Energy Efficiency Quality Assurance:
Past, Present, and Future
Dave Bohac | Director of Research
Jim Fitzgerald | Senior Analyst
Carl Nelson | Manager of Residential Programs
Isaac Smith | Program Assistant
3/6/2014
Pg. 2
Pg. 3
Pg. 4
Meeting Utility Resource Needs with Solar:
The Merits of the Aurora Solar Project
Wednesday, March 19th
11:00 – 12:00 CST
Betsy Engelking | Geranimo Energy Vice President
Nathan Franzen | Geranimo Director of Solar
• Introduction to the Aurora Solar Project that has
been selected in MN
• The design and technical merits of the proposed
project
Pg. 5
Presenters & Overview
• Experience that have informed best practices
• Innovations currently being used in the field
• Future implementation opportunities
Dave Bohac
Director of Research
Jim Fitzgerald
Senior Research Analyst
Carl Nelson
Manager of Residential
Programs
Isaac Smith
Program Assistant
Pg. 6
Operation Insulation
• Beginning of Quality Assurance (QA) at CEE
• ~1983
Pg. 7
Community Based Outreach
• One-stop shop for home improvement
Pg. 8
Partnered with contractors
• Agreed to standards
Pg. 9
Post Inspection
• Every job was inspected
• Borrowed IR camera from
fire department and Hughes
Aircraft
• Cooled with argon gas
Pg. 10
Operation Insulation
• Over 4,000 homes participated
• Funded by Minnegasco
Pg. 11
Sound Insulation Program
• Began in 1992 to reduce airport noise
• CEE hired to administer the program
• Funded by the Federal Aviation Administration (FAA) and
Metropolitan Airports Commission (MAC)
• Over 13,000 homes participated over next decade
• Work completed:
• Acoustic windows and doors
• Air-Conditioning
• Attic insulation and air-sealing
• Wall insulation
Pg. 12
Health and Safety
• 1996 Headline
Pg. 13
Health and Safety
• Indoor Air Quality (IAQ) issues discovered in treated
homes
• 3,200 homes had completed the program by 1996
• Issues of concern:
• Gas appliance combustion spillage
• Gas appliance carbon monoxide
• House tightness/ventilation
Pg. 14
Program Response
• Temporarily suspend program
• Assemble panel of international experts
• Led by Dave Bohac
• Design process to predict and resolve possible issues
• CEE developed inspection and testing standards
• “Worst-case” testing of natural and induced-draft appliances
• Carbon monoxide testing for each appliance
• Pass/Fail limits set
• Compare vent system size to code
• Establish house tightness criteria
Pg. 15
Ventilation standards
• Sound ventilation
requirement developed
• Air leakage (cfm50) <
Floor area (sf)
• Add continuous exhaust
ventilation
• Predicting the future
• 10% to 35% reduction
expected
Pg. 16
Problem Solved
• Detailed inspection
helped reduce post-
treatment issues
• 3,200 treated homes
were re-inspected
• Pre-tests found many
of the problems were
pre-existing
Pg. 17
Contractor Quality Assurance
• Homes were open for
bid on monthly cycle
• 35-75 homes per month
• In order to bid:
• Contactors agree to
standards
• Complete contractor
entry and certification
• On-going QA
Pg. 18
Why is it important to have an entry
process for new contractors?
• Initial process was incomplete
• Two process issues
• Contractor agreement to meet program work requirements
• Contractor’s staff may not know requirements or how to meet
them
• Entry process informs contractors and installers
• Pre bid demonstration on first jobs
• Crew has chance to demonstrate compliance
• Required tasks were the same as the QA test by CEE
Pg. 19
Contractor Entry
• 5 test jobs before contractor on bid list
• QA assessor verifies skills on-site
• Required skills
• Effective air sealing of bypasses
• Dense-pack insulation, equipment test
• Blower door test
• Contractor training as necessary
• Bid limit removed once skills verified
• Basic certification of each installer recorded
Pg. 20
Quality Assurance
• Every job inspected using
blower door and IR camera
• Contractor Requirements
• Maintain 90% pass rate
• Correct jobs within 14 days
• Failure to comply => off bid list
If necessary, another contractor
completed all work before
CEE final test
• Over 13,000 homes
inspected complete in full
compliance
Pg. 21
Evolution of Standards
• Not part of code at the time, only voluntary standards
• “best practices” developed in funded pilot programs
• Had to be adapted locally
• Learned from other programs
• Adapted this process for other Sound Insulation
programs, including Milwaukee
• This process contributed to the development of
national standards
• M200/advanced WX
• BPI and NYSERDA
Pg. 22
5 Keys of QA program
1. Installation Standards
2. Contractor Participation
Agreement
3. Verify contractor ability
4. Verify work completed to
standards
5. Contractor Accountability
Pg. 23
Authorized Insulation Contractor Program
1. Installation Standards
• Adapted from Sound Insulation Program
2. Contractor Participation Agreement
• Own required equipment
• Complete work to standards
• QA visits and callback completion
• Blower door and combustion safety testing
• Customer service
Note: Contractor needs incentive
Pg. 24
Authorized Insulation Contractor Program
3. Verify contractor ability
• Building Performance Institute (BPI) Installer certification
• Official name: Residential Building Envelope Whole House Air
Leakage Control Installer Certification
• Skills based certification developed by Jim Fitzgerald
• Certified employee must be on-site
Pg. 25
Authorized Insulation Contractor Program
4. Verify work completed to standards
• QA phone visits
• Complete on initial jobs
• QA on-site visits
• Check a sample of jobs
• QA site visit app
• Data entered on-site using iPad
• Database of info
• Generates visit report including score
• Provides contractor feedback
Pg. 26
Authorized Insulation Contractor Program
5. Contractor Accountability
• Requirements
• Maintain acceptable job score
• Complete required callback work
• Probation
• Additional QA phone visits
• On-line training portal
• Also used during contractor entry
• Suspension
• Removed from program if requirements are not met
Pg. 27
Authorized Insulation Contractor Program
• Further Details on program website
• http://mncee.org/AIC/
• Questions?
• ismith@mncee.org
Pg. 28
Future trends in residential QA
• Increased need for QA -- utilities need insulation programs
& rebates to meet savings goals, and potential for bad
contractors not going away
• But, delivered at low cost --- Long-term low natural gas
prices drive increased need for efficiency in delivery of QA
services
• Technology can lower cost and enhance performance
• Software
• Web-based training
• Increased need for coordination
• Regional technical committees for coordination / continued
refinement of standards
Dave Bohac | dbohac@mncee.org
Jim Fitzgerald | jfitzgerald@mncee.org
Carl Nelson | cnelson@mncee.org
Isaac Smith | ismith@mncee.org
Question & Answer
Webinar Link:
http://www.mncee.org/Innovation-Exchange/Resource-Center/
Pg. 31

