Managing Stakeholders’ Expectations through a Collaborative Solution:
Sellwood Bridge Replacement Project Case Study
Thea Robinson, Project Controls Consultant
Pro Management Systems, Inc.
April 2013
Oh So Many Modules!!!
Even though the Sellwood team is using nearly every module
available in PCM; today we will focus on the following modules:
• Submittals
• Materials
• Daily Reports
Project Background
The Sellwood Bridge Project in Portland, Oregon is an ongoing effort by Multnomah
County to replace this 87-year old Willamette River crossing with a new, seismically-
sound structure that offers upgraded facilities for users. Stakeholders who are funding
the project include Multnomah County (Bridge Owner), the City of Portland Bureau of
Transportation (PBOT), Oregon Department of Transportation (ODOT) and the Federal
Highway Administration (FHWA). ODOT is the lead Agency managing the Federal
funds and leading all reviews and audits. The Stakeholders’ objectives for this project
are:
• Replace the aging bridge with a new bridge in the same location and minimize the
disruptions to neighboring residents, businesses and the 30,000 commuters who
cross the current bridge daily.
• Deliver the project in the most timely, cost-efficient manner while meeting the
requirements of the Locally Preferred Alternative that was agreed to in 2009 by the
County, PBOT, Metro, ODOT and FHWA.
• Find a solution that allows the Stakeholders to collaborate with the design firm,
contractor, and owner in the review of documents as they relate to the design and
construction of the bridge.
Primavera Contract Manager: The Solution Chosen
to Manage Stakeholder Objectives
With the Stakeholders’ objectives in mind, David Evans and Associates, Inc. (DEA) was
selected to assist Multnomah County as an Owner’s Representative. PCM was chosen
and implemented because:
• It can be implemented as a web-based solution and documents can be submitted by
the design firm to the owner team and then sent out to ODOT and PBOT for review.
• Access to documents can be based on the role of the individual on the project.
• Reports have been created to provide live data to the management team so that
decisions can be made to keep the project on track and the team working on the
appropriate tasks.
• Forms can be generated that match the required ODOT forms that are typically filled
out manually or in a spreadsheet. The forms in PCM provide accurate data that can
be recorded in the field which keeps the team focused on the project and not worried
about if a form is legible or filed in the correct place.
Efficiencies of the Submittal Module
• The design or construction firm
submits their item.
• The Owner Team Coordinator then
notifies the internal review team and
the reviewers at ODOT and PBOT that
items are ready for review.
• Agency Reviewers respond to the
Owner Team Coordinator with
comments and entered into PCM.
Internal review leads enter their
comments directly into PCM.
• Owner Team Coordinator then finishes
the review cycle and notifies the
design or contractor the status of the
submittal.
Work-Flow for Submittals
• Reduction in time it takes to review
items as reviewers have access to
submittals within hours of submittal to
the Owner Team.
• If Reviewer requests resubmittal of the
item reviewed, the turn-around for a re-
submitted item is reduced.
• Reduction in reproduction charges
and paper used as printed sets for
each reviewer are no longer needed.
• Owner Team Inspectors use PCM in
the field to confirm contractors are
following the plans as submitted,
reviewed and approved.
Benefits of Paperless Reviews
Real-Time Data Reports for Submittals
Reports were developed to assist the Owner Team
submittal coordinators in the tracking of the submittals
as many of the submittals for this project have multiple
reviewers. Providing such clarity allows the Owner
Team to provide clarity and accountability to reviewers.
How the Inspectors Utilize the Daily Report Module
The Daily Report module allows the Owner Team Inspectors to be efficient in the
field by inputting the information for their reports using their iPads or laptops.
• Using the Issues Module, all final construction documents are filed and readily
accessible to the Inspectors.
• When changes occur, the system is updated and the inspector can reliably know
that he or she is looking at the correct set of documents.
iPads are Not
River-Proof,
Even in Their
Water Proof
Cases!
Daily Report Custom fields make Custom Forms Easier to Build
The “Custom Fields” tab was added to build fields not available in the PCM tabs.
• The “Shift” tab is important as there are times when there are several shifts of
work.
• While the materials tab is not filled in for the Daily Reports, it is important to note
if any materials are rejected and why. The field is set to 256 characters.
