Revised Draft Construction
     General Permit:
 Approach and Overview

           March 2008

State Water Resources Control Board
      Division of Water Quality
        Storm Water Section
Announcements
• USEPA Effluent Limitation Guidelines for
  Construction Activities
  – http://www.epa.gov/guide/construction/
  – Nothing noted on the web, yet – but staff heard this
    process is being restarted from USEPA staff at
    CASQA Mtg. in March 2007
• Our Process – next steps
  – Release a new “final” draft this Spring (after these
    workshops)
  – Schedule Board hearings / meetings to consider
    adoption (as early as August, more likely later)
Construction Activity Threats
• Two-fold – construction projects over an
  acre have the potential to cause impacts to
  our beneficial uses of water both during
  and after the project.
• During – potential for sediment and erosion
  discharges.
• After – potential for hydromodification
  impacts as a result of how the new
  landscape functions.
Construction   =
WQ threats
      +




          +
Performance Measurement for
                 Storm Water Program
Possible Measures                                          Desired Outcomes

Dischargers and Regulators monitor receiving
water outcomes
                                                          WQ        Stream Protection
Dischargers and Regulators measure behaviours,         Outcomes
like pollution prevention and financial
drivers/outcomes
                                                      Behavioural        Non-Filers Become Filers.
                                                       Outcomes
Dischargers monitor effluent quality

Dischargers monitor hydromodification changes                                Compliance w/
                                                     WQ Outputs              Numeric Effluent
Regulators compile and share information with all                            Limits
(e.g., CIWQS, SWAMP, etc.)
                                                                                 Compliance w/
                                                                                 “Narrative”
Dischargers and Regulators conduct and measure      Behavioral Outputs
and record inspections / audits
                                                                                 Requirements

Dischargers and Regulators record violations
Permit Reissuance Goals
1)Adopt a risk-based permit approach
2)Improve “performance” measurement of
  program
3)Establish a standard to avoid, minimize and
  mitigate hydromodification impacts
  associated with all new and re-development
  projects triggering the construction activity
  permit.
Population and New
   Development Pressure –
Projected for CA between 1990
           and 2040
Sediment Discharges
Direct Erosion / Sediment Control
           Requirements
• Old model used SWPPP as main vehicle
• New approach to use Rain Event Action
  Plan (REAP) as primary tool (SWPPP
  becomes more a master document/library)
• Requirements based on principles of “soil
  loss” (e.g., soil type, length:slope, etc.)
• Prevention and planning incentives
Hydromodification Impacts
2000's – Sacramento Area
1950's – Sacramento Area
Hydrologic Cycle



         From Lake (2004)
Pre-development



Aggradation Phase
-hillslope erosion is largest sediment
source
-width:depth may increase or stay
constant
-   cross-sectional area increases

Erosional Phase
-channel erosion is largest sediment
source
-   width:depth increase eventually
-cross-sectional area increased to
accommodate larger bankfull discharge
After Lane (1955) as cited in Rosgen (1996)
Increase in Bankfull Discharge

Urbanization tends to
increase storm water
runoff:
                                        Pre-Development
 peak flows                                 Post-Develop.
                        Runoff
 volume
 frequency



                                 Time
From Haltiner (2006)
Runoff Reduction
• Remains essentially the same – match
  volume and time of concentration of pre-
  construction hydrology
• Construction permit requirements will not
  apply if a project is within the jurisdiction of
  an MS4 permit
• Staff believes a simple, runoff reduction
  credit system is best for the “rest of CA”
• Staff wants to help develop a statewide
  WQ control plan/policy to address
  hydromod issues
Estimate Annual “Undisturbed” Sediment Yield
                                                  RUSLE
         Sediment Discharge Risk



Evaluate Site and Receiving Water (RW) Info    Characteristics
                                                of RW, site &
                 RW Risk                            BU’s




   RW Risk combined w/ Sediment Risk

   Tiered Implementation and Monitoring
        Requirements (site specific)
Overview
• Risk broken into two elements – sediment yield
  and RW sensitivity to sediment
• Risk then drives level of requirements – both
  implementation and monitoring
• Risk framework based on Southwestern
  Australia approach
• Turbidity Action Level is site-specific and
  dynamic, uses MUSLE, applies to all sites
• Turbidity AL limit (1000 NTU) will apply to all
  sites – exceedance of this value will constitute a
  violation (and more action)
Sediment Yield Risk
              using RUSLE to estimate




