Air sealing and ventilation
improvements for multifamily
buildings
March 2, 2012
Jim Fitzgerald
Dave Bohac
Center for Energy and Environment
Better Buildings: Better Business Conference
Better air quality through sealing leaks
between units and ventilation improvements
 What causes problems?
 Air leakage & air flow rate measurements
• 6 building CEE study
 Air sealing and ventilation case studies
Maybe save energy too
What causes problems?
Sometimes people smoke (and cook and ??)
Convert to smoke-free building
Association of Nonsmokers - Minnesota
http://www.mnsmokefreehousing.org/
500+ smoke-free apartment buildings listed in Minnesota
Owners – cooking odors are worst problem
What type of odor or contaminant is the most common source of
objectionable air in buildings you manage?
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50%
cooking odors
tobacco odors
other
none
don't know
How big are air flows between units?
 Pacific Northwest:
• Building average – 13 to 26% air from other units
• Individual units – as high as 35%
 NJ mid-rise: 4th floor – 22% from other units
 West Coast: 4% air from adjoining units
Francisco & Palmiter (1994)
Harrje et al (1988)
Feustal & Diamond (1988)
Multizone tracer gas measurements
How big are air leaks between units?
 Minnesota: Modera et al. (1986)
• 52% air leaks between units
• 1900’s low-rise masonry
 Chicago: Diamond et al. (1986)
• Similar results to Minnesota
• 1900’s low-rise
 Sweden: Levin (1988)
• 12 to 36% air leaks between units
• 3 Swedish apartment buildings
Blower door air leakage tests
What are the driving forces to
move air into and though
buildings?
What are the driving forces?
Winter
Stack Effect
Taller Building => Bigger Effect
In at the bottom and
out the top
What are the driving forces?
Wind Effect
In on windward side and
out on leeward side
Taller Building => Bigger Effect
 Mechanical ventilation is required by code:
bathrooms, corridors & some kitchens
 Exhaust ventilation => draws air into an apartment
 Flow imbalances can also cause air to move from
one apartment to another
What are the driving forces?
Mechanical System Effect
Does it help for a smoker in a lower floor unit
to open a window?
Not upstairs neighbor
Pressure in smoker’s unit
will be about the same as
outside, which increases
pressure to upstairs and
increases flow from
smoker’s unit to upstairs
In at the bottom and out the
top
 Anyway it can!
 Gaps in walls, floors, mechanical chases
 Some are accessible and others too diffuse or
inaccessible for sealing
How does the air travel between units?
Gaps around
sink plumbing
Most openings are small and diffuse
Baseboards and sprinkler
heads
Chemical smoke moves out of baseboard leak
Clear acrylic caulk required plus moving bookcases, etc
Gaps along
baseboard under
carpet
Gaps behind
baseboard heaters
Gaps around bath fan
Bathroom exhaust fans
Leaky (2.5 si)
Tight (0.1 si)
Recessed Light Fixtures
Hidden high rise chases = large uncontrolled
flows
Can practical air sealing and
ventilation treatments reduce
secondhand smoke (SHS) transfer?
6 dissimilar buildings common to local multifamily
building types
This research project was funded in part by ClearWay Minnesota, … funded by proceeds from
the Minnesota tobacco settlement. These findings are solely the responsibility of the authors
and do not necessarily represent the official views of ClearWay Minnesota.
General approach to reduce odor transport
between apartments and improve air quality
 Ventilate the source
• Capture source before transported
 Reduce transport between apartments
• Seal building leaks
• Reduce driving force - pressure difference
 Ventilate receiver’s apartment
General approach to reduce odor transport
between apartments and improve air quality
 Ventilate
 Seal
 Ventilate
Duplex 8-Plex
12-Plex
1930s
1970
1964
Minnesota SHS transfer study
New 4 story
138 unit
11 story
1982
2001
1999
Minnesota SHS transfer study
Page 28
Quantify – building tests
 Before and after fan pressurization tests
• Total “effective leakage area” of apartment
• Fraction of leakage area to outside and to other
units
Guarded Zone Multiple Fan Air Leakage Test
Up to 6 tests per unit
Test 1 Test 2
Unit A Unit B Unit C Unit A Unit B Unit C
QB1 QA2 QB2
Common Area Common Area
Q50
B total = QB1 Q50
B to A = QB1 - QB2
Test 3 Test 4
Unit A Unit B Unit C Unit A Unit B Unit C
QB3 QC3 QB4
QComm4
Common Area Common Area
Q50
B to C = QB1 - QB3 Q50
B exterior = QB4
Fan Fan Fan
Fan Fan Fan
Fan
Test 1 Test 2
Unit A Unit B Unit C Unit A Unit B Unit C
QB1 QA2 QB2
Common Area Common Area
Q50
B total = QB1 Q50
B to A = QB1 - QB2
Test 3 Test 4
Unit A Unit B Unit C Unit A Unit B Unit C
QB3 QC3 QB4
QComm4
Common Area Common Area
Q50
B to C = QB1 - QB3 Q50
B exterior = QB4
Fan Fan Fan
Fan Fan Fan
Fan
Test 1 Test 2
Unit A Unit B Unit C Unit A Unit B Unit C
QB1 QA2 QB2
Common Area Common Area
Q50
B total = QB1 Q50
B to A = QB1 - QB2
Test 3 Test 4
Unit A Unit B Unit C Unit A Unit B Unit C
QB3 QC3 QB4
QComm4
Common Area Common Area
Q50
B to C = QB1 - QB3 Q50
B exterior = QB4
Fan Fan Fan
Fan Fan Fan
Fan
Test 1 Test 2
Unit A Unit B Unit C Unit A Unit B Unit C
QB1 QA2 QB2
Common Area Common Area
Q50
B total = QB1 Q50
B to A = QB1 - QB2
Test 3 Test 4
Unit A Unit B Unit C Unit A Unit B Unit C
QB3 QC3 QB4
QComm4
Common Area Common Area
Q50
B to C = QB1 - QB3 Q50
B exterior = QB4
Fan Fan Fan
Fan Fan Fan
Fan
1: Total Leakage
2: 1 – 2= Leak to Right
3: 1 – 3= Leak to Left
4: 1 – 4= Leak to Out
Page 30
Quantify – building tests
 Before and after fan pressurization tests
• Total “effective leakage area” of apartment
• Fraction of leakage area to outside and to other units
 Before and after tracer gas tests
• Week long average tests
• Passive perfluorocarbon tracers
• Nicotine
• Particles
 Measure exhaust ventilation flow
 Measure before/after treatments
 Up to 7 units per building
Tracer gas tests show considerable air
movement between apartments
Fraction of Air Coming From Adjoining
Units Compared to Total Inflow
Building Min Median Max Min Median
Duplex 6% 35% 65%
8-Plex 1% 3% 24%
12-Plex 1% 12% 26%
138 Unit 1% 11% 25% 1% 7%
11 Story 2% 5% 12% 1% 2%
4 Story 1% 2% 10% 0% 2%
All Units 1% 5% 65% 0% 3%
Pre-Treatment (%) After Sealing (%
26%16%
26%
One-week tracer gas measurements
Range Median
Top-floor units: 2 to 26% 16%
Mid-floor units: 1 to 20% 5%
Lowest-floor units: 1 to 4% 2%
How does the fraction vary by floor?
Fraction of Air Coming From Adjoining Units
Compared to Total Inflow
One-week tracer gas measurements
Total air leakage of individual units
Min Median Max Min Median Max Min Median Max < 1.25
2,101 2,368 2,636 115 130 145 3.16 3.56 3.97 0%
837 1,008 1,031 46 55 57 1.93 2.04 2.46 0%
731 917 1,318 40 50 72 1.61 2.02 2.90 0%
390 665 754 21 37 41 0.86 1.01 2.06 88%
376 454 958 21 25 53 0.57 0.76 2.14 86%
921 1,156 1,559 51 63 86 1.05 1.85 2.30 14%
376 861 2,636 21 47 145 0.57 1.66 3.97 22%
NELA (si/100 sf)Ref. Flow Rate(cfm50) ELA (si)
Building Min Median Max Min Median Max Min
Duplex 2,101 2,368 2,636 115 130 145 3.16
8 Plex 837 1,008 1,031 46 55 57 1.93
12 Plex 731 917 1,318 40 50 72 1.61
138 Unit 390 665 754 21 37 41 0.86
11 Story 376 454 958 21 25 53 0.57
4 Story 921 1,156 1,559 51 63 86 1.05
All Buildings 376 861 2,636 21 47 145 0.57
Ref. Flow Rate(cfm50) ELA (si)
LEED Green Building Rating system for MF SHS control requires ELA
divided by wall & floor & ceiling area to be less than 1.25 si/100 sf
ELA – equivalent leakage area, reference 4Pa & coef. = 1
(1999)
(1982)
(2001)
Blower door air leakage tests
Fraction of air leakage to adjacent units
Total
Building ELA (si) ELA (si) (%)
Duplex 130 26 20%
8 Plex1
55 28 59%
12 Plex1
