SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Republic of the Philippines
                                                     Department of Environment & Natural Resources
                                                        MINES & GEOSCIENCES BUREAU

                                                    MINING INDUSTRY STATISTICS
                                                           (RELEASE DATE: 19 June 2012)
                                                                     2008               2009               2010              2011+            Q1 2012+
Gross Production Value In Mining (MGB)
 Large Scale Metallic Mining                                    P 29.7 Billion     P 42.8 Billion     P 69.1 Billion     P 88.0 Billion     P 18.5 Billion
 Small Scale Gold Mining                                          33.9 Billion        36.8 Billion      42.9 Billion       34.1 Billion        1.1 Billion
 Non-metallic mining                                             23.5 Billion         26.5 Billion      33.3 Billion          nya                nya
        TOTAL                                                   P 87.1 Billion     P 106.1 Billion    P145.3 Billion     P122.1 Billion     P 19.6 Billion
Total Mining Investment Data from the Revitalization            $604.2 Million     $ 719.5 Million    $ 968.3 Million   $ 618.5 Million          nya
 Program under EO 270 (MGB)
Gross Value Added In Mining At Current Prices (NSCB):           P 53.6 Billion     P 65.8 Billion     P 88.2 Billion     P 99.2 Billion     P 19.7 Billion
 Mining Contribution To GDP                                         0.7%               0.8%               1.0%               1.0%               0.8%
Total Exports of Minerals & Mineral Products (BSP)              $2,498 Million     $1,470 Million     $1,929 Million     $2,659 Million          nya
 Mining Contribution To Total Exports                                5.2%               3.9%               3.8%              5.6%
Total Exports of Non-Met. Mineral Manufactures (BSP)             $211 Million       $156 Million       $162 Million      $177 Million            nya
 Mining Contribution To Total Exports                               0.4%               0.4%               0.3%              0.4%
Employment In Mining and Quarrying (DOLE)                          158,000            169,000            197,000            210,000            238,000
 Mining Contribution To Total Employment                            0.5%               0.5%               0.5%               0.6%               0.6%
Taxes, Fees and Royalties From Mining
 Fees, Charges & Royalties Collected by DENR-MGB/LGUs          P 557.4 Million P 396.2 Million P 800.6 Million P 1,180.8 Million P 92.1 Million
 Excise Tax Collected by BIR                                      660.3 Million    718.8 Million 1,299.7 Million          nya             nya
 Taxes Collected by Nat'l. Gov't. Agencies                      5,949.5 Million 10,272.5 Million 10,201.9 Million    1,509.7 Million      nya
 Taxes and Fees Collected by LGUs                                 522.2 Million    992.8 Million 1,071.2 Million       289.0 Million    1.9 Million
       TOTAL                                                   P7,689.4 Million P12,380.3 Million P13,373.4 Million P2,979.5 Million P 94.0 Million
Number of Operating Metallic Mines:
 Copper (with gold & silver)                                           2                 3                  3                  3                  3
 Copper (with gold, silver & zinc)                                     1                 1                  1                  1                  1
 Gold (with silver)                                                    8                 8                  8                  5                  5
 Metallurgical Chromite (ore & concentrate)                            1                 1                  1                  2                  2
 Refractory Chromite
 Chemical Grade Chromite                                              1
 Nickel                                                              10                 10                 15                 18                 18
 Iron                                                              _______            _______            _______           ___1___             ___1___
      Total Operating Metallic Mines                                 23                 23                 28                 30                 30
Number Of Operating Non-Metallic Mines:
 Sand and Gravel                                                           1,820              1,820        nya                nya                nya
 Cement                                                                       16                 15                16         nya                nya
 Other Non-Metallics                                                         523                523        nya                nya                nya
     Total Operating Non-Metallic Mines                                    2,359              2,358
Number of Processing Plant/Smelter:
 Copper Smelter                                                       1                  1                  1                  1                  1
 Nickel Processing Plant                                            __1__              __1__              __1__              __1__              __1__
     Total Processing Plant/Smelter                                   2                  2                  2                  2                  2
Number of Approved and Registered(As of Current Yr.)
  MPSA                                                               264                275                318               321                 287
  FTAA                                                                2                  3                  6                 6                   6
  EP                                                                 39                 54                 99                106                 95
  IP                                                                 199                213                202               231                 217
  MPP                                                                41                 41                 54                 66                 54
     TOTAL                                                           545                586                679               730*               659**
Number of Applications Under Process(As of Current Yr.)
  MPSA                                                              1,058               997                839                628                621
  FTAA                                                                52                 52                 49                 40                 34
  EP                                                                1,496              1,575              1,545               957               1,110
  IP                                                                 291                288                294                160                169
  MPP                                                                 40                 42                 44                 33                 37
     TOTAL                                                          2,937              2,954              2,771             1,818*             1,971**
Average world price of Copper (WMS/LME)                            $3.16 / lb         $2.28 / lb        $3.40 / lb         $4.00 / lb         $3.77 / lb
Average world price of Gold (WMS/BSP)                            $871.52 / oz       $973.01 / oz      $1,222.02 / oz     $1,570.25 / oz     $1,689.95 / oz
Average world price of Silver (WMS/BSP)                           $15.00 / oz        $14.67 / oz       $20.13 / oz        $35.22 / oz        $32.58 / oz
Average world price of Nickel (WMS/LME)                            $9.58 / lb         $6.56 / lb        $9.82 / lb        $10.39 / lb         $8.91 / lb
Peso to US Dollar Exchange Rate (BSP)                                 P44.48            P47.64             P45.11            P43.31              P43.04
+Preliminary; *as of June; ** as of Jan.; nya - not yet available
Note: Number of operating mines were based on production reports submitted. Metallic mines include the following:
       a) Copper (with gold & silver): Padcal Copper-Gold Project, Canatuan Mining Project, and Toledo Copper Project
       b) Copper (with gold, silver & zinc): Rapu-Rapu Polymetallic Project
       c) Gold (with silver): Victoria Gold Project, Masbate Gold Project, Paracale Gold Project, APEX Maco Operation, and Banahaw Gold Project,
      d) Metallurgical Chromite (Ore & Concentrate): Dinagat Chromite Project and Homonhon Chromite Project
      e) Nickel Ore: Sta. Cruz-Candelaria Proj.; Sta. Cruz Nickel Proj.; Rio Tuba Nickel Proj.; Toronto and Pulot Nickel Projs.; Berong Nickel Proj.;
         Tubay Nickel-Cobalt Proj.; Dinagat Chromite-Nickel Proj.; Cagdianao Nickel Proj.; Tagana-an Nickel Proj.; Nonoc Nickel Proj.; Cagdianao
         Nickel Proj. (PGMC); Taganito Nickel Proj.; Tandawa Nickel Proj.; Adlay and Dahican Nickel Projs.; Dahican Nickel Proj.; Carrascal Nickel
         Proj.; Cantilan Nickel Proj.; and Bel-at Nickel Proj.
       Gross Value Added (GVA) - measures the contribution of a particular sector to the country's GNP; computed by subtracting the cost of production
         inputs from the gross output of a particular industry. Total GVA does not include crude oil. Data from 2007-present were adjusted due to
         NSCB's change of base year from 1985 to 2000.
ref: MIS(2012)/econ-ind/rvs/19Jun12

