Urban Runoff
Greg Gearheart
State Water Resources Control Board
Urban Runoff Problems
• Pollution
– Beach closures
– Water quality impairment
– Fish kills
– Plastic debris
• Physical alteration of the
watershed / water bodies
– Stream incision / erosion / deposition
– Habitat destruction
Hydrologic Changes
Runoff
Time
Pre-Development
Urbanization
tends to increase
storm water
runoff:

peak flows

volume

frequency
Post-Develop.
From Haltiner (2006)
Regulatory Solution
• Stormwater Program
– A Clean Water Act-based program
– A permitting solution
– “Forces” stormwater peg into the
existing hole designed to protect
surface waters
– Has evolved over the years to include
new tools and connect to TMDLs
Overview of the Clean Water
Act
• Federal Water Pollution Control Act of
1972, amended 1977
– NPDES programs
– Permits are a privilege, not a right
– Effluent limits must be both technology and
water quality based
• 1987 – added Section 402(p) to CWA
covering stormwater
Overview of the Clean Water
Act
• All “point sources”
• “Discharging a pollutant”
• Into a “Water of the U.S”
>>>>Must obtain a NPDES (National
Pollutant Discharge Elimination
System) Permit
What is a Point Source ?
• Point Source
– Discharge though a discrete
conveyance into waters of the US
• Industrial facilities
• Sewage treatment plants
• Stormwater from industrial sites and
storm sewers
– Non-point source
• Runoff that is not a point source
What is a Water of the
U.S ?
• All waters currently used, used in
the past, or susceptible to use for
interstate commerce including all
waters which are subject to the ebb
and flow of the tide
US Waters – Examples
• Rivers, lakes and streams
• Tributaries
• Territorial seas
• Wetlands
• Ephemeral washes
Stormwater Program Overview
• Municipal Program – urban runoff
• Industrial Program – industrial
sector specific runoff
• Program Overlap
– Many industrial sites discharge INTO
Municipal Separate Storm Sewer
Systems (MS4s)
Municipal Stormwater
Permits
• Municipal Separate Storm Sewer
Systems (MS4s)
– Phase I
• Municipalities > 100,000 population
– Phase II
• Small municipalities and others
– 9th
circuit court decision 1992
MS4 – Phase 1
• 26 Regional Water Board Phase I
MS4 Permits
• Covering over 1000 entities in CA
• 1 Statewide - Caltrans Permit
Municipal Permits
• Municipal permits (under Phase I) areMunicipal permits (under Phase I) are
issued by Regional Boards for:issued by Regional Boards for:
• Municipalities > 100,000Municipalities > 100,000
• Contiguous municipalities sharing aContiguous municipalities sharing a
large MS4large MS4
• Small municipalities covered underSmall municipalities covered under
Phase II regulationsPhase II regulations
MS4 Phase II – 6 Minimum
Program Elements
• Education an Outreach
• Public Participation/Involvement
• Illicit Discharge Detection and
Elimination
• Construction Site Runoff Control
• Post Construction Runoff Control
• Pollution Prevention/Good
Housekeeping
MS4 – Phase I Issues
• June 19, 2006 - State Water Board released Blue
Ribbon Panel Report
• Municipal Discharges - Panel Recommended
• (Action Levels and improve accountability)
• Impaired water bodies and TMDLs are being
implemented through MS4 permits
• Over 1000 cities, counties, and other governmental
agencies regulated – significant
MS4 – Phase II
• Current permit requires MS4s to
enroll and for Rbs to approve SWMP
• About 150 MS4s currently “covered”
• New Phase II permit being drafted
Industrial Stormwater
Permits
• Industrial General Permit (SB Order
97-03-DWQ)
– Sector/SIC code specific
• Construction General Permit (SB
Order No. 99-08-DWQ)
– Construction and development industry
– All projects that disturb 1 acre or
more of land must obtain coverage
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
Industrial Facilities
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
Industrial Facilities
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
Industrial Permit
• Over 500 Standard Industrial
Codes (SIC) regulating specific
industries
• Landfills, auto dismantlers,
refineries, plastic products, etc.
• Plastic
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
Construction
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
Construction
DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
Plastic Debris Program
• ~400 facilities regulated under the
industrial general permit (IGP)
• ~3000 facilities statewide that
handle preproduction plastic pellets
in some manner
• Part of global problem – fate and
transport in the environment of
plastic is impressive
The Construction Stormwater
Program
Construction Activity Threats
• Two-fold – construction projects have the
potential to cause impacts to our beneficial
uses of water both during and after the
project.
• During – potential for sediment erosion
discharges.
• After – potential for pollutant export and
hydromodification impacts as a result of how
the new landscape functions.
+
+
=Construction
WQ threats
Who needs coverage
1) All sites that disturb more than one
acre
2) All sites that are less than one acre but
part of a “larger plan of development”
3) All sites that are thought to be a
threat to water quality, as deemed by
the appropriate RWQCB
Permit Reissuance Goals
1) Adopt a risk-based permit approach-
“not all sites are created equal”
2) Improve “performance” measurement
of program
3) Establish standards to avoid, minimize
and mitigate post-construction impacts
associated with all new and re-
development projects triggering the
construction activity permit
Program “Performance” Elements
• Certification and training expectations
• Effluent monitoring = feedback for site
amd program
• Receiving water monitoring = feedback
for “water quality outcome”
goals/objectives
• Performance-based post-construction
runoff standards (pre = post)
Risk Approach
• Three risk categories
• Aimed at sediment transport and
receiving water risk of construction
activities “normal distribution”
assumption (most projects should not be
high risk)
• Incentives/requirements linked to risk.
Direct Erosion / Sediment
Control Requirements
• Old model used SWPPP as main vehicle
• New approach to use Rain Event Action
Plan (REAP) as primary tool (SWPPP
becomes more a master
document/library)
• Requirements based on risk
• Prevention and planning incentives
Post-Construction Impacts
Post-Construction Standards
• Design to mimic pre-development water
balance
• Preserve existing time of concentration
• Protect channels
After Lane (1955) as cited in Rosgen (1996)
Channel Changes Associated with Urbanization
The future
• Low Impact Development (LID) and
Green Infrastructure (GI)
represent “natural systems”
approach to building better urban
landscapes.
• Both aim to protect and/or restore
“natural hydrology” and ecological
processes
• LID – site and neighborhood scale
• GI – community and watershed scale
Ways to mimic pre-development water
balance and Tc

