Controlling Project Costs                         10/26/2012
SoTecConference 2012




                Controlling Project Costs

                        Jon Grunzweig
                   Vision Business Systems

              Leading IT to Business Excellence




Jon Grunzweig                                             1
Controlling Project Costs                                   10/26/2012
SoTecConference 2012




                       Ever Happen?
          • Great project plan, good resources, design
          • Before you know it…..
            – Delivery date slipping
            – Going over budget
          • Project keeps going along
            – Start ignoring the budget, so far overspent
            – Timeline goes into oblivion…




                        Shuttle Route




                 Endeavor’s Last Mission
          • Great preparation
            Things happen….




          • $$




Jon Grunzweig                                                       2
Controlling Project Costs               10/26/2012
SoTecConference 2012




                 Credibility Issues….




                Blame game starts……




                  Which leads to…….




Jon Grunzweig                                   3
Controlling Project Costs                                      10/26/2012
SoTecConference 2012




                               Why ?
          •   Many moving parts (very few fixed parts)
          •   Circumstances occur different
          •   Things left out / Estimates incomplete
          •   Poor cooperation within business, people
          •   Events and changes
          •   Issues with service providers
          •   Outside uncontrolled events
          •   Unknowns….




                          Most Projects
          •   Predictability
          •   Been done, or very similar (not one of a kind)
          •   Experienced resources
          •   Therefore:
              – Should be on time and on schedule
                (or very near)




                   What’s the disconnect?
          • Good plan, design, resources, project mgt

              but……..

          • Poor alignment of Accountability Cycle
          • Poor hours accountability
          • Elements unplanned for




Jon Grunzweig                                                          4
Controlling Project Costs                             10/26/2012
SoTecConference 2012




                    Our focus today….
          • Alignment of Accountability Cycle
          • Accountability of hours
          • Areas short-changed in estimates




                Foundation for Control
                        Project Execution Cycle

                    Project Planning & Agreements

                  Governance & Project Management

                    Contract & Vendor Management
                     Methodologies & Processes:
                    Design, Project, Change Control
                    Technology Vision and Strategy




              Spend & Execution Cycles
                          Spend         Execution
                      Authority Cycle     Cycle


                                          Project
                           Budgets
                                          Plans


                                        Timesheets/
                          Proposals
                                           Billing


                                          Status
                           SOWs
                                         Reporting




Jon Grunzweig                                                 5
Controlling Project Costs                                                                                     10/26/2012
SoTecConference 2012




                                Accountability Cycle
                                                            Methodology



                                       Status
                                                                                      Proposals
                                      Reporting




                                  Billing                                                   SOW’s




                                                                          Project Plan /
                                              Time Sheets
                                                                               Est




                          Accountability Alignment

                                Prop         SOW               Plan Time Invoice Status
        Total                     120          120               120   90    70    130

        Task 1                      40                 40             40                   30       20   35
        Task 2                      80                 80             80                   60       50   95




                                Accountability Hours

                        How Much ---> A                 B                 C

                                                                  Remain
                                            Plan Actual             A-B
                        Total                120    90                 30
          <----- What




                        Task 1 Rsc 1              40         30                10
                        Task 2 Rsc 2              80         60                20




Jon Grunzweig                                                                                                         6
Controlling Project Costs                                                          10/26/2012
SoTecConference 2012




                                 Accountability Hours – Plan

                                How Much ---> A            B  C
                                                           Remain
                                                            (Plan -
                                                Plan Actual Act)
                                Total            120    90      30
                  <----- What




                                Task 1 Rsc 1      40           30        10
                                Task 2 Rsc 2      80           60        20




                                Accountability Hours – Actual

                                How Much ---> A        B      C
                                                          Remain
                                                           (Plan -
                                               Plan Actual Act)
                                Total           120    90       30
               <----- What




                                Task 1 Rsc 1     40        30       10
                                Task 2 Rsc 2     80        60       20