           Low Sediment Yield Estimate: <1 ton per acre per
  Low      year

           Moderate Sediment Yield Estimate: between 1 - 74
Moderate   tons per acre per year

           High Sediment Yield Estimate: between 75-499 tons
  High     per acre per year

           Extreme Sediment Yield Estimate: greater than or
Extreme    equal to >=500 tons per acre per year
Receiving Water Sensitivity Risk
• Point system
• Based on Watershed and Site
  Characteristics
  – E.g., discharge to salmon streams = 10 points
  – ATS = deduct 10 points
  – Etc.
Receiving Water (RW) Risk
based on the sensitivity to receiving water and project
        capability to cause adverse effects


             Low Potential to Adversely Impact RW: low
   Low       sediment sensitivity WB and/or low risk of discharge
             causing or contributing to harm

             Moderate Potential to Adversely Impact RW:
Moderate     moderate sediment sensitivity WB and/or moderate
             risk of discharge causing or contributing to harm

             High Potential to Adversely Impact RW: high
   High      sediment sensitivity WB and/or high risk of discharge
             causing or contributing to harm
Risk and Requirements
         Combined Risk Level Matrix


                                            Sediment Risk



                           Low        Medium                High   Extreme



         Low              Level 1     Level 1           Level 2    Level 2

Receiv
 ing
Water
 Risk
         Medium           Level 1     Level 2           Level 2    Level 3




         High             Level 2     Level 2           Level 3    Level 4
MS4 Coverage
Examples of
Runoff Reduction
   Measures
 – Soil quality improvement
   (porosity)
 – Native and drought tolerant
   vegetation
 – Trees
 – Permeable pavement
 – Riparian buffers
 – A general reduction of
   connected, impervious surfaces
   in runoff pathways
 – Bioretention
 – Disconnected downspouts/rain
   chains/rain barrels
Rain chains and
mulch combo


Sacramento, CA
Staff Presentation 080311 Gtg
Staff Presentation 080311 Gtg
Staff Presentation 080311 Gtg
Staff Presentation 080311 Gtg
Staff Presentation 080311 Gtg
Staff Presentation 080311 Gtg

Contenu connexe

Tendances

General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed PuchiAGC of California
 
Phosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance PlanningPhosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance PlanningMSA Professional Services, Inc.
 
Media release niagara falls water board - september 1, 2017
Media release   niagara falls water board - september 1, 2017Media release   niagara falls water board - september 1, 2017
Media release niagara falls water board - september 1, 2017Fatima Bangura
 
Analysis of life cycle costs - Roseau Dam - final project
Analysis of life cycle costs - Roseau Dam - final projectAnalysis of life cycle costs - Roseau Dam - final project
Analysis of life cycle costs - Roseau Dam - final projectPaulaBauwens
 
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...Texas Alliance of Groundwater Districts
 
Environmental Risk Management - Leaking Underground Storage Tanks
Environmental Risk Management - Leaking Underground Storage TanksEnvironmental Risk Management - Leaking Underground Storage Tanks
Environmental Risk Management - Leaking Underground Storage TanksJoseph Berlin
 
Stormwater Management on the Coastal Plain & Beyond - Part I
Stormwater Management on the Coastal Plain & Beyond - Part IStormwater Management on the Coastal Plain & Beyond - Part I
Stormwater Management on the Coastal Plain & Beyond - Part IChesapeake Bay Foundation
 
Kevin Vought Select Samples of Water Resource Capability
Kevin Vought Select Samples of Water Resource CapabilityKevin Vought Select Samples of Water Resource Capability
Kevin Vought Select Samples of Water Resource CapabilityKevin Vought, P.E.
 
Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...
Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...
Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...TWCA
 
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersStudy Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersTexas Alliance of Groundwater Districts
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 HydroCEQAplanner
 
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakUSACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakTWCA
 
James Solution to Pollution
James Solution to Pollution James Solution to Pollution
James Solution to Pollution Contract Cities
 

Tendances (20)

General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
Phosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance PlanningPhosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
 
Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 
NDOR Research Conference: Dr. Zhang
NDOR Research Conference: Dr. ZhangNDOR Research Conference: Dr. Zhang
NDOR Research Conference: Dr. Zhang
 
Media release niagara falls water board - september 1, 2017
Media release   niagara falls water board - september 1, 2017Media release   niagara falls water board - september 1, 2017
Media release niagara falls water board - september 1, 2017
 