50 28 57%
138 Unit 37 5 16%
11 Story 25 8 26%
4 Story 64
All Buildings 47 9 27%
1 - leakage to adjacent units includes leakage to common area
To Adjacent Units
Blower door air leakage tests
Leakage Area of Individual Units
712
34
1.8
612
28
1.1
514 512 510
28 1.3 24 0.5 33
2.5 1.1 4.4
414 412 410
34 2.4 22 0.1 53
1.0 2.3 4.2
314 312 310
21 3.0 25 1.3 33
1.2
212
23
Elevator
11 Story Building
General approach to reduce odor transport
between apartments and improve air quality
 Ventilate
 Seal
 Ventilate
Air sealing treatments
 Focus on leaks between units (not exterior)
 Seal as much is practical – 3 to 8 hours/unit.
Average cost of about $700/unit
 Blower door test to monitor total leakage
 Use visual/smoke puffer diagnostics
sometimes aided by blower door. Tried IR in
limited cases
Total and shared leakage
CFM50/unit
Existing After Treatments
Total Shared Total Shared
Duplex 2409 466 1881 601
8-plex 1032 475 916 307
12-plex 918 507 769 247
138 unit 641 90 639 88
New 4 story 1150 25 900 20
11 story 556 120 417 108
Blower door air leakage tests
Modest overall reductions in leakage between
apartment units – but some were significant
Range Median
Duplex: small change
8-plex: 21 to 44% 35%
12-plex: 14 to 70% 55%
New 138-unit: 0 to 23% small change
New 4-story: 0 to 20%
11-story: 0 to 56% 23%
Blower door air leakage tests
Mechanical ventilation observations
 Often provided only by occupant-operated
(highly intermittent-typically off) bath fans
 Many bath fans are better noise-generators
than air movers, even when new
 Apartment bath fans are not
 maintained (corrosion, dirt)
 Apartment exhaust flows are
rarely balanced
Continuous ventilation in code
 “Old” Codes
• Kitchens: 0 cfm OR 100+ cfm
• Baths: 50 cfm
 2012 International Mech. Code
• Kitchens: 25 cfm
• Bathrooms: 20 cfm
 ASHRAE 62.1 -2010
• 5 cfm per person + 0.06cfm/sq ft
• Kitchens: 50 cfm
• Kitchenettes: 0.30 cfm/sq ft
• Toilets: 25cfm
Corridor supply choices
 Minimum 0.05 cfm/sq ft corridor area (IBC)
 Minimum 0.06 cfm/sq ft corridor area
ASHRAE 62.1-2010
 Supply all ventilation to corridor & exhaust
from units
 Original design flow (typically higher)
 Confirm with local code official
Ventilation treatments – for study
 Install effective (and quiet) exhaust fans with
capacity of at least 30 to 45cfm
 Convert intermittent exhaust to continuous
exhaust
 Balance exhaust air flows to reduce
ventilation driving force between units
Ventilation treatments
Quiet, Continuous Ventilation
Constant Air Regulator
Quiet Ceiling Exhaust
Multi-point
Ventilation rate increased substantially
60% Increase*only one unit with added fan
Existing After Treatments
Duplex: 28 (12 to 43) 43 (35 to 50)
8-plex: 38 (19 to 58) 50 (26 to 79)
12-plex: 38 (23 to 75) 73 (57 to 157)
New 138-unit: 26 (15 to 47) 41 (31 to 53)
11-story: 28 (18 to 79) 69 (45 to 124)
4-story*: 45 (26 to 61) 48 (22 to 88)
Average 34 54
Median Ventilation Rate (cfm)
min to max
One-week tracer gas measurements
Cleaner air, same transfer rate
 Original ventilation system may be a direct path
for smoke transfer (11 story, 138 unit, 4 story
ducts)
 More smoke is captured near source
 Dilution reduces concentration in nonsmoker’s
or receiver’s unit
Effect of Treatments: Air Transfer
Fraction of Incoming Air From Adjoining Units
Existing After Treatments
Top-floor: 16% (2 to 26%) 13% (0 to 42%)
Mid-floor: 5% (1 to 20%) 2% (0 to 12%)
Lowest-floor: 2% (1 to 4%) 7% (1 to 19%)
One-week tracer gas measurements
Effect of treatments
 65% of the units had decreased air transfer
 60% increase in ventilation rate
 80% of tenants: SHS drift was less frequent and
less severe
8-Plex: balance ventilation & air seal
Rooftop fan serves 4 units
47 28 32 53
26 17 9 32
Uneven exhaust flow rates cause pressure difference & air flow between units
Before
Apartment exhaust flow rates
Powered roof
ventilator
8 plex
25 26 28 26
23 26 27 24
47 28 32 53
26 17 9 32
Uneven exhaust flow rates cause pressure difference & air flow between units
Before
After
6
6
3 2
Added
Powered roof
ventilator
Apartment exhaust flow rates
Balanced exhaust flow rates reduces driving forces
Page 54
Open
between
tubs
Neighbor’s
bathtub
Why do our clothes smell like smoke?
Easy air flow is possible through framing
around pipes, etc
Page 56
Is better good enough?
Unit #3 contaminants in unit #7 decreased by
factor of five
Fraction of air from unit #3 to #7 reduced from
11% to 6%
Unit #3 ventilation rate increased 158%
Marked reduction of SHS odors per tenants
Will owners pay for it? Who can do the work?
Page 57
Ongoing Success: 67 Buildings in
Condo Complex of Tested 8-plex
Condo Maintenance team trained to respond to
smoke complaints in additional buildings.
Smoker is back-charged for repair costs
20 additional units have been completed to date
15 more units are scheduled
Huge improvement in livability
Common areas air quality improved
Page 58
Details of Ongoing work
 Typical complaint has smoker on lower level with fan off
and large bypasses venting smoke into chases.
 Non-smoker on upper level often had higher exhaust fan
flows which increased airflow from chase into unit. Stack
effect enhances this flow in winter.
 Seal major bypasses, 1-4 person hours
 Ventilation modifications
• Nonsmoker: replace fan damper with CAR
• Smoker: remove fan damper and omit CAR for higher capture.
• Typical flows are 25cfm in nonsmoker and 75cfm in smoker’s
unit.
Existing Conditions
Practical & Effective Work
Page 59
High rise case study: seal hidden shafts
& rooftop exhaust ventilation
Hidden chase openings often difficult to access
Add mineral wool fire-safing to high rise shaft openings
Seal with listed fire barrier
Page 63
PRV fan on roof – top of vent chase
Vent chase Operable register
Page 64
FLOOR
0 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17
11 3 3 3 3 3 3 0 3 3 3 3 -1 3 3 0 3 3
10 3 3 3 3 3 3 3 3 3 3 3 -1 2 3 0 3 3
9 3 3 3 2 2 3 3 3 3 3 3 -1 2 3 0 0 2
8 2 3 3 0 2 3 2 3 3 3 -1 0 0 3 2 2 2
7 2 3 2 1 2 3 2 1 3 2 2 0 2 3 2 0 2
6 2 2 2 2 2 1 2 2 2 0 2 0 0 2 -1 0 2
5 2 2 2 3 -1 2 -1 2 2 0 0 2 2 2 -1 2 0
4 0 2 2 0 3 2 1 2 2 1 2 1 0 0 0 -1 0
3 1 -1 2 -1 2 2 2 1 2 1 0 2 1 0 0 0 0
2 2 0 2 -1 2 2 0 2 -1 2 0 0 2 2 0 2 0
1 2 2 2 2 2 2 0 0 2
Unit Number
Register flow “tissue” test
- good - weak - ? - blow back
Shaft number
F
l
o
o
r
Page 65
Floor Press Flow Notes
11 -74 28
10 -45 27
9 -15 14
8 -10.8 14
7 -9.5 10
6 na
5 +1.2 + stinks
4 +0.1 + smoker
3 +0.3 + stinks
2 -2.8 4
1 -5.3 8
Flow box measurement
Page 66
Obstructions: undersized floor cutout
full-sized subduct
Concrete floor Bathroom
vent
sub duct
The 144 sq. in. shaft area only
has 32 sq. in. for air flow.
c
Vent chase: 12” X 12” = 144 Sq. in.
8 x 8 cutout
Page 67
Obstructions: undersized floor cutout
full-sized subduct
Vent chase: 12” X 12” = 144 Sq. in.
Concrete floor Bathroom
sub duct –
replaced
with 3” for
more flow.
The 144
in2 shaft
only has
32 in2 for
air flow
8 x 8 cutout
Page 68
Drywall joints open
Page 69
Total: 506 cfm
From units: 93 cfm
Leaks: 413 cfm
No flow from lower 5 floors
Fan & register flow measurements
Page 70
Ventilation system problems
Restrictions cause most air to be drawn from
upper apartments
Duct leaks
• Air drawn from unknown sources
• Lower units no or reverse flow
Operable registers – occupant “balancing”
• No flow when closed
• Too high when open
Page 71
Ventilation system solutions
Reduce duct restrictions: 3” sub ducts to
upper 3 floors
Seal ductwork with Aeroseal technology
Install constant air regulators or designed
orifice plates at registers
Test and adjust fan flow to required duct
pressure
Thanks to Don Stevens for advising us of subduct code issue
Target: equal flow from all units
