SlideShare une entreprise Scribd logo
1  sur  23
Télécharger pour lire hors ligne
Salone d‘ Impresa - Venezia                                                                                       18.05.2012




    The Bosch approach to Process Management


    Diesel Systems / Chassis Systems Control
1   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    BarP Process Model:
                                                                         Management Processes
                                                                                                                                      Change
                                 Strategic Management
                                                                                                                                    Management

                                          Core Processes (Value Adding Processes)
                                 Product Engineering Process
                                  Product    (PEP)
                                Development             Production Engineering




                                                                                                                                                                      Customer
       Customer




                                                         Order Fulfillment Process
                                     Procurement                                       Production                                        Delivery



                                                                              Support Processes
           Human                                                                                       Quality              Health Safety                  IT Coordination
                                 Controlling                                    Technical                                                 Plant Protection
          Resources                                     Purchasing                                   Management                 and                             and
                                and Finance                                     Functions                                                  and Security
         Management                                                                                  and Methods            Environment                      Organisation



    Diesel Systems / Chassis Systems Control
2   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    Order Fulfillment Process:




                                                         BPS approach




    Diesel Systems / Chassis Systems Control
3   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    The Bosch Production System:


                                                                                Targets
                                                                                                                                               ” True North”
                                                                            Best In Class

                 Initial                                                                                                                             Ideal
                  State                                                      Principles
                                                              Eight general rules, that                                                              status
                                                            describe the BPS philosophy
                                                                                                                                                • 0 failure
                                                                                  Tools                                                         • One Piece Flow
                                                                Empowerment in order to                                                                • in sequence
                                                                 execute the principles                                                                • according to
                                                                                                                                                         demand
                                                                                                                                                • 100% added value



                             BPS our success for Lean Production
    Diesel Systems / Chassis Systems Control
4   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    The Bosch Production System:
         BPS Principles                                       Perfect Quality                      Process Orientation
         as Guide Line
                                                         Flexibility                          Pull System




          BPS Elements
          for                                       Value Stream                     Quick Change                    Q-                Poka           Kaizen-
          empowering                                   Design                            Over                       Tools              Yoke          Workshop

                                                                  Consumption                                                      Ship to
                                           TPM                                                  Lean Line Design                                     6S
                                                                    Control                                                         Line

                                  Point             Flow Oriented                                                Cyclical
                                                       Lay Out                       Leveling                                                  ...
                                  CIP                                                                          Material Flow




    Diesel Systems / Chassis Systems Control
5   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    BarP BPS success story:
                                                                                                                                               From System
                                                                                        Leaders                                                CIP to
                                                                            Training    as                                                     Point CIP
                                                                            program for Mentor
                                                                                                                                               • Lean Admin
                                                                  Reinforce all leaders                                                         Review

                                                                  5S        and workers Training on                                            • Training
                                   Cyclical                                             shop floor:
                                                                                                                                                 blue collar:
                                                                                                                                                 System CIP
                                   Material                                                     Training on                    • Planners
                                                                                                                               • Quick
                                                                                                                                                 to Point
                                                                                                shop floor:                                      CIP,
                                   Flow                            • Pull-system                • Working                        Change          Leveling
           TPM                                                       stabilisation                According                      Over
                                                                                                                               • System CIP
                                                                   • Ship to Line                 to Standard
                                    • VSD Vision                                                                                 to Point
                                                                     roll-out                   • Shop-floor
                                    • CIP in al                                                                                  CIP
                                                                   • Reinforce                    Manage-
        • Integration                 direct areas
                                                                     bottom-up                    ment Cycle
          BPS-CIP                   • Cyclical
                                      Material                       processes
        • CIP on
          shop floor                  Flow
        • Linea
          Gialla


            2006                         2007                            2008                          2009                           2010          2011


    Diesel Systems / Chassis Systems Control
6   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

            Since 2006: Pull System through TPM
                                                                                                                                                       -          TPM/5S
                         Perfect Quality              Process Orientation
                                                                        Definierte                                                                         ä ne   Visualisation
                     Flexibility                 Pull System




                  Value Stream            Quick Change              Q-               Poka          Kaizen-
                     Design                   Over                 Tools             Yoke         Workshop

                            Consumption                                        Ship to
            TPM                                      Lean Line Design                             6S
                              Control                                           Line                                                                                  Gemeinsame

    Point         Flow Oriented                                  Cyclical
                     Lay Out              Leveling                                          ...                                                                       Aufr        ä
    CIP                                                        Material Flow

                                                                                                                                                                      Aktionen an


                                                                                                                                                                      Wochenenden




                       TPM


                  TPM to stabilize the OEE of all bottleneck processes
            Diesel Systems / Chassis Systems Control
7           BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
            distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

    BarP BPS success story:
                                                                                                                                               From System
                                                                                        Leaders                                                CIP to
                                                                            Training    as                                                     Point CIP
                                                                            program for Mentor
                                                                                                                                               • Lean Admin
                                                                  Reinforce all leaders                                                         Review

