Kota Super Thermal Power Plant
Introduction
• It was established in 1983.
• KSTPS is designed in following stages.
Stage Unit
Number
Installed
Capacity (MW)
Date of
Commissioning
Status
Stage I 1 110 January 1983 Running
Stage I 2 110 July 1983 Running
Stage II 3 210 September 1988 Running
Stage II 4 210 May 1989 Running
Stage III 5 210 March 1994 Running
Stage IV 6 195 July 2003 Running
Stage V 7 195 May 2009 Running
• Total generation capacity is 1240 MW.
• It is located at the left bank of the CHAMBAL River at the upstream of
KOTA BAIRAJ.
• Bituminous Coal is used as fuel.
• Its Calorific Value is 3300 K.cal/Kg.
• Coal India Limited supplies coal from its coal mines of coal producing
subsidiaries SECL & NCL to Kota Thermal Power Plant.
 General Layout & Basic Idea
 Coal Handling Plant
 Boiler
 Ash Handling Plant
 Steam Turbine
 Electricity Generator
 Cooling System
 Transformer
 Control Panel
Main & Auxiliaries Parts of KSTPS
General Layout & Basic Idea
 Fuel & Ash Circuit
 Air & Gas Circuit
 Feed Water & Steam Circuit
 Cooling Water Circuit
Air
Coal Handling Plant
Coal Handling Plant can be called the heart of the thermal power plant.
It Can be divided into 3 sections.
Wagon
Unloading
System
Crushing
System
Conveying
System
Wagon Unloading System
•Wagon Tripler unloads the coal from wagon to hopper.
•Hopper is made of iron, is in the form of net.
•Hopper allows to pass coal less than 200mm.
Crushing System
Crusher House :- Its main Function is to crush the coal to 20mm. Size.
Two types of crushers in KSTPS
Primary
Crushers
Secondary
Crushers
Primary Crusher:-
• Roll Crusher
Feed Size : 1200 mm.
End Product Size : 500mm
• Rotary Breaker
Feed Coal size : 500mm
End Product size : 0-200mm
 Secondary Crusher:-
It employs a combination of Impact,
shearing, Compression.
Roll Crusher
Conveying System:-
Belts are used to convey coal from coal handling plant to furnace.
Conveyor belt specification:-
Belt width : 1400 mm.
Speed : 2.2 m/sec.
Capacity : 750/1350 ton/hr.
No. of conveyor : 38
Total Installed Power : 360 KW
Boiler
 Water Tube Boiler:- In this type of boiler water flows inside the
tubes and hot gases flow outside the tubes.
A Boiler (or Steam Generator) is a closed vessel in which water,
under pressure is converted into steam.
(i) Fire Tube Boiler (ii) Water Tube Boiler
 Furnace:- Furnace is primary part of the boiler where the chemical
energy of coal is converted into thermal energy by combustion.
Boiler Drum
Its function is to separate
water and steam from
mixture of steam & water
generated in the furnace
walls.
Economizer
An Economizer extracts a part of heat
from the flue gases and uses it for
heating the feed water before it enters
into the steam drum.
Air Pre-heater Super heater
Air Pre heaters are employed to
recover the heat from the flue gases
leaving the Economizer & are used to
incoming air for combustion.
A Super heater is a device which
removes the last traces of moisture from
the saturated steam leaving the boiler
tubes & also increases the temperature .
Super heater consists a group of tubes.
Ash Handling Plant
In Thermal Plant coal is generally used as fuel & hence the ash is
produced as the byproduct. Ash generated in power plant is about
30-40% of total coal consumption.
Air & Gas Plant
Fuel & Ash
Plant
Air & Gas
Plant
Ash Disposal &
Dust Collection
Plant
Air
(Atmosphere) Air Pre heater Boiler
Boiler Tubes
Flue gases
(Due to
combustion)
Super HeaterChimney Economizer
Ash Disposal & Dust Collection Plant
The ash is removed from fly ash hoppers in dry state & it is carried out to
collecting equipment where it is mixed with water & resulting slurry is
discharged.
Steam Turbine
Steam Turbine is a machine in which a shaft is rotated steadily by impact
or reaction of current or stream of working substances (Steam , Air,
Water, Gases) upon Blades of a wheel.
Technical Data of Turbines
Rated Output
110MW
Rated Speed
3000 RPM
Clockwise
Direction
Maximum
Steam Pressure
146atm
 An electrical generator is a machine which converts mechanical energy
into electrical energy through electro mechanical energy conversion.
Electricity Generator
The generator is driven by directly coupled steam turbine at a
speed of 3000 RPM.
Current : 7720A Frequency: 50Hz
For
generator
(110MW)
Terminals: 6
Cooling System
 In KSTPS Hydrogen Cooling System is employed for generator cooling.
 Hydrogen is used Because of its superior cooling properties & we can
eliminate the fire risk because it doesn’t support combustion.
 Thermal conductivity of H2 is 7.3 times of air.
Transformer
 Transformer is a static device which is used to change the voltage level
keeping the power & frequency same.
 There are about 83 transformers installed at various places in plant to
operate the auxiliaries.
Generator Transformer A Steps up (16.5KV to 220KV)
Generator Transformer B Steps up (16.5KV to 400KV)
Unit Auxiliary Transformer Steps down (16.5KV to 6.9KV)
Station Service Transformer Steps down(6.9KV to 0.433KV)
Types of Installed Transformer
Control Panel
Control Panel I Fan Control Desk
Control Panel II Fuel Control Desk
Control Panel III Steam & Water Control Desk
Control Panel IV Turbine Control Desk
Control Panel V Generator Control Panel
All the Basic Parameters like Temperature of steam & air, Flow of water &
air, pressure, Electricity generation etc. are controlled in Control Panel.
A best ppt on kota super thermal power station