Page 72
Remove restriction and provide 3”
subducts for top 3 floors
Code: fire damper or sheet
metal sub duct extending
22” above fan inlet
Page 73
Aeroseal required for fan draw to reach
lower units Before After
Total: 506 279 cfm
From units: 93 221 cfm
Leaks: 413 58 cfm
Targets leaks
Page 74
Option used for test:
3” opening sized to
exact flow rate
Remove dampers, balance register flow
First option : “self-adjusting”
constant air regulator “CAR”
Production option:
fixed orifices – more to come
Page 75
Floor
Before After
Press Flow Press Flow
11 -74 28 -75 21
10 -45 27 -65 20
9 -15 14 -63 20
8 -10.8 14 -56 20
7 -9.5 10 -52 20
6 na -49 20
5 +1.2 + -42 20
4 +0.1 + -42 20
3 +0.3 + -42 20
2 -2.8 4 -42 20
1 -5.3 8 -44 20
Treatments
Subducts
Aeroseal
Orifice plates
Fan adjustment
Even flow after upgrades
Outcomes
Required ventilation
for all
Save 227cfm ($250 -
$500/year)
Reduce unit/unit flow
– smoke drift
17 fans ~ $4k - $8k
Page 76
Keep control fans on
Aethelometer Measurement of ETS
Particle Concentration in Nonsmoker's Apartment
-2
0
2
4
6
8
10
12
11/28 11/29 11/30 12/1 12/2 12/3 12/4 12/5 12/6
ETSParticleConcentration(mg/m3
)
Instrument precision
ETS odors logged by resident
Kitchen shaft central exhaust fan turned off at midnight
SHS odor threshold
Secondhand smoke monitored in 11th floor unit
SHS logged by resident
From research to production:
current options
 Spray seal ducts with mastic & seal fan curbs
 Orifice restrictors
 Efficient fan
 Clean or remove blockages
Current options
Spray sealing with mastic
Fan not connected - curb open
Current options: curb leakage
Total flow: 174 cfm
From units: 30 cfm
Airflow from building
shafts not exhaust grilles
Current options: stop curb leakage
Sealed
Total flow: 126 cfm
From units: 120 cfm
Current options
CARs failures: How soon? How often?
After 9 years – 1 in 3 plugged
Dust buildup in 9 months
Adjustment holes
Current options
Fixed orifices  Not prone to foul
 Can be cleaned
 Durable
 Sized for flow at target
pressure
 Mass - produced, low cost
 Allow lower operating
pressure (reduced duct leakage,
& fan power)
2
11/2
11/4
1
Current options
Fixed orifices – flow rate guideline
Inside Diameter
(in)
Pressure, in wc (Pa)
Nominal Actual
0.15
(36)
0.2
(50)
0.25
(62)
0.36
(90)
0.5
(124)
0.75
(186)
2 2.45 36 40 44 54
1.5 1.97 21 24 28 34 39 48
1.25 1.73 18 21 26 29 36
1 1.37 16 18 22
# stories* 3 to 7 5 to 10 6 to 12 9 to 18 12 to 25 to 25
*- building size for Minneapolis climate (20F average outside temp)
Current options: efficient fan
384
471
505
622
710
25 42 50
86
126
940
1143
1234
1508
1720
0
200
400
600
800
1000
1200
1400
1600
1800
2000
0 20 40 60 80 100 120
CFMandWatts
Static Pressure PA
CFM
Watts
RPM
Linear (CFM)
Linear (Watts)
EC style fan upgrade: lab test results
C 9" diam test
Static
Press (Pa)
Flow
(cfm)
Power
(watts)
63.6 in2 inlet area 29 384 25
(13 inlets 2.45 in) 44 471 42
(21 inlets 1.97 in) 50 505 50
(27 inlets 1.73 in) 78 622 86
(43 inlets 1.37 in) 100 710 126
Orifice Area= 64 sq in
Fixed Orifice Area= 64 sq in
Vary fan speed
400w to 50w saves 3000kwh/yr each
Exhaust grille on 12 story looks OK
Current options: blockages
Current options: blockages
Exhaust fan runs but DP low/high
Fan intake 20.9Pa too
low for flow needed
Fan outlet 221Pa to exterior
grille (side with resistance)
Check pressures
Current options: blockages
Access plugs from recent duct cleaning
Exhaust outlet plugged from inside
Hard to
see
Dirt obstructs flow: clean & adjust fan down
Current options: blockages
As found: 609 cfm After: 2,338cfm
Design flow: 1,780 cfm
Fan stops damper from opening
Current options: blockages
300 inspected – 1 in 4 plugged
Current options: supply blockages
Exterior screen is clear. Hidden screen is forgotten
Current options: supply blockages
Pressure across grille 0.9 in wc
(221Pa)
Inspection: 18 of 46
Corridor supply intakes
obstructed
Nobody can keep this clean:
remove hidden screens
Current options: supply blockages
138 unit: little unit to unit leakage
Meets LEED leakage guideline
Occupants still complain of smoke transfer
324 323 322 321
601 9 17 574 3 622
+/-1 +/-13 +/-3
1 44
224 +/-7 223 222 +/-4 221
21 688 71 33 661 65 654
+/-7 +/-4
28 -4 2 64
124 +/-14 Guest +/-12 123 +/-15 122 +/-12 121
609 35 390 37 606 51 664 93 683
+/-8 +/-2 +/-8
Guarded-Zone Measured Air Leakage Rates
734
680
-13
+/-11
Oaks: Pre-Treatment
unit #
total leakage
unit/unit leakage
leakage precision
(cfm50)
Smoker
Non-
smoker
Vent blocked: view inside smoker’s fan
duct in attic
Vent blocked: roof damper frozen shut on
same fan
CARs in fan duct in attic, smokers open for
higher flow
Post treatment fan flows
Unit
Flow
(cfm)
Unit
Flow
(cfm)
Unit
Flow
(cfm)
323 24 322 25
224 21 223 20 222 22
Guest 26 123 28 122 20Smoker
4 Story: duct leakage in ceiling joist space
All leakage into joist space
Aeroseal ducts in joist space
Leaks into joist space: lights & sprinklers
New continuous duty fan in kitchen:
source of odor complaint
 Continuous at 40cfm.
Installer sets high speed:
75, 160, or 390 cfm
 Less than 20 watts at low
speed
Continuous ventilation with kitchen hood
in 1 unit
Duct seal side-benefit
Backdraft potential reduced by Aeroseal
-4.5 pa before -1.5pa after
80%-ID furnace both into B vent natural draft water heater
Door closed
dryer+ AC fan on
in 1 unit
Recommendations
 Ventilate - source
 Seal - between
 Ventilate - receiver
Recommendations: ventilation
 Moderate/continuous/quiet – better than
intermittent
 Central exhaust: orifice, seal ducts, replace or
adjust fan
 Check for blockages and leaks
Recommendations: air sealing
 Seal between units
 Large, accessible leaks (unoccupied or new is better)
 Includes ducts and mechanical/plumbing
chases
Improvement possible –
can not eliminate transfer
In at the bottom and out the
top
Additional slides
Additional Information
Canada Mortgage and Housing Corporation
Fact Sheet: Solving Odour Transfer Problems in Your Apartment
http://www.cmhc.ca/en/co/reho/reho_002.cfm
Fan not connected - curb open
Current options: curb leakage
Total flow: 174 cfm
From units: 30 cfm
Airflow from building shafts
not unit exhaust grilles
Current options: stop curb leakage
Sealed
Total flow: 126 cfm
From units: 120 cfm
2-part Foam Seals Plumbing Chase
Stop Vertical Air Transfer In Plumbing Wall
Patched, primed
Inject Foam Along Top of Wall
12-plex
Shared leakage reduced about
50% from 507 to 247 cfm50
Kitchen option for cooking source
In different project after work
 Cooking moisture was an issue in 15% of units
 Continuous kitchen fan option needed
 VenMar developed (UL) a quiet continuous
range hood
Page 115
Note – Improvements are possible. Managing expectations is
important.
Page 116
What does this cost,
who pays, who can do it?
•Licensed mechanical contractor required for all duct alterations.
•Aeroseal franchisee required for duct sealing. (Maint. prep ok)
•Performance contractor/ consultant for design, balancing, QC
•$300 per unit or $3,200 for 1 shaft minimum, $5,000 for 2 shafts
•Changes to the building are an Association responsibility.
•Airsealing in unit is responsibility of individual condo owner
Page 117
Individual supply and very low
leakage required for best control
If an occupant opens a window to let smoke out air can
come in and blow smoke into adjacent units.
At 30F we measured a lower unit change pressure from
from -0.7pa to hall to +24pa to hall by opening 1 window.
Some flow still came in from under the kitchen kickboard
@+2pa to hall. The occupant complained about
intermittent smoke. Total air leakage down to 283cfm50
after work.
Some individuals may not tolerate any smoke transfer,
a large improvement may not be enough.

