SlideShare une entreprise Scribd logo
1  sur  21
Télécharger pour lire hors ligne
A case study on
Effective Communication should
  be developed through Trust



                               NewGate India
                      Hyderabad, Andhra Pradesh- 500038

                            Website: www.newgate.in
                            Email: contact@newgate.in
                                  Slideshare URL :
                     http://www.slideshare.net/newgateindia
  Business
Communication
                      1
Transparency, credibility and sticking to the commitments is
very important while communicating. Effective Communication




                                                                BENCHMARK – 2 0 1 1
       is driven through loyalty and trust of the people.

         Purpose of this case
•   Importance of communication in business
•   Understanding unethical practices in business
•   Transparency, Credibility & accountability are a
•   major concern for managers
•   Trust is must in an employee driven company
•   Commitment is a worth of company’s values
•   Effective management is won through loyalty
                                                                        2
                                                                  Fri
                                                                25 Feb
BENCHMARK – 2 0 1 1
Case Overview
                        3
                  Fri
                25 Feb
Characters in Case




                                                     BENCHMARK – 2 0 1 1
                                 Business Head
 Mr. Shantanu Bannerjee
 B.tech,Punjab University
 Designation: Project Trainee
 Internship: 6 months            Domain Lead



                                Project Manager
 Mr. Ravi Sharma
 Designation: Project Manager
 Experience: 9 years
                                   Team Lead



  Mr. Shyam Kumar               Trainee, Engineers
                                                             4
  Designation: Domain Lead
  Experience: 13 years                                 Fri
                                                     25 Feb
Case Overview




                                                                           BENCHMARK – 2 0 1 1
                            Work Profile:
                            • Simulating and mending circuits
                            • Development & validation

                            Strengths
                            • Very good at performing task
Mr. Shantanu Bannerjee
                            • Committed to all deadlines
                            • Mend and verify circuit better than anyone
                              else in the team al though being a fresher
 Achievements
 1. He was given the in charge of entire procurement team & reviewing
    electronic items
 2. He found flaws in inventory system .optimized it using software and
    reduced the whole project life cycle time by 23%                               5
 3. His inventory model was accepted & implemented by other teams
 4. His manager rewarded him for his innovation                              Fri
                                                                           25 Feb
Case Overview




                                                                          BENCHMARK – 2 0 1 1
                          “Shantanu was very talented and technically
                          expert. Once you provide him with the
                          objective, he does that before the stipulated
                          time with perfection. There is no need of any
                          mentor or supervisor to guide him. He knew
Mr. Shantanu Bannerjee    his work, deadlines and how to make it done”

• Shantanu got more priority over
  other trainees
• He interacted with client overseas
• He was in the lime light for a while
• Some senior team members were not                    Opinion
  happy
• His dynamism & progress were taken Mr. Satyajit Khurana                         6
  as a threat to prestige & position of Designation: Senior Engineer        Fri
  other team members                    Experience: 3 years               25 Feb
Case Overview




                                                                                   BENCHMARK – 2 0 1 1
Ms. Sheela,Project Manager                            Mr. Shantanu Bannerjee


Sheela: “Hi! Am I speaking to Mr. Shantanu
Shantanu: “Yes, Shantanu Speaking”
Sheela: “We have an urgent opening for project trainee. Your CV has been
shortlisted. You would be hired after undergoing 2 rounds of technical PI.Kindly
let me know if you are interested. But the condition apply only when you are not
being hired by the current team or any other team”                                         7
Shantanu: “Thanks sheela. I would talk to my manager regarding the same and
                                                                                     Fri
revert back in case they are not hiring me”.
                                                                                   25 Feb
Case Overview




                                                                  BENCHMARK – 2 0 1 1
 Mr. Shantanu Bannerjee                Mr. Ravi Sharma
• So he had a talk with his current manager, Mr. Ravi who asked
  his manager Mr. Shyam Kumar about the vacancy
• Within 2 days he got a reply that Mr. Ravi & his manager are
  very satisfied with his performance
• Mr. Ravi informed him that Shantanu’s training period will be
  extended to 3 months & will take him as a permanent
  employee
• They were ready to hire him at any cost                                 8
• They said that there will be an interview as a formality and      Fri
  either of them will be there                                    25 Feb
Statements by Mr. Ravi