• The TD & DT check box was added as the TP & DT tab only needs to be
completed if the TP & DT items are not correct.
To comply with ODOT requirements, the module needed to have tab-specific
custom fields added…and directories customized.
General tab:
• The field “Report number” is used to record the Inspector’s certificate # as required
by the ODOT report.
Equipment tab:
• Equipment Type directory was customized to include equipment for bridge project
that includes stabilization of a landslide area, detour bridge, and structure
deconstruction.
• Work Area directory was customized for all modules to reflect the different
packages of the project.
Field Force:
• Custom Fields were added to report the field force as ODOT requires more detail
than provided out of the box in PCM.
Materials:
• This tab is NOT used in the daily report as it is used to report installations and
calculate payments to the contractor and will be covered later in this presentation.
Attachments:
• While not customized, this tab is used to attach a copy of the signed report, photos
and videos. We currently are reviewing photo solutions to use instead of attaching
photos directly to the report, Inspectors would attach a URL to where the photos
and videos are stored.
Daily Report Forms Customized to Match ODOT Forms
ODOT Form PCM Customized Form
Is This Picture of the Old Bridge Upside Down or Right Side
Up? Accuracy is Key When Paying Contractors
• The Owner Team uses the Materials
Module to record the progress of the
contractor’s work.
• As part of their monthly work,
inspectors use the Delivery Ticket as
Installation Sheets (Pay Notes) and
record material installations.
• Custom forms and reports are in
place to conform with ODOT
requirements.
• The custom reports also are in place
to assist management in tracking
costs for the overall program which
includes the tracking of any
overruns.
Since the project is funded in part by
Federal, State, and City funds, the County is
subject to an Audit. Therefore, recording
contractor payments accurately is crucial.
Custom Fields in Delivery Ticket Tab are the Key to
Creating Customized Forms that Match the ODOT Forms
Over 30 custom fields were added in
the order of the ODOT form to make
sure that the Installation Sheets (also
known as a Pay Notes) are filled out
properly by the Inspectors.
ODOT Installation Sheet PCM Customized Installation Sheet
Contractor Payments from Materials Module
PCM streamlined the monthly quality and quantity checks that are performed
by the Owner Team since information is only entered in once by the
Inspectors.
Once the checks are complete, and the reconciliation meeting with the
contractor is held, the Pay Notes are brought into Payment Requisitions.
Pay Notes Directly Brought Into Payment Requisitions
Utilizing the “Get Materials Delivery” function in
the Schedule of Values tab, the Pay Notes that
are scheduled for payment that month are
imported into the Payment Requisition
All Bid Items are brought in using this function
including lump sum items.
Both the summary
and detail
requisitions forms
were tailored to
meet the needs of
the Owner’s
Finance
Department.
General Ledger Report – ODOT’s Audit Tool
The Pay Notes are reviewed and compared to the
General Ledger Report on a quarterly basis by
ODOT to ensure accuracy of payments.
This report was formatted to follow the ODOT standard and to
date, the Regional Assurance Specialist has indicated he is
satisfied with the way the information is presented for review.
Overrun Bid Items Report During construction, unforeseen
conditions cause overruns on materials
installed. In the past, this information was
gathered manually by reviewing the
General Ledger reports and tracking the
information in a spreadsheet.
This report replaced that spreadsheet and is now the tool used by the Office
Engineer who generates the monthly Contract Change Orders that reconcile the
overruns.
This also provides management an accurate picture of the monthly overruns.
When Stakeholders ask for Percent Complete
Information…
The Quantity Tracking report is a summary report that provides the Owner Team
management “live” data on how much has been spent on certain bid items across the
six packages currently under construction. So, when the County Commissioners or
the City of Portland Mayor ask how much has been spent on a certain bid item (i.e.
Structural Steel) the report can be pulled and the team can provide accurate
information to the Stakeholders.
A detailed report was also created in case the Stakeholders want detailed break-outs
of what has been spent by package.
The partners involved in the Implementation of PCM
for the Sellwood Bridge Replacement Project are:
Questions?
Thea Robinson, Project Controls Consultant
Pro Management Systems, Inc.
thear@promanagementsystems.com

