SlideShare une entreprise Scribd logo
1  sur  29
Building
Information
Modelling
(BIM)
Syed Nematulla Quadri
3KB11CV060
B.E. Civil Engineering (8th semester)
K.B.N. College of Engineering, Gulbarga
Under the guidance of
Prof. Md. Faisaluddin
Contents
• What is BIM?
• What is 3D, 4D, 5D, 6D and 7D in BIM?
• Software used in BIM
• Benefits of BIM
• Industry Foundation Class
• BIM cloud
• BIM maturity wedge diagram
• BIM in India and abroad
• Drawbacks of BIM
What is BIM?
BIM is an intelligent model-based process that provides insight to help you plan,
design, construct, and manage buildings and infrastructure. – Autodesk
Who can take advantage of BIM
What is 3D, 4D, 5D, 6D and 7D in BIM?
Problems faced when BIM is not used
• Flow of data
• Improper schedule of work
• Cost estimate is tedious and not accurate
• Digitalization of data is less
• Clash detection becomes very difficult to notice
• Reinforcement details in junctions
• Energy analysis
3D Software used in BIM
Design analysis software used in BIM
Scheduling software used in BIM
Estimation software used in BIM
Non – BIM software
Interaction among the AEC professionals due to
BIM without any conflict
Industry Foundation Classes (IFC)
BIM Cloud
Drawing based process vs. BIM process
CAD vs. BIM
Task CAD
(hours)
BIM
(hours)
Hours saved Time savings
Schematic 190 90 100 53%
Design development 436 220 216 50%
Construction
documents
1023 815 208 20%
Checking and
coordination
175 16 159 91%
Totals: 1824 1141 683
(Rick Rundel (7),2007)
Countries making BIM compulsory for big
projects/government projects
• United Kingdom
• Norway
• Denmark
• Finland
• Hong Kong
• South Korea
• Netherlands
BIM maturity wedge diagram
BIM in India
None
Allplan
ArchiCAD
Microstation
Revit
VectorWorks Architect
40%
5%
6%
0%
49%
0%
BIM Application used in India
Anti-Drafting
Better Design
Faster Documents
Virtualization
Democratization
Visualization
30%
65%
53%
56%
26%
74%
Aspect of BIM that appeals
the most
(Lachmi Khemlani, 2007 (3))
Don't know about BIM
Interested but not adopted BIM
Interested and planning to adopt BIM
Testing BIM
Actively utilizing BIM
Exclusively using BIM
15%
23%
15%
15%
9%
23%
Firm Leaders interested
towards BIM
Save costs
Clients demand
Energy analysis purpose
Better design tool
Competative advantage
19%
14%
12%
44%
12%
Reasons for the interest
towards BIM
(Lachmi Khemlani, 2007 (3))
Software too Expensive
24%
No technical Expertise
28%
Owners not requested
24%
Not familier with the
technology
24%
Reasons for not using BIM in India
(Lachmi Khemlani, 2007 (3))
Drawbacks of BIM
• Complexity of software used for BIM
• Cost of software
• Lack of BIM knowledge in India
• BIM course is only available abroad
• The computer system running these software needs high end specifications
Conclusion
• BIM is promising and more advantageous compared to the traditional
process, but still it has several setbacks as the technology is still in
primitive stage.
• A significant amount of development is to be done in information flow and
interoperability of the software.
• Additional training material is to be provided with software to learn the
complicated features.
• In India, universities should start teaching BIM as an academic course to
make the people perfect in this field.
BIM - Building Information Modelling
BIM - Building Information Modelling
BIM - Building Information Modelling

Contenu connexe

Tendances

BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionVeetil Digital Service
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingFARO_Europe
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
BIM Presentation
BIM PresentationBIM Presentation
BIM PresentationOmer Syed
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!bimservicesindia1
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 

Tendances (20)

BIM training
BIM training BIM training
BIM training
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
bim+ Presentation BIM Manager
bim+ Presentation BIM Managerbim+ Presentation BIM Manager
bim+ Presentation BIM Manager
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
Bim
BimBim
Bim
 
BIM
BIMBIM
BIM
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
BIM
BIM BIM
BIM
 
BIM
BIMBIM
BIM
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 

Similaire à BIM - Building Information Modelling

Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212AlistairGardner
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
 
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,GujaratIRJET Journal
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models Viasys VDC
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectNguyen Manh Tuan
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxyustofiachmad
 
Who are the beneficiaries of bim!
Who are the beneficiaries of bim!Who are the beneficiaries of bim!
Who are the beneficiaries of bim!Omar Selim
 
Who are the beneficiaries of bim!
Who are the beneficiaries of bim!Who are the beneficiaries of bim!
Who are the beneficiaries of bim!Omar Selim
 
bim and project controls
 bim and project controls bim and project controls
bim and project controlsOmar Selim
 
Integrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bimIntegrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bimOmar Selim
 

Similaire à BIM - Building Information Modelling (20)

Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Bim
BimBim
Bim
 
Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212
 
BIM comp
BIM compBIM comp
BIM comp
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
NZIHE Conference 2019
NZIHE Conference 2019NZIHE Conference 2019
NZIHE Conference 2019
 
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
 
BIM-1.pptx
BIM-1.pptxBIM-1.pptx
BIM-1.pptx
 
Bim
BimBim
Bim
 
Who are the beneficiaries of bim!
Who are the beneficiaries of bim!Who are the beneficiaries of bim!
Who are the beneficiaries of bim!
 
