SlideShare une entreprise Scribd logo
1  sur  56
A MINI PROJECT ON THE
TRANSMISSION TOWER
PRESENTED BY:-
ATUL YADAV
MUKESH RANJAN SINGH
NAQEEB KHAN
NAVEEN KUMAR
ELECTRICAL DEPARTMENT
FINAL YEAR,BBDU
1
INTRODUCTION
NAMING
"Transmission tower" is the name for the
structure used in the industry in the United
Kingdom, United States, and other English-
speaking countries. The term "pylon" comes
from the basic shape of the structure, an
obelisk-like structure which tapers toward the
top, and is mostly used in the United
Kingdom and parts of Europe in everyday
colloquial speech. This term is used
infrequently in the United States, as the word
"pylon" is commonly used for a multitude of
other things, mostly for traffic cones.
2
TRANSMISSION TOWER
 A Transmission tower is a tall structure, usually a
steel lattic tower, used to support an overhead
power line.
 They are used in high-voltage AC and DC systems,
and come in a wide variety of shapes and sizes.
 Typical height ranges from 15 to 55 metres (49 to
180 ft), though the tallest are the 370 m (1,214 ft)
towers of a 2700-metre-long span of Zhoushan
Island Overhead Powerline Tie
3
ON THE BASIS OF CURRENT
TYPES OF TOWER
1. HVAC TRANSMISSION TOWER.
2. HVDC TRANSMISSION TOWER.
3. RAILWAY TRACTION LINE TOWER.
4. TOWER FOR DIFFERENT TYPE OF
CURRENT.
4
HVAC TRANSMISSION
TOWER
 Three phase electric power systems are used for high
voltage (66 or 69 kV and above) and extra-high voltage
(110 or 115 kV and above; most often 138 or 230 kV
and above in contemporary systems) AC transmission
lines.
 The towers must be designed to carry three(or multiples
of three) conductors.
 The towers are usually steel lattices or
trusses (wooden structures are used
in Canada,Germany, and Scandinavia in some cases)
and the insulators are either glass or porcelain discs.
5
HVDC TRANSMISSION TOWER
 HVDC transmission lines are either monopolar or
bipolar systems.
 With bipolar systems a conductor arrangement with
one conductor on each side of the tower is used.
 For single-pole HVDC transmission with ground
return, towers with only one conductor can be
used.
 The towers are designed for later conversion to a
two-pole system. In these cases, often conductors
on both sides of the tower are installed for
mechanical reasons.
6
RAILWAY TRACTION LINE
TOWER
 Towers used for single-phase AC railway traction
lines are similar in construction to those towers used for
110 kV-three phase lines.
 Steel tube or concrete poles are also often used for
these lines.
 The towers of railway traction lines carry two electric
circuits, so they have four conductors.
 Each circuit occupies one half of the cross arm. For six
electric circuits arrangement of the conductors is in
three levels.
7
TOWER FOR DIFFERENT
TYPE OF CURRENT
 Line carry both AC and DC power circuits. One set of
towers is near the HVDC Volgograd-Donbass on Volga
Hydroelectric Power Station. The other are two towers
south of Stenkullen, which carry one circuit of HVDC
Konti-Skan and üne circuit of the three-phase AC line
Stenkullen-Holmbakullen.
 Towers carrying AC circuits and DC electrode lines exist
in a section of the powerline between Adalph Static
Inverter Plant and Brookston the pylons carry the
electrode line of HVDC Square Butte.
 The overhead section of the electrode line of Pacific DC
Intertie from Sylmar Converter Station to the grounding
electrode in the Pacific Ocean near Will Rogers State
Beach is also installed on AC pylons
8
ON THE BASIS OF LINE
SUPPORT TYPES OF TOWER
1. WOODEN POLES
2. RCC POLES
3. STEEL TUBULAR POLES
4. STEEL TOWERS
The supports for an overhead line must be
capable of carrying the load due to:
 Conductors
 Insulators
 Wind load on the support itself.
9
WOODEN POLES
 Made of chemically treated wood.
 Used for distribution lines especially in
areas where good quality wood are
available.
 Very economical but susceptible to decay.
 To protect from decay,poles have zinc or
aluminium cap at the top and Bitumen
coating at the bottom.
10
RCC POLES
 Made of reinforced concrete cement.
 Stronger than wood poles but more costly.
 Very long life and need little maintenance.
 Bulky and heavy.
 Widely used for distribution lines upto 33kV.
 Can be manufactured at site.
11
STEEL TUBULAR POLES
 Stepped pole manufactured from a single
tube , the diameter being reduced in
parallel steps.
 More costly than RCC and wood poles.
 Have light weight , high strength to weight
ratio and long life.
 Widely used for lines upto 33kV.
12
STEEL TOWERS
 Used for lines of 66kV and above.
 Very long life and high degree of reliability.
 Can withstand very severe weather
conditions.
 Overhead HV, EHV and UHV lines mostly
use self supporting steel towers.
13
TYPES OF TOWER ON THE
BASIS OF LINE DIVERSION
 Type A Tower (Tangent Tower with suspension string)
o Used on straight runs and up to 2° line diversion
 Type B Tower (Small Angle Tower with tension string)
o Used for line deviation from 2° to 15°
 Type C Tower (Medium Angle Tower with tension string ).
o Used for line deviation from 15° to 30°.
 Type D Tower (Large angle tower with tension string)
o Used for line deviation from 30° to 60°
 Type E Tower (Dead End Tower with tension string)
o Used for line termination & starting
 Special tower-
 Suspension Tower (Span ≈ 1000 m)
o Used for River crossing, Mountain crossing etc.
 Transposition Tower
o Used for transposition of tower
14
DIFFERENT TYPES OF TOWER
15
Selection of Tower Structure
 Single circuit Tower/ double circuit Tower.
 Length of the insulator assembly.
 Minimum clearances to be maintained between ground
conductors, and between conductors and tower.
 Location of ground wire/wires with respect to the
outermost conductor.
 Mid-span clearance required from considerations of the
dynamic behavior of conductors and lightning protection
of the line.
 Minimum clearance of the lowest conductor above ground
level.
16
Tower Design
 Tower height
 Base width
 Top damper width
 Cross arms length
17
Height of Tower Structure
18
4321 hhhhH 
Height of tower is determine by-
h1=Minimum permissible ground
clearance
h2=Maximum sag
h3=Vertical spacing between conductors
h4=Vertical clearance between earthwire
and top conductor
19
Determination of Base Width
The base width(at the concrete level) is the distance
between the centre of gravity at one corner leg and
the centre of gravity of the adjacent corner leg.
 A particular base width which gives the minimum total cost of the
tower and foundations.
 The ratio of base width to total tower height for most towers is
generally about one-fifth to one-tenth.
Ryle
Formula
Spacing and Clearances
20
Ground Clearances
KCL *305.0182.5 