Contenu connexe

Tendances

INDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCINDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCInder Singh
 
ETI Wastewater Consulting Presentation
ETI Wastewater Consulting PresentationETI Wastewater Consulting Presentation
ETI Wastewater Consulting PresentationBasilDonaldson
 
Mick Lovett Resume 2015
Mick Lovett Resume 2015Mick Lovett Resume 2015
Mick Lovett Resume 2015Micheal Lovett
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
Process innovation - Key success factor in Government Projects - Scrum Gather...
Process innovation - Key success factor in Government Projects - Scrum Gather...Process innovation - Key success factor in Government Projects - Scrum Gather...
Process innovation - Key success factor in Government Projects - Scrum Gather...Remi Hansen
 
Project Site management - Facade perspective
Project Site management - Facade perspectiveProject Site management - Facade perspective
Project Site management - Facade perspectiveArshad khan
 
Gas Service Excellence Presentation 20 May 2010 Ms Final
Gas Service Excellence Presentation   20 May 2010   Ms   FinalGas Service Excellence Presentation   20 May 2010   Ms   Final
Gas Service Excellence Presentation 20 May 2010 Ms Finalmseaborn
 
Building inspections
Building inspectionsBuilding inspections
Building inspectionsjhonboric12
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateSteve Williams
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016John Gantz
 
Rene Contreras CV (eng)
Rene Contreras CV (eng)Rene Contreras CV (eng)
Rene Contreras CV (eng)Rene Contreras
 
Tyler Garlock Resume
Tyler Garlock ResumeTyler Garlock Resume
Tyler Garlock ResumeTyler Garlock
 
Operations department org chart 2011
Operations department org chart 2011Operations department org chart 2011
Operations department org chart 2011Beckyp27
 

Tendances (20)

Portfolio
PortfolioPortfolio
Portfolio
 
INDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCINDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QC
 
ETI Wastewater Consulting Presentation
ETI Wastewater Consulting PresentationETI Wastewater Consulting Presentation
ETI Wastewater Consulting Presentation
 
Mick Lovett Resume 2015
Mick Lovett Resume 2015Mick Lovett Resume 2015
Mick Lovett Resume 2015
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Process innovation - Key success factor in Government Projects - Scrum Gather...
Process innovation - Key success factor in Government Projects - Scrum Gather...Process innovation - Key success factor in Government Projects - Scrum Gather...
Process innovation - Key success factor in Government Projects - Scrum Gather...
 