Current Issues in Stormwater Management
Current Issues in Stormwater ManagementCurrent Issues in Stormwater Management
Current Issues in Stormwater Management
 
Checkdam
CheckdamCheckdam
Checkdam
 
Analysis of life cycle costs - Roseau Dam - final project
Analysis of life cycle costs - Roseau Dam - final projectAnalysis of life cycle costs - Roseau Dam - final project
Analysis of life cycle costs - Roseau Dam - final project
 
Stormwater Regulation
Stormwater RegulationStormwater Regulation
Stormwater Regulation
 
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
 
Environmental Risk Management - Leaking Underground Storage Tanks
Environmental Risk Management - Leaking Underground Storage TanksEnvironmental Risk Management - Leaking Underground Storage Tanks
Environmental Risk Management - Leaking Underground Storage Tanks
 
Stormwater Management on the Coastal Plain & Beyond - Part I
Stormwater Management on the Coastal Plain & Beyond - Part IStormwater Management on the Coastal Plain & Beyond - Part I
Stormwater Management on the Coastal Plain & Beyond - Part I
 
Kevin Vought Select Samples of Water Resource Capability
Kevin Vought Select Samples of Water Resource CapabilityKevin Vought Select Samples of Water Resource Capability
Kevin Vought Select Samples of Water Resource Capability
 
Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...
Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...
Reuse Litigation and Policy: Lyn Clancy, Jason Hill, Doug Caroom and Trey Nes...
 
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersStudy Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 Hydro
 
Dubai_brochure
Dubai_brochureDubai_brochure
Dubai_brochure
 
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakUSACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
 
Ground water o&m_norms
Ground water o&m_normsGround water o&m_norms
Ground water o&m_norms
 
James Solution to Pollution
James Solution to Pollution James Solution to Pollution
James Solution to Pollution
 

En vedette

Introduction to building permits
Introduction to building permitsIntroduction to building permits
Introduction to building permitsjinuseo82
 
Construction Coordinator Duties
Construction Coordinator DutiesConstruction Coordinator Duties
Construction Coordinator DutiesDevon Newman
 
CPTC Site Plan Review module 8.23.2015
CPTC Site Plan Review module 8.23.2015CPTC Site Plan Review module 8.23.2015
CPTC Site Plan Review module 8.23.2015Wayne Feiden
 
United neighborhoods permit conditions
United neighborhoods permit conditionsUnited neighborhoods permit conditions
United neighborhoods permit conditionsJoseph Horwedel
 
Ank 86 97 Construction Permit E[1]
Ank 86 97 Construction Permit E[1]Ank 86 97 Construction Permit E[1]
Ank 86 97 Construction Permit E[1]guestfa246c
 
Google Fiber City Checklist
Google Fiber City ChecklistGoogle Fiber City Checklist
Google Fiber City ChecklistArik Abel
 
Construction Sector - Canada - September 2016
Construction Sector - Canada - September 2016Construction Sector - Canada - September 2016
Construction Sector - Canada - September 2016paul young cpa, cga
 
Halloween Party Activity - Pumpkin Seed Toss
Halloween Party Activity - Pumpkin Seed TossHalloween Party Activity - Pumpkin Seed Toss
Halloween Party Activity - Pumpkin Seed TossKen Sapp
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATIONimtfiber
 
Fibre optic FTTH FTTX network design, engineering and planning solutions,
Fibre optic FTTH FTTX network design, engineering and planning solutions,Fibre optic FTTH FTTX network design, engineering and planning solutions,
Fibre optic FTTH FTTX network design, engineering and planning solutions,van den Dool Dick
 
Properties of fibers
Properties of  fibersProperties of  fibers
Properties of fibersLily Bhagat
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presentionRazu Khan
 

En vedette (19)

Pp webinar
Pp webinarPp webinar
Pp webinar
 
Introduction to building permits
Introduction to building permitsIntroduction to building permits
Introduction to building permits
 
Utility Work within Public Right of Way
Utility Work within Public Right of WayUtility Work within Public Right of Way
Utility Work within Public Right of Way
 
Construction Coordinator Duties
Construction Coordinator DutiesConstruction Coordinator Duties
Construction Coordinator Duties
 
CPTC Site Plan Review module 8.23.2015
CPTC Site Plan Review module 8.23.2015CPTC Site Plan Review module 8.23.2015
CPTC Site Plan Review module 8.23.2015
 
United neighborhoods permit conditions
United neighborhoods permit conditionsUnited neighborhoods permit conditions
United neighborhoods permit conditions
 