Contenu connexe

Similaire à Mineral Industry Statistics

Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...
Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...
Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...Arangkada Philippines
 
Philippine Metallic Mineral Production - May 2011
Philippine Metallic Mineral Production - May 2011Philippine Metallic Mineral Production - May 2011
Philippine Metallic Mineral Production - May 2011No to mining in Palawan
 
Microsoft power point magref-apres_padrao_4q09eng
Microsoft power point   magref-apres_padrao_4q09engMicrosoft power point   magref-apres_padrao_4q09eng
Microsoft power point magref-apres_padrao_4q09engMagnesita_ri
 
Presentations 4 q09
Presentations 4 q09Presentations 4 q09
Presentations 4 q09MagnesitaRI
 
Philippine Mining Luncheon -Shangri La Hotel Makati
Philippine Mining Luncheon -Shangri La Hotel MakatiPhilippine Mining Luncheon -Shangri La Hotel Makati
Philippine Mining Luncheon -Shangri La Hotel MakatiNo to mining in Palawan
 
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL ProjectCoral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL ProjectNo to mining in Palawan
 
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...Commerce Resources Corp. (TSXv:CCE)
 
Balatoc Gold Tailings Project _ Sta. Cruz Nickel Project
Balatoc Gold Tailings Project _ Sta. Cruz Nickel ProjectBalatoc Gold Tailings Project _ Sta. Cruz Nickel Project
Balatoc Gold Tailings Project _ Sta. Cruz Nickel ProjectNo to mining in Palawan
 
Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...
Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...
Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...Viral Network Inc
 