Contenu connexe

En vedette

Dunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyDunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyVijith Nambiar
 
Effective Mechanical Ventilation for Multi-Unit Residential Buildings
Effective Mechanical Ventilation for Multi-Unit Residential BuildingsEffective Mechanical Ventilation for Multi-Unit Residential Buildings
Effective Mechanical Ventilation for Multi-Unit Residential BuildingsToronto 2030 District
 
Vertical transporation systems in building
Vertical transporation systems in buildingVertical transporation systems in building
Vertical transporation systems in buildingSelva Architect
 
Escalators
EscalatorsEscalators
Escalatorssound10
 
BS 2 Lift presentation 1
BS 2 Lift presentation 1BS 2 Lift presentation 1
BS 2 Lift presentation 1Est
 
Meaning of confort in a house
 Meaning of confort in a house Meaning of confort in a house
Meaning of confort in a houseclimablock
 
Types of ac and humidity control
Types of ac and humidity controlTypes of ac and humidity control
Types of ac and humidity controlAnanth Kumar M
 
Human thermal perception and outdoor thermal comfort under shaded conditions ...
Human thermal perception and outdoor thermal comfort under shaded conditions ...Human thermal perception and outdoor thermal comfort under shaded conditions ...
Human thermal perception and outdoor thermal comfort under shaded conditions ...Manat Srivanit
 
An approach for selection of material handling equipment and material handlin...
An approach for selection of material handling equipment and material handlin...An approach for selection of material handling equipment and material handlin...
An approach for selection of material handling equipment and material handlin...Soumyodeep Mukherjee
 
NurseReview.Org - Introduction to Mechanical Ventilation
NurseReview.Org - Introduction to Mechanical VentilationNurseReview.Org - Introduction to Mechanical Ventilation
NurseReview.Org - Introduction to Mechanical VentilationNurse ReviewDotOrg
 
Advanced Mechanical Ventilation
Advanced Mechanical VentilationAdvanced Mechanical Ventilation
Advanced Mechanical VentilationAndrew Ferguson
 
Mechanical ventilation
Mechanical ventilationMechanical ventilation
Mechanical ventilationSanil Varghese
 
Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalatorsKuNal MeHta
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning SystemSumit Ranjan
 
Mechanical ventilation ppt
Mechanical ventilation pptMechanical ventilation ppt
Mechanical ventilation pptBibini Bab
 
Mechanical Ventilation
Mechanical VentilationMechanical Ventilation
Mechanical VentilationShalini Garg
 
Basic modes of mechanical ventilation
Basic modes of mechanical ventilationBasic modes of mechanical ventilation
Basic modes of mechanical ventilationLokesh Tiwari
 

En vedette (20)

Dunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyDunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancy
 
Effective Mechanical Ventilation for Multi-Unit Residential Buildings
Effective Mechanical Ventilation for Multi-Unit Residential BuildingsEffective Mechanical Ventilation for Multi-Unit Residential Buildings
Effective Mechanical Ventilation for Multi-Unit Residential Buildings
 
Vertical transporation systems in building
Vertical transporation systems in buildingVertical transporation systems in building
Vertical transporation systems in building
 
Escalators
EscalatorsEscalators
Escalators
 
BS 2 Lift presentation 1
BS 2 Lift presentation 1BS 2 Lift presentation 1
BS 2 Lift presentation 1
 
Meaning of confort in a house
 Meaning of confort in a house Meaning of confort in a house
Meaning of confort in a house
 
Types of ac and humidity control
Types of ac and humidity controlTypes of ac and humidity control
Types of ac and humidity control
 
Human thermal perception and outdoor thermal comfort under shaded conditions ...
Human thermal perception and outdoor thermal comfort under shaded conditions ...Human thermal perception and outdoor thermal comfort under shaded conditions ...
Human thermal perception and outdoor thermal comfort under shaded conditions ...
 
Building Ventilation
Building VentilationBuilding Ventilation
Building Ventilation
 
An approach for selection of material handling equipment and material handlin...
An approach for selection of material handling equipment and material handlin...An approach for selection of material handling equipment and material handlin...
An approach for selection of material handling equipment and material handlin...
 
NurseReview.Org - Introduction to Mechanical Ventilation
NurseReview.Org - Introduction to Mechanical VentilationNurseReview.Org - Introduction to Mechanical Ventilation
NurseReview.Org - Introduction to Mechanical Ventilation
 
Torcan lift equipment
Torcan lift equipmentTorcan lift equipment
Torcan lift equipment
 
Advanced Mechanical Ventilation
Advanced Mechanical VentilationAdvanced Mechanical Ventilation
Advanced Mechanical Ventilation
 
Mechanical ventilation
Mechanical ventilationMechanical ventilation
Mechanical ventilation
 
Elevators & Escalators
Elevators & EscalatorsElevators & Escalators
Elevators & Escalators
 
Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalators
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
Mechanical ventilation ppt
Mechanical ventilation pptMechanical ventilation ppt
Mechanical ventilation ppt
 
Mechanical Ventilation
Mechanical VentilationMechanical Ventilation
Mechanical Ventilation
 
Basic modes of mechanical ventilation
Basic modes of mechanical ventilationBasic modes of mechanical ventilation
Basic modes of mechanical ventilation
 

Similaire à Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgerald and Bohac

Airflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential BuildingsAirflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential BuildingsRDH Building Science
 
New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingCenter for Energy and Environment
 
USP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra UniversalUSP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra UniversalTerra Universal
 
New Technology For Reducing Facility Operating Costs
New Technology For Reducing Facility Operating CostsNew Technology For Reducing Facility Operating Costs
New Technology For Reducing Facility Operating CostsNeal Walsh
 
Corridor Pressurization System Performance in MURBS
Corridor Pressurization System Performance in MURBSCorridor Pressurization System Performance in MURBS
Corridor Pressurization System Performance in MURBSRDH Building Science
 
Ventilation in Multi-Family Buildings - Summer Camp 2015
Ventilation in Multi-Family Buildings - Summer Camp 2015Ventilation in Multi-Family Buildings - Summer Camp 2015
Ventilation in Multi-Family Buildings - Summer Camp 2015Lorne Ricketts
 
The Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsThe Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsCenter for Energy and Environment
 
Airtightness of Large Buildings - Where We're At and Where We're Going
Airtightness of Large Buildings - Where We're At and Where We're GoingAirtightness of Large Buildings - Where We're At and Where We're Going
Airtightness of Large Buildings - Where We're At and Where We're GoingLorne Ricketts
 
Multifamily Central Ventilation Assessment and Retrofit Techniques
 Multifamily Central Ventilation Assessment and Retrofit Techniques Multifamily Central Ventilation Assessment and Retrofit Techniques
Multifamily Central Ventilation Assessment and Retrofit TechniquesCenter for Energy and Environment
 
ASHRAE Standard 62.1 Update
ASHRAE Standard 62.1 UpdateASHRAE Standard 62.1 Update
ASHRAE Standard 62.1 UpdateASHRAE Region VI
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct designAmber Joan Wood
 
Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...
Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...
Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...Center for Energy and Environment
 
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageUsing Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageCenter for Energy and Environment
 
final presentation edit.pptx
final presentation edit.pptxfinal presentation edit.pptx
final presentation edit.pptxssuser0ee912
 
Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...alone160162
 

Similaire à Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgerald and Bohac (20)

Energy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large BuildingsEnergy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large Buildings
 
Airflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential BuildingsAirflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential Buildings
 
New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope Sealing
 
USP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra UniversalUSP 797/800 Cleanroom Compliance by Terra Universal
USP 797/800 Cleanroom Compliance by Terra Universal
 
New Technology For Reducing Facility Operating Costs
New Technology For Reducing Facility Operating CostsNew Technology For Reducing Facility Operating Costs
New Technology For Reducing Facility Operating Costs
 
Corridor Pressurization System Performance in MURBS
Corridor Pressurization System Performance in MURBSCorridor Pressurization System Performance in MURBS
Corridor Pressurization System Performance in MURBS
 
