COMMONWEALTH OF MASSACHUSETTS
                                         EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
                                         DEPARTMENT OF ENVIRONMENTAL PROTECTION
                                         ONE WINTER STREET, BOSTON, MA 02108 617··292·5500



MITT ROMNEY                                                                                                                           STEPHEN R. PRITCHARD
Governor                                                                                                                                                   Secretary
KERRY HEALEY                                                                                                                       ROBERT W. GOLLEDGE, Jr
Lieutenant Governor                                                                                                                                   Commissioner




       MEMORANDUM

        To:   Steve Ellis, Actin~Regir, WRO
                                      ·
        From: Bob Golledge, Co    er
        Date: June 23, 2006        ·==- -..·--··---
                                    ·

        RE:      Approval of Waiver Request, Northampton Landfill Application for Expansion,
                 Northampton, Massachusetts (Transmittal #s W016447 and W074719)

        The City of Northampton has submitted a site assignment application to the Department for a
        proposed lateral expansion of the existing municipal landfill. As part of the site assignment
        application, the proponent is asking for a waiver from the siting criteria for Zone lis at 310 CMR
        l6..40(3)(a)1, arrd Potentially Productive Aquifers (PPA) at 310 CMR 16A0(3)(a)l 0. The
        specific regulatory requirements are as follows:

         (3) Facility .Specific Site Suitability Criteria .
                 (a) Criteria for Landfill Facilities (Restricted Areasl. No site shall be determined to be
                 suitable or be assigned as a landfill facility where:
                          1 . any area of waste deposition would be within a Zone II area of an existing
                          public water supply well;

                               10.. any area o:fwaste deposition would be within a Potentially Productive
                               Aquifer unless:
                                       a. the proponent demonstrates to the Department's satisfaction, based on
                                       hydrogeological studies, that the designation ofthe ar·ea as a potentially
                                       productive aquifer is incorrect;
                                       b the proponent demonstrates to the Department's satisfaction, based on
                                       hydrogeological studies, that the aquifer cannot now, nor in the reasonably
                                       foreseeable futrue, be used as a public water supply due to existing
                                        contamination ofthe aquifer; or
                                        c the area has been excluded as a "Non-Potential Drinking Water Somce
                                        Area" pursuant to 310 CMR 40.0932, or as otherwise defined at 310 CMR
                                        40.0006: TheMassachusetts Contingency Plan.

           The Site Assignment Regulations at 310 CMR 16 40( 6) govern the waiver pmcess
                  Ibis information is available in alternate format Call Donald M. Gomes, ADA Coordinator· at 61'7·556-1057, IDD Service -1-800-298-2207

                                                     MassDEP on the World Wide Web: http:l/www mass gov/dep
                                                                    ( ) Printed on Recycled Paper
Background

The City ofNmthampton commenced landfill operations at the Glendale Road site in the 1960's
(see Site Locus Map). The City of Easthampton permitted the Maloney Well through the
MassDEP Division of Water Supply in 1976. Throughout the 1990's the City ofNmthampton
received permits for lined expansions of the Nmthampton landfill at the existing site. The
landfill cunently accepts municipal solid waste from numerous communities in the region On
August 2, 2001 the Department, as part of the Source Water Assessment Program (SWAP),
approved a conceptual Zone II delineation for the Maloney Well in Easthampton that
encompasses both the existing Nmthampton Landfill and the proposed expansion Additionally,
 a number of existing land uses in Easthampton are within the Zone II and pose a potential threat
 to the well, including two closed Easthampton landfills which lie between the Nmthampton
 Landfill and the well.

The Maloney Well is located within the Barnes Aquifer, a very extensive buried valley, sand and
gravel aquifer extending from the Westfield River in the south to Nmthampton The nmthem
pmtion of the Barnes Aquifer consists of three "lobes", the east and west lobes flowing north
toward the center of Easthampton and the nmthwest lobe flowing southeast toward the center of
Easthampton and then east/nmtheast toward the Maloney Well and the Connecticut River (see
Maloney Well Watershed map and Hydrogeologic Features map) The Northampton Landfill is
located in the nmthwest "lobe" The landfill is located approximately 16,000 feet west of the
 Maloney Well, but approximately 22,000 feet along the groundwater flow path. The Maloney
 Well is located down gradient of the confluence of the three lobes.

 The Maloney Well is a free flowing artesian (confined), gravel developed well, installed in 1975 .
 Due to elevated manganese concentrations, the well has not been used since November 1996
 The City of Easthampton developed a new well (Nonotuck Well) to replace the Maloney Well
 capacity.. The Maloney well is, however, maintained as an active well, allowing Easthampton
 the flexibility to use the well on demand, as needed. Easthampton also uses several other wells
 (Hendricks Street wellfield, Pines Well and Brooks Street Well) and these wells provide
 adequate sources to allow the Maloney Well to be used only for active back-up

  Proposal

  The City ofNmthampton is pwposing to expand the Northampton landfill onto a parcel of land
  adjacent to and nmth of the existing landfill operation (see Conceptual Grading Plan) The
  expansion areas, designated as Phases 5 and 5B, were purchased by the City in 1988 for the
  purpose of the expansion.. The proposed Phase 5 area is 15.6 acres and the pwposed Phase SB
  area is 4J acres. The current permitted landfill is expected to run out of capacity at the end of
  2007 or early 2008 The proposed expansion area, including the area of overlap onto the existing
  landfill (an additional 9.5 acres) will provide an estimated gross volume (not including the
  volume taken up by the liner and cap) of2,237,000 cubic yards, which will provide 21 years of
   additional capacity at the cunent disposal rate.

   The applicant is requesting a waiver ofthe requirements of310 CMR 1640(3)(a)l and 10, with
   respect to the siting ofthe Phase 5 and 5B expansion areas in the Zone II of a public drinking




                                                    2
water well and within a Potentially Productive Aquifer. The existing landfill is also located
within the Zone II and the PP A

The Department reviewed several documents submitted as part ofthe site assignment application
with regard to the waiver request, including:
    • Northampton Landfill Sanitary Landfill Phase 5B, BWP SW 01 Site Suitability Report
       Volume 1: Technical Report
    • Northampton Landfill Sanitary Landfill Phase 5B, BWP SW 01 Site Suitability Report
        Volume 2: Appendices
    • Northampton Landfill Phase 5 Expansion Contaminant Transport Scope of Work
    • Summary Report on Contaminant Transport Model, Northampton Sanitary Landfill Phase
        5 Expansion Project
     • Letter dated June 6, 2006 fiom Stantec to MassDEP: Northampton Sanitary Landfill-
        Phase 5 Expansion, BWP SWOl Site Suitability Report Transmittal No . W016447-
        Supplemental Information
     • Letter dated June 12, 2006 from Stantec to MassDEP: Northampton Sanitary Landfill-
        Phase 5/5B Expansion, BWP SWOl Site Suitability Report Transmittal No . W074719-
        Supplemental Information

 Criteria for Granting a Waiver

 The Department has reviewed the waiver request submitted with the Site Assignment
 Application based upon the waiver criteria established in the Site Assignment Regulations at 310
 CMR 16.40(6).. Those regulations indicate that the Commissioner may waive a facility-specific
 site suitability criterion when the Commissioner finds that strict compliance with the criterion
 "would result in undue hardship and would not serve to minimize or avoid adverse impact."

