SlideShare une entreprise Scribd logo
1  sur  5
Télécharger pour lire hors ligne
PROJECT TRACKING SYSTEM
   PROJECT EFFORT TRACKING SYSTEM & SOLUTIONS
The Aim of the Project is latest generation Web Based System for Managing
and Tracking Software Development Projects. It is called "Project tracking System"
for a good reason - it was specifically designed to make software project management
hassle free and straightforward.
Despite the simplicity of use, Easy Projects is a powerful and sophisticated system based
on the Microsoft .NET technology and MS-Access. These robust technologies provide with
a scalable and flexible solution to manage and track projects of any complexity level.


PROJECT REQUIREMENT STUDY AND DOCUMENTATION
The Project Tracking System (PTS) was initially developed to document, prioritize and
track the progress of internal Remedy projects by setting milestones and establishing
deliverables required to complete a project. As the application became more robust, other
groups became interested in using PTS to manage their own projects.

Using the Project Tracking System
This document discusses opening PTS, how to create an PTS projects, adding
attachments, setting up deliverables, establishing project members, creating deliverables
and milestones to measure progress, project security features, setting milestone alert
notifications, sending email from within a PTS project and more..

Notifications and Communications within PTS
This document discusses all of the types of notifications that PTS sends to project
members and customers throughout the lifecycle of the project.
Notifications are divided into categories and defined for who receives a notification, what
information is distributed, when the notification is sent, and why the notification is sent to
either the customer or the support staff working the request.

Advanced Searching and Reporting
This document discusses advanced searching techniques including queries by example
(QBE) and using the Advanced Search Bar to construct search statements to extract
needed information as well as built in reporting and reports generated using an external
application called Crystal Reports.

PROJECT TRACKING SYSTEM - OVERVIEW
The Project Tracking System was initially developed to document, prioritize and track the
progress of internal Remedy projects by setting milestones and establishing deliverables
required to complete a project. As the application became more robust, other groups
became interested in using PTS to manage their own projects.
The Project Tracking System (PTS) can be displayed in two different modes: Save
mode and Search mode. Save mode is indicated in PTS by the Save button located in the
upper right corner of the form and is used to create or modify requests. Search mode is
indicated in PTS by the Search button located in the upper right corner of the form and is
used to find an existing request.
MODULES OF THE PROJECT
   USER AUTHENTICATION
       TIMES TREE LOG
       PROJECTS LIST
       • PROJECT
       • TASK
       • BUGS
       • REQUEST


   REQUEST LIST
       SUMMARY
       RESOURCE
       PROJECT
       BUGS
       REQUEST


   OPTIONS


AUTHENTICATION
Project manager only having the rights to enter the sites and see what the projects going on. The
former can be used to, for example, restrict project modules to use within a company.
However if the people who are allowed to access the modules are widely dispersed, or the server
administrator needs to be able to control access on an individual basis, it is possible to require a
username and password before being allowed access to a module and databases. This is called
authentication.


TIMES TREE LOG
In an organization each projects contains different module. Each modules maintained by single or
more persons. The times tree log contains person’s details, project titles, modules, total time to
work in particular modules, status of project, and task of all the things are viewed.
In any particular user performance also find out this times tree log module. Also each person
works also maintain this times tree log module.


PROJECT LIST
Created by Project Manager. He can create any number of projects and assign Users to the
projects. A project is an independent unit and can contain its own customized Components, such
as statuses and categories.
Each project can have a different set of Users, statuses, categories, which are independent
from other projects of the system
Requested - Initial request from the customer for ITSS’ involvement in a project.
Investigating - Investigating and researching the project request to determine what resources
including money, materials and people that are required to complete the project within the
specified time frame.
Active - Project is approved and resources are allocated and these resources are actively working
on the project.
Waiting List - A project that meets one of the following criteria: no funding available yet, not
enough IT and / or business unit resources available to work on the project, or the project was put
on hold by the customer.
Rejected - A project request that was either not approved or the request was actually a request for
service from our nested of an actual project.
Completed - A project where all of the stated deliverables were completed


TASK TREE
Created by the Project Manager and assigned to Developers and QA. The tasks can be whether
single or nested. A big task can be divided into small Subtasks and assigned to various Team
Members.
Task tree navigator gives all the group of task details and the modules that are hold by tree
format.


TASK DETAILS
It contains each module details, what are all operation done by that particular project, who working
the entire module, time duration ,status all things hold it has managed.