                                                    BENCHMARK – 2 0 1 1
   “ No need to worry. You can decline your
proposal from Sheela & also from other teams if
coming to you. Interview is just a formality. You
 are in. Now don’t think about your interviews
much & concentrate on your projects. We have
 lot of expectation from you. One of our team               9
   members will be in the panel to take care.         Fri
                                                    25 Feb
Shantanu in Interview




                                                                         BENCHMARK – 2 0 1 1
Mr. Shantanu Bannerjee

• Shantanu rejected Miss Sheela’s offer
• Shantanu waited for the day to come…
• During the interview, none of his managers were present
• Shantanu was fired in the interview
• He was asked out of context questions which were not related to his
  work. Neither he had worked nor did it match with the profile of the
  work he was about to be assigned.
                                                                              10
• Shantanu managed the out of box questions as he was resolving partly
  the technical disputes of other team                                     Fri
                                                                         25 Feb
“Shantanu,we cannot hire you because you couldn’t
                                   perform well in the interview




                                                                                 BENCHMARK – 2 0 1 1
Mr. Ravi
  “Why Ravi, I performed well till date. I am having a very
    good track record for last 5 months & feedbacks were
  very good as given by you only. I kept to all my deadlines.
   You people awarded me. Because of you only I denied
    sheela’s offer. You only assured me that the interview
  was just a formality & I need to concentrate on my work.
                                                                Mr. Shantanu
                      Our Company’s policy says that while recruitment it is
                        the interviewer who decides the final selection. The
                     panel of your interviewer is not ready to hire you. They
                    have an opinion that the task to which you were going to
                    be assigned is different from your current profile & does
                       not meet their expectation. So you can apply for your          11
                     resignation latest by next 5 days so that it gets updated
                      to the database before your tenure of training ends by       Fri
Mr. Ravi                                      default                            25 Feb
Case Overview




                                                                                BENCHMARK – 2 0 1 1
 Mr. Shantanu Bannerjee                            Ms. Sheela,Project Manager



Shanrtunu: “Hi Sheela, Shantanu speaking. Earlier you called me
regarding a opening in your team. Is it still there”
Sheela: “Shantanu there is no vacancy in our team expected probably till
next 6 months”
Shantanu: “Thanks sheela.”                                                           12
                                                                                  Fri
                                                                                25 Feb
Shantanu’s Perception




                                                                               BENCHMARK – 2 0 1 1
                 • Shantanu did not ask for the feedback after interview as
                   he was assured that it’s not going to impact anyway.
                 • He knew that as per company’s policy “Interns are hired
                   temporarily for projects & thus have no assurance about
                   confirmation of their job after completion of the project
Mr. Shantanu       even if they had performed well.
                 • He also didn’t have any documentary proof as
                   everything was intended to him orally.
   HR
                 • He could have talked to HR’s, But in his company he
  Cannot help
                   knew that HR will only say that if the line managers are
                   not ready then no one can do anything as the entire
                   decision is based on managers.
                 • Shantanu was helpless.
                 • Finally he resigned                                              13
                                                                                 Fri
                                                                               25 Feb
BENCHMARK – 2 0 1 1
Teaching Notes
                      14
                   Fri
                 25 Feb
Prior action to overcome




                                                                   BENCHMARK – 2 0 1 1
         the situation
• When the feedback was delayed, Shantanu should have
  thought about the other odd situations.
• Shantuna should have been very alert for his interview
• He should have talked to HR regarding other vacancies.
• He should have intelligently managed to use the written
  documents like mail about the assurance given by the
  manager , so that his claims to HR would have been strong
• He should have talked to his manager’s manager about the
  issue
• He should have given a trial, to freely convey the same to his
  domain HR                                                             15
                                                                     Fri
                                                                   25 Feb
Major Communication Barrier




                                                                    BENCHMARK – 2 0 1 1
  • Lack of transparency in communication
  • Lack of trust
  • Lack of fulfillment of commitment by the manager
  • Perception: He believed that HR’s cannot solve his problem in
    any way
  • Improper organizational structure :Lack of autonomy &
    privileges to bottom employees to discuss & resolve their
    personal issues.




