SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
William Neil Brodie Tel Nos +44(0) 1563 522173
44 Sherwood Road +44(0) 7850 441 900
Hurlford e-mail: neil_brodie@hotmail.com
Kilmarnock D.O.B : 10th Jan 1964
Scotland KA1 5DW Marital status : Married
Higher National Diploma in MANUFACTURING TECHNOLOGY (Paisley College, Scotland)
Higher National Certificate in AERONAUTICAL ENGINEERING (Ayr College, Scotland)
PROFILE: A career stretching over 30 years in aircraft industry graduating from apprentice, shop floor
fitter, manufacturing engineer and design engineer. SIGNATORY STATUS to EASA.21J.
CAD System Experience
CATIA V5 (AIRBUS trained with certificates) 15,000 hours
CATIA V4 (BAe trained with certificates) 18,000 hours
CATIA V4 - E3D 3,500 hours
ANVIL 4000 (BAe trained with certificates) 8,000 hours
(1).CDP / PM (2).HMS CAPP-NCM (3).IMAN (4).VPM (AIRBUS) (5).PRIMES (AIRBUS) (6).Trans-
national SAP (AIRBUS) (7).Windchill EPD (8) PDM Link, def specialist (AIRBUS) (9) SMARTEAM
EXPERIENCE SUMMARY
DISCIPLINE ATA YEARS EXP DESCRIPTION
Structures 53 10+ Primary and Secondary structures of major components including
57 fuselage, wing, leading edges and flaps.
Electrical 92 3.5 Wire/bundle/SAM route definition and clipping in engine and
Fuselage considering separation, segregation and shielding.
Satisfying the bonding and grounding requirements.
2D/3D creation of loom assembly’s.
Flight Test Installation (FTI) experience.
Systems 21 1 ECS distribution system of ram air ducts, pneumatic pipes.
28 1 Fuel and inerting System component design including
47 connectors, double walled floating pipes and ‘A’ brackets.
36 1 Bleed air distribution insulated ducts, expansion joints, bellows
and leak detect system.
27 1 Cables, linkages and mechanisms that control aileron / rudder
trim and gust lock.2D drawings using geometrical tolerancing
76 2 Engine controls from cockpit centre console including camshafts,
Power levers, gears, rods and electrical interface.
Interiors 25 2.5 Design and layout of cabin ceiling panels and seals.
Cabinet and Galley design for McCarthy interiors
CAREER HISTORY
Senior Design Engineer: A350-1000 XWB Wing Flap Tracks : ATA 57
SAAB Development of complex Levers and Ribs to support the Flaps Installation.
Sweden Progression from Mat B to Mat C and DFM stages.
(Jan14 to Date) Exposure to Kinematics. CATIA V5, PDMLink, VPM.
Senior Design Engineer: Structures and Systems : ATA 21/38/53 Airbus / Boeing aircraft
Jet Aviation Bespoke design of water supply / drainage and air conditioning /venting.
Switzerland Structural design of upper,side and floor attachments for cabinets and
(Mar11 to Oct 11) monuments.Conceptual design of a standard seat track installation.
(Aug12 to Dec13) Liaison engineer on shop providing solutions to installation and cosmetic
problems with general interiors including galleys and cabinets.
Achieved SIGNATORY STATUS to EASA approval EASA.21J.
CATIA V5 , AUTOCAD and SMARTEAM (REFERENCE AVAILABLE)
Lead Designer: Mech/Sys A350-900 XWB Bleed Air ATA 36 (REFERENCE AVAILABLE)
Senior Design Engineer: A350-900 XWB - Fuel and Inerting system: ATA 28/47
Airbus site Lead design responsible for a small team progressing the installation of bleed air
(PFW office) system in Section 16-19.1.Tasks include checking work and interfacing with other
Hamburg risk sharing partners and to hold regular design reviews monitoring progress
(Feb10 – Mar 11) towards PDR and CDR. CATIA V5.R18. PDMLink, VPM
(Oct 11 – Aug 12) 2D/3D design of fuel system components including “A” Brackets.
Proof of Compliance statements to satisfy Verification and Validation.
Senior Designer: Mech/Sys RJ146-100 On Board Inert Gas Generating System (OBIGGS)
BAE SYSTEMS Conceptual design of support structure, pneumatic pipe routes, ECS ducts and
Prestwick installation of the ASM (Air Separation Module) and BAPM (Bleed Air Preparation