REQUEST LIST
Created by Project Manager on the request of Client. The Client himself can also submit a request.
Once the requests are created, they are assigned to the developers.
Generally requests are created when the client requires some additional functionality in the
software developed by the company.


REPORT
Can be used by Project Managers to view the progress of their projects. Reports are efficient way
to have a broader outlook of the project.


                                A TYPICAL WORKFLOW
1. Administrator creates users, such as Project Managers, QA, Developers and Administrators.
2. Project Manager creates a project and assigns users to it.
3. Project Manager creates tasks. Divides bigger tasks into smaller tasks and assign them to
   developers.
4. Developers develop the software according to the project plan.
5. Team members test the projects and submit bugs to the system. The bugs are then assigned
   to Developers or QA.
6. Developers fix the bugs.
7. Project Manager keeps track of the project by setting the status of project bugs, tasks and
   requests. Project Manager assigns and reassigns tasks to team members if required.
8. Client tests the product and submits bugs and requests to the system if required.
9. Project Manager views reports to have a broader view of the project data.
10. The users fill their time sheets entries to keep track of the time spent on each project activity.
11. The Project Manager evaluates the gap between the estimated and actual time spent on a project.
EASY PROJECTS MANAGEMENT
Using only a few clicks you will be able to see a complete picture of your project including
resource allocation, completed and outstanding tasks, fixed and opened issues, status of
customers' requests, employees/contractors timesheets and other valuable information.
A variety of filters and sorting options will allow you to see certain tasks at a glance. Creating a
task and assigning it to a team member will take just 30 seconds!


Multi-nesting (hierarchical) Projects and Tasks
Our system allows you to have an unlimited number of projects and tasks with as many sub-levels
of hierarchy as you need.
You can split large tasks into small ones, assign deadlines and team members, specify estimated
durations and activity categories. Be effective - eat the elephant bite by byte!


Employees/Contractors Timesheets
Do you want to know exactly how your project members spent their working time? Our easy-to-
use timesheets will help you.
Each team member will just select the project and task assigned to him, enter number of hours,
specify the status of the task and voila! - you have all necessary data in real time.


Auto assign
This unique feature will speed up your team response time drastically. Once a new feature request
or issue is submitted to your system by the customer, the request or issue will be automatically
converted to a task and assigned to a specific team member, based on your preferences (by
username or team role). As soon as the task is assigned it appears on the person's task list.


Easily Customizable and Expandable
User interfaces, including colors, graphics and text, can be customized according to your company
policies and culture. Easy Projects .NET is built on the Microsoft .NET framework and Microsoft
SQL Server 2000. This means that it can be easily modified to meet your requirements or integrate
into your existing system.


Multiple Project Roles (Project Manager, Developer/Engineer, QA, Customer)
Project tracking System uses a multi-level permissions system based on the user's role in a
project. Each role has different access rights and can work only with the objects available to
them.
In addition, each role can be restricted to certain actions such as deleting the project or task,
submitting a new request, assigning resources, etc...


Issues (defects) Tracking
Project tracking System has a built-in Issue (defect) tracking system. You can use it for your
internal issues tracking or for client support.
Once a defect is submitted, it will be automatically converted to a task and assigned to a member
of the team responsible for the project. You will be able to track how many hours were spent on
bug fixing and compare actual times versus estimated.


Customers Requests Tracking
Project tracking System allows you to keep track of all customer requests. Either a customer or
a project manager can submit these requests.
All hours spent on the tasks that are out of the original specification scope will be logged
separately and this data can be linked to your billing system.
Email Notifications
This feature will keep your team members updated in real-time and provide excellent
communication within a team. Each user will be able to receive an email when the task
or project he is working on is changed or assigned to him. . Here is one possible scenario
to demonstrate how this feature works:
• Customer submits a new request or an issue
• It is automatically converted to a task and assigned to a specific team member
• The team member receives an email with a new task notification
• Once the task is completed the team member changes its status
• Proper email notification is sent to the customer who submitted the request or issue.
Just imagine how much time the Project Manager can save!

Message boards
This is another useful tool that will facilitate project's team collaboration. You will be able
to attach a discussion board to each of your project tasks. You can have as many topics
as you need. This feature will help your team to improve communications and keep track
of all discussions.