  The regulations indicate that the Commissioner can only grant a waiver upon a finding that it "is
  necessary to accommodate an oveniding community, regional, or state public interest and the
  granting of the waiver would not diminish the level ofprotection to public health a:rrd safety and
  the environment"

  In reviewing a waiver request, the regulations also include a number of factors for consideration:
      • The availability of other suitable sites in the affected municipality or regional district;
                                                                                              1
       • Whether the site is in a prefened municipality as defined in M GL c.J 11, sl50A h;
       • The minimum facility size required to reasonably meet essential waste ha:rrdling
          activities;
       • Whether the waiver will result in environmental benefits in excess of those that could be
          achieved in the absence ofthe waiver;
        • The extent to which the proposed facility is part of an integrated solid waste management
          activity; and
        • Whether the solid waste ma:rragement objectives ofthe proposed project could be
           achieved in the absence of the waiver .

   Each of these factors is discussed in greater detail with regard specifically to the Northampton
   waiver r equt:st




                                                     3
1 . The availability of other suitable sites in the affected municipality or regional district

The Site Suitability Repmt, Volume 1 includes a detailed siting analysis, the intent of which was
to identify other suitable sites inN mthampton for a landfill that would meet all the siting criteria
for a suitably sized landfill capable of managing the amount of waste cunently disposed at the
Nmthampton LandfilL Because the landfill is owned by the City ofNmthampton, the analysis
only looks to identify other sites within Nmthampton. The results of this siting analysis indicate
that one area on the westem City line meets all the site suitability criteria . However, as indicated
 in the analysis, this location is zoned residentialmral and it is anticipated that there would be
 considerable opposition to siting a new landfill facility in that area because the area is
 undisturbed forest surrounded by residences The proposed Phase 5 and 5B expansion is
 proposed in a previously disturbed area that includes an old gravel pit adjacent to the existing
 landfill, which has been operating in this area for approximately 40 years.. Therefore, the City is
  of the opinion, and the Department concurs, that expansion of the existing facility is prefer able to
  constructing a new facility in a "greenfield" location

 On a regional basis, the Northampton Landfill pmvides valuable disposal capacity to numerous
 other communities At least 44 communities deliver residential and commercial solid waste to
 the Northampton landfill, .39 ofwhich have contractual agreements with the landfill 23 of those
 communities sent all of their municipal solid waste to the Nmthampton Landfill in 2004.
 If the Northampton Landfill were not to expand, this waste (47,631 tons in 2004) would need to
 be diverted to the other regional solid waste disposal facilities in the area. These facilities (The
 Pioneer Valley Resource Recovery Facility in Agawam, the S. Hadley landfill, the Chicopee
  landfill and the Granby landfill) are all operating at 01 near their permitted capacity.

 2.. Whether the site is in a prefeiTed municipality as defined in M.G.L. c.lll, sl50A1h

  The Solid Waste Act of 198 7, which established M.GL. c .111, sl50A 1h, encouraged the
  establishment of both regional solid waste disposal facilities and the siting of new facilities in
  municipalities that were not already served by another solid waste disposal facility. Therefore,
  site assigmnents are prefened in municipalities that are not already participating in a regional
  refuse disposal district

  This preference is not applicable to Nmthampton. The Nmthampton Landfill, which operates as
  a regional facility, serving numerous other municipalities, is an existing landfill seeking an
  expansion. It is not a new landfill being sited in a municipality with another landfill that already
  serves that municipality

   3. The minimum facility size reguired to reasonably meet essential waste handling activities

   The proposed expansion will add new capacity at the existing landfill and will provide sufficient
   new capacity to manage solid waste, at the cunently permitting capacity of 50,000 tons per year,
   for another 21 years




                                                       4
4. Whether the waiver will result in enviwnmental benefits in excess of those that could be
     achieved in the absence of the waiver

   The existing Nmthampton Landfill is located in the Zone II of the Maloney Well and in a
   Potentially Productive AquifeL The proposed landfill expansion will be more protective of
   groundwater than the existing landfill because a more stringent and protective standard liner
   design will be employed as a result of the recently revised solid waste management facility
   regulations and additional mitigation measmes will be employed. The mitigation measmes will
   improve protections fiom the existing landfill as well as provide further pwtections fm the
    aquifer These mitigation measmes fall into two categmies: those that are directly related to the
    construction and operation of the landfill; and those that will take place beyond the landfill In
    both cases, these mitigation measures will enhance pwtection of the Maloney well and the
    associated Zone II and Potentially Productive Aquifei In the absence of the waiver the
· -~ortharnpton Landfill will need to be closed and capped and it is unlikely that the mitigation
    measmes would be implemented.

   At the landfill, Nmtharilpton will be required to develop and obtain MassDEP approval of a
   contingency plan for specific actions that will be taken in the event that significant leachate is
   found in the secondary leachate collection system. The leachate collection system can function
   as an "early warning" system of potential leaks in the primary liner Having a contingency plan
   in place to address such a situation will allow for faster response by th!:> City should there be a
   pwblem with the liner. In addition, the City will upgrade the enviwnmental monitming system
   around the landfill by installing more monitming wells and set aside money in a MassDEP
    approved financial assurance mechanism, that can be used for remediation should there ever be a
   problem with the liner OJ leachate collection system

    Outside of the landfill, Nmthampton will need to adopt land use protection zoning and non-
    zoning controls for the N mthampton pmtion of the Maloney Well Zone II. These zoning and
    non-zoning controls are designed to pwtect public drinking water supplies by limiting the types
    of activities that can occur in a Zone II In addition, N mthampton will need to do further wmk to
    ensure household hazardous wastes are not disposed in the landfill. This will reduce the amount
    of potentially toxic materials disposed and promote better management, and in some cases
    recycling, of such materials.

     In the absence of a waiver, the Nmthampton Landfill will run out of capacity at cuuent filling
     rates in 200 7 or 2008. At that time, the landfill would be closed and capped, and all the
     municipalities that cunently use the landfill would need to seek altemative waste disposal
     options These mmicipalities would need to haul their solid waste to other solid waste facilities
     that are farther away than the Northampton Landfill, resulting in mme truck traffic and
      substantially longer haul distances with a consequent increase in air pollution .