 

33
33V
KWhere-
S.No. Voltage level Ground
clearance(m)
1. ≤33 KV 5.20
2. 66 KV 5.49
3. 132KV 6.10
4. 220 KV 7.01
5. 400 KV 8.84
Minimum permissible ground clearance as per IE Rules,
1956,Rule 77(4)
21
Clearance for PowerLine Crossings
 Crossing over rivers:
• 3.05m above maximum flood level.
 Crossing over telecommunication lines
• Minimum clearances between the conductors of a power
line and telecommunication wires are :-
Voltage Level Minimum
Clearance(mm)
≤33 KV 2440
66KV 2440
132 KV 2740
220 KV 3050
400 KV 4880
22
 Power line Crossing over railway tracks
under maximum sag condition minimum clearance over rail level
stipulated in the regulations for Electrical Crossings of Railway Tracks,
1963
Table. For un-electrified tracks or tracks electrified on 1,500 volts D.C.
system
System Voltage
Level
Broad Gauge Meter & Narrow
Gauge
Inside station
limits(m)
Out side
station
limits(m)
Inside
station
limits(m)
Out side
station
limits(m)
≤66 KV 10.3 7.9 9.1 6.7
132 KV 10.9 8.5 9.8 7.3
220 KV 11.2 8.8 10.0 7.6
400 KV 13.6 11.2 12.4 10.0
23
Spacing Between Conductor(Phases)
1) Mecomb's formula
2) VDE formula
S
W
D
VcmSpacing 010.43048.0)( * 
Where-
V= Voltage of system in KV
D= Diameter of Conductor in cm
S= Sag in cm
W= weight of conductor in Kg/m
2000
5.7)(
2
VScmSpacing  Where-
V= Voltage of system in KV
S= Sag in cm
24
3) Still's formula




8.27
2
*814.108.5)(
l
VcmSpacing
Where-
l = Average span length(m)
4) NESC formula
2
681.3*762.0)(
L
SVcmSpacing 
Where-
V= Voltage of system in KV
S= Sag in cm
L= Length of insulator string in cm
25
5) Swedish formula
EScmSpacing *7.05.6)( 
Where-
E= Line Voltage in KV
S= Sag in cm
6) French formula
5.1
0.8)(
E
LScmSpacing 
Where-
E= Line Voltage in KV
S= Sag in cm
L= length of insulating string(cm)
26
Offset of conductors (under ice-loading conditions)
Sleet Jump:
The jump of the conductor, resulting from ice dropping
off one span of an ice-covered line, has been the cause of many
serious outages on long-span lines where conductors are
arranged in the same vertical plane.
Offset in cm = 60 + Span in cm / 400
Clearances b/n Conductors
27
SYSTEM
VOLTAG
E
TYPE OF
TOWER
Vertical spacing
b/n
conductors(mm)
Horizontal spacing
b/n
conductors(mm)
66 kV
SINGLE
CIRCUIT
A(0-2°) 1080 4040
B(2-30°) 1080 4270
C(30-60°) 1220 4880
DOUBLE
CIRCUIT
A(0-2°) 2170 4270
B(2-30°) 2060 4880
C(30-60°) 2440 6000
132 KV
SINGLE
CIRCUIT
A(0-2°) 4200 7140
B(2-30°) 4200 6290
C(30-60°) 4200 7150
D(30-60°) 4200 8820
DOUBLE
CIRCUIT
A(0-2°) 3965 7020
B(2-15°) 3965 7320
C(15-30°) 3965 7320
D(30-60°) 4270 8540
28
220 kV
SINGLE
CIRCUIT
A(0-2°) 5200 8500
B(2-15°) 5250 10500
C(15-30°) 6700 12600
D(30-60°) 7800 14000
DOUBLE
CIRCUIT
A(0-2°) 5200 9900
B(2-15°) 5200 10100
C(15-30°) 5200 10500
D(30-60°) 6750 12600
400 KV
SINGLE
CIRCUIT
A(0-2°) 7800 12760
B(2-15°) 7800 12760
C(15-30°) 7800 14000
D(30-60°) 8100 16200
Sag and Tension Calculation
29
 Parabolic formula:  Catenary formula:
Span >300 mSag & TensionSpan ≤300 m
Corona
Visual corona voltage in fair weather
condition is given by-
 V0= corona starting voltage, KV(rms).
 r= radius of conductor in cm.
 D= GMD equivalent spacing b/n conductors in
cm.
 m= roughness factor.
= 1.0 for clean smooth conductor
=0.85 for stranded conductor
30





 
 r
D
n
r
r
mV log
)3.01(
1.210

31
Voltage gradient at the surface of conductor at operating
voltage :-







r
D
Log
V
n
g 3
0
Corona discharge form at the surface of conductor if g0≥
corona starting gradient i.e.
r
rmg
)3.01(
1.21
0