OMPRAKASH_Resume
OMPRAKASH_ResumeOMPRAKASH_Resume
OMPRAKASH_Resume
 
Project Site management - Facade perspective
Project Site management - Facade perspectiveProject Site management - Facade perspective
Project Site management - Facade perspective
 
Gas Service Excellence Presentation 20 May 2010 Ms Final
Gas Service Excellence Presentation   20 May 2010   Ms   FinalGas Service Excellence Presentation   20 May 2010   Ms   Final
Gas Service Excellence Presentation 20 May 2010 Ms Final
 
Building inspections
Building inspectionsBuilding inspections
Building inspections
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
2015 Resume (1)
2015 Resume (1)2015 Resume (1)
2015 Resume (1)
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016
 
Host-Based IDS LLifecycle
Host-Based IDS LLifecycleHost-Based IDS LLifecycle
Host-Based IDS LLifecycle
 
Steven Vukusic Resume
Steven Vukusic ResumeSteven Vukusic Resume
Steven Vukusic Resume
 
Rene Contreras CV (eng)
Rene Contreras CV (eng)Rene Contreras CV (eng)
Rene Contreras CV (eng)
 
Tyler Garlock Resume
Tyler Garlock ResumeTyler Garlock Resume
Tyler Garlock Resume
 
new RESUME OF JOHN W.Holt
new RESUME OF JOHN W.Holtnew RESUME OF JOHN W.Holt
new RESUME OF JOHN W.Holt
 
Operations department org chart 2011
Operations department org chart 2011Operations department org chart 2011
Operations department org chart 2011
 

En vedette

En vedette (7)

Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
 
2017 Policy Forum - Panelist slides combined
2017 Policy Forum - Panelist slides combined2017 Policy Forum - Panelist slides combined
2017 Policy Forum - Panelist slides combined
 
Bridging the Gap Between Direct Install and Whole House Programs
Bridging the Gap Between Direct Install and Whole House ProgramsBridging the Gap Between Direct Install and Whole House Programs
Bridging the Gap Between Direct Install and Whole House Programs
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
Commercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler OptimizaitonCommercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler Optimizaiton
 
Passive House slideshow for Passive House Minn
Passive House slideshow for Passive House MinnPassive House slideshow for Passive House Minn
Passive House slideshow for Passive House Minn
 
David Saggau Keynote Presentation- 2017 Energy Policy Forum
David Saggau Keynote Presentation- 2017 Energy Policy ForumDavid Saggau Keynote Presentation- 2017 Energy Policy Forum
David Saggau Keynote Presentation- 2017 Energy Policy Forum
 

Similaire à Energy Efficiency Quality Assurance

AESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and Environment
AESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and EnvironmentAESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and Environment
AESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and EnvironmentCenter for Energy and Environment
 
Team Optimus_IIM K
Team Optimus_IIM KTeam Optimus_IIM K
Team Optimus_IIM KPravin Bokil
 
Mark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting ChallengesMark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting ChallengesAll4 Inc.
 
Ventilation and building airtightness: Inspection schemes in belgium
Ventilation and building airtightness: Inspection schemes in belgiumVentilation and building airtightness: Inspection schemes in belgium
Ventilation and building airtightness: Inspection schemes in belgiumSustainableEnergyAut
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02jitendra kumar biswas
 
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsWhy 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsAVEVA Group plc
 
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...EMEX
 
Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...
Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...
Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...Enhabit
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cvfady toma
 
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...energytrustor
 

Similaire à Energy Efficiency Quality Assurance (20)

Quality Assurance Program Using Picture Phones
Quality Assurance Program Using Picture PhonesQuality Assurance Program Using Picture Phones
Quality Assurance Program Using Picture Phones
 
