5. www.duanemorris.com5Source: IHA and REN21
Top 8 Countries (2014)
for hydropower production
Total capacity
GW
Added in 2014
MW
Generation
TWh
1) China 300 21,850 1,070
2) Brazil 89 3,312 392
3) Canada 78 1,724 376
4) United States 101 212 257
5) Russia 49 1,058 164
6) Norway 31 - 136
7) India 44 1,195 125
8) Japan 45 724 85
Rest of World 318 14,925 1,345
World Total 1,055 45,000 3,950
Myanmar 3.1 160 15.8
5
6. www.duanemorris.com6Source: IHA and REN21
Top 10 Countries (2014)
by remaining hydropower potential
Total potential
TWh/year
Current utilization
%
Undeveloped
TWh/year
1) Russia 1670 10 1502
2) China 2140 41 1259
3) Canada 1181 32 799
4) India 660 21 523
5) Brazil 818 48 425
6) Indonesia 402 3 389
7) Peru 395 6 379
8) DR Congo 314 2 307
9) Tajikistan 317 5 301
10)U.S 529 52 256
Myanmar 240 5 226
6
8. www.duanemorris.com8
Potential of Myanmar
(Major river basins)
8
River basin
Developed
capacity
(MW)
Under
construction
(MW)
Under
processing
(MW)
Potential
future
projects
(MW)
Total of
each
basin
(MW)
Ayeyarwady
Upper Ayeyarwady
Lower Ayeyarwady
1,870
149
2,056
150
15,200
-
6,000
-
25,126
299
Chindwin - - 380 1860 2,240
Sittaung 810 - 260 - 1,070
Thanlwin 302 81.4 15,395 765 16,543.4
Others 20 111 521 1,511.5 2,163.5
Total (MW) 3,151 2,398.4 31,756 10,136.5 47,441.9
9. www.duanemorris.com9
Existing Electricity
9
Installed capacity 4,805 MW
Electricity generation 14,156 GWh
Electricity generation from hydropower 8829 GWh (62.4%)
No. of consumers 3.3 millions
Per capita consumptions 222 KWh
Electrification town 429 Nos (On grid)
Electrification villages 6626 Nos (On grid)
Electrification ratio 33%
Generator,
12783
Power
System,
4785
Solar
Power, 740
Bio Gas,
1213
Micro-
Hydro,
2154
Generator Power System Solar Power Bio Gas Micro-Hydro
Power Sources of Villages (2012-13)
Kachin, 355 Kayah, 108
Kayin, 255
Chin, 294
Sagaing,
3815
Tanintharyi,
696
Bago, 1090
Magway,
2514
Mandalay,
2563
Mon, 573
Rakhine,
1016
Yangon, 455
Shan, 1848
Ayeyarwady,
5616
Naypyitaw,
477
Electrified Villages (2012-13)
Average
34%
(21,675)
Average
34%
(21,675)
12. www.duanemorris.com12
Forecasting Conditions
12
Analysis step Conditions for the forecast Reference
Variable
setting
GDP High Case : 8.7% The growth rate of 2011-2012
Low Case : 6.4% IMF “Economic Outlook”
Elasticity 1.4 The average from the result of
2002-2010
Power
Consumption
Forecast
Potential
demand
4.4% Calculated from the load shedding
result data
Scenario High case Both industry and non-industry
sector will grow at 13%
Low case Industry sector will grow at 13% by
2020, afterwards, 9.8%
Non-industry sector will grow at
9.8% constantly
14. www.duanemorris.com14
Industrial Complex
14
State/Region Industrial Zone Max Peak Load (MW)
Kachin State Myintkyina 0.1
Kayah State Loikaw 0.5
Kayin State Hpa-an -
Mon State Mawlamying 0.5
Shan(South)State Ayetharyar 3
Mandalay Region
Zone(1) 20
Zone(2) 20
Meikhtila 4.8
Myingyan 1.2
Sagaing Region
Ruby Zone 5
Nandawon Zone 6
Monywa Zone 2.5
Magway
Yaenanchaung 0.6
Pakokku 1.2
Bago(West)Region
Zone(1) 2.5
Zone(2) 0.3
Ayeyarwady Region
Pathein 0.25
Myaungmya 1.56
Total 70.01
Year
Industry Development
High Case (MW) Low Case (MW)
2012 609 609
2020 1,472 1,472
2030 4,723 3,468
Year
Special Economic Zone (MW)
Thilawa Kyaukphyu Mandalay Dawei
2020 180 – 200 100 100 180
2030 400 – 500 180 300 300 - 500
15. www.duanemorris.com15
Forecasting Conditions
15
Results of Demand Forecast by region/state