                                                                  5S        and workers Training on                                            • Training
                                   Cyclical                                             shop floor:
                                                                                                                                                 blue collar:
                                                                                                                                                 System CIP
                                   Material                                                     Training on                    • Planners
                                                                                                                               • Quick
                                                                                                                                                 to Point
                                                                                                shop floor:                                      CIP,
                                   Flow                            • Pull-system                • Working                        Change          Leveling
           TPM                                                       stabilisation                According                      Over
                                                                                                                               • System CIP
                                                                   • Ship to Line                 to Standard
                                    • VSD Vision                                                                                 to Point
                                                                     roll-out                   • Shop-floor
                                    • CIP in al                                                                                  CIP
                                                                   • Reinforce                    Manage-
        • Integration                 direct areas
                                                                     bottom-up                    ment Cycle
          BPS-CIP                   • Cyclical
                                      Material                       processes
        • CIP on
          shop floor                  Flow
        • Linea
          Gialla


           2006                          2007                            2008                          2009                           2010          2011


    Diesel Systems / Chassis Systems Control
8   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
    distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                           18.05.2012

             Since 2007: Flexibility through Material Flow
                                                                                                           Batch size for transport = 1600              Batch size for transport = 120
                          Perfect Quality              Process Orientation

                      Flexibility                 Pull System




                   Value Stream            Quick Change              Q-            Poka          Kaizen-
                      Design                   Over                 Tools          Yoke         Workshop

                             Consumption                                        Ship to
             TPM                                      Lean Line Design                          6S
                               Control                                           Line

     Point         Flow Oriented                                  Cyclical
                      Lay Out              Leveling                                       ...
     CIP                                                        Material Flow




              Cyclical Material
              Flow


    Frequency transportation allows continuous stock reduction
             Diesel Systems / Chassis Systems Control
9            BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
             distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


             2006                         2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
10   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

             Since 2008: Transparency through
                         5S + Safety = 6S
                          Perfect Quality              Process Orientation

                      Flexibility                 Pull System




                   Value Stream            Quick Change              Q-            Poka          Kaizen-
                      Design                   Over                 Tools          Yoke         Workshop

                             Consumption                                        Ship to
             TPM                                      Lean Line Design                          6S
                               Control                                           Line

     Point         Flow Oriented                                  Cyclical
                      Lay Out              Leveling                                       ...
     CIP                                                        Material Flow




                      6S


                                                                                                           6S as must for BPS
             Diesel Systems / Chassis Systems Control
11           BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
             distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


             2006                         2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
12   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2009: Associate Involvement - empowering
                 the entire organization
                             Training for
                              Managers
        Training Top Down




                             Shopfloor                                                        PM                                                Shopfloor




                                                                                                                                                                  Training Bottom Up
                              Management                                                   VSMgr
                                                                                                                                                  Management
                              Cycle                                                                                                               Cycle
                                                                                     Department
                             Leveling and                                            Manager                                                    Standards for
                              Pull                                                                                                                TeCo and
                                                                                     Groupleader
                                                                                                                                                  Tele
                             Training for                           Teamkoordinater, Planer,
                              Planer                                      Teamleader                                                             Standards at
                                                                                                                                                  Shopfloor for
                                                                                         Workers
                                                                                                                                                  workers

        Training, involvement and motivation as success factor
     Diesel Systems / Chassis Systems Control
13   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


            2006                          2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
14   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2009: Associate Involvement
                 Management as Mentor in daily work
                                                                                                              Targ
                                                                                                                  et
      Management Top Down:
                             - Development of the Vision




                                                                                                                                                             - Mentor - Mentee

                                                                                                                                                             - Support employees to
                                                                                                                                                                                      Management Bottom Up:
                                                                                                                                                               find solutions
                             - Release of resources
                             - Target setting




                                                                                           Management


                                                                        Associate




                                            I Know it               I do it                          I Lead it                                  I teach it
     Diesel Systems / Chassis Systems Control
15   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP BPS success story:
                                                                                                                                                From System
                                                                                         Leaders                                                CIP to
                                                                             Training    as                                                     Point CIP
                                                                             program for Mentor
                                                                                                                                                • Lean Admin
                                                                   Reinforce all leaders                                                         Review

                                                                   5S        and workers Training on                                            • Training
                                    Cyclical                                             shop floor:
                                                                                                                                                  blue collar:
                                                                                                                                                  System CIP
                                    Material                                                     Training on                    • Planners
                                                                                                                                • Quick
                                                                                                                                                  to Point
                                                                                                 shop floor:                                      CIP,
                                    Flow                            • Pull-system                • Working                        Change          Leveling
            TPM                                                       stabilisation                According                      Over
                                                                                                                                • System CIP
                                                                    • Ship to Line                 to Standard
                                     • VSD Vision                                                                                 to Point
                                                                      roll-out                   • Shop-floor
                                     • CIP in al                                                                                  CIP
                                                                    • Reinforce                    Manage-
         • Integration                 direct areas
                                                                      bottom-up                    ment Cycle
           BPS-CIP                   • Cyclical
                                       Material                       processes
         • CIP on
           shop floor                  Flow
         • Linea
           Gialla