Soil quality improvement (porosity)

Native and drought tolerant
vegetation

Trees

Permeable pavement

Riparian buffers

A general reduction of connected,
impervious surfaces in runoff
pathways

Bioretention

Disconnected downspouts/rain
chains/rain barrels
Ideal Soil Structure for Plant Growth
Mineral
45%
Organic
Matter
5%
Water
25%
Air
25%
Rain chains and
mulch combo
Sacramento
Greg Gearheart
916.341.5892
ggearheart@waterboards.ca.gov

Contenu connexe

Tendances

A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
ijiert bestjournal
 
WaterServices&projectsExperienceADJllr
WaterServices&projectsExperienceADJllrWaterServices&projectsExperienceADJllr
WaterServices&projectsExperienceADJllr
Alejandro DUSSAILLANT
 
Macro Sustainability Methodologies project
Macro Sustainability Methodologies projectMacro Sustainability Methodologies project
Macro Sustainability Methodologies project
Shironika Farrior
 
Final Report_Edited by JC and KP
Final Report_Edited by JC and KPFinal Report_Edited by JC and KP
Final Report_Edited by JC and KP
Jared Cordes
 

Tendances (19)

Chapter 1 & 2 ss (1)
Chapter 1 & 2 ss (1)Chapter 1 & 2 ss (1)
Chapter 1 & 2 ss (1)
 
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
 
Alera starting conference. UPC. Constructed wetlands.
Alera starting conference. UPC. Constructed wetlands.Alera starting conference. UPC. Constructed wetlands.
Alera starting conference. UPC. Constructed wetlands.
 
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
 
Site 6 suds
Site 6 sudsSite 6 suds
Site 6 suds
 
Storm water management and its techniques
Storm water management and its techniquesStorm water management and its techniques
Storm water management and its techniques
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage design
 
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
DESIGN A HYDRAULIC STRUCTURE USING THE RAINFALL INTENSITY- DURATION- FREQUENC...
 