Ventilation in Multi-Family Buildings - Summer Camp 2015
Ventilation in Multi-Family Buildings - Summer Camp 2015Ventilation in Multi-Family Buildings - Summer Camp 2015
Ventilation in Multi-Family Buildings - Summer Camp 2015
 
Cleanrooms 101
Cleanrooms 101Cleanrooms 101
Cleanrooms 101
 
The Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsThe Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial Buildings
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
Airtightness of Large Buildings - Where We're At and Where We're Going
Airtightness of Large Buildings - Where We're At and Where We're GoingAirtightness of Large Buildings - Where We're At and Where We're Going
Airtightness of Large Buildings - Where We're At and Where We're Going
 
Multifamily Central Ventilation Assessment and Retrofit Techniques
 Multifamily Central Ventilation Assessment and Retrofit Techniques Multifamily Central Ventilation Assessment and Retrofit Techniques
Multifamily Central Ventilation Assessment and Retrofit Techniques
 
GLP.lean room fundamentals
GLP.lean room fundamentalsGLP.lean room fundamentals
GLP.lean room fundamentals
 
ASHRAE Standard 62.1 Update
ASHRAE Standard 62.1 UpdateASHRAE Standard 62.1 Update
ASHRAE Standard 62.1 Update
 
HVAC for clean rooms 120217
HVAC for clean rooms 120217HVAC for clean rooms 120217
HVAC for clean rooms 120217
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
 
Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...
Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...
Leakage Reduction for Large Building Air Sealing and HVAC System Pressure Eff...
 
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageUsing Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
 
final presentation edit.pptx
final presentation edit.pptxfinal presentation edit.pptx
final presentation edit.pptx
 
Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...
 

Plus de Center for Energy and Environment

Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaField Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaCenter for Energy and Environment
 
Presentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteePresentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteeCenter for Energy and Environment
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramCenter for Energy and Environment
 
Humidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyHumidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyCenter for Energy and Environment
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesCenter for Energy and Environment
 
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseDemand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseCenter for Energy and Environment
 

Plus de Center for Energy and Environment (20)

Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaField Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
 
Cold-Climate Air-Source Heat Pumps: Insights form the Field
Cold-Climate Air-Source Heat Pumps: Insights form the FieldCold-Climate Air-Source Heat Pumps: Insights form the Field
Cold-Climate Air-Source Heat Pumps: Insights form the Field
 
Presentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteePresentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy Committee
 
Achieving a Healthy Low-Carbon Economy in Minnesota
Achieving a Healthy Low-Carbon Economy in MinnesotaAchieving a Healthy Low-Carbon Economy in Minnesota
Achieving a Healthy Low-Carbon Economy in Minnesota
 
Field Assessment of Cold-Climate Air-Source Heat Pumps
Field Assessment of Cold-Climate Air-Source Heat PumpsField Assessment of Cold-Climate Air-Source Heat Pumps
Field Assessment of Cold-Climate Air-Source Heat Pumps
 
Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot Program
 
Really Selling Efficiency
Really Selling EfficiencyReally Selling Efficiency
Really Selling Efficiency
 
CEE's Strategic Electrification Forum
CEE's Strategic Electrification ForumCEE's Strategic Electrification Forum
CEE's Strategic Electrification Forum
 
Humidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyHumidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace Efficiency
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New Homes
 
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseDemand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
 
Energy Fit Homes - Realtor Benefits
Energy Fit Homes - Realtor BenefitsEnergy Fit Homes - Realtor Benefits
Energy Fit Homes - Realtor Benefits
 
Optimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool FacilitiesOptimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool Facilities
 
Deep Carbonization
Deep CarbonizationDeep Carbonization
Deep Carbonization
 
Webinar- Air Source Heat Pumps: Cold Climate Ready
Webinar- Air Source Heat Pumps: Cold Climate ReadyWebinar- Air Source Heat Pumps: Cold Climate Ready
Webinar- Air Source Heat Pumps: Cold Climate Ready
 
Small Embedded Data Center Pilot
Small Embedded Data Center PilotSmall Embedded Data Center Pilot
Small Embedded Data Center Pilot
 
The Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV EffectivenessThe Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV Effectiveness
 
Cost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage ReductionCost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage Reduction
 
Supporting energy design performance thru code compliance
Supporting energy design performance thru code complianceSupporting energy design performance thru code compliance
Supporting energy design performance thru code compliance
 

Dernier

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 

Dernier (20)