                                                                         16
                                                                      Fri
                                                                    25 Feb
Mistakes committed by the




                                                                   BENCHMARK – 2 0 1 1
management
• Project manager should have kept control on his emotions
  and waited till the results of the interview came out

• He shouldn’t have assured Shantanu, rather should have told
  him to prepare well without giving any guarantee before hand

• Project manager should have justified Shantanu stating him
  the actual reasons for not selecting him & should have cleared
  all his doubts

• He should have conveyed the message with the motive to
  convince him, till he found that Shantanu was with his
  statement & was in a position to agree to what he was saying

• Shantanu should have been given with adequate time to make            17
  necessary arrangement in the meantime & to make up himself
  for the cause                                                      Fri
                                                                   25 Feb
Conflicting statements




                                                            BENCHMARK – 2 0 1 1
 “ No need to worry. You        “ Our Company’s policy
can decline your proposal            says that while
 from Sheela & also from           recruitment it’s the
 other teams if coming to      interviewer who decides
  you. Interview is just a       the final selection. The
formality. You are in. Now   panel of your interviewers
  don’t think about your        is not ready to hire you.
    interviews much &         They have an opinion that
   concentrate on your       the task to which you were
 projects. We have lot of        going to be assigned is
  expectation from you ”     different from your current
                                profile & does not meet
                                   their expectation ”
                                                                 18
                                                              Fri
                                                            25 Feb
Role of HR & its policy




                                                          BENCHMARK – 2 0 1 1
• Open door policy should be implemented
• They should have a well expertise team to carry out
  employee counseling & manage stress
• HR department should train their managers about of
  maintaining transparency, accountability, credibility
  & autonomy within employees
• Feedback should be collected from employee when
  they are leaving about the reason for leaving
• HR Dept. should train managers without MBA about
  communication barriers
• All employees who are undergoing resignation
  process should be examined well. They should track
  their details & come up with report & analyze all
  types of circumstances to encounter such problems            19
  before hand & optimize them.
                                                            Fri
                                                          25 Feb
Conclusion




                                                           BENCHMARK – 2 0 1 1
• Maintaining effective communication, transparency&
  sticking to commitment plays an important role
• Doubts of the bottom line employees should be
  clarified
• Employee should have faith in organization
• Organizational structure should be simplified so that
  the employees can sort out the problems with HR easily



                                                                20
                                                             Fri
                                                           25 Feb
Questions Please ????
                        21

Contenu connexe

Similaire à Politics in organization-PPT

Case Study on Business Communication
Case Study on Business CommunicationCase Study on Business Communication
Case Study on Business CommunicationSunam Pal
 
Case study on communications
Case study  on  communicationsCase study  on  communications
Case study on communicationsNewGate India
 
Case Study on Business Communication
Case Study on Business Communication Case Study on Business Communication
Case Study on Business Communication Sunam Pal
 
The power to Say NO - Using Scrum in a BAU Team
The power to Say NO - Using Scrum in a BAU TeamThe power to Say NO - Using Scrum in a BAU Team
The power to Say NO - Using Scrum in a BAU TeamMia Horrigan
 
Greendwee.key
Greendwee.keyGreendwee.key
Greendwee.keymuneric
 
ACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsMia Horrigan
 
Positive performance mgmt vb - r
Positive performance mgmt   vb - rPositive performance mgmt   vb - r
Positive performance mgmt vb - rGlenn Powell
 
Reference Letters
Reference LettersReference Letters
Reference Lettershenryremiz
 
Communication case study
Communication case studyCommunication case study
Communication case studyAbhiNandana9
 