            2006                          2007                            2008                          2009                           2010          2011


     Diesel Systems / Chassis Systems Control
16   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2010: Continous Improvement through
                 „From System CIP to Point CIP“
       4 System CIP Workshops per year

       Duration 2 days

       Participants:
                        PM (PT, PC), VSMgrs
                        Department Managers, Group Leaders, Planners
                        First line shop floor manager (Foremen)
                        External Fresh Eye

       Content of the System CIP LIVE Workshop:
                        Customer Requirements                                                                30’      Plenum
                        Business Requirements, current/target state                                          30’      VSMgrs
                        “Go to Gemba”LIVE, VSM/Bubble Diagram                                               180’      7 Workgroups
                        Development VSD/Bubble Diagram                                                      180’      7 Workgroups
                        Definition of projects including KPIs and Tree                                      120’      7 Workgroups
                        Roadmap                                                                             180’      7 Workgroups
                        Release of projects by PM (PT,PC), VSMgrs                                            90’      Plenum



          Leaders drive with Speed the Improvement Process
     Diesel Systems / Chassis Systems Control
17   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Positive experience:
           A Production System is a change of mindset:
              If you decide to do it, no doubt

                                     JUST DO IT
              The Production System isn‘t a Sprint, it is a Marathon

              Leaders: I can lead it

              Involve the whole organization




           Start consequently with 6S
              No Production System without 6S




           Deployment and Training through the entire organization




     Diesel Systems / Chassis Systems Control
18   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Support Processes:




         Lean Administration approach




     Diesel Systems / Chassis Systems Control
19   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP Lean Administration – VS visualization:
                                                                                                                            Flusso di informazioni
                                                                                                                             VSM = modello “swimlanes”




     Diesel Systems / Chassis Systems Control
20   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP Lean Administration:                                                                                                                      High
                                                                                                                                                    maturity
                                                                                                                                                    level
                                                                                                                                    CIP
                                                                                                   Redefined                        running         • Improvement
                                                                                                                                                      process
                                                                                                   approach                        • Point CIP at     managed at
                                                                        VSDiA                                                        office 100%      lowest level
                                       Process                                                      • Organization
                                                                                                    • Strategy
                                                                                                                                     installed
                                                                                                                                   • Competence
                                                                                                                                                      (employees,
                                                                                                                                                      planers)
                                       mapping                                                      • Vision                         level 4 for    • higher level
        Roll-out                                                      • Training for
                                                                        Lean
                                                                                                    • WS
                                                                                                    • Training
                                                                                                                                     managers         assures a role
                                                                                                                                                      of mentor
                                       • Training for                   referents
                                         Lean                         • Redesign
        • Lean                           experts                        of several
          Administrati                 • All the main                   key
          on starts                      processes                      processes
        • Basic                          are                            (VSD)
          training for                   mapped
          managers                       (VSM)


            2009                            2010                           2011                           2012                         2013            2014


     Diesel Systems / Chassis Systems Control
21   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     Since 2012 – Redefined approach:
           Revised strategy and long term vision
           New department fully dedicated to Lean Administration
           Structured VSDiA projects to assure :
                 Reasonable duration (4 to 8 months)

                 Adequate and stable results




             Put the basis for Lean Administration success story
     Diesel Systems / Chassis Systems Control
22   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.
Salone d‘ Impresa - Venezia                                                                                       18.05.2012

     BarP Lean Administration:                                                                                                                      High
                                                                                                                                                    maturity
                                                                                                                                                    level
                                                                                                                                    CIP
                                                                                                   Redefined                        running         • Improvement
                                                                                                                                                      process
                                                                                                   approach                        • Point CIP at     managed at
                                                                        VSDiA                                                        office 100%      lowest level
                                       Process                                                      • Organization
                                                                                                    • Strategy
                                                                                                                                     installed
                                                                                                                                   • Competence
                                                                                                                                                      (employees,
                                                                                                                                                      planers)
                                       mapping                        • Training for
                                                                                                    • Vision                         level 4 for    • higher level
                                                                                                    • WS                             managers         assures a role
         Roll-out                                                       Lean
                                                                        referents
                                                                                                    • Training                                        of mentor
                                       • Training for
                                         Lean                         • Redesign
                                         experts                        of several
        • Lean
                                       • All the main                   key
          Administrati
                                         processes                      processes
          on starts
                                         are                            (VSD)
        • Basic
          training for                   mapped
          managers                       (VSM)


            2009                            2010                           2011                           2012                         2013            2014


     Diesel Systems / Chassis Systems Control
23   BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing,
     distribution, as well as in the event of applications for industrial property rights.

