7. Business vs System metrics We already have many “system” metrics from Mgt Systems, CMDBs etc But these metrics will “influence” the business metrics (and visa-versa) … i.e. Performance/ Availability of the Services affects Service Penalties
8.
9.
10.
11.
12. Technical Model 2 POP sites Single Voice Switch. Note: We can model as granularly as we like. Here just Call Agents are shown. Generic Customer Sites
13. In 3D Colour, shape and size can all be used to help understand complexity
14. Business Model Workflows – Imply that Signalling Messages are sent Actions performed during Call Flow Dataflows – Imply that media stream is sent/received Implemented By Devices in Physical Model
17. As-Is+ Results: Performance However, increasing users by 35% results in signalling messages missing deadlines and experiencing jitter Media flow packets come close to missing deadlines, and experience increased jitter
18.
19.
20. Evolution 2 Results: Performance Addition of POP Sites (including additional media proxies) allows media streams to meet deadlines Two Voice Switches allow signalling messages from 135% users to be handled within deadlines
21. Overall Results: The one ABACUS model contains all 4 architectures Allows unique comparative / trade-off analysis
22. Conclusions: Capability Space Diagram Response Time “blow-out” for As-Is+ and To-Be 1 To-Be 2 is significantly more Complex Is Cost within budget?