                                  Accountability Hours - ETC

                             How Much ---> A           B     C     D
                                                          Remain
                                                           (Plan -
                                               Plan Actual Act) ETC
                             Total              120    90      30 40
         <----- What




                             Task 1 Rsc 1        40        30        10        5
                             Task 2 Rsc 2        80        60        20       35




Jon Grunzweig                                                                              7
Controlling Project Costs                                                                10/26/2012
SoTecConference 2012




                         Accountability Hours – Proj Total

                         How Much ---> A       B        C     E  D  F  G
                                                             Proj
                                                   Remain    Total Var
                                        Plan Actual A-B ETC B+D A-E Billing
                         Total           120    90     30 40 130 (10)    70
         <----- What




                         Task 1 Rsc 1    40        30       10    5       35 5      20
                         Task 2 Rsc 2    80        60       20   35       95 (15)   50




                         Accountability Hours - Summary

                         How Much ---> A       B        C     E  D  F  G
                                                             Proj
                                                   Remain    Total Var
                                        Plan Actual A-B ETC B+D A-E Billing
                         Total           120    90     30 40 130 (10)    70
           <----- What




                         Task 1 Rsc 1     40       30       10        5   35 5      20
                         Task 2 Rsc 2     80       60       20       35   95 (15)   50




                           Accountability Hours - Keys
               • Must do it timely (daily or weekly)
                          – With additional early warning protocol
               • Accountability at the resource level
               • Accountability of the group




Jon Grunzweig                                                                                    8
Controlling Project Costs                                    10/26/2012
SoTecConference 2012




                 Problems with Estimates
          • More than initial coding or configuration
          • Testing    Unit, integration, system,
            regression
          • Rework      It will occur
          • Deployment (prepare, deploy, verify)
          • Post live support (immediate)




                 Summary - Key Elements
          • Appropriate Project Plan
              – Watch out for common items left out
               – Resources own estimates & updates
          •   Accountability Cycle lines up
          •   Solid relationship with vendors
          •   Timely reporting (within 1-2 days of cutoff)
          •   Stick to methodologies/processes
          •   Plan for contingencies and issues
          •   Measure your success rate




                       If control costs…..




Jon Grunzweig                                                        9
Controlling Project Costs                                    10/26/2012
SoTecConference 2012




                             Footnotes
          •   Types of Projects: ERP vs. Development
          •   Not Covered: All other types of issues
          •   Hard Costs (hardware, equipment, etc.)
          •   Challenges
              – Putting time in without regard to estimate
              – Getting systems, processes aligned




                  Questions / Discussion




                                   ?




Jon Grunzweig                                                       10
Controlling Project Costs                   10/26/2012
SoTecConference 2012




                Controlling Project Costs

                       Jon Grunzweig

                     Thank You!




Jon Grunzweig                                      11

Contenu connexe

Tendances

Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.rNASAPMC
 
Chambers.calvin
Chambers.calvinChambers.calvin
Chambers.calvinNASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Early Completion Schedules
Early Completion SchedulesEarly Completion Schedules
Early Completion SchedulesChris Carson
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.ciolettiNASAPMC
 
Nichols.david
Nichols.davidNichols.david
Nichols.davidNASAPMC
 
Law.richard
Law.richardLaw.richard
Law.richardNASAPMC
 
R simpson elee
R simpson eleeR simpson elee
R simpson eleeNASAPMC
 
William.miller.pmc2010
William.miller.pmc2010William.miller.pmc2010
William.miller.pmc2010NASAPMC
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidyNASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Esker.linda
Esker.lindaEsker.linda
Esker.lindaNASAPMC
 
Healy edward
Healy edwardHealy edward
Healy edwardNASAPMC
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahaniNASAPMC
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beeneNASAPMC
 

Tendances (20)

Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Chambers.calvin
Chambers.calvinChambers.calvin
Chambers.calvin
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Early Completion Schedules
Early Completion SchedulesEarly Completion Schedules
Early Completion Schedules
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
Modular Construction Conference 2012
Modular Construction Conference 2012Modular Construction Conference 2012
Modular Construction Conference 2012
 
Nichols.david
Nichols.davidNichols.david
Nichols.david
 
Symons
SymonsSymons
Symons
 
Law.richard
Law.richardLaw.richard
Law.richard
 
R simpson elee
R simpson eleeR simpson elee
R simpson elee
 
William.miller.pmc2010
William.miller.pmc2010William.miller.pmc2010
William.miller.pmc2010
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidy
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
 
Healy edward
Healy edwardHealy edward
Healy edward
 
Kickoffsample
KickoffsampleKickoffsample
Kickoffsample
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
Resolving TIAs
Resolving TIAsResolving TIAs
Resolving TIAs
 

En vedette

Business Intelligence 9 11 08 Cio Breakfast 1
Business Intelligence 9 11 08 Cio Breakfast 1Business Intelligence 9 11 08 Cio Breakfast 1
Business Intelligence 9 11 08 Cio Breakfast 1James Sutter
 
E-Collaboration with Web 2.0
E-Collaboration with Web 2.0E-Collaboration with Web 2.0
E-Collaboration with Web 2.0James Sutter
 
The value of QA CIO peer group
The value of QA  CIO peer groupThe value of QA  CIO peer group
The value of QA CIO peer groupJames Sutter
 
Cloud Computing Update 1
Cloud Computing Update 1Cloud Computing Update 1
Cloud Computing Update 1James Sutter
 
Unified Communications
Unified CommunicationsUnified Communications
Unified CommunicationsJames Sutter
 
What's new on the desktop
What's new on the desktopWhat's new on the desktop
What's new on the desktopJames Sutter
 
Agile methodology v 4.5 s
Agile methodology   v 4.5 sAgile methodology   v 4.5 s
Agile methodology v 4.5 sJames Sutter
 
It Alighnment10 V3.1
It Alighnment10 V3.1It Alighnment10 V3.1
It Alighnment10 V3.1James Sutter
 
Enterprise social networking v1.2
Enterprise social networking v1.2Enterprise social networking v1.2
Enterprise social networking v1.2James Sutter
 
CIO RoundtableIot IOT
CIO RoundtableIot IOTCIO RoundtableIot IOT
CIO RoundtableIot IOTJames Sutter
 
The evolving role of the cio mkg occiort 021011
The evolving role of the cio mkg occiort 021011The evolving role of the cio mkg occiort 021011
The evolving role of the cio mkg occiort 021011James Sutter
 
Scrum Agile by David Mann
 Scrum Agile by David Mann Scrum Agile by David Mann
Scrum Agile by David MannJames Sutter
 
Future of intelligent transportation CIO Roundtable 080214
Future of intelligent transportation   CIO Roundtable 080214Future of intelligent transportation   CIO Roundtable 080214
Future of intelligent transportation CIO Roundtable 080214James Sutter
 
It governance 13 may20102
It governance 13 may20102It governance 13 may20102
It governance 13 may20102James Sutter
 

En vedette (19)

Business Intelligence 9 11 08 Cio Breakfast 1
Business Intelligence 9 11 08 Cio Breakfast 1Business Intelligence 9 11 08 Cio Breakfast 1
Business Intelligence 9 11 08 Cio Breakfast 1
 
E-Collaboration with Web 2.0
E-Collaboration with Web 2.0E-Collaboration with Web 2.0
E-Collaboration with Web 2.0
 
Web 2.0
Web 2.0Web 2.0
Web 2.0
 
The value of QA CIO peer group
The value of QA  CIO peer groupThe value of QA  CIO peer group
The value of QA CIO peer group
 
Cloud Computing Update 1
Cloud Computing Update 1Cloud Computing Update 1
Cloud Computing Update 1
 
