Road Safety Audits* * Assessments, Reviews, etc.
Background ,[object Object],[object Object],[object Object]
Road Safety Audits (RSAs) ,[object Object],[object Object],[object Object]
Why RSAs? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Traditional Road Safety Review  versus   Road Safety Audit ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Traditional Road  Safety Review Road Safety Audit
An RSA also… ,[object Object],[object Object],[object Object],[object Object]
Systems Approach:  Crashes Caused by Various Factors Vehicle 12% Roadway 34% Driver  80% Human is weakest link  in this system, so we  must design around  human needs.
Complexity
RISK CATEGORY Prioritize Safety Concerns  Qualitative Estimate  of Risk Low Moderate High Extreme Frequent Occasional Infrequent Rare C D E F B C D E A B C D A A B C Crash Frequency Category SEVERITY
When do we conduct RSAs? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
RSAs & Project Stages Planning / Scoping Preliminary Design Detailed Design Pre-Opening More Major Issues Addressed by RSA Less Opportunity for  Changes
RSA Benefits ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
RSA PROCEDURES The 8-step Process
1 Identify project   2 Select RSA team 3 Conduct  start-up meeting 4 Perform field  reviews   5 Conduct analysis and prepare report 6 Present  findings to Project Owner 7 Prepare formal response 8 Incorporate findings RSA Team Road Owner RSA Procedure Responsibilities
1 Identify  project   RSA Procedure RSA Team Road Owner Responsibilities 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present  findings to Project Owner 7 Prepare formal response 8 Incorporate findings
Step 1 Identify the Project Planning/Scoping Stage Design Stage Existing Roadway
2 Select RSA team RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project or  2 Select RSA team 3 Conduct  start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
Step 2 Select RSA Team ,[object Object],[object Object],[object Object]
Traffic operations Step 2 Geometric design Road users/human factors Select RSA Team: Core Skills Planning
Step 2 Select RSA Team:  Supplementary Skills ,[object Object],[object Object],[object Object]
3 Conduct a start-up meeting RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project  2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project  Owner 7 Prepare formal response 8 Incorporate findings
Step 3 Start-up Meeting ,[object Object],[object Object],[object Object],[object Object]
Step 3 Start-up Meeting:  Provide Project Information ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Crash Data
4 Perform field  reviews   RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project   2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
Field Review: Observations ,[object Object],[object Object],[object Object],[object Object],Step 4
Step 4 Field Reviews: Common Items ,[object Object],[object Object],[object Object]
Step 4 Field Reviews: Variable Conditions to Observe ,[object Object],[object Object],[object Object]
Night
Night
Pedestrian Prompt List
Facility - Signing
Pedestrian Crossing
Pedestrian Crossing
Performance
Observation
Observation
Sidewalk Condition
Conditions
Conditions
Pedestrian Wayfinding
Area Wide Analysis
Pedestrian activity
Context and Desire Lines
5 Conduct RSA analysis RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project  Owner 7 Prepare formal response 8 Incorporate findings
Step 5 Conduct RSA Analysis ,[object Object],[object Object],[object Object]
Risks to be considered Drop Offs
RISK CATEGORY Prioritize Safety Concerns  Qualitative Estimate  of Risk Low Moderate High Extreme Frequent Occasional Infrequent Rare C D E F B C D E A B C D A A B C Crash Frequency Category SEVERITY
Prioritizing
Step 5 Mitigate Safety Concerns: Short and Long Term Solutions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
6 Present preliminary RSA findings to Project Owner RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project  2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
Step 6 RSA Findings Presentation ,[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],Step 6 RSA Findings: Formal Report
Options
Options
Example from report
7 Prepare formal response RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
Suggestion 1: Consider sidewalks along the project route to accommodate future pedestrian activity. Planning Division will recommend sidewalks be included within the scope of this project when submitted to Design Division. Suggestion 2: If R/W is available, add an acceleration on US 60 in the westbound direction for RT turning from Bowring Rd. This is not feasible for the following reasons: Any changes to the top of cut/toe of slope would affect the utility relocation which is currently under way. Also, the drive at Sta. 551+20 may conflict with accelerating vehicles. Action taken Step 7 Response Letter Reason for not taking action
8 Incorporate findings into the project RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field  reviews under  various  conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner / 7 Prepare formal response 8 Incorporate findings into the project
[object Object],Step 8 Implementation of  Improvements
1 Identify project   2 Select RSA team 3 Conduct  start-up meeting 4 Perform field  reviews   5 Conduct analysis and prepare report 6 Present  findings to Project Owner 7 Prepare formal response 8 Incorporate findings Responsibilities RSA Team Design Team / Project Owner