  
(rms kv/cm)
 Conductor size will be so chosen that normal gradient of
conductor should not exceed 17.5 KV/cm.
 For EHV transmission line 400KV and above use bundle
conductor from point view of corona.
Erection
a) Setting of stubs:
Template
B/B & diagonal at Template top
B/B & diagonal at stub top Ram bus shape
Stub cleats with B&N 2 each
Extra cleats to avoid failure of foundation due
to tower falling.
Threads to bisect
LP&AP
Template height at centre point & joining of 2
threads
Probe setting
b) After 14 days of curing
Built-up method:- This method consist of erection of
towers member by member. The 4 main leg members of first
section of the tower are first erected and guyed of. The cross
braces then assembled. For assembling second section a light
gin pole is placed on top of the corner legs for raising the
second section of the tower. Afterwards the gin pole is shifted
to top of second section leg to raise third section this process
is continued till complete tower is erected.
Section method :-
Major sections of the tower are assembled on the
ground and same are erected as units.
Either mobile crane or gin pole of 10m long is used.
Ground assembly(Proto) :-
This method consist of assembling the tower on ground
and erecting it as a complete unit. The complete tower is
assembled in line wise position to allow Xarms to fitted.
After assembly is completed tower is picked up from
ground with the help of crane and carried to is location and
set on its foundation.
This method is not is useful when the towers are large
and heavy and the locations are difficult.
HELICOPTER METHOD
In this method the tower is erected in section.
Bottom section is first lifted on to the stub and
then the upper section is lifted and bolted to
first section and the process is repeated till the
tower is erected. Some times complete
assembled tower is raised with the help of
helicopter. This method is adopted when
approach is impossible
Helicopter Method.
TIGHTENING OF BOLT AND
NUT
 The bolts & nuts are used to join the tower parts.
 The bolts are of 16mm diameter and 20mm diameter
 The length of bolts are various from 35mm to 80mm multiple
of 5mm.
 17.5mm/21.5mm dia hole is provided on tower part for fixing
bolt & nut.
 Spring washers - 16 x 3.5 mm- to tighten the bolt & nut
 Flat washers 4, 5, 6, 8, 10,20 and 25mm to fill up gaps
between the tower parts.
 Check for tight of B&N using torque wrench.
37
TIGHTENING OF BOLT AND
NUT
 The threads of bolts projecting out side shall be
punched at 3 positions and do half round welding to
ensure that nuts are not loosened in course of time
and avoid theft of angles.
 Zinc epoxy painting is applied on welded portion to
avoid rusting.
38
TOWER ACCESSORIES
 Danger boards.
 Number plate.
 Phase plate.
 Anti Climbing Device.
 Step bolts 16x175 mm.
 Antiperch / Bird guards for suspension towers.
 Hanger rods.
39
GENERAL STEPS TO BE
FOLLOWED FOR TOWER
ERECTION NO TOWER SHALL BE ERECTED ON FOUNDATION BEFORE 10
DAYS AFTER CONCRETING.
 CHECK THE CORRECTNESS OF DIAGONAL AND LEVEL OF
THE STUB OF THE FOUNDATION.
 TOWERS ARE TO BE ERECTED AS PER ERECTION DRAWING
 ASSEMBLY OF TOWER PARTS SHALL BE MADE AS PER MARK
NUMBER WISE ENGRAVED ON THE TOWER MEMBER
CORRESPONDING TO NUMBER IN THE ERECTION DRAWING.
 SPECIAL CARE SHALL BE TAKEN IN SELECTION OF MARK
NUMBER FOR TRANSVERSE AND LONGITUDINAL FACE OF
THE SQUARE BASE TOWER.
40
GENERAL STEPS TO BE
FOLLOWED FOR TOWER
ERECTION ANY BUCKLING, DAMAGE TO STEEL MEMBER, DAMAGE TO
GALVANIZING SHALL BE AVOIDED
 NO MEMBER SHALL BE SUBJECTED TO UNDUE STRESS.
 REASON CAN BE: (i) DEFECTIVE FABRICATION.
(ii) DEFECTIVE FOUNDATION.
(iii) DEFECTIVE ERECTION METHOD.
 COLLECT MATERIAL FROM STORE TALLYING WITH BOM.
 PREFERABLY TRANSPORT COMPLETE TOWER OR COMPLETE
SECTION.
 THE TOWER MEMBER AT LOCATION SHALL BE KEPT ON GROUND
SERIALLY ACCORDING TO THE NEED FOR FOLLOWING UP ERECTION
SEQUENCE.
41
TOWER ERECTION
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
CROW BARS
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
CROW BARS
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
CROW BARS
DERRICK
DERRICK TYING ROPE
20mm POLY
PROPYLENE
ROPE
CROW BARS
Tower Grounding
Used to reduce earth wire potential and stress on
insulators at the time of stroke and also for
safety.
 Tower footing resistance will be 10Ω and should
not be more than 20 Ω under any condition
throughout the year.
 Earth resistance depend upon soil
resistivity(general 100 Ω-m).
43
Method of Tower Grounding
44
 Buried Conductor
One or more conductor are connected to tower lags and buried in back
filled of tower foundation.
o Used where soil resistivity is low
 Counterpoise Wire
A length of wire/ Strip of 50 m is buried horizontally at depth of 0.5 m
below ground. This wire is connected to tower lags.
o Used when earth resistance is very high and soil conductivity is
mostly confined to upper layer)
 Rod Pipe
Pipe/Rod of 3 to 4 m is driven into ground near the tower and top of rod is
connected to tower by suitable wire/strip
o Used where ground conductivity increase with depth
 Treated Earth Pits
Pipe/Rod of 3 to 4 m are buried in treated earth pits and top of rod is
connected to tower by suitable wire/strip.
o Used in very high resistivity near tower
Tower Grounding
45
SAFETY OF TOWER ERECTION
46
47
 While Loading And Unloading The Tower Parts,
Care Should Be Taken For Stacking
Systematically.
 Handle The Tower Parts Carefully. While Handling
Them Wear Suitable Gloves.
 Establish Clear Signal/Communication Between
The Persons Working On The Top And The People
Supplying Tower Parts, Watching Guys Pulling Etc
Special Care Shall Be Taken For R.C. Tower.
 All Lifting Tools And Tackles Should Be Load
Tested As Per Standard.
48
 Ensure The Derrick Used Before Tower Erection
Has Been Checked For Adequate Strength / Size.
 Keep Watch On All Guys Used During Erection
Any Slippage/Failure If The Guy Can Cause
Accident.
 After 5 Operations Check The Condition Of The
Rope. If Worn Out Then Reject.
 Avoid All Tower Erection In Rainy Day.
 Heavily Cloudy Days Avoid All Type Tower
Erection. Stop Tower Erection Of R.C.Tower.
EFFECT OF LINE
49
EFFECT ON HUMAN BEING
 SHORT TERM HEALTH PROBLEM
 Headaches.
 Fatigue.
 Insomnia.
 Prickling and/or burning skin.
 Rashes.
 Muscle pain.
50
EFFECT ON HUMAN BEING
 LONG TERM HEALTH PROBLEM
 Risk of damaging DNA.
 Risk of Cancer.
 Risk of Leukemia.
 Risk of Neurodegenerative Disease.
 Risk of Miscarriage.
51
EFFECT ON ANIMALS
 Many researchers are studying the effect of
Electrostatic field on animals. In order to do
so they keeps the cages of animals under
high Electrostatic field of about 30 kV/m.
The results of these Experiments are
shocking as animals (are kept below high
Electrostatic field their body acquires a
charge & when they try to drink water, a
spark usually jumps from their nose to the
grounded Pipe) like Hens are unable to pick
up grain because of chattering of their
beaks which also affects their growth. 52
EFFECT ON PLANTS
 High power transmission lines affects the growth of
plants.
 Physiological parameter was primarily due to the
effect of reduced cell division and cell enlargement.
 From various practically study it was found that the
response of the crop to EMF from 110 KV and 230
KV Power lines showed variations among
themselves. Based on the results the growth
characteristics like shoot length, root length, leaf
area, leaf fresh weight, specific leaf weight,
shoot/root ratio, total biomass content and total
water content of the four crop plants were reduced
significantly over the control plants.
53
EFFECTS ON VEHICLES
PARKED NEAR LINE
When a vehicle is parked under high voltage
transmission line an electrostatic field is
developed in it. When a person who is
grounded touches it a discharge current
flows through the human being. In order to
avoid this parking lots are located below the
transmission lines the recommended
clearance is 17 m for 345 kV and 20 m for
400 kV lines.
54
Reference Standards
55
 IS-398
 IS-802
 IS 3853
 IS 4091
 IS 5613
 CBIP
 IE Rules,
1956
Specification of Aluminium Conductor for Over Head
Transmission Line(ACSR)
Code of Practice for use of Structural Steel in over head
Transmission Line Tower
Specification of Aluminium Steel Core Wire for Aluminium
Conductor
Code Practice for Design and Construction of Foundation of
Transmission Line Tower and Pole
Specification of Design, Installation and Maintenance of Line
above 11 KV and up to 220 KV
Manual on Transmission Line Tower, Technical Report N0. 9,
March 1977
56
THANK YOU