(Mar09 – Feb10) Module) as part of an inert gas fuel system. CATIA V5.R17.
Senior Designer: Electrical AIRBUS A400M- Wing Electrical Systems Installation TDQN
Assystem, Answering and embodying production electrical and FTI DQN,s for A400M
Preston, Filton, Seville wing installations using SAP, PRIMES, Windchill EPD, and CATIA V5R16
(Oct 08 – Mar 09) Electrical Work Bench.
Senior Designer: Mechanical NH90 Helicopter – Life raft Container (REFRENCE AVAILABLE)
Inter-Tec Services Concept design of primary structure and boarding aid mechanism
Scotland Detail design of life raft composite door. CATIA V5R17
(May 07 – Oct 08) A400M Wing Spoiler Actuator Brackets / System Brackets
Actuator Brackets and systems brackets 2D, 3D. CATIA V5R14
A319 Cabinets / Galley for (McCarthy Interiors)
Creation of 2D drawings for galley assembly and installation CATIA V5R16.
Designer: Electrical AIRBUS A380 - Electrical Routing / Installation / SFM
CDI Aerospace, Definition of 2M, 4M wire routing to/from SPDB, Avionic Racks and equipment
Hamburg/Toulouse using E3D, e-tool, DVise and VPM.
(Dec 04 – May 07) Part of MAP team in Toulouse FAL providing solutions to production to aid instal-
lation of brackets and harnesses using Dvise, MORE, Zamiz TAKSY and SAP.
Designer: Interiors AIRBUS A380 Interior Furnishings (REFERENCE AVAILABLE)
EADS, Hamburg 3D design and layout of main and upper deck composite ceiling panels and attachment
(June03 - Dec 04 brackets using CATIA V4 and VPM. Creation of 2D interface control drawings.
Designer: Mechanical EUROFIGHTER Structures, Systems and Composites
BAe Samlesbury Concessions / Liaison: Conceptual design of repair schemes using a
(Feb 02 – Jun 03) combination of CATIA V4 and HMS CAPP – Non Conformance Management
Involved with front / rear fuselage structures including repair to composite
panels, fore planes, IFRP, ECS systems and windscreen / canopy.
Designer: Mechanical EMBRAER 145XR and 170. Fuselage, Wing leading edges, Flaps
GAMESA, Spain Design and detailing of complete wing box assembly, flaps and leading edges.
(Aug 00 – Feb 02) Layout and design of rear fuselage floor and avionic rack support structure
For Embraer 170. (CATIA V4) (REFERENCE AVAILABLE)
Designer: Mechanical NIMROD MRA4 Fuselage and composites
BAe Prestwick Conceptual detailing, assembly and installation of fuselage floor support
(Nov 97-Aug00) structure, seat rails and composite panels. (CATIA V4)
Senior Manufacturing Engineer : JETSTREAM 41: Cost Reduction Team
(BAE Prestwick) Engineer responsible for small engineering team in final assembly
Aug 94 – Nov 97 implementing cost reductions and man hour savings by conceptually
improving methods and tooling. (ANVIL 4000)
Senior Manufacturing Engineer: JETSTREAM 41: Ctr console Engine controls and throttle box
(BAE Prestwick) Engineering of a mechanical system of levers, camshafts, gears, rods and
Sept 91 – Aug 94 locks to regulate engine speed with a closed loop feedback control system
using mechanically operated micro switch boxes and control panel readouts
all contained within the cockpit centre console structure.
Manufacturing Engineer: BAE125-1000: Fuel system, fuel tank structures
(BAE Prestwick) Production planning of new design forward and rear ventral fuel tanks
Apr 88 - Sept 91 Involved in conceptual detail, assembly and installation of structure and fuel
system, simultaneously provisioning for jigs and tooling for manufacture and test.
Manufacturing Engineer: JETSTREAM 31: fuselage, wing structures and systems
(BAE Prestwick) Integrated into manufacturing engineering embodying design modifications
Aug 86 – Apr 88 Decide and implement make or buy decisions based on quality and cost
parameters.
Aircraft Technician Completed 4 years apprenticeship in aircraft fitting and erecting to EITB
(BAE 1980-86) requirements and 2 years time served fitter.