Rain water harvesting in buildings
Rain water harvesting in buildings Rain water harvesting in buildings
Rain water harvesting in buildings
 
L 2 sources and water supply schemes
L 2 sources and water supply schemesL 2 sources and water supply schemes
L 2 sources and water supply schemes
 
Prayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiPrayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya Nandi
 
WaterServices&projectsExperienceADJllr
WaterServices&projectsExperienceADJllrWaterServices&projectsExperienceADJllr
WaterServices&projectsExperienceADJllr
 
Stormwater Management & Green Infrastructure
Stormwater Management & Green InfrastructureStormwater Management & Green Infrastructure
Stormwater Management & Green Infrastructure
 
Macro Sustainability Methodologies project
Macro Sustainability Methodologies projectMacro Sustainability Methodologies project
Macro Sustainability Methodologies project
 
Stormwater management
Stormwater managementStormwater management
Stormwater management
 
Final Report_Edited by JC and KP
Final Report_Edited by JC and KPFinal Report_Edited by JC and KP
Final Report_Edited by JC and KP
 
L 4 wastewater flow rates
L 4 wastewater flow ratesL 4 wastewater flow rates
L 4 wastewater flow rates
 
Rain Water Harvesting - Indian Railways Institute of Civil Engineering
Rain Water Harvesting - Indian Railways Institute of Civil Engineering  Rain Water Harvesting - Indian Railways Institute of Civil Engineering
Rain Water Harvesting - Indian Railways Institute of Civil Engineering
 
Smart tunnel
Smart tunnelSmart tunnel
Smart tunnel
 

En vedette

Training SWMM LID control
Training SWMM LID controlTraining SWMM LID control
Training SWMM LID control
sjyeol84
 
Santa Monica Lid Neil Shapiro
Santa Monica Lid Neil ShapiroSanta Monica Lid Neil Shapiro
Santa Monica Lid Neil Shapiro
Greg Gearheart
 

En vedette (20)

UTM_SWMM_KAMAL
UTM_SWMM_KAMALUTM_SWMM_KAMAL
UTM_SWMM_KAMAL
 
Performance of geosynthetic filters in treatment of urban storm water runoff
Performance of geosynthetic filters in treatment of urban storm water runoffPerformance of geosynthetic filters in treatment of urban storm water runoff
Performance of geosynthetic filters in treatment of urban storm water runoff
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
OSD using SWMM...
OSD using SWMM...OSD using SWMM...
OSD using SWMM...
 
Info swmm sustain_infoswmm_2d_and_swmm_live
Info swmm sustain_infoswmm_2d_and_swmm_liveInfo swmm sustain_infoswmm_2d_and_swmm_live
Info swmm sustain_infoswmm_2d_and_swmm_live
 
Treatment of storm water generated from highways
Treatment of storm water generated from highwaysTreatment of storm water generated from highways
Treatment of storm water generated from highways
 
Training SWMM LID control
Training SWMM LID controlTraining SWMM LID control
Training SWMM LID control
 
Info swmm sustain_infoswmm_2d_and_swmm_live
Info swmm sustain_infoswmm_2d_and_swmm_liveInfo swmm sustain_infoswmm_2d_and_swmm_live
Info swmm sustain_infoswmm_2d_and_swmm_live
 
Project ppt
Project pptProject ppt
Project ppt
 
Santa Monica Lid Neil Shapiro
Santa Monica Lid Neil ShapiroSanta Monica Lid Neil Shapiro
Santa Monica Lid Neil Shapiro
 
Storm Water Management in Accra, Ghana - Presentation
Storm Water Management in Accra, Ghana - PresentationStorm Water Management in Accra, Ghana - Presentation
Storm Water Management in Accra, Ghana - Presentation
 
SWMM practice (basic)
SWMM practice (basic)SWMM practice (basic)
SWMM practice (basic)
 
Swmm quick start tutorial
Swmm quick start tutorialSwmm quick start tutorial
Swmm quick start tutorial
 
Permeable Paving: A New Tool for Sustainable Site Development
Permeable Paving: A New Tool for Sustainable Site DevelopmentPermeable Paving: A New Tool for Sustainable Site Development
Permeable Paving: A New Tool for Sustainable Site Development
 