Results of Demand Forecast
Year
High Case (MW) Low Case (MW)
Total
Non-
industry
Industry Total
Non-
industry
Industry
2012 1,874 1,265 609 1,874 1,265 609
2020 4,531 3,060 1,472 3,862 2,390 1,472
2030 14,542 9,819 4,723 9,100 5,631 3,468
Region
/State
High Case (MW) Low Case (MW)
FY2012 FY2030 FY2012 FY2030
Kachin 21 185 21 140
Kayah 8 162 8 130
Kayin 13 165 13 135
Chin 3 90 3 60
Mon 45 418 45 338
Rakhine 10 243 10 180
Shan 103 355 103 288
Sagaing 98 349 98 282
Tanintharyi 52 290 52 235
Bago 131 646 131 523
Magwe 106 293 106 238
Mandalay 457 2,731 457 2,203
Ayeyarwaddy 85 406 85 329
Yangon 742 8,209 742 4,019
Total 1,874 14,542 1,874 9,100
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Electricity(MW)
High Case Low Case
16. www.duanemorris.com16
Balance - Demand & Supply
16
Demand : 14.5GW in High case
Supply : 18.9GW in Dry season available by installed capacity for
Myanmar 23.6GW & total installed capacity 27.0GW
17. www.duanemorris.com17
Power Supply Planning
17
Scenarios
SN 1- Domestic Energy
Consumption
SN 2- Least Cost
SN 3- Power Resources Balance
Annual Transition of Power Supply for Peak Demand (MW)
8896, 38%
4758, 20%
7940, 34%
2000, 8%
Hydro Gas Coal Renewable
22. www.duanemorris.com22 22
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
River - Paunglaung River
Inflow - 260 Mm3
Dam - RCC Dam, 98 m Height
Progress - 99.25 %
Upper Paunglaung HPP (140 MW)
23. www.duanemorris.com23 23
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
Powerhouse
Headrace
(Tunnel)
Dam and Spillway
Switchyard
River flow direction
Right Abutment
T/L
Intake
Tailrace
Left Abutment
Middle Paunglaung HPP (100 MW)
River - Paunglaung River
Inflow - 7.31 Mm3
Dam - RCC Dam, 94.5 m Height
Progress - Review FSR
24. www.duanemorris.com24 24
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
Shweli (3) HPP (1,050 MW)
River - Shweli River
Inflow - 14259 Mm3
Dam - RCC Dam, 120 m Height
Progress - 9.61 %
25. www.duanemorris.com25 25
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
Deedoke HPP (60 MW)
River - Myitnge River
Dam - Gravity Dam, 14 m Height
Progress - MOU Stage (Andritz)
26. www.duanemorris.com26 26
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
Upper Yeywa HPP (280 MW)
River - Myitnge River
Inflow - 11702 Mm3
Dam - RCC Dam, 97 m Height
Progress - 23.62%
27. www.duanemorris.com27 27
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
Middle Yeywa HPP (700 MW)
River - Myitnge River
Inflow - 12814 Mm3
Dam - RCC Dam, 160 m Height
Progress - MOU Stage (SN Power)
28. www.duanemorris.com28 28
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
Tha-htay HPP (111 MW)
River - Tha-htay River
Inflow - 2876Mm3
Dam - Zoned Type Rockfill Dam, 91m Height
Progress - 40.50%
29. www.duanemorris.com29 29
Progress of Hydropower
Implementing Hydropower Projects (MOEP)
River - Nam Teng River
Inflow - 2302 Mm3
Dam - Zoned Type Rockfill Dam, 57 m Height
Progress - 29.15%
Upper Keng Tawng HPP (51 MW)
32. www.duanemorris.com32
Conclusion
32
appears to have a promising future
can increase the clean energy supply and reduce
greenhouse gas emission
moving to public private partnership
focus sustainable and responsible development
key sources of energy for industry players
electricity supply from the national grid support
industries to reduce the production cost
assists economic development & reduction of poverty
Hydropower Strategy in Myanmar: