SlideShare une entreprise Scribd logo
1  sur  28
Télécharger pour lire hors ligne
Corporate Presentation
June 2015
TSX: ORT OTCQX: EORBF© Orbite
© Orbite TSX: ORT OTCQX: EORBF
Forward Looking Statements
Certain information contained in this document may include "forward-looking information". Without limiting the
foregoing, the information and any forward-looking information may include statements regarding projects, costs,
objectives and future returns of the Company or hypotheses underlying these items. In this document, words such as
"may", "would", "could", "will", "likely", "believe", "expect", "anticipate", "intend", "plan", "estimate" and similar words and
the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be
read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the
times at or by which, such future performance will be achieved. Forward-looking statements and information are based
on information available at the time and/or the Company management's good-faith beliefs with respect to future events
and are subject to known or unknown risks, uncertainties, assumptions and other unpredictable factors, many of which
are beyond the Company's control. These risks uncertainties and assumptions include, but are not limited to, those
described in the section of the Management's Discussion and Analysis (MD&A) entitled "Risk and Uncertainties" as filed
on March 31, 2015 on SEDAR.
The Company does not intend, nor does it undertake, any obligation to update or revise any forward-looking information
or statements contained in this document to reflect subsequent information, events or circumstances or otherwise,
except as required by applicable laws.
2
© Orbite TSX: ORT OTCQX: EORBF
TSX: ORT OTCQX: EORBF
Commercializing Game Changing Technology – The Orbite Process
Extracting all value
from a variety of
mineral and
industrial waste
feedstocks
3
© Orbite TSX: ORT OTCQX: EORBF
…inefficient and creates waste
Today’s resource processing is …
4
© Orbite TSX: ORT OTCQX: EORBF
• Waste product from alumina production
• Financial liability for producers
• Ecologically damaging
3 billion tonnes
stored globally
+ 120 million tpa
© Orbite - Confidential
Lots of waste, such as red mud
5
Contains high-value elements:
Rare Earths / Ga / Sc / Al2O3 / others
© Orbite TSX: ORT OTCQX: EORBF
TSX: ORT OTCQX: EORBF6
2 billiontonnes stockpiled in the
province of Québec
These residues :
• Contain ≥ 40% magnesium oxide
• Remainder is mainly SiO2 (≈ 40%)
and Al2O3 (≈ 5%)
• Leach well in hydrochloric acid
And Mine Tailings such as Asbestos Residues…
6
© Orbite TSX: ORT OTCQX: EORBF
Fly ash :
• Waste product from coal-fired
power stations
• Contains high-value elements
• On-going liability for producers and
communities
71 milliontonnes produced
annually in U.S.
550 million
tonnes worldwide
Or Fly Ash…
7
© Orbite TSX: ORT OTCQX: EORBF
RARE EARTHS
Growing demand, uncertain
supply, no substitutes
We need the value in that waste!
ALUMINA
Rapid decline in bauxite
quality = increasing OPEX
TSX: ORT OTCQX: EORBF8
8
© Orbite TSX: ORT OTCQX: EORBF
9
We can fix all of that
9
© Orbite TSX: ORT OTCQX: EORBF
In the case of alumina
and certain other
customized specialty
products: calcination
Technology
Feedstock
preparation
Leaching
(digestion)
Selective, steps-wise
extraction of alumina,
and other valuable
products
In parallel, acid
is recovered from
the mother liquor and
during calcination
10
© Orbite TSX: ORT OTCQX: EORBF
$117 million extraction and
purification facility
(commissioning Q3, 2015)
HPA production capacity of 3 tpd
Calcinator capacity of 5 tpd
Fully qualified operational team
Assets
TSX: ORT OTCQX: EORBF11© Orbite
11
© Orbite TSX: ORT OTCQX: EORBF
Capabilities
Process development and optimization
Product Customization
People
Extensively tested and validated front-
end of HPA process
Extensive pre-purchase testing of
technology back-end (calcination)
12
State-of-the-art Technology Development Centre
12
© Orbite TSX: ORT OTCQX: EORBF
1) Processes for extracting aluminum from aluminous ores.
• Patent protection granted in USA, Canada, Australia, Russia, Japan, China and Hong Kong
• Additional patents pending in EU, India, Hong Kong, Australia, USA, Brazil, China, Russia.
2) Processes for extracting aluminum from aluminous ores.
3) Processes for extracting rare earth elements from aluminum-bearing materials.
4) Processes for extracting rare earth elements from various ores.
5) Methods for preparing hematite.
6) Methods for separating iron ions from aluminous ions.
7) Processes for preparing alumina and various other products.
8) Processes for treating Red Mud.
9) Processes for treating Fly Ash.
10) Processes for preparing titanium oxide and various other products.