Contenu connexe

Tendances

kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training reportEr. Aman Agrawal
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurAbhishek Mathur
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Stationpukhraj palariya
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant FamiliarizationAanand Kumar
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportDeepak Solanki
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plantRama Charan
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentationShahzaib Hussain
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantAbhishek Kumar
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)sometech
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardI.E.T. lucknow
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plantJinendra Ninama
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plantHîmãńshu Mêęńä
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Shubham Thakur
 

Tendances (20)

kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training report
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training report
 
Training Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS ReportTraining Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS Report
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plant
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Similaire à A best ppt on kota super thermal power station

Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationFellowBuddy.com
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxssuser4c2635
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plantR G Sanjay Prakash
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminarCentury Rayon
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingRadhe Shyam
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurChandra veer singh
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator TrainingVedant Sumaria
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Stationsagnikchoudhury
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant pptAshish Singh
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plantANIL SHARMA
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantHarshit Madaan
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavmukesh yadav
 

Similaire à A best ppt on kota super thermal power station (20)

Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
KTPS
KTPSKTPS
KTPS
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant ppt
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power Plant
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Dernier

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Dernier (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

A best ppt on kota super thermal power station

  • 1. Welcome to Presentation on Kota Super Thermal Power Station (KSTPS) Submitted by : - Naveen Kumar Saini 7th Sem., EI&CE (11EEBEI037) Govt. Engineering College Bikaner Submitted to: Pooja Bhardwaj (Assistant Processor) EI&CE
  • 2. Kota Super Thermal Power Plant
  • 3. Introduction • It was established in 1983. • KSTPS is designed in following stages. Stage Unit Number Installed Capacity (MW) Date of Commissioning Status Stage I 1 110 January 1983 Running Stage I 2 110 July 1983 Running Stage II 3 210 September 1988 Running Stage II 4 210 May 1989 Running Stage III 5 210 March 1994 Running Stage IV 6 195 July 2003 Running Stage V 7 195 May 2009 Running • Total generation capacity is 1240 MW. • It is located at the left bank of the CHAMBAL River at the upstream of KOTA BAIRAJ.
  • 4. • Bituminous Coal is used as fuel. • Its Calorific Value is 3300 K.cal/Kg. • Coal India Limited supplies coal from its coal mines of coal producing subsidiaries SECL & NCL to Kota Thermal Power Plant.
  • 5.  General Layout & Basic Idea  Coal Handling Plant  Boiler  Ash Handling Plant  Steam Turbine  Electricity Generator  Cooling System  Transformer  Control Panel Main & Auxiliaries Parts of KSTPS
  • 6. General Layout & Basic Idea  Fuel & Ash Circuit  Air & Gas Circuit  Feed Water & Steam Circuit  Cooling Water Circuit Air
