Adds for City of FayettevilleValue Adds for City of Fayetteville
Value Adds for City of Fayetteville
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
Resume_Jerry_Yang - 20170109
Resume_Jerry_Yang - 20170109Resume_Jerry_Yang - 20170109
Resume_Jerry_Yang - 20170109
 
Resume - Sumit Jindal
Resume - Sumit JindalResume - Sumit Jindal
Resume - Sumit Jindal
 
Project Planning & Feasibility Study
Project Planning & Feasibility StudyProject Planning & Feasibility Study
Project Planning & Feasibility Study
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 
RESUME_difronzo_2016
RESUME_difronzo_2016RESUME_difronzo_2016
RESUME_difronzo_2016
 
Prashanth naik cv
Prashanth naik  cvPrashanth naik  cv
Prashanth naik cv
 
Intake Process Itpmo
Intake Process ItpmoIntake Process Itpmo
Intake Process Itpmo
 
Resume
ResumeResume
Resume
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
om ch 2.1 product & service design.ppt
om ch 2.1 product & service design.pptom ch 2.1 product & service design.ppt
om ch 2.1 product & service design.ppt
 
Resume-Kausik
Resume-KausikResume-Kausik
Resume-Kausik
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 

Dernier

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 

Dernier (20)

Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 

Operations & engineering presentation to sales meeting

  • 1. Operations / Engineering Presentation to Sales meeting December 2013
  • 2. Sales Meeting Objectives Communication Channels Organisational structure Sales & Operations Planning Interaction between Sales & Engineering / Operations Engineering / Operations Strategy Product Rationalisation MTC MTC MTC SU / MTC SU
  • 3. Overview of Woking Presentation – Relative to Operations / Engineering Request from Acteon, Level sales in 2014, Increase in EBITDA to 22%. Overheads tasking required. Pulse strategy: Maintain Rental Delivery, Offer quick & guaranteed response Increase efficiencies / Drive Up Margins Continuous review of Make / Buy in production & Engineering. Investigate further scope for Outsourcing Risk Assessments – Review & Re-categorise Use JSA cards – Offshore Toolbox talks for all Operations Sales meeting Communication Channels Organisational structure
  • 4. QHSE Develop KPI’s that are aligned to Shareholder / Customer expectations covering: Quality Delivery Factory / Overhead Costs Health & Safety Recruit QHSE Manager (Action Complete) Review and update all Risk assessments, Train all staff on use and implications Create HSE policy document defining responsibilities Implement JSA (Job Safety Analysis) form and train all staff on use (RK, Q4 13) Field failures Create fast response team to perform route cause analysis on field failures, and respond efficiently to client
  • 5. Project Management Project Management to take full ownership of Quality, Delivery, Cost (MTC) Develop hand over process between Sales & PM (MTC, Q1 14) PM to consider acceptance of QDC at handover Concerns / issues to be raised at earliest point Training on project Cost Module (DK/BP, Q1 2014) Prioritise QDC over “Hands On” (Project managers, Q1 2014) Project Engineers transferred to Engineering to facilitate hands off PM (Action Complete) Project Engineer training to improve support from Engineering (SU Q1, 2014)
  • 6. Project Management Sales & PM training on Contract Law (MTC, Q2 14) Intent to avoid unnecessary risk with Customer Contracts Project controls / gates (MTC, Q2 14) Rules relating to Type / Qty of work with no contract / LOI Financial targets (MTC, Q2 14) Payment milestones Variation Order opportunities Kick back / Back to back terms on suppliers Forecasted cost to complete for all projects every month PM’s to be held accountable for contract financial performance
  • 7. Project Management Delivery performance / Workload (MTC, DK, BP, Q1 14) Define roles / responsibilities and reporting structure of Program Manager and Technical Manager (Sharing of Project managers and Off Shore Support Team) Create Process for Program Management that considers capacity & capabilities of PM’s Project Control (MTC Q3 2014) Investigate opportunity to focus individual PM’s on market segments Develop tools to assess PM ability to manage multiple projects Investigate opportunity to use “Top Solutions” as integrated PM tool
  • 8. Supply Chain Visit, assess and discuss partnership sourcing with Strategic Suppliers (MTC, EZ Q2 2014) Draft and agree non-compete / non disclosure contract for suppliers and seek Acteon approval Update Purchase T&C to consider extended payment terms, LD’s, etc (MTC, EZ Q4 2013) Assess if existing supply base is able to support PSM growth Identify new suppliers, develop strong partnerships aimed at improving working capital, total costs, ownership of Quality and sharing workload (design capabilities) Consider kanban supply tools for stock control Challenge make / buy decisions on Design and Production (Ongoing)
  • 9. Supply Chain Fasteners / High Volume / Low Value products Enter into agreement with suppliers for breadman (bin filling) system – Linked with rationalisation of fasteners – See engineering Low labour Cost Countries (MTC, Low priority) Explore opportunities and risks associated with LLCC Consider China / Mexico production to support Asia and North / South America growth, and reduce shipping costs PCB , Machining, Fabrication, Design Expertise to be considered
  • 10. Production Conduct Training on Lean Manufacturing (MTC, Q1 2014) Conduct 5S exercise in Prod’n and FAT areas (MS, Q1.2014) Shadow Boards A place for everything, everything in its’ place Stabilise Designs (SU / MTC, Ongoing through 2014) Address quality issues in TIU, hardwired loggers, INTEGRIstick, Mk 2 Loggers (Cross Calibration) Create user friendly work instructions Investigate / improve Goods In / Goods Out process
  • 11. Production Lean manufacturing (SU / MTC, Through 2014) Automate calibration / Documentation (Birth Certs) process Start Design for Manufacture / Calibration process Conduct Lean / Quality Kaizen events including stakeholders ERP Production Implement ERP system for Supply Chain and Production Establish Part Number protocol for all parts Use MRPII for creation and management of Item Masters and BOM
  • 12. Production Dashboard (MS Q1 2014) Create Dashboards in production showing KPI’s, workload and performance metrics Investigate fit for purpose on production / calibration equipment. Toolbox Talks (MS, Ongoing) Production Regular toolbox talks with all personnel, covering HSE, Customer satisfaction, workload, lean
  • 13. R&D / Engineering Design for Manufacture Develop Modular concept on Mk3 Loggers to offer bespoke feel for minimal costs Make / Buy design activities through Sub-Contract base Are sub-contractors able to share design burden for minimal costs? Get PCB contractors to FAT & deliver 100% quality Environmentally test all standard equipment for compliance with ISO13628 Subsea Equipment Product Rationalisation Plan
  • 14. R&D / Engineering Develop design protocol that uses agreed / reduced range of standard fasteners and products Investigate process for configuration and revision control (as built drawings, Solid Works revision control) CE approval / Other International specifications. Review of legal compliance and develop a plan to meet regulations?
  • 15.
  • 16. Other Move to new factory Consider increased costs & Acteon requirement for 2014 BP Consider 5 Year growth plan Are we able to short term sub-let? Consider quiet room / Do Not Disturb offices to allow personnel under pressure to concentrate Personnel Investigate new contract terms with temporary contractor agencies – Tender to different agencies for competitive costs Request free transfer from temp to perm after set period Establish skills matrix and training plan to improve competency and interest within the team Site survey training for offshore technicians
  • 17. 2014 business plan Assumptions Drilling market (Predominantly rental) increase will utilise existing rental fleet so growth of 55% will not impact Production Capacity Production market reducing by 45%, will reduce Engineering and PM workload. Subsea Infrastructure