Contenu connexe

Tendances

Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design conceptKumar VEL
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission lineDhananjay Jha
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesPower System Operation
 
transmission line
transmission line transmission line
transmission line singh1515
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Electrical power transmission system
Electrical power transmission systemElectrical power transmission system
Electrical power transmission systemAbdul Wahab Malik
 
Presentation1
Presentation1Presentation1
Presentation1darshanaf
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)Ameh Messiah Edache
 
Overhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxOverhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxEdlirPeci1
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design) SayanSarkar55
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical powerpriyanka1432
 

Tendances (20)

Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
 
HVDC System
HVDC SystemHVDC System
HVDC System
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
Supports of overhead line
Supports of overhead lineSupports of overhead line
Supports of overhead line
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
 
Over head power lines
Over head power linesOver head power lines
Over head power lines
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
transmission line
transmission line transmission line
transmission line
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Electrical power transmission system
Electrical power transmission systemElectrical power transmission system
Electrical power transmission system
 
Presentation1
Presentation1Presentation1
Presentation1
 
Cable and laying
Cable and layingCable and laying
Cable and laying
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
 
Overhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxOverhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptx
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
distance relay
distance relaydistance relay
distance relay
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Pole type structures
Pole type structuresPole type structures
Pole type structures
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical power
 

En vedette

Transmission tower
Transmission towerTransmission tower
Transmission towerKiran Hadiya
 
Kulekhani I hydropower ,Nepal
Kulekhani I hydropower ,NepalKulekhani I hydropower ,Nepal
Kulekhani I hydropower ,NepalBishal Rimal
 
Artifical intelligence
Artifical intelligenceArtifical intelligence
Artifical intelligenceBishal Rimal
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final uploadBishal Rimal
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurementBishal Rimal
 

En vedette (6)

Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Railway project
Railway projectRailway project
Railway project
 
Kulekhani I hydropower ,Nepal
Kulekhani I hydropower ,NepalKulekhani I hydropower ,Nepal
Kulekhani I hydropower ,Nepal
 
Artifical intelligence
Artifical intelligenceArtifical intelligence
Artifical intelligence
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurement
 