Contenu connexe

Tendances

1 maintenance-strategystrategy
1  maintenance-strategystrategy1  maintenance-strategystrategy
1 maintenance-strategystrategyNgoc Dep
 
Asset Lifecycle Management: A Community Worth Joining
Asset Lifecycle Management:  A Community Worth JoiningAsset Lifecycle Management:  A Community Worth Joining
Asset Lifecycle Management: A Community Worth JoiningARC Advisory Group
 
Managing and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and ConcernsManaging and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and ConcernsIBS America
 
At Lab Company Presentationl 2007 1 Q V0.2
At Lab Company Presentationl 2007 1 Q V0.2At Lab Company Presentationl 2007 1 Q V0.2
At Lab Company Presentationl 2007 1 Q V0.2alanlai.wae
 
Improving the safety culture at VTTI by using serious gaming
Improving the safety culture at VTTI by using serious gamingImproving the safety culture at VTTI by using serious gaming
Improving the safety culture at VTTI by using serious gamingjhjsmits
 
EAdirections State Of Ea 6 15 2010
EAdirections State Of Ea 6 15 2010EAdirections State Of Ea 6 15 2010
EAdirections State Of Ea 6 15 2010Tim Westbrock
 

Tendances (7)

1 maintenance-strategystrategy
1  maintenance-strategystrategy1  maintenance-strategystrategy
1 maintenance-strategystrategy
 
Asset Lifecycle Management: A Community Worth Joining
Asset Lifecycle Management:  A Community Worth JoiningAsset Lifecycle Management:  A Community Worth Joining
Asset Lifecycle Management: A Community Worth Joining
 
Lean Ofis Presentation
Lean Ofis PresentationLean Ofis Presentation
Lean Ofis Presentation
 
Managing and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and ConcernsManaging and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and Concerns
 
At Lab Company Presentationl 2007 1 Q V0.2
At Lab Company Presentationl 2007 1 Q V0.2At Lab Company Presentationl 2007 1 Q V0.2
At Lab Company Presentationl 2007 1 Q V0.2
 
Improving the safety culture at VTTI by using serious gaming
Improving the safety culture at VTTI by using serious gamingImproving the safety culture at VTTI by using serious gaming
Improving the safety culture at VTTI by using serious gaming
 
EAdirections State Of Ea 6 15 2010
EAdirections State Of Ea 6 15 2010EAdirections State Of Ea 6 15 2010
EAdirections State Of Ea 6 15 2010
 

En vedette

Organisation planning
Organisation planningOrganisation planning
Organisation planningOmkar Dalvi
 
Time management & goal setting
Time management &  goal settingTime management &  goal setting
Time management & goal settingNirav Mevcha
 
Ice breaker- management fun
Ice breaker- management funIce breaker- management fun
Ice breaker- management funSelf-employed
 
Time management and goal setting
Time management and goal settingTime management and goal setting
Time management and goal settingEileen Brumitt
 
Workers%20 participation%20in%20management%202
Workers%20 participation%20in%20management%202Workers%20 participation%20in%20management%202
Workers%20 participation%20in%20management%202Soumya Sahoo
 
Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12Chuck Catron
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4dottinger
 
Energy management & audits
Energy management & auditsEnergy management & audits
Energy management & auditsColin Porter
 
Managing With A Difference Tita Jeslie
Managing With A Difference Tita JeslieManaging With A Difference Tita Jeslie
Managing With A Difference Tita Jesliergamo
 
Presentation on how to do AAC Blockwork
Presentation on how to do AAC BlockworkPresentation on how to do AAC Blockwork
Presentation on how to do AAC BlockworkCivil 4M
 
PARLE QUALITY SYSTEM AND HR TECHNIQUES
PARLE QUALITY SYSTEM AND HR TECHNIQUESPARLE QUALITY SYSTEM AND HR TECHNIQUES
PARLE QUALITY SYSTEM AND HR TECHNIQUESsunil00000
 
Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranizationColin Porter
 

En vedette (17)

Goal Setting Mastery
Goal Setting MasteryGoal Setting Mastery
Goal Setting Mastery
 
Organisation planning
Organisation planningOrganisation planning
Organisation planning
 
Time management & goal setting
Time management &  goal settingTime management &  goal setting
Time management & goal setting
 
Ice breaker- management fun
Ice breaker- management funIce breaker- management fun
Ice breaker- management fun
 
Chapter 24
Chapter 24Chapter 24
Chapter 24
 
Time management and goal setting
Time management and goal settingTime management and goal setting
Time management and goal setting
 
23.05.2015
23.05.201523.05.2015
23.05.2015
 
Workers%20 participation%20in%20management%202
Workers%20 participation%20in%20management%202Workers%20 participation%20in%20management%202
Workers%20 participation%20in%20management%202
 
Excellence in work and business
Excellence in work and businessExcellence in work and business
Excellence in work and business
 
Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4
 
Unit 3
Unit 3Unit 3
Unit 3
 
Energy management & audits
Energy management & auditsEnergy management & audits
Energy management & audits
 
Managing With A Difference Tita Jeslie
Managing With A Difference Tita JeslieManaging With A Difference Tita Jeslie
Managing With A Difference Tita Jeslie
 
Presentation on how to do AAC Blockwork
Presentation on how to do AAC BlockworkPresentation on how to do AAC Blockwork
Presentation on how to do AAC Blockwork
 
PARLE QUALITY SYSTEM AND HR TECHNIQUES
PARLE QUALITY SYSTEM AND HR TECHNIQUESPARLE QUALITY SYSTEM AND HR TECHNIQUES
PARLE QUALITY SYSTEM AND HR TECHNIQUES
 
Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranization
 

Similaire à DECIMO SALONE D'IMPRESA Carmine Vox

Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bRobdeHeus
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total costKobi Vider
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMDinesh Kumar P
 
BPM sustained transformation key note extract arkgroup (19th october 2010) ihc
BPM sustained transformation key note extract   arkgroup (19th october 2010) ihcBPM sustained transformation key note extract   arkgroup (19th october 2010) ihc
BPM sustained transformation key note extract arkgroup (19th october 2010) ihcArk Group Australia Pty Ltd
 
20090901 London Enterprise Session V3 Colour
20090901 London Enterprise Session V3 Colour20090901 London Enterprise Session V3 Colour
20090901 London Enterprise Session V3 ColourRogerBurlton
 
Mark johnson business model transformation
Mark johnson   business model transformationMark johnson   business model transformation
Mark johnson business model transformationifmaworld
 
A Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the EnterpriseA Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the Enterprisejamieraut
 
HP Software - The Bto Solution
HP Software - The Bto SolutionHP Software - The Bto Solution
HP Software - The Bto SolutionHPDutchWorld
 
Anatomy of a Business Process - How Work Gets Done
Anatomy of a Business Process - How Work Gets DoneAnatomy of a Business Process - How Work Gets Done
Anatomy of a Business Process - How Work Gets DoneDATAVERSITY
 
Optimized Business Processes in the Age of Cloud Computing
Optimized Business Processes in the Age of Cloud ComputingOptimized Business Processes in the Age of Cloud Computing
Optimized Business Processes in the Age of Cloud ComputingOracle Day
 
Business Process Modeling
Business Process ModelingBusiness Process Modeling
Business Process Modelingguest2c3da5c7
 
Nek e am_overview_2010_1f.ppt [compatibility m
Nek e am_overview_2010_1f.ppt [compatibility mNek e am_overview_2010_1f.ppt [compatibility m
Nek e am_overview_2010_1f.ppt [compatibility mOracle Hrvatska
 
Sapphire, Atlanta, 2007
Sapphire, Atlanta, 2007Sapphire, Atlanta, 2007
Sapphire, Atlanta, 2007Mauro Okamoto
 
Maximizing EA Impact: Using Business Architecture to Achieve Alignment
Maximizing EA Impact: Using Business Architecture to Achieve AlignmentMaximizing EA Impact: Using Business Architecture to Achieve Alignment
Maximizing EA Impact: Using Business Architecture to Achieve AlignmentDavid Baker
 
OR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaOR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaImprovement Skills Consulting Ltd.
 
Infosys - Enterprise System Integration Software | White Paper
Infosys - Enterprise System Integration Software | White PaperInfosys - Enterprise System Integration Software | White Paper
Infosys - Enterprise System Integration Software | White PaperInfosys
 
Hypatia spec sheet1
Hypatia spec sheet1Hypatia spec sheet1
Hypatia spec sheet1Ron Giuntini
 

Similaire à DECIMO SALONE D'IMPRESA Carmine Vox (20)

Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3b
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total cost
 
BI Business Requirements - A Framework For Business Analysts
BI Business Requirements -  A Framework For Business AnalystsBI Business Requirements -  A Framework For Business Analysts
BI Business Requirements - A Framework For Business Analysts
 
Hexaware insurance analytics
Hexaware insurance analyticsHexaware insurance analytics
Hexaware insurance analytics
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPM
 
BPM sustained transformation key note extract arkgroup (19th october 2010) ihc
BPM sustained transformation key note extract   arkgroup (19th october 2010) ihcBPM sustained transformation key note extract   arkgroup (19th october 2010) ihc
BPM sustained transformation key note extract arkgroup (19th october 2010) ihc
 
20090901 London Enterprise Session V3 Colour
20090901 London Enterprise Session V3 Colour20090901 London Enterprise Session V3 Colour
20090901 London Enterprise Session V3 Colour
 
Mark johnson business model transformation
Mark johnson   business model transformationMark johnson   business model transformation
Mark johnson business model transformation
 
A Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the EnterpriseA Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the Enterprise
 
HP Software - The Bto Solution
HP Software - The Bto SolutionHP Software - The Bto Solution
HP Software - The Bto Solution
 
Anatomy of a Business Process - How Work Gets Done
Anatomy of a Business Process - How Work Gets DoneAnatomy of a Business Process - How Work Gets Done
Anatomy of a Business Process - How Work Gets Done
 