Peergroup CIO
Peergroup CIO Peergroup CIO
Peergroup CIO
 
Unified Communications
Unified CommunicationsUnified Communications
Unified Communications
 
What's new on the desktop
What's new on the desktopWhat's new on the desktop
What's new on the desktop
 
Agile methodology v 4.5 s
Agile methodology   v 4.5 sAgile methodology   v 4.5 s
Agile methodology v 4.5 s
 
It Alighnment10 V3.1
It Alighnment10 V3.1It Alighnment10 V3.1
It Alighnment10 V3.1
 
Enterprise social networking v1.2
Enterprise social networking v1.2Enterprise social networking v1.2
Enterprise social networking v1.2
 
CIO RoundtableIot IOT
CIO RoundtableIot IOTCIO RoundtableIot IOT
CIO RoundtableIot IOT
 
CIO Value Issue
CIO Value IssueCIO Value Issue
CIO Value Issue
 
The evolving role of the cio mkg occiort 021011
The evolving role of the cio mkg occiort 021011The evolving role of the cio mkg occiort 021011
The evolving role of the cio mkg occiort 021011
 
E Discovery
E DiscoveryE Discovery
E Discovery
 
Scrum Agile by David Mann
 Scrum Agile by David Mann Scrum Agile by David Mann
Scrum Agile by David Mann
 
Future of intelligent transportation CIO Roundtable 080214
Future of intelligent transportation   CIO Roundtable 080214Future of intelligent transportation   CIO Roundtable 080214
Future of intelligent transportation CIO Roundtable 080214
 
It governance 13 may20102
It governance 13 may20102It governance 13 may20102
It governance 13 may20102
 
Telecommuting
TelecommutingTelecommuting
Telecommuting
 

Similaire à Controlling project costs

What would you do if government suddenly became a really demanding client? Od...
What would you do if government suddenly became a really demanding client? Od...What would you do if government suddenly became a really demanding client? Od...
What would you do if government suddenly became a really demanding client? Od...commonsenseLT
 
Observe, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project ManagementObserve, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project Managementstatelibaz
 
International Project Management.- Mercedes Benz- Demo
International Project Management.- Mercedes   Benz- DemoInternational Project Management.- Mercedes   Benz- Demo
International Project Management.- Mercedes Benz- Demodaverashesh
 
Se lect14 btech
Se lect14 btechSe lect14 btech
Se lect14 btechIIITA
 
Project management
Project managementProject management
Project managementSameer Kumar
 
Pmd project value_management_sent [režim kompatibility]
Pmd project value_management_sent [režim kompatibility]Pmd project value_management_sent [režim kompatibility]
Pmd project value_management_sent [režim kompatibility]TUESDAY Business Network
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management DashboardsBob Prieto
 
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology OverviewDaniel Brody
 
Risk response plan
Risk response planRisk response plan
Risk response plandftm2607
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Adding quantitative risk analysis your Swiss Army Knife
Adding quantitative risk analysis your Swiss Army KnifeAdding quantitative risk analysis your Swiss Army Knife
Adding quantitative risk analysis your Swiss Army KnifeJohn Goodpasture
 
TouchBase Quote-to-Cash-solutions
TouchBase Quote-to-Cash-solutionsTouchBase Quote-to-Cash-solutions
TouchBase Quote-to-Cash-solutionsJohnMaverick9
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance ModelConstient
 
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...Project Controls Expo
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdfTanzeelShahid5
 
PROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VISPROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VIStpvishnu1
 
Basics of Project Planning
Basics of Project PlanningBasics of Project Planning
Basics of Project PlanningZilicus
 

Similaire à Controlling project costs (20)

What would you do if government suddenly became a really demanding client? Od...
What would you do if government suddenly became a really demanding client? Od...What would you do if government suddenly became a really demanding client? Od...
What would you do if government suddenly became a really demanding client? Od...
 