Similaire à A mini project on the transmission tower

Electrical power system
Electrical power systemElectrical power system
Electrical power systemChovatiya
 
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSUNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSPremanandDesai
 
Nexans high-voltage.pdf
Nexans high-voltage.pdfNexans high-voltage.pdf
Nexans high-voltage.pdfprse
 
main content
main contentmain content
main contentRaj Kumar
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution ZunAib Ali
 
Sonali ppt.pptx
Sonali ppt.pptxSonali ppt.pptx
Sonali ppt.pptxRBTV1
 
Electrical transmission
Electrical transmissionElectrical transmission
Electrical transmissionDarya khan
 
Introduction to power system power point ch-4&5.pdf
Introduction to power system power point ch-4&5.pdfIntroduction to power system power point ch-4&5.pdf
Introduction to power system power point ch-4&5.pdfGetahunShankoKefeni
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptxpramod719257
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 
Mechanical Design of Overhead Lines
Mechanical Design of Overhead LinesMechanical Design of Overhead Lines
Mechanical Design of Overhead LinesRanjeet Kumar
 
Transmission lines of Electrical powe
Transmission lines of Electrical poweTransmission lines of Electrical powe
Transmission lines of Electrical poweDarya khan
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note FinalMohamed Elfike
 

Similaire à A mini project on the transmission tower (20)

Electrical power system
Electrical power systemElectrical power system
Electrical power system
 
SOUMADIP-FACT.pptx
SOUMADIP-FACT.pptxSOUMADIP-FACT.pptx
SOUMADIP-FACT.pptx
 
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSUNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
 
Nexans high-voltage.pdf
Nexans high-voltage.pdfNexans high-voltage.pdf
Nexans high-voltage.pdf
 
main content
main contentmain content
main content
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
 
Sonali ppt.pptx
Sonali ppt.pptxSonali ppt.pptx
Sonali ppt.pptx
 
Transmission system
Transmission systemTransmission system
Transmission system
 
transmission line installation
transmission line installationtransmission line installation
transmission line installation
 
Electrical transmission
Electrical transmissionElectrical transmission
Electrical transmission
 
Introduction to power system power point ch-4&5.pdf
Introduction to power system power point ch-4&5.pdfIntroduction to power system power point ch-4&5.pdf
Introduction to power system power point ch-4&5.pdf
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
Akt tl design01
Akt tl design01Akt tl design01
Akt tl design01
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Mechanical Design of Overhead Lines
Mechanical Design of Overhead LinesMechanical Design of Overhead Lines
Mechanical Design of Overhead Lines
 
Transmission lines of Electrical powe
Transmission lines of Electrical poweTransmission lines of Electrical powe
Transmission lines of Electrical powe
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
 