Files Upload
Easy Projects .NET allows attaching files to a project or a task. The files can include
executables, source codes, documents, images, etc… Forget about searching through
thousands of emails. Just open the project or task and see all relevant files.

Multiple reports and Statistics
Project tracking System has a special Reports section. It provides you with set of
ready-to-use reports showing all aspects of the project development process at a
glance. You can view a summary for all projects, resource workloads, team member
timesheets, estimated time vs. actual time and issue and request statistics. Flexible filters
make it easy for you to see only the information relevant to you at that particular moment.
In addition, since the Microsoft SQL Server 2000 is used as a database, you will be able
to create custom reports using any third party report engine such as Crystal Reports or
Active Reports.

PROPOSED SYSTEM REQUIREMENTS
                PROPOSED SYSTEM SOFTWARE REQUIREMENTS
Server           : Windows 2000 and Client
Client           : Windows Client
Software         :    ASP.NET
Database         :    Oracle 8 / Access / SQL SERVER

PROPOSED SYSTEM HARDWARE REQUIREMENTS
•   PIII and Above with 256 MB RAM
•   40 GB HDD
•   Digital Color Monitor
•   Key Board, Mouse

Contenu connexe

Plus de ncct

Bot Robo Tanker Sound Detector
Bot Robo  Tanker  Sound DetectorBot Robo  Tanker  Sound Detector
Bot Robo Tanker Sound Detector
ncct
 
Distance Protection
Distance ProtectionDistance Protection
Distance Protection
ncct
 
Bluetooth Jammer
Bluetooth  JammerBluetooth  Jammer
Bluetooth Jammer
ncct
 
Crypkit 1
Crypkit 1Crypkit 1
Crypkit 1
ncct
 
I E E E 2009 Java Projects
I E E E 2009  Java  ProjectsI E E E 2009  Java  Projects
I E E E 2009 Java Projects
ncct
 
B E Projects M C A Projects B
B E  Projects  M C A  Projects  BB E  Projects  M C A  Projects  B
B E Projects M C A Projects B
ncct
 
J2 E E Projects, I E E E Projects 2009
J2 E E  Projects,  I E E E  Projects 2009J2 E E  Projects,  I E E E  Projects 2009
J2 E E Projects, I E E E Projects 2009
ncct
 
J2 M E Projects, I E E E Projects 2009
J2 M E  Projects,  I E E E  Projects 2009J2 M E  Projects,  I E E E  Projects 2009
J2 M E Projects, I E E E Projects 2009
ncct
 
Engineering College Projects, M C A Projects, B E Projects, B Tech Pr...
Engineering  College  Projects,  M C A  Projects,  B E  Projects,  B Tech  Pr...Engineering  College  Projects,  M C A  Projects,  B E  Projects,  B Tech  Pr...
Engineering College Projects, M C A Projects, B E Projects, B Tech Pr...
ncct
 
B E M E Projects M C A Projects B
B E  M E  Projects  M C A  Projects  BB E  M E  Projects  M C A  Projects  B
B E M E Projects M C A Projects B
ncct
 
I E E E 2009 Java Projects, I E E E 2009 A S P
I E E E 2009  Java  Projects,  I E E E 2009  A S PI E E E 2009  Java  Projects,  I E E E 2009  A S P
I E E E 2009 Java Projects, I E E E 2009 A S P
ncct
 
Advantages Of Software Projects N C C T
Advantages Of  Software  Projects  N C C TAdvantages Of  Software  Projects  N C C T
Advantages Of Software Projects N C C T
ncct
 
Engineering Projects
Engineering  ProjectsEngineering  Projects
Engineering Projects
ncct
 
Software Projects Java Projects Mobile Computing
Software  Projects  Java  Projects  Mobile  ComputingSoftware  Projects  Java  Projects  Mobile  Computing
Software Projects Java Projects Mobile Computing
ncct
 
Final Year Engineering Projects
Final  Year  Engineering  ProjectsFinal  Year  Engineering  Projects
Final Year Engineering Projects
ncct
 
A S P
A S PA S P
A S P
ncct
 
I E E E 2009 A S P
I E E E 2009  A S PI E E E 2009  A S P
I E E E 2009 A S P
ncct
 
I E E E 2009 Real Time Projects, I E E E 2009 Live Projects, I E E E 2...
I E E E 2009  Real  Time  Projects,  I E E E 2009  Live  Projects,  I E E E 2...I E E E 2009  Real  Time  Projects,  I E E E 2009  Live  Projects,  I E E E 2...
I E E E 2009 Real Time Projects, I E E E 2009 Live Projects, I E E E 2...
ncct
 