Budgeting presentation
Budgeting presentationBudgeting presentation
Budgeting presentation
 
Observe, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project ManagementObserve, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project Management
 
International Project Management.- Mercedes Benz- Demo
International Project Management.- Mercedes   Benz- DemoInternational Project Management.- Mercedes   Benz- Demo
International Project Management.- Mercedes Benz- Demo
 
Se lect14 btech
Se lect14 btechSe lect14 btech
Se lect14 btech
 
Spmcasestudy
SpmcasestudySpmcasestudy
Spmcasestudy
 
Project management
Project managementProject management
Project management
 
Pmd project value_management_sent [režim kompatibility]
Pmd project value_management_sent [režim kompatibility]Pmd project value_management_sent [režim kompatibility]
Pmd project value_management_sent [režim kompatibility]
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management Dashboards
 
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview
 
Risk response plan
Risk response planRisk response plan
Risk response plan
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Adding quantitative risk analysis your Swiss Army Knife
Adding quantitative risk analysis your Swiss Army KnifeAdding quantitative risk analysis your Swiss Army Knife
Adding quantitative risk analysis your Swiss Army Knife
 
TouchBase Quote-to-Cash-solutions
TouchBase Quote-to-Cash-solutionsTouchBase Quote-to-Cash-solutions
TouchBase Quote-to-Cash-solutions
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance Model
 
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdf
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
 
PROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VISPROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VIS
 
Basics of Project Planning
Basics of Project PlanningBasics of Project Planning
Basics of Project Planning
 

Plus de James Sutter

Security in the News
Security in the NewsSecurity in the News
Security in the NewsJames Sutter
 
3-D Printing_feb_13_2014
3-D Printing_feb_13_20143-D Printing_feb_13_2014
3-D Printing_feb_13_2014James Sutter
 
It Governance OC CIO Nov,2013
It Governance OC CIO Nov,2013It Governance OC CIO Nov,2013
It Governance OC CIO Nov,2013James Sutter
 
CIO evolution 10102013
CIO evolution 10102013CIO evolution 10102013
CIO evolution 10102013James Sutter
 
Technology business management_7.13
Technology business management_7.13Technology business management_7.13
Technology business management_7.13James Sutter
 
Oc cio roundtable mooney management imperatives for realizing value from clou...
Oc cio roundtable mooney management imperatives for realizing value from clou...Oc cio roundtable mooney management imperatives for realizing value from clou...
Oc cio roundtable mooney management imperatives for realizing value from clou...James Sutter
 
Erp governance methodology and case studies v rjt
Erp governance methodology and case studies  v rjtErp governance methodology and case studies  v rjt
Erp governance methodology and case studies v rjtJames Sutter
 
Google apps CIO Peer Group presentation
Google apps CIO Peer Group presentationGoogle apps CIO Peer Group presentation
Google apps CIO Peer Group presentationJames Sutter
 
CIO Roundtable 10-12
CIO Roundtable 10-12CIO Roundtable 10-12
CIO Roundtable 10-12James Sutter
 
CIO presentation aug 2012
CIO presentation aug 2012 CIO presentation aug 2012
CIO presentation aug 2012 James Sutter
 
Mobile security v2
Mobile security v2Mobile security v2
Mobile security v2James Sutter
 
Peer group itsm presentation 6.12
Peer group itsm presentation 6.12Peer group itsm presentation 6.12
Peer group itsm presentation 6.12James Sutter
 
Google apps cio peer group presentation
Google apps cio peer group presentationGoogle apps cio peer group presentation
Google apps cio peer group presentationJames Sutter
 
Cio roundtable microsoft update - 9-8-11
Cio roundtable   microsoft update - 9-8-11 Cio roundtable   microsoft update - 9-8-11
Cio roundtable microsoft update - 9-8-11 James Sutter
 
Cloud computing present
Cloud computing presentCloud computing present
Cloud computing presentJames Sutter
 

Plus de James Sutter (20)

Security in the News
Security in the NewsSecurity in the News
Security in the News
 