     5. The extent to which the pwposed facilitY..i§. part of an integrated solid waste management
        activity

      The Northampton Landfill operates as part of an integrated solid waste management activity
      Through a Memorandum of Understanding (MOU) with .39 communities, it has established




                                                        5
requirements fen dive1ting Iecyclable materials and household hazmdous wastes from the
landfill In addition, the Landfill, w01king with regional waste management 01ganizations such
as the Hilltown Resomce Management Cooperative, the Franklin County Solid Waste
Management District and the Springfield Mateiials Recycling Facility Advis01y Bomd, has
wo1ked to reduce the aiTiount and toxicity of wastes disposed at the landfill

The MOU gumantees access to the landfill fen the communities fo1 a pe1iod of five yems as well
as establishing a ceiling tipping fee that can be I educed but not exceeded The MOU se1ves the
goal of integ~ated waste management by establishing restJictions and conditions fo1 use of the
landfill for disposal MOU communities must, fo1 example, ag~ee to establish, maintain and/01
regularly pmticipate in dive1sion prog~ams for unacceptable wastes and recyclable wastes to
keep them out of the landfilL The MOU requires all member communities to establish a
mandatory recycling ordinance and have access to at least one household hazmdous waste
 collection each yem. A summmy of mate1ials Iecycling access by community is provided in the
 site assignment application. F01 example, through regional coopemtion, the City and member
 communities have reciprocal household hazmdous waste collections, allowing residents of one
 community access to collection events in other communities.. Seveml othe1 exaiTiples of
 promotion ofintegmted waste management se1ving to maximize recycling and dive1sion of toxic
 mate1ials fiom the landfill are presented in Appendix K of the site assignment application. All of
 these actions se1ve to reduce the volume and toxicity of solid waste that must be disposed in the
 landfill and maximize the volume of solid waste 1ecycled 01 dive1ted to more approp1iate
 disposal options

 6. Whether the solid waste management objectives of the proposed project could be achieved in
    the absence of the waiver

 In the absence of the waive!, the existing peimitted area of the N01thaiTipton Landfill will Iun out
 of capacity in 2007 or 2008 At that time N01thampton and the communities that cunently use
 the landfill for disposal of then non-recyclable waste mateiials will need to seek other disposal
 options . Given the lack of sufficient disposal capacity in Massachusetts and the fact that most       •
 other facilities me already opemting at 01 nem then pe1mitted capacity . In addition, if the
 landfill cannot expand, the prograiTis put in place as a 1esult of the MOU and cooperation aiTiong
  the 1egional solid waste management distJicts (that has resulted in a high Iecycling mte and
  diversion of toxic mate1ials in these communities) could diminish as each community is 1equired
  to find a new solid waste management option with other disposal facilities

  By granting a waive! f01 the expansion of the N orthaiTipton landfill, the landfill will gain
  significant new capacity fo1 management of solid waste for the City and the othe1 municipalities
  that dispose of solid waste at the landfill, providing approximately 21 years of additional
  disposal capacity at the cuuently pe1mitted tonnage limit of 50,000 tons pe1 yem . The City also
  Iemains committed to continuing to work with its municipal customeis to maximize somce
  I eduction and recycling



   Decision




                                                    6
I have reviewed the waiver request submitted by the City ofNorthampton and hereby grant a
waiver that will allow the expansion of theN orthampton Landfill in the Zone II of the Maloney
Well and the Potentially Productive Aquifer. I find that strict compliance with the criterion
would result in undue hardship and would not serve to minimize or avoid adverse impact I also
find that the combination of land use controls, monitoring measmes and continued removal of
taxies fiom the waste stream will ensme that the Maloney Well can be used as a public water
 supply in the futme . Moreover, the granting of the waiver is necessary to accommodate an
 oveniding community, regional and state public interest and will not diminish the level of
 protection to public health, safety and the environment for the following reasons:
      • The contaminant transport model demonstrates that a release of contaminants fiom the
          landfill would be below cmrent detection limits at the welL The Northampton Landfill
          contaminant transport model indicates that even under the worst-case scenario, where
          contaminants are released to the groundwater in leachate, the concentrations of those
           contaminants would be diluted to levels below cmrent detection limits for Drinking
           Water Program analytical methods The model results indicate no measmable net impact
           at the welL As groundwater flows, the Northampton Landfill is approximately 22,000
           feet from the well.
       • Mitigation measmes or controls will provide greater protection for the Zone II and PP A
           than cmrently exists . Mitigation measmes must be employed that will not only provide
           further protection to the aquifer fiom the proposed expansion area, but will increase
            protection of the aquifer from the existing landfill These mitigation measmes include
            upgrading the environmental monitoring system at the landfill so as to better detect any
            contaminants that may come from the landfill; establishing a remediation financial
            assmance mechanism that could also be applied to remediation activities at the existing
            landfill; implementing zoning and non-zoning controls for the Northampton portion of
            the Zone II which will limit land uses and activities that could impair the Zone II; and
            expanding household hazardous waste collections in the communities served by the
            landfill, thereby reducing toxic materials fiom being disposed in the landfill
        • The fail me ofleachate collection systems is low for a landfill with a double-composite
             liner with a leak detection system. The likelihood of the worst-case scenario occuning is
             very low given that the expansion area will be required to have a double-composite liner
             with leak detection . Fmthermore, a site-specific "action leakage rate" will be developed
             dming the permitting process that will require specific actions to be taken should leakage
              above that rate occur through the primary liner. This serves as the fust level of
              monitming of the performance ofthe landfill In addition, the landfill environmental
              monitoring system will be upgraded.. This serves as the second level of monitoring of
              the performance of the landfill.
         • The Nmthampton Landfill is near capacity and there are few local options available
              Without the waiver, the Nmthampton Landfill will soon run out of capacity and will
              have to close This will require the City and the other municipalities that cunently
               dispose of solid waste in the landfill to have to seek other disposal options. Closme of
               the N mthampton Landfill will further reduce the available solid waste disposal options
               and capacity in Massachusetts and will likely result in an increase in expmt of solid
               waste to out of state facilities




                                                      7
• Other potential sources of contamination lie closer to the well The Northampton
  Landfill and the Maloney Well (the well for which the Zone II has been delineated) have
  co-existed since 1976 . The recent Zone II delineation for the Maloney Well captmes an
  existing condition which includes both the existing landfill area and the proposed
  expansion area of the Northampton Landfill, two closed landfills in Easthampton, and
  numerous other potential contaminant sources (i.e dry cleaners, cemeteries, gas stations,
  etc.) which likely present a greater concern than the proposed landfill expansion because
  these potential contaminant somces lie closer to the well than the Northampton Landfill .
• Mitigation measmes The City will be required to put in place several mitigation
  measmes as a condition of the waiver. These measmes, discussed above, include:
       o Leakage contingency plan
       o Upgrade the enviromnental monitoring system
       o Establish a remediation financial assmance mechanism
       o Put in place zoning and non-zoning controls in the Northampton portion of the
           Maloney Well zone II
       o Expand household hazardous waste collections for those municipalities served by
           the landfill




                                              8
--------




   BASE MAP FROM USGS EASTHAMPTON AND
   MT TOM   QUADRANGL~
                                                                                                 FIGURE 2-1