Who are the beneficiaries of bim!
Who are the beneficiaries of bim!Who are the beneficiaries of bim!
Who are the beneficiaries of bim!
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Nw b im_hub_-_march2013
Nw b im_hub_-_march2013Nw b im_hub_-_march2013
Nw b im_hub_-_march2013
 
Integrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bimIntegrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bim
 
Bim its applications
Bim   its applicationsBim   its applications
Bim its applications
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 

Dernier

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 

Dernier (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

BIM - Building Information Modelling

  • 1. Building Information Modelling (BIM) Syed Nematulla Quadri 3KB11CV060 B.E. Civil Engineering (8th semester) K.B.N. College of Engineering, Gulbarga Under the guidance of Prof. Md. Faisaluddin
  • 2.
  • 3.
  • 4. Contents • What is BIM? • What is 3D, 4D, 5D, 6D and 7D in BIM? • Software used in BIM • Benefits of BIM • Industry Foundation Class • BIM cloud • BIM maturity wedge diagram • BIM in India and abroad • Drawbacks of BIM
  • 5. What is BIM? BIM is an intelligent model-based process that provides insight to help you plan, design, construct, and manage buildings and infrastructure. – Autodesk
  • 6. Who can take advantage of BIM
  • 7. What is 3D, 4D, 5D, 6D and 7D in BIM?
  • 8. Problems faced when BIM is not used • Flow of data • Improper schedule of work • Cost estimate is tedious and not accurate • Digitalization of data is less • Clash detection becomes very difficult to notice • Reinforcement details in junctions • Energy analysis
  • 13. Non – BIM software
  • 14.
  • 15. Interaction among the AEC professionals due to BIM without any conflict
  • 18. Drawing based process vs. BIM process
  • 19. CAD vs. BIM Task CAD (hours) BIM (hours) Hours saved Time savings Schematic 190 90 100 53% Design development 436 220 216 50% Construction documents 1023 815 208 20% Checking and coordination 175 16 159 91% Totals: 1824 1141 683 (Rick Rundel (7),2007)
  • 20. Countries making BIM compulsory for big projects/government projects • United Kingdom • Norway • Denmark • Finland • Hong Kong • South Korea • Netherlands
  • 22. BIM in India None Allplan ArchiCAD Microstation Revit VectorWorks Architect 40% 5% 6% 0% 49% 0% BIM Application used in India Anti-Drafting Better Design Faster Documents Virtualization Democratization Visualization 30% 65% 53% 56% 26% 74% Aspect of BIM that appeals the most (Lachmi Khemlani, 2007 (3))
  • 23. Don't know about BIM Interested but not adopted BIM Interested and planning to adopt BIM Testing BIM Actively utilizing BIM Exclusively using BIM 15% 23% 15% 15% 9% 23% Firm Leaders interested towards BIM Save costs Clients demand Energy analysis purpose Better design tool Competative advantage 19% 14% 12% 44% 12% Reasons for the interest towards BIM (Lachmi Khemlani, 2007 (3))
  • 24. Software too Expensive 24% No technical Expertise 28% Owners not requested 24% Not familier with the technology 24% Reasons for not using BIM in India (Lachmi Khemlani, 2007 (3))
  • 25. Drawbacks of BIM • Complexity of software used for BIM • Cost of software • Lack of BIM knowledge in India • BIM course is only available abroad • The computer system running these software needs high end specifications
  • 26. Conclusion • BIM is promising and more advantageous compared to the traditional process, but still it has several setbacks as the technology is still in primitive stage. • A significant amount of development is to be done in information flow and interoperability of the software. • Additional training material is to be provided with software to learn the complicated features. • In India, universities should start teaching BIM as an academic course to make the people perfect in this field.

Notes de l'éditeur

  1. Good morning all the judges teachers and all my dear friends. BIM is completely dependent on software. Examples of 3d models
  2. Maintenance, renovation and demolition
  3. Maintenance, renovation and demolition
  4. In starting all is good and well. But after proceeding further everything goes wrong
  5. My personal experience Chodo yaar jaane do koun jhanjhat mei padhega