Ank 86 97 Construction Permit E[1]
Ank 86 97 Construction Permit E[1]Ank 86 97 Construction Permit E[1]
Ank 86 97 Construction Permit E[1]
 
Google Fiber City Checklist
Google Fiber City ChecklistGoogle Fiber City Checklist
Google Fiber City Checklist
 
Construction Sector - Canada - September 2016
Construction Sector - Canada - September 2016Construction Sector - Canada - September 2016
Construction Sector - Canada - September 2016
 
Halloween Party Activity - Pumpkin Seed Toss
Halloween Party Activity - Pumpkin Seed TossHalloween Party Activity - Pumpkin Seed Toss
Halloween Party Activity - Pumpkin Seed Toss
 
07 spp-izin-lingkungan
07 spp-izin-lingkungan07 spp-izin-lingkungan
07 spp-izin-lingkungan
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Fiber Network Deployment
Fiber Network DeploymentFiber Network Deployment
Fiber Network Deployment
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
 
Fibre optic FTTH FTTX network design, engineering and planning solutions,
Fibre optic FTTH FTTX network design, engineering and planning solutions,Fibre optic FTTH FTTX network design, engineering and planning solutions,
Fibre optic FTTH FTTX network design, engineering and planning solutions,
 
Properties of fibers
Properties of  fibersProperties of  fibers
Properties of fibers
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 

Similaire à Staff Presentation 080311 Gtg

Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingAlex Nwoko
 
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Robert Muir
 
Regulating our way to beter creeks and streams
Regulating our way to beter creeks and streamsRegulating our way to beter creeks and streams
Regulating our way to beter creeks and streamsGreg Gearheart
 
BMT WBM UK W&E Capability 151027 Low Res
BMT WBM UK W&E Capability 151027 Low ResBMT WBM UK W&E Capability 151027 Low Res
BMT WBM UK W&E Capability 151027 Low ResElisabeth Evans
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...elodieperrat
 
California State Stormwater Permit Requirements
California State Stormwater Permit RequirementsCalifornia State Stormwater Permit Requirements
California State Stormwater Permit RequirementsMichael Josselyn
 
Climate Change Adaptation and Resilience | Water in the Oil & Gas Sector
Climate Change Adaptation and Resilience | Water in the Oil & Gas SectorClimate Change Adaptation and Resilience | Water in the Oil & Gas Sector
Climate Change Adaptation and Resilience | Water in the Oil & Gas SectorAdvisian
 
Reef water quality protection plan, bob speirs
Reef water quality protection plan, bob speirsReef water quality protection plan, bob speirs
Reef water quality protection plan, bob speirsInternational WaterCentre
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communitiesecowatchers
 
The runoff reduction method
The runoff reduction methodThe runoff reduction method
The runoff reduction methodwalled ashwah
 
Protection by Will Price, Program Director, Pinchot Institute for Conservation
Protection by Will Price, Program Director, Pinchot Institute for Conservation Protection by Will Price, Program Director, Pinchot Institute for Conservation
Protection by Will Price, Program Director, Pinchot Institute for Conservation Kim Beidler
 
Water safety plans & catchment management
Water safety plans & catchment managementWater safety plans & catchment management
Water safety plans & catchment managementIwl Pcu
 

Similaire à Staff Presentation 080311 Gtg (20)

Stormwater Compliance
Stormwater ComplianceStormwater Compliance
Stormwater Compliance
 
Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modelling
 
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
 
Regulating our way to beter creeks and streams
Regulating our way to beter creeks and streamsRegulating our way to beter creeks and streams
Regulating our way to beter creeks and streams
 
BMT WBM UK W&E Capability 151027 Low Res
BMT WBM UK W&E Capability 151027 Low ResBMT WBM UK W&E Capability 151027 Low Res
BMT WBM UK W&E Capability 151027 Low Res
 
Trans-boundary Issues
Trans-boundary IssuesTrans-boundary Issues
Trans-boundary Issues
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
 
California State Stormwater Permit Requirements
California State Stormwater Permit RequirementsCalifornia State Stormwater Permit Requirements
California State Stormwater Permit Requirements
 
Climate Change Adaptation and Resilience | Water in the Oil & Gas Sector
Climate Change Adaptation and Resilience | Water in the Oil & Gas SectorClimate Change Adaptation and Resilience | Water in the Oil & Gas Sector
Climate Change Adaptation and Resilience | Water in the Oil & Gas Sector
 