Mobile Security
Mobile Security Mobile Security
Mobile Security
 
3-D Printing_feb_13_2014
3-D Printing_feb_13_20143-D Printing_feb_13_2014
3-D Printing_feb_13_2014
 
It Governance OC CIO Nov,2013
It Governance OC CIO Nov,2013It Governance OC CIO Nov,2013
It Governance OC CIO Nov,2013
 
CIO evolution 10102013
CIO evolution 10102013CIO evolution 10102013
CIO evolution 10102013
 
OC CIO BYOD
OC CIO BYODOC CIO BYOD
OC CIO BYOD
 
Technology business management_7.13
Technology business management_7.13Technology business management_7.13
Technology business management_7.13
 
Oc cio roundtable mooney management imperatives for realizing value from clou...
Oc cio roundtable mooney management imperatives for realizing value from clou...Oc cio roundtable mooney management imperatives for realizing value from clou...
Oc cio roundtable mooney management imperatives for realizing value from clou...
 
Erp governance methodology and case studies v rjt
Erp governance methodology and case studies  v rjtErp governance methodology and case studies  v rjt
Erp governance methodology and case studies v rjt
 
CIO Branding
CIO BrandingCIO Branding
CIO Branding
 
Google apps CIO Peer Group presentation
Google apps CIO Peer Group presentationGoogle apps CIO Peer Group presentation
Google apps CIO Peer Group presentation
 
CIO Roundtable 10-12
CIO Roundtable 10-12CIO Roundtable 10-12
CIO Roundtable 10-12
 
CIO presentation aug 2012
CIO presentation aug 2012 CIO presentation aug 2012
CIO presentation aug 2012
 
Mobile security v2
Mobile security v2Mobile security v2
Mobile security v2
 
Peer group itsm presentation 6.12
Peer group itsm presentation 6.12Peer group itsm presentation 6.12
Peer group itsm presentation 6.12
 
Google apps cio peer group presentation
Google apps cio peer group presentationGoogle apps cio peer group presentation
Google apps cio peer group presentation
 
Rjt analytics
Rjt analyticsRjt analytics
Rjt analytics
 
Cio roundtable microsoft update - 9-8-11
Cio roundtable   microsoft update - 9-8-11 Cio roundtable   microsoft update - 9-8-11
Cio roundtable microsoft update - 9-8-11
 
Mobility
MobilityMobility
Mobility
 
Cloud computing present
Cloud computing presentCloud computing present
Cloud computing present
 