Energy Fit Homes
Energy Fit Homes Energy Fit Homes
Energy Fit Homes
 
Optimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy EfficiencyOptimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy Efficiency
 
AESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and Environment
AESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and EnvironmentAESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and Environment
AESP Midwest Chapter Meeting- 2.25.5 at Center for Energy and Environment
 
Energy Fit Homes - Realtor Benefits
Energy Fit Homes - Realtor BenefitsEnergy Fit Homes - Realtor Benefits
Energy Fit Homes - Realtor Benefits
 
Team Optimus_IIM K
Team Optimus_IIM KTeam Optimus_IIM K
Team Optimus_IIM K
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
Mark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting ChallengesMark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting Challenges
 
Ventilation and building airtightness: Inspection schemes in belgium
Ventilation and building airtightness: Inspection schemes in belgiumVentilation and building airtightness: Inspection schemes in belgium
Ventilation and building airtightness: Inspection schemes in belgium
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
 
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsWhy 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
 
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...
Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...
Leveraging Health Messages & Home Performance with ENERGY STAR to Sell Home P...
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
CV
CVCV
CV
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Daikin Internship
Daikin Internship Daikin Internship
Daikin Internship
 
Aerosol Sealing in New Construction
Aerosol Sealing in New ConstructionAerosol Sealing in New Construction
Aerosol Sealing in New Construction
 
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
 

Plus de Center for Energy and Environment

Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaField Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaCenter for Energy and Environment
 
Presentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteePresentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteeCenter for Energy and Environment
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramCenter for Energy and Environment
 
Humidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyHumidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyCenter for Energy and Environment
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesCenter for Energy and Environment
 
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseDemand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseCenter for Energy and Environment
 
New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingCenter for Energy and Environment
 

Plus de Center for Energy and Environment (20)

Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaField Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
 
Cold-Climate Air-Source Heat Pumps: Insights form the Field
Cold-Climate Air-Source Heat Pumps: Insights form the FieldCold-Climate Air-Source Heat Pumps: Insights form the Field
Cold-Climate Air-Source Heat Pumps: Insights form the Field
 
Presentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteePresentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy Committee
 
Achieving a Healthy Low-Carbon Economy in Minnesota
Achieving a Healthy Low-Carbon Economy in MinnesotaAchieving a Healthy Low-Carbon Economy in Minnesota
Achieving a Healthy Low-Carbon Economy in Minnesota
 
Field Assessment of Cold-Climate Air-Source Heat Pumps
Field Assessment of Cold-Climate Air-Source Heat PumpsField Assessment of Cold-Climate Air-Source Heat Pumps
Field Assessment of Cold-Climate Air-Source Heat Pumps
 
Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot Program
 
Really Selling Efficiency
Really Selling EfficiencyReally Selling Efficiency
Really Selling Efficiency
 
CEE's Strategic Electrification Forum
CEE's Strategic Electrification ForumCEE's Strategic Electrification Forum
CEE's Strategic Electrification Forum
 
Humidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyHumidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace Efficiency
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New Homes
 
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseDemand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
 
Optimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool FacilitiesOptimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool Facilities
 
Deep Carbonization
Deep CarbonizationDeep Carbonization
Deep Carbonization
 
Webinar- Air Source Heat Pumps: Cold Climate Ready
Webinar- Air Source Heat Pumps: Cold Climate ReadyWebinar- Air Source Heat Pumps: Cold Climate Ready
Webinar- Air Source Heat Pumps: Cold Climate Ready
 
Small Embedded Data Center Pilot
Small Embedded Data Center PilotSmall Embedded Data Center Pilot
Small Embedded Data Center Pilot
 
The Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV EffectivenessThe Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV Effectiveness
 
New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope Sealing
 
Cost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage ReductionCost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage Reduction
 
Supporting energy design performance thru code compliance
Supporting energy design performance thru code complianceSupporting energy design performance thru code compliance
Supporting energy design performance thru code compliance
 

Dernier

Governance in SharePoint Premium:What's in the box?
Governance in SharePoint Premium:What's in the box?Governance in SharePoint Premium:What's in the box?
Governance in SharePoint Premium:What's in the box?Juan Carlos Gonzalez
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Brian Pichman
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
100+ ChatGPT Prompts for SEO Optimization
100+ ChatGPT Prompts for SEO Optimization100+ ChatGPT Prompts for SEO Optimization
100+ ChatGPT Prompts for SEO Optimizationarrow10202532yuvraj
 
IEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK GuideIEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK GuideHironori Washizaki
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
The Kubernetes Gateway API and its role in Cloud Native API Management
The Kubernetes Gateway API and its role in Cloud Native API ManagementThe Kubernetes Gateway API and its role in Cloud Native API Management
The Kubernetes Gateway API and its role in Cloud Native API ManagementNuwan Dias
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 

Dernier (20)

Governance in SharePoint Premium:What's in the box?
Governance in SharePoint Premium:What's in the box?Governance in SharePoint Premium:What's in the box?
Governance in SharePoint Premium:What's in the box?
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
201610817 - edge part1
201610817 - edge part1201610817 - edge part1
201610817 - edge part1
 
100+ ChatGPT Prompts for SEO Optimization
100+ ChatGPT Prompts for SEO Optimization100+ ChatGPT Prompts for SEO Optimization
100+ ChatGPT Prompts for SEO Optimization
 
IEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK GuideIEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
20230104 - machine vision
20230104 - machine vision20230104 - machine vision
20230104 - machine vision
 
The Kubernetes Gateway API and its role in Cloud Native API Management
The Kubernetes Gateway API and its role in Cloud Native API ManagementThe Kubernetes Gateway API and its role in Cloud Native API Management
The Kubernetes Gateway API and its role in Cloud Native API Management
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 

