quality assurance latest interview questions
These are frequently asked software testing interview questions.
P2Cinfotech is one of the leading, Online IT Training facilities and Job Consultant, spread all over the world. We have successfully conducted online classes on various Software Technologies that are currently in Demand. To name a few, we provide quality online training for QA, QTP, Manual Testing, HP LoadRunner, BA, Java Technologies.
Unique Features of P2Cinfotech:
1. All online software Training Batches will Be handled by Real time working Professionals only.
2. Live online training like Real time face to face, Instructor ? student interaction.
3. Good online training virtual class room environment.
4. Special Exercises and Assignments to make you self-confident on your course subject.
5. Interactive Sessions to update students with latest Developments on the particular course.
6. Flexible Batch Timings and proper timetable.
7. Affordable, decent and Flexible fee structure.
8. Extended Technical assistance even after completion of the course.
9. 100% Job Assistance and Guidance.
Courses What we cover:
Quality Assurance
Business Analsis
QTp
JAVA
Apps Devlepoment Training
Register for Free DEMO:
www.p2cinfotech.com p2cinfotech@gmail.com +1-732-546-3607 (USA)
A Critique of the Proposed National Education Policy Reform
QA interview questions 2013
1. P2CINFOTECH
www.p2cinfotech.com
Contact : +1-732-546-3607
Email id:training@p2cinfotech.com
IT Online Training and Placement
(QA, BA, QTP, JAVA, Mobile apps..)
Mock interviews.
100% job Placement assistance.
Free Training for Opt/MS Students.
Placement with one of our Fortune 500 clients.
Live Instructor Led Face2Face Online Training.
2. QA SKILL TEST
2-tier architecture and windows based applications, similarly 3 tier
architecture and web based applications are the same?
Not always, the tiers is usually nothing to do with the windows or web apps Tiers are
at for software design.
I want to know about the delivery and maintenance phase in spiral model?
Delivery will be done at end of each spiral/or few spirals. The project goes to
maintenance only after the complete software is developed, deployed to production
and accepted by the client. it starts after the end of the project.
One of the disadvantages in waterfall and v-model is no prototypes are
produced, what is it mean?
Prototypes are the samples or models of end application. but in the waterfall & v-
model the application s available to client only after its completely done
3. www.P2cinfotech.com
Pre production environment is this optional environment or is it must in every SDLC
model?
A must
Can we do static testing and dynamic testing in any SDLC model?
We should do it in all models.
Who involves in alpha and beta testing? Tester who tests the app. in a company is
that same person can do beta testing and alpha testing or else some other person
belongs to customer?
User (from customer/client side) tests and IT project team need provide the assistance that
they require
Is QA can do white box testing without knowledge of coding? Are they use any
tools for doing whitebox testing?
white box testing cannot be done without programming knowledge so QA cannot do it
INDEPENDENTLY, but he associates himself with the development team and participates
with developers to do white box testing. Yes the tools and techniques are avail- like
statement coverage, branch coverage etc
(USA) +1-732-546-3607
4. www.P2cinfotech.com
What is code review? Code review -- Review the program files
Reasons of regular interactions between tester and developer?
Static testing, defect fixing, understanding the application, white box testing etc
Difference between unit and integration testing done by developer and QA?
Unit & integration testing are done by the developer which is directly on the code./program.
What is the difference between QA and tester?
Both are same-different titles but same roles & responsibilities.
What are the differences we can find while testing an Java application, C/C++/C# and
.Net application?
no difference as a tester because u test the end application. The technology/programming
language used should hardly matter to us
(USA) +1-732-546-3607
5. www.P2cinfotech.com
How we will select reasonable tests to be applied on a project?
Depends on various parameter like windows or web, testing duration, type of app, purpose,
budget, risk involved etc.
How can we measure the quality?
Number of defects, user- friendliness, portability, robustness, how close its to the given set of
requirements etc.
Who involves in verification part and in validation part? -- Tester & developers.
Responsibilities of a person in verification part and similarly in validation part?
Verification is quality control process where in the modification in code/design/reqquest can be
done. validation s quality assurance wherein we decide whether the feature is PASS/FAIL
without involving in taking corrective action.
http://www.p2cinfotech.com/
(USA) +1-732-546-3607
Try our FREE DEMO today..!