1. Damani Mital
 Corridor:
A Corridor is a set of essentially parallel & competing
facilities & modes with cross – connectors that serve trips
between two designated points. It may contain rural
highway ,urban street ,pedestrian ,etc.


Corridor Traffic forecasting



Corridor Traffic Study



Count



Segment



Point
o Segment: Segments are stretches of a facility in which the traffic
demand and capacity conditions are relatively constant.
o Point: Points are locations at the beginning and end of each segment, at
which traffic enters, leaves, or crosses the facility.

o Freeway: A freeway is defined as a divided highway with full control of
access and having two uninterrupted flow or more lanes for the exclusive
use of traffic in each direction. All the access is through a ramp a separate
entrance or exit way to or from the Freeway.
o Segment Capacity :
Capacity is the maximum hourly flow rate, at which persons or
vehicles reasonably can be expected to traverse a point or a
uniform section, of a lane or roadway during a given time period,
under prevailing roadway, traffic and control conditions. But
sometimes the demand may exceed the capacity during peak
hours, which will bring Queue delay. Thus demand adjustment is
required and is done as follows: Adjusting for excess demand
from the capacity is necessary only if working with forecasted or
estimated demands rather than counted traffic. If the demand
exceeds the capacity at any point in time or space, then the
excess demand must be stored on the segment and carried over
to the following hour. The downstream demands are reduced by
the amount of excess demand stored on the segment. The
algorithm starts with the entry gate segments on the periphery of
the corridor and works inward until all segment demands have
been checked against their capacity.
o Corridor Identification Steps:
 Step One: Data Collection & Review -1. Collect and review various background information.
2. Review existing plans and recommendations for the study area.
 Step Two: Identify Issues & Planning Concepts -3. Identify planning process issues.

4. Visualize issues and identify alternative concepts.
5. Review and discuss background information, issues and concepts with
community.
o Corridor Identification steps..
 Step Three: Develop & Choose Alternatives -6. Identify land use alternatives.
7. Present & review land use alternatives with community.

8. Evaluate alternatives.
9. Choose recommended alternative.
 Step Four: Create Plan -10. Identify implementation priorities.
11. Review draft plan, recommended alternative, and implementation
with community.

12. Draft & adopt plan.
o Corridor Analysis :
Corridor analysis is the method of combining
point , segment & Facility analysis to estimate
the overall performance of multimodal corridor.
Mostly the performance measure of any
corridor are determined by calculating its
capacity ,the travel & queue delay in the
given section. Since this tool is required for
multi facility & multimodal transportation
system mostly it covers highway subsystem (
freeways,rural highways & urban streets) &
transit.
o

Queue Delay :

The queuing delay only the amount due to demand
exceeding capacity is computed for all segments. The
queuing delay is computed for each direction of each
segment and time period only when demand is greater
than Capacity.

o Free flow Travel time:
The segment free-flow traversal times are obtained by dividing the
length of the segment by the estimated free-flow speed (FFS).
Cordon Line Survey
 Objective
To understand the present internal-external travel patterns
(Origin - Destination matrix) The survey supplements the
Home Visit Survey.

 Methodology


Traffic Count Survey



Interview Survey (Roads, Railway, Airport)
o Screen Line Survey :
o Objective

The estimated OD matrix from PT Survey will be verified by
comparing estimated demand on the selected links in the
traffic simulation with the counted traffic volume on the
screen line
o Methodology
Traffic Count (Hourly traffic volume by vehicle type by
direction, 24 hours and 16 hours)
o Screen Line Analysis :
o Screen line analysis compare the results of trip
assignment with the traffic counts on roads. More
precisely, it is a process of comparing the directional
sum of ground count traffic volumes across a screen line
or a cordon line with the directional sum of the assigned
traffic volumes across the same screen line or corridor
line.

o

Screen line analysis is a useful tool for the calibration of
trip assignment models, & it can also be used for more
general purpose of calculating flows that cross a screen
line .
o Conclusion :

o Delay due to traffic congestion accounts 28.9%
(PHD/PHT) of the total number of travel.
o No any over saturation (i.e., no Queue delay). So that
the sub system is good.
o Though many vehicles are passing without stopping
there is operational failure (there are few vehicles
passing the section with stopping).
Thank you !!!