Energy Efficiency Quality Assurance

  • 1. Energy Efficiency Quality Assurance: Past, Present, and Future Dave Bohac | Director of Research Jim Fitzgerald | Senior Analyst Carl Nelson | Manager of Residential Programs Isaac Smith | Program Assistant 3/6/2014
  • 4. Pg. 4 Meeting Utility Resource Needs with Solar: The Merits of the Aurora Solar Project Wednesday, March 19th 11:00 – 12:00 CST Betsy Engelking | Geranimo Energy Vice President Nathan Franzen | Geranimo Director of Solar • Introduction to the Aurora Solar Project that has been selected in MN • The design and technical merits of the proposed project
  • 5. Pg. 5 Presenters & Overview • Experience that have informed best practices • Innovations currently being used in the field • Future implementation opportunities Dave Bohac Director of Research Jim Fitzgerald Senior Research Analyst Carl Nelson Manager of Residential Programs Isaac Smith Program Assistant
  • 6. Pg. 6 Operation Insulation • Beginning of Quality Assurance (QA) at CEE • ~1983
  • 7. Pg. 7 Community Based Outreach • One-stop shop for home improvement
  • 8. Pg. 8 Partnered with contractors • Agreed to standards
  • 9. Pg. 9 Post Inspection • Every job was inspected • Borrowed IR camera from fire department and Hughes Aircraft • Cooled with argon gas
  • 10. Pg. 10 Operation Insulation • Over 4,000 homes participated • Funded by Minnegasco
  • 11. Pg. 11 Sound Insulation Program • Began in 1992 to reduce airport noise • CEE hired to administer the program • Funded by the Federal Aviation Administration (FAA) and Metropolitan Airports Commission (MAC) • Over 13,000 homes participated over next decade • Work completed: • Acoustic windows and doors • Air-Conditioning • Attic insulation and air-sealing • Wall insulation
  • 12. Pg. 12 Health and Safety • 1996 Headline
  • 13. Pg. 13 Health and Safety • Indoor Air Quality (IAQ) issues discovered in treated homes • 3,200 homes had completed the program by 1996 • Issues of concern: • Gas appliance combustion spillage • Gas appliance carbon monoxide • House tightness/ventilation
  • 14. Pg. 14 Program Response • Temporarily suspend program • Assemble panel of international experts • Led by Dave Bohac • Design process to predict and resolve possible issues • CEE developed inspection and testing standards • “Worst-case” testing of natural and induced-draft appliances • Carbon monoxide testing for each appliance • Pass/Fail limits set • Compare vent system size to code • Establish house tightness criteria
  • 15. Pg. 15 Ventilation standards • Sound ventilation requirement developed • Air leakage (cfm50) < Floor area (sf) • Add continuous exhaust ventilation • Predicting the future • 10% to 35% reduction expected
  • 16. Pg. 16 Problem Solved • Detailed inspection helped reduce post- treatment issues • 3,200 treated homes were re-inspected • Pre-tests found many of the problems were pre-existing
  • 17. Pg. 17 Contractor Quality Assurance • Homes were open for bid on monthly cycle • 35-75 homes per month • In order to bid: • Contactors agree to standards • Complete contractor entry and certification • On-going QA
  • 18. Pg. 18 Why is it important to have an entry process for new contractors? • Initial process was incomplete • Two process issues • Contractor agreement to meet program work requirements • Contractor’s staff may not know requirements or how to meet them • Entry process informs contractors and installers • Pre bid demonstration on first jobs • Crew has chance to demonstrate compliance • Required tasks were the same as the QA test by CEE
  • 19. Pg. 19 Contractor Entry • 5 test jobs before contractor on bid list • QA assessor verifies skills on-site • Required skills • Effective air sealing of bypasses • Dense-pack insulation, equipment test • Blower door test • Contractor training as necessary • Bid limit removed once skills verified • Basic certification of each installer recorded
  • 20. Pg. 20 Quality Assurance • Every job inspected using blower door and IR camera • Contractor Requirements • Maintain 90% pass rate • Correct jobs within 14 days • Failure to comply => off bid list If necessary, another contractor completed all work before CEE final test • Over 13,000 homes inspected complete in full compliance
  • 21. Pg. 21 Evolution of Standards • Not part of code at the time, only voluntary standards • “best practices” developed in funded pilot programs • Had to be adapted locally • Learned from other programs • Adapted this process for other Sound Insulation programs, including Milwaukee • This process contributed to the development of national standards • M200/advanced WX • BPI and NYSERDA
  • 22. Pg. 22 5 Keys of QA program 1. Installation Standards 2. Contractor Participation Agreement 3. Verify contractor ability 4. Verify work completed to standards 5. Contractor Accountability
  • 23. Pg. 23 Authorized Insulation Contractor Program 1. Installation Standards • Adapted from Sound Insulation Program 2. Contractor Participation Agreement • Own required equipment • Complete work to standards • QA visits and callback completion • Blower door and combustion safety testing • Customer service Note: Contractor needs incentive
  • 24. Pg. 24 Authorized Insulation Contractor Program 3. Verify contractor ability • Building Performance Institute (BPI) Installer certification • Official name: Residential Building Envelope Whole House Air Leakage Control Installer Certification • Skills based certification developed by Jim Fitzgerald • Certified employee must be on-site
  • 25. Pg. 25 Authorized Insulation Contractor Program 4. Verify work completed to standards • QA phone visits • Complete on initial jobs • QA on-site visits • Check a sample of jobs • QA site visit app • Data entered on-site using iPad • Database of info • Generates visit report including score • Provides contractor feedback
  • 26. Pg. 26 Authorized Insulation Contractor Program 5. Contractor Accountability • Requirements • Maintain acceptable job score • Complete required callback work • Probation • Additional QA phone visits • On-line training portal • Also used during contractor entry • Suspension • Removed from program if requirements are not met
  • 27. Pg. 27 Authorized Insulation Contractor Program • Further Details on program website • http://mncee.org/AIC/ • Questions? • ismith@mncee.org
  • 28. Pg. 28 Future trends in residential QA • Increased need for QA -- utilities need insulation programs & rebates to meet savings goals, and potential for bad contractors not going away • But, delivered at low cost --- Long-term low natural gas prices drive increased need for efficiency in delivery of QA services • Technology can lower cost and enhance performance • Software • Web-based training • Increased need for coordination • Regional technical committees for coordination / continued refinement of standards
  • 29. Dave Bohac | dbohac@mncee.org Jim Fitzgerald | jfitzgerald@mncee.org Carl Nelson | cnelson@mncee.org Isaac Smith | ismith@mncee.org
  • 30. Question & Answer Webinar Link: http://www.mncee.org/Innovation-Exchange/Resource-Center/