                                                   DEPARTMENT OF PUBLIC WORKS                  Project No.    9205015

                                                       SITE LOCUS                              Proj. Mgr.    J.LAURILA
                                                NORTHAMPTON LANDFILL AND                       Scale           1"~4000'
                                                EASTHAMPTON MALONEY WELL
Northampton, Massachusetts                                                                     Date            JULY05
     TeL {413)584-4776
 "'ww.dufresne-hemy rom           NORTHAMPTON                                   MASSACHUSEHS    A
3000   6000   9000 Feet
Geogr.~plllc Data is from   MassGIS ~ June 2006

Contenu connexe

Tendances

IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16Graeme Donaldson
 
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway AuthorityPositive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway AuthorityMarcellus Drilling News
 
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PAHarry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PAMichael Hewitt, GISP
 
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Michael Hewitt, GISP
 
Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...Alberto Asquer
 
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga CreekDRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga CreekMarcellus Drilling News
 
Max KroschelResume061715
Max KroschelResume061715Max KroschelResume061715
Max KroschelResume061715Max Kroschel
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesSMRPC
 
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Ecotist
 
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Michael Hewitt, GISP
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsFabio Brambilla
 
Greystones Harbour Presentation
Greystones Harbour PresentationGreystones Harbour Presentation
Greystones Harbour PresentationExSite
 
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarReview of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarEcotist
 
Chatham rolling knolls_3-15-10
Chatham rolling knolls_3-15-10Chatham rolling knolls_3-15-10
Chatham rolling knolls_3-15-10kundavertices
 

Tendances (20)

IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16
 
SPE-15101-PA
SPE-15101-PASPE-15101-PA
SPE-15101-PA
 
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway AuthorityPositive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
 
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PAHarry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
 
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
 
Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...Water infrastructure regulation in Italy: how does it work, does it work, and...
Water infrastructure regulation in Italy: how does it work, does it work, and...
 
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga CreekDRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
 
Max KroschelResume061715
Max KroschelResume061715Max KroschelResume061715
Max KroschelResume061715
 
Subwatershed Planning TMDLs
Subwatershed Planning TMDLsSubwatershed Planning TMDLs
Subwatershed Planning TMDLs
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Agenda meeting (1)
Agenda meeting (1)Agenda meeting (1)
Agenda meeting (1)
 
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
 
City Council June 7, 2011 Agenda Packet
City Council June 7, 2011 Agenda PacketCity Council June 7, 2011 Agenda Packet
City Council June 7, 2011 Agenda Packet
 
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
 
FONSI
FONSIFONSI
FONSI
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wells
 
Greystones Harbour Presentation
Greystones Harbour PresentationGreystones Harbour Presentation
Greystones Harbour Presentation
 
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarReview of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
 
Mississippi
MississippiMississippi
Mississippi
 
Chatham rolling knolls_3-15-10
Chatham rolling knolls_3-15-10Chatham rolling knolls_3-15-10
Chatham rolling knolls_3-15-10
 

Similaire à Northampton Landfill Waiver from DEP 06-23-2006

Enviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations RecsEnviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations RecsAndrea Drabicki
 
2 the mcmechan reservoir development
2 the mcmechan reservoir development2 the mcmechan reservoir development
2 the mcmechan reservoir developmentBARRY STANLEY 2 fasd
 
City of Winter Springs Mitigation Credits Purchase
City of Winter Springs Mitigation Credits PurchaseCity of Winter Springs Mitigation Credits Purchase
City of Winter Springs Mitigation Credits PurchaseVictoriaColangelo
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfBappy114
 
NATCL Biopile Management Plan Dec 2014 - IFU
NATCL  Biopile Management Plan Dec 2014 - IFUNATCL  Biopile Management Plan Dec 2014 - IFU
NATCL Biopile Management Plan Dec 2014 - IFUStacey O'Sullivan
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsAndrea Drabicki
 
US Magnesium LOV Ltr
US Magnesium LOV LtrUS Magnesium LOV Ltr
US Magnesium LOV LtrRic Cuchetto
 
Aldergrove Aquifer Issues
Aldergrove Aquifer IssuesAldergrove Aquifer Issues
Aldergrove Aquifer Issuesjgabateman
 
Fohh, planning for the future, tpb 19.5.14
Fohh, planning for the future, tpb 19.5.14Fohh, planning for the future, tpb 19.5.14
Fohh, planning for the future, tpb 19.5.14Kelly Chan
 
SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9Andrew Ackerman
 
Responses to New York District Corps of Engineers Review
Responses to New York District Corps of Engineers ReviewResponses to New York District Corps of Engineers Review
Responses to New York District Corps of Engineers ReviewQuogueBeaches
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockHoboken Resistance
 
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...StopHermosaBeachOil
 
Mountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental IssuesMountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental IssuesJacqueline Tkac
 

Similaire à Northampton Landfill Waiver from DEP 06-23-2006 (20)

Enviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations RecsEnviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations Recs
 
2 the mcmechan reservoir development
2 the mcmechan reservoir development2 the mcmechan reservoir development
2 the mcmechan reservoir development
 
City of Winter Springs Mitigation Credits Purchase
City of Winter Springs Mitigation Credits PurchaseCity of Winter Springs Mitigation Credits Purchase
City of Winter Springs Mitigation Credits Purchase
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
 
NATCL Biopile Management Plan Dec 2014 - IFU
NATCL  Biopile Management Plan Dec 2014 - IFUNATCL  Biopile Management Plan Dec 2014 - IFU
NATCL Biopile Management Plan Dec 2014 - IFU
 
Kentucky
KentuckyKentucky
Kentucky
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation Recommendaitons
 
US Magnesium LOV Ltr
US Magnesium LOV LtrUS Magnesium LOV Ltr
US Magnesium LOV Ltr
 
Aldergrove Aquifer Issues
Aldergrove Aquifer IssuesAldergrove Aquifer Issues
Aldergrove Aquifer Issues
 
Missouri
MissouriMissouri
Missouri
 
Fohh, planning for the future, tpb 19.5.14
Fohh, planning for the future, tpb 19.5.14Fohh, planning for the future, tpb 19.5.14
Fohh, planning for the future, tpb 19.5.14
 
West virginia
West virginiaWest virginia
West virginia
 
SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9
 
19529
1952919529
19529
 
Gravel pits sept_2010
Gravel pits sept_2010Gravel pits sept_2010
Gravel pits sept_2010
 
Responses to New York District Corps of Engineers Review
Responses to New York District Corps of Engineers ReviewResponses to New York District Corps of Engineers Review
Responses to New York District Corps of Engineers Review
 
Kentucky
KentuckyKentucky
Kentucky
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
 
Mountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental IssuesMountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental Issues
 