Contenu connexe

Tendances

02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...
02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...
02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...Hossam Shafiq I
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordinationKartik Yadiyapur
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance SACHIN NAGAYACH
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...Hossam Shafiq I
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section Rana Ibrahim
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesNayana 54321
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra cŔąvî Bøňđ
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signalBhavya Patel
 
Horizontal curve- IRC 38
Horizontal curve- IRC 38Horizontal curve- IRC 38
Horizontal curve- IRC 38Surabhi Suman
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliManjurali Balya
 
Road user characteristics
Road user characteristicsRoad user characteristics
Road user characteristicsChockalingam T
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTUVATSAL PATEL
 
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLDESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLSAMADHANA
 
Travel demand management
Travel demand managementTravel demand management
Travel demand managementPresi
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineeringRonakModi34
 

Tendances (20)

02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...
02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...
02-A Components of Traffic System [Road Users and Vehicles] (Traffic Engineer...
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordination
 
Traffic control devices
Traffic control devicesTraffic control devices
Traffic control devices
 
Crash Investigation and Black Spot Assessment
Crash Investigation and Black Spot AssessmentCrash Investigation and Black Spot Assessment
Crash Investigation and Black Spot Assessment
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notes
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra c
 
Traffic regulations
Traffic regulationsTraffic regulations
Traffic regulations
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signal
 
Horizontal curve- IRC 38
Horizontal curve- IRC 38Horizontal curve- IRC 38
Horizontal curve- IRC 38
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
 
Highway safety
Highway safetyHighway safety
Highway safety
 
Traffic geometrics
Traffic geometricsTraffic geometrics
Traffic geometrics
 
Road user characteristics
Road user characteristicsRoad user characteristics
Road user characteristics
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
 
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLDESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
 
Travel demand management
Travel demand managementTravel demand management
Travel demand management
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 

Similaire à Road safety audit presentation with special application to pedestrian issues

Copyright 2012 John Wiley & Sons, Inc.Part IIProject P.docx
Copyright 2012 John Wiley & Sons, Inc.Part IIProject P.docxCopyright 2012 John Wiley & Sons, Inc.Part IIProject P.docx
Copyright 2012 John Wiley & Sons, Inc.Part IIProject P.docxvanesaburnand
 
Rsa workshop overview
Rsa workshop overviewRsa workshop overview
Rsa workshop overviewRPO America
 
Development of an Advanced RAIM multi-constellation receiver
Development of an Advanced RAIM multi-constellation receiver Development of an Advanced RAIM multi-constellation receiver
Development of an Advanced RAIM multi-constellation receiver The European GNSS Agency (GSA)
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Skillogic Solutions
 
Delivering Large Post-Trade Initiatives: Quality Assurance and Key Challenges
Delivering Large Post-Trade Initiatives:  Quality Assurance and Key ChallengesDelivering Large Post-Trade Initiatives:  Quality Assurance and Key Challenges
Delivering Large Post-Trade Initiatives: Quality Assurance and Key ChallengesIosif Itkin
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationAjay Kumar Uppal
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop pyoungkyova
 
Congestion Reduction Plan Introduction
Congestion Reduction Plan IntroductionCongestion Reduction Plan Introduction
Congestion Reduction Plan IntroductionMike Iswalt
 
Risk Management Processes from Jerry Klanac
Risk Management Processes from Jerry KlanacRisk Management Processes from Jerry Klanac
Risk Management Processes from Jerry KlanacPMA Consultants
 
API RP 78 Process for API Meeting - 2016 04 05
API RP 78 Process for API Meeting - 2016 04 05API RP 78 Process for API Meeting - 2016 04 05
API RP 78 Process for API Meeting - 2016 04 05Neil Bergstrom, P.E.
 
Armstrong
ArmstrongArmstrong
ArmstrongNASAPMC
 
Project phases and risks
Project phases and risksProject phases and risks
Project phases and risksAdamRice38
 
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...Association for Project Management
 
Keeping Road Safety Audits Relevant
Keeping Road Safety Audits RelevantKeeping Road Safety Audits Relevant
Keeping Road Safety Audits RelevantJumpingJaq
 
Final 360 stakeholder_presentation_110515
Final 360 stakeholder_presentation_110515Final 360 stakeholder_presentation_110515
Final 360 stakeholder_presentation_110515Paul Schumann
 

Similaire à Road safety audit presentation with special application to pedestrian issues (20)

Opportunity framing
Opportunity framingOpportunity framing
Opportunity framing
 
Copyright 2012 John Wiley & Sons, Inc.Part IIProject P.docx
Copyright 2012 John Wiley & Sons, Inc.Part IIProject P.docxCopyright 2012 John Wiley & Sons, Inc.Part IIProject P.docx
Copyright 2012 John Wiley & Sons, Inc.Part IIProject P.docx
 
Rsa workshop overview
Rsa workshop overviewRsa workshop overview
Rsa workshop overview
 
Development of an Advanced RAIM multi-constellation receiver
Development of an Advanced RAIM multi-constellation receiver Development of an Advanced RAIM multi-constellation receiver
Development of an Advanced RAIM multi-constellation receiver
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
Remade Slides.pptx
Remade Slides.pptxRemade Slides.pptx
Remade Slides.pptx
 
Vienna_Slides_v.15
Vienna_Slides_v.15Vienna_Slides_v.15
Vienna_Slides_v.15
 
Delivering Large Post-Trade Initiatives: Quality Assurance and Key Challenges
Delivering Large Post-Trade Initiatives:  Quality Assurance and Key ChallengesDelivering Large Post-Trade Initiatives:  Quality Assurance and Key Challenges
Delivering Large Post-Trade Initiatives: Quality Assurance and Key Challenges
 
Project cycle
Project cycleProject cycle
Project cycle
 
Project stages v2.0
Project stages v2.0Project stages v2.0
Project stages v2.0
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management Information
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop
 
Congestion Reduction Plan Introduction
Congestion Reduction Plan IntroductionCongestion Reduction Plan Introduction
Congestion Reduction Plan Introduction
 
Risk Management Processes from Jerry Klanac
Risk Management Processes from Jerry KlanacRisk Management Processes from Jerry Klanac
Risk Management Processes from Jerry Klanac
 
API RP 78 Process for API Meeting - 2016 04 05
API RP 78 Process for API Meeting - 2016 04 05API RP 78 Process for API Meeting - 2016 04 05
API RP 78 Process for API Meeting - 2016 04 05
 
Armstrong
ArmstrongArmstrong
Armstrong
 
Project phases and risks
Project phases and risksProject phases and risks
Project phases and risks
 
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
 
Keeping Road Safety Audits Relevant
Keeping Road Safety Audits RelevantKeeping Road Safety Audits Relevant
Keeping Road Safety Audits Relevant
 
Final 360 stakeholder_presentation_110515
Final 360 stakeholder_presentation_110515Final 360 stakeholder_presentation_110515
Final 360 stakeholder_presentation_110515
 

Dernier

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 

Dernier (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 

Road safety audit presentation with special application to pedestrian issues

  • 1. Road Safety Audits* * Assessments, Reviews, etc.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. Systems Approach: Crashes Caused by Various Factors Vehicle 12% Roadway 34% Driver 80% Human is weakest link in this system, so we must design around human needs.
  • 9. RISK CATEGORY Prioritize Safety Concerns Qualitative Estimate of Risk Low Moderate High Extreme Frequent Occasional Infrequent Rare C D E F B C D E A B C D A A B C Crash Frequency Category SEVERITY
  • 10.
  • 11. RSAs & Project Stages Planning / Scoping Preliminary Design Detailed Design Pre-Opening More Major Issues Addressed by RSA Less Opportunity for Changes
  • 12.
  • 13. RSA PROCEDURES The 8-step Process
  • 14. 1 Identify project 2 Select RSA team 3 Conduct start-up meeting 4 Perform field reviews 5 Conduct analysis and prepare report 6 Present findings to Project Owner 7 Prepare formal response 8 Incorporate findings RSA Team Road Owner RSA Procedure Responsibilities
  • 15. 1 Identify project RSA Procedure RSA Team Road Owner Responsibilities 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 16. Step 1 Identify the Project Planning/Scoping Stage Design Stage Existing Roadway
  • 17. 2 Select RSA team RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project or 2 Select RSA team 3 Conduct start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 18.
  • 19. Traffic operations Step 2 Geometric design Road users/human factors Select RSA Team: Core Skills Planning
  • 20.
  • 21. 3 Conduct a start-up meeting RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 22.
  • 23.
  • 25. 4 Perform field reviews RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 26.
  • 27.
  • 28.
  • 29. Night
  • 30. Night
  • 45. 5 Conduct RSA analysis RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 46.
  • 47. Risks to be considered Drop Offs
  • 48. RISK CATEGORY Prioritize Safety Concerns Qualitative Estimate of Risk Low Moderate High Extreme Frequent Occasional Infrequent Rare C D E F B C D E A B C D A A B C Crash Frequency Category SEVERITY
  • 50.
  • 51. 6 Present preliminary RSA findings to Project Owner RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 52.
  • 53.
  • 57. 7 Prepare formal response RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner 7 Prepare formal response 8 Incorporate findings
  • 58. Suggestion 1: Consider sidewalks along the project route to accommodate future pedestrian activity. Planning Division will recommend sidewalks be included within the scope of this project when submitted to Design Division. Suggestion 2: If R/W is available, add an acceleration on US 60 in the westbound direction for RT turning from Bowring Rd. This is not feasible for the following reasons: Any changes to the top of cut/toe of slope would affect the utility relocation which is currently under way. Also, the drive at Sta. 551+20 may conflict with accelerating vehicles. Action taken Step 7 Response Letter Reason for not taking action
  • 59. 8 Incorporate findings into the project RSA Team Road Owner Responsibilities RSA Procedure 1 Identify project 2 Select RSA team 3 Conduct a start-up meeting 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present RSA findings to Project Owner / 7 Prepare formal response 8 Incorporate findings into the project
  • 60.
  • 61. 1 Identify project 2 Select RSA team 3 Conduct start-up meeting 4 Perform field reviews 5 Conduct analysis and prepare report 6 Present findings to Project Owner 7 Prepare formal response 8 Incorporate findings Responsibilities RSA Team Design Team / Project Owner

Notes de l'éditeur

  1. What is a Road Safety Audit? A road safety audit (RSA) is a formal safety performance examination of an existing or future road or intersection by an independent, multidisciplinary team. RSAs are a step further than traditional safety reviews that are currently done.
  2. It is also important to note that the RSA team may need to consider the safety performance of the project from the perspective of all road users. The graphic shows a passenger car, pedestrian, pedal cyclist, motorcyclist, and large truck. Participants may be able to name other possible road users, such as public safety vehicles (police or fire), maintenance vehicles, older drivers, etc. The RSA team examines connections to existing infrastructure beyond the project limits, and looks at the segment/intersection from the point of view of users entering and exiting it. For example, is signing adequate for drivers approaching from adjacent road segments (are approaching drivers correctly positioned for turn-only lanes, and is signing consistent with similar facilities upstream and downstream)? How do various project elements interact, especially combinations of minimum standards? For example, what are the implications of providing a minimum-radius curve on an approach to an intersection where the minimum stopping sight distance is provided? Can vehicles (especially trucks) safely brake? An RSA does not simply identify potential problems – it may also identify potential solutions. Some questionable elements may be unavoidable in a design, such as where there are constraints (geometric, fiscal, etc.) that limit the project. An RSA can identify possible mitigation measures to address these risks. For example, limited land availability may result in the need to incorporate a horizontal curve having a radius below the minimum design value for anticipated speeds. The RSA can identify potential measures to identify this hazard (appropriate signing) and induce lower approach speeds (narrower lanes or transverse rumble strips), which can be implemented at reasonable expense during construction.
  3. RSAs can be done at any stage of a project’s life. For simplicity’s sake, we have grouped them into three categories: The Early State (Planning or early-design) RSA looks at a roadway before it is built, at the planning/feasibility stage or the design (preliminary or detailed design) stage. The earlier a pre-construction RSA is conducted, the more potential it has to identify potential safety issues before they cause collisions. Construction RSAs are work-zone audits to examine temporary traffic management plans associated with construction or other roadworks, and can also be conducted when construction is completed but before the roadway is opened to traffic. The post-construction or operational (existing road) RSA looks at a road that has been built and is operating.
  4. Examples
  5. 77
  6. FHWA RSA Train-the-Trainer Course Part 2 (RSA Procedures)