More Related Content

What's hot

Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...BCS ProSoft
 
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...BCS ProSoft
 
Ps training mannual ( configuration )
Ps training mannual ( configuration )Ps training mannual ( configuration )
Ps training mannual ( configuration )Soumya De
 
Set up and utilize internal orders as standard SAP functionality
 Set up and utilize internal orders as standard SAP functionality Set up and utilize internal orders as standard SAP functionality
Set up and utilize internal orders as standard SAP functionalityJohn Jordan
 
Case study material ledger implementation lessons learned
Case study  material ledger implementation lessons learnedCase study  material ledger implementation lessons learned
Case study material ledger implementation lessons learnedJohannes Le Roux
 
SAP Project Management
SAP Project ManagementSAP Project Management
SAP Project ManagementKumar M.
 
Sage X3 year end webinar 2017
Sage X3 year end webinar 2017Sage X3 year end webinar 2017
Sage X3 year end webinar 2017RKLeSolutions
 
Sage Enterprise Management year-end Processing Webinar 2018
Sage Enterprise Management year-end Processing Webinar 2018Sage Enterprise Management year-end Processing Webinar 2018
Sage Enterprise Management year-end Processing Webinar 2018RKLeSolutions
 
SAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP ControllingSAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP ControllingAlice Adams
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentationKumar M.
 
Baseline Condition Assessment
Baseline Condition AssessmentBaseline Condition Assessment
Baseline Condition AssessmentGrantWhittle
 
Planning for Solar Installation Company
Planning for Solar Installation CompanyPlanning for Solar Installation Company
Planning for Solar Installation CompanyJade Global
 
Cs inhouse subcontracting process
Cs inhouse subcontracting processCs inhouse subcontracting process
Cs inhouse subcontracting processRamani Thinakaran
 
5 tips for sap material master buyer and planner functions
5 tips for sap material master buyer and planner functions5 tips for sap material master buyer and planner functions
5 tips for sap material master buyer and planner functionsJohn Jordan
 
Project Systems
Project SystemsProject Systems
Project Systemschalah
 

What's hot (20)

Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 User Gro...
 
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...
Year-End Processing with Sage 100 ERP (MAS 90 and MAS 200) | Q4 2014 Sage 100...
 
Ps training mannual ( configuration )
Ps training mannual ( configuration )Ps training mannual ( configuration )
Ps training mannual ( configuration )
 
Opticon PRIME Sales Overview
Opticon PRIME Sales OverviewOpticon PRIME Sales Overview
Opticon PRIME Sales Overview
 
Set up and utilize internal orders as standard SAP functionality
 Set up and utilize internal orders as standard SAP functionality Set up and utilize internal orders as standard SAP functionality
Set up and utilize internal orders as standard SAP functionality
 
Tim Howard
Tim HowardTim Howard
Tim Howard
 
Case study material ledger implementation lessons learned
Case study  material ledger implementation lessons learnedCase study  material ledger implementation lessons learned
Case study material ledger implementation lessons learned
 
PRASAD_KARUTURI_RES
PRASAD_KARUTURI_RESPRASAD_KARUTURI_RES
PRASAD_KARUTURI_RES
 
SAP Project Management
SAP Project ManagementSAP Project Management
SAP Project Management
 
Sage X3 year end webinar 2017
Sage X3 year end webinar 2017Sage X3 year end webinar 2017
Sage X3 year end webinar 2017
 
Sage Enterprise Management year-end Processing Webinar 2018
Sage Enterprise Management year-end Processing Webinar 2018Sage Enterprise Management year-end Processing Webinar 2018
Sage Enterprise Management year-end Processing Webinar 2018
 
SAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP ControllingSAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP Controlling
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentation
 
SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM) SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM)
 
New gl migration 1
New gl migration 1New gl migration 1
New gl migration 1
 
Baseline Condition Assessment
Baseline Condition AssessmentBaseline Condition Assessment
Baseline Condition Assessment
 
Planning for Solar Installation Company
Planning for Solar Installation CompanyPlanning for Solar Installation Company
Planning for Solar Installation Company
 
Cs inhouse subcontracting process
Cs inhouse subcontracting processCs inhouse subcontracting process
Cs inhouse subcontracting process
 
5 tips for sap material master buyer and planner functions
5 tips for sap material master buyer and planner functions5 tips for sap material master buyer and planner functions
5 tips for sap material master buyer and planner functions
 
Project Systems
Project SystemsProject Systems
Project Systems
 

Similar to 204560 sellwood bridge replacement project case study

Automated Utility bills payments solution for Oracle Customers
Automated Utility bills payments solution for Oracle CustomersAutomated Utility bills payments solution for Oracle Customers
Automated Utility bills payments solution for Oracle CustomersEmiconhrd
 
M tech dynamic_construction&pm_solution_2019_v10.00
M tech dynamic_construction&pm_solution_2019_v10.00M tech dynamic_construction&pm_solution_2019_v10.00
M tech dynamic_construction&pm_solution_2019_v10.00ovais99
 