Optimized Business Processes in the Age of Cloud Computing
Optimized Business Processes in the Age of Cloud ComputingOptimized Business Processes in the Age of Cloud Computing
Optimized Business Processes in the Age of Cloud Computing
 
Business Process Modeling
Business Process ModelingBusiness Process Modeling
Business Process Modeling
 
Nek e am_overview_2010_1f.ppt [compatibility m
Nek e am_overview_2010_1f.ppt [compatibility mNek e am_overview_2010_1f.ppt [compatibility m
Nek e am_overview_2010_1f.ppt [compatibility m
 
BPM in Telecoms
BPM in TelecomsBPM in Telecoms
BPM in Telecoms
 
Sapphire, Atlanta, 2007
Sapphire, Atlanta, 2007Sapphire, Atlanta, 2007
Sapphire, Atlanta, 2007
 
Maximizing EA Impact: Using Business Architecture to Achieve Alignment
Maximizing EA Impact: Using Business Architecture to Achieve AlignmentMaximizing EA Impact: Using Business Architecture to Achieve Alignment
Maximizing EA Impact: Using Business Architecture to Achieve Alignment
 
OR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaOR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 Sigma
 
Infosys - Enterprise System Integration Software | White Paper
Infosys - Enterprise System Integration Software | White PaperInfosys - Enterprise System Integration Software | White Paper
Infosys - Enterprise System Integration Software | White Paper
 
Hypatia spec sheet1
Hypatia spec sheet1Hypatia spec sheet1
Hypatia spec sheet1
 

Plus de Roberto Terzi

XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloudXI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloudRoberto Terzi
 
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe GianbussoXI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe GianbussoRoberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De MarchXI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De MarchRoberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Alessandro Da ...
XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Alessandro Da ...XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Alessandro Da ...
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Alessandro Da ...Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Carla Maria Ba...
XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Carla Maria Ba...XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Carla Maria Ba...
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Carla Maria Ba...Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM Roberto Terzi
 
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...Roberto Terzi
 
DECIMO SALONE D'IMPRESA Enrico Peruffo
DECIMO SALONE D'IMPRESA Enrico PeruffoDECIMO SALONE D'IMPRESA Enrico Peruffo
DECIMO SALONE D'IMPRESA Enrico PeruffoRoberto Terzi
 
DECIMO SALONE D'IMPRESA Panozzo
DECIMO SALONE D'IMPRESA PanozzoDECIMO SALONE D'IMPRESA Panozzo
DECIMO SALONE D'IMPRESA PanozzoRoberto Terzi
 
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea StrasseraDECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea StrasseraRoberto Terzi
 
DECIMO SALONE D'IMPRESA Paolo Buratto
DECIMO SALONE D'IMPRESA Paolo BurattoDECIMO SALONE D'IMPRESA Paolo Buratto
DECIMO SALONE D'IMPRESA Paolo BurattoRoberto Terzi
 
DECIMO SALONE D'IMPRESA Italo Benedini
DECIMO SALONE D'IMPRESA Italo BenediniDECIMO SALONE D'IMPRESA Italo Benedini
DECIMO SALONE D'IMPRESA Italo BenediniRoberto Terzi
 
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggioDECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggioRoberto Terzi
 

Plus de Roberto Terzi (20)

XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloudXI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
XI UNDICESIMO SALONE DIMPRESA LABORATORI wordcloud
 
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
XI SALONE DIMPRESA Pensa Leggero Agisci Veloce - Furio Bragagnolo PASTA Z…
 
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
XI UNDICESIMO SALONE DIMPRESA - Pensa Leggero Agisci Veloce - 18 maggio 2013
 
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe GianbussoXI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Giuseppe Gianbusso
 
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
XI UNDICESIMO SALONE DIMPRESA Lab 4 Semplificare l’Ufficio - Mauro De Bona un...
 
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De MarchXI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
XI UNDICESIMO SALONE DIMPRESA Lab 2 Vendite Leggere - Roberto De March
 
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
XI UNDICESIMO SALONE DIMPRESA LAB 2 vendite Leggere - Italfile
 
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
XI UNDICESIMO SALONE DIMPRESA LAB 2 Vendite Leggere - Sabrina Danieli ITALIAN...
 
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Alessandro Da ...
XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Alessandro Da ...XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Alessandro Da ...
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Alessandro Da ...
 
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Carla Maria Ba...
XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Carla Maria Ba...XI UNDICESIMO SALONE DIMPRESA  LAB 1 la Supply Chain Leggera - Carla Maria Ba...
XI UNDICESIMO SALONE DIMPRESA LAB 1 la Supply Chain Leggera - Carla Maria Ba...
 
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
XI UNDICESIMO SALONE DIMPRESA Telecom Roberto Collavizza
 
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
XI UNDICESIMO SALONE DIMPRESA IBM Ferdinando Polato La leggerezza secondo IBM
 
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
XI UNDICESIMO SALONE DIMPRESA Pensa Leggero Agisci Veloce Agenda di lavoro 17...
 