Plus de Adam Cohen

Owen Freeman-Daniels Campaign Brochure - July 2011 #1
Owen Freeman-Daniels Campaign Brochure - July 2011 #1Owen Freeman-Daniels Campaign Brochure - July 2011 #1
Owen Freeman-Daniels Campaign Brochure - July 2011 #1Adam Cohen
 
Owen Freeman-Daniels Campaign Brochure - July 2011 #2
Owen Freeman-Daniels Campaign Brochure - July 2011 #2Owen Freeman-Daniels Campaign Brochure - July 2011 #2
Owen Freeman-Daniels Campaign Brochure - July 2011 #2Adam Cohen
 
Arnie Levinson Campaign Brochure - May 2011
Arnie Levinson Campaign Brochure - May 2011Arnie Levinson Campaign Brochure - May 2011
Arnie Levinson Campaign Brochure - May 2011Adam Cohen
 
Arnie Levinson Debate Flyer - July 2011
Arnie Levinson Debate Flyer - July 2011Arnie Levinson Debate Flyer - July 2011
Arnie Levinson Debate Flyer - July 2011Adam Cohen
 
Owen Freeman-Daniels Campaign Brochure May 2011
Owen Freeman-Daniels Campaign Brochure May 2011Owen Freeman-Daniels Campaign Brochure May 2011
Owen Freeman-Daniels Campaign Brochure May 2011Adam Cohen
 
Arnie Levinson Campaign Brochure May 2011
Arnie Levinson Campaign Brochure May 2011Arnie Levinson Campaign Brochure May 2011
Arnie Levinson Campaign Brochure May 2011Adam Cohen
 
2011 Ward 3 Special Election Calendar
2011 Ward 3 Special Election Calendar2011 Ward 3 Special Election Calendar
2011 Ward 3 Special Election CalendarAdam Cohen
 
Lisa Fusco Campaign Flyer 2011 April
Lisa Fusco Campaign Flyer 2011 AprilLisa Fusco Campaign Flyer 2011 April
Lisa Fusco Campaign Flyer 2011 AprilAdam Cohen
 
Transition Northampton Event 21 April 2011
Transition Northampton Event 21 April 2011Transition Northampton Event 21 April 2011
Transition Northampton Event 21 April 2011Adam Cohen
 
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011Adam Cohen
 
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011Adam Cohen
 
Contact Information for Our State Legislators
Contact Information for Our State LegislatorsContact Information for Our State Legislators
Contact Information for Our State LegislatorsAdam Cohen
 
Summary of Northampton Budget FY2012 as of 31 March 2011
Summary of Northampton Budget FY2012 as of 31 March 2011Summary of Northampton Budget FY2012 as of 31 March 2011
Summary of Northampton Budget FY2012 as of 31 March 2011Adam Cohen
 
Northampton Budget Trends 2000 to 2011
Northampton Budget Trends 2000 to 2011Northampton Budget Trends 2000 to 2011
Northampton Budget Trends 2000 to 2011Adam Cohen
 
Northampton Budget FY2012 as of 31 March 2011
Northampton Budget FY2012 as of 31 March 2011Northampton Budget FY2012 as of 31 March 2011
Northampton Budget FY2012 as of 31 March 2011Adam Cohen
 
Memo Reprecincting Committee 29 March 2011
Memo Reprecincting Committee 29 March 2011Memo Reprecincting Committee 29 March 2011
Memo Reprecincting Committee 29 March 2011Adam Cohen
 
Zoning Changes Proposal Detail 28 March 2011
Zoning Changes Proposal Detail 28 March 2011Zoning Changes Proposal Detail 28 March 2011
Zoning Changes Proposal Detail 28 March 2011Adam Cohen
 
SWTF Minutes 14 March 2011 Final Draft
SWTF Minutes 14 March 2011 Final DraftSWTF Minutes 14 March 2011 Final Draft
SWTF Minutes 14 March 2011 Final DraftAdam Cohen
 
North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011Adam Cohen
 
Main Street King Street Charrette Final Presentation
Main Street King Street Charrette Final PresentationMain Street King Street Charrette Final Presentation
Main Street King Street Charrette Final PresentationAdam Cohen
 

Plus de Adam Cohen (20)

Owen Freeman-Daniels Campaign Brochure - July 2011 #1
Owen Freeman-Daniels Campaign Brochure - July 2011 #1Owen Freeman-Daniels Campaign Brochure - July 2011 #1
Owen Freeman-Daniels Campaign Brochure - July 2011 #1
 
Owen Freeman-Daniels Campaign Brochure - July 2011 #2
Owen Freeman-Daniels Campaign Brochure - July 2011 #2Owen Freeman-Daniels Campaign Brochure - July 2011 #2
Owen Freeman-Daniels Campaign Brochure - July 2011 #2
 
Arnie Levinson Campaign Brochure - May 2011
Arnie Levinson Campaign Brochure - May 2011Arnie Levinson Campaign Brochure - May 2011
Arnie Levinson Campaign Brochure - May 2011
 
Arnie Levinson Debate Flyer - July 2011
Arnie Levinson Debate Flyer - July 2011Arnie Levinson Debate Flyer - July 2011
Arnie Levinson Debate Flyer - July 2011
 
Owen Freeman-Daniels Campaign Brochure May 2011
Owen Freeman-Daniels Campaign Brochure May 2011Owen Freeman-Daniels Campaign Brochure May 2011
Owen Freeman-Daniels Campaign Brochure May 2011
 
Arnie Levinson Campaign Brochure May 2011
Arnie Levinson Campaign Brochure May 2011Arnie Levinson Campaign Brochure May 2011
Arnie Levinson Campaign Brochure May 2011
 
2011 Ward 3 Special Election Calendar
2011 Ward 3 Special Election Calendar2011 Ward 3 Special Election Calendar
2011 Ward 3 Special Election Calendar
 
Lisa Fusco Campaign Flyer 2011 April
Lisa Fusco Campaign Flyer 2011 AprilLisa Fusco Campaign Flyer 2011 April
Lisa Fusco Campaign Flyer 2011 April
 
Transition Northampton Event 21 April 2011
Transition Northampton Event 21 April 2011Transition Northampton Event 21 April 2011
Transition Northampton Event 21 April 2011
 
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
 
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
Gateways Beautification Committee Meeting 01 Minutes 05 April 2011
 
Contact Information for Our State Legislators
Contact Information for Our State LegislatorsContact Information for Our State Legislators
Contact Information for Our State Legislators
 
Summary of Northampton Budget FY2012 as of 31 March 2011
Summary of Northampton Budget FY2012 as of 31 March 2011Summary of Northampton Budget FY2012 as of 31 March 2011
Summary of Northampton Budget FY2012 as of 31 March 2011
 
Northampton Budget Trends 2000 to 2011
Northampton Budget Trends 2000 to 2011Northampton Budget Trends 2000 to 2011
Northampton Budget Trends 2000 to 2011
 
Northampton Budget FY2012 as of 31 March 2011
Northampton Budget FY2012 as of 31 March 2011Northampton Budget FY2012 as of 31 March 2011
Northampton Budget FY2012 as of 31 March 2011
 