Contenu connexe

Tendances

A400 m program update 2012
A400 m program update 2012A400 m program update 2012
A400 m program update 2012ICSA, LLC
 
An Update on the A400M, May 2013
An Update on the A400M, May 2013An Update on the A400M, May 2013
An Update on the A400M, May 2013ICSA, LLC
 
Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016ICSA, LLC
 
Airbus Defence and Space on UAS systems, June 2016
Airbus Defence and Space on UAS systems, June 2016Airbus Defence and Space on UAS systems, June 2016
Airbus Defence and Space on UAS systems, June 2016ICSA, LLC
 
Clean sky towards horizon2020
Clean sky towards horizon2020Clean sky towards horizon2020
Clean sky towards horizon2020Leonardo
 
An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013ICSA, LLC
 
H Force Briefing, June 2016
H Force Briefing, June 2016H Force Briefing, June 2016
H Force Briefing, June 2016ICSA, LLC
 
A TL to build team presentation
A TL to build team presentationA TL to build team presentation
A TL to build team presentationDoug Scannell
 
A330 mrtt update 2012
A330 mrtt update 2012A330 mrtt update 2012
A330 mrtt update 2012ICSA, LLC
 
Eurofighter Briefing, June 2016
Eurofighter Briefing, June 2016Eurofighter Briefing, June 2016
Eurofighter Briefing, June 2016ICSA, LLC
 

Tendances (13)

A400 m program update 2012
A400 m program update 2012A400 m program update 2012
A400 m program update 2012
 
An Update on the A400M, May 2013
An Update on the A400M, May 2013An Update on the A400M, May 2013
An Update on the A400M, May 2013
 
Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016
 
General Presentation
General PresentationGeneral Presentation
General Presentation
 
1
11
1
 
SIPAL Automotive
SIPAL AutomotiveSIPAL Automotive
SIPAL Automotive
 
Airbus Defence and Space on UAS systems, June 2016
Airbus Defence and Space on UAS systems, June 2016Airbus Defence and Space on UAS systems, June 2016
Airbus Defence and Space on UAS systems, June 2016
 
Clean sky towards horizon2020
Clean sky towards horizon2020Clean sky towards horizon2020
Clean sky towards horizon2020
 
An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013
 
H Force Briefing, June 2016
H Force Briefing, June 2016H Force Briefing, June 2016
H Force Briefing, June 2016
 
A TL to build team presentation
A TL to build team presentationA TL to build team presentation
A TL to build team presentation
 
A330 mrtt update 2012
A330 mrtt update 2012A330 mrtt update 2012
A330 mrtt update 2012
 
Eurofighter Briefing, June 2016
Eurofighter Briefing, June 2016Eurofighter Briefing, June 2016
Eurofighter Briefing, June 2016
 

En vedette

PD230 Catalytic Reforming
PD230 Catalytic ReformingPD230 Catalytic Reforming
PD230 Catalytic ReformingpetroEDGE
 
Reduction and Start-Up of Steam Reforming Catalyst
Reduction and Start-Up of Steam Reforming CatalystReduction and Start-Up of Steam Reforming Catalyst
Reduction and Start-Up of Steam Reforming CatalystGerard B. Hawkins
 
Naphtha Steam Reforming Catalyst Reduction with Methanol
Naphtha Steam Reforming Catalyst Reduction with MethanolNaphtha Steam Reforming Catalyst Reduction with Methanol
Naphtha Steam Reforming Catalyst Reduction with MethanolGerard B. Hawkins
 
Catalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsCatalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsGerard B. Hawkins
 
Reactions of isomerization of n butane
Reactions of isomerization of n butaneReactions of isomerization of n butane
Reactions of isomerization of n butaneKareem Tharaa
 
006 isomerization of hydrocarbons
006 isomerization of hydrocarbons006 isomerization of hydrocarbons
006 isomerization of hydrocarbonsElizabeth Indah P
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampGerard B. Hawkins
 