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 

Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgerald and Bohac

  • 1. Air sealing and ventilation improvements for multifamily buildings March 2, 2012 Jim Fitzgerald Dave Bohac Center for Energy and Environment Better Buildings: Better Business Conference
  • 2. Better air quality through sealing leaks between units and ventilation improvements  What causes problems?  Air leakage & air flow rate measurements • 6 building CEE study  Air sealing and ventilation case studies Maybe save energy too
  • 3. What causes problems? Sometimes people smoke (and cook and ??)
  • 4. Convert to smoke-free building Association of Nonsmokers - Minnesota http://www.mnsmokefreehousing.org/ 500+ smoke-free apartment buildings listed in Minnesota
  • 5. Owners – cooking odors are worst problem What type of odor or contaminant is the most common source of objectionable air in buildings you manage? 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% cooking odors tobacco odors other none don't know
  • 6. How big are air flows between units?  Pacific Northwest: • Building average – 13 to 26% air from other units • Individual units – as high as 35%  NJ mid-rise: 4th floor – 22% from other units  West Coast: 4% air from adjoining units Francisco & Palmiter (1994) Harrje et al (1988) Feustal & Diamond (1988) Multizone tracer gas measurements
  • 7. How big are air leaks between units?  Minnesota: Modera et al. (1986) • 52% air leaks between units • 1900’s low-rise masonry  Chicago: Diamond et al. (1986) • Similar results to Minnesota • 1900’s low-rise  Sweden: Levin (1988) • 12 to 36% air leaks between units • 3 Swedish apartment buildings Blower door air leakage tests
  • 8. What are the driving forces to move air into and though buildings?
  • 9. What are the driving forces? Winter Stack Effect Taller Building => Bigger Effect In at the bottom and out the top
  • 10. What are the driving forces? Wind Effect In on windward side and out on leeward side Taller Building => Bigger Effect
  • 11.  Mechanical ventilation is required by code: bathrooms, corridors & some kitchens  Exhaust ventilation => draws air into an apartment  Flow imbalances can also cause air to move from one apartment to another What are the driving forces? Mechanical System Effect
  • 12. Does it help for a smoker in a lower floor unit to open a window? Not upstairs neighbor Pressure in smoker’s unit will be about the same as outside, which increases pressure to upstairs and increases flow from smoker’s unit to upstairs
  • 13. In at the bottom and out the top  Anyway it can!  Gaps in walls, floors, mechanical chases  Some are accessible and others too diffuse or inaccessible for sealing How does the air travel between units?
  • 14. Gaps around sink plumbing Most openings are small and diffuse
  • 16. Chemical smoke moves out of baseboard leak Clear acrylic caulk required plus moving bookcases, etc
  • 19. Gaps around bath fan Bathroom exhaust fans
  • 20. Leaky (2.5 si) Tight (0.1 si) Recessed Light Fixtures
  • 21. Hidden high rise chases = large uncontrolled flows
  • 22.
  • 23. Can practical air sealing and ventilation treatments reduce secondhand smoke (SHS) transfer? 6 dissimilar buildings common to local multifamily building types This research project was funded in part by ClearWay Minnesota, … funded by proceeds from the Minnesota tobacco settlement. These findings are solely the responsibility of the authors and do not necessarily represent the official views of ClearWay Minnesota.
  • 24. General approach to reduce odor transport between apartments and improve air quality  Ventilate the source • Capture source before transported  Reduce transport between apartments • Seal building leaks • Reduce driving force - pressure difference  Ventilate receiver’s apartment
  • 25. General approach to reduce odor transport between apartments and improve air quality  Ventilate  Seal  Ventilate
  • 27. New 4 story 138 unit 11 story 1982 2001 1999 Minnesota SHS transfer study
  • 28. Page 28 Quantify – building tests  Before and after fan pressurization tests • Total “effective leakage area” of apartment • Fraction of leakage area to outside and to other units
  • 29. Guarded Zone Multiple Fan Air Leakage Test Up to 6 tests per unit Test 1 Test 2 Unit A Unit B Unit C Unit A Unit B Unit C QB1 QA2 QB2 Common Area Common Area Q50 B total = QB1 Q50 B to A = QB1 - QB2 Test 3 Test 4 Unit A Unit B Unit C Unit A Unit B Unit C QB3 QC3 QB4 QComm4 Common Area Common Area Q50 B to C = QB1 - QB3 Q50 B exterior = QB4 Fan Fan Fan Fan Fan Fan Fan Test 1 Test 2 Unit A Unit B Unit C Unit A Unit B Unit C QB1 QA2 QB2 Common Area Common Area Q50 B total = QB1 Q50 B to A = QB1 - QB2 Test 3 Test 4 Unit A Unit B Unit C Unit A Unit B Unit C QB3 QC3 QB4 QComm4 Common Area Common Area Q50 B to C = QB1 - QB3 Q50 B exterior = QB4 Fan Fan Fan Fan Fan Fan Fan Test 1 Test 2 Unit A Unit B Unit C Unit A Unit B Unit C QB1 QA2 QB2 Common Area Common Area Q50 B total = QB1 Q50 B to A = QB1 - QB2 Test 3 Test 4 Unit A Unit B Unit C Unit A Unit B Unit C QB3 QC3 QB4 QComm4 Common Area Common Area Q50 B to C = QB1 - QB3 Q50 B exterior = QB4 Fan Fan Fan Fan Fan Fan Fan Test 1 Test 2 Unit A Unit B Unit C Unit A Unit B Unit C QB1 QA2 QB2 Common Area Common Area Q50 B total = QB1 Q50 B to A = QB1 - QB2 Test 3 Test 4 Unit A Unit B Unit C Unit A Unit B Unit C QB3 QC3 QB4 QComm4 Common Area Common Area Q50 B to C = QB1 - QB3 Q50 B exterior = QB4 Fan Fan Fan Fan Fan Fan Fan 1: Total Leakage 2: 1 – 2= Leak to Right 3: 1 – 3= Leak to Left 4: 1 – 4= Leak to Out
  • 30. Page 30 Quantify – building tests  Before and after fan pressurization tests • Total “effective leakage area” of apartment • Fraction of leakage area to outside and to other units  Before and after tracer gas tests • Week long average tests • Passive perfluorocarbon tracers • Nicotine • Particles  Measure exhaust ventilation flow  Measure before/after treatments  Up to 7 units per building
  • 31. Tracer gas tests show considerable air movement between apartments Fraction of Air Coming From Adjoining Units Compared to Total Inflow Building Min Median Max Min Median Duplex 6% 35% 65% 8-Plex 1% 3% 24% 12-Plex 1% 12% 26% 138 Unit 1% 11% 25% 1% 7% 11 Story 2% 5% 12% 1% 2% 4 Story 1% 2% 10% 0% 2% All Units 1% 5% 65% 0% 3% Pre-Treatment (%) After Sealing (% 26%16% 26% One-week tracer gas measurements
  • 32. Range Median Top-floor units: 2 to 26% 16% Mid-floor units: 1 to 20% 5% Lowest-floor units: 1 to 4% 2% How does the fraction vary by floor? Fraction of Air Coming From Adjoining Units Compared to Total Inflow One-week tracer gas measurements
  • 33. Total air leakage of individual units Min Median Max Min Median Max Min Median Max < 1.25 2,101 2,368 2,636 115 130 145 3.16 3.56 3.97 0% 837 1,008 1,031 46 55 57 1.93 2.04 2.46 0% 731 917 1,318 40 50 72 1.61 2.02 2.90 0% 390 665 754 21 37 41 0.86 1.01 2.06 88% 376 454 958 21 25 53 0.57 0.76 2.14 86% 921 1,156 1,559 51 63 86 1.05 1.85 2.30 14% 376 861 2,636 21 47 145 0.57 1.66 3.97 22% NELA (si/100 sf)Ref. Flow Rate(cfm50) ELA (si) Building Min Median Max Min Median Max Min Duplex 2,101 2,368 2,636 115 130 145 3.16 8 Plex 837 1,008 1,031 46 55 57 1.93 12 Plex 731 917 1,318 40 50 72 1.61 138 Unit 390 665 754 21 37 41 0.86 11 Story 376 454 958 21 25 53 0.57 4 Story 921 1,156 1,559 51 63 86 1.05 All Buildings 376 861 2,636 21 47 145 0.57 Ref. Flow Rate(cfm50) ELA (si) LEED Green Building Rating system for MF SHS control requires ELA divided by wall & floor & ceiling area to be less than 1.25 si/100 sf ELA – equivalent leakage area, reference 4Pa & coef. = 1 (1999) (1982) (2001) Blower door air leakage tests
  • 34. Fraction of air leakage to adjacent units Total Building ELA (si) ELA (si) (%) Duplex 130 26 20% 8 Plex1 55 28 59% 12 Plex1 50 28 57% 138 Unit 37 5 16% 11 Story 25 8 26% 4 Story 64 All Buildings 47 9 27% 1 - leakage to adjacent units includes leakage to common area To Adjacent Units Blower door air leakage tests
  • 35. Leakage Area of Individual Units 712 34 1.8 612 28 1.1 514 512 510 28 1.3 24 0.5 33 2.5 1.1 4.4 414 412 410 34 2.4 22 0.1 53 1.0 2.3 4.2 314 312 310 21 3.0 25 1.3 33 1.2 212 23 Elevator 11 Story Building
  • 36.
  • 37. General approach to reduce odor transport between apartments and improve air quality  Ventilate  Seal  Ventilate
  • 38. Air sealing treatments  Focus on leaks between units (not exterior)  Seal as much is practical – 3 to 8 hours/unit. Average cost of about $700/unit  Blower door test to monitor total leakage  Use visual/smoke puffer diagnostics sometimes aided by blower door. Tried IR in limited cases
  • 39. Total and shared leakage CFM50/unit Existing After Treatments Total Shared Total Shared Duplex 2409 466 1881 601 8-plex 1032 475 916 307 12-plex 918 507 769 247 138 unit 641 90 639 88 New 4 story 1150 25 900 20 11 story 556 120 417 108 Blower door air leakage tests
  • 40. Modest overall reductions in leakage between apartment units – but some were significant Range Median Duplex: small change 8-plex: 21 to 44% 35% 12-plex: 14 to 70% 55% New 138-unit: 0 to 23% small change New 4-story: 0 to 20% 11-story: 0 to 56% 23% Blower door air leakage tests
  • 41. Mechanical ventilation observations  Often provided only by occupant-operated (highly intermittent-typically off) bath fans  Many bath fans are better noise-generators than air movers, even when new  Apartment bath fans are not  maintained (corrosion, dirt)  Apartment exhaust flows are rarely balanced
  • 42. Continuous ventilation in code  “Old” Codes • Kitchens: 0 cfm OR 100+ cfm • Baths: 50 cfm  2012 International Mech. Code • Kitchens: 25 cfm • Bathrooms: 20 cfm  ASHRAE 62.1 -2010 • 5 cfm per person + 0.06cfm/sq ft • Kitchens: 50 cfm • Kitchenettes: 0.30 cfm/sq ft • Toilets: 25cfm
  • 43. Corridor supply choices  Minimum 0.05 cfm/sq ft corridor area (IBC)  Minimum 0.06 cfm/sq ft corridor area ASHRAE 62.1-2010  Supply all ventilation to corridor & exhaust from units  Original design flow (typically higher)  Confirm with local code official
  • 44. Ventilation treatments – for study  Install effective (and quiet) exhaust fans with capacity of at least 30 to 45cfm  Convert intermittent exhaust to continuous exhaust  Balance exhaust air flows to reduce ventilation driving force between units
  • 45. Ventilation treatments Quiet, Continuous Ventilation Constant Air Regulator Quiet Ceiling Exhaust Multi-point
  • 46. Ventilation rate increased substantially 60% Increase*only one unit with added fan Existing After Treatments Duplex: 28 (12 to 43) 43 (35 to 50) 8-plex: 38 (19 to 58) 50 (26 to 79) 12-plex: 38 (23 to 75) 73 (57 to 157) New 138-unit: 26 (15 to 47) 41 (31 to 53) 11-story: 28 (18 to 79) 69 (45 to 124) 4-story*: 45 (26 to 61) 48 (22 to 88) Average 34 54 Median Ventilation Rate (cfm) min to max One-week tracer gas measurements
  • 47. Cleaner air, same transfer rate  Original ventilation system may be a direct path for smoke transfer (11 story, 138 unit, 4 story ducts)  More smoke is captured near source  Dilution reduces concentration in nonsmoker’s or receiver’s unit
  • 48. Effect of Treatments: Air Transfer Fraction of Incoming Air From Adjoining Units Existing After Treatments Top-floor: 16% (2 to 26%) 13% (0 to 42%) Mid-floor: 5% (1 to 20%) 2% (0 to 12%) Lowest-floor: 2% (1 to 4%) 7% (1 to 19%) One-week tracer gas measurements
  • 49. Effect of treatments  65% of the units had decreased air transfer  60% increase in ventilation rate  80% of tenants: SHS drift was less frequent and less severe
  • 50.
  • 51. 8-Plex: balance ventilation & air seal Rooftop fan serves 4 units
  • 52. 47 28 32 53 26 17 9 32 Uneven exhaust flow rates cause pressure difference & air flow between units Before Apartment exhaust flow rates Powered roof ventilator 8 plex