11) Processes for recovering rare earth elements and rare metals.
12) Processes for treating various materials.
13) Methods for purifying aluminum ions.
14) Processes for preparing alumina and various other products.
15) Processes for decomposition and calcination of alumina.
IP: 15 Families, 17 Granted, 95 Pending
Recently awarded Red Mud patents in United States and Canada
TSX: ORT OTCQX: EORBF13© Orbite
13
© Orbite TSX: ORT OTCQX: EORBF
Three Business Lines
Specialty Products
Addressing supply issues in
high-end markets
Waste Monetization
Converting financial and
environmental liabilities into
assets
Commodity Minerals
Strategically located low-
cost producer of
commodities
14
Build, own, operate Scale up with JV Partner
Expansion through
licenses/royalties
Commercialization with
JV partner. We own the
deposit: 1 bn tonnes
indicated resources
High-Purity Alumina
(HPA), Gallium,
Scandium
Silica, Titanium, Scandium,
Gallium, REE, RM
Smelter-Grade Alumina,
Slica, Hematite
© Orbite TSX: ORT OTCQX: EORBF
Specialty Products
First Commercial Product: High Purity Alumina (HPA)
High-end product for niche markets
LED lighting
Smart phone screens (sapphire)
Separators in Li-ion battery packs
Specialized ceramics for industrial, military or medical applications
HPA sells for $20,000 – $30,000 USD per tonne
1515
© Orbite TSX: ORT OTCQX: EORBF
*4N stands for 99.99% purity, 5N for 99.999%
17,340
21,240
25,360
30,360
34,390
2012 2013 2014 2015 2016
The premium market is mainly for
4N* to 5N* purities
HPA prices: $20,000 –$30,000 USD
per tonne, depending on
characteristics and application
Confident of producing up to 5N
consistently
Market expected to strengthen
beyond current outlook
Global HPA Demand (tpa)
HPA Market
© Orbite
16
© Orbite TSX: ORT OTCQX: EORBF
Over thirty potential customers interested in our HPA
Commenced shipping samples for customers’ qualification programmes in Q1
2015 (4N8 purity)
17
HPA - Potential Customers Lined Up
17
© Orbite TSX: ORT OTCQX: EORBF
Products represent signifcant value,
only small fraction of original feedstock remains (<10%)
Multiple feedstock opportunities
Initial focus on red mud and fly ash
Discussions with Veolia for global commercialization
Subsequent focus on mine tailings
TSX: ORT OTCQX: EORBF18© Orbite
Turning liabilities into assets
Waste Monetization: extracting all value
18
© Orbite TSX: ORT OTCQX: EORBF
Waste monetization: strategic advantages
Huge quantities of feedstock available
Representing valuable asset for Orbite
(REEs, RMOs, Alumina, etc.)
No mines to develop
Already in industrial zone
TSX: ORT OTCQX: EORBF19
Why waste monetization?
Transportation and energy
infrastructure in place
Resource with negative value to
current owners
Customer is right next door
19
© Orbite TSX: ORT OTCQX: EORBF
Regulated utility producing approximately 50,000 megawatts
to serve approximately 7.2 million customers in SE and
Midwest USA
In North Carolina: 14 sites, 33 ash impoundments, >100 M
tonnes stored
Feb 2014: storm sewer line running beneath the Dan River
impoundment collapsed, releasing 23,000 – 30,000 m3 of ash
and 100 M liters of ash pond water into the river
TSX: ORT OTCQX: EORBF20
Duke Energy: A Case-Study
© Orbite
20
© Orbite TSX: ORT OTCQX: EORBF
In Sept 2014, NC enacted a coal ash law:
• Applies to existing and closed sites
• Close high-risk ponds by end of 2019
(4 Duke sites)
• Medium-risk ponds by 2024, low-risk ponds
by 2029
• Sites assessment plan to be in place by end
of 2014
• Excavation and lining of existing ponds or
excavation and disposal at permitted
facilities
TSX: ORT OTCQX: EORBF21
Duke Energy: A Case-Study
© Orbite
21
Duke Energy estimates compliance
costs at $2-10 billion
© Orbite TSX: ORT OTCQX: EORBF
Front end of plant to be converted to start
consuming multiple feedstocks
Facility to provide critical input in
formalization of plant design for processing
red mud, fly ash, mine tailings, clay
Will continue to produce HPA
Expand HPA facility to 5 tpd
Scandium and Gallium extraction to be added
Technology Demonstration at Industrial Scale for Waste Monetization &
Commodities Initiatives
TSX: ORT OTCQX: EORBF22© Orbite
22
© Orbite TSX: ORT OTCQX: EORBF
Third priority: Commodity Minerals
Binding 10-year off-take agreement signed with Glencore for 100%
of planned plant’s SGA production
To become a low-cost, strategically located producer of commodities
such as SGA, magnesium, silica and hematite
First smelter grade alumina (SGA) plant to be built in Canada
World’s third largest aluminum producing region, fully dependant on the import of alumina
Feedstock will be aluminous clay from the Company’s Grande-Vallée deposit
Negotiations soon to be initiated with potential joint-venture partners, Glencore interested