Geotextile Filter Design
Geotextile Filter DesignGeotextile Filter Design
Geotextile Filter Design
 
Urban Storm Water Management: possible catalyst for moving towards a Water Se...
Urban Storm Water Management: possible catalyst for moving towards a Water Se...Urban Storm Water Management: possible catalyst for moving towards a Water Se...
Urban Storm Water Management: possible catalyst for moving towards a Water Se...
 
airport drainage
airport drainageairport drainage
airport drainage
 
Geotextiles
GeotextilesGeotextiles
Geotextiles
 
Geotextiles
GeotextilesGeotextiles
Geotextiles
 
Modeling the water food-energy nexus in the arab world: River basin modeling ...
Modeling the water food-energy nexus in the arab world: River basin modeling ...Modeling the water food-energy nexus in the arab world: River basin modeling ...
Modeling the water food-energy nexus in the arab world: River basin modeling ...
 

Similaire à Urban Runoff - Storm Water 101

1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
guest7dbf4
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
jnett
 

Similaire à Urban Runoff - Storm Water 101 (20)

1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Final
 
James Solution to Pollution
James Solution to Pollution James Solution to Pollution
James Solution to Pollution
 
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
 
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
 
Municipal Stormwater Illicit Discharge Programs, Stormwater System Maintenanc...
Municipal Stormwater Illicit Discharge Programs, Stormwater System Maintenanc...Municipal Stormwater Illicit Discharge Programs, Stormwater System Maintenanc...
Municipal Stormwater Illicit Discharge Programs, Stormwater System Maintenanc...
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
 
Georgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPDGeorgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPD
 
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3
 
Mitigation symposium - Andre Corbould
Mitigation symposium - Andre CorbouldMitigation symposium - Andre Corbould
Mitigation symposium - Andre Corbould
 
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in Minnesota
 
ICLR Friday Forum: Reducing flood risk in Toronto (February 2016)
ICLR Friday Forum: Reducing flood risk in Toronto (February 2016)ICLR Friday Forum: Reducing flood risk in Toronto (February 2016)
ICLR Friday Forum: Reducing flood risk in Toronto (February 2016)
 
Iee
IeeIee
Iee
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Low impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigationLow impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigation
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
SNEAPA 2013 Friday g4 1_45_don't_feelflushed
SNEAPA 2013 Friday g4 1_45_don't_feelflushedSNEAPA 2013 Friday g4 1_45_don't_feelflushed
SNEAPA 2013 Friday g4 1_45_don't_feelflushed
 

Plus de Greg Gearheart

Pre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtgPre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtg
Greg Gearheart
 
Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslam
Greg Gearheart
 
Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2
Greg Gearheart
 
Storm water program v2 0
Storm water program v2 0Storm water program v2 0
Storm water program v2 0
Greg Gearheart
 
Pimple dimples eureka2013
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013
Greg Gearheart
 
Lid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgLid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtg
Greg Gearheart
 
Pp munispectors ds_comp
Pp munispectors ds_compPp munispectors ds_comp
Pp munispectors ds_comp
Greg Gearheart
 
Ents Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 GgEnts Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 Gg
Greg Gearheart
 
Lidstrategiesandtechniques
LidstrategiesandtechniquesLidstrategiesandtechniques
Lidstrategiesandtechniques
Greg Gearheart
 

Plus de Greg Gearheart (20)

Ppp sept21 gtg
Ppp sept21 gtgPpp sept21 gtg
Ppp sept21 gtg
 
Pre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtgPre production plastics and stormwater-h2 o-gtg
Pre production plastics and stormwater-h2 o-gtg
 
Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslam
 
Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2Sept21 board hearing_plasticspresentation_de_gver2
Sept21 board hearing_plasticspresentation_de_gver2
 
Storm water program v2 0
Storm water program v2 0Storm water program v2 0
Storm water program v2 0
 
Pimple dimples eureka2013
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013
 
Casqa2012 igp gtg
Casqa2012 igp gtgCasqa2012 igp gtg
Casqa2012 igp gtg
 
Lid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgLid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtg
 
Pp munispectors ds_comp
Pp munispectors ds_compPp munispectors ds_comp
Pp munispectors ds_comp
 
Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010
 
Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010Pre Production Plastics And Stormwater March11 2010
Pre Production Plastics And Stormwater March11 2010
 
Mark Bradley
Mark BradleyMark Bradley
Mark Bradley
 
Ents Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 GgEnts Arcata Urban Numerical Cbec 081808 Gg
Ents Arcata Urban Numerical Cbec 081808 Gg
 
Lid Intro Nw
Lid Intro NwLid Intro Nw
Lid Intro Nw
 
Liddesignandanalysis
LiddesignandanalysisLiddesignandanalysis
Liddesignandanalysis
 
Lidstrategiesandtechniques
LidstrategiesandtechniquesLidstrategiesandtechniques
Lidstrategiesandtechniques
 
Tressie Word
Tressie WordTressie Word
Tressie Word
 
Rachel Hunter
Rachel HunterRachel Hunter
Rachel Hunter
 
Mike Wilson
Mike WilsonMike Wilson
Mike Wilson
 
Greg Gearheart
Greg GearheartGreg Gearheart
Greg Gearheart
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Dernier (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 

Urban Runoff - Storm Water 101

  • 1. Urban Runoff Greg Gearheart State Water Resources Control Board
  • 2. Urban Runoff Problems • Pollution – Beach closures – Water quality impairment – Fish kills – Plastic debris • Physical alteration of the watershed / water bodies – Stream incision / erosion / deposition – Habitat destruction
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. Hydrologic Changes Runoff Time Pre-Development Urbanization tends to increase storm water runoff:  peak flows  volume  frequency Post-Develop. From Haltiner (2006)
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Regulatory Solution • Stormwater Program – A Clean Water Act-based program – A permitting solution – “Forces” stormwater peg into the existing hole designed to protect surface waters – Has evolved over the years to include new tools and connect to TMDLs
  • 14. Overview of the Clean Water Act • Federal Water Pollution Control Act of 1972, amended 1977 – NPDES programs – Permits are a privilege, not a right – Effluent limits must be both technology and water quality based • 1987 – added Section 402(p) to CWA covering stormwater
  • 15. Overview of the Clean Water Act • All “point sources” • “Discharging a pollutant” • Into a “Water of the U.S” >>>>Must obtain a NPDES (National Pollutant Discharge Elimination System) Permit
  • 16. What is a Point Source ? • Point Source – Discharge though a discrete conveyance into waters of the US • Industrial facilities • Sewage treatment plants • Stormwater from industrial sites and storm sewers – Non-point source • Runoff that is not a point source
  • 17. What is a Water of the U.S ? • All waters currently used, used in the past, or susceptible to use for interstate commerce including all waters which are subject to the ebb and flow of the tide
  • 18. US Waters – Examples • Rivers, lakes and streams • Tributaries • Territorial seas • Wetlands • Ephemeral washes
  • 19. Stormwater Program Overview • Municipal Program – urban runoff • Industrial Program – industrial sector specific runoff • Program Overlap – Many industrial sites discharge INTO Municipal Separate Storm Sewer Systems (MS4s)
  • 20. Municipal Stormwater Permits • Municipal Separate Storm Sewer Systems (MS4s) – Phase I • Municipalities > 100,000 population – Phase II • Small municipalities and others – 9th circuit court decision 1992
  • 21.
  • 22. MS4 – Phase 1 • 26 Regional Water Board Phase I MS4 Permits • Covering over 1000 entities in CA • 1 Statewide - Caltrans Permit
  • 23. Municipal Permits • Municipal permits (under Phase I) areMunicipal permits (under Phase I) are issued by Regional Boards for:issued by Regional Boards for: • Municipalities > 100,000Municipalities > 100,000 • Contiguous municipalities sharing aContiguous municipalities sharing a large MS4large MS4 • Small municipalities covered underSmall municipalities covered under Phase II regulationsPhase II regulations
  • 24. MS4 Phase II – 6 Minimum Program Elements • Education an Outreach • Public Participation/Involvement • Illicit Discharge Detection and Elimination • Construction Site Runoff Control • Post Construction Runoff Control • Pollution Prevention/Good Housekeeping
  • 25. MS4 – Phase I Issues • June 19, 2006 - State Water Board released Blue Ribbon Panel Report • Municipal Discharges - Panel Recommended • (Action Levels and improve accountability) • Impaired water bodies and TMDLs are being implemented through MS4 permits • Over 1000 cities, counties, and other governmental agencies regulated – significant