DECIMO SALONE D'IMPRESA Enrico Peruffo
DECIMO SALONE D'IMPRESA Enrico PeruffoDECIMO SALONE D'IMPRESA Enrico Peruffo
DECIMO SALONE D'IMPRESA Enrico Peruffo
 
DECIMO SALONE D'IMPRESA Panozzo
DECIMO SALONE D'IMPRESA PanozzoDECIMO SALONE D'IMPRESA Panozzo
DECIMO SALONE D'IMPRESA Panozzo
 
6. ratto
6. ratto6. ratto
6. ratto
 
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea StrasseraDECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
DECIMO SALONE D'IMPRESA Paolo Firmino, Andrea Strassera
 
DECIMO SALONE D'IMPRESA Paolo Buratto
DECIMO SALONE D'IMPRESA Paolo BurattoDECIMO SALONE D'IMPRESA Paolo Buratto
DECIMO SALONE D'IMPRESA Paolo Buratto
 
DECIMO SALONE D'IMPRESA Italo Benedini
DECIMO SALONE D'IMPRESA Italo BenediniDECIMO SALONE D'IMPRESA Italo Benedini
DECIMO SALONE D'IMPRESA Italo Benedini
 
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggioDECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio
DECIMO SALONE D'IMPRESA programma pomeriggio 18 maggio
 

Dernier

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Dernier (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