Hit the Roadway Running - Streamlining DOT project costs using PCM
Hit the Roadway Running - Streamlining DOT project costs using PCMHit the Roadway Running - Streamlining DOT project costs using PCM
Hit the Roadway Running - Streamlining DOT project costs using PCMp6academy
 
Shraddha_Gaherwar_Data_Analyst1
Shraddha_Gaherwar_Data_Analyst1Shraddha_Gaherwar_Data_Analyst1
Shraddha_Gaherwar_Data_Analyst1shraddha gaherwar
 
Material Quotation System Functional Requirements Document V6
Material Quotation System  Functional Requirements Document V6Material Quotation System  Functional Requirements Document V6
Material Quotation System Functional Requirements Document V6Semon Wu
 
IntellisenseIT infraMSWH (Construction ERP)
IntellisenseIT infraMSWH (Construction ERP)IntellisenseIT infraMSWH (Construction ERP)
IntellisenseIT infraMSWH (Construction ERP)intellisenseit
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509Richard Gay, CPPO, RSBO
 
205240 sunny skies and smarter schools in san diego
205240 sunny skies and smarter schools in san diego205240 sunny skies and smarter schools in san diego
205240 sunny skies and smarter schools in san diegop6academy
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The informSilvaGraf83
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The informMartineMccracken314
 
Smart card system for buses
Smart card system for buses  Smart card system for buses
Smart card system for buses Hashini Senaratne
 
Clint Britt _ Six Sigma Project _ MFP_ June2016
Clint Britt _ Six Sigma Project _ MFP_ June2016Clint Britt _ Six Sigma Project _ MFP_ June2016
Clint Britt _ Six Sigma Project _ MFP_ June2016Clint Britt
 
Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...
Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...
Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...Global Business Events
 
Agile Development with Agile Contract
Agile Development with Agile ContractAgile Development with Agile Contract
Agile Development with Agile ContractNUS-ISS
 
Migration Decoded
Migration DecodedMigration Decoded
Migration DecodedCognizant
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and constructionAnkit Singhai
 

Similar to 204560 sellwood bridge replacement project case study (20)

Automated Utility bills payments solution for Oracle Customers
Automated Utility bills payments solution for Oracle CustomersAutomated Utility bills payments solution for Oracle Customers
Automated Utility bills payments solution for Oracle Customers
 
5d in BIM
5d in BIM5d in BIM
5d in BIM
 
M tech dynamic_construction&pm_solution_2019_v10.00
M tech dynamic_construction&pm_solution_2019_v10.00M tech dynamic_construction&pm_solution_2019_v10.00
M tech dynamic_construction&pm_solution_2019_v10.00
 
Hit the Roadway Running - Streamlining DOT project costs using PCM
Hit the Roadway Running - Streamlining DOT project costs using PCMHit the Roadway Running - Streamlining DOT project costs using PCM
Hit the Roadway Running - Streamlining DOT project costs using PCM
 
K Becker - Resume 2016
K Becker - Resume 2016K Becker - Resume 2016
K Becker - Resume 2016
 
Shraddha_Gaherwar_Data_Analyst1
Shraddha_Gaherwar_Data_Analyst1Shraddha_Gaherwar_Data_Analyst1
Shraddha_Gaherwar_Data_Analyst1
 
Material Quotation System Functional Requirements Document V6
Material Quotation System  Functional Requirements Document V6Material Quotation System  Functional Requirements Document V6
Material Quotation System Functional Requirements Document V6
 
ATCO Engineering - Process Evaluation
ATCO Engineering - Process EvaluationATCO Engineering - Process Evaluation
ATCO Engineering - Process Evaluation
 
IntellisenseIT infraMSWH (Construction ERP)
IntellisenseIT infraMSWH (Construction ERP)IntellisenseIT infraMSWH (Construction ERP)
IntellisenseIT infraMSWH (Construction ERP)
 
DDOT Buys 2017 Presentation (September 26, 2017)
DDOT Buys 2017 Presentation (September 26, 2017)DDOT Buys 2017 Presentation (September 26, 2017)
DDOT Buys 2017 Presentation (September 26, 2017)
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509
 
205240 sunny skies and smarter schools in san diego
205240 sunny skies and smarter schools in san diego205240 sunny skies and smarter schools in san diego
205240 sunny skies and smarter schools in san diego
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
 
Smart card system for buses
Smart card system for buses  Smart card system for buses
Smart card system for buses
 
Clint Britt _ Six Sigma Project _ MFP_ June2016
Clint Britt _ Six Sigma Project _ MFP_ June2016Clint Britt _ Six Sigma Project _ MFP_ June2016
Clint Britt _ Six Sigma Project _ MFP_ June2016
 
Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...
Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...
Richard Beaumont, Global Procurement Development Executive at Rolls-Royce - E...
 