TSX: ORT OTCQX: EORBF23
23
© Orbite TSX: ORT OTCQX: EORBF
Deployment Timeline
Specialty Products
Addressing supply issues in
high-end markets
Waste Monetization
Converting economic and
environmental liabilities into
assets
Commodity Minerals
Strategically located low-
cost producer of
commodities
HPA 3 tpd
production
2015 - 2016
Upgrade and conversion
HPA facility 5tpd
Waste monetization
commercial demonstration
Scandium & Gallium
production
BEYOND 2017FROM Q4 2015
Design & construction
of first 100-200 ktpa
waste monetization
plant
Design commodities
plant
24
© Orbite TSX: ORT OTCQX: EORBF
Investment Highlights
25
 Months away from being commercial
 Game-changing technology addressing traditional inefficiencies
 Waste monetization: turning liabilities into assets
 Governmental financial support
• In January 2014, Orbite received $4 million interest-free loan from Canada Economic
Development
• In May 2014, following a thorough third-party due-diligence process, Quebec Government
invested $10 million in Orbite’s equity
• In February 2015, selected for a $4.5 million grant from Sustainable Development Technology
Canada (SDTC) towards our red mud and waste monetization demonstration following a
technical and economic due-diligence process
• Eligible for a refundable 32% tax credit on equipment purchases over the next 3 years
 Orbite can address supply issues in strategic and critical materials such as scandium,
gallium and rare earths
 Strong interest from large industry players, such as Veolia and Glencore
 Portfolio of high-value added specialty products
© Orbite TSX: ORT OTCQX: EORBF
Capital Structure and Financial Position
$21.3M Proforma cash position as of May 6, 2015 following 15M$ bought deal and
$5 M Bridge loan announced on June 12, 2015 on 2015 Investment tax credits
Market Capitalization
(Data as of May 31, 2015)
Balance Sheet
As at March 31, 2015
(In C$ millions )
Current assets
Cash and Short-Term (Proforma $21.3M) $ 2.23
Short-Term Rec. and Tax Credits $ 7.65
Other Current Assets $ 0.99
$ 10.87
Non-current assets
Restricted Cash $ 20.41
Refundable Investment Tax Credits $ 5.36
Property, Plant and Equipment $ 82.00
Patents and Exploration and Evaluation Assets $ 18.53
$ 126.30
Total assets $ 137.17
Current Liabilities
Accounts Payable and Accrued Liabilities $ 5.97
Short-Term Loan $ 3.02
Current portion of Long-term Debt $ 0.01
$ 9.00
Non-current liabilities
Convertible Debentures $ 21.67
Long-Term Debt $ 4.72
Derivative Financial Instrument $ 0.05
Deferred Income and Mining Tax Liabilities $ 2.37
$ 28.81
Equity $ 99.36
Total liabilities and equity $ 137.17
26
26
Closing Price per Share (ORT-T – May 31, 2015) $0.255
Basic Shares Outstanding 363.9
Options - $0.68 WAP 18.7
Warrants - $0.44 WAP 66.3
Convertible Debentures ($25M @ $3.50/share) 7.1
Convertible Debentures ($0.37M @ $0.40/share) 0.9
Convertible Debentures ($4.3M @ $0.325/share) 13.3
Fully Diluted Shares Outstanding (M) 470.2
Market Cap. (M) 92.8
© Orbite TSX: ORT OTCQX: EORBF
Management and Board
Claude Lamoureux, Chairman of the Board of Directors
Former President & CEO Ontario Teachers’ Pension Plan .
Pierre Meunier, LL.L
Partner and Strategic Consultant at Fasken Martineau LLP, which he joined in 1989
after filling several important positions for the Government of Québec.
Pascal Decary
Senior Executive Vice President for Germany, Eastern Europe and Asia and Executive
Director at Veolia Environmental Services
Lionel Léveillé
Former President & CEO of Adacel, President of Raytheon, VP of Bombardier, VP of
Oerlikon, and Exec VP of CMC Electronics.
Stéphane Bertrand
Executive director for the 2014 International Summit of Cooperatives. From 2003 to
2007, he was Chief of Staff for the Premier of Québec.
Christian Van Houtte, M.A. (IR), ASC
President of Van Houtte Conseil Inc. since 2009, Mr. Van Houtte was President and
CEO of the Aluminum Association of Canada for 18 years.
Glenn Kelly
President & Chief Executive Officer,
Director
Jacques Bédard
VP Finance & Chief Financial Officer
Yves Noël
VP Business Development
Denis Arguin
VP Engineering & Operations
Hubert Dumont
Director Technology Development
TSX: ORT OTCQX: EORBF27© Orbite
27
© Orbite TSX: ORT OTCQX: EORBF
Executive Office:
6505, route Transcanadienne, Suite 610
St-Laurent, Québec, Canada H4T 1S3
Tel: 514-744-6264
Fax: 514-744-4193
www.orbitetech.com
Glenn Kelly
President and Chief Executive Officer
Tel: 514-744-6264
gkelly@orbitetech.com
Jacques Bédard
VP Finance & Chief Financial Officer
Tel: 514-744-6264
jbedard@orbitetech.com
TMX Equicom
Marc Lakmaaker, External Investor Relations Consultant
1-800-385-5451 ext. 248
mlakmaaker@tmxequicom.com
Key Orbite Contacts
28
28