Controlling project costs

  • 1. Controlling Project Costs 10/26/2012 SoTecConference 2012 Controlling Project Costs Jon Grunzweig Vision Business Systems Leading IT to Business Excellence Jon Grunzweig 1
  • 2. Controlling Project Costs 10/26/2012 SoTecConference 2012 Ever Happen? • Great project plan, good resources, design • Before you know it….. – Delivery date slipping – Going over budget • Project keeps going along – Start ignoring the budget, so far overspent – Timeline goes into oblivion… Shuttle Route Endeavor’s Last Mission • Great preparation Things happen…. • $$ Jon Grunzweig 2
  • 3. Controlling Project Costs 10/26/2012 SoTecConference 2012 Credibility Issues…. Blame game starts…… Which leads to……. Jon Grunzweig 3
  • 4. Controlling Project Costs 10/26/2012 SoTecConference 2012 Why ? • Many moving parts (very few fixed parts) • Circumstances occur different • Things left out / Estimates incomplete • Poor cooperation within business, people • Events and changes • Issues with service providers • Outside uncontrolled events • Unknowns…. Most Projects • Predictability • Been done, or very similar (not one of a kind) • Experienced resources • Therefore: – Should be on time and on schedule (or very near) What’s the disconnect? • Good plan, design, resources, project mgt but…….. • Poor alignment of Accountability Cycle • Poor hours accountability • Elements unplanned for Jon Grunzweig 4
  • 5. Controlling Project Costs 10/26/2012 SoTecConference 2012 Our focus today…. • Alignment of Accountability Cycle • Accountability of hours • Areas short-changed in estimates Foundation for Control Project Execution Cycle Project Planning & Agreements Governance & Project Management Contract & Vendor Management Methodologies & Processes: Design, Project, Change Control Technology Vision and Strategy Spend & Execution Cycles Spend Execution Authority Cycle Cycle Project Budgets Plans Timesheets/ Proposals Billing Status SOWs Reporting Jon Grunzweig 5
  • 6. Controlling Project Costs 10/26/2012 SoTecConference 2012 Accountability Cycle Methodology Status Proposals Reporting Billing SOW’s Project Plan / Time Sheets Est Accountability Alignment Prop SOW Plan Time Invoice Status Total 120 120 120 90 70 130 Task 1 40 40 40 30 20 35 Task 2 80 80 80 60 50 95 Accountability Hours How Much ---> A B C Remain Plan Actual A-B Total 120 90 30 <----- What Task 1 Rsc 1 40 30 10 Task 2 Rsc 2 80 60 20 Jon Grunzweig 6
  • 7. Controlling Project Costs 10/26/2012 SoTecConference 2012 Accountability Hours – Plan How Much ---> A B C Remain (Plan - Plan Actual Act) Total 120 90 30 <----- What Task 1 Rsc 1 40 30 10 Task 2 Rsc 2 80 60 20 Accountability Hours – Actual How Much ---> A B C Remain (Plan - Plan Actual Act) Total 120 90 30 <----- What Task 1 Rsc 1 40 30 10 Task 2 Rsc 2 80 60 20 Accountability Hours - ETC How Much ---> A B C D Remain (Plan - Plan Actual Act) ETC Total 120 90 30 40 <----- What Task 1 Rsc 1 40 30 10 5 Task 2 Rsc 2 80 60 20 35 Jon Grunzweig 7
  • 8. Controlling Project Costs 10/26/2012 SoTecConference 2012 Accountability Hours – Proj Total How Much ---> A B C E D F G Proj Remain Total Var Plan Actual A-B ETC B+D A-E Billing Total 120 90 30 40 130 (10) 70 <----- What Task 1 Rsc 1 40 30 10 5 35 5 20 Task 2 Rsc 2 80 60 20 35 95 (15) 50 Accountability Hours - Summary How Much ---> A B C E D F G Proj Remain Total Var Plan Actual A-B ETC B+D A-E Billing Total 120 90 30 40 130 (10) 70 <----- What Task 1 Rsc 1 40 30 10 5 35 5 20 Task 2 Rsc 2 80 60 20 35 95 (15) 50 Accountability Hours - Keys • Must do it timely (daily or weekly) – With additional early warning protocol • Accountability at the resource level • Accountability of the group Jon Grunzweig 8
  • 9. Controlling Project Costs 10/26/2012 SoTecConference 2012 Problems with Estimates • More than initial coding or configuration • Testing Unit, integration, system, regression • Rework It will occur • Deployment (prepare, deploy, verify) • Post live support (immediate) Summary - Key Elements • Appropriate Project Plan – Watch out for common items left out – Resources own estimates & updates • Accountability Cycle lines up • Solid relationship with vendors • Timely reporting (within 1-2 days of cutoff) • Stick to methodologies/processes • Plan for contingencies and issues • Measure your success rate If control costs….. Jon Grunzweig 9
  • 10. Controlling Project Costs 10/26/2012 SoTecConference 2012 Footnotes • Types of Projects: ERP vs. Development • Not Covered: All other types of issues • Hard Costs (hardware, equipment, etc.) • Challenges – Putting time in without regard to estimate – Getting systems, processes aligned Questions / Discussion ? Jon Grunzweig 10
  • 11. Controlling Project Costs 10/26/2012 SoTecConference 2012 Controlling Project Costs Jon Grunzweig Thank You! Jon Grunzweig 11