Ieee Projects Ieeeprojects
Ieee Projects IeeeprojectsIeee Projects Ieeeprojects
Ieee Projects Ieeeprojects
ncct
 
A S P
A S PA S P
A S P
ncct
 

Plus de ncct (20)

Bot Robo Tanker Sound Detector
Bot Robo  Tanker  Sound DetectorBot Robo  Tanker  Sound Detector
Bot Robo Tanker Sound Detector
 
Distance Protection
Distance ProtectionDistance Protection
Distance Protection
 
Bluetooth Jammer
Bluetooth  JammerBluetooth  Jammer
Bluetooth Jammer
 
Crypkit 1
Crypkit 1Crypkit 1
Crypkit 1
 
I E E E 2009 Java Projects
I E E E 2009  Java  ProjectsI E E E 2009  Java  Projects
I E E E 2009 Java Projects
 
B E Projects M C A Projects B
B E  Projects  M C A  Projects  BB E  Projects  M C A  Projects  B
B E Projects M C A Projects B
 
J2 E E Projects, I E E E Projects 2009
J2 E E  Projects,  I E E E  Projects 2009J2 E E  Projects,  I E E E  Projects 2009
J2 E E Projects, I E E E Projects 2009
 
J2 M E Projects, I E E E Projects 2009
J2 M E  Projects,  I E E E  Projects 2009J2 M E  Projects,  I E E E  Projects 2009
J2 M E Projects, I E E E Projects 2009
 
Engineering College Projects, M C A Projects, B E Projects, B Tech Pr...
Engineering  College  Projects,  M C A  Projects,  B E  Projects,  B Tech  Pr...Engineering  College  Projects,  M C A  Projects,  B E  Projects,  B Tech  Pr...
Engineering College Projects, M C A Projects, B E Projects, B Tech Pr...
 
B E M E Projects M C A Projects B
B E  M E  Projects  M C A  Projects  BB E  M E  Projects  M C A  Projects  B
B E M E Projects M C A Projects B
 
I E E E 2009 Java Projects, I E E E 2009 A S P
I E E E 2009  Java  Projects,  I E E E 2009  A S PI E E E 2009  Java  Projects,  I E E E 2009  A S P
I E E E 2009 Java Projects, I E E E 2009 A S P
 
Advantages Of Software Projects N C C T
Advantages Of  Software  Projects  N C C TAdvantages Of  Software  Projects  N C C T
Advantages Of Software Projects N C C T
 
Engineering Projects
Engineering  ProjectsEngineering  Projects
Engineering Projects
 
Software Projects Java Projects Mobile Computing
Software  Projects  Java  Projects  Mobile  ComputingSoftware  Projects  Java  Projects  Mobile  Computing
Software Projects Java Projects Mobile Computing
 
Final Year Engineering Projects
Final  Year  Engineering  ProjectsFinal  Year  Engineering  Projects
Final Year Engineering Projects
 
A S P
A S PA S P
A S P
 
I E E E 2009 A S P
I E E E 2009  A S PI E E E 2009  A S P
I E E E 2009 A S P
 
I E E E 2009 Real Time Projects, I E E E 2009 Live Projects, I E E E 2...
I E E E 2009  Real  Time  Projects,  I E E E 2009  Live  Projects,  I E E E 2...I E E E 2009  Real  Time  Projects,  I E E E 2009  Live  Projects,  I E E E 2...
I E E E 2009 Real Time Projects, I E E E 2009 Live Projects, I E E E 2...
 
Ieee Projects Ieeeprojects
Ieee Projects IeeeprojectsIeee Projects Ieeeprojects
Ieee Projects Ieeeprojects
 
A S P
A S PA S P
A S P
 

Dernier

Dernier (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Project Tracking System