Contenu connexe

Tendances

Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013PA Resources AB
 
PA Resources Q3 2011 presentation 26 Oct
PA Resources Q3 2011 presentation 26 OctPA Resources Q3 2011 presentation 26 Oct
PA Resources Q3 2011 presentation 26 OctPA Resources AB
 
Overview and introduction to Jwaneng
Overview and introduction to JwanengOverview and introduction to Jwaneng
Overview and introduction to JwanengAnglo American
 
Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013PA Resources AB
 
Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...
Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...
Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...Michael Dehn
 
Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013PA Resources AB
 
Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013PA Resources AB
 
Pa resources q3 2013 results 23 october 2013
Pa resources q3 2013 results 23 october 2013Pa resources q3 2013 results 23 october 2013
Pa resources q3 2013 results 23 october 2013PA Resources AB
 
Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013PA Resources AB
 
Latest Report: Coal Mining Industry in Australia to 2020
Latest Report: Coal Mining Industry in Australia to 2020Latest Report: Coal Mining Industry in Australia to 2020
Latest Report: Coal Mining Industry in Australia to 2020David2591
 
Pa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_finalPa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_finalPA Resources AB
 
PA Resources Q4 Interim report
PA Resources Q4 Interim report PA Resources Q4 Interim report
PA Resources Q4 Interim report PA Resources AB
 
Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...
Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...
Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...ReportsnReports
 
Pa resources nordic energy summit 2013 21 march 2013
Pa resources nordic energy summit 2013 21 march 2013Pa resources nordic energy summit 2013 21 march 2013
Pa resources nordic energy summit 2013 21 march 2013PA Resources AB
 
Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013PA Resources AB
 
PA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources AB
 
Pareto securities corporate bond conference 23 January 2014
Pareto securities corporate bond conference 23 January 2014Pareto securities corporate bond conference 23 January 2014
Pareto securities corporate bond conference 23 January 2014PA Resources AB
 

Tendances (18)

Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013
 
PA Resources Q3 2011 presentation 26 Oct
PA Resources Q3 2011 presentation 26 OctPA Resources Q3 2011 presentation 26 Oct
PA Resources Q3 2011 presentation 26 Oct
 
Overview and introduction to Jwaneng
Overview and introduction to JwanengOverview and introduction to Jwaneng
Overview and introduction to Jwaneng
 
Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013
 
Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...
Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...
Jourdan Resources Announces Agreements to Acquire The Rome Lithium And Bailla...
 
Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013
 
Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013
 
Pa resources q3 2013 results 23 october 2013
Pa resources q3 2013 results 23 october 2013Pa resources q3 2013 results 23 october 2013
Pa resources q3 2013 results 23 october 2013
 
Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013
 
Latest Report: Coal Mining Industry in Australia to 2020
Latest Report: Coal Mining Industry in Australia to 2020Latest Report: Coal Mining Industry in Australia to 2020
Latest Report: Coal Mining Industry in Australia to 2020
 
Pa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_finalPa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_final
 
PA Resources Q4 Interim report
PA Resources Q4 Interim report PA Resources Q4 Interim report
PA Resources Q4 Interim report
 
Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...
Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...
Oil and Gas Exploration in the Arctic - Vast, Technically Recoverable Oil and...
 
Pa resources nordic energy summit 2013 21 march 2013
Pa resources nordic energy summit 2013 21 march 2013Pa resources nordic energy summit 2013 21 march 2013
Pa resources nordic energy summit 2013 21 march 2013
 
Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013
 
08.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 13908.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 139
 
PA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentation
 
Pareto securities corporate bond conference 23 January 2014
Pareto securities corporate bond conference 23 January 2014Pareto securities corporate bond conference 23 January 2014
Pareto securities corporate bond conference 23 January 2014
 

En vedette

Orbite_AR2013-ENG-FinalWeb
Orbite_AR2013-ENG-FinalWebOrbite_AR2013-ENG-FinalWeb
Orbite_AR2013-ENG-FinalWeborbitealuminae
 
27e conférence annuelle ROTH Capital Partners
27e conférence annuelle ROTH Capital Partners27e conférence annuelle ROTH Capital Partners
27e conférence annuelle ROTH Capital Partnersorbitealuminae
 
Ort corp-presentation_december-18-2014-eng-web
Ort  corp-presentation_december-18-2014-eng-webOrt  corp-presentation_december-18-2014-eng-web
Ort corp-presentation_december-18-2014-eng-weborbitealuminae
 
Los juegos paralímpicos
Los juegos paralímpicosLos juegos paralímpicos
Los juegos paralímpicosAgustín Gracia
 
December Corporate Presentation
December Corporate PresentationDecember Corporate Presentation
December Corporate Presentationorbitealuminae
 
Celebración del aniversario de la iniciación de la
Celebración del aniversario de la iniciación de laCelebración del aniversario de la iniciación de la
Celebración del aniversario de la iniciación de laJe Re
 
Ort presentation aga_2016_francais-web
Ort presentation aga_2016_francais-webOrt presentation aga_2016_francais-web
Ort presentation aga_2016_francais-weborbitealuminae
 

En vedette (16)

Customer service manager
Customer service managerCustomer service manager
Customer service manager
 
Construction secretary
Construction secretaryConstruction secretary
Construction secretary
 