Fuel and combustion
Fuel and combustionFuel and combustion
Fuel and combustionRaju Mirdha
 
Isomerization And Dextrinization S
Isomerization And Dextrinization SIsomerization And Dextrinization S
Isomerization And Dextrinization Sanshulber
 
Fuels, Octane number & Cetane number
Fuels, Octane number & Cetane numberFuels, Octane number & Cetane number
Fuels, Octane number & Cetane numberRipal Maravia
 
Catalytic reforming process
Catalytic reforming processCatalytic reforming process
Catalytic reforming processIhsan Wassan
 
octane and cetane numbers
octane and cetane numbersoctane and cetane numbers
octane and cetane numbersajitthorat
 
03 Chemical Engineering Plant Design And Economics
03 Chemical Engineering Plant Design And Economics03 Chemical Engineering Plant Design And Economics
03 Chemical Engineering Plant Design And Economicsguestac67362
 
ppt of fuel and combustion
ppt of fuel and combustionppt of fuel and combustion
ppt of fuel and combustionSiddiqui Arif
 
Isomerism Power point
Isomerism Power pointIsomerism Power point
Isomerism Power pointsuresh gdvm
 

En vedette (20)

PD230 Catalytic Reforming
PD230 Catalytic ReformingPD230 Catalytic Reforming
PD230 Catalytic Reforming
 
Reduction and Start-Up of Steam Reforming Catalyst
Reduction and Start-Up of Steam Reforming CatalystReduction and Start-Up of Steam Reforming Catalyst
Reduction and Start-Up of Steam Reforming Catalyst
 
Naphtha Steam Reforming Catalyst Reduction with Methanol
Naphtha Steam Reforming Catalyst Reduction with MethanolNaphtha Steam Reforming Catalyst Reduction with Methanol
Naphtha Steam Reforming Catalyst Reduction with Methanol
 
Naphtha Sulfur Guards
Naphtha Sulfur GuardsNaphtha Sulfur Guards
Naphtha Sulfur Guards
 
catalytic reforming
catalytic reformingcatalytic reforming
catalytic reforming
 
Catalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsCatalytic Reforming Technology - Infographics
Catalytic Reforming Technology - Infographics
 
Reactions of isomerization of n butane
Reactions of isomerization of n butaneReactions of isomerization of n butane
Reactions of isomerization of n butane
 
Isome hoa pdf
Isome hoa pdfIsome hoa pdf
Isome hoa pdf
 
006 isomerization of hydrocarbons
006 isomerization of hydrocarbons006 isomerization of hydrocarbons
006 isomerization of hydrocarbons
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit Revamp
 
KIT_Isomerization unit
KIT_Isomerization unitKIT_Isomerization unit
KIT_Isomerization unit
 
Fuel and combustion
Fuel and combustionFuel and combustion
Fuel and combustion
 
Isomerization And Dextrinization S
Isomerization And Dextrinization SIsomerization And Dextrinization S
Isomerization And Dextrinization S
 
Fuels, Octane number & Cetane number
Fuels, Octane number & Cetane numberFuels, Octane number & Cetane number
Fuels, Octane number & Cetane number
 
Octane number
Octane numberOctane number
Octane number
 
Catalytic reforming process
Catalytic reforming processCatalytic reforming process
Catalytic reforming process
 
octane and cetane numbers
octane and cetane numbersoctane and cetane numbers
octane and cetane numbers
 
03 Chemical Engineering Plant Design And Economics
03 Chemical Engineering Plant Design And Economics03 Chemical Engineering Plant Design And Economics
03 Chemical Engineering Plant Design And Economics
 
ppt of fuel and combustion
ppt of fuel and combustionppt of fuel and combustion
ppt of fuel and combustion
 
Isomerism Power point
Isomerism Power pointIsomerism Power point
Isomerism Power point
 

Similaire à cv

Aviq Company Introduction
Aviq Company IntroductionAviq Company Introduction
Aviq Company Introductionmojazu
 
Mechanical aerospace project design engineer experienced cezar puica
Mechanical aerospace project design engineer experienced  cezar puicaMechanical aerospace project design engineer experienced  cezar puica
Mechanical aerospace project design engineer experienced cezar puicaCezar C. Puic?
 