  • 1. PROJECT TRACKING SYSTEM PROJECT EFFORT TRACKING SYSTEM & SOLUTIONS The Aim of the Project is latest generation Web Based System for Managing and Tracking Software Development Projects. It is called "Project tracking System" for a good reason - it was specifically designed to make software project management hassle free and straightforward. Despite the simplicity of use, Easy Projects is a powerful and sophisticated system based on the Microsoft .NET technology and MS-Access. These robust technologies provide with a scalable and flexible solution to manage and track projects of any complexity level. PROJECT REQUIREMENT STUDY AND DOCUMENTATION The Project Tracking System (PTS) was initially developed to document, prioritize and track the progress of internal Remedy projects by setting milestones and establishing deliverables required to complete a project. As the application became more robust, other groups became interested in using PTS to manage their own projects. Using the Project Tracking System This document discusses opening PTS, how to create an PTS projects, adding attachments, setting up deliverables, establishing project members, creating deliverables and milestones to measure progress, project security features, setting milestone alert notifications, sending email from within a PTS project and more.. Notifications and Communications within PTS This document discusses all of the types of notifications that PTS sends to project members and customers throughout the lifecycle of the project. Notifications are divided into categories and defined for who receives a notification, what information is distributed, when the notification is sent, and why the notification is sent to either the customer or the support staff working the request. Advanced Searching and Reporting This document discusses advanced searching techniques including queries by example (QBE) and using the Advanced Search Bar to construct search statements to extract needed information as well as built in reporting and reports generated using an external application called Crystal Reports. PROJECT TRACKING SYSTEM - OVERVIEW The Project Tracking System was initially developed to document, prioritize and track the progress of internal Remedy projects by setting milestones and establishing deliverables required to complete a project. As the application became more robust, other groups became interested in using PTS to manage their own projects. The Project Tracking System (PTS) can be displayed in two different modes: Save mode and Search mode. Save mode is indicated in PTS by the Save button located in the upper right corner of the form and is used to create or modify requests. Search mode is indicated in PTS by the Search button located in the upper right corner of the form and is used to find an existing request.
  • 2. MODULES OF THE PROJECT USER AUTHENTICATION TIMES TREE LOG PROJECTS LIST • PROJECT • TASK • BUGS • REQUEST REQUEST LIST SUMMARY RESOURCE PROJECT BUGS REQUEST OPTIONS AUTHENTICATION Project manager only having the rights to enter the sites and see what the projects going on. The former can be used to, for example, restrict project modules to use within a company. However if the people who are allowed to access the modules are widely dispersed, or the server administrator needs to be able to control access on an individual basis, it is possible to require a username and password before being allowed access to a module and databases. This is called authentication. TIMES TREE LOG In an organization each projects contains different module. Each modules maintained by single or more persons. The times tree log contains person’s details, project titles, modules, total time to work in particular modules, status of project, and task of all the things are viewed. In any particular user performance also find out this times tree log module. Also each person works also maintain this times tree log module. PROJECT LIST Created by Project Manager. He can create any number of projects and assign Users to the projects. A project is an independent unit and can contain its own customized Components, such as statuses and categories. Each project can have a different set of Users, statuses, categories, which are independent from other projects of the system
  • 3. Requested - Initial request from the customer for ITSS’ involvement in a project. Investigating - Investigating and researching the project request to determine what resources including money, materials and people that are required to complete the project within the specified time frame. Active - Project is approved and resources are allocated and these resources are actively working on the project. Waiting List - A project that meets one of the following criteria: no funding available yet, not enough IT and / or business unit resources available to work on the project, or the project was put on hold by the customer. Rejected - A project request that was either not approved or the request was actually a request for service from our nested of an actual project. Completed - A project where all of the stated deliverables were completed TASK TREE Created by the Project Manager and assigned to Developers and QA. The tasks can be whether single or nested. A big task can be divided into small Subtasks and assigned to various Team Members. Task tree navigator gives all the group of task details and the modules that are hold by tree format. TASK DETAILS It contains each module details, what are all operation done by that particular project, who working the entire module, time duration ,status all things hold it has managed. REQUEST LIST Created by Project Manager on the request of Client. The Client himself can also submit a request. Once the requests are created, they are assigned to the developers. Generally requests are created when the client requires some additional functionality in the software developed by the company. REPORT Can be used by Project Managers to view the progress of their projects. Reports are efficient way to have a broader outlook of the project. A TYPICAL WORKFLOW 1. Administrator creates users, such as Project Managers, QA, Developers and Administrators. 2. Project Manager creates a project and assigns users to it. 3. Project Manager creates tasks. Divides bigger tasks into smaller tasks and assign them to developers. 4. Developers develop the software according to the project plan. 5. Team members test the projects and submit bugs to the system. The bugs are then assigned to Developers or QA. 6. Developers fix the bugs. 7. Project Manager keeps track of the project by setting the status of project bugs, tasks and requests. Project Manager assigns and reassigns tasks to team members if required. 8. Client tests the product and submits bugs and requests to the system if required. 9. Project Manager views reports to have a broader view of the project data. 10. The users fill their time sheets entries to keep track of the time spent on each project activity. 11. The Project Manager evaluates the gap between the estimated and actual time spent on a project.