Orbite_AR2013-ENG-FinalWeb
Orbite_AR2013-ENG-FinalWebOrbite_AR2013-ENG-FinalWeb
Orbite_AR2013-ENG-FinalWeb
 
Construction labor
Construction laborConstruction labor
Construction labor
 
Construction electrician
Construction electricianConstruction electrician
Construction electrician
 
27e conférence annuelle ROTH Capital Partners
27e conférence annuelle ROTH Capital Partners27e conférence annuelle ROTH Capital Partners
27e conférence annuelle ROTH Capital Partners
 
Construction technician
Construction technicianConstruction technician
Construction technician
 
Ort corp-presentation_december-18-2014-eng-web
Ort  corp-presentation_december-18-2014-eng-webOrt  corp-presentation_december-18-2014-eng-web
Ort corp-presentation_december-18-2014-eng-web
 
Menú escolar
Menú escolarMenú escolar
Menú escolar
 
Los juegos paralímpicos
Los juegos paralímpicosLos juegos paralímpicos
Los juegos paralímpicos
 
Construction planner
Construction plannerConstruction planner
Construction planner
 
Construction administrator
Construction administratorConstruction administrator
Construction administrator
 
December Corporate Presentation
December Corporate PresentationDecember Corporate Presentation
December Corporate Presentation
 
Customer service associate
Customer service associateCustomer service associate
Customer service associate
 
Celebración del aniversario de la iniciación de la
Celebración del aniversario de la iniciación de laCelebración del aniversario de la iniciación de la
Celebración del aniversario de la iniciación de la
 
Ort presentation aga_2016_francais-web
Ort presentation aga_2016_francais-webOrt presentation aga_2016_francais-web
Ort presentation aga_2016_francais-web
 

Similaire à Ort corp_presentation_2015-06

Ort agm presentation_2016_web
Ort agm presentation_2016_webOrt agm presentation_2016_web
Ort agm presentation_2016_weborbitealuminae
 
Orbite AR2013 ENG FinalWeb
Orbite AR2013 ENG FinalWebOrbite AR2013 ENG FinalWeb
Orbite AR2013 ENG FinalWeborbitealuminae
 
Erhc south africa conference october 2013 final
Erhc south africa conference october 2013 finalErhc south africa conference october 2013 final
Erhc south africa conference october 2013 finalDan Keeney
 
Orbite presentation april 2013 final 930
Orbite presentation april 2013 final   930Orbite presentation april 2013 final   930
Orbite presentation april 2013 final 930proedge2013
 
Oroco Resource Corp Oco.V March 1 09 PDAC
Oroco Resource Corp Oco.V March 1 09 PDACOroco Resource Corp Oco.V March 1 09 PDAC
Oroco Resource Corp Oco.V March 1 09 PDACChristopher R Anderson
 
South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014Symposium
 
May rdc overview (handout)
May rdc overview (handout)May rdc overview (handout)
May rdc overview (handout)RowanCompanies
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsCurt Huber
 
11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...
11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...
11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...The Business Council of Mongolia
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015reservoirminerals
 
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor PresentationBroken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor PresentationSymposium
 
23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...
23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...
23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...The Business Council of Mongolia
 
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...GE 94
 
Corporate Presentation - October 2014
Corporate Presentation - October 2014Corporate Presentation - October 2014
Corporate Presentation - October 2014reservoirminerals
 

Similaire à Ort corp_presentation_2015-06 (20)

Ort agm presentation_2016_web
Ort agm presentation_2016_webOrt agm presentation_2016_web
Ort agm presentation_2016_web
 
Orbite AR2013 ENG FinalWeb
Orbite AR2013 ENG FinalWebOrbite AR2013 ENG FinalWeb
Orbite AR2013 ENG FinalWeb
 
Erhc south africa conference october 2013 final
Erhc south africa conference october 2013 finalErhc south africa conference october 2013 final
Erhc south africa conference october 2013 final
 
Orbite presentation april 2013 final 930
Orbite presentation april 2013 final   930Orbite presentation april 2013 final   930
Orbite presentation april 2013 final 930
 
South Africa: coal, the fuel of growth
South Africa: coal, the fuel of growthSouth Africa: coal, the fuel of growth
South Africa: coal, the fuel of growth
 
Oroco Resource Corp Oco.V March 1 09 PDAC
Oroco Resource Corp Oco.V March 1 09 PDACOroco Resource Corp Oco.V March 1 09 PDAC
Oroco Resource Corp Oco.V March 1 09 PDAC
 
South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014South Boulder Mines (ASX:STB) Investor Presentation November 2014
South Boulder Mines (ASX:STB) Investor Presentation November 2014
 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014
 
May rdc overview (handout)
May rdc overview (handout)May rdc overview (handout)
May rdc overview (handout)
 
September Investor Presentation
September Investor PresentationSeptember Investor Presentation
September Investor Presentation
 
Investor Presentation November 2014
Investor Presentation November 2014Investor Presentation November 2014
Investor Presentation November 2014
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...
11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...
11.16-17.2015, PRESENTATION, The way forward for Oyu Tolgoi underground, Rio ...
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor PresentationBroken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
 
Reservoir Corporate PDAC
Reservoir Corporate PDACReservoir Corporate PDAC
Reservoir Corporate PDAC
 
Nap investor presentation march 2015
Nap investor presentation march 2015Nap investor presentation march 2015
Nap investor presentation march 2015
 
23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...
23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...
23.06.2011 Rio Tinto Copper: Global opportunities in the mining sector, Mr. P...
 