DECIMO SALONE D'IMPRESA Carmine Vox

  • 1. Salone d‘ Impresa - Venezia 18.05.2012 The Bosch approach to Process Management Diesel Systems / Chassis Systems Control 1 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 2. Salone d‘ Impresa - Venezia 18.05.2012 BarP Process Model: Management Processes Change Strategic Management Management Core Processes (Value Adding Processes) Product Engineering Process Product (PEP) Development Production Engineering Customer Customer Order Fulfillment Process Procurement Production Delivery Support Processes Human Quality Health Safety IT Coordination Controlling Technical Plant Protection Resources Purchasing Management and and and Finance Functions and Security Management and Methods Environment Organisation Diesel Systems / Chassis Systems Control 2 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 3. Salone d‘ Impresa - Venezia 18.05.2012 Order Fulfillment Process: BPS approach Diesel Systems / Chassis Systems Control 3 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 4. Salone d‘ Impresa - Venezia 18.05.2012 The Bosch Production System: Targets ” True North” Best In Class Initial Ideal State Principles Eight general rules, that status describe the BPS philosophy • 0 failure Tools • One Piece Flow Empowerment in order to • in sequence execute the principles • according to demand • 100% added value BPS our success for Lean Production Diesel Systems / Chassis Systems Control 4 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 5. Salone d‘ Impresa - Venezia 18.05.2012 The Bosch Production System: BPS Principles Perfect Quality Process Orientation as Guide Line Flexibility Pull System BPS Elements for Value Stream Quick Change Q- Poka Kaizen- empowering Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Point Flow Oriented Cyclical Lay Out Leveling ... CIP Material Flow Diesel Systems / Chassis Systems Control 5 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 6. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 6 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 7. Salone d‘ Impresa - Venezia 18.05.2012 Since 2006: Pull System through TPM - TPM/5S Perfect Quality Process Orientation Definierte ä ne Visualisation Flexibility Pull System Value Stream Quick Change Q- Poka Kaizen- Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Gemeinsame Point Flow Oriented Cyclical Lay Out Leveling ... Aufr ä CIP Material Flow Aktionen an Wochenenden TPM TPM to stabilize the OEE of all bottleneck processes Diesel Systems / Chassis Systems Control 7 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 8. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 8 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 9. Salone d‘ Impresa - Venezia 18.05.2012 Since 2007: Flexibility through Material Flow Batch size for transport = 1600 Batch size for transport = 120 Perfect Quality Process Orientation Flexibility Pull System Value Stream Quick Change Q- Poka Kaizen- Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Point Flow Oriented Cyclical Lay Out Leveling ... CIP Material Flow Cyclical Material Flow Frequency transportation allows continuous stock reduction Diesel Systems / Chassis Systems Control 9 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 10. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 10 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 11. Salone d‘ Impresa - Venezia 18.05.2012 Since 2008: Transparency through 5S + Safety = 6S Perfect Quality Process Orientation Flexibility Pull System Value Stream Quick Change Q- Poka Kaizen- Design Over Tools Yoke Workshop Consumption Ship to TPM Lean Line Design 6S Control Line Point Flow Oriented Cyclical Lay Out Leveling ... CIP Material Flow 6S 6S as must for BPS Diesel Systems / Chassis Systems Control 11 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 12. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 12 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 13. Salone d‘ Impresa - Venezia 18.05.2012 Since 2009: Associate Involvement - empowering the entire organization  Training for Managers Training Top Down  Shopfloor PM  Shopfloor Training Bottom Up Management VSMgr Management Cycle Cycle Department  Leveling and Manager  Standards for Pull TeCo and Groupleader Tele  Training for Teamkoordinater, Planer, Planer Teamleader  Standards at Shopfloor for Workers workers Training, involvement and motivation as success factor Diesel Systems / Chassis Systems Control 13 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 14. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 14 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 15. Salone d‘ Impresa - Venezia 18.05.2012 Since 2009: Associate Involvement Management as Mentor in daily work Targ et Management Top Down: - Development of the Vision - Mentor - Mentee - Support employees to Management Bottom Up: find solutions - Release of resources - Target setting Management Associate I Know it I do it I Lead it I teach it Diesel Systems / Chassis Systems Control 15 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 16. Salone d‘ Impresa - Venezia 18.05.2012 BarP BPS success story: From System Leaders CIP to Training as Point CIP program for Mentor • Lean Admin Reinforce all leaders Review 5S and workers Training on • Training Cyclical shop floor: blue collar: System CIP Material Training on • Planners • Quick to Point shop floor: CIP, Flow • Pull-system • Working Change Leveling TPM stabilisation According Over • System CIP • Ship to Line to Standard • VSD Vision to Point roll-out • Shop-floor • CIP in al CIP • Reinforce Manage- • Integration direct areas bottom-up ment Cycle BPS-CIP • Cyclical Material processes • CIP on shop floor Flow • Linea Gialla 2006 2007 2008 2009 2010 2011 Diesel Systems / Chassis Systems Control 16 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 17. Salone d‘ Impresa - Venezia 18.05.2012 Since 2010: Continous Improvement through „From System CIP to Point CIP“  4 System CIP Workshops per year  Duration 2 days  Participants:  PM (PT, PC), VSMgrs  Department Managers, Group Leaders, Planners  First line shop floor manager (Foremen)  External Fresh Eye  Content of the System CIP LIVE Workshop:  Customer Requirements 30’ Plenum  Business Requirements, current/target state 30’ VSMgrs  “Go to Gemba”LIVE, VSM/Bubble Diagram 180’ 7 Workgroups  Development VSD/Bubble Diagram 180’ 7 Workgroups  Definition of projects including KPIs and Tree 120’ 7 Workgroups  Roadmap 180’ 7 Workgroups  Release of projects by PM (PT,PC), VSMgrs 90’ Plenum Leaders drive with Speed the Improvement Process Diesel Systems / Chassis Systems Control 17 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 18. Salone d‘ Impresa - Venezia 18.05.2012 Positive experience:  A Production System is a change of mindset:  If you decide to do it, no doubt  JUST DO IT  The Production System isn‘t a Sprint, it is a Marathon  Leaders: I can lead it  Involve the whole organization  Start consequently with 6S  No Production System without 6S  Deployment and Training through the entire organization Diesel Systems / Chassis Systems Control 18 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 19. Salone d‘ Impresa - Venezia 18.05.2012 Support Processes: Lean Administration approach Diesel Systems / Chassis Systems Control 19 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 20. Salone d‘ Impresa - Venezia 18.05.2012 BarP Lean Administration – VS visualization:  Flusso di informazioni VSM = modello “swimlanes” Diesel Systems / Chassis Systems Control 20 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 21. Salone d‘ Impresa - Venezia 18.05.2012 BarP Lean Administration: High maturity level CIP Redefined running • Improvement process approach • Point CIP at managed at VSDiA office 100% lowest level Process • Organization • Strategy installed • Competence (employees, planers) mapping • Vision level 4 for • higher level Roll-out • Training for Lean • WS • Training managers assures a role of mentor • Training for referents Lean • Redesign • Lean experts of several Administrati • All the main key on starts processes processes • Basic are (VSD) training for mapped managers (VSM) 2009 2010 2011 2012 2013 2014 Diesel Systems / Chassis Systems Control 21 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 22. Salone d‘ Impresa - Venezia 18.05.2012 Since 2012 – Redefined approach:  Revised strategy and long term vision  New department fully dedicated to Lean Administration  Structured VSDiA projects to assure :  Reasonable duration (4 to 8 months)  Adequate and stable results Put the basis for Lean Administration success story Diesel Systems / Chassis Systems Control 22 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.
  • 23. Salone d‘ Impresa - Venezia 18.05.2012 BarP Lean Administration: High maturity level CIP Redefined running • Improvement process approach • Point CIP at managed at VSDiA office 100% lowest level Process • Organization • Strategy installed • Competence (employees, planers) mapping • Training for • Vision level 4 for • higher level • WS managers assures a role Roll-out Lean referents • Training of mentor • Training for Lean • Redesign experts of several • Lean • All the main key Administrati processes processes on starts are (VSD) • Basic training for mapped managers (VSM) 2009 2010 2011 2012 2013 2014 Diesel Systems / Chassis Systems Control 23 BarP/ADM | 18/05/2012 | © Robert Bosch GmbH 2012. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.