T352 Project Leadership Asmi Dy Web
T352 Project Leadership Asmi Dy WebT352 Project Leadership Asmi Dy Web
T352 Project Leadership Asmi Dy Webperformanceweb
 
Confidence building of employees at workplace
Confidence building of employees at workplaceConfidence building of employees at workplace
Confidence building of employees at workplaceSamruddhiGaud
 

Similaire à Politics in organization-PPT (20)

Case Study on Business Communication
Case Study on Business CommunicationCase Study on Business Communication
Case Study on Business Communication
 
COMMUNICATION MINICASE.pdf
COMMUNICATION MINICASE.pdfCOMMUNICATION MINICASE.pdf
COMMUNICATION MINICASE.pdf
 
Casestudy on effective communication
Casestudy on effective communicationCasestudy on effective communication
Casestudy on effective communication
 
Case study on communications
Case study  on  communicationsCase study  on  communications
Case study on communications
 
Case Study on Business Communication
Case Study on Business Communication Case Study on Business Communication
Case Study on Business Communication
 
Business Communcation
Business CommuncationBusiness Communcation
Business Communcation
 
The power to Say NO - Using Scrum in a BAU Team
The power to Say NO - Using Scrum in a BAU TeamThe power to Say NO - Using Scrum in a BAU Team
The power to Say NO - Using Scrum in a BAU Team
 
T331 Web
T331 WebT331 Web
T331 Web
 
My final Evaluation
My final Evaluation My final Evaluation
My final Evaluation
 
Performance counseling
Performance counselingPerformance counseling
Performance counseling
 
Greendwee.key
Greendwee.keyGreendwee.key
Greendwee.key
 
ACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 months
 
Positive performance mgmt vb - r
Positive performance mgmt   vb - rPositive performance mgmt   vb - r
Positive performance mgmt vb - r
 
Reference Letters
Reference LettersReference Letters
Reference Letters
 
T352 Pi
T352 PiT352 Pi
T352 Pi
 
T331 Web
T331 WebT331 Web
T331 Web
 
Communication case study
Communication case studyCommunication case study
Communication case study
 
T352 Project Leadership Asmi Dy Web
T352 Project Leadership Asmi Dy WebT352 Project Leadership Asmi Dy Web
T352 Project Leadership Asmi Dy Web
 
Kdu talk ver2
Kdu talk ver2Kdu talk ver2
Kdu talk ver2
 
Confidence building of employees at workplace
Confidence building of employees at workplaceConfidence building of employees at workplace
Confidence building of employees at workplace
 

Plus de NewGate India

Newgate india 2013 sociometrics
Newgate india 2013  sociometricsNewgate india 2013  sociometrics
Newgate india 2013 sociometricsNewGate India
 
Business proposal coffee shop in Canada
Business proposal coffee shop in CanadaBusiness proposal coffee shop in Canada
Business proposal coffee shop in CanadaNewGate India
 
Contagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeContagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeNewGate India
 
E-Procurement System
E-Procurement SystemE-Procurement System
E-Procurement SystemNewGate India
 
Social media statistics statistics
Social media statistics statisticsSocial media statistics statistics
Social media statistics statisticsNewGate India
 
Newgate Youtube statistics statistics
Newgate Youtube  statistics statisticsNewgate Youtube  statistics statistics
Newgate Youtube statistics statisticsNewGate India
 
Contagion effect of greece debt crisis
Contagion effect of greece debt crisisContagion effect of greece debt crisis
Contagion effect of greece debt crisisNewGate India
 
Case study on SM Tech-ppt
Case study on SM Tech-pptCase study on SM Tech-ppt
Case study on SM Tech-pptNewGate India
 
Telecom market research
Telecom market researchTelecom market research
Telecom market researchNewGate India
 
Risk management Report
Risk management ReportRisk management Report
Risk management ReportNewGate India
 
Quality control report
Quality control reportQuality control report
Quality control reportNewGate India
 