Discover Innocentro Aeroespacial
Discover Innocentro AeroespacialDiscover Innocentro Aeroespacial
Discover Innocentro AeroespacialSergio Segura
 
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017Nicola BONTULOVIC
 
Aernnova capability presentation 2020
Aernnova capability presentation 2020Aernnova capability presentation 2020
Aernnova capability presentation 2020Stuart Douglas
 
Mechanical Aerospace Project Design Eng experienced-Cezar P
Mechanical Aerospace Project Design Eng experienced-Cezar PMechanical Aerospace Project Design Eng experienced-Cezar P
Mechanical Aerospace Project Design Eng experienced-Cezar PCezar C. Puic?
 
ACT Aero 2010
ACT Aero 2010ACT Aero 2010
ACT Aero 2010mmogle
 
CV_Chetan Kumar RJ
CV_Chetan Kumar RJCV_Chetan Kumar RJ
CV_Chetan Kumar RJChetan Kumar
 
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet
 
Kaman Tooling Ltd
Kaman Tooling Ltd Kaman Tooling Ltd
Kaman Tooling Ltd Andy Rourke
 
Aw Aerospace
Aw AerospaceAw Aerospace
Aw Aerospaceairworks
 
Aw Aerospace Presentation
Aw Aerospace PresentationAw Aerospace Presentation
Aw Aerospace Presentationairworks
 
C.V. Jan30-2017 -
C.V. Jan30-2017 -C.V. Jan30-2017 -
C.V. Jan30-2017 -wickins
 
Rep Presentation V4 13
Rep Presentation V4 13Rep Presentation V4 13
Rep Presentation V4 13lyndonroberts
 

Similaire à cv (20)

Aviq Company Introduction
Aviq Company IntroductionAviq Company Introduction
Aviq Company Introduction
 
Mechanical aerospace project design engineer experienced cezar puica
Mechanical aerospace project design engineer experienced  cezar puicaMechanical aerospace project design engineer experienced  cezar puica
Mechanical aerospace project design engineer experienced cezar puica
 
Discover Innocentro Aeroespacial
Discover Innocentro AeroespacialDiscover Innocentro Aeroespacial
Discover Innocentro Aeroespacial
 
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
 
Aernnova capability presentation 2020
Aernnova capability presentation 2020Aernnova capability presentation 2020
Aernnova capability presentation 2020
 
MK_CV
MK_CVMK_CV
MK_CV
 
Mechanical Aerospace Project Design Eng experienced-Cezar P
Mechanical Aerospace Project Design Eng experienced-Cezar PMechanical Aerospace Project Design Eng experienced-Cezar P
Mechanical Aerospace Project Design Eng experienced-Cezar P
 
ACT Aero 2010
ACT Aero 2010ACT Aero 2010
ACT Aero 2010
 
CV_Chetan Kumar RJ
CV_Chetan Kumar RJCV_Chetan Kumar RJ
CV_Chetan Kumar RJ
 
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)
 
Kaman Tooling Ltd
Kaman Tooling Ltd Kaman Tooling Ltd
Kaman Tooling Ltd
 
Aw Aerospace
Aw AerospaceAw Aerospace
Aw Aerospace
 
Aw Aerospace Presentation
Aw Aerospace PresentationAw Aerospace Presentation
Aw Aerospace Presentation
 
Aw Aerospace Presentation
Aw Aerospace PresentationAw Aerospace Presentation
Aw Aerospace Presentation
 
C.V. Jan30-2017 -
C.V. Jan30-2017 -C.V. Jan30-2017 -
C.V. Jan30-2017 -
 
CV_Basavanagowda
CV_BasavanagowdaCV_Basavanagowda
CV_Basavanagowda
 
Carbures1
Carbures1Carbures1
Carbures1
 
jet_aviation_CDGuide_August2015
jet_aviation_CDGuide_August2015jet_aviation_CDGuide_August2015
jet_aviation_CDGuide_August2015
 