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
 
Corporate Presentation - October 2014
Corporate Presentation - October 2014Corporate Presentation - October 2014
Corporate Presentation - October 2014
 

Dernier

Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 

Dernier (20)

Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 

Ort corp_presentation_2015-06

  • 1. Corporate Presentation June 2015 TSX: ORT OTCQX: EORBF© Orbite
  • 2. © Orbite TSX: ORT OTCQX: EORBF Forward Looking Statements Certain information contained in this document may include "forward-looking information". Without limiting the foregoing, the information and any forward-looking information may include statements regarding projects, costs, objectives and future returns of the Company or hypotheses underlying these items. In this document, words such as "may", "would", "could", "will", "likely", "believe", "expect", "anticipate", "intend", "plan", "estimate" and similar words and the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the times at or by which, such future performance will be achieved. Forward-looking statements and information are based on information available at the time and/or the Company management's good-faith beliefs with respect to future events and are subject to known or unknown risks, uncertainties, assumptions and other unpredictable factors, many of which are beyond the Company's control. These risks uncertainties and assumptions include, but are not limited to, those described in the section of the Management's Discussion and Analysis (MD&A) entitled "Risk and Uncertainties" as filed on March 31, 2015 on SEDAR. The Company does not intend, nor does it undertake, any obligation to update or revise any forward-looking information or statements contained in this document to reflect subsequent information, events or circumstances or otherwise, except as required by applicable laws. 2
  • 3. © Orbite TSX: ORT OTCQX: EORBF TSX: ORT OTCQX: EORBF Commercializing Game Changing Technology – The Orbite Process Extracting all value from a variety of mineral and industrial waste feedstocks 3
  • 4. © Orbite TSX: ORT OTCQX: EORBF …inefficient and creates waste Today’s resource processing is … 4
  • 5. © Orbite TSX: ORT OTCQX: EORBF • Waste product from alumina production • Financial liability for producers • Ecologically damaging 3 billion tonnes stored globally + 120 million tpa © Orbite - Confidential Lots of waste, such as red mud 5 Contains high-value elements: Rare Earths / Ga / Sc / Al2O3 / others
  • 6. © Orbite TSX: ORT OTCQX: EORBF TSX: ORT OTCQX: EORBF6 2 billiontonnes stockpiled in the province of Québec These residues : • Contain ≥ 40% magnesium oxide • Remainder is mainly SiO2 (≈ 40%) and Al2O3 (≈ 5%) • Leach well in hydrochloric acid And Mine Tailings such as Asbestos Residues… 6
  • 7. © Orbite TSX: ORT OTCQX: EORBF Fly ash : • Waste product from coal-fired power stations • Contains high-value elements • On-going liability for producers and communities 71 milliontonnes produced annually in U.S. 550 million tonnes worldwide Or Fly Ash… 7
  • 8. © Orbite TSX: ORT OTCQX: EORBF RARE EARTHS Growing demand, uncertain supply, no substitutes We need the value in that waste! ALUMINA Rapid decline in bauxite quality = increasing OPEX TSX: ORT OTCQX: EORBF8 8
  • 9. © Orbite TSX: ORT OTCQX: EORBF 9 We can fix all of that 9
  • 10. © Orbite TSX: ORT OTCQX: EORBF In the case of alumina and certain other customized specialty products: calcination Technology Feedstock preparation Leaching (digestion) Selective, steps-wise extraction of alumina, and other valuable products In parallel, acid is recovered from the mother liquor and during calcination 10
  • 11. © Orbite TSX: ORT OTCQX: EORBF $117 million extraction and purification facility (commissioning Q3, 2015) HPA production capacity of 3 tpd Calcinator capacity of 5 tpd Fully qualified operational team Assets TSX: ORT OTCQX: EORBF11© Orbite 11
  • 12. © Orbite TSX: ORT OTCQX: EORBF Capabilities Process development and optimization Product Customization People Extensively tested and validated front- end of HPA process Extensive pre-purchase testing of technology back-end (calcination) 12 State-of-the-art Technology Development Centre 12
  • 13. © Orbite TSX: ORT OTCQX: EORBF 1) Processes for extracting aluminum from aluminous ores. • Patent protection granted in USA, Canada, Australia, Russia, Japan, China and Hong Kong • Additional patents pending in EU, India, Hong Kong, Australia, USA, Brazil, China, Russia. 2) Processes for extracting aluminum from aluminous ores. 3) Processes for extracting rare earth elements from aluminum-bearing materials. 4) Processes for extracting rare earth elements from various ores. 5) Methods for preparing hematite. 6) Methods for separating iron ions from aluminous ions. 7) Processes for preparing alumina and various other products. 8) Processes for treating Red Mud. 9) Processes for treating Fly Ash. 10) Processes for preparing titanium oxide and various other products. 11) Processes for recovering rare earth elements and rare metals. 12) Processes for treating various materials. 13) Methods for purifying aluminum ions. 14) Processes for preparing alumina and various other products. 15) Processes for decomposition and calcination of alumina. IP: 15 Families, 17 Granted, 95 Pending Recently awarded Red Mud patents in United States and Canada TSX: ORT OTCQX: EORBF13© Orbite 13