Dernier

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

A mini project on the transmission tower

  • 1. A MINI PROJECT ON THE TRANSMISSION TOWER PRESENTED BY:- ATUL YADAV MUKESH RANJAN SINGH NAQEEB KHAN NAVEEN KUMAR ELECTRICAL DEPARTMENT FINAL YEAR,BBDU 1
  • 2. INTRODUCTION NAMING "Transmission tower" is the name for the structure used in the industry in the United Kingdom, United States, and other English- speaking countries. The term "pylon" comes from the basic shape of the structure, an obelisk-like structure which tapers toward the top, and is mostly used in the United Kingdom and parts of Europe in everyday colloquial speech. This term is used infrequently in the United States, as the word "pylon" is commonly used for a multitude of other things, mostly for traffic cones. 2
  • 3. TRANSMISSION TOWER  A Transmission tower is a tall structure, usually a steel lattic tower, used to support an overhead power line.  They are used in high-voltage AC and DC systems, and come in a wide variety of shapes and sizes.  Typical height ranges from 15 to 55 metres (49 to 180 ft), though the tallest are the 370 m (1,214 ft) towers of a 2700-metre-long span of Zhoushan Island Overhead Powerline Tie 3
  • 4. ON THE BASIS OF CURRENT TYPES OF TOWER 1. HVAC TRANSMISSION TOWER. 2. HVDC TRANSMISSION TOWER. 3. RAILWAY TRACTION LINE TOWER. 4. TOWER FOR DIFFERENT TYPE OF CURRENT. 4
  • 5. HVAC TRANSMISSION TOWER  Three phase electric power systems are used for high voltage (66 or 69 kV and above) and extra-high voltage (110 or 115 kV and above; most often 138 or 230 kV and above in contemporary systems) AC transmission lines.  The towers must be designed to carry three(or multiples of three) conductors.  The towers are usually steel lattices or trusses (wooden structures are used in Canada,Germany, and Scandinavia in some cases) and the insulators are either glass or porcelain discs. 5
  • 6. HVDC TRANSMISSION TOWER  HVDC transmission lines are either monopolar or bipolar systems.  With bipolar systems a conductor arrangement with one conductor on each side of the tower is used.  For single-pole HVDC transmission with ground return, towers with only one conductor can be used.  The towers are designed for later conversion to a two-pole system. In these cases, often conductors on both sides of the tower are installed for mechanical reasons. 6
  • 7. RAILWAY TRACTION LINE TOWER  Towers used for single-phase AC railway traction lines are similar in construction to those towers used for 110 kV-three phase lines.  Steel tube or concrete poles are also often used for these lines.  The towers of railway traction lines carry two electric circuits, so they have four conductors.  Each circuit occupies one half of the cross arm. For six electric circuits arrangement of the conductors is in three levels. 7
  • 8. TOWER FOR DIFFERENT TYPE OF CURRENT  Line carry both AC and DC power circuits. One set of towers is near the HVDC Volgograd-Donbass on Volga Hydroelectric Power Station. The other are two towers south of Stenkullen, which carry one circuit of HVDC Konti-Skan and üne circuit of the three-phase AC line Stenkullen-Holmbakullen.  Towers carrying AC circuits and DC electrode lines exist in a section of the powerline between Adalph Static Inverter Plant and Brookston the pylons carry the electrode line of HVDC Square Butte.  The overhead section of the electrode line of Pacific DC Intertie from Sylmar Converter Station to the grounding electrode in the Pacific Ocean near Will Rogers State Beach is also installed on AC pylons 8
  • 9. ON THE BASIS OF LINE SUPPORT TYPES OF TOWER 1. WOODEN POLES 2. RCC POLES 3. STEEL TUBULAR POLES 4. STEEL TOWERS The supports for an overhead line must be capable of carrying the load due to:  Conductors  Insulators  Wind load on the support itself. 9
  • 10. WOODEN POLES  Made of chemically treated wood.  Used for distribution lines especially in areas where good quality wood are available.  Very economical but susceptible to decay.  To protect from decay,poles have zinc or aluminium cap at the top and Bitumen coating at the bottom. 10
  • 11. RCC POLES  Made of reinforced concrete cement.  Stronger than wood poles but more costly.  Very long life and need little maintenance.  Bulky and heavy.  Widely used for distribution lines upto 33kV.  Can be manufactured at site. 11
  • 12. STEEL TUBULAR POLES  Stepped pole manufactured from a single tube , the diameter being reduced in parallel steps.  More costly than RCC and wood poles.  Have light weight , high strength to weight ratio and long life.  Widely used for lines upto 33kV. 12
  • 13. STEEL TOWERS  Used for lines of 66kV and above.  Very long life and high degree of reliability.  Can withstand very severe weather conditions.  Overhead HV, EHV and UHV lines mostly use self supporting steel towers. 13
  • 14. TYPES OF TOWER ON THE BASIS OF LINE DIVERSION  Type A Tower (Tangent Tower with suspension string) o Used on straight runs and up to 2° line diversion  Type B Tower (Small Angle Tower with tension string) o Used for line deviation from 2° to 15°  Type C Tower (Medium Angle Tower with tension string ). o Used for line deviation from 15° to 30°.  Type D Tower (Large angle tower with tension string) o Used for line deviation from 30° to 60°  Type E Tower (Dead End Tower with tension string) o Used for line termination & starting  Special tower-  Suspension Tower (Span ≈ 1000 m) o Used for River crossing, Mountain crossing etc.  Transposition Tower o Used for transposition of tower 14
  • 15. DIFFERENT TYPES OF TOWER 15
  • 16. Selection of Tower Structure  Single circuit Tower/ double circuit Tower.  Length of the insulator assembly.  Minimum clearances to be maintained between ground conductors, and between conductors and tower.  Location of ground wire/wires with respect to the outermost conductor.  Mid-span clearance required from considerations of the dynamic behavior of conductors and lightning protection of the line.  Minimum clearance of the lowest conductor above ground level. 16
  • 17. Tower Design  Tower height  Base width  Top damper width  Cross arms length 17
  • 18. Height of Tower Structure 18 4321 hhhhH  Height of tower is determine by- h1=Minimum permissible ground clearance h2=Maximum sag h3=Vertical spacing between conductors h4=Vertical clearance between earthwire and top conductor
  • 19. 19 Determination of Base Width The base width(at the concrete level) is the distance between the centre of gravity at one corner leg and the centre of gravity of the adjacent corner leg.  A particular base width which gives the minimum total cost of the tower and foundations.  The ratio of base width to total tower height for most towers is generally about one-fifth to one-tenth. Ryle Formula
  • 20. Spacing and Clearances 20 Ground Clearances KCL *305.0182.5          33 33V KWhere- S.No. Voltage level Ground clearance(m) 1. ≤33 KV 5.20 2. 66 KV 5.49 3. 132KV 6.10 4. 220 KV 7.01 5. 400 KV 8.84 Minimum permissible ground clearance as per IE Rules, 1956,Rule 77(4)
  • 21. 21 Clearance for PowerLine Crossings  Crossing over rivers: • 3.05m above maximum flood level.  Crossing over telecommunication lines • Minimum clearances between the conductors of a power line and telecommunication wires are :- Voltage Level Minimum Clearance(mm) ≤33 KV 2440 66KV 2440 132 KV 2740 220 KV 3050 400 KV 4880
  • 22. 22  Power line Crossing over railway tracks under maximum sag condition minimum clearance over rail level stipulated in the regulations for Electrical Crossings of Railway Tracks, 1963 Table. For un-electrified tracks or tracks electrified on 1,500 volts D.C. system System Voltage Level Broad Gauge Meter & Narrow Gauge Inside station limits(m) Out side station limits(m) Inside station limits(m) Out side station limits(m) ≤66 KV 10.3 7.9 9.1 6.7 132 KV 10.9 8.5 9.8 7.3 220 KV 11.2 8.8 10.0 7.6 400 KV 13.6 11.2 12.4 10.0
  • 23. 23 Spacing Between Conductor(Phases) 1) Mecomb's formula 2) VDE formula S W D VcmSpacing 010.43048.0)( *  Where- V= Voltage of system in KV D= Diameter of Conductor in cm S= Sag in cm W= weight of conductor in Kg/m 2000 5.7)( 2 VScmSpacing  Where- V= Voltage of system in KV S= Sag in cm
  • 24. 24 3) Still's formula     8.27 2 *814.108.5)( l VcmSpacing Where- l = Average span length(m) 4) NESC formula 2 681.3*762.0)( L SVcmSpacing  Where- V= Voltage of system in KV S= Sag in cm L= Length of insulator string in cm
  • 25. 25 5) Swedish formula EScmSpacing *7.05.6)(  Where- E= Line Voltage in KV S= Sag in cm 6) French formula 5.1 0.8)( E LScmSpacing  Where- E= Line Voltage in KV S= Sag in cm L= length of insulating string(cm)
  • 26. 26 Offset of conductors (under ice-loading conditions) Sleet Jump: The jump of the conductor, resulting from ice dropping off one span of an ice-covered line, has been the cause of many serious outages on long-span lines where conductors are arranged in the same vertical plane. Offset in cm = 60 + Span in cm / 400
  • 27. Clearances b/n Conductors 27 SYSTEM VOLTAG E TYPE OF TOWER Vertical spacing b/n conductors(mm) Horizontal spacing b/n conductors(mm) 66 kV SINGLE CIRCUIT A(0-2°) 1080 4040 B(2-30°) 1080 4270 C(30-60°) 1220 4880 DOUBLE CIRCUIT A(0-2°) 2170 4270 B(2-30°) 2060 4880 C(30-60°) 2440 6000 132 KV SINGLE CIRCUIT A(0-2°) 4200 7140 B(2-30°) 4200 6290 C(30-60°) 4200 7150 D(30-60°) 4200 8820 DOUBLE CIRCUIT A(0-2°) 3965 7020 B(2-15°) 3965 7320 C(15-30°) 3965 7320 D(30-60°) 4270 8540
  • 28. 28 220 kV SINGLE CIRCUIT A(0-2°) 5200 8500 B(2-15°) 5250 10500 C(15-30°) 6700 12600 D(30-60°) 7800 14000 DOUBLE CIRCUIT A(0-2°) 5200 9900 B(2-15°) 5200 10100 C(15-30°) 5200 10500 D(30-60°) 6750 12600 400 KV SINGLE CIRCUIT A(0-2°) 7800 12760 B(2-15°) 7800 12760 C(15-30°) 7800 14000 D(30-60°) 8100 16200
  • 29. Sag and Tension Calculation 29  Parabolic formula:  Catenary formula: Span >300 mSag & TensionSpan ≤300 m
  • 30. Corona Visual corona voltage in fair weather condition is given by-  V0= corona starting voltage, KV(rms).  r= radius of conductor in cm.  D= GMD equivalent spacing b/n conductors in cm.  m= roughness factor. = 1.0 for clean smooth conductor =0.85 for stranded conductor 30         r D n r r mV log )3.01( 1.210 
  • 31. 31 Voltage gradient at the surface of conductor at operating voltage :-        r D Log V n g 3 0 Corona discharge form at the surface of conductor if g0≥ corona starting gradient i.e. r rmg )3.01( 1.21 0     (rms kv/cm)  Conductor size will be so chosen that normal gradient of conductor should not exceed 17.5 KV/cm.  For EHV transmission line 400KV and above use bundle conductor from point view of corona.
  • 32. Erection a) Setting of stubs: Template B/B & diagonal at Template top B/B & diagonal at stub top Ram bus shape Stub cleats with B&N 2 each Extra cleats to avoid failure of foundation due to tower falling. Threads to bisect LP&AP Template height at centre point & joining of 2 threads Probe setting
  • 33. b) After 14 days of curing Built-up method:- This method consist of erection of towers member by member. The 4 main leg members of first section of the tower are first erected and guyed of. The cross braces then assembled. For assembling second section a light gin pole is placed on top of the corner legs for raising the second section of the tower. Afterwards the gin pole is shifted to top of second section leg to raise third section this process is continued till complete tower is erected.
  • 34. Section method :- Major sections of the tower are assembled on the ground and same are erected as units. Either mobile crane or gin pole of 10m long is used. Ground assembly(Proto) :- This method consist of assembling the tower on ground and erecting it as a complete unit. The complete tower is assembled in line wise position to allow Xarms to fitted. After assembly is completed tower is picked up from ground with the help of crane and carried to is location and set on its foundation. This method is not is useful when the towers are large and heavy and the locations are difficult.
  • 35. HELICOPTER METHOD In this method the tower is erected in section. Bottom section is first lifted on to the stub and then the upper section is lifted and bolted to first section and the process is repeated till the tower is erected. Some times complete assembled tower is raised with the help of helicopter. This method is adopted when approach is impossible
  • 37. TIGHTENING OF BOLT AND NUT  The bolts & nuts are used to join the tower parts.  The bolts are of 16mm diameter and 20mm diameter  The length of bolts are various from 35mm to 80mm multiple of 5mm.  17.5mm/21.5mm dia hole is provided on tower part for fixing bolt & nut.  Spring washers - 16 x 3.5 mm- to tighten the bolt & nut  Flat washers 4, 5, 6, 8, 10,20 and 25mm to fill up gaps between the tower parts.  Check for tight of B&N using torque wrench. 37