When Civil Dig The Earth,
Even Earth Has To Quake …

Contenu connexe

Tendances

Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignRiaz Zalil
 
Corridor Identification UTS
Corridor Identification UTSCorridor Identification UTS
Corridor Identification UTSfreshwoody patel
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination surveyraj balar
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination surveykezangkl11
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveysDhwani Shah
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit systemEddy Ankit Gangani
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineeringSatyapal Singh
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanencekrishnacp
 
Classification of station
Classification of stationClassification of station
Classification of stationGiri Guru
 
Screen line and Corrider Line Analysis
Screen line and Corrider Line AnalysisScreen line and Corrider Line Analysis
Screen line and Corrider Line AnalysisAbhishek Kansara
 

Tendances (20)

Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement Design
 
Corridor Identification UTS
Corridor Identification UTSCorridor Identification UTS
Corridor Identification UTS
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Sight distance
Sight distanceSight distance
Sight distance
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination survey
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination survey
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineering
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Classification of station
Classification of stationClassification of station
Classification of station
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Screen line and Corrider Line Analysis
Screen line and Corrider Line AnalysisScreen line and Corrider Line Analysis
Screen line and Corrider Line Analysis
 
O & d survey
O & d survey O & d survey
O & d survey
 

Similaire à Transportation Plan Preparation and Corridor Analysis

ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptxCivilhod15
 
Traffic impact assessment
Traffic impact assessmentTraffic impact assessment
Traffic impact assessmentVivek Pai
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Civil Zone
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Piyush KumAr
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineeringholegajendra
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highwayBharat Upadhyay
 
Traffic analysis and Road Widening
Traffic analysis and Road WideningTraffic analysis and Road Widening
Traffic analysis and Road WideningAbhinav Pateriya
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsAbhinav Pateriya
 
Traffic volume count .pptx
Traffic volume count                             .pptxTraffic volume count                             .pptx
Traffic volume count .pptxAshishGahlawat9
 
Exit Presentation 2.pptx
Exit Presentation 2.pptxExit Presentation 2.pptx
Exit Presentation 2.pptxYitbarekSisay
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxSoKhit1
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdfsandipanpaul16
 
Urban Traffic Estimation & Optimization: An Overview
Urban Traffic Estimation & Optimization: An OverviewUrban Traffic Estimation & Optimization: An Overview
Urban Traffic Estimation & Optimization: An OverviewRakedet
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studiesJanak Parmar
 
Transportation planning 1
Transportation planning 1Transportation planning 1
Transportation planning 1EngrABRahimoon
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planningPratyush Kumar
 

Similaire à Transportation Plan Preparation and Corridor Analysis (20)

Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptx
 
Traffic impact assessment
Traffic impact assessmentTraffic impact assessment
Traffic impact assessment
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief
 
Unit 3
Unit 3Unit 3
Unit 3
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highway
 
Traffic analysis and Road Widening
Traffic analysis and Road WideningTraffic analysis and Road Widening
Traffic analysis and Road Widening
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of Roads
 
Traffic volume count .pptx
Traffic volume count                             .pptxTraffic volume count                             .pptx
Traffic volume count .pptx
 
Exit Presentation 2.pptx
Exit Presentation 2.pptxExit Presentation 2.pptx
Exit Presentation 2.pptx
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
 
Traffic Engineering.pptx
Traffic Engineering.pptxTraffic Engineering.pptx
Traffic Engineering.pptx
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf
 
Traffic Speed Analysis
Traffic Speed   AnalysisTraffic Speed   Analysis
Traffic Speed Analysis
 
Urban Traffic Estimation & Optimization: An Overview
Urban Traffic Estimation & Optimization: An OverviewUrban Traffic Estimation & Optimization: An Overview
Urban Traffic Estimation & Optimization: An Overview
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studies
 
Transportation planning 1
Transportation planning 1Transportation planning 1
Transportation planning 1
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planning
 

Plus de Mital Damani

Final seminar on its
Final seminar on itsFinal seminar on its
Final seminar on itsMital Damani
 
ITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital DamaniITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital DamaniMital Damani
 
Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Mital Damani
 
Research summary on ITS in Europe
Research summary on ITS in Europe Research summary on ITS in Europe
Research summary on ITS in Europe Mital Damani
 
Greenbuildings 140121064151 phpapp02
Greenbuildings 140121064151 phpapp02Greenbuildings 140121064151 phpapp02
Greenbuildings 140121064151 phpapp02Mital Damani
 
Research paper on TQM
Research paper on TQM Research paper on TQM
Research paper on TQM Mital Damani
 
Presentation on boring
Presentation on boringPresentation on boring
Presentation on boringMital Damani
 

Plus de Mital Damani (16)

Final seminar on its
Final seminar on itsFinal seminar on its
Final seminar on its
 
ITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital DamaniITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital Damani
 
Quality standards
Quality standardsQuality standards
Quality standards
 
Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)
 
Research summary on ITS in Europe
Research summary on ITS in Europe Research summary on ITS in Europe
Research summary on ITS in Europe
 
Sqcm
SqcmSqcm
Sqcm
 
Greenbuildings 140121064151 phpapp02
Greenbuildings 140121064151 phpapp02Greenbuildings 140121064151 phpapp02
Greenbuildings 140121064151 phpapp02
 