  • 14. © Orbite TSX: ORT OTCQX: EORBF Three Business Lines Specialty Products Addressing supply issues in high-end markets Waste Monetization Converting financial and environmental liabilities into assets Commodity Minerals Strategically located low- cost producer of commodities 14 Build, own, operate Scale up with JV Partner Expansion through licenses/royalties Commercialization with JV partner. We own the deposit: 1 bn tonnes indicated resources High-Purity Alumina (HPA), Gallium, Scandium Silica, Titanium, Scandium, Gallium, REE, RM Smelter-Grade Alumina, Slica, Hematite
  • 15. © Orbite TSX: ORT OTCQX: EORBF Specialty Products First Commercial Product: High Purity Alumina (HPA) High-end product for niche markets LED lighting Smart phone screens (sapphire) Separators in Li-ion battery packs Specialized ceramics for industrial, military or medical applications HPA sells for $20,000 – $30,000 USD per tonne 1515
  • 16. © Orbite TSX: ORT OTCQX: EORBF *4N stands for 99.99% purity, 5N for 99.999% 17,340 21,240 25,360 30,360 34,390 2012 2013 2014 2015 2016 The premium market is mainly for 4N* to 5N* purities HPA prices: $20,000 –$30,000 USD per tonne, depending on characteristics and application Confident of producing up to 5N consistently Market expected to strengthen beyond current outlook Global HPA Demand (tpa) HPA Market © Orbite 16
  • 17. © Orbite TSX: ORT OTCQX: EORBF Over thirty potential customers interested in our HPA Commenced shipping samples for customers’ qualification programmes in Q1 2015 (4N8 purity) 17 HPA - Potential Customers Lined Up 17
  • 18. © Orbite TSX: ORT OTCQX: EORBF Products represent signifcant value, only small fraction of original feedstock remains (<10%) Multiple feedstock opportunities Initial focus on red mud and fly ash Discussions with Veolia for global commercialization Subsequent focus on mine tailings TSX: ORT OTCQX: EORBF18© Orbite Turning liabilities into assets Waste Monetization: extracting all value 18
  • 19. © Orbite TSX: ORT OTCQX: EORBF Waste monetization: strategic advantages Huge quantities of feedstock available Representing valuable asset for Orbite (REEs, RMOs, Alumina, etc.) No mines to develop Already in industrial zone TSX: ORT OTCQX: EORBF19 Why waste monetization? Transportation and energy infrastructure in place Resource with negative value to current owners Customer is right next door 19
  • 20. © Orbite TSX: ORT OTCQX: EORBF Regulated utility producing approximately 50,000 megawatts to serve approximately 7.2 million customers in SE and Midwest USA In North Carolina: 14 sites, 33 ash impoundments, >100 M tonnes stored Feb 2014: storm sewer line running beneath the Dan River impoundment collapsed, releasing 23,000 – 30,000 m3 of ash and 100 M liters of ash pond water into the river TSX: ORT OTCQX: EORBF20 Duke Energy: A Case-Study © Orbite 20
  • 21. © Orbite TSX: ORT OTCQX: EORBF In Sept 2014, NC enacted a coal ash law: • Applies to existing and closed sites • Close high-risk ponds by end of 2019 (4 Duke sites) • Medium-risk ponds by 2024, low-risk ponds by 2029 • Sites assessment plan to be in place by end of 2014 • Excavation and lining of existing ponds or excavation and disposal at permitted facilities TSX: ORT OTCQX: EORBF21 Duke Energy: A Case-Study © Orbite 21 Duke Energy estimates compliance costs at $2-10 billion
  • 22. © Orbite TSX: ORT OTCQX: EORBF Front end of plant to be converted to start consuming multiple feedstocks Facility to provide critical input in formalization of plant design for processing red mud, fly ash, mine tailings, clay Will continue to produce HPA Expand HPA facility to 5 tpd Scandium and Gallium extraction to be added Technology Demonstration at Industrial Scale for Waste Monetization & Commodities Initiatives TSX: ORT OTCQX: EORBF22© Orbite 22
  • 23. © Orbite TSX: ORT OTCQX: EORBF Third priority: Commodity Minerals Binding 10-year off-take agreement signed with Glencore for 100% of planned plant’s SGA production To become a low-cost, strategically located producer of commodities such as SGA, magnesium, silica and hematite First smelter grade alumina (SGA) plant to be built in Canada World’s third largest aluminum producing region, fully dependant on the import of alumina Feedstock will be aluminous clay from the Company’s Grande-Vallée deposit Negotiations soon to be initiated with potential joint-venture partners, Glencore interested TSX: ORT OTCQX: EORBF23 23