Microsoft word mmx earnings release 2 q12 versão final - ingles
Microsoft word   mmx earnings release 2 q12 versão final - inglesMicrosoft word   mmx earnings release 2 q12 versão final - ingles
Microsoft word mmx earnings release 2 q12 versão final - inglesmmxriweb
 
DRC Mining sector key players.pdf
DRC Mining sector key players.pdfDRC Mining sector key players.pdf
DRC Mining sector key players.pdfLandry DJIMPE
 
Base Metals One Year Forecast November 2009 All Metals
Base Metals One Year Forecast   November 2009   All MetalsBase Metals One Year Forecast   November 2009   All Metals
Base Metals One Year Forecast November 2009 All MetalsChristopher R Anderson
 

Similaire à Mineral Industry Statistics (20)

Mineral Industry Statistics_May_2013
Mineral Industry Statistics_May_2013Mineral Industry Statistics_May_2013
Mineral Industry Statistics_May_2013
 
Historical Mineral Industry Statistics
Historical Mineral Industry StatisticsHistorical Mineral Industry Statistics
Historical Mineral Industry Statistics
 
Nickel Asia Corporation
Nickel Asia CorporationNickel Asia Corporation
Nickel Asia Corporation
 
Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...
Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...
Leo Jasareno presentation at Conference on Mining's Impact on Philippine Econ...
 
Philippine Metallic Mineral Production - May 2011
Philippine Metallic Mineral Production - May 2011Philippine Metallic Mineral Production - May 2011
Philippine Metallic Mineral Production - May 2011
 
Blast furnance
Blast furnanceBlast furnance
Blast furnance
 
Microsoft power point magref-apres_padrao_4q09eng
Microsoft power point   magref-apres_padrao_4q09engMicrosoft power point   magref-apres_padrao_4q09eng
Microsoft power point magref-apres_padrao_4q09eng
 
Presentations 4 q09
Presentations 4 q09Presentations 4 q09
Presentations 4 q09
 
Philippine Mining Luncheon -Shangri La Hotel Makati
Philippine Mining Luncheon -Shangri La Hotel MakatiPhilippine Mining Luncheon -Shangri La Hotel Makati
Philippine Mining Luncheon -Shangri La Hotel Makati
 
Coral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL ProjectCoral Bay Update on the Palawan HPAL Project
Coral Bay Update on the Palawan HPAL Project
 
Metallic Production
Metallic ProductionMetallic Production
Metallic Production
 
Philippine Metallic Mineral Production
Philippine Metallic Mineral ProductionPhilippine Metallic Mineral Production
Philippine Metallic Mineral Production
 
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
 
Nrp feb13 investormtg
Nrp feb13 investormtgNrp feb13 investormtg
Nrp feb13 investormtg
 
Balatoc Gold Tailings Project _ Sta. Cruz Nickel Project
Balatoc Gold Tailings Project _ Sta. Cruz Nickel ProjectBalatoc Gold Tailings Project _ Sta. Cruz Nickel Project
Balatoc Gold Tailings Project _ Sta. Cruz Nickel Project
 
Nrp mar13 mlppresentation
Nrp mar13 mlppresentationNrp mar13 mlppresentation
Nrp mar13 mlppresentation
 
Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...
Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...
Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban D...
 
Microsoft word mmx earnings release 2 q12 versão final - ingles
Microsoft word   mmx earnings release 2 q12 versão final - inglesMicrosoft word   mmx earnings release 2 q12 versão final - ingles
Microsoft word mmx earnings release 2 q12 versão final - ingles
 
DRC Mining sector key players.pdf
DRC Mining sector key players.pdfDRC Mining sector key players.pdf
DRC Mining sector key players.pdf
 
Base Metals One Year Forecast November 2009 All Metals
Base Metals One Year Forecast   November 2009   All MetalsBase Metals One Year Forecast   November 2009   All Metals
Base Metals One Year Forecast November 2009 All Metals
 

Plus de No to mining in Palawan

Philippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_FinalPhilippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_FinalNo to mining in Palawan
 
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalPhilippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalNo to mining in Palawan
 
Philippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_InformationPhilippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_InformationNo to mining in Palawan
 
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...No to mining in Palawan
 
Mining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-AssesmentMining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-AssesmentNo to mining in Palawan
 
Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013No to mining in Palawan
 
Intex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose InformationIntex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose InformationNo to mining in Palawan
 
Philippine Mining Production Export Figures
Philippine Mining Production Export FiguresPhilippine Mining Production Export Figures
Philippine Mining Production Export FiguresNo to mining in Palawan
 
CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013No to mining in Palawan
 
Pollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act ViolationsPollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act ViolationsNo to mining in Palawan
 
Draft Minerals Law (New) Mongolia December 5-2012
Draft  Minerals  Law (New) Mongolia December 5-2012Draft  Minerals  Law (New) Mongolia December 5-2012
Draft Minerals Law (New) Mongolia December 5-2012No to mining in Palawan
 

Plus de No to mining in Palawan (20)

Philippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_FinalPhilippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_Final
 
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalPhilippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
 
Philippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_InformationPhilippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_Information
 
Mining Presentation-11142014
Mining Presentation-11142014Mining Presentation-11142014
Mining Presentation-11142014
 
Cetim cetim's statements at the un
Cetim   cetim's statements at the unCetim   cetim's statements at the un
Cetim cetim's statements at the un
 
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
 
Mining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-AssesmentMining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-Assesment
 
Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013
 
Study Tampakan HRIA
Study Tampakan HRIAStudy Tampakan HRIA
Study Tampakan HRIA
 
Intex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose InformationIntex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose Information
 
Philippine Mining Production Export Figures
Philippine Mining Production Export FiguresPhilippine Mining Production Export Figures
Philippine Mining Production Export Figures
 
Position Paper on Philex Mining Spill
Position Paper on Philex Mining SpillPosition Paper on Philex Mining Spill
Position Paper on Philex Mining Spill
 
CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013
 
Philex Padcal Mine PAB Resolution
Philex Padcal Mine PAB ResolutionPhilex Padcal Mine PAB Resolution
Philex Padcal Mine PAB Resolution
 
Mining Arangkada Assessment_2013
Mining  Arangkada Assessment_2013Mining  Arangkada Assessment_2013
Mining Arangkada Assessment_2013
 
Mining Survey 2012-2013
Mining Survey 2012-2013Mining Survey 2012-2013
Mining Survey 2012-2013
 
Ochoa Tampakan Decision
Ochoa Tampakan DecisionOchoa Tampakan Decision
Ochoa Tampakan Decision
 
Macventures MPSA 016_93_XIII
Macventures MPSA 016_93_XIIIMacventures MPSA 016_93_XIII
Macventures MPSA 016_93_XIII
 
Pollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act ViolationsPollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act Violations
 
Draft Minerals Law (New) Mongolia December 5-2012
Draft  Minerals  Law (New) Mongolia December 5-2012Draft  Minerals  Law (New) Mongolia December 5-2012
Draft Minerals Law (New) Mongolia December 5-2012
 