Memo Reprecincting Committee 29 March 2011
Memo Reprecincting Committee 29 March 2011Memo Reprecincting Committee 29 March 2011
Memo Reprecincting Committee 29 March 2011
 
Zoning Changes Proposal Detail 28 March 2011
Zoning Changes Proposal Detail 28 March 2011Zoning Changes Proposal Detail 28 March 2011
Zoning Changes Proposal Detail 28 March 2011
 
SWTF Minutes 14 March 2011 Final Draft
SWTF Minutes 14 March 2011 Final DraftSWTF Minutes 14 March 2011 Final Draft
SWTF Minutes 14 March 2011 Final Draft
 
North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011
 
Main Street King Street Charrette Final Presentation
Main Street King Street Charrette Final PresentationMain Street King Street Charrette Final Presentation
Main Street King Street Charrette Final Presentation
 

Dernier

Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership AwardN. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Awardsrinuseo15
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Dernier (20)

Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership AwardN. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 

Northampton Landfill Waiver from DEP 06-23-2006

  • 1. COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION ONE WINTER STREET, BOSTON, MA 02108 617··292·5500 MITT ROMNEY STEPHEN R. PRITCHARD Governor Secretary KERRY HEALEY ROBERT W. GOLLEDGE, Jr Lieutenant Governor Commissioner MEMORANDUM To: Steve Ellis, Actin~Regir, WRO · From: Bob Golledge, Co er Date: June 23, 2006 ·==- -..·--··--- · RE: Approval of Waiver Request, Northampton Landfill Application for Expansion, Northampton, Massachusetts (Transmittal #s W016447 and W074719) The City of Northampton has submitted a site assignment application to the Department for a proposed lateral expansion of the existing municipal landfill. As part of the site assignment application, the proponent is asking for a waiver from the siting criteria for Zone lis at 310 CMR l6..40(3)(a)1, arrd Potentially Productive Aquifers (PPA) at 310 CMR 16A0(3)(a)l 0. The specific regulatory requirements are as follows: (3) Facility .Specific Site Suitability Criteria . (a) Criteria for Landfill Facilities (Restricted Areasl. No site shall be determined to be suitable or be assigned as a landfill facility where: 1 . any area of waste deposition would be within a Zone II area of an existing public water supply well; 10.. any area o:fwaste deposition would be within a Potentially Productive Aquifer unless: a. the proponent demonstrates to the Department's satisfaction, based on hydrogeological studies, that the designation ofthe ar·ea as a potentially productive aquifer is incorrect; b the proponent demonstrates to the Department's satisfaction, based on hydrogeological studies, that the aquifer cannot now, nor in the reasonably foreseeable futrue, be used as a public water supply due to existing contamination ofthe aquifer; or c the area has been excluded as a "Non-Potential Drinking Water Somce Area" pursuant to 310 CMR 40.0932, or as otherwise defined at 310 CMR 40.0006: TheMassachusetts Contingency Plan. The Site Assignment Regulations at 310 CMR 16 40( 6) govern the waiver pmcess Ibis information is available in alternate format Call Donald M. Gomes, ADA Coordinator· at 61'7·556-1057, IDD Service -1-800-298-2207 MassDEP on the World Wide Web: http:l/www mass gov/dep ( ) Printed on Recycled Paper
  • 2. Background The City ofNmthampton commenced landfill operations at the Glendale Road site in the 1960's (see Site Locus Map). The City of Easthampton permitted the Maloney Well through the MassDEP Division of Water Supply in 1976. Throughout the 1990's the City ofNmthampton received permits for lined expansions of the Nmthampton landfill at the existing site. The landfill cunently accepts municipal solid waste from numerous communities in the region On August 2, 2001 the Department, as part of the Source Water Assessment Program (SWAP), approved a conceptual Zone II delineation for the Maloney Well in Easthampton that encompasses both the existing Nmthampton Landfill and the proposed expansion Additionally, a number of existing land uses in Easthampton are within the Zone II and pose a potential threat to the well, including two closed Easthampton landfills which lie between the Nmthampton Landfill and the well. The Maloney Well is located within the Barnes Aquifer, a very extensive buried valley, sand and gravel aquifer extending from the Westfield River in the south to Nmthampton The nmthem pmtion of the Barnes Aquifer consists of three "lobes", the east and west lobes flowing north toward the center of Easthampton and the nmthwest lobe flowing southeast toward the center of Easthampton and then east/nmtheast toward the Maloney Well and the Connecticut River (see Maloney Well Watershed map and Hydrogeologic Features map) The Northampton Landfill is located in the nmthwest "lobe" The landfill is located approximately 16,000 feet west of the Maloney Well, but approximately 22,000 feet along the groundwater flow path. The Maloney Well is located down gradient of the confluence of the three lobes. The Maloney Well is a free flowing artesian (confined), gravel developed well, installed in 1975 . Due to elevated manganese concentrations, the well has not been used since November 1996 The City of Easthampton developed a new well (Nonotuck Well) to replace the Maloney Well capacity.. The Maloney well is, however, maintained as an active well, allowing Easthampton the flexibility to use the well on demand, as needed. Easthampton also uses several other wells (Hendricks Street wellfield, Pines Well and Brooks Street Well) and these wells provide adequate sources to allow the Maloney Well to be used only for active back-up Proposal The City ofNmthampton is pwposing to expand the Northampton landfill onto a parcel of land adjacent to and nmth of the existing landfill operation (see Conceptual Grading Plan) The expansion areas, designated as Phases 5 and 5B, were purchased by the City in 1988 for the purpose of the expansion.. The proposed Phase 5 area is 15.6 acres and the pwposed Phase SB area is 4J acres. The current permitted landfill is expected to run out of capacity at the end of 2007 or early 2008 The proposed expansion area, including the area of overlap onto the existing landfill (an additional 9.5 acres) will provide an estimated gross volume (not including the volume taken up by the liner and cap) of2,237,000 cubic yards, which will provide 21 years of additional capacity at the cunent disposal rate. The applicant is requesting a waiver ofthe requirements of310 CMR 1640(3)(a)l and 10, with respect to the siting ofthe Phase 5 and 5B expansion areas in the Zone II of a public drinking 2
  • 3. water well and within a Potentially Productive Aquifer. The existing landfill is also located within the Zone II and the PP A The Department reviewed several documents submitted as part ofthe site assignment application with regard to the waiver request, including: • Northampton Landfill Sanitary Landfill Phase 5B, BWP SW 01 Site Suitability Report Volume 1: Technical Report • Northampton Landfill Sanitary Landfill Phase 5B, BWP SW 01 Site Suitability Report Volume 2: Appendices • Northampton Landfill Phase 5 Expansion Contaminant Transport Scope of Work • Summary Report on Contaminant Transport Model, Northampton Sanitary Landfill Phase 5 Expansion Project • Letter dated June 6, 2006 fiom Stantec to MassDEP: Northampton Sanitary Landfill- Phase 5 Expansion, BWP SWOl Site Suitability Report Transmittal No . W016447- Supplemental Information • Letter dated June 12, 2006 from Stantec to MassDEP: Northampton Sanitary Landfill- Phase 5/5B Expansion, BWP SWOl Site Suitability Report Transmittal No . W074719- Supplemental Information Criteria for Granting a Waiver The Department has reviewed the waiver request submitted with the Site Assignment Application based upon the waiver criteria established in the Site Assignment Regulations at 310 CMR 16.40(6).. Those regulations indicate that the Commissioner may waive a facility-specific site suitability criterion when the Commissioner finds that strict compliance with the criterion "would result in undue hardship and would not serve to minimize or avoid adverse impact." The regulations indicate that the Commissioner can only grant a waiver upon a finding that it "is necessary to accommodate an oveniding community, regional, or state public interest and the granting of the waiver would not diminish the level ofprotection to public health a:rrd safety and the environment" In reviewing a waiver request, the regulations also include a number of factors for consideration: • The availability of other suitable sites in the affected municipality or regional district; 1 • Whether the site is in a prefened municipality as defined in M GL c.J 11, sl50A h; • The minimum facility size required to reasonably meet essential waste ha:rrdling activities; • Whether the waiver will result in environmental benefits in excess of those that could be achieved in the absence ofthe waiver; • The extent to which the proposed facility is part of an integrated solid waste management activity; and • Whether the solid waste ma:rragement objectives ofthe proposed project could be achieved in the absence of the waiver . Each of these factors is discussed in greater detail with regard specifically to the Northampton waiver r equt:st 3
  • 4. 1 . The availability of other suitable sites in the affected municipality or regional district The Site Suitability Repmt, Volume 1 includes a detailed siting analysis, the intent of which was to identify other suitable sites inN mthampton for a landfill that would meet all the siting criteria for a suitably sized landfill capable of managing the amount of waste cunently disposed at the Nmthampton LandfilL Because the landfill is owned by the City ofNmthampton, the analysis only looks to identify other sites within Nmthampton. The results of this siting analysis indicate that one area on the westem City line meets all the site suitability criteria . However, as indicated in the analysis, this location is zoned residentialmral and it is anticipated that there would be considerable opposition to siting a new landfill facility in that area because the area is undisturbed forest surrounded by residences The proposed Phase 5 and 5B expansion is proposed in a previously disturbed area that includes an old gravel pit adjacent to the existing landfill, which has been operating in this area for approximately 40 years.. Therefore, the City is of the opinion, and the Department concurs, that expansion of the existing facility is prefer able to constructing a new facility in a "greenfield" location On a regional basis, the Northampton Landfill pmvides valuable disposal capacity to numerous other communities At least 44 communities deliver residential and commercial solid waste to the Northampton landfill, .39 ofwhich have contractual agreements with the landfill 23 of those communities sent all of their municipal solid waste to the Nmthampton Landfill in 2004. If the Northampton Landfill were not to expand, this waste (47,631 tons in 2004) would need to be diverted to the other regional solid waste disposal facilities in the area. These facilities (The Pioneer Valley Resource Recovery Facility in Agawam, the S. Hadley landfill, the Chicopee landfill and the Granby landfill) are all operating at 01 near their permitted capacity. 2.. Whether the site is in a prefeiTed municipality as defined in M.G.L. c.lll, sl50A1h The Solid Waste Act of 198 7, which established M.GL. c .111, sl50A 1h, encouraged the establishment of both regional solid waste disposal facilities and the siting of new facilities in municipalities that were not already served by another solid waste disposal facility. Therefore, site assigmnents are prefened in municipalities that are not already participating in a regional refuse disposal district This preference is not applicable to Nmthampton. The Nmthampton Landfill, which operates as a regional facility, serving numerous other municipalities, is an existing landfill seeking an expansion. It is not a new landfill being sited in a municipality with another landfill that already serves that municipality 3. The minimum facility size reguired to reasonably meet essential waste handling activities The proposed expansion will add new capacity at the existing landfill and will provide sufficient new capacity to manage solid waste, at the cunently permitting capacity of 50,000 tons per year, for another 21 years 4
  • 5. 4. Whether the waiver will result in enviwnmental benefits in excess of those that could be achieved in the absence of the waiver The existing Nmthampton Landfill is located in the Zone II of the Maloney Well and in a Potentially Productive AquifeL The proposed landfill expansion will be more protective of groundwater than the existing landfill because a more stringent and protective standard liner design will be employed as a result of the recently revised solid waste management facility regulations and additional mitigation measmes will be employed. The mitigation measmes will improve protections fiom the existing landfill as well as provide further pwtections fm the aquifer These mitigation measmes fall into two categmies: those that are directly related to the construction and operation of the landfill; and those that will take place beyond the landfill In both cases, these mitigation measures will enhance pwtection of the Maloney well and the associated Zone II and Potentially Productive Aquifei In the absence of the waiver the · -~ortharnpton Landfill will need to be closed and capped and it is unlikely that the mitigation measmes would be implemented. At the landfill, Nmtharilpton will be required to develop and obtain MassDEP approval of a contingency plan for specific actions that will be taken in the event that significant leachate is found in the secondary leachate collection system. The leachate collection system can function as an "early warning" system of potential leaks in the primary liner Having a contingency plan in place to address such a situation will allow for faster response by th!:> City should there be a pwblem with the liner. In addition, the City will upgrade the enviwnmental monitming system around the landfill by installing more monitming wells and set aside money in a MassDEP approved financial assurance mechanism, that can be used for remediation should there ever be a problem with the liner OJ leachate collection system Outside of the landfill, Nmthampton will need to adopt land use protection zoning and non- zoning controls for the N mthampton pmtion of the Maloney Well Zone II. These zoning and non-zoning controls are designed to pwtect public drinking water supplies by limiting the types of activities that can occur in a Zone II In addition, N mthampton will need to do further wmk to ensure household hazardous wastes are not disposed in the landfill. This will reduce the amount of potentially toxic materials disposed and promote better management, and in some cases recycling, of such materials. In the absence of a waiver, the Nmthampton Landfill will run out of capacity at cuuent filling rates in 200 7 or 2008. At that time, the landfill would be closed and capped, and all the municipalities that cunently use the landfill would need to seek altemative waste disposal options These mmicipalities would need to haul their solid waste to other solid waste facilities that are farther away than the Northampton Landfill, resulting in mme truck traffic and substantially longer haul distances with a consequent increase in air pollution . 5. The extent to which the pwposed facilitY..i§. part of an integrated solid waste management activity The Northampton Landfill operates as part of an integrated solid waste management activity Through a Memorandum of Understanding (MOU) with .39 communities, it has established 5