  • 53. 25 26 28 26 23 26 27 24 47 28 32 53 26 17 9 32 Uneven exhaust flow rates cause pressure difference & air flow between units Before After 6 6 3 2 Added Powered roof ventilator Apartment exhaust flow rates Balanced exhaust flow rates reduces driving forces
  • 55. Easy air flow is possible through framing around pipes, etc
  • 56. Page 56 Is better good enough? Unit #3 contaminants in unit #7 decreased by factor of five Fraction of air from unit #3 to #7 reduced from 11% to 6% Unit #3 ventilation rate increased 158% Marked reduction of SHS odors per tenants Will owners pay for it? Who can do the work?
  • 57. Page 57 Ongoing Success: 67 Buildings in Condo Complex of Tested 8-plex Condo Maintenance team trained to respond to smoke complaints in additional buildings. Smoker is back-charged for repair costs 20 additional units have been completed to date 15 more units are scheduled Huge improvement in livability Common areas air quality improved
  • 58. Page 58 Details of Ongoing work  Typical complaint has smoker on lower level with fan off and large bypasses venting smoke into chases.  Non-smoker on upper level often had higher exhaust fan flows which increased airflow from chase into unit. Stack effect enhances this flow in winter.  Seal major bypasses, 1-4 person hours  Ventilation modifications • Nonsmoker: replace fan damper with CAR • Smoker: remove fan damper and omit CAR for higher capture. • Typical flows are 25cfm in nonsmoker and 75cfm in smoker’s unit. Existing Conditions Practical & Effective Work
  • 59. Page 59 High rise case study: seal hidden shafts & rooftop exhaust ventilation
  • 60. Hidden chase openings often difficult to access
  • 61. Add mineral wool fire-safing to high rise shaft openings
  • 62. Seal with listed fire barrier
  • 63. Page 63 PRV fan on roof – top of vent chase Vent chase Operable register
  • 64. Page 64 FLOOR 0 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 11 3 3 3 3 3 3 0 3 3 3 3 -1 3 3 0 3 3 10 3 3 3 3 3 3 3 3 3 3 3 -1 2 3 0 3 3 9 3 3 3 2 2 3 3 3 3 3 3 -1 2 3 0 0 2 8 2 3 3 0 2 3 2 3 3 3 -1 0 0 3 2 2 2 7 2 3 2 1 2 3 2 1 3 2 2 0 2 3 2 0 2 6 2 2 2 2 2 1 2 2 2 0 2 0 0 2 -1 0 2 5 2 2 2 3 -1 2 -1 2 2 0 0 2 2 2 -1 2 0 4 0 2 2 0 3 2 1 2 2 1 2 1 0 0 0 -1 0 3 1 -1 2 -1 2 2 2 1 2 1 0 2 1 0 0 0 0 2 2 0 2 -1 2 2 0 2 -1 2 0 0 2 2 0 2 0 1 2 2 2 2 2 2 0 0 2 Unit Number Register flow “tissue” test - good - weak - ? - blow back Shaft number F l o o r
  • 65. Page 65 Floor Press Flow Notes 11 -74 28 10 -45 27 9 -15 14 8 -10.8 14 7 -9.5 10 6 na 5 +1.2 + stinks 4 +0.1 + smoker 3 +0.3 + stinks 2 -2.8 4 1 -5.3 8 Flow box measurement
  • 66. Page 66 Obstructions: undersized floor cutout full-sized subduct Concrete floor Bathroom vent sub duct The 144 sq. in. shaft area only has 32 sq. in. for air flow. c Vent chase: 12” X 12” = 144 Sq. in. 8 x 8 cutout
  • 67. Page 67 Obstructions: undersized floor cutout full-sized subduct Vent chase: 12” X 12” = 144 Sq. in. Concrete floor Bathroom sub duct – replaced with 3” for more flow. The 144 in2 shaft only has 32 in2 for air flow 8 x 8 cutout
  • 69. Page 69 Total: 506 cfm From units: 93 cfm Leaks: 413 cfm No flow from lower 5 floors Fan & register flow measurements
  • 70. Page 70 Ventilation system problems Restrictions cause most air to be drawn from upper apartments Duct leaks • Air drawn from unknown sources • Lower units no or reverse flow Operable registers – occupant “balancing” • No flow when closed • Too high when open
  • 71. Page 71 Ventilation system solutions Reduce duct restrictions: 3” sub ducts to upper 3 floors Seal ductwork with Aeroseal technology Install constant air regulators or designed orifice plates at registers Test and adjust fan flow to required duct pressure Thanks to Don Stevens for advising us of subduct code issue Target: equal flow from all units
  • 72. Page 72 Remove restriction and provide 3” subducts for top 3 floors Code: fire damper or sheet metal sub duct extending 22” above fan inlet
  • 73. Page 73 Aeroseal required for fan draw to reach lower units Before After Total: 506 279 cfm From units: 93 221 cfm Leaks: 413 58 cfm Targets leaks
  • 74. Page 74 Option used for test: 3” opening sized to exact flow rate Remove dampers, balance register flow First option : “self-adjusting” constant air regulator “CAR” Production option: fixed orifices – more to come
  • 75. Page 75 Floor Before After Press Flow Press Flow 11 -74 28 -75 21 10 -45 27 -65 20 9 -15 14 -63 20 8 -10.8 14 -56 20 7 -9.5 10 -52 20 6 na -49 20 5 +1.2 + -42 20 4 +0.1 + -42 20 3 +0.3 + -42 20 2 -2.8 4 -42 20 1 -5.3 8 -44 20 Treatments Subducts Aeroseal Orifice plates Fan adjustment Even flow after upgrades Outcomes Required ventilation for all Save 227cfm ($250 - $500/year) Reduce unit/unit flow – smoke drift 17 fans ~ $4k - $8k
  • 76. Page 76 Keep control fans on Aethelometer Measurement of ETS Particle Concentration in Nonsmoker's Apartment -2 0 2 4 6 8 10 12 11/28 11/29 11/30 12/1 12/2 12/3 12/4 12/5 12/6 ETSParticleConcentration(mg/m3 ) Instrument precision ETS odors logged by resident Kitchen shaft central exhaust fan turned off at midnight SHS odor threshold Secondhand smoke monitored in 11th floor unit SHS logged by resident
  • 77. From research to production: current options  Spray seal ducts with mastic & seal fan curbs  Orifice restrictors  Efficient fan  Clean or remove blockages
  • 79. Fan not connected - curb open Current options: curb leakage Total flow: 174 cfm From units: 30 cfm Airflow from building shafts not exhaust grilles
  • 80. Current options: stop curb leakage Sealed Total flow: 126 cfm From units: 120 cfm
  • 81. Current options CARs failures: How soon? How often? After 9 years – 1 in 3 plugged Dust buildup in 9 months Adjustment holes
  • 82. Current options Fixed orifices  Not prone to foul  Can be cleaned  Durable  Sized for flow at target pressure  Mass - produced, low cost  Allow lower operating pressure (reduced duct leakage, & fan power) 2 11/2 11/4 1
  • 83. Current options Fixed orifices – flow rate guideline Inside Diameter (in) Pressure, in wc (Pa) Nominal Actual 0.15 (36) 0.2 (50) 0.25 (62) 0.36 (90) 0.5 (124) 0.75 (186) 2 2.45 36 40 44 54 1.5 1.97 21 24 28 34 39 48 1.25 1.73 18 21 26 29 36 1 1.37 16 18 22 # stories* 3 to 7 5 to 10 6 to 12 9 to 18 12 to 25 to 25 *- building size for Minneapolis climate (20F average outside temp)
  • 84. Current options: efficient fan 384 471 505 622 710 25 42 50 86 126 940 1143 1234 1508 1720 0 200 400 600 800 1000 1200 1400 1600 1800 2000 0 20 40 60 80 100 120 CFMandWatts Static Pressure PA CFM Watts RPM Linear (CFM) Linear (Watts) EC style fan upgrade: lab test results C 9" diam test Static Press (Pa) Flow (cfm) Power (watts) 63.6 in2 inlet area 29 384 25 (13 inlets 2.45 in) 44 471 42 (21 inlets 1.97 in) 50 505 50 (27 inlets 1.73 in) 78 622 86 (43 inlets 1.37 in) 100 710 126 Orifice Area= 64 sq in Fixed Orifice Area= 64 sq in Vary fan speed 400w to 50w saves 3000kwh/yr each
  • 85. Exhaust grille on 12 story looks OK Current options: blockages
  • 86. Current options: blockages Exhaust fan runs but DP low/high Fan intake 20.9Pa too low for flow needed Fan outlet 221Pa to exterior grille (side with resistance) Check pressures
  • 87. Current options: blockages Access plugs from recent duct cleaning Exhaust outlet plugged from inside Hard to see
  • 88. Dirt obstructs flow: clean & adjust fan down Current options: blockages As found: 609 cfm After: 2,338cfm Design flow: 1,780 cfm
  • 89. Fan stops damper from opening Current options: blockages
  • 90. 300 inspected – 1 in 4 plugged Current options: supply blockages
  • 91. Exterior screen is clear. Hidden screen is forgotten Current options: supply blockages Pressure across grille 0.9 in wc (221Pa) Inspection: 18 of 46 Corridor supply intakes obstructed
  • 92. Nobody can keep this clean: remove hidden screens Current options: supply blockages
  • 93. 138 unit: little unit to unit leakage
  • 94. Meets LEED leakage guideline Occupants still complain of smoke transfer 324 323 322 321 601 9 17 574 3 622 +/-1 +/-13 +/-3 1 44 224 +/-7 223 222 +/-4 221 21 688 71 33 661 65 654 +/-7 +/-4 28 -4 2 64 124 +/-14 Guest +/-12 123 +/-15 122 +/-12 121 609 35 390 37 606 51 664 93 683 +/-8 +/-2 +/-8 Guarded-Zone Measured Air Leakage Rates 734 680 -13 +/-11 Oaks: Pre-Treatment unit # total leakage unit/unit leakage leakage precision (cfm50) Smoker Non- smoker
  • 95. Vent blocked: view inside smoker’s fan duct in attic
  • 96. Vent blocked: roof damper frozen shut on same fan
  • 97. CARs in fan duct in attic, smokers open for higher flow
  • 98. Post treatment fan flows Unit Flow (cfm) Unit Flow (cfm) Unit Flow (cfm) 323 24 322 25 224 21 223 20 222 22 Guest 26 123 28 122 20Smoker
  • 99. 4 Story: duct leakage in ceiling joist space
  • 100. All leakage into joist space
  • 101. Aeroseal ducts in joist space
  • 102. Leaks into joist space: lights & sprinklers
  • 103. New continuous duty fan in kitchen: source of odor complaint
  • 104.  Continuous at 40cfm. Installer sets high speed: 75, 160, or 390 cfm  Less than 20 watts at low speed Continuous ventilation with kitchen hood in 1 unit
  • 105. Duct seal side-benefit Backdraft potential reduced by Aeroseal -4.5 pa before -1.5pa after 80%-ID furnace both into B vent natural draft water heater Door closed dryer+ AC fan on in 1 unit
  • 106. Recommendations  Ventilate - source  Seal - between  Ventilate - receiver
  • 107. Recommendations: ventilation  Moderate/continuous/quiet – better than intermittent  Central exhaust: orifice, seal ducts, replace or adjust fan  Check for blockages and leaks
  • 108. Recommendations: air sealing  Seal between units  Large, accessible leaks (unoccupied or new is better)  Includes ducts and mechanical/plumbing chases Improvement possible – can not eliminate transfer
  • 109. In at the bottom and out the top Additional slides
  • 110. Additional Information Canada Mortgage and Housing Corporation Fact Sheet: Solving Odour Transfer Problems in Your Apartment http://www.cmhc.ca/en/co/reho/reho_002.cfm
  • 111. Fan not connected - curb open Current options: curb leakage Total flow: 174 cfm From units: 30 cfm Airflow from building shafts not unit exhaust grilles
  • 112. Current options: stop curb leakage Sealed Total flow: 126 cfm From units: 120 cfm
  • 113. 2-part Foam Seals Plumbing Chase Stop Vertical Air Transfer In Plumbing Wall Patched, primed Inject Foam Along Top of Wall 12-plex Shared leakage reduced about 50% from 507 to 247 cfm50
  • 114. Kitchen option for cooking source In different project after work  Cooking moisture was an issue in 15% of units  Continuous kitchen fan option needed  VenMar developed (UL) a quiet continuous range hood
  • 115. Page 115 Note – Improvements are possible. Managing expectations is important.
  • 116. Page 116 What does this cost, who pays, who can do it? •Licensed mechanical contractor required for all duct alterations. •Aeroseal franchisee required for duct sealing. (Maint. prep ok) •Performance contractor/ consultant for design, balancing, QC •$300 per unit or $3,200 for 1 shaft minimum, $5,000 for 2 shafts •Changes to the building are an Association responsibility. •Airsealing in unit is responsibility of individual condo owner
  • 117. Page 117 Individual supply and very low leakage required for best control If an occupant opens a window to let smoke out air can come in and blow smoke into adjacent units. At 30F we measured a lower unit change pressure from from -0.7pa to hall to +24pa to hall by opening 1 window. Some flow still came in from under the kitchen kickboard @+2pa to hall. The occupant complained about intermittent smoke. Total air leakage down to 283cfm50 after work. Some individuals may not tolerate any smoke transfer, a large improvement may not be enough.