  • 4. EASY PROJECTS MANAGEMENT Using only a few clicks you will be able to see a complete picture of your project including resource allocation, completed and outstanding tasks, fixed and opened issues, status of customers' requests, employees/contractors timesheets and other valuable information. A variety of filters and sorting options will allow you to see certain tasks at a glance. Creating a task and assigning it to a team member will take just 30 seconds! Multi-nesting (hierarchical) Projects and Tasks Our system allows you to have an unlimited number of projects and tasks with as many sub-levels of hierarchy as you need. You can split large tasks into small ones, assign deadlines and team members, specify estimated durations and activity categories. Be effective - eat the elephant bite by byte! Employees/Contractors Timesheets Do you want to know exactly how your project members spent their working time? Our easy-to- use timesheets will help you. Each team member will just select the project and task assigned to him, enter number of hours, specify the status of the task and voila! - you have all necessary data in real time. Auto assign This unique feature will speed up your team response time drastically. Once a new feature request or issue is submitted to your system by the customer, the request or issue will be automatically converted to a task and assigned to a specific team member, based on your preferences (by username or team role). As soon as the task is assigned it appears on the person's task list. Easily Customizable and Expandable User interfaces, including colors, graphics and text, can be customized according to your company policies and culture. Easy Projects .NET is built on the Microsoft .NET framework and Microsoft SQL Server 2000. This means that it can be easily modified to meet your requirements or integrate into your existing system. Multiple Project Roles (Project Manager, Developer/Engineer, QA, Customer) Project tracking System uses a multi-level permissions system based on the user's role in a project. Each role has different access rights and can work only with the objects available to them. In addition, each role can be restricted to certain actions such as deleting the project or task, submitting a new request, assigning resources, etc... Issues (defects) Tracking Project tracking System has a built-in Issue (defect) tracking system. You can use it for your internal issues tracking or for client support. Once a defect is submitted, it will be automatically converted to a task and assigned to a member of the team responsible for the project. You will be able to track how many hours were spent on bug fixing and compare actual times versus estimated. Customers Requests Tracking Project tracking System allows you to keep track of all customer requests. Either a customer or a project manager can submit these requests. All hours spent on the tasks that are out of the original specification scope will be logged separately and this data can be linked to your billing system.
  • 5. Email Notifications This feature will keep your team members updated in real-time and provide excellent communication within a team. Each user will be able to receive an email when the task or project he is working on is changed or assigned to him. . Here is one possible scenario to demonstrate how this feature works: • Customer submits a new request or an issue • It is automatically converted to a task and assigned to a specific team member • The team member receives an email with a new task notification • Once the task is completed the team member changes its status • Proper email notification is sent to the customer who submitted the request or issue. Just imagine how much time the Project Manager can save! Message boards This is another useful tool that will facilitate project's team collaboration. You will be able to attach a discussion board to each of your project tasks. You can have as many topics as you need. This feature will help your team to improve communications and keep track of all discussions. Files Upload Easy Projects .NET allows attaching files to a project or a task. The files can include executables, source codes, documents, images, etc… Forget about searching through thousands of emails. Just open the project or task and see all relevant files. Multiple reports and Statistics Project tracking System has a special Reports section. It provides you with set of ready-to-use reports showing all aspects of the project development process at a glance. You can view a summary for all projects, resource workloads, team member timesheets, estimated time vs. actual time and issue and request statistics. Flexible filters make it easy for you to see only the information relevant to you at that particular moment. In addition, since the Microsoft SQL Server 2000 is used as a database, you will be able to create custom reports using any third party report engine such as Crystal Reports or Active Reports. PROPOSED SYSTEM REQUIREMENTS PROPOSED SYSTEM SOFTWARE REQUIREMENTS Server : Windows 2000 and Client Client : Windows Client Software : ASP.NET Database : Oracle 8 / Access / SQL SERVER PROPOSED SYSTEM HARDWARE REQUIREMENTS • PIII and Above with 256 MB RAM • 40 GB HDD • Digital Color Monitor • Key Board, Mouse