Production operation management-scheduling PPT
Production operation management-scheduling PPTProduction operation management-scheduling PPT
Production operation management-scheduling PPTNewGate India
 
Market Research Report
Market Research ReportMarket Research Report
Market Research ReportNewGate India
 
Market research report
Market research reportMarket research report
Market research reportNewGate India
 
Market feasibility test
Market feasibility testMarket feasibility test
Market feasibility testNewGate India
 
Report on Dasborad & scorecard
Report on Dasborad & scorecardReport on Dasborad & scorecard
Report on Dasborad & scorecardNewGate India
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysisNewGate India
 
Case study on scheduling
Case study on schedulingCase study on scheduling
Case study on schedulingNewGate India
 

Plus de NewGate India (20)

Newgate india 2013 sociometrics
Newgate india 2013  sociometricsNewgate india 2013  sociometrics
Newgate india 2013 sociometrics
 
Business proposal coffee shop in Canada
Business proposal coffee shop in CanadaBusiness proposal coffee shop in Canada
Business proposal coffee shop in Canada
 
Consumer Demand
Consumer DemandConsumer Demand
Consumer Demand
 
Contagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeContagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europe
 
E-Procurement System
E-Procurement SystemE-Procurement System
E-Procurement System
 
Social media statistics statistics
Social media statistics statisticsSocial media statistics statistics
Social media statistics statistics
 
Newgate Youtube statistics statistics
Newgate Youtube  statistics statisticsNewgate Youtube  statistics statistics
Newgate Youtube statistics statistics
 
Contagion effect of greece debt crisis
Contagion effect of greece debt crisisContagion effect of greece debt crisis
Contagion effect of greece debt crisis
 
Case study on SM Tech-ppt
Case study on SM Tech-pptCase study on SM Tech-ppt
Case study on SM Tech-ppt
 
Research ppt
Research pptResearch ppt
Research ppt
 
Telecom market research
Telecom market researchTelecom market research
Telecom market research
 
Risk management Report
Risk management ReportRisk management Report
Risk management Report
 
Quality control report
Quality control reportQuality control report
Quality control report
 
Production operation management-scheduling PPT
Production operation management-scheduling PPTProduction operation management-scheduling PPT
Production operation management-scheduling PPT
 
Market Research Report
Market Research ReportMarket Research Report
Market Research Report
 
Market research report
Market research reportMarket research report
Market research report
 
Market feasibility test
Market feasibility testMarket feasibility test
Market feasibility test
 
Report on Dasborad & scorecard
Report on Dasborad & scorecardReport on Dasborad & scorecard
Report on Dasborad & scorecard
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysis
 
Case study on scheduling
Case study on schedulingCase study on scheduling
Case study on scheduling
 

Dernier

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Dernier (20)