  • 38. TIGHTENING OF BOLT AND NUT  The threads of bolts projecting out side shall be punched at 3 positions and do half round welding to ensure that nuts are not loosened in course of time and avoid theft of angles.  Zinc epoxy painting is applied on welded portion to avoid rusting. 38
  • 39. TOWER ACCESSORIES  Danger boards.  Number plate.  Phase plate.  Anti Climbing Device.  Step bolts 16x175 mm.  Antiperch / Bird guards for suspension towers.  Hanger rods. 39
  • 40. GENERAL STEPS TO BE FOLLOWED FOR TOWER ERECTION NO TOWER SHALL BE ERECTED ON FOUNDATION BEFORE 10 DAYS AFTER CONCRETING.  CHECK THE CORRECTNESS OF DIAGONAL AND LEVEL OF THE STUB OF THE FOUNDATION.  TOWERS ARE TO BE ERECTED AS PER ERECTION DRAWING  ASSEMBLY OF TOWER PARTS SHALL BE MADE AS PER MARK NUMBER WISE ENGRAVED ON THE TOWER MEMBER CORRESPONDING TO NUMBER IN THE ERECTION DRAWING.  SPECIAL CARE SHALL BE TAKEN IN SELECTION OF MARK NUMBER FOR TRANSVERSE AND LONGITUDINAL FACE OF THE SQUARE BASE TOWER. 40
  • 41. GENERAL STEPS TO BE FOLLOWED FOR TOWER ERECTION ANY BUCKLING, DAMAGE TO STEEL MEMBER, DAMAGE TO GALVANIZING SHALL BE AVOIDED  NO MEMBER SHALL BE SUBJECTED TO UNDUE STRESS.  REASON CAN BE: (i) DEFECTIVE FABRICATION. (ii) DEFECTIVE FOUNDATION. (iii) DEFECTIVE ERECTION METHOD.  COLLECT MATERIAL FROM STORE TALLYING WITH BOM.  PREFERABLY TRANSPORT COMPLETE TOWER OR COMPLETE SECTION.  THE TOWER MEMBER AT LOCATION SHALL BE KEPT ON GROUND SERIALLY ACCORDING TO THE NEED FOR FOLLOWING UP ERECTION SEQUENCE. 41
  • 42. TOWER ERECTION DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE CROW BARS DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE CROW BARS DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE CROW BARS DERRICK DERRICK TYING ROPE 20mm POLY PROPYLENE ROPE CROW BARS
  • 43. Tower Grounding Used to reduce earth wire potential and stress on insulators at the time of stroke and also for safety.  Tower footing resistance will be 10Ω and should not be more than 20 Ω under any condition throughout the year.  Earth resistance depend upon soil resistivity(general 100 Ω-m). 43
  • 44. Method of Tower Grounding 44  Buried Conductor One or more conductor are connected to tower lags and buried in back filled of tower foundation. o Used where soil resistivity is low  Counterpoise Wire A length of wire/ Strip of 50 m is buried horizontally at depth of 0.5 m below ground. This wire is connected to tower lags. o Used when earth resistance is very high and soil conductivity is mostly confined to upper layer)  Rod Pipe Pipe/Rod of 3 to 4 m is driven into ground near the tower and top of rod is connected to tower by suitable wire/strip o Used where ground conductivity increase with depth  Treated Earth Pits Pipe/Rod of 3 to 4 m are buried in treated earth pits and top of rod is connected to tower by suitable wire/strip. o Used in very high resistivity near tower
  • 46. SAFETY OF TOWER ERECTION 46
  • 47. 47  While Loading And Unloading The Tower Parts, Care Should Be Taken For Stacking Systematically.  Handle The Tower Parts Carefully. While Handling Them Wear Suitable Gloves.  Establish Clear Signal/Communication Between The Persons Working On The Top And The People Supplying Tower Parts, Watching Guys Pulling Etc Special Care Shall Be Taken For R.C. Tower.  All Lifting Tools And Tackles Should Be Load Tested As Per Standard.
  • 48. 48  Ensure The Derrick Used Before Tower Erection Has Been Checked For Adequate Strength / Size.  Keep Watch On All Guys Used During Erection Any Slippage/Failure If The Guy Can Cause Accident.  After 5 Operations Check The Condition Of The Rope. If Worn Out Then Reject.  Avoid All Tower Erection In Rainy Day.  Heavily Cloudy Days Avoid All Type Tower Erection. Stop Tower Erection Of R.C.Tower.
  • 50. EFFECT ON HUMAN BEING  SHORT TERM HEALTH PROBLEM  Headaches.  Fatigue.  Insomnia.  Prickling and/or burning skin.  Rashes.  Muscle pain. 50
  • 51. EFFECT ON HUMAN BEING  LONG TERM HEALTH PROBLEM  Risk of damaging DNA.  Risk of Cancer.  Risk of Leukemia.  Risk of Neurodegenerative Disease.  Risk of Miscarriage. 51
  • 52. EFFECT ON ANIMALS  Many researchers are studying the effect of Electrostatic field on animals. In order to do so they keeps the cages of animals under high Electrostatic field of about 30 kV/m. The results of these Experiments are shocking as animals (are kept below high Electrostatic field their body acquires a charge & when they try to drink water, a spark usually jumps from their nose to the grounded Pipe) like Hens are unable to pick up grain because of chattering of their beaks which also affects their growth. 52
  • 53. EFFECT ON PLANTS  High power transmission lines affects the growth of plants.  Physiological parameter was primarily due to the effect of reduced cell division and cell enlargement.  From various practically study it was found that the response of the crop to EMF from 110 KV and 230 KV Power lines showed variations among themselves. Based on the results the growth characteristics like shoot length, root length, leaf area, leaf fresh weight, specific leaf weight, shoot/root ratio, total biomass content and total water content of the four crop plants were reduced significantly over the control plants. 53
  • 54. EFFECTS ON VEHICLES PARKED NEAR LINE When a vehicle is parked under high voltage transmission line an electrostatic field is developed in it. When a person who is grounded touches it a discharge current flows through the human being. In order to avoid this parking lots are located below the transmission lines the recommended clearance is 17 m for 345 kV and 20 m for 400 kV lines. 54
  • 55. Reference Standards 55  IS-398  IS-802  IS 3853  IS 4091  IS 5613  CBIP  IE Rules, 1956 Specification of Aluminium Conductor for Over Head Transmission Line(ACSR) Code of Practice for use of Structural Steel in over head Transmission Line Tower Specification of Aluminium Steel Core Wire for Aluminium Conductor Code Practice for Design and Construction of Foundation of Transmission Line Tower and Pole Specification of Design, Installation and Maintenance of Line above 11 KV and up to 220 KV Manual on Transmission Line Tower, Technical Report N0. 9, March 1977

Notes de l'éditeur

  1. Height of tower is determine by-
  2. Where-
  3. asf
  4. Tower are at same level
  5. (rms kv/cm)