  • 7. Coal Handling Plant Coal Handling Plant can be called the heart of the thermal power plant. It Can be divided into 3 sections. Wagon Unloading System Crushing System Conveying System Wagon Unloading System •Wagon Tripler unloads the coal from wagon to hopper. •Hopper is made of iron, is in the form of net. •Hopper allows to pass coal less than 200mm.
  • 8. Crushing System Crusher House :- Its main Function is to crush the coal to 20mm. Size. Two types of crushers in KSTPS Primary Crushers Secondary Crushers Primary Crusher:- • Roll Crusher Feed Size : 1200 mm. End Product Size : 500mm • Rotary Breaker Feed Coal size : 500mm End Product size : 0-200mm  Secondary Crusher:- It employs a combination of Impact, shearing, Compression. Roll Crusher
  • 9. Conveying System:- Belts are used to convey coal from coal handling plant to furnace. Conveyor belt specification:- Belt width : 1400 mm. Speed : 2.2 m/sec. Capacity : 750/1350 ton/hr. No. of conveyor : 38 Total Installed Power : 360 KW
  • 10. Boiler  Water Tube Boiler:- In this type of boiler water flows inside the tubes and hot gases flow outside the tubes. A Boiler (or Steam Generator) is a closed vessel in which water, under pressure is converted into steam. (i) Fire Tube Boiler (ii) Water Tube Boiler  Furnace:- Furnace is primary part of the boiler where the chemical energy of coal is converted into thermal energy by combustion.
  • 11. Boiler Drum Its function is to separate water and steam from mixture of steam & water generated in the furnace walls. Economizer An Economizer extracts a part of heat from the flue gases and uses it for heating the feed water before it enters into the steam drum.
  • 12. Air Pre-heater Super heater Air Pre heaters are employed to recover the heat from the flue gases leaving the Economizer & are used to incoming air for combustion. A Super heater is a device which removes the last traces of moisture from the saturated steam leaving the boiler tubes & also increases the temperature . Super heater consists a group of tubes.
  • 13. Ash Handling Plant In Thermal Plant coal is generally used as fuel & hence the ash is produced as the byproduct. Ash generated in power plant is about 30-40% of total coal consumption. Air & Gas Plant Fuel & Ash Plant Air & Gas Plant Ash Disposal & Dust Collection Plant Air (Atmosphere) Air Pre heater Boiler Boiler Tubes Flue gases (Due to combustion) Super HeaterChimney Economizer
  • 14. Ash Disposal & Dust Collection Plant The ash is removed from fly ash hoppers in dry state & it is carried out to collecting equipment where it is mixed with water & resulting slurry is discharged.
  • 15. Steam Turbine Steam Turbine is a machine in which a shaft is rotated steadily by impact or reaction of current or stream of working substances (Steam , Air, Water, Gases) upon Blades of a wheel. Technical Data of Turbines Rated Output 110MW Rated Speed 3000 RPM Clockwise Direction Maximum Steam Pressure 146atm
  • 16.  An electrical generator is a machine which converts mechanical energy into electrical energy through electro mechanical energy conversion. Electricity Generator The generator is driven by directly coupled steam turbine at a speed of 3000 RPM. Current : 7720A Frequency: 50Hz For generator (110MW) Terminals: 6
  • 17. Cooling System  In KSTPS Hydrogen Cooling System is employed for generator cooling.  Hydrogen is used Because of its superior cooling properties & we can eliminate the fire risk because it doesn’t support combustion.  Thermal conductivity of H2 is 7.3 times of air.
  • 18. Transformer  Transformer is a static device which is used to change the voltage level keeping the power & frequency same.  There are about 83 transformers installed at various places in plant to operate the auxiliaries. Generator Transformer A Steps up (16.5KV to 220KV) Generator Transformer B Steps up (16.5KV to 400KV) Unit Auxiliary Transformer Steps down (16.5KV to 6.9KV) Station Service Transformer Steps down(6.9KV to 0.433KV) Types of Installed Transformer
  • 19. Control Panel Control Panel I Fan Control Desk Control Panel II Fuel Control Desk Control Panel III Steam & Water Control Desk Control Panel IV Turbine Control Desk Control Panel V Generator Control Panel All the Basic Parameters like Temperature of steam & air, Flow of water & air, pressure, Electricity generation etc. are controlled in Control Panel.