SlideShare une entreprise Scribd logo
1  sur  75
Learning To See
VSM
(Value-Stream Mapping)
Whenever there is a product for a customer,
there is a value stream.
The challenge lies in seeing it.
VALUE STREAM MAPPING =
MATERIAL & INFO FLOW MAPPING
1. Adding value
2. Eliminating Waste
3. Establishing flow
What is VSM ?
• All the actions (both value added & non-value
added) currently required to bring a product
through the main flows essential to every
product.
Types:
1. Production: Raw Material to the customer
2. Design: Design to concept launch
What is VSM ?
• What we are going to study here is “Door-to-
Door”
Why VSM is an essential tool ?
1. It helps you visualize more than just the single-process level. (i.e.
assembly, welding … etc.)
2. Mapping helps you to see more than waste and it’s sources.
3. It makes decisions about the flow apparent, so you can discuss them.
4. It ties together lean concepts and techniques which helps you avoid
“cherry picking”*
5. It forms the basis of an implementation plan. VSM becomes blueprint for
lean manufacturing.
6. It shows the linkage between the information flow and the material flow.
7. VSM is a qualitative tool by which you describe in detail how your facility
should operate in order to create flow. Numbers are good for creating
sense of urgency or as before/after measures. VSM is good for describing
what are actually going to do to affect those numbers
• Material and information flows
To create Value-adding flow you need a vision. Mapping helps you see and
focus on flow with a vision of an ideal or improved state.
• Selecting a Product Family
• Family: group of products that pass through
similar processing steps and over common
equipment in the downstream process.
• Value Stream Manager
To get away from the “Isolated Islands” of Functionality
• Kaizen
• Flow Kaizen : Value Stream improvement, it
focuses on material and info.
• Process-Level Kaizen : Elimination of waste at
the shop floor , it focuses on people and
process flow.
One improves the other.
Initial VSM steps
The Current-State Map
Current-State Map
• Purpose: make clear the current production
situation by drawing the material & info flows.
Current-State Map
Mapping begins at the level of the door-to-door flow in the plant
• Mapping tips
• Always collect current-state info while walking along
the actual pathways of material and info flows yourself.
• Begin with quik waks along the entire dorr-to-door
value stream.
• Begin at the shipping end and work upstream, instead
of starting at the receiving dock and walking
downstream.
• Bring your stopwatch and do not rely on standard
times or info that you do not personally obtain.
• Map the whole value stream YOURSELF.
• Always draw by hand and pencil.
The idea of value stream mapping is not map,
But understanding the flow of info and material.
• Drawing the Current-State map
The mapping begins with the customer
requirements.
(Lean Thinking)
1. Factory Icon: mapping starts with the customer’s
requirement represented by the factory icon placed on the
right side. Data box under it recording the requirements.
• Drawing the Current-State map
2. Drawing the basic production process.
Process Box: indicates a process in which the
material is flowing.
• Material flow is drawn form left to the right.
• List of typical process description:
1. C/T (cycle time)
2. C/O (Change over time)
3. Uptime
4. EPEx (Every part every ___ ) : production batch size
5. Number of operators
6. Number of product variations
7. Patch size
8. Scrap rate
9. Working time
• Drawing the Current-State map
• Drawing the Current-State map
• Inventory accumulates capture the location
and amount of inventory.
• Drawing the Current-State map
• Some Lean Measurements:
1. C/T: the time it takes an operator to go
through all of their work elements before
repeating them.
• Drawing the Current-State map
2. VCT (Value Creating Time): time of those
work elements that actually transform the
product in a way that the customer is willing to
pay for.
• Drawing the Current-State map
3. L/T (Lead Time): time form start to finish
through the process or value stream.
• Drawing the Current-State map
3. Truck icon* & a Broad Arrow: indicate the
movement to finished goods to the customer.
• Do not map every purchased part in your
family. Just draw for one or two main raw
materials.
• Drawing the Current-State map
4. Information Flow: describing different
information flows arrows.
• Drawing the Current-State map
5. Production Control Department
• Drawn with a Process Box.
• MRP : Material Requirements Planning system
(computerized)
• Go See : Manual Scheduling
• Drawing the Current-State map
6. Push
7. Time line: under the process box.
• The shorter the production lead time, the
shorter the time between paying for raw
material and getting payed for product made
from these materials.
• Drawing the Current-State map
• Lead time (in days): for each inventory triangle
are calculated.
Inventory Quantity
= ---------------------------------
Daily Customer requirment
What makes a VS lean ?
What makes a VS lean ?
• Over Production:
Mass Production = Batch & Push
(Operates as an Isolated Island)
It is producing more, sooner or faster than is required
by the next process.
It the most significant source of waste.
What makes a VS lean ?
Over Production
• Mass Production
Thinking
The more and faster you
produce, the cheaper is to
produce.
Note: True only for a Direct-
cost-per-item perspective.
• Lean Manufacturing
Thinking
Get one process to make
only what the next
process needs when it
needs it. To generate :
1. Shortest Lead time
2. Highest Quality
3. Lowest Cost
What makes a VS lean ?
• Characteristics of lean VS guidelines:
1. Produce to Takt time:
– Tkat time: Synchronizes pace of production to
match pace of sales.
Available working time per day
T = --------------------------------------------------------
Customer demand rate per day
What makes a VS lean ?
Characteristics of lean VS guidelines
• Takt time:
– It is a reference no. that give you sense for the
rate at which a process should be producing.
– Producing to takt time sounds simple, BUT it
requires concentrated effort to :
• Provide fast response (within takt time).
• Eliminate causes of unplanned downtime.
• Eliminate changeover time in downstream.
What makes a VS lean ?
2. Continuous Flow: producing one piece at a time.
A good approach can be to begin with a combination of continuous flow and some
pull/FIFO.
What makes a VS lean ?
3. Supermarket pull system (KANBAN):
Customer Process : goes to supermarket and withdraws what it needs when it needs it
Supplying process : Produces to replenish what was withdrawn
What makes a VS lean ?
Supermarket pull system (KANBAN)
• Pull: is a method of controlling production
between flows.
• FIFO Lane (First In First Out): used when it is not
practical to keep an inventory of all possible part
variations in pull-system supermarket, Example:
– Parts that has short shelf-life.
– Costly parts that are used frequently.
What makes a VS lean ?
Supermarket pull system (KANBAN)
• “Sequenced Pull” or “The Golf ball system” :
What makes a VS lean ?
4. Pacemaker: Try to send the customer
schedule to only one production process
What makes a VS lean ?
5. Level the production mix:
Distributing the production of different products
evenly over a time period.
• Instead of Type “A” in the morning and type
“B” in the afternoon, Alternating repeatedly
between smaller batches of “A & B”
What makes a VS lean ?
6. Level the Production Volume “Initial Pull”:
– Large batches of work to the shop floor process
cause several problems:
1. No sense of takt time
2. The situation becomes difficult to monitor “Are we
behind or ahead?”
3. Responding to customer requirements becomes very
complicated.
– Level Production volume creates:
1. A predictable production flow.
2. Enables to take quick corrective actions.
What makes a VS lean ?
Level the Production Volume “Initial Pull”
• Paced Withdrawal: A good place to start
production instruction at the pacemaker process.
• Pitch: It is the consistent increment of work.
Pitch = The no. of parts one finished goods
container holds
X
Takt time
What makes a VS lean ?
Level the Production Volume “Initial Pull”
• Example of Pitch :
– Takt time = 30 seconds
– Pack Size = 20 pieces
Pitch= 30 sec * 20 pcs = 10 minutes
Which means every 10 mins:
• Give the pacemaker process info to produce one pack
quantity.
• Take away one finished pitch quantity.
What makes a VS lean ?
Level the Production Volume “Initial Pull”
• How often do you know your performance to
customer demand ? “Management time frame”
Release work to the floor
One week
It is impossible to
produce to takt time
situation.
Every Pitch
You can rapidly
respond to problems
and maintain takt
time.
What makes a VS lean ?
Level the Production Volume “Initial Pull”
• Load-Leveling box
What makes a VS lean ?
Level the Production Volume “Initial Pull”
What makes a VS lean ?
7. EPEx (Every part every ….. ):
Shortening change over times
&
Running smaller batches in your fabrication
process.
• EPEx (x: day, shift, pitch .. Etc.): This describes
how frequently a process changeovers to
produce all part variations.
Future State Map
Future State Map
• Key Questions:
1. What is the Takt time ?
2. Will you build a finished goods Supermarket
from which the customer will Pulls, or
directly to shipping ?
3. Where can you use a Continuous Flow
Processing (One Piece Flow) ?
4. Where will you need to use Supermarket Pull
System (Kanban) ?
Future State Map
Key Questions
5. At What Single point is in the production Chain
(The Pacemaker Process) will you schedule
production ?
6. How will you Level the Production Mix at the
pacemaker process ?
7. What increment of work will you consistently
release (Pitch) and take away to produce ?
8. What Process improvement will be necessary for
the value stream to flow as your Future-State
design specifies ?
Future State Map
1-Takt time
Available Working time
Takt Time = ------------------------------------
Customer Demand
• A gap between Takt time & Cycle time
indicates the existence of production
problems that cause unplanned downtime.
Future State Map
2-Supermarket
Building to a supermarket
(The supermarket schedules assembly)
Future State Map
2-Supermarket
Or Building directly to Shipping
(Production Control schedules assembly)
Future State Map
3- Continuous Flow
(One Piece flow)
(operator balanced chart)
Total Takt time
Number of operators = -----------------------------
Number of operators
Future State Map
4- Supermarket Pull system
Normal Pull System
4- Supermarket Pull system
Signal Kanban : The Kanban is brought from the supermarket
whenever the number of bins remaining in the supermarket
drops to a minimum point
Future State Map
Future State Map
4- Supermarket Pull system
Kanban Post:
» Internal withdrawal kanban between
Production Process & Production Control
Department.
» Production Control then can order form the
Supplier based on actual usage instead of
MRP’s forecast.
Future State Map
5- The Pacemaker Process
Future State Map
6- Leveling the Production Mix
At the pacemaker process
Future State Map
6- Leveling the Production Mix
At the pacemaker process
According to the
production condition
Future State Map
6- Leveling the Production Mix
At the pacemaker process
According to the
production condition
Future State Map
7-Pitch
Future State Map
8-Process Improvements
• Examples:
– Reduction Changeover time
– Total Work content time
– Uptime
Achieving the Future-State
Achieving the Future-State
• Breaking Implementation into Steps:
1. Value Stream Loops :
– Objectives
– Goals
• Improvements to a loop often follows this pattern:
– Continuous flow that operates based on takt time.
– Establish Pull System to control production.
– Leveling.
– Practice Kaizen.
Achieving the Future-State
Value Stream Loops
Achieving the Future-State
Breaking Implementation into Steps
2. The value Stream Plan
• A yearly VS plan that shows:
1. What you plan to do step-by-step.
2. Measurable goals.
3. Clear check points with real deadline and named reviews.
• Where to begin :
1. Where the process is well-understood by your people.
2. Where the likelihood of success is high. (to build
momentum)
3. Where you can predict big bank of the buck.
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix

Contenu connexe

Tendances

Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with exampleMouhcine Nahal
 
value stream mapping
value stream mappingvalue stream mapping
value stream mappingvvmech
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The ConceptSubhrajyoti Parida
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleTKMG, Inc.
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping TechniquesStephen Deas
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com GoLeanSixSigma.com
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training jah10632
 

Tendances (20)

Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Lean basics
Lean basicsLean basics
Lean basics
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
3mu
3mu3mu
3mu
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not people
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Standard Work
Standard WorkStandard Work
Standard Work
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping Techniques
 
Spaghetti Chart
Spaghetti ChartSpaghetti Chart
Spaghetti Chart
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training
 

Similaire à Learning to see (VSM)

VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingJessica Mitchell
 
Value stream mapping - A Simple Primer
Value stream mapping - A Simple PrimerValue stream mapping - A Simple Primer
Value stream mapping - A Simple PrimerVenkat Srinivasan
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Value stream mapping (1)
Value stream mapping (1)Value stream mapping (1)
Value stream mapping (1)jmachado33
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Kanban_230916
Kanban_230916Kanban_230916
Kanban_230916Ram Kumar
 
10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf
10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf
10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdfBENCHERMUSHEMEZA1
 
how-to-understand-and-complete-a-value-stream-map
how-to-understand-and-complete-a-value-stream-maphow-to-understand-and-complete-a-value-stream-map
how-to-understand-and-complete-a-value-stream-mapBENCHERMUSHEMEZA1
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentationBijo Joseph
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxshayanzafar2
 
Taking Value Stream Mapping to the Gemba
Taking Value Stream Mapping to the GembaTaking Value Stream Mapping to the Gemba
Taking Value Stream Mapping to the GembaRaymond Kelly
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 

Similaire à Learning to see (VSM) (20)

VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturing
 
Value stream mapping - A Simple Primer
Value stream mapping - A Simple PrimerValue stream mapping - A Simple Primer
Value stream mapping - A Simple Primer
 
VSM (Méthode HOSHIN)
VSM (Méthode HOSHIN)VSM (Méthode HOSHIN)
VSM (Méthode HOSHIN)
 
VSM - Value Stream Mapping
VSM - Value Stream MappingVSM - Value Stream Mapping
VSM - Value Stream Mapping
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
 
Value stream mapping (1)
Value stream mapping (1)Value stream mapping (1)
Value stream mapping (1)
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Kanban_230916
Kanban_230916Kanban_230916
Kanban_230916
 
Value Stream Analysis
Value Stream AnalysisValue Stream Analysis
Value Stream Analysis
 
VSM Lean Value Stream intro
VSM Lean Value Stream introVSM Lean Value Stream intro
VSM Lean Value Stream intro
 
10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf
10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf
10-vcc-how-to-understand-and-complete-a-value-stream-map-v2.pdf
 
how-to-understand-and-complete-a-value-stream-map
how-to-understand-and-complete-a-value-stream-maphow-to-understand-and-complete-a-value-stream-map
how-to-understand-and-complete-a-value-stream-map
 
VSM
VSMVSM
VSM
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
 
Taking Value Stream Mapping to the Gemba
Taking Value Stream Mapping to the GembaTaking Value Stream Mapping to the Gemba
Taking Value Stream Mapping to the Gemba
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Patton kanban fr
Patton kanban frPatton kanban fr
Patton kanban fr
 

Plus de Mohamed Effat

Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)Mohamed Effat
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementMohamed Effat
 
Toyota Way - Philosophy
Toyota Way - PhilosophyToyota Way - Philosophy
Toyota Way - PhilosophyMohamed Effat
 

Plus de Mohamed Effat (6)

Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Toyota Way - Philosophy
Toyota Way - PhilosophyToyota Way - Philosophy
Toyota Way - Philosophy
 
Advertising
AdvertisingAdvertising
Advertising
 
5s
5s5s
5s
 
Visual Management
Visual Management Visual Management
Visual Management
 

Dernier

GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 

Dernier (20)

GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 

Learning to see (VSM)

  • 2. Whenever there is a product for a customer, there is a value stream. The challenge lies in seeing it.
  • 3. VALUE STREAM MAPPING = MATERIAL & INFO FLOW MAPPING 1. Adding value 2. Eliminating Waste 3. Establishing flow
  • 4. What is VSM ? • All the actions (both value added & non-value added) currently required to bring a product through the main flows essential to every product. Types: 1. Production: Raw Material to the customer 2. Design: Design to concept launch
  • 5. What is VSM ? • What we are going to study here is “Door-to- Door”
  • 6. Why VSM is an essential tool ? 1. It helps you visualize more than just the single-process level. (i.e. assembly, welding … etc.) 2. Mapping helps you to see more than waste and it’s sources. 3. It makes decisions about the flow apparent, so you can discuss them. 4. It ties together lean concepts and techniques which helps you avoid “cherry picking”* 5. It forms the basis of an implementation plan. VSM becomes blueprint for lean manufacturing. 6. It shows the linkage between the information flow and the material flow. 7. VSM is a qualitative tool by which you describe in detail how your facility should operate in order to create flow. Numbers are good for creating sense of urgency or as before/after measures. VSM is good for describing what are actually going to do to affect those numbers
  • 7. • Material and information flows To create Value-adding flow you need a vision. Mapping helps you see and focus on flow with a vision of an ideal or improved state.
  • 8. • Selecting a Product Family • Family: group of products that pass through similar processing steps and over common equipment in the downstream process.
  • 9. • Value Stream Manager To get away from the “Isolated Islands” of Functionality
  • 10. • Kaizen • Flow Kaizen : Value Stream improvement, it focuses on material and info. • Process-Level Kaizen : Elimination of waste at the shop floor , it focuses on people and process flow. One improves the other.
  • 13. Current-State Map • Purpose: make clear the current production situation by drawing the material & info flows.
  • 14. Current-State Map Mapping begins at the level of the door-to-door flow in the plant
  • 15. • Mapping tips • Always collect current-state info while walking along the actual pathways of material and info flows yourself. • Begin with quik waks along the entire dorr-to-door value stream. • Begin at the shipping end and work upstream, instead of starting at the receiving dock and walking downstream. • Bring your stopwatch and do not rely on standard times or info that you do not personally obtain. • Map the whole value stream YOURSELF. • Always draw by hand and pencil.
  • 16. The idea of value stream mapping is not map, But understanding the flow of info and material.
  • 17. • Drawing the Current-State map The mapping begins with the customer requirements. (Lean Thinking) 1. Factory Icon: mapping starts with the customer’s requirement represented by the factory icon placed on the right side. Data box under it recording the requirements.
  • 18. • Drawing the Current-State map 2. Drawing the basic production process. Process Box: indicates a process in which the material is flowing. • Material flow is drawn form left to the right.
  • 19. • List of typical process description: 1. C/T (cycle time) 2. C/O (Change over time) 3. Uptime 4. EPEx (Every part every ___ ) : production batch size 5. Number of operators 6. Number of product variations 7. Patch size 8. Scrap rate 9. Working time • Drawing the Current-State map
  • 20. • Drawing the Current-State map • Inventory accumulates capture the location and amount of inventory.
  • 21. • Drawing the Current-State map • Some Lean Measurements: 1. C/T: the time it takes an operator to go through all of their work elements before repeating them.
  • 22. • Drawing the Current-State map 2. VCT (Value Creating Time): time of those work elements that actually transform the product in a way that the customer is willing to pay for.
  • 23. • Drawing the Current-State map 3. L/T (Lead Time): time form start to finish through the process or value stream.
  • 24. • Drawing the Current-State map 3. Truck icon* & a Broad Arrow: indicate the movement to finished goods to the customer. • Do not map every purchased part in your family. Just draw for one or two main raw materials.
  • 25. • Drawing the Current-State map 4. Information Flow: describing different information flows arrows.