Notes de l'éditeur

  1. Probably the more appropriate title of this presentation is “how to achieve better air quality by sealing leaks between units and improving ventilation. Our focus is not necessarily on reducing energy, but what can be done to improve air quality in MF buildings. So we’ll talk about what the sources of contaminants are, how they get between units, what others have found regarding air leakage and air flows between units and then we’ll present information from our 6 building study in Minnesota.
  2. So do you think the person in this apartment smoked a little bit? It’s either that or a lot of fired food. Secondhand smoke drift between units is one of the most significant sources of concern in apartment buildings and condos.
  3. You could get rid of one of the SHS problem by converting the building to be smoke-free. There has been a strong effort in Minnesota and the “Live Smoke Free” program now has more than 500 smoke-free apartment buildings in Minnesota listed on their web site. They have a nice page that allows people to search for buildings in their area. They also have information for owners regarding steps to making their building smoke-free.
  4. Survey of apartment owners indicates that cooking is the most common source of complaints. So even if a building goes smoke-free, you still have to deal with cooking and other odors that are transferred between units. Also, want to provide adequate ventilation in each unit to keep them fresh.
  5. The cause of the problems are not just the sources, but that air and odors travel between units. You can see in these three studies with tracer gas measurements in apartments across the country that up to 35% of an apartment’s air comes from their neighbors.
  6. Other studies that have looked at the leakage in apartment buildings have found 50% or more of the total leakage is to other apartments or to the common area.
  7. So why is it that apartments share their air and their odors and other contaminants with their neighbors? What are the driving forces?
  8. Just a little building science 101 here. In colder climates the main driving force is the stack effect. You have warm air in the building and colder air outside. Just like a hot air balloon, hotter air rises. In this case this tends to cause air to enter the building on the lower floors and exit out the top. This effect gets bigger with taller buildings, so it can be a big issue for taller MF buildings. That is unless the floors are air sealed or isolated from each other – and that doesn’t happen often.
  9. The wind effect on buildings is pretty obvious. Air tends to enter on the windward side and leave on the downwind side. It is important to note that wind speeds are higher farther from the ground, so wind pressures are greater for the upper level of taller MF buildings.
  10. The third effect is the mechanical system effect and sometimes that isn’t discussed much for single family houses. This is the imbalance of air flow in apartments. In most cases this occurs when there is more exhaust ventilation in one unit than an adjacent unit. Now in some buildings it makes sense to do this. Say for instance you have a pool attached to a school. You don’t want the chlorine smell from the pool to get into the school, so you run extra exhaust in the pool area which causes the pool to be at a negative pressure relative to the school and air flows from the school to the pool – not the other way around. Unfortunately, this same effect happens in MF buildings. Someone doesn’t like their neighbor’s cooking or smoking, so they turn on their bath fan. Unfortunately, that typically causes more air and odor to move into their unit. So turning on an exhaust fan has the exact opposite of the desired effect.
  11. Sometimes smokers can be proactive. We’ve had buildings where the smoker got tired of their neighbor’s complaints so they opened a window when they smoked. Do you think that helps? Well on a cold day it probably helps the person in the unit below, but it doesn’t help their upstairs neighbor. When you open a window it causes the pressure to be about the same as outside which only increases the pressure difference from the smoker to the upper unit and produces more air flow (and odor) to the upper unit. Something to think about – another case where you intuition of what should help actually does not.
  12. Of course you not only need the driving force, but also the pathways. For people that haven’t been involved in air sealing, the initial response can be – how does the air get from my unit to theirs? Solid floor no obvious leaks. But there are always leaks.
  13. Unfortunately, most are small and spread out around the unit – access of occupied units can be a problem.
  14. Baseboards or under walls can be an issue. 1/32” crack doesn’t seem like much but multiply that by 3’ and you have a 1 square inch leak. Multiply by 30’ and you have 10 sq inches.
  15. Not sure if you want this slide here
  16. Not sure if you want this slide here
  17. Add unit ERV/HRV as per Gord Cooke Stack vents
  18. Put these 3 slides in with the LakeShore case study?