  • 6. requirements fen dive1ting Iecyclable materials and household hazmdous wastes from the landfill In addition, the Landfill, w01king with regional waste management 01ganizations such as the Hilltown Resomce Management Cooperative, the Franklin County Solid Waste Management District and the Springfield Mateiials Recycling Facility Advis01y Bomd, has wo1ked to reduce the aiTiount and toxicity of wastes disposed at the landfill The MOU gumantees access to the landfill fen the communities fo1 a pe1iod of five yems as well as establishing a ceiling tipping fee that can be I educed but not exceeded The MOU se1ves the goal of integ~ated waste management by establishing restJictions and conditions fo1 use of the landfill for disposal MOU communities must, fo1 example, ag~ee to establish, maintain and/01 regularly pmticipate in dive1sion prog~ams for unacceptable wastes and recyclable wastes to keep them out of the landfilL The MOU requires all member communities to establish a mandatory recycling ordinance and have access to at least one household hazmdous waste collection each yem. A summmy of mate1ials Iecycling access by community is provided in the site assignment application. F01 example, through regional coopemtion, the City and member communities have reciprocal household hazmdous waste collections, allowing residents of one community access to collection events in other communities.. Seveml othe1 exaiTiples of promotion ofintegmted waste management se1ving to maximize recycling and dive1sion of toxic mate1ials fiom the landfill are presented in Appendix K of the site assignment application. All of these actions se1ve to reduce the volume and toxicity of solid waste that must be disposed in the landfill and maximize the volume of solid waste 1ecycled 01 dive1ted to more approp1iate disposal options 6. Whether the solid waste management objectives of the proposed project could be achieved in the absence of the waiver In the absence of the waive!, the existing peimitted area of the N01thaiTipton Landfill will Iun out of capacity in 2007 or 2008 At that time N01thampton and the communities that cunently use the landfill for disposal of then non-recyclable waste mateiials will need to seek other disposal options . Given the lack of sufficient disposal capacity in Massachusetts and the fact that most • other facilities me already opemting at 01 nem then pe1mitted capacity . In addition, if the landfill cannot expand, the prograiTis put in place as a 1esult of the MOU and cooperation aiTiong the 1egional solid waste management distJicts (that has resulted in a high Iecycling mte and diversion of toxic mate1ials in these communities) could diminish as each community is 1equired to find a new solid waste management option with other disposal facilities By granting a waive! f01 the expansion of the N orthaiTipton landfill, the landfill will gain significant new capacity fo1 management of solid waste for the City and the othe1 municipalities that dispose of solid waste at the landfill, providing approximately 21 years of additional disposal capacity at the cuuently pe1mitted tonnage limit of 50,000 tons pe1 yem . The City also Iemains committed to continuing to work with its municipal customeis to maximize somce I eduction and recycling Decision 6
  • 7. I have reviewed the waiver request submitted by the City ofNorthampton and hereby grant a waiver that will allow the expansion of theN orthampton Landfill in the Zone II of the Maloney Well and the Potentially Productive Aquifer. I find that strict compliance with the criterion would result in undue hardship and would not serve to minimize or avoid adverse impact I also find that the combination of land use controls, monitoring measmes and continued removal of taxies fiom the waste stream will ensme that the Maloney Well can be used as a public water supply in the futme . Moreover, the granting of the waiver is necessary to accommodate an oveniding community, regional and state public interest and will not diminish the level of protection to public health, safety and the environment for the following reasons: • The contaminant transport model demonstrates that a release of contaminants fiom the landfill would be below cmrent detection limits at the welL The Northampton Landfill contaminant transport model indicates that even under the worst-case scenario, where contaminants are released to the groundwater in leachate, the concentrations of those contaminants would be diluted to levels below cmrent detection limits for Drinking Water Program analytical methods The model results indicate no measmable net impact at the welL As groundwater flows, the Northampton Landfill is approximately 22,000 feet from the well. • Mitigation measmes or controls will provide greater protection for the Zone II and PP A than cmrently exists . Mitigation measmes must be employed that will not only provide further protection to the aquifer fiom the proposed expansion area, but will increase protection of the aquifer from the existing landfill These mitigation measmes include upgrading the environmental monitoring system at the landfill so as to better detect any contaminants that may come from the landfill; establishing a remediation financial assmance mechanism that could also be applied to remediation activities at the existing landfill; implementing zoning and non-zoning controls for the Northampton portion of the Zone II which will limit land uses and activities that could impair the Zone II; and expanding household hazardous waste collections in the communities served by the landfill, thereby reducing toxic materials fiom being disposed in the landfill • The fail me ofleachate collection systems is low for a landfill with a double-composite liner with a leak detection system. The likelihood of the worst-case scenario occuning is very low given that the expansion area will be required to have a double-composite liner with leak detection . Fmthermore, a site-specific "action leakage rate" will be developed dming the permitting process that will require specific actions to be taken should leakage above that rate occur through the primary liner. This serves as the fust level of monitming of the performance ofthe landfill In addition, the landfill environmental monitoring system will be upgraded.. This serves as the second level of monitoring of the performance of the landfill. • The Nmthampton Landfill is near capacity and there are few local options available Without the waiver, the Nmthampton Landfill will soon run out of capacity and will have to close This will require the City and the other municipalities that cunently dispose of solid waste in the landfill to have to seek other disposal options. Closme of the N mthampton Landfill will further reduce the available solid waste disposal options and capacity in Massachusetts and will likely result in an increase in expmt of solid waste to out of state facilities 7
  • 8. • Other potential sources of contamination lie closer to the well The Northampton Landfill and the Maloney Well (the well for which the Zone II has been delineated) have co-existed since 1976 . The recent Zone II delineation for the Maloney Well captmes an existing condition which includes both the existing landfill area and the proposed expansion area of the Northampton Landfill, two closed landfills in Easthampton, and numerous other potential contaminant sources (i.e dry cleaners, cemeteries, gas stations, etc.) which likely present a greater concern than the proposed landfill expansion because these potential contaminant somces lie closer to the well than the Northampton Landfill . • Mitigation measmes The City will be required to put in place several mitigation measmes as a condition of the waiver. These measmes, discussed above, include: o Leakage contingency plan o Upgrade the enviromnental monitoring system o Establish a remediation financial assmance mechanism o Put in place zoning and non-zoning controls in the Northampton portion of the Maloney Well zone II o Expand household hazardous waste collections for those municipalities served by the landfill 8
  • 9. -------- BASE MAP FROM USGS EASTHAMPTON AND MT TOM QUADRANGL~ FIGURE 2-1 DEPARTMENT OF PUBLIC WORKS Project No. 9205015 SITE LOCUS Proj. Mgr. J.LAURILA NORTHAMPTON LANDFILL AND Scale 1"~4000' EASTHAMPTON MALONEY WELL Northampton, Massachusetts Date JULY05 TeL {413)584-4776 "'ww.dufresne-hemy rom NORTHAMPTON MASSACHUSEHS A
  • 10. 3000 6000 9000 Feet Geogr.~plllc Data is from MassGIS ~ June 2006