  • 26. MS4 – Phase II • Current permit requires MS4s to enroll and for Rbs to approve SWMP • About 150 MS4s currently “covered” • New Phase II permit being drafted
  • 27. Industrial Stormwater Permits • Industrial General Permit (SB Order 97-03-DWQ) – Sector/SIC code specific • Construction General Permit (SB Order No. 99-08-DWQ) – Construction and development industry – All projects that disturb 1 acre or more of land must obtain coverage
  • 28.
  • 29.
  • 30. DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 31. Industrial Facilities DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 32. DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 33. Industrial Facilities DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 34. Industrial Permit • Over 500 Standard Industrial Codes (SIC) regulating specific industries • Landfills, auto dismantlers, refineries, plastic products, etc. • Plastic
  • 35. DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 36. Construction DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 37. DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 38. Construction DRAFT Program report cards developed by Rafael Maestu in the Office of Research, Planning and Performance
  • 39. Plastic Debris Program • ~400 facilities regulated under the industrial general permit (IGP) • ~3000 facilities statewide that handle preproduction plastic pellets in some manner • Part of global problem – fate and transport in the environment of plastic is impressive
  • 40.
  • 41.
  • 42.
  • 44. Construction Activity Threats • Two-fold – construction projects have the potential to cause impacts to our beneficial uses of water both during and after the project. • During – potential for sediment erosion discharges. • After – potential for pollutant export and hydromodification impacts as a result of how the new landscape functions.
  • 46. Who needs coverage 1) All sites that disturb more than one acre 2) All sites that are less than one acre but part of a “larger plan of development” 3) All sites that are thought to be a threat to water quality, as deemed by the appropriate RWQCB
  • 47. Permit Reissuance Goals 1) Adopt a risk-based permit approach- “not all sites are created equal” 2) Improve “performance” measurement of program 3) Establish standards to avoid, minimize and mitigate post-construction impacts associated with all new and re- development projects triggering the construction activity permit
  • 48. Program “Performance” Elements • Certification and training expectations • Effluent monitoring = feedback for site amd program • Receiving water monitoring = feedback for “water quality outcome” goals/objectives • Performance-based post-construction runoff standards (pre = post)
  • 49. Risk Approach • Three risk categories • Aimed at sediment transport and receiving water risk of construction activities “normal distribution” assumption (most projects should not be high risk) • Incentives/requirements linked to risk.
  • 50. Direct Erosion / Sediment Control Requirements • Old model used SWPPP as main vehicle • New approach to use Rain Event Action Plan (REAP) as primary tool (SWPPP becomes more a master document/library) • Requirements based on risk • Prevention and planning incentives
  • 52. Post-Construction Standards • Design to mimic pre-development water balance • Preserve existing time of concentration • Protect channels
  • 53.
  • 54.
  • 55. After Lane (1955) as cited in Rosgen (1996)
  • 56. Channel Changes Associated with Urbanization
  • 57. The future • Low Impact Development (LID) and Green Infrastructure (GI) represent “natural systems” approach to building better urban landscapes. • Both aim to protect and/or restore “natural hydrology” and ecological processes • LID – site and neighborhood scale • GI – community and watershed scale
  • 58. Ways to mimic pre-development water balance and Tc  Soil quality improvement (porosity)  Native and drought tolerant vegetation  Trees  Permeable pavement  Riparian buffers  A general reduction of connected, impervious surfaces in runoff pathways  Bioretention  Disconnected downspouts/rain chains/rain barrels
  • 59. Ideal Soil Structure for Plant Growth Mineral 45% Organic Matter 5% Water 25% Air 25%
  • 60.
  • 61.
  • 62. Rain chains and mulch combo Sacramento
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.

Notes de l'éditeur

  1. Q’s: Very familiar with stormwater program ? How many pretreatment operators ? How many municipalities – phase I ? II ?
  2. NPDES permit is a “license to discharge”
  3. Point source – includes stormwater from industrial , construction & storm sewers - does not include agriculture return flows