  • 26. • Drawing the Current-State map 5. Production Control Department • Drawn with a Process Box. • MRP : Material Requirements Planning system (computerized) • Go See : Manual Scheduling
  • 27. • Drawing the Current-State map 6. Push 7. Time line: under the process box. • The shorter the production lead time, the shorter the time between paying for raw material and getting payed for product made from these materials.
  • 28. • Drawing the Current-State map • Lead time (in days): for each inventory triangle are calculated. Inventory Quantity = --------------------------------- Daily Customer requirment
  • 29. What makes a VS lean ?
  • 30. What makes a VS lean ? • Over Production: Mass Production = Batch & Push (Operates as an Isolated Island) It is producing more, sooner or faster than is required by the next process. It the most significant source of waste.
  • 31. What makes a VS lean ? Over Production • Mass Production Thinking The more and faster you produce, the cheaper is to produce. Note: True only for a Direct- cost-per-item perspective. • Lean Manufacturing Thinking Get one process to make only what the next process needs when it needs it. To generate : 1. Shortest Lead time 2. Highest Quality 3. Lowest Cost
  • 32. What makes a VS lean ? • Characteristics of lean VS guidelines: 1. Produce to Takt time: – Tkat time: Synchronizes pace of production to match pace of sales. Available working time per day T = -------------------------------------------------------- Customer demand rate per day
  • 33. What makes a VS lean ? Characteristics of lean VS guidelines • Takt time: – It is a reference no. that give you sense for the rate at which a process should be producing. – Producing to takt time sounds simple, BUT it requires concentrated effort to : • Provide fast response (within takt time). • Eliminate causes of unplanned downtime. • Eliminate changeover time in downstream.
  • 34. What makes a VS lean ? 2. Continuous Flow: producing one piece at a time. A good approach can be to begin with a combination of continuous flow and some pull/FIFO.
  • 35. What makes a VS lean ? 3. Supermarket pull system (KANBAN): Customer Process : goes to supermarket and withdraws what it needs when it needs it Supplying process : Produces to replenish what was withdrawn
  • 36. What makes a VS lean ? Supermarket pull system (KANBAN) • Pull: is a method of controlling production between flows. • FIFO Lane (First In First Out): used when it is not practical to keep an inventory of all possible part variations in pull-system supermarket, Example: – Parts that has short shelf-life. – Costly parts that are used frequently.
  • 37. What makes a VS lean ? Supermarket pull system (KANBAN) • “Sequenced Pull” or “The Golf ball system” :
  • 38. What makes a VS lean ? 4. Pacemaker: Try to send the customer schedule to only one production process
  • 39. What makes a VS lean ? 5. Level the production mix: Distributing the production of different products evenly over a time period. • Instead of Type “A” in the morning and type “B” in the afternoon, Alternating repeatedly between smaller batches of “A & B”
  • 40. What makes a VS lean ? 6. Level the Production Volume “Initial Pull”: – Large batches of work to the shop floor process cause several problems: 1. No sense of takt time 2. The situation becomes difficult to monitor “Are we behind or ahead?” 3. Responding to customer requirements becomes very complicated. – Level Production volume creates: 1. A predictable production flow. 2. Enables to take quick corrective actions.
  • 41. What makes a VS lean ? Level the Production Volume “Initial Pull” • Paced Withdrawal: A good place to start production instruction at the pacemaker process. • Pitch: It is the consistent increment of work. Pitch = The no. of parts one finished goods container holds X Takt time
  • 42. What makes a VS lean ? Level the Production Volume “Initial Pull” • Example of Pitch : – Takt time = 30 seconds – Pack Size = 20 pieces Pitch= 30 sec * 20 pcs = 10 minutes Which means every 10 mins: • Give the pacemaker process info to produce one pack quantity. • Take away one finished pitch quantity.
  • 43. What makes a VS lean ? Level the Production Volume “Initial Pull” • How often do you know your performance to customer demand ? “Management time frame” Release work to the floor One week It is impossible to produce to takt time situation. Every Pitch You can rapidly respond to problems and maintain takt time.
  • 44. What makes a VS lean ? Level the Production Volume “Initial Pull” • Load-Leveling box