Area & volume 2
Area & volume  2Area & volume  2
Area & volume 2
 
Area & volume 1
Area & volume  1Area & volume  1
Area & volume 1
 
Area & volume 3
Area & volume  3Area & volume  3
Area & volume 3
 
Surveying
SurveyingSurveying
Surveying
 
Research paper on TQM
Research paper on TQM Research paper on TQM
Research paper on TQM
 
Tqm
TqmTqm
Tqm
 
Kaizen2
Kaizen2Kaizen2
Kaizen2
 
Minus 1
Minus 1Minus 1
Minus 1
 
Presentation on boring
Presentation on boringPresentation on boring
Presentation on boring
 

Dernier

Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 

Dernier (20)

Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 

Transportation Plan Preparation and Corridor Analysis

  • 2.  Corridor: A Corridor is a set of essentially parallel & competing facilities & modes with cross – connectors that serve trips between two designated points. It may contain rural highway ,urban street ,pedestrian ,etc.  Corridor Traffic forecasting  Corridor Traffic Study  Count  Segment  Point
  • 3. o Segment: Segments are stretches of a facility in which the traffic demand and capacity conditions are relatively constant. o Point: Points are locations at the beginning and end of each segment, at which traffic enters, leaves, or crosses the facility. o Freeway: A freeway is defined as a divided highway with full control of access and having two uninterrupted flow or more lanes for the exclusive use of traffic in each direction. All the access is through a ramp a separate entrance or exit way to or from the Freeway.
  • 4. o Segment Capacity : Capacity is the maximum hourly flow rate, at which persons or vehicles reasonably can be expected to traverse a point or a uniform section, of a lane or roadway during a given time period, under prevailing roadway, traffic and control conditions. But sometimes the demand may exceed the capacity during peak hours, which will bring Queue delay. Thus demand adjustment is required and is done as follows: Adjusting for excess demand from the capacity is necessary only if working with forecasted or estimated demands rather than counted traffic. If the demand exceeds the capacity at any point in time or space, then the excess demand must be stored on the segment and carried over to the following hour. The downstream demands are reduced by the amount of excess demand stored on the segment. The algorithm starts with the entry gate segments on the periphery of the corridor and works inward until all segment demands have been checked against their capacity.
  • 5. o Corridor Identification Steps:  Step One: Data Collection & Review -1. Collect and review various background information. 2. Review existing plans and recommendations for the study area.  Step Two: Identify Issues & Planning Concepts -3. Identify planning process issues. 4. Visualize issues and identify alternative concepts. 5. Review and discuss background information, issues and concepts with community.
  • 6. o Corridor Identification steps..  Step Three: Develop & Choose Alternatives -6. Identify land use alternatives. 7. Present & review land use alternatives with community. 8. Evaluate alternatives. 9. Choose recommended alternative.  Step Four: Create Plan -10. Identify implementation priorities. 11. Review draft plan, recommended alternative, and implementation with community. 12. Draft & adopt plan.
  • 7. o Corridor Analysis : Corridor analysis is the method of combining point , segment & Facility analysis to estimate the overall performance of multimodal corridor. Mostly the performance measure of any corridor are determined by calculating its capacity ,the travel & queue delay in the given section. Since this tool is required for multi facility & multimodal transportation system mostly it covers highway subsystem ( freeways,rural highways & urban streets) & transit.
  • 8. o Queue Delay : The queuing delay only the amount due to demand exceeding capacity is computed for all segments. The queuing delay is computed for each direction of each segment and time period only when demand is greater than Capacity. o Free flow Travel time: The segment free-flow traversal times are obtained by dividing the length of the segment by the estimated free-flow speed (FFS).
  • 9. Cordon Line Survey  Objective To understand the present internal-external travel patterns (Origin - Destination matrix) The survey supplements the Home Visit Survey.  Methodology  Traffic Count Survey  Interview Survey (Roads, Railway, Airport)
  • 10.
  • 11. o Screen Line Survey : o Objective The estimated OD matrix from PT Survey will be verified by comparing estimated demand on the selected links in the traffic simulation with the counted traffic volume on the screen line o Methodology Traffic Count (Hourly traffic volume by vehicle type by direction, 24 hours and 16 hours)
  • 12.
  • 13. o Screen Line Analysis : o Screen line analysis compare the results of trip assignment with the traffic counts on roads. More precisely, it is a process of comparing the directional sum of ground count traffic volumes across a screen line or a cordon line with the directional sum of the assigned traffic volumes across the same screen line or corridor line. o Screen line analysis is a useful tool for the calibration of trip assignment models, & it can also be used for more general purpose of calculating flows that cross a screen line .
  • 14. o Conclusion : o Delay due to traffic congestion accounts 28.9% (PHD/PHT) of the total number of travel. o No any over saturation (i.e., no Queue delay). So that the sub system is good. o Though many vehicles are passing without stopping there is operational failure (there are few vehicles passing the section with stopping).