Agile Development with Agile Contract
Agile Development with Agile ContractAgile Development with Agile Contract
Agile Development with Agile Contract
 
Migration Decoded
Migration DecodedMigration Decoded
Migration Decoded
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and construction
 

More from p6academy

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015p6academy
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1p6academy
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2p6academy
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2p6academy
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1p6academy
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1p6academy
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1p6academy
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktopp6academy
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announcedp6academy
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1p6academy
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overviewp6academy
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientationp6academy
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Propositionp6academy
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition p6academy
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)p6academy
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guidep6academy
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guidep6academy
 

More from p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Recently uploaded

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Recently uploaded (20)

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

204560 sellwood bridge replacement project case study

  • 1. Managing Stakeholders’ Expectations through a Collaborative Solution: Sellwood Bridge Replacement Project Case Study Thea Robinson, Project Controls Consultant Pro Management Systems, Inc. April 2013
  • 2. Oh So Many Modules!!! Even though the Sellwood team is using nearly every module available in PCM; today we will focus on the following modules: • Submittals • Materials • Daily Reports
  • 3. Project Background The Sellwood Bridge Project in Portland, Oregon is an ongoing effort by Multnomah County to replace this 87-year old Willamette River crossing with a new, seismically- sound structure that offers upgraded facilities for users. Stakeholders who are funding the project include Multnomah County (Bridge Owner), the City of Portland Bureau of Transportation (PBOT), Oregon Department of Transportation (ODOT) and the Federal Highway Administration (FHWA). ODOT is the lead Agency managing the Federal funds and leading all reviews and audits. The Stakeholders’ objectives for this project are: • Replace the aging bridge with a new bridge in the same location and minimize the disruptions to neighboring residents, businesses and the 30,000 commuters who cross the current bridge daily. • Deliver the project in the most timely, cost-efficient manner while meeting the requirements of the Locally Preferred Alternative that was agreed to in 2009 by the County, PBOT, Metro, ODOT and FHWA. • Find a solution that allows the Stakeholders to collaborate with the design firm, contractor, and owner in the review of documents as they relate to the design and construction of the bridge.
  • 4. Primavera Contract Manager: The Solution Chosen to Manage Stakeholder Objectives With the Stakeholders’ objectives in mind, David Evans and Associates, Inc. (DEA) was selected to assist Multnomah County as an Owner’s Representative. PCM was chosen and implemented because: • It can be implemented as a web-based solution and documents can be submitted by the design firm to the owner team and then sent out to ODOT and PBOT for review. • Access to documents can be based on the role of the individual on the project. • Reports have been created to provide live data to the management team so that decisions can be made to keep the project on track and the team working on the appropriate tasks. • Forms can be generated that match the required ODOT forms that are typically filled out manually or in a spreadsheet. The forms in PCM provide accurate data that can be recorded in the field which keeps the team focused on the project and not worried about if a form is legible or filed in the correct place.
  • 5. Efficiencies of the Submittal Module • The design or construction firm submits their item. • The Owner Team Coordinator then notifies the internal review team and the reviewers at ODOT and PBOT that items are ready for review. • Agency Reviewers respond to the Owner Team Coordinator with comments and entered into PCM. Internal review leads enter their comments directly into PCM. • Owner Team Coordinator then finishes the review cycle and notifies the design or contractor the status of the submittal. Work-Flow for Submittals • Reduction in time it takes to review items as reviewers have access to submittals within hours of submittal to the Owner Team. • If Reviewer requests resubmittal of the item reviewed, the turn-around for a re- submitted item is reduced. • Reduction in reproduction charges and paper used as printed sets for each reviewer are no longer needed. • Owner Team Inspectors use PCM in the field to confirm contractors are following the plans as submitted, reviewed and approved. Benefits of Paperless Reviews
  • 6. Real-Time Data Reports for Submittals Reports were developed to assist the Owner Team submittal coordinators in the tracking of the submittals as many of the submittals for this project have multiple reviewers. Providing such clarity allows the Owner Team to provide clarity and accountability to reviewers.