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

Politics in organization-PPT

  • 1. A case study on Effective Communication should be developed through Trust NewGate India Hyderabad, Andhra Pradesh- 500038 Website: www.newgate.in Email: contact@newgate.in Slideshare URL : http://www.slideshare.net/newgateindia Business Communication 1
  • 2. Transparency, credibility and sticking to the commitments is very important while communicating. Effective Communication BENCHMARK – 2 0 1 1 is driven through loyalty and trust of the people. Purpose of this case • Importance of communication in business • Understanding unethical practices in business • Transparency, Credibility & accountability are a • major concern for managers • Trust is must in an employee driven company • Commitment is a worth of company’s values • Effective management is won through loyalty 2 Fri 25 Feb
  • 3. BENCHMARK – 2 0 1 1 Case Overview 3 Fri 25 Feb
  • 4. Characters in Case BENCHMARK – 2 0 1 1 Business Head Mr. Shantanu Bannerjee B.tech,Punjab University Designation: Project Trainee Internship: 6 months Domain Lead Project Manager Mr. Ravi Sharma Designation: Project Manager Experience: 9 years Team Lead Mr. Shyam Kumar Trainee, Engineers 4 Designation: Domain Lead Experience: 13 years Fri 25 Feb
  • 5. Case Overview BENCHMARK – 2 0 1 1 Work Profile: • Simulating and mending circuits • Development & validation Strengths • Very good at performing task Mr. Shantanu Bannerjee • Committed to all deadlines • Mend and verify circuit better than anyone else in the team al though being a fresher Achievements 1. He was given the in charge of entire procurement team & reviewing electronic items 2. He found flaws in inventory system .optimized it using software and reduced the whole project life cycle time by 23% 5 3. His inventory model was accepted & implemented by other teams 4. His manager rewarded him for his innovation Fri 25 Feb
  • 6. Case Overview BENCHMARK – 2 0 1 1 “Shantanu was very talented and technically expert. Once you provide him with the objective, he does that before the stipulated time with perfection. There is no need of any mentor or supervisor to guide him. He knew Mr. Shantanu Bannerjee his work, deadlines and how to make it done” • Shantanu got more priority over other trainees • He interacted with client overseas • He was in the lime light for a while • Some senior team members were not Opinion happy • His dynamism & progress were taken Mr. Satyajit Khurana 6 as a threat to prestige & position of Designation: Senior Engineer Fri other team members Experience: 3 years 25 Feb
  • 7. Case Overview BENCHMARK – 2 0 1 1 Ms. Sheela,Project Manager Mr. Shantanu Bannerjee Sheela: “Hi! Am I speaking to Mr. Shantanu Shantanu: “Yes, Shantanu Speaking” Sheela: “We have an urgent opening for project trainee. Your CV has been shortlisted. You would be hired after undergoing 2 rounds of technical PI.Kindly let me know if you are interested. But the condition apply only when you are not being hired by the current team or any other team” 7 Shantanu: “Thanks sheela. I would talk to my manager regarding the same and Fri revert back in case they are not hiring me”. 25 Feb
  • 8. Case Overview BENCHMARK – 2 0 1 1 Mr. Shantanu Bannerjee Mr. Ravi Sharma • So he had a talk with his current manager, Mr. Ravi who asked his manager Mr. Shyam Kumar about the vacancy • Within 2 days he got a reply that Mr. Ravi & his manager are very satisfied with his performance • Mr. Ravi informed him that Shantanu’s training period will be extended to 3 months & will take him as a permanent employee • They were ready to hire him at any cost 8 • They said that there will be an interview as a formality and Fri either of them will be there 25 Feb
  • 9. Statements by Mr. Ravi BENCHMARK – 2 0 1 1 “ No need to worry. You can decline your proposal from Sheela & also from other teams if coming to you. Interview is just a formality. You are in. Now don’t think about your interviews much & concentrate on your projects. We have lot of expectation from you. One of our team 9 members will be in the panel to take care. Fri 25 Feb
  • 10. Shantanu in Interview BENCHMARK – 2 0 1 1 Mr. Shantanu Bannerjee • Shantanu rejected Miss Sheela’s offer • Shantanu waited for the day to come… • During the interview, none of his managers were present • Shantanu was fired in the interview • He was asked out of context questions which were not related to his work. Neither he had worked nor did it match with the profile of the work he was about to be assigned. 10 • Shantanu managed the out of box questions as he was resolving partly the technical disputes of other team Fri 25 Feb
