Cautionary Statements
 •      Statements contained in this presentation that state the intentions, hopes, estimates, beliefs, anticipations, expectations or predictions of the future of Far East Energy Corporation and its management are forward-looking statements within the meaning of Section 27A of the Securities Act of
        1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. It is important to note that any such forward-looking statements are not guarantees of future performance and involve a number of risks and uncertainties. Actual results could differ materially from those
        projected in such forward-looking statements. Factors that could cause actual results to differ materially from those projected in such forward-looking statements include: the preliminary nature of well data, including permeability and gas content; there can be no assurance as to the volume of
        gas that is ultimately produced or sold from our wells; the fracture stimulation program may not be successful in increasing gas volumes; due to limitations under Chinese law, we may have only limited rights to enforce the gas sales agreement between Shanxi Province Guoxin Energy
        Development Group Limited and China United Coalbed Methane Corporation (“CUCBM”), to which we are an express beneficiary; additional wells may not be drilled, or if drilled may not be timely; additional pipelines and gathering systems needed to transport our gas may not be constructed, or
        if constructed may not be timely, or their routes may differ from those anticipated; the pipeline and local distribution/compressed natural gas companies may decline to purchase or take our gas, or we may not be able to enforce our rights under definitive agreements with pipelines; conflicts with
        coal mining operations or coordination of our exploration and production activities with mining activities could adversely impact or add significant costs to our operations; the Chinese Ministry of Commerce (“MofCom”) may not approve the Modification Agreement to the Shouyang PSC (the
        “Modification Agreement”) on a timely basis or at all, or, if so, on commercially advantageous terms; the MofCom’s failure to approve the extension of the Modification Agreement by March 1, 2012 limited our ability to borrow additional amounts under the credit facility absent a waiver from
        Standard Chartered; the MofCom’s failure to approve the extension of the Modification Agreement by May 30, 2012 could result in the early termination of the credit facility and require immediate repayment of all outstanding amounts thereunder; our inability to comply with certain quarterly
        financial covenants, satisfy certain continuing representations, or remedy a material adverse effect to our business or to certain other conditions could result in an early termination of the credit facility and require immediate repayment of all outstanding amounts thereunder; our Chinese partner
        companies or MofCom may require certain changes to the terms and conditions of the Modification Agreement or our PSCs in conjunction with their approval, including reductions in acreage or a reduction in the term of the extension for the exploration period; our lack of operating history; limited
        and potentially inadequate management of our cash resources; risk and uncertainties associated with exploration, development and production of coalbed methane; our inability to extract or sell all or a substantial portion of our reserves and other resources; we may not satisfy requirements for
        the listing of our securities on a securities exchange; expropriation and other risks associated with foreign operations; disruptions in capital markets affecting fundraising; matters affecting the energy industry generally; lack of availability of oil and gas field goods and services; environmental
        risks; drilling and production risks; changes in laws or regulations affecting our operations, as well as other risks described in our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q and subsequent filings with the Securities and Exchange Commission. Statements contained in this
        presentation speak only as of the date hereof. We assume no obligation to update any of these statements.


 •      Definition of Technical Terms:
        We use certain terms in this presentation, such as “Original Gas-in-Place,” “Recoverable CBM Resources,” “Contingent Resources,” and “Estimated Ultimate Recovery” that the SEC’s guidelines strictly prohibit us from including in filings with the SEC because such technical terms are not
        consistent with the definition of “Proved Reserves” in the SEC rules. Such terms used herein are defined as follows:
            –         SPE Contingent Resources: Those quantities of CBM estimated, as of a given date, to be potentially recoverable from known accumulations by application of development projects, but which are not currently considered to be commercially recoverable due to one or more
                      contingencies.
            –         Original Gas-in-Place: This term refers to discovered and undiscovered Gas-In-Place, which is the quantity of hydrocarbons which is estimated, on a given date, to be contained in known accumulations, plus those quantities already produced therefrom, plus those estimated
                      quantities in accumulations yet to be discovered.
            –         Recoverable CBM Resources: This term refers to discovered and undiscovered Gas-In-Place, which is the quantity of hydrocarbons which is estimated, on a given date, to be contained in known accumulations, plus those quantities already produced therefrom, plus those
                      estimated quantities in accumulations yet to be discovered.
            –         Estimated Ultimate Recovery: The sum of resources remaining as of a given date and the cumulative production as of that date.



 •      Note to Investors Regarding PV-10 Value:

 •      PV-10 Value – This term is considered a non-GAAP financial measure under SEC regulations and represents a pre-tax number. We believe that pre-tax PV-10 Value is an important measure that can be used to evaluate the relative significance of its coalbed methane gas reserves and that PV-
        10 Value is widely used by security analysts and investors when evaluating oil and gas companies. Because many factors that are unique to each individual company impact the amount of future income taxes to be paid, we believe that the use of a pre-tax measure provides greater
        comparability of assets when evaluating companies.

 •      The PV-10 Value does not purport to be, nor should it be interpreted to present, the fair value of the gas reserves of the property. An estimate of fair value would take into account, among other things, the recovery of reserves not presently classified as proved, the value of unproved properties,
        and consideration of expected future economic and operating conditions. The estimates of future cash flows and future production and development costs as of December 31, 2011 are based on the unweighted arithmetic average first-day-of-the-month price for the preceding 12-month period.
        Prices were adjusted by lease for quality, transportation fees and regional price differentials. Estimated future production of proved reserves and estimated future production and development costs of proved reserves are based on current costs and economic conditions.

 •      Far East Energy cautions that the disclosures contained in this presentation related to the PV-10 Value are based on estimates of proved reserve quantities and future production schedules which are inherently imprecise and subject to revision, and the 10% discount rate applied to the PV-10
        Value is arbitrary. In addition, costs and prices as of the measurement date are used in the determinations, and no value may be assigned to probable or possible reserves. Estimates of economically recoverable oil and gas reserves and of future net revenues are based upon a number of
        variable factors and assumptions, all of which are to some degree subjective and may vary considerably from actual results. Therefore, actual production, revenues, development and operating expenditures may not occur as estimated. The reserve data are estimates only, are subject to many
        uncertainties and are based on data gained from production histories and on assumptions as to geologic formations and other matters. Actual quantities of coal bed methane gas may differ materially from the amounts estimated.

 •      Note to Investors Regarding Adjacent Properties:

 •      This presentation contains information about adjacent properties on which we have no right to explore. U.S. investors are cautioned that petroleum/mineral deposits on adjacent properties are not necessarily indicative of such deposits on our properties. This presentation also includes various
        estimates and comparisons contained in studies and reports. Actual results are likely to vary from the results in the studies and reports.
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                                                                                                                                                                           2
Far East Energy Profile
 •        Coalbed methane development company operating under three production sharing contracts
          (PSCs) in Shanxi and Yunnan Provinces (see SEC filings for current status)
           – Total 1.1 million acres (~4450 km2)(d)
           – Estimated 21.3-29.2 Tcf (603-827 Bcm) of gross original gas-in-place (OGIP)(b)
           – Shouyang coals exhibit both high permeability and high gas content, properties that are
             consistent with the most commercially successful CBM basins worldwide
 •        Exceptional infrastructure and market access
           – 20 year gas pipeline sales agreement in place in Shouyang
           – Approximately $6.45 to $7.34/Mcf(c) wellhead price
 •        Strong management and board
           – Solid experience in CBM and with Chinese energy industry and policy makers
 •        Funding in place
           – Bank note payable issued in November 2011 securing the funding needs for current drilling
             program without issuance of equity
     a.   1.1 million gross acres includes acres subject to the Qinnan PSC. Note that the exploration period of the Qinnan PSC has not been extended and remains subject to approval by
          Chinese authorities, we can not be optimistic at this time. The Qinnan PSC covers approximately 528,620 gross acres (2,139 km 2).
     b.   OGIP estimates (P10 -P90) for Qinnan from ConocoPhillips; for Yunnan from Yunnan Provincial Coal Geological Bureau; for Shouyang from July 2011 report by Netherland, Sewell &
          Associates, Inc. (NSAI), and does not take into account recently relinquished acreage.
     c.   Inclusive of current and announced estimated government subsidies, and subject to annual review and exchange rate fluctuations.
     d.   Estimates based on recent extensions and modification agreements for Shouyang and Yunnan PSC. The extensions of the Shouyang and Yunnan PSCs have been executed and are
          pending Chinese government approval from MofCom.
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                                               3
Investment Highlights
                                                     (Trades on OTC:BB as FEEC)
      •      Beneficiary of CHINA’S ECONOMIC GROWTH/robust energy demand
               – Gas demand far exceeds supply with demand expected to triple over next 10 years. PRC
                  focusing on CBM as desirable alternative to LNG imports
      •      Far East Energy’s blocks have enormous gas-in-place, and discovery of HIGH
             PERMEABILITY in Shouyang makes acreage unique in China and potentially world class
               – Netherland Sewell and ARI have verified high gas content/high permeability and project high
                  production rates
               – Shouyang Block could support 4,000 to 5,000 vertical wells on 80-acre spacing
      •      SALES AGREEMENT WITH PIPELINE PROVIDES CAPACITY to move large volumes
             which is ESSENTIAL FOR LARGE-SCALE DEVELOPMENT. Believed to be first of its kind
             for foreign operators. At $6.45 to $7.34/Mcf and assuming ARI projected production levels,
             economics are compelling
      •      Second competing pipeline to Shouyang is now completed, creating likely competition and
             potentially adding up to 50 MMcf/d of off-take capacity (Total possible off-take of 90 MMcf/d
             from both pipelines)
      •      Critical desorption pressure (CDP) reached in portions of the Shouyang 1-H pilot area. At stage
             where high permeability reservoirs often begin to exhibit significant production increases
      •      Multi-year drilling program planning– ramping up to an annual pace of 200 wells per year and up
             to 500 wells per year in outer years

Copyright © 2012 Far East Energy Corp., All rights reserved.                                                   4
Far East Energy’s
                           Production Sharing Contract Areas
                                                                                                       Estimates are based on recent
                                                                                                       extension and modification
                                                                                                       agreement which has been
                                                                                                       executed and is now pending
                                                                                                       Chinese government approval.

                                                                                                        Shouyang contract area
                                                                                                             1656.3 km2
                                                                                                            (409,282 ac)




          Yunnan contract area
               483 km2
             (119,338 ac)
      Estimates are based on recent extension
      and modification agreement which has
      been executed and is now pending
      Chinese government approval.
                                                           Qinnan contract area
                                                               2317.4 km²
                                                              (572,642 ac)
                                        Note that the exploration period of the Qinnan PSC has not
                                        been extended and remains subject to approval by Chinese
                                        authorities. If the Qinnan PSC is not extended, Far East
                                        Energy will hold rights to approximately 528,620 gross acres
                                        (2,139 km2).
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                           5
Why Coalbed Methane in China?
                 Why China?                                            Why Coalbed Methane?
      Enormous energy demand/enormous
           environmental problems                                                   CBM addresses both concerns


                        DEMAND:                                                            SUPPLY:
                       World’s largest                                        China has the largest CBM resources
                     consumer of energy                                       in the world (1305 Tcf gas-in-place)


                     DIRTY ENERGY:                                                              CLEAN CBM:
          73% of energy supply from coal                             CBM (gas) burns substantially cleaner than coal

             ENVIRONMENTAL CONCERNS:                                            China targets 27X increase in gas
  20 out of 30 of the world’s most polluted cities in the world;
                   Number 1 in CO2 emissions
                                                                                  consumption in energy mix
                                                                        CBM production eliminates mine venting and reduces
                   Number 1 in methane emissions
                     (21X heat trapping of CO2)
                                                                               emission of methane to atmosphere


    China coal has among the highest gas
     content in the world, but over 5,000                                            Degasification in advance of
    miners/year die in methane explosions                                              mining coal saves lives
Copyright © 2012 Far East Energy Corp., All rights reserved.       Slide Sources: Business Week, EIA, World Bank, EPA, China Daily, Trading Markets   6
China’s Current Energy Targets
          • China aims for 2.5x increase in CBM
            production in next 5 years
          • China also wants to triple the use of gas by 2020
          • Chinese government officials have stated an
            intent to double the subsidy for CBM
            production to 0.4 RMB/m3 which would move
            the price paid for Far East Energy gas from U.S.
            $6.45 per Mcf to $7.34 per Mcf, a significant
            premium over the Henry Hub U.S. gas price of
            $2.98 per Mcf as of December 30, 2011
Copyright © 2012 Far East Energy Corp., All rights reserved.    7
A Chinese Coalbed Methane Breakthrough
                                          To Supply Growing Demand
•      Far East Energy’s discovery is a breakthrough
       for China’s CBM industry
        – Shouyang’s primary coal seams exhibit both
           high permeability (80 to 120 millidarcies)
                                                               China
           and high gas content
        – Coal seams with similar properties in San
           Juan and Black Warrior basins initiated
           dramatic CBM production growth in U.S.
        – Established operators in China are
           accelerating major development plans
•      Coalbed methane may hold some of the
       greatest potential for increasing Chinese
       domestic gas supplies
        – Demand fundamentals drove flurry of
           acquisitions of Australian CBM in 2008              Australia
        – Domestic sources obviously desirable,
           fueling interests by majors in China CBM
Copyright © 2012 Far East Energy Corp., All rights reserved.                8
Resource Comparison
                           Preliminary technical data suggests that the
                      Company’s North Shouyang acreage compares very well
                                  to premier U.S. CBM plays
          Note: Actual results are likely to vary from the following preliminary estimates, which are based on various assumptions

                                                                                                                      Black      N. Shouyang
                                                                                                      San Juan
                                                                                                                     Warrior       Acreage
  Coal Gas Content (Scf/ton)(b)                                                                        400-500       350-500      400-600(a)
  Coal Thickness: Typical net coal (feet)(b)                                                               40            5          10-15
                                                                                                         (12 m)       (1.5 m)     (3-4.5 m)
  Pressure (psi)(b)                                                                                     1500            400          400
                                                                                                     (10.3 MPa)      (2.8 MPa)    (2.8 MPa)
  Permeability (mD)(b)                                                                                      25          75          100(d)
  Recovery Factor(c)                                                                                       80%         65%         50-70%
  Notes:
  a. Based on recent gas content test results from several pilot development test wells.
  b. Source: Data on U.S. Basins from John P. Seidle, Sproule Associates, Inc., Coalbed Methane. of North America.
  c. Source: Gas Research Institute and March 2008 ARI report.
  d. Permeability in Shouyang Pilot area ranges from 80-120 mD, according to the ARI Report of March 21, 2008.

Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                   9
Netherland, Sewell & Associates, Inc. (NSAI)
                            Reports on OGIP for Shouyang PSC*


                                                                                             Gross OGIP (Tcf / Bcm)
                                                                                               As of June 30, 2011
                                                           Low Estimate                                 Best Estimate                                High Estimate
     Coal Seam                                             Tcf                 Bcm                    Tcf                   Bcm                       Tcf                  Bcm
     No. 3                                               0.900                25.47                 1.487                  42.08                   2.100                   59.43
    No. 9                                                0.860                24.34                 1.047                  29.63                   1.216                   34.41
    No. 15                                               4.964               140.48                 6.056                 171.38                   7.053                 199.60
    Total                                                6.724               190.29                 8.590                 243.10                  10.369                 293.44



     *The NSAI report s on OGIP estimates, which contains further information and qualifications, can be found on Far East Energy’s website at: www.fareastenergy.com. Note that some
       numbers may not total exactly, due to rounding. Estimates are based on original acreage held by the Shouyang PSC. The extension of the exploration period of the Shouyang PSC has
       been executed and is now pending Chinese government approval.




Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                                               10
Netherland, Sewell & Associates, Inc. (NSAI)
                       Contingent Resource Report* for Shouyang PSC


                                                                          RESTATED BASED ON PSC MODIFICATION
                                                                                    As of June 30, 2011

   Shouyang Block                                                               Low                                     Best                                      High
   Net Contingent Resources, Bcf                                          100.4 Bcf                                319.6 Bcf                               461.8 Bcf
   (Bcm)                                                                  (2.8 Bcm)                                (9.1 Bcm)                              (13.1 Bcm)

   Net Cash Flow (NPV10)                                               $259,689,000                           $1,057,426,000                          $1,689,875,000

     (Relinquished 16% of acreage in Shouyang for a 10% reduction in NPV10 of contingent resources)




     Contingent resources are those quantities of CBM estimated, as of a given date, to be potentially recoverable from known
     accumulations by application of development projects, but which are not currently considered to be commercially recoverable
     due to one or more contingencies.

  * The contingent resources report is posted to the FEEC website, www.fareastenergy.com. The NPV10 amounts are shown before consideration of any income taxes.
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                             11
Shouyang US SEC Reserves – RISC
                                      As of December 31, 2011

                                                                   Gross                       Net                       Future Net Revenue
                                 Category                         Reserves                   Reserves                         $million

                                                                    MMscf                      MMscf                            10% Discount

                  Proved Developed                                   14,160                    13,505                                     $34.5
                  Proved Undeveloped                                 45,469                    41,094                                      30.9
                  Total Proved                                       59,629                    54,599                                      65.4
                  Total Probable                                    514,953                    379,603                                    663.9
                  Total Possible                                    165,265                    114,436                                    378.9
                  Total Proved, Probable
                  and Possible Reserves                             739,847                    548,638                               $1,108.2
                  Totals may differ due to rounding.
                  Gas volumes are expressed in units of million standard cubic feet at reference conditions of 60 deg F and 14.696 psia




Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                      12
First Pipeline Sales Agreement
                              for Foreign CBM Operator in China
     20 year gas sales contract with Shanxi
                                                                                             • Flowing in newly constructed pipeline with 40 million cubic feet
          Provincial Guoxin Energy                                                             per day (40 MMcf/d) of capacity
          Development Group (SPG)
             Wellhead price of
                                                                                             • Price includes enacted and announced government subsidies
           1.45 to 1.65 RMB/m3,                                                              • Wellhead price approximately 2.5x that of U.S. Henry Hub gas(b)
   or approximately $6.45 to $7.34/Mcf(a)

                                                                                             • Pipeline must “take” all gas produced up to 300,000 m3/d
    Favorable “take-or-pay” contract terms                                                     (10.6 MMcf/d), or pay for available volumes not taken



         Ability to renegotiate contract for                                                 • Setting stage for strong competitive bidding for selling gas into
                                                                                               second pipeline built to the area
         volumes in excess of 10.6 MMcf/d

                     Second pipeline built to                                                • Presents possibility of even higher prices as two lines may
                                                                                               compete for Far East Energy’s gas
                      Shouyang is complete

   Notes: a.   Inclusive of existing government subsidies (0.2 RMB/m3 from central government plus 0.05 RMB/m3 from Shanxi provincial government) plus estimated 0.2 RMB m3
               government subsidy (announced but not yet implemented), and subject to annual review and exchange rate fluctuations.
          b.   Henry Hub average natural gas price of $2.98/Mcf at December 30, 2011 close.
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                                  13
Extension Agreement for
                      Shouyang Block CBM PSC Signed
     • Agreement signed November 15, 2011, by FEEB and CUCBM extending
       exploration period of Shouyang Block PSC (currently pending Ministry of
       Finance approval)
     • 84.5% of acreage retained (1656.3 km2 or approximately 409,281 acres)
     • Relinquished approximately 306.5 km2 (approximately 75,738 acres)
     • Portions of relinquished acreage are considered by management to be marginal
       or non-prospective
     • Approximately 100 km2 (24,710 acres) is currently pending reserves
       certification by Chinese authorities (includes 1H pilot area as well as several
       nearby PDT wells)
               – Pending Chinese reserves area constitutes basis of a potential Overall Development
                 Plan (ODP)
               – Of this pending reserves area, FEEB is entitled to100% of reserves of approximately
                 65 km2 (16,062 acres) and includes all wells in the 1H pilot area
               – Of this pending reserves area, CUCBM is entitled to100% of reserves of
                 approximately 35 km2 (8,649 acres)

Copyright © 2012 Far East Energy Corp., All rights reserved.                                           14
Gas Gathering System
                                                    Compressor Stations




Copyright © 2012 Far East Energy Corp., All rights reserved.              15
A                         D

                                                                         B                                        R    CUCBM to drill well for FEEB to replace P8




                                                                                    C




                                    Shouyang PSC Exploration Agreement Acreage Diagram
                                    84.5% of acreage retained
                                    A. Approximately 65 km2 with FEEB entitled to100% of reserves
                                    B. 35 km2 with CUCBM entitled to100% of reserves
                                    C. 1656.3 km2 (includes area A)
                                    D. Of the 306.5 km2 relinquished, 104 km2 was either a no coal or thin coal zone



Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                        16
Operations Update
                                                               • 16 new wells completed in July-August 2011 completion cycle

    Drilling and                                               • 3 wells completed in November-December 2011 completion cycle;
                                                                 7 deferred to March 2012 due to freezing conditions
                                                               • De-watering continuing on 1H Pilot Area wells
    Completion                                                 • Currently drilling one well per month over the winter; continued focus on pattern
                                                                 drilling in 1H Pilot Area




                                                               •Located in east central Shouyang Block
                                                               •Thickness of #15 coal seam: 3.85m (12.63 ft)

               SY-P18                                          •Top of the #15 coal seam: 1070 m (3510 ft)
                                                               •Current Production Rate: 40 Mcf/d (1132m3/d)
                                                               •Has produced over 100 Mcf/d at 40 psi surface flowing pressure; 220 M fluid over #15 coal seam
                                                               •Initial test results indicate gas content of 660 scf/ton
                                                               •Demonstrates further permeability continuity across the Shouyang Block




                                                                 •Located in southeast Shouyang Block
                                                                 •Thickness of #15 coal seam: 6.4m (21 ft)
                                                                 •Approximate Vertical Depth:1372m (4501 ft)

               SYS-05                                            •Current Production Rate: 77 Mcf /d (2180m3/d)
                                                                 •Test results indicate gas content of 935 scf/ton
                                                                 •Saturation: 95%


Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                     17
Shouyang Block
                                                                                   Appraisal Wells
  Approximately
  18 km west of                                                                         50-70 mD
   1H pilot area



                       140 mD                                                                        80-100 mD
                      Prod Test                                        20-40 mD                       Prod Test                                                                          Approximately
                                                                       Prod Test                                                                                                         12 km due east
                                                       180mD
                                                                                                                                             +200 mD                                     of 1H pilot area
                                     120 mD           Prod Test                           50 mD
                                    Prod Test
                                                                                                                                                             CUCBM to drill well        Approximately
                                                                                                                                                       R for FEEB to replace P8.        22 km southeast
                                                     30 mD                                                                                                   Location TBD.              of 1H pilot area
                                   50 mD            Prod Test
                                  Prod Test                                   10-20 mD
                                                                              Prod Test        300 mD                                                                                   Approximately
                                                                                              Prod Test                                           2H/2V                                 26 km southeast
                                                                                                                                                  60 mD                                 of 1H pilot area
                                                                                                                                                 Prod Test
                                                                                                            20 mD                                                       10 mD
                                                                                                           IFO Test                                                  Gas Content:
                                                                                                                                                                      529 scf/ton




                                                                                                                                                                                        Depth: 1070 m
                                                                                                                                                                                    Gas Content: 660 scf/ton



                                           Located midway between
                                            northern and southern
                                          boundaries of block and is
                                         approximately 20km south of
                                                 1H pilot area

                                                                                     300+ mD
                                                                                   Gas Content:
                                                                                    479 scf/ton


                                                                                                                                  SYS-05
                                                                                                                      Approximately 14 km south and
                                                                                                                      22 km east of SYS02 and 35 km
                                                                                                                           south of 1H pilot area
                                                                                                                               Depth 1372m
                                                                                                                          Gas Content: 935 scf/ton
                                                                                                                              Saturation: 95%


Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                                                                   18
Shouyang Results of
                                                                 Appraisal Wells
         Approximately
         18 km west of                                                     Approximately                        Approx. Depth: 662 m
          1H pilot area                                                   12 km due east of                        Perm: 200 mD
                                                                            1H pilot area                  Prelim Gas Content: 520 scf/ton
           1H Pilot Area
         Perm: 80-100 mD                                                                             R CUCBM to drill well for FEEB to replace P8. Location TBD.
   Average Depth: approx. 600 m
Average Gas Content: 400-600 scf/ton                                                                                                    SY-P12
    Average Thickness: 3-4.5 m                                                                                                    Approx. Depth: 970 m
                                                                                                                                     Perm: 10 mD
           SY-P17                                                                                                            Prelim Gas Content: 529 scf/ton
    Approx. Depth: 1196 m
    Gas Content: 583 scf/ton                                                                                                                 Approximately 26 km
                                                                                                 Approximately 22 km                              southeast
           SY-P20                                                                                     southeast                                of 1H pilot area
    Approx. Depth: 1054m                                                    SYS-02                 of 1H pilot area
    Gas Content: 561 scf/ton                                         Approx. Depth: 1274m                                                   SY-P18: Promising Area
                                                                         Perm: 300+ mD                                                       Approx. Depth: 1070 m
                                                                     Gas Content: 479 scf/ton                                            Prelim Gas Content: 660 scf/ton
                                                                     Average Thickness: 4m                                                Reached Production Rate over
                                                                                                                                                  100 Mcfpd

               Located midway between
                northern and southern
              boundaries of block and is                                      SYS-05
             approximately 20km south of
                                                                       Approx. Depth:1372m                                                  Approximately 14 km
                     1H pilot area
                                                                      Gas Content: 935 scf/ton                                             south and 22 km east of
                                                                          Saturation: 95%                                                 SYS02 and 35 km south of
                                                                                                                                                1H pilot area




Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                          19
Shouyang Block Permeability*


                                                                          Permeability
                                                                             Range                              Number of Wells
                                  Well Area                                  (mD)                                In this Range
                               1H Pilot Area                                    80-100                        1H Pilot Area Wells

                                      PDTW                                     200-300                                        3
                                      PDTW                                     100-199                                        3
                                      PDTW                                       50-99                                        4
                                      PDTW                                       10-49                                        6




                            *Results of Pilot Development Test Wells (PDTW) to determine the extent of high permeability in Shouyang Block
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                 20
Projected Drilling
                                              Program at Shouyang
                                           Subject to approval by CUCBM
                                                                            Wells
                                                                      Drilled, Drilling
                                                                     and/or Completed
                                        2010 (actual)                        26
                                        2011 (actual spud)                   33
                                        2012 (estimated next12 mos.)        200
                                        2013 (estimated)               300-400
                                        2014 (estimated)                 500

     •         FEEC is currently considering various financial sources to secure project
               finance to fund costs not covered by gas sales.
     •         The revenue from additional wells could provide substantial offset to well costs.

Copyright © 2012 Far East Energy Corp., All rights reserved.                                       21
Bank Financing of 2012
                           Shouyang Development Costs
        Gross Loan Amount:                                                        $25 Million

        Proceeds Net of Issuance Costs:                                          $23.5 Million

        Tenor:                                                   9 months with potential additional 3 month

        Interest Rate:                                                         LIBOR plus 9.5%

        Common Stock Dilution:                                                       NONE

        Amount Drawn at Closing:                                                $17.87 Million

        Use of Proceeds:                                        Operational costs related to first half of 2012
                                                                     and finance and related expenses
        Bank:                                                              Standard Chartered PLC
                                                               (Leading international bank, operated over 150 years
                                                               and earned over 90% of income and profit from Asia,
                                                                           Africa and the Middle East)

Copyright © 2012 Far East Energy Corp., All rights reserved.                                                          22
Key Validation Points
 •       China’s economy robust; energy demand enormous; gas consumption expected to rise
 •       Far East Energy well-positioned to benefit from China’s demand for clean burning gas
           –     In-Country (a competitive advantage over LNG), with enormous resource base of
                 1.1 million acres and 21.3-29.2 Tcf (603-827 Bcm) of estimated gas-in-place (see SEC filings for current
                 status)*
           –     Discovery of breakthrough area of high permeability, high gas content is unique in China with potential
                 to generate optimal economics akin to world’s best CBM plays
           –     Netherland Sewell, ARI verified high permeability, high gas content and projected very attractive
                 economic rates of production
 •       Excellent access to market through national trunk and provincial pipelines
 •       20 year gas sales contract already secured at $6.45 to $7.34/Mcf. Believed to be first foreign
         CBM operator to secure pipeline access essential for large-scale development
 •       Netherland Sewell Contingent Resource Report of June 30, 2011, as restated for PSC extension,
         NPV10 “Best” case $1.1 billion , “High” case $1.7 billion and “Low” case $260 million
 •       Initial independent reserves report by RISC (in accordance with SEC guidelines) showing
         NPV10 of $65.4 million-Proved, $663.9 million-Probable, and $378.9 million-Possible

*Does not take into account acreage relinquished under modification agreement to PSCs pending MofCom approval.
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                23
APPENDIX



Copyright © 2012 Far East Energy Corp., All rights reserved.              24
Third Party Review
                            Shouyang Block #15 Coal Seam
  Advanced Resources International, Inc. (ARI) 2008                                                      Netherland, Sewell & Associates, Inc. (NSAI) 2007

  Initial permeability:                                                                                   Study stated Shouyang Block #15 coal
  80 and 120 millidarcies (md)                                                                            seam has high permeability,
                                                                                                          approximately 100 millidarcies (md)
  Gas content estimate:
  500 scf/ton dry ash free
                                                                                                          Gas content measurements:
                                                                                                          400-600 scf/ton
  Forecast peak daily production
  rate estimates
  •Vertical well   80 acre spacing: 300-500 Mcfpd (8496-14,160 m3pd)                                      Higher gas rates of 1 to 2 MMcfpd
  •Horizontal well 400 acre spacing: 2.3-5 MMcfpd (65-142 Mcmpd)                                          (28-57 Mcmpd) are possible in future
                                                                                                          horizontal wells
  Forecast gas recovery rate estimates
  (20 year, P50)                                                                                          Most likely and mean recovery estimate of
  • Vertical well   40-160 acre spacing: 0.5-1.2 Bcf/well                                                 1.1 Bcf and 1.8 Bcf
                    (14.2-34 MMcm/well)
  • Horizontal well 250 & 550 acre spacing: 3.4-5.3 Bcf/well
                                                                                                          (31.2 and 51 MMcm), respectively, per
                    (96.3-150.1 MMcm/well)                                                                horizontal well
Note: Actual results are likely to vary from the foregoing preliminary estimates, which are based on various assumptions. The third party reports, which contain further information and qualifications,
may be found on Far East Energy’s website (www.fareastenergy.com). ARI is a research and consulting firm that provides services related to coalbed methane, gas shale, tight sands, enhanced oil
recovery and carbon sequestration (www.adv-res.com). NSAI is an independent engineering firm that provides engineering studies of reservoirs for oil and gas companies worldwide
(www.netherlandsewell.com).
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                                                             25
Financial Highlights

                                                                      As of December 31, 2011
                                  Outstanding Shares                           342,209,884
                                  Outstanding Warrants                          21,994,982
                                  Outstanding Options                           10,823,833




                                                               Market Cap                Daily Volume
                OTC.BB                                          @ 12/31/2011
                                                                                             (3 month average
                                                                                              @ 12/31/2011)



                     FEEC                                      $71.9 MM                      1,366,579

Copyright © 2012 Far East Energy Corp., All rights reserved.                                                    26
Vision and Commitment
    Our vision is zero harm to
          people and the
   environment while creating
    value for our shareholders
       as well as for China



                                                               Comply with International
     No lost-time accidents in                                    laws and regulations
      6+ years and no major                                          concerning the
     environmental incidents                                   environment, occupational
                                                               safety and health in China



    Good corporate citizens of
     China, utilizing very high
                                                               Employ numerous safety
     levels of Chinese content
                                                                    precautions
    in personnel, services, and
             equipment

Copyright © 2012 Far East Energy Corp., All rights reserved.                                27
FEEC Management and
                                        Operations Team
                                                                       Michael R. McElwrath
                                                                         CEO, President and Director
                                                               Former U.S. Assistant Secretary of Energy, Director
                                                                 National Institute Petroleum & Energy Research
           Robert “Bob” Hockert                                                     (30+ years)                                     Dr. Zhendong “Alex”
              China Country Manager                                                                                                        Yang
           CBM Drilling & Production                                                                                               Sr. Vice President - Geology
          Manager; District Manager for                                                                                             Pioneer in China Coalbed
             Halliburton – Russia                                                                                                 Methane, Chief Geologist with
                  (20+ years)                                                                                                     Amoco, Arco, BP CBM projects
                                                                                                                                           (40+ years)




                                  Bruce N. Huff                                                                          David J. Minor
                               Chief Financial Officer                                                                  Executive Director of
                                                                                                                            Operations
                           Former President, Director and
                              Chief Financial Officer                                                                Former President and General
                                of Harken Energy                                                                       Manager of Walter Black
                                    (35+ years)                                                                          Warrior Basin, LLC
                                                                                                                             (30+ years)
                                                                         Rebecca B. “Beckie” Le
                                                                           President and CFO – FEEB
                                                                          Sr. VP Government Relations

                                                                            Amerada Hess, Price
                                                                           Waterhouse, Consolidated
                                                                             Edison (15+ years)




Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                      28
FEEC Board of Directors
                                                                            Donald A. Juckett
                                                                   Chairman, retired U.S. Department of Energy;
                                                               Director, Office of Natural Gas; Director, DC Office of
                                                                  American Association of Petroleum Geologists;
                                                                 Established U.S.-China Oil & Gas Industry Forum

                          William A. Anderson                                                                        C. P. Chiang
        Former Founder, Director, President or CFO of publicly and                                           Former China Country Manager of
         privately held banking, energy and technology companies                                                   Burlington Resources;
                                                                                                        40 yrs with Exxon, British Gas, Tenneco, etc.



                       Michael R. McElwrath                                                                         John C. Mihm
                   Former U.S. Assistant Secretary of Energy;                                          Retired Senior Vice President of ConocoPhillips
                           Director National Institute                                                         China background dates to 1983
                        Petroleum & Energy Research
                          (30+ years energy industry)


                           Lucian L. Morrison                                                                  Thomas E. Williams
   Founder and Director of numerous trust and investment companies;                            Retired President of Mauer Technology and VP, R&BD of Noble
              former Chairman and CEO of Wing Corp.                                                             Technology Services Division
                (exploration and production company)                                                          (both Noble Corporation subsidiaries)



Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                 29
Production Sharing Contract Briefs
       Shanxi Province Shouyang PSC(a)                                                        Yunnan Province PSC(a)

       •       FEEC has 100% interest in H-1 proved                                  •     60/40 split with CUCBM
               reserves area, including development costs and                        •     FEEC pays 100% exploration costs/60%
               all production                                                              development costs
       •       70/30% split in other areas
                                                                                     •     CUCBM pays 40% development costs
       •       CUCBM pays 30% development costs in areas
               outside H-1                                                           •     FEEC recovers all exploration costs out of
                                                                                           production
       •       FEEC recovers all exploration costs and
               CUCBM recovers all pre-contract costs                                 •     Parties recover development costs out of
               (US$2.8M) out of production, including H-1                                  production with 9% interest
       •       ConocoPhillips 3.5% ORRI out of FEEC share                            •     Parties pay up to 3% PRC royalty(b)
       •       Parties recover development costs out of
               production with 9% interest
       •       Parties pay up to 3% PRC royalty(b)


                            Shanxi Province Qinnan PSC is similar to Shouyang before the most recent amendment,
                              however force majeure relating to transfer from CUCBM to PetroChina is pending
    (a) The exploration period for the Yunnan PSC and Shouyang PSC expired on 6/30/2011, however an extension has been agreed for Shouyang and
        Yunnan and are awaiting final government approval.
    (b) PRC royalty is zero until 50 million cubic feet per day of gas production, and up to 3% after reaching 500 MMcf/d; however, FEEC understands that
        the royalty regime is changing to a tax regime
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                30
Shanxi Province
                      Gas Pipeline Network                                                  1


       Shouyang Block Pipeline
            Opportunities                                                                   2




                                       Shouyang Block
                                                                                        1
                                      20 year gas sales agreement signed with SPG
                                      (Pipeline arrived to Shouyang PSC in July 2010)



                                                                                        2
                                      Shanxi International
                                      (second competing pipeline complete)




Copyright © 2012 Far East Energy Corp., All rights reserved.                                    31
Acreage Comparison
                                         San Juan Basin (Fruitland Coal)




                                  Source: Map: Energy Information Administration (November, 2007); Shouyang Block Overlay: Jay Smith, Viking Engineering, L.C.
                                                   This map is not an indication that the Shouyang Block will be as successful as the San Juan Basin.
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                     32
Acreage Comparison
                                                             Black Warrior Basin




                                                                                                  Shouyang
                                                                                                    Block
                                                                                                   Acreage
                                                                                                    Size



                                 Source: Map: Energy Information Administration (November, 2007); Shouyang Block Overlay: Jay Smith, Viking Engineering, L.C.
                                                    This map is not an indication that the Shouyang Block will be as successful as the Black Warrior Basin
Copyright © 2012 Far East Energy Corp., All rights reserved.                                                                                                    33
Far East Energy Corporation
                                                                     Website
                                                               www.fareastenergy.com

                                                       Investor Relations Contacts
                                                Michael R. McElwrath – CEO and President
                                                 Bruce N. Huff – Chief Financial Officer
                                                     Catherine Gay – Assistant to CEO
                                                   investorrelations@fareastenergy.com
                                                               281.606.1600

                                                         Corporate Headquarters
                                                 363 N. Sam Houston Parkway E., Suite 380
                                                          Houston, Texas 77060
                                                         Telephone: 832.598.0470

Copyright © 2012 Far East Energy Corp., All rights reserved.                                34

Contenu connexe

Tendances

2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentationApproachResources
 
2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentationApproachResources
 
2014.06 rbc 1x1 presentation
2014.06 rbc 1x1 presentation2014.06 rbc 1x1 presentation
2014.06 rbc 1x1 presentationApproachResources
 
Arex 1 q15 results presentation
Arex 1 q15 results presentationArex 1 q15 results presentation
Arex 1 q15 results presentationApproachResources
 
Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015Marcellus Drilling News
 
Teekay Group 2019 Investor Day - Presentation
Teekay Group 2019 Investor Day - PresentationTeekay Group 2019 Investor Day - Presentation
Teekay Group 2019 Investor Day - PresentationTeekay Corporation
 
Final august investor presentation
Final august investor presentationFinal august investor presentation
Final august investor presentationSandRidgeIR
 
3 q14 results presentation vfinal
3 q14 results presentation vfinal3 q14 results presentation vfinal
3 q14 results presentation vfinalApproachResources
 
Approach 2 q14 results presentation final
Approach 2 q14 results presentation finalApproach 2 q14 results presentation final
Approach 2 q14 results presentation finalApproachResources
 
August 2016 corporate_presentation_final Eclipse resources
August 2016 corporate_presentation_final Eclipse resourcesAugust 2016 corporate_presentation_final Eclipse resources
August 2016 corporate_presentation_final Eclipse resourcesSteve Wittrig
 
Rex Energy Investor Presentation May 2015
Rex Energy Investor Presentation May 2015Rex Energy Investor Presentation May 2015
Rex Energy Investor Presentation May 2015Marcellus Drilling News
 
Arex 3 q15 results presentation
Arex 3 q15 results presentationArex 3 q15 results presentation
Arex 3 q15 results presentationApproachResources
 
Eog 0816 version ms slideshare
Eog 0816 version ms slideshare Eog 0816 version ms slideshare
Eog 0816 version ms slideshare Resources1Smith
 
Rice Energy Investor Presentation - April 2014
Rice Energy Investor Presentation - April 2014Rice Energy Investor Presentation - April 2014
Rice Energy Investor Presentation - April 2014Marcellus Drilling News
 
Teekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation
 
Zeta Oil Capital Presentation - Sept 2015
Zeta Oil Capital Presentation - Sept 2015Zeta Oil Capital Presentation - Sept 2015
Zeta Oil Capital Presentation - Sept 2015Andy Morrison
 

Tendances (20)

2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation
 
2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation
 
2014.06 rbc 1x1 presentation
2014.06 rbc 1x1 presentation2014.06 rbc 1x1 presentation
2014.06 rbc 1x1 presentation
 
Arex 1 q15 results presentation
Arex 1 q15 results presentationArex 1 q15 results presentation
Arex 1 q15 results presentation
 
CHK 2016 Analyst Day
CHK 2016 Analyst DayCHK 2016 Analyst Day
CHK 2016 Analyst Day
 
Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015
 
Teekay Group 2019 Investor Day - Presentation
Teekay Group 2019 Investor Day - PresentationTeekay Group 2019 Investor Day - Presentation
Teekay Group 2019 Investor Day - Presentation
 
Final august investor presentation
Final august investor presentationFinal august investor presentation
Final august investor presentation
 
3 q14 results presentation vfinal
3 q14 results presentation vfinal3 q14 results presentation vfinal
3 q14 results presentation vfinal
 
Approach 2 q14 results presentation final
Approach 2 q14 results presentation finalApproach 2 q14 results presentation final
Approach 2 q14 results presentation final
 
August 2016 corporate_presentation_final Eclipse resources
August 2016 corporate_presentation_final Eclipse resourcesAugust 2016 corporate_presentation_final Eclipse resources
August 2016 corporate_presentation_final Eclipse resources
 
2014 Enercom Presentation
2014 Enercom Presentation2014 Enercom Presentation
2014 Enercom Presentation
 
Eog 0817
Eog 0817Eog 0817
Eog 0817
 
Rex Energy Investor Presentation May 2015
Rex Energy Investor Presentation May 2015Rex Energy Investor Presentation May 2015
Rex Energy Investor Presentation May 2015
 
Arex 3 q15 results presentation
Arex 3 q15 results presentationArex 3 q15 results presentation
Arex 3 q15 results presentation
 
Eog 0816 version ms slideshare
Eog 0816 version ms slideshare Eog 0816 version ms slideshare
Eog 0816 version ms slideshare
 
Rice Energy Investor Presentation - April 2014
Rice Energy Investor Presentation - April 2014Rice Energy Investor Presentation - April 2014
Rice Energy Investor Presentation - April 2014
 
Barclays CEO Energy Conference
Barclays CEO Energy ConferenceBarclays CEO Energy Conference
Barclays CEO Energy Conference
 
Teekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings Presentation
 
Zeta Oil Capital Presentation - Sept 2015
Zeta Oil Capital Presentation - Sept 2015Zeta Oil Capital Presentation - Sept 2015
Zeta Oil Capital Presentation - Sept 2015
 

En vedette

Otis goldfeb2013presentation
Otis goldfeb2013presentationOtis goldfeb2013presentation
Otis goldfeb2013presentationnabarnes
 
Eagle mountainjan13presentation
Eagle mountainjan13presentationEagle mountainjan13presentation
Eagle mountainjan13presentationnabarnes
 
Thompson creekdec2012corppres
Thompson creekdec2012corppresThompson creekdec2012corppres
Thompson creekdec2012corppresnabarnes
 
Entree goldjan2013presentation
Entree goldjan2013presentationEntree goldjan2013presentation
Entree goldjan2013presentationnabarnes
 
Telkonet nov2012presentation
Telkonet nov2012presentationTelkonet nov2012presentation
Telkonet nov2012presentationnabarnes
 
Fortune mineralsjan2013cp
Fortune mineralsjan2013cpFortune mineralsjan2013cp
Fortune mineralsjan2013cpnabarnes
 
Pyramid oilfeb2012presentation
Pyramid oilfeb2012presentationPyramid oilfeb2012presentation
Pyramid oilfeb2012presentationnabarnes
 
Enservco jan2013corppresentation
Enservco jan2013corppresentationEnservco jan2013corppresentation
Enservco jan2013corppresentationnabarnes
 

En vedette (9)

Otis goldfeb2013presentation
Otis goldfeb2013presentationOtis goldfeb2013presentation
Otis goldfeb2013presentation
 
Eagle mountainjan13presentation
Eagle mountainjan13presentationEagle mountainjan13presentation
Eagle mountainjan13presentation
 
Thompson creekdec2012corppres
Thompson creekdec2012corppresThompson creekdec2012corppres
Thompson creekdec2012corppres
 
Boost belgium e-sens
Boost belgium e-sensBoost belgium e-sens
Boost belgium e-sens
 
Entree goldjan2013presentation
Entree goldjan2013presentationEntree goldjan2013presentation
Entree goldjan2013presentation
 
Telkonet nov2012presentation
Telkonet nov2012presentationTelkonet nov2012presentation
Telkonet nov2012presentation
 
Fortune mineralsjan2013cp
Fortune mineralsjan2013cpFortune mineralsjan2013cp
Fortune mineralsjan2013cp
 
Pyramid oilfeb2012presentation
Pyramid oilfeb2012presentationPyramid oilfeb2012presentation
Pyramid oilfeb2012presentation
 
Enservco jan2013corppresentation
Enservco jan2013corppresentationEnservco jan2013corppresentation
Enservco jan2013corppresentation
 

Similaire à Far eastenergyapr2012corporatepresentation

Permex Petroleum Investors Presentation June 2022
Permex Petroleum Investors Presentation June 2022Permex Petroleum Investors Presentation June 2022
Permex Petroleum Investors Presentation June 2022RedChip Companies, Inc.
 
PVA Howard Weil Presentation
PVA Howard Weil PresentationPVA Howard Weil Presentation
PVA Howard Weil PresentationPennVirginiaCorp
 
PVA Howard Weil Presentation
PVA Howard Weil PresentationPVA Howard Weil Presentation
PVA Howard Weil PresentationPennVirginiaCorp
 
EQT Analyst Presentation for Marcellus Shale Drilling Program
EQT Analyst Presentation for Marcellus Shale Drilling ProgramEQT Analyst Presentation for Marcellus Shale Drilling Program
EQT Analyst Presentation for Marcellus Shale Drilling ProgramMarcellus Drilling News
 
PVA June Investor Presentation
PVA June Investor PresentationPVA June Investor Presentation
PVA June Investor PresentationPennVirginiaCorp
 
2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentationApproachResources
 
Scotia Howard Weil 43rd Annual Energy Conference Presentation
Scotia Howard Weil 43rd Annual Energy Conference PresentationScotia Howard Weil 43rd Annual Energy Conference Presentation
Scotia Howard Weil 43rd Annual Energy Conference PresentationApproachResources
 
PVA Investor Presentation 9 -2012
PVA Investor Presentation 9 -2012PVA Investor Presentation 9 -2012
PVA Investor Presentation 9 -2012PennVirginiaCorp
 
Arex 2 q15 results presentation
Arex 2 q15 results presentationArex 2 q15 results presentation
Arex 2 q15 results presentationApproachResources
 
PVA Barclays Investor Presentation
PVA Barclays Investor PresentationPVA Barclays Investor Presentation
PVA Barclays Investor PresentationPennVirginiaCorp
 
PVA Investor Presentation
PVA Investor Presentation PVA Investor Presentation
PVA Investor Presentation PennVirginiaCorp
 
Arex 4 q and fy15 results presentation
Arex 4 q and fy15 results presentationArex 4 q and fy15 results presentation
Arex 4 q and fy15 results presentationApproachResources
 
PVA Investor Presentation (May 2012)
PVA Investor Presentation (May 2012)PVA Investor Presentation (May 2012)
PVA Investor Presentation (May 2012)PennVirginiaCorp
 
PVA Credit Suisse Investor Presentation
PVA Credit Suisse Investor PresentationPVA Credit Suisse Investor Presentation
PVA Credit Suisse Investor PresentationPennVirginiaCorp
 
PVA Brean Murray Investor Presentation
PVA Brean Murray Investor PresentationPVA Brean Murray Investor Presentation
PVA Brean Murray Investor PresentationPennVirginiaCorp
 
Penn Virginia RBC Presentation
Penn Virginia RBC PresentationPenn Virginia RBC Presentation
Penn Virginia RBC PresentationPennVirginiaCorp
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - finalEnLinkMidstreamLLC
 

Similaire à Far eastenergyapr2012corporatepresentation (20)

Permex Petroleum Investors Presentation June 2022
Permex Petroleum Investors Presentation June 2022Permex Petroleum Investors Presentation June 2022
Permex Petroleum Investors Presentation June 2022
 
PVA Howard Weil Presentation
PVA Howard Weil PresentationPVA Howard Weil Presentation
PVA Howard Weil Presentation
 
PVA Howard Weil Presentation
PVA Howard Weil PresentationPVA Howard Weil Presentation
PVA Howard Weil Presentation
 
EQT Analyst Presentation for Marcellus Shale Drilling Program
EQT Analyst Presentation for Marcellus Shale Drilling ProgramEQT Analyst Presentation for Marcellus Shale Drilling Program
EQT Analyst Presentation for Marcellus Shale Drilling Program
 
PVA June Investor Presentation
PVA June Investor PresentationPVA June Investor Presentation
PVA June Investor Presentation
 
2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation2014.02.24 (final) 4 q & fy13 results presentation
2014.02.24 (final) 4 q & fy13 results presentation
 
Scotia Howard Weil 43rd Annual Energy Conference Presentation
Scotia Howard Weil 43rd Annual Energy Conference PresentationScotia Howard Weil 43rd Annual Energy Conference Presentation
Scotia Howard Weil 43rd Annual Energy Conference Presentation
 
PVA Investor Presentation 9 -2012
PVA Investor Presentation 9 -2012PVA Investor Presentation 9 -2012
PVA Investor Presentation 9 -2012
 
Arex 2 q15 results presentation
Arex 2 q15 results presentationArex 2 q15 results presentation
Arex 2 q15 results presentation
 
PVA Barclays Investor Presentation
PVA Barclays Investor PresentationPVA Barclays Investor Presentation
PVA Barclays Investor Presentation
 
PVA Investor Presentation
PVA Investor PresentationPVA Investor Presentation
PVA Investor Presentation
 
PVA Investor Presentation
PVA Investor PresentationPVA Investor Presentation
PVA Investor Presentation
 
PVA Investor Presentation
PVA Investor Presentation PVA Investor Presentation
PVA Investor Presentation
 
Arex 4 q and fy15 results presentation
Arex 4 q and fy15 results presentationArex 4 q and fy15 results presentation
Arex 4 q and fy15 results presentation
 
PVA Investor Presentation
PVA Investor PresentationPVA Investor Presentation
PVA Investor Presentation
 
PVA Investor Presentation (May 2012)
PVA Investor Presentation (May 2012)PVA Investor Presentation (May 2012)
PVA Investor Presentation (May 2012)
 
PVA Credit Suisse Investor Presentation
PVA Credit Suisse Investor PresentationPVA Credit Suisse Investor Presentation
PVA Credit Suisse Investor Presentation
 
PVA Brean Murray Investor Presentation
PVA Brean Murray Investor PresentationPVA Brean Murray Investor Presentation
PVA Brean Murray Investor Presentation
 
Penn Virginia RBC Presentation
Penn Virginia RBC PresentationPenn Virginia RBC Presentation
Penn Virginia RBC Presentation
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - final
 

Plus de nabarnes

Alexco jan13presentation
Alexco jan13presentationAlexco jan13presentation
Alexco jan13presentationnabarnes
 
Otis goldfeb2013corppres
Otis goldfeb2013corppresOtis goldfeb2013corppres
Otis goldfeb2013corppresnabarnes
 
Intl mineralsjan2013corppresentation
Intl mineralsjan2013corppresentationIntl mineralsjan2013corppresentation
Intl mineralsjan2013corppresentationnabarnes
 
Great panthersilverjan2013presentation
Great panthersilverjan2013presentationGreat panthersilverjan2013presentation
Great panthersilverjan2013presentationnabarnes
 
Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013nabarnes
 
Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013nabarnes
 
Colt resourcesjan12cp
Colt resourcesjan12cpColt resourcesjan12cp
Colt resourcesjan12cpnabarnes
 
Max resource presentationnov12
Max resource presentationnov12Max resource presentationnov12
Max resource presentationnov12nabarnes
 
Corporate Presentation January 2013
Corporate Presentation January 2013Corporate Presentation January 2013
Corporate Presentation January 2013nabarnes
 
Inovio dec12corppesentation
Inovio dec12corppesentationInovio dec12corppesentation
Inovio dec12corppesentationnabarnes
 
Inovio 2012 Presentation
Inovio 2012 PresentationInovio 2012 Presentation
Inovio 2012 Presentationnabarnes
 
Inovio dec12corppesentation
Inovio dec12corppesentationInovio dec12corppesentation
Inovio dec12corppesentationnabarnes
 

Plus de nabarnes (12)

Alexco jan13presentation
Alexco jan13presentationAlexco jan13presentation
Alexco jan13presentation
 
Otis goldfeb2013corppres
Otis goldfeb2013corppresOtis goldfeb2013corppres
Otis goldfeb2013corppres
 
Intl mineralsjan2013corppresentation
Intl mineralsjan2013corppresentationIntl mineralsjan2013corppresentation
Intl mineralsjan2013corppresentation
 
Great panthersilverjan2013presentation
Great panthersilverjan2013presentationGreat panthersilverjan2013presentation
Great panthersilverjan2013presentation
 
Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013
 
Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013Eagle mtngoldcorppresjan2013
Eagle mtngoldcorppresjan2013
 
Colt resourcesjan12cp
Colt resourcesjan12cpColt resourcesjan12cp
Colt resourcesjan12cp
 
Max resource presentationnov12
Max resource presentationnov12Max resource presentationnov12
Max resource presentationnov12
 
Corporate Presentation January 2013
Corporate Presentation January 2013Corporate Presentation January 2013
Corporate Presentation January 2013
 
Inovio dec12corppesentation
Inovio dec12corppesentationInovio dec12corppesentation
Inovio dec12corppesentation
 
Inovio 2012 Presentation
Inovio 2012 PresentationInovio 2012 Presentation
Inovio 2012 Presentation
 
Inovio dec12corppesentation
Inovio dec12corppesentationInovio dec12corppesentation
Inovio dec12corppesentation
 

Far eastenergyapr2012corporatepresentation

  • 1. Far East Energy Corporation Corporate Presentation April 17, 2012 2012-05 Copyright © 2012 Far East Energy Corp., All rights reserved.
  • 2. Cautionary Statements • Statements contained in this presentation that state the intentions, hopes, estimates, beliefs, anticipations, expectations or predictions of the future of Far East Energy Corporation and its management are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. It is important to note that any such forward-looking statements are not guarantees of future performance and involve a number of risks and uncertainties. Actual results could differ materially from those projected in such forward-looking statements. Factors that could cause actual results to differ materially from those projected in such forward-looking statements include: the preliminary nature of well data, including permeability and gas content; there can be no assurance as to the volume of gas that is ultimately produced or sold from our wells; the fracture stimulation program may not be successful in increasing gas volumes; due to limitations under Chinese law, we may have only limited rights to enforce the gas sales agreement between Shanxi Province Guoxin Energy Development Group Limited and China United Coalbed Methane Corporation (“CUCBM”), to which we are an express beneficiary; additional wells may not be drilled, or if drilled may not be timely; additional pipelines and gathering systems needed to transport our gas may not be constructed, or if constructed may not be timely, or their routes may differ from those anticipated; the pipeline and local distribution/compressed natural gas companies may decline to purchase or take our gas, or we may not be able to enforce our rights under definitive agreements with pipelines; conflicts with coal mining operations or coordination of our exploration and production activities with mining activities could adversely impact or add significant costs to our operations; the Chinese Ministry of Commerce (“MofCom”) may not approve the Modification Agreement to the Shouyang PSC (the “Modification Agreement”) on a timely basis or at all, or, if so, on commercially advantageous terms; the MofCom’s failure to approve the extension of the Modification Agreement by March 1, 2012 limited our ability to borrow additional amounts under the credit facility absent a waiver from Standard Chartered; the MofCom’s failure to approve the extension of the Modification Agreement by May 30, 2012 could result in the early termination of the credit facility and require immediate repayment of all outstanding amounts thereunder; our inability to comply with certain quarterly financial covenants, satisfy certain continuing representations, or remedy a material adverse effect to our business or to certain other conditions could result in an early termination of the credit facility and require immediate repayment of all outstanding amounts thereunder; our Chinese partner companies or MofCom may require certain changes to the terms and conditions of the Modification Agreement or our PSCs in conjunction with their approval, including reductions in acreage or a reduction in the term of the extension for the exploration period; our lack of operating history; limited and potentially inadequate management of our cash resources; risk and uncertainties associated with exploration, development and production of coalbed methane; our inability to extract or sell all or a substantial portion of our reserves and other resources; we may not satisfy requirements for the listing of our securities on a securities exchange; expropriation and other risks associated with foreign operations; disruptions in capital markets affecting fundraising; matters affecting the energy industry generally; lack of availability of oil and gas field goods and services; environmental risks; drilling and production risks; changes in laws or regulations affecting our operations, as well as other risks described in our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q and subsequent filings with the Securities and Exchange Commission. Statements contained in this presentation speak only as of the date hereof. We assume no obligation to update any of these statements. • Definition of Technical Terms: We use certain terms in this presentation, such as “Original Gas-in-Place,” “Recoverable CBM Resources,” “Contingent Resources,” and “Estimated Ultimate Recovery” that the SEC’s guidelines strictly prohibit us from including in filings with the SEC because such technical terms are not consistent with the definition of “Proved Reserves” in the SEC rules. Such terms used herein are defined as follows: – SPE Contingent Resources: Those quantities of CBM estimated, as of a given date, to be potentially recoverable from known accumulations by application of development projects, but which are not currently considered to be commercially recoverable due to one or more contingencies. – Original Gas-in-Place: This term refers to discovered and undiscovered Gas-In-Place, which is the quantity of hydrocarbons which is estimated, on a given date, to be contained in known accumulations, plus those quantities already produced therefrom, plus those estimated quantities in accumulations yet to be discovered. – Recoverable CBM Resources: This term refers to discovered and undiscovered Gas-In-Place, which is the quantity of hydrocarbons which is estimated, on a given date, to be contained in known accumulations, plus those quantities already produced therefrom, plus those estimated quantities in accumulations yet to be discovered. – Estimated Ultimate Recovery: The sum of resources remaining as of a given date and the cumulative production as of that date. • Note to Investors Regarding PV-10 Value: • PV-10 Value – This term is considered a non-GAAP financial measure under SEC regulations and represents a pre-tax number. We believe that pre-tax PV-10 Value is an important measure that can be used to evaluate the relative significance of its coalbed methane gas reserves and that PV- 10 Value is widely used by security analysts and investors when evaluating oil and gas companies. Because many factors that are unique to each individual company impact the amount of future income taxes to be paid, we believe that the use of a pre-tax measure provides greater comparability of assets when evaluating companies. • The PV-10 Value does not purport to be, nor should it be interpreted to present, the fair value of the gas reserves of the property. An estimate of fair value would take into account, among other things, the recovery of reserves not presently classified as proved, the value of unproved properties, and consideration of expected future economic and operating conditions. The estimates of future cash flows and future production and development costs as of December 31, 2011 are based on the unweighted arithmetic average first-day-of-the-month price for the preceding 12-month period. Prices were adjusted by lease for quality, transportation fees and regional price differentials. Estimated future production of proved reserves and estimated future production and development costs of proved reserves are based on current costs and economic conditions. • Far East Energy cautions that the disclosures contained in this presentation related to the PV-10 Value are based on estimates of proved reserve quantities and future production schedules which are inherently imprecise and subject to revision, and the 10% discount rate applied to the PV-10 Value is arbitrary. In addition, costs and prices as of the measurement date are used in the determinations, and no value may be assigned to probable or possible reserves. Estimates of economically recoverable oil and gas reserves and of future net revenues are based upon a number of variable factors and assumptions, all of which are to some degree subjective and may vary considerably from actual results. Therefore, actual production, revenues, development and operating expenditures may not occur as estimated. The reserve data are estimates only, are subject to many uncertainties and are based on data gained from production histories and on assumptions as to geologic formations and other matters. Actual quantities of coal bed methane gas may differ materially from the amounts estimated. • Note to Investors Regarding Adjacent Properties: • This presentation contains information about adjacent properties on which we have no right to explore. U.S. investors are cautioned that petroleum/mineral deposits on adjacent properties are not necessarily indicative of such deposits on our properties. This presentation also includes various estimates and comparisons contained in studies and reports. Actual results are likely to vary from the results in the studies and reports. Copyright © 2012 Far East Energy Corp., All rights reserved. 2
  • 3. Far East Energy Profile • Coalbed methane development company operating under three production sharing contracts (PSCs) in Shanxi and Yunnan Provinces (see SEC filings for current status) – Total 1.1 million acres (~4450 km2)(d) – Estimated 21.3-29.2 Tcf (603-827 Bcm) of gross original gas-in-place (OGIP)(b) – Shouyang coals exhibit both high permeability and high gas content, properties that are consistent with the most commercially successful CBM basins worldwide • Exceptional infrastructure and market access – 20 year gas pipeline sales agreement in place in Shouyang – Approximately $6.45 to $7.34/Mcf(c) wellhead price • Strong management and board – Solid experience in CBM and with Chinese energy industry and policy makers • Funding in place – Bank note payable issued in November 2011 securing the funding needs for current drilling program without issuance of equity a. 1.1 million gross acres includes acres subject to the Qinnan PSC. Note that the exploration period of the Qinnan PSC has not been extended and remains subject to approval by Chinese authorities, we can not be optimistic at this time. The Qinnan PSC covers approximately 528,620 gross acres (2,139 km 2). b. OGIP estimates (P10 -P90) for Qinnan from ConocoPhillips; for Yunnan from Yunnan Provincial Coal Geological Bureau; for Shouyang from July 2011 report by Netherland, Sewell & Associates, Inc. (NSAI), and does not take into account recently relinquished acreage. c. Inclusive of current and announced estimated government subsidies, and subject to annual review and exchange rate fluctuations. d. Estimates based on recent extensions and modification agreements for Shouyang and Yunnan PSC. The extensions of the Shouyang and Yunnan PSCs have been executed and are pending Chinese government approval from MofCom. Copyright © 2012 Far East Energy Corp., All rights reserved. 3
  • 4. Investment Highlights (Trades on OTC:BB as FEEC) • Beneficiary of CHINA’S ECONOMIC GROWTH/robust energy demand – Gas demand far exceeds supply with demand expected to triple over next 10 years. PRC focusing on CBM as desirable alternative to LNG imports • Far East Energy’s blocks have enormous gas-in-place, and discovery of HIGH PERMEABILITY in Shouyang makes acreage unique in China and potentially world class – Netherland Sewell and ARI have verified high gas content/high permeability and project high production rates – Shouyang Block could support 4,000 to 5,000 vertical wells on 80-acre spacing • SALES AGREEMENT WITH PIPELINE PROVIDES CAPACITY to move large volumes which is ESSENTIAL FOR LARGE-SCALE DEVELOPMENT. Believed to be first of its kind for foreign operators. At $6.45 to $7.34/Mcf and assuming ARI projected production levels, economics are compelling • Second competing pipeline to Shouyang is now completed, creating likely competition and potentially adding up to 50 MMcf/d of off-take capacity (Total possible off-take of 90 MMcf/d from both pipelines) • Critical desorption pressure (CDP) reached in portions of the Shouyang 1-H pilot area. At stage where high permeability reservoirs often begin to exhibit significant production increases • Multi-year drilling program planning– ramping up to an annual pace of 200 wells per year and up to 500 wells per year in outer years Copyright © 2012 Far East Energy Corp., All rights reserved. 4
  • 5. Far East Energy’s Production Sharing Contract Areas Estimates are based on recent extension and modification agreement which has been executed and is now pending Chinese government approval. Shouyang contract area 1656.3 km2 (409,282 ac) Yunnan contract area 483 km2 (119,338 ac) Estimates are based on recent extension and modification agreement which has been executed and is now pending Chinese government approval. Qinnan contract area 2317.4 km² (572,642 ac) Note that the exploration period of the Qinnan PSC has not been extended and remains subject to approval by Chinese authorities. If the Qinnan PSC is not extended, Far East Energy will hold rights to approximately 528,620 gross acres (2,139 km2). Copyright © 2012 Far East Energy Corp., All rights reserved. 5
  • 6. Why Coalbed Methane in China? Why China? Why Coalbed Methane? Enormous energy demand/enormous environmental problems CBM addresses both concerns DEMAND: SUPPLY: World’s largest China has the largest CBM resources consumer of energy in the world (1305 Tcf gas-in-place) DIRTY ENERGY: CLEAN CBM: 73% of energy supply from coal CBM (gas) burns substantially cleaner than coal ENVIRONMENTAL CONCERNS: China targets 27X increase in gas 20 out of 30 of the world’s most polluted cities in the world; Number 1 in CO2 emissions consumption in energy mix CBM production eliminates mine venting and reduces Number 1 in methane emissions (21X heat trapping of CO2) emission of methane to atmosphere China coal has among the highest gas content in the world, but over 5,000 Degasification in advance of miners/year die in methane explosions mining coal saves lives Copyright © 2012 Far East Energy Corp., All rights reserved. Slide Sources: Business Week, EIA, World Bank, EPA, China Daily, Trading Markets 6
  • 7. China’s Current Energy Targets • China aims for 2.5x increase in CBM production in next 5 years • China also wants to triple the use of gas by 2020 • Chinese government officials have stated an intent to double the subsidy for CBM production to 0.4 RMB/m3 which would move the price paid for Far East Energy gas from U.S. $6.45 per Mcf to $7.34 per Mcf, a significant premium over the Henry Hub U.S. gas price of $2.98 per Mcf as of December 30, 2011 Copyright © 2012 Far East Energy Corp., All rights reserved. 7
  • 8. A Chinese Coalbed Methane Breakthrough To Supply Growing Demand • Far East Energy’s discovery is a breakthrough for China’s CBM industry – Shouyang’s primary coal seams exhibit both high permeability (80 to 120 millidarcies) China and high gas content – Coal seams with similar properties in San Juan and Black Warrior basins initiated dramatic CBM production growth in U.S. – Established operators in China are accelerating major development plans • Coalbed methane may hold some of the greatest potential for increasing Chinese domestic gas supplies – Demand fundamentals drove flurry of acquisitions of Australian CBM in 2008 Australia – Domestic sources obviously desirable, fueling interests by majors in China CBM Copyright © 2012 Far East Energy Corp., All rights reserved. 8
  • 9. Resource Comparison Preliminary technical data suggests that the Company’s North Shouyang acreage compares very well to premier U.S. CBM plays Note: Actual results are likely to vary from the following preliminary estimates, which are based on various assumptions Black N. Shouyang San Juan Warrior Acreage Coal Gas Content (Scf/ton)(b) 400-500 350-500 400-600(a) Coal Thickness: Typical net coal (feet)(b) 40 5 10-15 (12 m) (1.5 m) (3-4.5 m) Pressure (psi)(b) 1500 400 400 (10.3 MPa) (2.8 MPa) (2.8 MPa) Permeability (mD)(b) 25 75 100(d) Recovery Factor(c) 80% 65% 50-70% Notes: a. Based on recent gas content test results from several pilot development test wells. b. Source: Data on U.S. Basins from John P. Seidle, Sproule Associates, Inc., Coalbed Methane. of North America. c. Source: Gas Research Institute and March 2008 ARI report. d. Permeability in Shouyang Pilot area ranges from 80-120 mD, according to the ARI Report of March 21, 2008. Copyright © 2012 Far East Energy Corp., All rights reserved. 9
  • 10. Netherland, Sewell & Associates, Inc. (NSAI) Reports on OGIP for Shouyang PSC* Gross OGIP (Tcf / Bcm) As of June 30, 2011 Low Estimate Best Estimate High Estimate Coal Seam Tcf Bcm Tcf Bcm Tcf Bcm No. 3 0.900 25.47 1.487 42.08 2.100 59.43 No. 9 0.860 24.34 1.047 29.63 1.216 34.41 No. 15 4.964 140.48 6.056 171.38 7.053 199.60 Total 6.724 190.29 8.590 243.10 10.369 293.44 *The NSAI report s on OGIP estimates, which contains further information and qualifications, can be found on Far East Energy’s website at: www.fareastenergy.com. Note that some numbers may not total exactly, due to rounding. Estimates are based on original acreage held by the Shouyang PSC. The extension of the exploration period of the Shouyang PSC has been executed and is now pending Chinese government approval. Copyright © 2012 Far East Energy Corp., All rights reserved. 10
  • 11. Netherland, Sewell & Associates, Inc. (NSAI) Contingent Resource Report* for Shouyang PSC RESTATED BASED ON PSC MODIFICATION As of June 30, 2011 Shouyang Block Low Best High Net Contingent Resources, Bcf 100.4 Bcf 319.6 Bcf 461.8 Bcf (Bcm) (2.8 Bcm) (9.1 Bcm) (13.1 Bcm) Net Cash Flow (NPV10) $259,689,000 $1,057,426,000 $1,689,875,000 (Relinquished 16% of acreage in Shouyang for a 10% reduction in NPV10 of contingent resources) Contingent resources are those quantities of CBM estimated, as of a given date, to be potentially recoverable from known accumulations by application of development projects, but which are not currently considered to be commercially recoverable due to one or more contingencies. * The contingent resources report is posted to the FEEC website, www.fareastenergy.com. The NPV10 amounts are shown before consideration of any income taxes. Copyright © 2012 Far East Energy Corp., All rights reserved. 11
  • 12. Shouyang US SEC Reserves – RISC As of December 31, 2011 Gross Net Future Net Revenue Category Reserves Reserves $million MMscf MMscf 10% Discount Proved Developed 14,160 13,505 $34.5 Proved Undeveloped 45,469 41,094 30.9 Total Proved 59,629 54,599 65.4 Total Probable 514,953 379,603 663.9 Total Possible 165,265 114,436 378.9 Total Proved, Probable and Possible Reserves 739,847 548,638 $1,108.2 Totals may differ due to rounding. Gas volumes are expressed in units of million standard cubic feet at reference conditions of 60 deg F and 14.696 psia Copyright © 2012 Far East Energy Corp., All rights reserved. 12
  • 13. First Pipeline Sales Agreement for Foreign CBM Operator in China 20 year gas sales contract with Shanxi • Flowing in newly constructed pipeline with 40 million cubic feet Provincial Guoxin Energy per day (40 MMcf/d) of capacity Development Group (SPG) Wellhead price of • Price includes enacted and announced government subsidies 1.45 to 1.65 RMB/m3, • Wellhead price approximately 2.5x that of U.S. Henry Hub gas(b) or approximately $6.45 to $7.34/Mcf(a) • Pipeline must “take” all gas produced up to 300,000 m3/d Favorable “take-or-pay” contract terms (10.6 MMcf/d), or pay for available volumes not taken Ability to renegotiate contract for • Setting stage for strong competitive bidding for selling gas into second pipeline built to the area volumes in excess of 10.6 MMcf/d Second pipeline built to • Presents possibility of even higher prices as two lines may compete for Far East Energy’s gas Shouyang is complete Notes: a. Inclusive of existing government subsidies (0.2 RMB/m3 from central government plus 0.05 RMB/m3 from Shanxi provincial government) plus estimated 0.2 RMB m3 government subsidy (announced but not yet implemented), and subject to annual review and exchange rate fluctuations. b. Henry Hub average natural gas price of $2.98/Mcf at December 30, 2011 close. Copyright © 2012 Far East Energy Corp., All rights reserved. 13
  • 14. Extension Agreement for Shouyang Block CBM PSC Signed • Agreement signed November 15, 2011, by FEEB and CUCBM extending exploration period of Shouyang Block PSC (currently pending Ministry of Finance approval) • 84.5% of acreage retained (1656.3 km2 or approximately 409,281 acres) • Relinquished approximately 306.5 km2 (approximately 75,738 acres) • Portions of relinquished acreage are considered by management to be marginal or non-prospective • Approximately 100 km2 (24,710 acres) is currently pending reserves certification by Chinese authorities (includes 1H pilot area as well as several nearby PDT wells) – Pending Chinese reserves area constitutes basis of a potential Overall Development Plan (ODP) – Of this pending reserves area, FEEB is entitled to100% of reserves of approximately 65 km2 (16,062 acres) and includes all wells in the 1H pilot area – Of this pending reserves area, CUCBM is entitled to100% of reserves of approximately 35 km2 (8,649 acres) Copyright © 2012 Far East Energy Corp., All rights reserved. 14
  • 15. Gas Gathering System Compressor Stations Copyright © 2012 Far East Energy Corp., All rights reserved. 15
  • 16. A D B R CUCBM to drill well for FEEB to replace P8 C Shouyang PSC Exploration Agreement Acreage Diagram 84.5% of acreage retained A. Approximately 65 km2 with FEEB entitled to100% of reserves B. 35 km2 with CUCBM entitled to100% of reserves C. 1656.3 km2 (includes area A) D. Of the 306.5 km2 relinquished, 104 km2 was either a no coal or thin coal zone Copyright © 2012 Far East Energy Corp., All rights reserved. 16
  • 17. Operations Update • 16 new wells completed in July-August 2011 completion cycle Drilling and • 3 wells completed in November-December 2011 completion cycle; 7 deferred to March 2012 due to freezing conditions • De-watering continuing on 1H Pilot Area wells Completion • Currently drilling one well per month over the winter; continued focus on pattern drilling in 1H Pilot Area •Located in east central Shouyang Block •Thickness of #15 coal seam: 3.85m (12.63 ft) SY-P18 •Top of the #15 coal seam: 1070 m (3510 ft) •Current Production Rate: 40 Mcf/d (1132m3/d) •Has produced over 100 Mcf/d at 40 psi surface flowing pressure; 220 M fluid over #15 coal seam •Initial test results indicate gas content of 660 scf/ton •Demonstrates further permeability continuity across the Shouyang Block •Located in southeast Shouyang Block •Thickness of #15 coal seam: 6.4m (21 ft) •Approximate Vertical Depth:1372m (4501 ft) SYS-05 •Current Production Rate: 77 Mcf /d (2180m3/d) •Test results indicate gas content of 935 scf/ton •Saturation: 95% Copyright © 2012 Far East Energy Corp., All rights reserved. 17
  • 18. Shouyang Block Appraisal Wells Approximately 18 km west of 50-70 mD 1H pilot area 140 mD 80-100 mD Prod Test 20-40 mD Prod Test Approximately Prod Test 12 km due east 180mD +200 mD of 1H pilot area 120 mD Prod Test 50 mD Prod Test CUCBM to drill well Approximately R for FEEB to replace P8. 22 km southeast 30 mD Location TBD. of 1H pilot area 50 mD Prod Test Prod Test 10-20 mD Prod Test 300 mD Approximately Prod Test 2H/2V 26 km southeast 60 mD of 1H pilot area Prod Test 20 mD 10 mD IFO Test Gas Content: 529 scf/ton Depth: 1070 m Gas Content: 660 scf/ton Located midway between northern and southern boundaries of block and is approximately 20km south of 1H pilot area 300+ mD Gas Content: 479 scf/ton SYS-05 Approximately 14 km south and 22 km east of SYS02 and 35 km south of 1H pilot area Depth 1372m Gas Content: 935 scf/ton Saturation: 95% Copyright © 2012 Far East Energy Corp., All rights reserved. 18
  • 19. Shouyang Results of Appraisal Wells Approximately 18 km west of Approximately Approx. Depth: 662 m 1H pilot area 12 km due east of Perm: 200 mD 1H pilot area Prelim Gas Content: 520 scf/ton 1H Pilot Area Perm: 80-100 mD R CUCBM to drill well for FEEB to replace P8. Location TBD. Average Depth: approx. 600 m Average Gas Content: 400-600 scf/ton SY-P12 Average Thickness: 3-4.5 m Approx. Depth: 970 m Perm: 10 mD SY-P17 Prelim Gas Content: 529 scf/ton Approx. Depth: 1196 m Gas Content: 583 scf/ton Approximately 26 km Approximately 22 km southeast SY-P20 southeast of 1H pilot area Approx. Depth: 1054m SYS-02 of 1H pilot area Gas Content: 561 scf/ton Approx. Depth: 1274m SY-P18: Promising Area Perm: 300+ mD Approx. Depth: 1070 m Gas Content: 479 scf/ton Prelim Gas Content: 660 scf/ton Average Thickness: 4m Reached Production Rate over 100 Mcfpd Located midway between northern and southern boundaries of block and is SYS-05 approximately 20km south of Approx. Depth:1372m Approximately 14 km 1H pilot area Gas Content: 935 scf/ton south and 22 km east of Saturation: 95% SYS02 and 35 km south of 1H pilot area Copyright © 2012 Far East Energy Corp., All rights reserved. 19
  • 20. Shouyang Block Permeability* Permeability Range Number of Wells Well Area (mD) In this Range 1H Pilot Area 80-100 1H Pilot Area Wells PDTW 200-300 3 PDTW 100-199 3 PDTW 50-99 4 PDTW 10-49 6 *Results of Pilot Development Test Wells (PDTW) to determine the extent of high permeability in Shouyang Block Copyright © 2012 Far East Energy Corp., All rights reserved. 20
  • 21. Projected Drilling Program at Shouyang Subject to approval by CUCBM Wells Drilled, Drilling and/or Completed 2010 (actual) 26 2011 (actual spud) 33 2012 (estimated next12 mos.) 200 2013 (estimated) 300-400 2014 (estimated) 500 • FEEC is currently considering various financial sources to secure project finance to fund costs not covered by gas sales. • The revenue from additional wells could provide substantial offset to well costs. Copyright © 2012 Far East Energy Corp., All rights reserved. 21
  • 22. Bank Financing of 2012 Shouyang Development Costs Gross Loan Amount: $25 Million Proceeds Net of Issuance Costs: $23.5 Million Tenor: 9 months with potential additional 3 month Interest Rate: LIBOR plus 9.5% Common Stock Dilution: NONE Amount Drawn at Closing: $17.87 Million Use of Proceeds: Operational costs related to first half of 2012 and finance and related expenses Bank: Standard Chartered PLC (Leading international bank, operated over 150 years and earned over 90% of income and profit from Asia, Africa and the Middle East) Copyright © 2012 Far East Energy Corp., All rights reserved. 22
  • 23. Key Validation Points • China’s economy robust; energy demand enormous; gas consumption expected to rise • Far East Energy well-positioned to benefit from China’s demand for clean burning gas – In-Country (a competitive advantage over LNG), with enormous resource base of 1.1 million acres and 21.3-29.2 Tcf (603-827 Bcm) of estimated gas-in-place (see SEC filings for current status)* – Discovery of breakthrough area of high permeability, high gas content is unique in China with potential to generate optimal economics akin to world’s best CBM plays – Netherland Sewell, ARI verified high permeability, high gas content and projected very attractive economic rates of production • Excellent access to market through national trunk and provincial pipelines • 20 year gas sales contract already secured at $6.45 to $7.34/Mcf. Believed to be first foreign CBM operator to secure pipeline access essential for large-scale development • Netherland Sewell Contingent Resource Report of June 30, 2011, as restated for PSC extension, NPV10 “Best” case $1.1 billion , “High” case $1.7 billion and “Low” case $260 million • Initial independent reserves report by RISC (in accordance with SEC guidelines) showing NPV10 of $65.4 million-Proved, $663.9 million-Probable, and $378.9 million-Possible *Does not take into account acreage relinquished under modification agreement to PSCs pending MofCom approval. Copyright © 2012 Far East Energy Corp., All rights reserved. 23
  • 24. APPENDIX Copyright © 2012 Far East Energy Corp., All rights reserved. 24
  • 25. Third Party Review Shouyang Block #15 Coal Seam Advanced Resources International, Inc. (ARI) 2008 Netherland, Sewell & Associates, Inc. (NSAI) 2007 Initial permeability: Study stated Shouyang Block #15 coal 80 and 120 millidarcies (md) seam has high permeability, approximately 100 millidarcies (md) Gas content estimate: 500 scf/ton dry ash free Gas content measurements: 400-600 scf/ton Forecast peak daily production rate estimates •Vertical well 80 acre spacing: 300-500 Mcfpd (8496-14,160 m3pd) Higher gas rates of 1 to 2 MMcfpd •Horizontal well 400 acre spacing: 2.3-5 MMcfpd (65-142 Mcmpd) (28-57 Mcmpd) are possible in future horizontal wells Forecast gas recovery rate estimates (20 year, P50) Most likely and mean recovery estimate of • Vertical well 40-160 acre spacing: 0.5-1.2 Bcf/well 1.1 Bcf and 1.8 Bcf (14.2-34 MMcm/well) • Horizontal well 250 & 550 acre spacing: 3.4-5.3 Bcf/well (31.2 and 51 MMcm), respectively, per (96.3-150.1 MMcm/well) horizontal well Note: Actual results are likely to vary from the foregoing preliminary estimates, which are based on various assumptions. The third party reports, which contain further information and qualifications, may be found on Far East Energy’s website (www.fareastenergy.com). ARI is a research and consulting firm that provides services related to coalbed methane, gas shale, tight sands, enhanced oil recovery and carbon sequestration (www.adv-res.com). NSAI is an independent engineering firm that provides engineering studies of reservoirs for oil and gas companies worldwide (www.netherlandsewell.com). Copyright © 2012 Far East Energy Corp., All rights reserved. 25
  • 26. Financial Highlights As of December 31, 2011 Outstanding Shares 342,209,884 Outstanding Warrants 21,994,982 Outstanding Options 10,823,833 Market Cap Daily Volume OTC.BB @ 12/31/2011 (3 month average @ 12/31/2011) FEEC $71.9 MM 1,366,579 Copyright © 2012 Far East Energy Corp., All rights reserved. 26
  • 27. Vision and Commitment Our vision is zero harm to people and the environment while creating value for our shareholders as well as for China Comply with International No lost-time accidents in laws and regulations 6+ years and no major concerning the environmental incidents environment, occupational safety and health in China Good corporate citizens of China, utilizing very high Employ numerous safety levels of Chinese content precautions in personnel, services, and equipment Copyright © 2012 Far East Energy Corp., All rights reserved. 27
  • 28. FEEC Management and Operations Team Michael R. McElwrath CEO, President and Director Former U.S. Assistant Secretary of Energy, Director National Institute Petroleum & Energy Research Robert “Bob” Hockert (30+ years) Dr. Zhendong “Alex” China Country Manager Yang CBM Drilling & Production Sr. Vice President - Geology Manager; District Manager for Pioneer in China Coalbed Halliburton – Russia Methane, Chief Geologist with (20+ years) Amoco, Arco, BP CBM projects (40+ years) Bruce N. Huff David J. Minor Chief Financial Officer Executive Director of Operations Former President, Director and Chief Financial Officer Former President and General of Harken Energy Manager of Walter Black (35+ years) Warrior Basin, LLC (30+ years) Rebecca B. “Beckie” Le President and CFO – FEEB Sr. VP Government Relations Amerada Hess, Price Waterhouse, Consolidated Edison (15+ years) Copyright © 2012 Far East Energy Corp., All rights reserved. 28
  • 29. FEEC Board of Directors Donald A. Juckett Chairman, retired U.S. Department of Energy; Director, Office of Natural Gas; Director, DC Office of American Association of Petroleum Geologists; Established U.S.-China Oil & Gas Industry Forum William A. Anderson C. P. Chiang Former Founder, Director, President or CFO of publicly and Former China Country Manager of privately held banking, energy and technology companies Burlington Resources; 40 yrs with Exxon, British Gas, Tenneco, etc. Michael R. McElwrath John C. Mihm Former U.S. Assistant Secretary of Energy; Retired Senior Vice President of ConocoPhillips Director National Institute China background dates to 1983 Petroleum & Energy Research (30+ years energy industry) Lucian L. Morrison Thomas E. Williams Founder and Director of numerous trust and investment companies; Retired President of Mauer Technology and VP, R&BD of Noble former Chairman and CEO of Wing Corp. Technology Services Division (exploration and production company) (both Noble Corporation subsidiaries) Copyright © 2012 Far East Energy Corp., All rights reserved. 29
  • 30. Production Sharing Contract Briefs Shanxi Province Shouyang PSC(a) Yunnan Province PSC(a) • FEEC has 100% interest in H-1 proved • 60/40 split with CUCBM reserves area, including development costs and • FEEC pays 100% exploration costs/60% all production development costs • 70/30% split in other areas • CUCBM pays 40% development costs • CUCBM pays 30% development costs in areas outside H-1 • FEEC recovers all exploration costs out of production • FEEC recovers all exploration costs and CUCBM recovers all pre-contract costs • Parties recover development costs out of (US$2.8M) out of production, including H-1 production with 9% interest • ConocoPhillips 3.5% ORRI out of FEEC share • Parties pay up to 3% PRC royalty(b) • Parties recover development costs out of production with 9% interest • Parties pay up to 3% PRC royalty(b) Shanxi Province Qinnan PSC is similar to Shouyang before the most recent amendment, however force majeure relating to transfer from CUCBM to PetroChina is pending (a) The exploration period for the Yunnan PSC and Shouyang PSC expired on 6/30/2011, however an extension has been agreed for Shouyang and Yunnan and are awaiting final government approval. (b) PRC royalty is zero until 50 million cubic feet per day of gas production, and up to 3% after reaching 500 MMcf/d; however, FEEC understands that the royalty regime is changing to a tax regime Copyright © 2012 Far East Energy Corp., All rights reserved. 30
  • 31. Shanxi Province Gas Pipeline Network 1 Shouyang Block Pipeline Opportunities 2 Shouyang Block 1 20 year gas sales agreement signed with SPG (Pipeline arrived to Shouyang PSC in July 2010) 2 Shanxi International (second competing pipeline complete) Copyright © 2012 Far East Energy Corp., All rights reserved. 31
  • 32. Acreage Comparison San Juan Basin (Fruitland Coal) Source: Map: Energy Information Administration (November, 2007); Shouyang Block Overlay: Jay Smith, Viking Engineering, L.C. This map is not an indication that the Shouyang Block will be as successful as the San Juan Basin. Copyright © 2012 Far East Energy Corp., All rights reserved. 32
  • 33. Acreage Comparison Black Warrior Basin Shouyang Block Acreage Size Source: Map: Energy Information Administration (November, 2007); Shouyang Block Overlay: Jay Smith, Viking Engineering, L.C. This map is not an indication that the Shouyang Block will be as successful as the Black Warrior Basin Copyright © 2012 Far East Energy Corp., All rights reserved. 33
  • 34. Far East Energy Corporation Website www.fareastenergy.com Investor Relations Contacts Michael R. McElwrath – CEO and President Bruce N. Huff – Chief Financial Officer Catherine Gay – Assistant to CEO investorrelations@fareastenergy.com 281.606.1600 Corporate Headquarters 363 N. Sam Houston Parkway E., Suite 380 Houston, Texas 77060 Telephone: 832.598.0470 Copyright © 2012 Far East Energy Corp., All rights reserved. 34