  • 7. How the Inspectors Utilize the Daily Report Module The Daily Report module allows the Owner Team Inspectors to be efficient in the field by inputting the information for their reports using their iPads or laptops. • Using the Issues Module, all final construction documents are filed and readily accessible to the Inspectors. • When changes occur, the system is updated and the inspector can reliably know that he or she is looking at the correct set of documents. iPads are Not River-Proof, Even in Their Water Proof Cases!
  • 8. Daily Report Custom fields make Custom Forms Easier to Build The “Custom Fields” tab was added to build fields not available in the PCM tabs. • The “Shift” tab is important as there are times when there are several shifts of work. • While the materials tab is not filled in for the Daily Reports, it is important to note if any materials are rejected and why. The field is set to 256 characters. • The TD & DT check box was added as the TP & DT tab only needs to be completed if the TP & DT items are not correct. To comply with ODOT requirements, the module needed to have tab-specific custom fields added…and directories customized.
  • 9. General tab: • The field “Report number” is used to record the Inspector’s certificate # as required by the ODOT report. Equipment tab: • Equipment Type directory was customized to include equipment for bridge project that includes stabilization of a landslide area, detour bridge, and structure deconstruction. • Work Area directory was customized for all modules to reflect the different packages of the project. Field Force: • Custom Fields were added to report the field force as ODOT requires more detail than provided out of the box in PCM. Materials: • This tab is NOT used in the daily report as it is used to report installations and calculate payments to the contractor and will be covered later in this presentation. Attachments: • While not customized, this tab is used to attach a copy of the signed report, photos and videos. We currently are reviewing photo solutions to use instead of attaching photos directly to the report, Inspectors would attach a URL to where the photos and videos are stored.
  • 10. Daily Report Forms Customized to Match ODOT Forms ODOT Form PCM Customized Form
  • 11. Is This Picture of the Old Bridge Upside Down or Right Side Up? Accuracy is Key When Paying Contractors • The Owner Team uses the Materials Module to record the progress of the contractor’s work. • As part of their monthly work, inspectors use the Delivery Ticket as Installation Sheets (Pay Notes) and record material installations. • Custom forms and reports are in place to conform with ODOT requirements. • The custom reports also are in place to assist management in tracking costs for the overall program which includes the tracking of any overruns. Since the project is funded in part by Federal, State, and City funds, the County is subject to an Audit. Therefore, recording contractor payments accurately is crucial.
  • 12. Custom Fields in Delivery Ticket Tab are the Key to Creating Customized Forms that Match the ODOT Forms Over 30 custom fields were added in the order of the ODOT form to make sure that the Installation Sheets (also known as a Pay Notes) are filled out properly by the Inspectors.
  • 13. ODOT Installation Sheet PCM Customized Installation Sheet
  • 14. Contractor Payments from Materials Module PCM streamlined the monthly quality and quantity checks that are performed by the Owner Team since information is only entered in once by the Inspectors. Once the checks are complete, and the reconciliation meeting with the contractor is held, the Pay Notes are brought into Payment Requisitions.
  • 15. Pay Notes Directly Brought Into Payment Requisitions Utilizing the “Get Materials Delivery” function in the Schedule of Values tab, the Pay Notes that are scheduled for payment that month are imported into the Payment Requisition All Bid Items are brought in using this function including lump sum items. Both the summary and detail requisitions forms were tailored to meet the needs of the Owner’s Finance Department.
  • 16. General Ledger Report – ODOT’s Audit Tool The Pay Notes are reviewed and compared to the General Ledger Report on a quarterly basis by ODOT to ensure accuracy of payments. This report was formatted to follow the ODOT standard and to date, the Regional Assurance Specialist has indicated he is satisfied with the way the information is presented for review.
  • 17. Overrun Bid Items Report During construction, unforeseen conditions cause overruns on materials installed. In the past, this information was gathered manually by reviewing the General Ledger reports and tracking the information in a spreadsheet. This report replaced that spreadsheet and is now the tool used by the Office Engineer who generates the monthly Contract Change Orders that reconcile the overruns. This also provides management an accurate picture of the monthly overruns.
  • 18. When Stakeholders ask for Percent Complete Information… The Quantity Tracking report is a summary report that provides the Owner Team management “live” data on how much has been spent on certain bid items across the six packages currently under construction. So, when the County Commissioners or the City of Portland Mayor ask how much has been spent on a certain bid item (i.e. Structural Steel) the report can be pulled and the team can provide accurate information to the Stakeholders. A detailed report was also created in case the Stakeholders want detailed break-outs of what has been spent by package.
  • 19. The partners involved in the Implementation of PCM for the Sellwood Bridge Replacement Project are:
  • 20. Questions? Thea Robinson, Project Controls Consultant Pro Management Systems, Inc. thear@promanagementsystems.com