  • 45. What makes a VS lean ? Level the Production Volume “Initial Pull”
  • 46. What makes a VS lean ? 7. EPEx (Every part every ….. ): Shortening change over times & Running smaller batches in your fabrication process. • EPEx (x: day, shift, pitch .. Etc.): This describes how frequently a process changeovers to produce all part variations.
  • 47.
  • 49. Future State Map • Key Questions: 1. What is the Takt time ? 2. Will you build a finished goods Supermarket from which the customer will Pulls, or directly to shipping ? 3. Where can you use a Continuous Flow Processing (One Piece Flow) ? 4. Where will you need to use Supermarket Pull System (Kanban) ?
  • 50. Future State Map Key Questions 5. At What Single point is in the production Chain (The Pacemaker Process) will you schedule production ? 6. How will you Level the Production Mix at the pacemaker process ? 7. What increment of work will you consistently release (Pitch) and take away to produce ? 8. What Process improvement will be necessary for the value stream to flow as your Future-State design specifies ?
  • 51. Future State Map 1-Takt time Available Working time Takt Time = ------------------------------------ Customer Demand • A gap between Takt time & Cycle time indicates the existence of production problems that cause unplanned downtime.
  • 52. Future State Map 2-Supermarket Building to a supermarket (The supermarket schedules assembly)
  • 53. Future State Map 2-Supermarket Or Building directly to Shipping (Production Control schedules assembly)
  • 54. Future State Map 3- Continuous Flow (One Piece flow) (operator balanced chart) Total Takt time Number of operators = ----------------------------- Number of operators
  • 55. Future State Map 4- Supermarket Pull system Normal Pull System
  • 56. 4- Supermarket Pull system Signal Kanban : The Kanban is brought from the supermarket whenever the number of bins remaining in the supermarket drops to a minimum point Future State Map
  • 57. Future State Map 4- Supermarket Pull system Kanban Post: » Internal withdrawal kanban between Production Process & Production Control Department. » Production Control then can order form the Supplier based on actual usage instead of MRP’s forecast.
  • 58. Future State Map 5- The Pacemaker Process
  • 59. Future State Map 6- Leveling the Production Mix At the pacemaker process
  • 60. Future State Map 6- Leveling the Production Mix At the pacemaker process According to the production condition
  • 61. Future State Map 6- Leveling the Production Mix At the pacemaker process According to the production condition
  • 63. Future State Map 8-Process Improvements • Examples: – Reduction Changeover time – Total Work content time – Uptime
  • 64.
  • 66. Achieving the Future-State • Breaking Implementation into Steps: 1. Value Stream Loops : – Objectives – Goals • Improvements to a loop often follows this pattern: – Continuous flow that operates based on takt time. – Establish Pull System to control production. – Leveling. – Practice Kaizen.
  • 68. Achieving the Future-State Breaking Implementation into Steps 2. The value Stream Plan • A yearly VS plan that shows: 1. What you plan to do step-by-step. 2. Measurable goals. 3. Clear check points with real deadline and named reviews. • Where to begin : 1. Where the process is well-understood by your people. 2. Where the likelihood of success is high. (to build momentum) 3. Where you can predict big bank of the buck.
  • 69.

Notes de l'éditeur

  1. There are two types of mapping :Door-to-door Molecules-to-end-user
  2. *cherry picking: act of pointing to individual cases or data that seem to confirm particular position, While ignoring a significant position of related cases or data that contradict that position.
  3. Do not make the mistake of splitting up the mapping tasks among area managers and then hope to stitch together their individual segments.Do not map your organization, map the flow of the products through the organization.
  4. Work plan & Implementation: Described on one page how to achieve.
  5. Change over time : to switch from producing one type of product type to another.Working time : in seconds, minus break, clean up times … etc.
  6. Note:Cycle time , takt time and availble working times uses seconds
  7. * Rail or air freight icons may be used as well.
  8. Pitch:مقدار ثابت من العمل
  9. عايز أفهم المثال و ال grapgh
  10. MPR : Used to provide a capacity planning forecastDay to Day orders : Based on Pull