Luther steele catia
Luther steele catiaLuther steele catia
Luther steele catia
 
Rep Presentation V4 13
Rep Presentation V4 13Rep Presentation V4 13
Rep Presentation V4 13
 

cv

  • 1. William Neil Brodie Tel Nos +44(0) 1563 522173 44 Sherwood Road +44(0) 7850 441 900 Hurlford e-mail: neil_brodie@hotmail.com Kilmarnock D.O.B : 10th Jan 1964 Scotland KA1 5DW Marital status : Married Higher National Diploma in MANUFACTURING TECHNOLOGY (Paisley College, Scotland) Higher National Certificate in AERONAUTICAL ENGINEERING (Ayr College, Scotland) PROFILE: A career stretching over 30 years in aircraft industry graduating from apprentice, shop floor fitter, manufacturing engineer and design engineer. SIGNATORY STATUS to EASA.21J. CAD System Experience CATIA V5 (AIRBUS trained with certificates) 15,000 hours CATIA V4 (BAe trained with certificates) 18,000 hours CATIA V4 - E3D 3,500 hours ANVIL 4000 (BAe trained with certificates) 8,000 hours (1).CDP / PM (2).HMS CAPP-NCM (3).IMAN (4).VPM (AIRBUS) (5).PRIMES (AIRBUS) (6).Trans- national SAP (AIRBUS) (7).Windchill EPD (8) PDM Link, def specialist (AIRBUS) (9) SMARTEAM EXPERIENCE SUMMARY DISCIPLINE ATA YEARS EXP DESCRIPTION Structures 53 10+ Primary and Secondary structures of major components including 57 fuselage, wing, leading edges and flaps. Electrical 92 3.5 Wire/bundle/SAM route definition and clipping in engine and Fuselage considering separation, segregation and shielding. Satisfying the bonding and grounding requirements. 2D/3D creation of loom assembly’s. Flight Test Installation (FTI) experience. Systems 21 1 ECS distribution system of ram air ducts, pneumatic pipes. 28 1 Fuel and inerting System component design including 47 connectors, double walled floating pipes and ‘A’ brackets. 36 1 Bleed air distribution insulated ducts, expansion joints, bellows and leak detect system. 27 1 Cables, linkages and mechanisms that control aileron / rudder trim and gust lock.2D drawings using geometrical tolerancing 76 2 Engine controls from cockpit centre console including camshafts, Power levers, gears, rods and electrical interface. Interiors 25 2.5 Design and layout of cabin ceiling panels and seals. Cabinet and Galley design for McCarthy interiors CAREER HISTORY Senior Design Engineer: A350-1000 XWB Wing Flap Tracks : ATA 57 SAAB Development of complex Levers and Ribs to support the Flaps Installation. Sweden Progression from Mat B to Mat C and DFM stages. (Jan14 to Date) Exposure to Kinematics. CATIA V5, PDMLink, VPM. Senior Design Engineer: Structures and Systems : ATA 21/38/53 Airbus / Boeing aircraft Jet Aviation Bespoke design of water supply / drainage and air conditioning /venting. Switzerland Structural design of upper,side and floor attachments for cabinets and (Mar11 to Oct 11) monuments.Conceptual design of a standard seat track installation. (Aug12 to Dec13) Liaison engineer on shop providing solutions to installation and cosmetic problems with general interiors including galleys and cabinets. Achieved SIGNATORY STATUS to EASA approval EASA.21J. CATIA V5 , AUTOCAD and SMARTEAM (REFERENCE AVAILABLE)
  • 2. Lead Designer: Mech/Sys A350-900 XWB Bleed Air ATA 36 (REFERENCE AVAILABLE) Senior Design Engineer: A350-900 XWB - Fuel and Inerting system: ATA 28/47 Airbus site Lead design responsible for a small team progressing the installation of bleed air (PFW office) system in Section 16-19.1.Tasks include checking work and interfacing with other Hamburg risk sharing partners and to hold regular design reviews monitoring progress (Feb10 – Mar 11) towards PDR and CDR. CATIA V5.R18. PDMLink, VPM (Oct 11 – Aug 12) 2D/3D design of fuel system components including “A” Brackets. Proof of Compliance statements to satisfy Verification and Validation. Senior Designer: Mech/Sys RJ146-100 On Board Inert Gas Generating System (OBIGGS) BAE SYSTEMS Conceptual design of support structure, pneumatic pipe routes, ECS ducts and Prestwick