  • 11. “Shantanu,we cannot hire you because you couldn’t perform well in the interview BENCHMARK – 2 0 1 1 Mr. Ravi “Why Ravi, I performed well till date. I am having a very good track record for last 5 months & feedbacks were very good as given by you only. I kept to all my deadlines. You people awarded me. Because of you only I denied sheela’s offer. You only assured me that the interview was just a formality & I need to concentrate on my work. Mr. Shantanu Our Company’s policy says that while recruitment it is the interviewer who decides the final selection. The panel of your interviewer is not ready to hire you. They have an opinion that the task to which you were going to be assigned is different from your current profile & does not meet their expectation. So you can apply for your 11 resignation latest by next 5 days so that it gets updated to the database before your tenure of training ends by Fri Mr. Ravi default 25 Feb
  • 12. Case Overview BENCHMARK – 2 0 1 1 Mr. Shantanu Bannerjee Ms. Sheela,Project Manager Shanrtunu: “Hi Sheela, Shantanu speaking. Earlier you called me regarding a opening in your team. Is it still there” Sheela: “Shantanu there is no vacancy in our team expected probably till next 6 months” Shantanu: “Thanks sheela.” 12 Fri 25 Feb
  • 13. Shantanu’s Perception BENCHMARK – 2 0 1 1 • Shantanu did not ask for the feedback after interview as he was assured that it’s not going to impact anyway. • He knew that as per company’s policy “Interns are hired temporarily for projects & thus have no assurance about confirmation of their job after completion of the project Mr. Shantanu even if they had performed well. • He also didn’t have any documentary proof as everything was intended to him orally. HR • He could have talked to HR’s, But in his company he Cannot help knew that HR will only say that if the line managers are not ready then no one can do anything as the entire decision is based on managers. • Shantanu was helpless. • Finally he resigned 13 Fri 25 Feb
  • 14. BENCHMARK – 2 0 1 1 Teaching Notes 14 Fri 25 Feb
  • 15. Prior action to overcome BENCHMARK – 2 0 1 1 the situation • When the feedback was delayed, Shantanu should have thought about the other odd situations. • Shantuna should have been very alert for his interview • He should have talked to HR regarding other vacancies. • He should have intelligently managed to use the written documents like mail about the assurance given by the manager , so that his claims to HR would have been strong • He should have talked to his manager’s manager about the issue • He should have given a trial, to freely convey the same to his domain HR 15 Fri 25 Feb
  • 16. Major Communication Barrier BENCHMARK – 2 0 1 1 • Lack of transparency in communication • Lack of trust • Lack of fulfillment of commitment by the manager • Perception: He believed that HR’s cannot solve his problem in any way • Improper organizational structure :Lack of autonomy & privileges to bottom employees to discuss & resolve their personal issues. 16 Fri 25 Feb
  • 17. Mistakes committed by the BENCHMARK – 2 0 1 1 management • Project manager should have kept control on his emotions and waited till the results of the interview came out • He shouldn’t have assured Shantanu, rather should have told him to prepare well without giving any guarantee before hand • Project manager should have justified Shantanu stating him the actual reasons for not selecting him & should have cleared all his doubts • He should have conveyed the message with the motive to convince him, till he found that Shantanu was with his statement & was in a position to agree to what he was saying • Shantanu should have been given with adequate time to make 17 necessary arrangement in the meantime & to make up himself for the cause Fri 25 Feb
  • 18. Conflicting statements BENCHMARK – 2 0 1 1 “ No need to worry. You “ Our Company’s policy can decline your proposal says that while from Sheela & also from recruitment it’s the other teams if coming to interviewer who decides you. Interview is just a the final selection. The formality. You are in. Now panel of your interviewers don’t think about your is not ready to hire you. interviews much & They have an opinion that concentrate on your the task to which you were projects. We have lot of going to be assigned is expectation from you ” different from your current profile & does not meet their expectation ” 18 Fri 25 Feb
  • 19. Role of HR & its policy BENCHMARK – 2 0 1 1 • Open door policy should be implemented • They should have a well expertise team to carry out employee counseling & manage stress • HR department should train their managers about of maintaining transparency, accountability, credibility & autonomy within employees • Feedback should be collected from employee when they are leaving about the reason for leaving • HR Dept. should train managers without MBA about communication barriers • All employees who are undergoing resignation process should be examined well. They should track their details & come up with report & analyze all types of circumstances to encounter such problems 19 before hand & optimize them. Fri 25 Feb
  • 20. Conclusion BENCHMARK – 2 0 1 1 • Maintaining effective communication, transparency& sticking to commitment plays an important role • Doubts of the bottom line employees should be clarified • Employee should have faith in organization • Organizational structure should be simplified so that the employees can sort out the problems with HR easily 20 Fri 25 Feb