Reef water quality protection plan, bob speirs
Reef water quality protection plan, bob speirsReef water quality protection plan, bob speirs
Reef water quality protection plan, bob speirs
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
 
The runoff reduction method
The runoff reduction methodThe runoff reduction method
The runoff reduction method
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
26. Floods Directive & Hydromorpholgy Measures
26. Floods Directive & Hydromorpholgy Measures26. Floods Directive & Hydromorpholgy Measures
26. Floods Directive & Hydromorpholgy Measures
 
Protection by Will Price, Program Director, Pinchot Institute for Conservation
Protection by Will Price, Program Director, Pinchot Institute for Conservation Protection by Will Price, Program Director, Pinchot Institute for Conservation
Protection by Will Price, Program Director, Pinchot Institute for Conservation
 
Water safety plans & catchment management
Water safety plans & catchment managementWater safety plans & catchment management
Water safety plans & catchment management
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
 

Plus de Greg Gearheart

Pre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtgPre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtgGreg Gearheart
 
Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslamGreg Gearheart
 
Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2Greg Gearheart
 
Storm water program v2 0
Storm water program v2 0Storm water program v2 0
Storm water program v2 0Greg Gearheart
 
Pimple dimples eureka2013
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013Greg Gearheart
 
Lid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgLid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgGreg Gearheart
 
Pp munispectors ds_comp
Pp munispectors ds_compPp munispectors ds_comp
Pp munispectors ds_compGreg Gearheart
 
Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Greg Gearheart
 
Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Greg Gearheart
 
Ents Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 GgEnts Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 GgGreg Gearheart
 
Lidstrategiesandtechniques
LidstrategiesandtechniquesLidstrategiesandtechniques
LidstrategiesandtechniquesGreg Gearheart
 

Plus de Greg Gearheart (20)

Ppp sept21 gtg
Ppp sept21 gtgPpp sept21 gtg
Ppp sept21 gtg
 
Pre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtgPre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtg
 
Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslam
 
Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2
 
Storm water program v2 0
Storm water program v2 0Storm water program v2 0
Storm water program v2 0
 
Pimple dimples eureka2013
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013
 
Casqa2012 igp gtg
Casqa2012 igp gtgCasqa2012 igp gtg
Casqa2012 igp gtg
 
Lid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgLid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtg
 
Pp munispectors ds_comp
Pp munispectors ds_compPp munispectors ds_comp
Pp munispectors ds_comp
 
Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010
 
Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010
 
Mark Bradley
Mark BradleyMark Bradley
Mark Bradley
 
Ents Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 GgEnts Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 Gg
 
Lid Intro Nw
Lid Intro NwLid Intro Nw
Lid Intro Nw
 
Liddesignandanalysis
LiddesignandanalysisLiddesignandanalysis
Liddesignandanalysis
 
Lidstrategiesandtechniques
LidstrategiesandtechniquesLidstrategiesandtechniques
Lidstrategiesandtechniques
 
Tressie Word
Tressie WordTressie Word
Tressie Word
 
Rachel Hunter
Rachel HunterRachel Hunter
Rachel Hunter
 
Mike Wilson
Mike WilsonMike Wilson
Mike Wilson
 
Greg Gearheart
Greg GearheartGreg Gearheart
Greg Gearheart
 

Dernier

Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 

Dernier (20)

Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 

Staff Presentation 080311 Gtg

  • 1. Revised Draft Construction General Permit: Approach and Overview March 2008 State Water Resources Control Board Division of Water Quality Storm Water Section
  • 2. Announcements • USEPA Effluent Limitation Guidelines for Construction Activities – http://www.epa.gov/guide/construction/ – Nothing noted on the web, yet – but staff heard this process is being restarted from USEPA staff at CASQA Mtg. in March 2007 • Our Process – next steps – Release a new “final” draft this Spring (after these workshops) – Schedule Board hearings / meetings to consider adoption (as early as August, more likely later)
  • 3. Construction Activity Threats • Two-fold – construction projects over an acre have the potential to cause impacts to our beneficial uses of water both during and after the project. • During – potential for sediment and erosion discharges. • After – potential for hydromodification impacts as a result of how the new landscape functions.
  • 4. Construction = WQ threats + +
  • 5. Performance Measurement for Storm Water Program Possible Measures Desired Outcomes Dischargers and Regulators monitor receiving water outcomes WQ Stream Protection Dischargers and Regulators measure behaviours, Outcomes like pollution prevention and financial drivers/outcomes Behavioural Non-Filers Become Filers. Outcomes Dischargers monitor effluent quality Dischargers monitor hydromodification changes Compliance w/ WQ Outputs Numeric Effluent Regulators compile and share information with all Limits (e.g., CIWQS, SWAMP, etc.) Compliance w/ “Narrative” Dischargers and Regulators conduct and measure Behavioral Outputs and record inspections / audits Requirements Dischargers and Regulators record violations
  • 6. Permit Reissuance Goals 1)Adopt a risk-based permit approach 2)Improve “performance” measurement of program 3)Establish a standard to avoid, minimize and mitigate hydromodification impacts associated with all new and re-development projects triggering the construction activity permit.
  • 7. Population and New Development Pressure – Projected for CA between 1990 and 2040
  • 8.
  • 10. Direct Erosion / Sediment Control Requirements • Old model used SWPPP as main vehicle • New approach to use Rain Event Action Plan (REAP) as primary tool (SWPPP becomes more a master document/library) • Requirements based on principles of “soil loss” (e.g., soil type, length:slope, etc.) • Prevention and planning incentives
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. 2000's – Sacramento Area 1950's – Sacramento Area
  • 25. Hydrologic Cycle From Lake (2004)
  • 26. Pre-development Aggradation Phase -hillslope erosion is largest sediment source -width:depth may increase or stay constant - cross-sectional area increases Erosional Phase -channel erosion is largest sediment source - width:depth increase eventually -cross-sectional area increased to accommodate larger bankfull discharge
  • 27. After Lane (1955) as cited in Rosgen (1996)
  • 28.
  • 29. Increase in Bankfull Discharge Urbanization tends to increase storm water runoff: Pre-Development peak flows Post-Develop. Runoff volume frequency Time From Haltiner (2006)
  • 30. Runoff Reduction • Remains essentially the same – match volume and time of concentration of pre- construction hydrology • Construction permit requirements will not apply if a project is within the jurisdiction of an MS4 permit • Staff believes a simple, runoff reduction credit system is best for the “rest of CA” • Staff wants to help develop a statewide WQ control plan/policy to address hydromod issues
  • 31. Estimate Annual “Undisturbed” Sediment Yield RUSLE Sediment Discharge Risk Evaluate Site and Receiving Water (RW) Info Characteristics of RW, site & RW Risk BU’s RW Risk combined w/ Sediment Risk Tiered Implementation and Monitoring Requirements (site specific)
  • 32. Overview • Risk broken into two elements – sediment yield and RW sensitivity to sediment • Risk then drives level of requirements – both implementation and monitoring • Risk framework based on Southwestern Australia approach • Turbidity Action Level is site-specific and dynamic, uses MUSLE, applies to all sites • Turbidity AL limit (1000 NTU) will apply to all sites – exceedance of this value will constitute a violation (and more action)
  • 33. Sediment Yield Risk using RUSLE to estimate Low Sediment Yield Estimate: <1 ton per acre per Low year Moderate Sediment Yield Estimate: between 1 - 74 Moderate tons per acre per year High Sediment Yield Estimate: between 75-499 tons High per acre per year Extreme Sediment Yield Estimate: greater than or Extreme equal to >=500 tons per acre per year
  • 34. Receiving Water Sensitivity Risk • Point system • Based on Watershed and Site Characteristics – E.g., discharge to salmon streams = 10 points – ATS = deduct 10 points – Etc.
  • 35. Receiving Water (RW) Risk based on the sensitivity to receiving water and project capability to cause adverse effects Low Potential to Adversely Impact RW: low Low sediment sensitivity WB and/or low risk of discharge causing or contributing to harm Moderate Potential to Adversely Impact RW: Moderate moderate sediment sensitivity WB and/or moderate risk of discharge causing or contributing to harm High Potential to Adversely Impact RW: high High sediment sensitivity WB and/or high risk of discharge causing or contributing to harm
  • 36. Risk and Requirements Combined Risk Level Matrix Sediment Risk Low Medium High Extreme Low Level 1 Level 1 Level 2 Level 2 Receiv ing Water Risk Medium Level 1 Level 2 Level 2 Level 3 High Level 2 Level 2 Level 3 Level 4
  • 38.
  • 39.
  • 40. Examples of Runoff Reduction Measures – Soil quality improvement (porosity) – Native and drought tolerant vegetation – Trees – Permeable pavement – Riparian buffers – A general reduction of connected, impervious surfaces in runoff pathways – Bioretention – Disconnected downspouts/rain chains/rain barrels