  • 24. © Orbite TSX: ORT OTCQX: EORBF Deployment Timeline Specialty Products Addressing supply issues in high-end markets Waste Monetization Converting economic and environmental liabilities into assets Commodity Minerals Strategically located low- cost producer of commodities HPA 3 tpd production 2015 - 2016 Upgrade and conversion HPA facility 5tpd Waste monetization commercial demonstration Scandium & Gallium production BEYOND 2017FROM Q4 2015 Design & construction of first 100-200 ktpa waste monetization plant Design commodities plant 24
  • 25. © Orbite TSX: ORT OTCQX: EORBF Investment Highlights 25  Months away from being commercial  Game-changing technology addressing traditional inefficiencies  Waste monetization: turning liabilities into assets  Governmental financial support • In January 2014, Orbite received $4 million interest-free loan from Canada Economic Development • In May 2014, following a thorough third-party due-diligence process, Quebec Government invested $10 million in Orbite’s equity • In February 2015, selected for a $4.5 million grant from Sustainable Development Technology Canada (SDTC) towards our red mud and waste monetization demonstration following a technical and economic due-diligence process • Eligible for a refundable 32% tax credit on equipment purchases over the next 3 years  Orbite can address supply issues in strategic and critical materials such as scandium, gallium and rare earths  Strong interest from large industry players, such as Veolia and Glencore  Portfolio of high-value added specialty products
  • 26. © Orbite TSX: ORT OTCQX: EORBF Capital Structure and Financial Position $21.3M Proforma cash position as of May 6, 2015 following 15M$ bought deal and $5 M Bridge loan announced on June 12, 2015 on 2015 Investment tax credits Market Capitalization (Data as of May 31, 2015) Balance Sheet As at March 31, 2015 (In C$ millions ) Current assets Cash and Short-Term (Proforma $21.3M) $ 2.23 Short-Term Rec. and Tax Credits $ 7.65 Other Current Assets $ 0.99 $ 10.87 Non-current assets Restricted Cash $ 20.41 Refundable Investment Tax Credits $ 5.36 Property, Plant and Equipment $ 82.00 Patents and Exploration and Evaluation Assets $ 18.53 $ 126.30 Total assets $ 137.17 Current Liabilities Accounts Payable and Accrued Liabilities $ 5.97 Short-Term Loan $ 3.02 Current portion of Long-term Debt $ 0.01 $ 9.00 Non-current liabilities Convertible Debentures $ 21.67 Long-Term Debt $ 4.72 Derivative Financial Instrument $ 0.05 Deferred Income and Mining Tax Liabilities $ 2.37 $ 28.81 Equity $ 99.36 Total liabilities and equity $ 137.17 26 26 Closing Price per Share (ORT-T – May 31, 2015) $0.255 Basic Shares Outstanding 363.9 Options - $0.68 WAP 18.7 Warrants - $0.44 WAP 66.3 Convertible Debentures ($25M @ $3.50/share) 7.1 Convertible Debentures ($0.37M @ $0.40/share) 0.9 Convertible Debentures ($4.3M @ $0.325/share) 13.3 Fully Diluted Shares Outstanding (M) 470.2 Market Cap. (M) 92.8
  • 27. © Orbite TSX: ORT OTCQX: EORBF Management and Board Claude Lamoureux, Chairman of the Board of Directors Former President & CEO Ontario Teachers’ Pension Plan . Pierre Meunier, LL.L Partner and Strategic Consultant at Fasken Martineau LLP, which he joined in 1989 after filling several important positions for the Government of Québec. Pascal Decary Senior Executive Vice President for Germany, Eastern Europe and Asia and Executive Director at Veolia Environmental Services Lionel Léveillé Former President & CEO of Adacel, President of Raytheon, VP of Bombardier, VP of Oerlikon, and Exec VP of CMC Electronics. Stéphane Bertrand Executive director for the 2014 International Summit of Cooperatives. From 2003 to 2007, he was Chief of Staff for the Premier of Québec. Christian Van Houtte, M.A. (IR), ASC President of Van Houtte Conseil Inc. since 2009, Mr. Van Houtte was President and CEO of the Aluminum Association of Canada for 18 years. Glenn Kelly President & Chief Executive Officer, Director Jacques Bédard VP Finance & Chief Financial Officer Yves Noël VP Business Development Denis Arguin VP Engineering & Operations Hubert Dumont Director Technology Development TSX: ORT OTCQX: EORBF27© Orbite 27
  • 28. © Orbite TSX: ORT OTCQX: EORBF Executive Office: 6505, route Transcanadienne, Suite 610 St-Laurent, Québec, Canada H4T 1S3 Tel: 514-744-6264 Fax: 514-744-4193 www.orbitetech.com Glenn Kelly President and Chief Executive Officer Tel: 514-744-6264 gkelly@orbitetech.com Jacques Bédard VP Finance & Chief Financial Officer Tel: 514-744-6264 jbedard@orbitetech.com TMX Equicom Marc Lakmaaker, External Investor Relations Consultant 1-800-385-5451 ext. 248 mlakmaaker@tmxequicom.com Key Orbite Contacts 28 28