Mineral Industry Statistics

  • 1. Republic of the Philippines Department of Environment & Natural Resources MINES & GEOSCIENCES BUREAU MINING INDUSTRY STATISTICS (RELEASE DATE: 19 June 2012) 2008 2009 2010 2011+ Q1 2012+ Gross Production Value In Mining (MGB) Large Scale Metallic Mining P 29.7 Billion P 42.8 Billion P 69.1 Billion P 88.0 Billion P 18.5 Billion Small Scale Gold Mining 33.9 Billion 36.8 Billion 42.9 Billion 34.1 Billion 1.1 Billion Non-metallic mining 23.5 Billion 26.5 Billion 33.3 Billion nya nya TOTAL P 87.1 Billion P 106.1 Billion P145.3 Billion P122.1 Billion P 19.6 Billion Total Mining Investment Data from the Revitalization $604.2 Million $ 719.5 Million $ 968.3 Million $ 618.5 Million nya Program under EO 270 (MGB) Gross Value Added In Mining At Current Prices (NSCB): P 53.6 Billion P 65.8 Billion P 88.2 Billion P 99.2 Billion P 19.7 Billion Mining Contribution To GDP 0.7% 0.8% 1.0% 1.0% 0.8% Total Exports of Minerals & Mineral Products (BSP) $2,498 Million $1,470 Million $1,929 Million $2,659 Million nya Mining Contribution To Total Exports 5.2% 3.9% 3.8% 5.6% Total Exports of Non-Met. Mineral Manufactures (BSP) $211 Million $156 Million $162 Million $177 Million nya Mining Contribution To Total Exports 0.4% 0.4% 0.3% 0.4% Employment In Mining and Quarrying (DOLE) 158,000 169,000 197,000 210,000 238,000 Mining Contribution To Total Employment 0.5% 0.5% 0.5% 0.6% 0.6% Taxes, Fees and Royalties From Mining Fees, Charges & Royalties Collected by DENR-MGB/LGUs P 557.4 Million P 396.2 Million P 800.6 Million P 1,180.8 Million P 92.1 Million Excise Tax Collected by BIR 660.3 Million 718.8 Million 1,299.7 Million nya nya Taxes Collected by Nat'l. Gov't. Agencies 5,949.5 Million 10,272.5 Million 10,201.9 Million 1,509.7 Million nya Taxes and Fees Collected by LGUs 522.2 Million 992.8 Million 1,071.2 Million 289.0 Million 1.9 Million TOTAL P7,689.4 Million P12,380.3 Million P13,373.4 Million P2,979.5 Million P 94.0 Million Number of Operating Metallic Mines: Copper (with gold & silver) 2 3 3 3 3 Copper (with gold, silver & zinc) 1 1 1 1 1 Gold (with silver) 8 8 8 5 5 Metallurgical Chromite (ore & concentrate) 1 1 1 2 2 Refractory Chromite Chemical Grade Chromite 1 Nickel 10 10 15 18 18 Iron _______ _______ _______ ___1___ ___1___ Total Operating Metallic Mines 23 23 28 30 30 Number Of Operating Non-Metallic Mines: Sand and Gravel 1,820 1,820 nya nya nya Cement 16 15 16 nya nya Other Non-Metallics 523 523 nya nya nya Total Operating Non-Metallic Mines 2,359 2,358 Number of Processing Plant/Smelter: Copper Smelter 1 1 1 1 1 Nickel Processing Plant __1__ __1__ __1__ __1__ __1__ Total Processing Plant/Smelter 2 2 2 2 2 Number of Approved and Registered(As of Current Yr.) MPSA 264 275 318 321 287 FTAA 2 3 6 6 6 EP 39 54 99 106 95 IP 199 213 202 231 217 MPP 41 41 54 66 54 TOTAL 545 586 679 730* 659** Number of Applications Under Process(As of Current Yr.) MPSA 1,058 997 839 628 621 FTAA 52 52 49 40 34 EP 1,496 1,575 1,545 957 1,110 IP 291 288 294 160 169 MPP 40 42 44 33 37 TOTAL 2,937 2,954 2,771 1,818* 1,971** Average world price of Copper (WMS/LME) $3.16 / lb $2.28 / lb $3.40 / lb $4.00 / lb $3.77 / lb Average world price of Gold (WMS/BSP) $871.52 / oz $973.01 / oz $1,222.02 / oz $1,570.25 / oz $1,689.95 / oz Average world price of Silver (WMS/BSP) $15.00 / oz $14.67 / oz $20.13 / oz $35.22 / oz $32.58 / oz Average world price of Nickel (WMS/LME) $9.58 / lb $6.56 / lb $9.82 / lb $10.39 / lb $8.91 / lb Peso to US Dollar Exchange Rate (BSP) P44.48 P47.64 P45.11 P43.31 P43.04 +Preliminary; *as of June; ** as of Jan.; nya - not yet available Note: Number of operating mines were based on production reports submitted. Metallic mines include the following: a) Copper (with gold & silver): Padcal Copper-Gold Project, Canatuan Mining Project, and Toledo Copper Project b) Copper (with gold, silver & zinc): Rapu-Rapu Polymetallic Project c) Gold (with silver): Victoria Gold Project, Masbate Gold Project, Paracale Gold Project, APEX Maco Operation, and Banahaw Gold Project, d) Metallurgical Chromite (Ore & Concentrate): Dinagat Chromite Project and Homonhon Chromite Project e) Nickel Ore: Sta. Cruz-Candelaria Proj.; Sta. Cruz Nickel Proj.; Rio Tuba Nickel Proj.; Toronto and Pulot Nickel Projs.; Berong Nickel Proj.; Tubay Nickel-Cobalt Proj.; Dinagat Chromite-Nickel Proj.; Cagdianao Nickel Proj.; Tagana-an Nickel Proj.; Nonoc Nickel Proj.; Cagdianao Nickel Proj. (PGMC); Taganito Nickel Proj.; Tandawa Nickel Proj.; Adlay and Dahican Nickel Projs.; Dahican Nickel Proj.; Carrascal Nickel Proj.; Cantilan Nickel Proj.; and Bel-at Nickel Proj. Gross Value Added (GVA) - measures the contribution of a particular sector to the country's GNP; computed by subtracting the cost of production inputs from the gross output of a particular industry. Total GVA does not include crude oil. Data from 2007-present were adjusted due to NSCB's change of base year from 1985 to 2000. ref: MIS(2012)/econ-ind/rvs/19Jun12