installation of the ASM (Air Separation Module) and BAPM (Bleed Air Preparation (Mar09 – Feb10) Module) as part of an inert gas fuel system. CATIA V5.R17. Senior Designer: Electrical AIRBUS A400M- Wing Electrical Systems Installation TDQN Assystem, Answering and embodying production electrical and FTI DQN,s for A400M Preston, Filton, Seville wing installations using SAP, PRIMES, Windchill EPD, and CATIA V5R16 (Oct 08 – Mar 09) Electrical Work Bench. Senior Designer: Mechanical NH90 Helicopter – Life raft Container (REFRENCE AVAILABLE) Inter-Tec Services Concept design of primary structure and boarding aid mechanism Scotland Detail design of life raft composite door. CATIA V5R17 (May 07 – Oct 08) A400M Wing Spoiler Actuator Brackets / System Brackets Actuator Brackets and systems brackets 2D, 3D. CATIA V5R14 A319 Cabinets / Galley for (McCarthy Interiors) Creation of 2D drawings for galley assembly and installation CATIA V5R16. Designer: Electrical AIRBUS A380 - Electrical Routing / Installation / SFM CDI Aerospace, Definition of 2M, 4M wire routing to/from SPDB, Avionic Racks and equipment Hamburg/Toulouse using E3D, e-tool, DVise and VPM. (Dec 04 – May 07) Part of MAP team in Toulouse FAL providing solutions to production to aid instal- lation of brackets and harnesses using Dvise, MORE, Zamiz TAKSY and SAP. Designer: Interiors AIRBUS A380 Interior Furnishings (REFERENCE AVAILABLE) EADS, Hamburg 3D design and layout of main and upper deck composite ceiling panels and attachment (June03 - Dec 04 brackets using CATIA V4 and VPM. Creation of 2D interface control drawings. Designer: Mechanical EUROFIGHTER Structures, Systems and Composites BAe Samlesbury Concessions / Liaison: Conceptual design of repair schemes using a (Feb 02 – Jun 03) combination of CATIA V4 and HMS CAPP – Non Conformance Management Involved with front / rear fuselage structures including repair to composite panels, fore planes, IFRP, ECS systems and windscreen / canopy. Designer: Mechanical EMBRAER 145XR and 170. Fuselage, Wing leading edges, Flaps GAMESA, Spain Design and detailing of complete wing box assembly, flaps and leading edges. (Aug 00 – Feb 02) Layout and design of rear fuselage floor and avionic rack support structure For Embraer 170. (CATIA V4) (REFERENCE AVAILABLE) Designer: Mechanical NIMROD MRA4 Fuselage and composites BAe Prestwick Conceptual detailing, assembly and installation of fuselage floor support (Nov 97-Aug00) structure, seat rails and composite panels. (CATIA V4) Senior Manufacturing Engineer : JETSTREAM 41: Cost Reduction Team (BAE Prestwick) Engineer responsible for small engineering team in final assembly Aug 94 – Nov 97 implementing cost reductions and man hour savings by conceptually improving methods and tooling. (ANVIL 4000) Senior Manufacturing Engineer: JETSTREAM 41: Ctr console Engine controls and throttle box (BAE Prestwick) Engineering of a mechanical system of levers, camshafts, gears, rods and Sept 91 – Aug 94 locks to regulate engine speed with a closed loop feedback control system using mechanically operated micro switch boxes and control panel readouts all contained within the cockpit centre console structure. Manufacturing Engineer: BAE125-1000: Fuel system, fuel tank structures (BAE Prestwick) Production planning of new design forward and rear ventral fuel tanks Apr 88 - Sept 91 Involved in conceptual detail, assembly and installation of structure and fuel system, simultaneously provisioning for jigs and tooling for manufacture and test. Manufacturing Engineer: JETSTREAM 31: fuselage, wing structures and systems (BAE Prestwick) Integrated into manufacturing engineering embodying design modifications Aug 86 – Apr 88 Decide and implement make or buy decisions based on quality and cost parameters. Aircraft Technician Completed 4 years apprenticeship in aircraft fitting and erecting to EITB (BAE 1980-86) requirements and 2 years time served fitter.