Notes de l'éditeur

  1. http://www.irinfo.org/articles/12-1-2013-kochanek.htmlArgon gas cooling
  2. We took what we learned from Operation Insulation and took that to another level for the sound insulation program that we managed for the Minneapolis – St. Paul airport. The project started in 1992 with the goal to reduce the impact of airport noise on the residences around the airport. The work was funded by the FAA and the Metropolitan Airports Commission. The program treated over 13,000 homes.This work included the installation of acoustic windows and doors and air conditioning for the homes that didn’t have functioning AC. It also included attic and wall insulation and attic bypass sealing. So we had many of the same issues with insulation contractor quality control that low-income weatherization and utility programs have. Except in our case the program had a very high profile.
  3. For example, in 1996 I woke up one Saturday morning to the following headline – not exactly how I had hoped to start my weekend. It turns out that five of the houses that had been sound insulated had some combustion safety issues and there were concerns that some of the houses had gotten overly tight.No one wants to have this kind of press for a program that is intended to benefit households. Much in the same way that you wouldn’t want a LIWX or utility program having complaints about poor work by insulation contractors.
  4. In this case the main issues were furnace and water heater combustion gas spillage and carbon monoxide. The concern was that they could down draft or spill as the houses were tightened. In addition, tighter houses could mean that infiltration through house leaks wouldn’t be enough to properly ventilate the houses.At that time the program had treated 3,200 homes, so this was a significant concern.
  5. MAC took this very seriously. They suspended the program and brought in a group of international experts including a couple of local people - David Grimsrud and Matt Wilber. We established a comprehensive test and design process to assure that any combustion safety and ventilation issues were addressed. The tests included worst-case combustion spillage &amp; carbon monoxide under normal and down-draft conditions. We established pass/fail criteria for those tests. The tests were performed when the houses were coming into the program and repeated after the insulation work was completed. The homeowners had to address any pre-existing failures and the program paid for remediation for work due to house tightening. In fact, we tried to anticipate problems as much as possible and design the solution into the retrofit package.With experience we found that many of the combustion vent systems were undersized or improperly installed. So we compared the connector and chimney sizes to code requirements to determine our recommendations.We also established a house tightness criteria to determine when mechanical ventilation was required.
  6. At that time there wasn’t an established guideline or standard for house tightness. We based ours on a comparison of the house floor area to the blower door cfm50. We added either bathroom or kitchen exhaust fans that were quiet and rated for continuous operation. We based the ventilation design on the current house tightness and our experience of how much the house would be tightened by the program measures – which was 10% for tighter houses and up to 35% for leakier houses.
  7. After we implemented the test and design process we had very few “failures” when the work was completed. In addition to using the new process for all of the incoming houses, we also went back and tested the 3,200 houses that had already been treated.An interesting outcome of the project was many of the problems were pre-existing. So what was originally thought were problems caused by the sound program were already present before the houses were treated.
  8. That effort was focused on indoor air quality or combustion safety and ventilation.This same level of quality control was applied to our insulation contractors. We were working with 35 to 75 additional houses each month. So this was seen as a significant business opportunity for insulation contractors and many contractors were interested in getting involved. We established a comprehensive process for the work standards, initial training/certification, quality assurance inspections, and performance level required to remain in the program.
  9. Experience boiled down to 5 keys of QA programEstablish standards, have contractor agree to standards…
  10. Applied these keys to MER AIC program, a QA program for their air sealing and insulation rebate program. Adapted from sound include 20 pages on material and installation requirementsContractors must agree to complete work to standards as well as other requirements you would like for your program…examples hereNeed incentive: AIC must be on list to offer MER rebate, sound and OI produced a lot of business for contractors
  11. 3rd key verify abilityRequire the BPI installer certificationHands on skills based certification where contractor shows ability to air seal (picture examples) 9 total air sealing and 3 dense packing tasksDeveloped by Jim FitzFor ind crew leader not contractor, person on-site doing the work
  12. Remote QA procedure, where crew leader uses a smart phone to send pictures. Saves time and money, esp. MER which is very large territory and would require travelComplete on every job in the beginning, important to verify skill early to get on same page about requirementsImportant so you don’t get behind on contractor work, like with post checks, contractor could complete 10 jobs before you have chanceAlso makes scheduling easierComplete on-site once skill verified, also do one on first jobs then complete on a sampleDeveloped QA app where assessor can enter data on site, allows for tracking data and creating database of QA infoApp generates report and score for contractor, gives the contractor feedback on areas to improve and is specific to crew leader, reports can be e-mailed on site
  13. Need to hold contractor to requirementsMust clearly outline probation and suspension procedures for contractorAIC requires additional QA phone visits so more work is not completed without being checked, get back on same page with crew leaderAlso require on-line training to brush up on testing procedures and requirementsThis is also required during entry to reiterate the training during entryIt is an interactive on-line course that includes short quizesWe are informed when contractors have completed this