CRITICAL OBSERVATIONS DURING SHUT DOWN AUDIT OF A 330 MW
PULVERIZED COAL FIRED BOILER
By K.K.Parthiban, B.Tech ( IIT-M), M.E Thermal Engineering- RECT Trichy
Introduction
Boiler maintenance cost can be reduced, if every failure & shortcoming are analysed and addressed.
In a power plant, engineers are stressed and hard-pressed for early restart of the unit and hence they
do not have time to analyze the failures. However,
employing specialists for unit inspection during
shut down would help to identify defects in boiler
& reasons for past failures. Actions could be taken
to stop repetitive failures. In future, unscheduled
outages can be avoided. Performance of the plant
can be greatly improved. There have been cases
wherein two or three annual shut down audits have
led to much better understanding of the boilers.
There have been cases where the plant engineers
stopped calling us when they became clear of what
to inspect in the annual shut downs. The value
addition of a shutdown audit by experienced boiler
consultants can be known only if it is experienced. We bring below the value addition by us in a
tower type PF boiler outside India.
Features of the unit
The boiler is a once through unit with a centrifugal separator. The furnace is made of spiral wall rifle
tube construction. All the tube banks of superheaters, reheaters and economizers are horizontally
arranged in a single pass directly above the furnace. The screen tubes are arranged above the furnace.
The screen outlet tubes act as support tubes for all the tube banks except for the low temperature
economiser. The tower type configuration is a bold configuration selected by the designers. It
certainly improves the free board for better burn out of the coal particles. The lateral pitch of bank
assemblies decrease, as the gas moves up. Thus, required gas side velocities are maintained for good
heat transfer. The low temperature economiser is constructed out of square finned tube. The unit is
provided with two rotary airheaters. Gas recirculation fans are provided for startup purpose and for
low load operation. 5 mills are provided. Electrostatic precipitator is provided for dust capture.
Condensate polishing units are provided for ensuring the feed water / return condensate quality.
Detailed observations at shut down
We bring out our observations in the unit which was inspected by us. We feel this technical paper
would help the unit operators to understand about methodical approach to be taken for inspection of
the boiler and correlate to the failures being experienced in the unit. We have compiled below the
important observations in this unit.
Photo 1: Distant view of the unit
Final superheater stub cracks
It was learnt from plant engineers, that there had been cracks of the stubs at final SH outlet since
long. It had become a routine to inspect the stub weldment at headers by DP test. The stub
weldments are repaired when the cracks are observed. On review of detailed drawing and installation
of SH inlet & outlet headers, it became clear that there had been design mistake. The header supports
were restricting the thermal expansion and hence the short stubs were subject to force.
Photo 2: Location of stub cracks in superheater outlet
header
Photo 3: DP test done at header stubs show cracks.
These cracks are not deep routed.
Photo 4: The SH outlet header moves to the right by 42
mm as per calculation. Available slot is 30 mm only.
Photo 5: The SH outlet header is required to move
away from Waterwall by 16.5 mm. But space
available is less.
Photo 6: The above
drawing shows SH inlet
header support detail. The
header moves by 31 mm
away from waterwall. The
slot provision is 40 mm.
Since the details of SH
outlet header support was
not available, this drawing
is referred here for
comparison purpose.
Photo 7: A true to scale drawing was made to find the
fillet length of SH stubs.
Photo 8: The actual weld lengths were found to be
25-27 mm. It should have been around 12.8 mm.
High steam temperature headers are subject to creep and thermal fatigue. The stubs should be with
full penetration welds. At the same time, the weld reinforcements should be within limits.
Low temperature superheater spacer support failures
In low temperature superheater bottom bank is of T2 material and top bank is of T22 material. The
tubes are supported by hanger tubes. However vertical pitch is maintained by sliding spacer of SS
304 material. The sliding supports welding with T22 tube material had cracked at 295 locations.
Photo 9: The above drawing shows sliding support detail. The insert photo shows the dislodging of the sliding
support from the tube by weld crack. This is a dissimilar weld. The reason is the wrong choice of electrode.
Photo 10: Photo shows the weld failure of sliding spacer
supports between LTSH tubes.
Photo 11: The photo shows the LTSH supporting
(binding) by hanger tubes.
Table 1: T22 material comes under P5A group. P8 is the Stainless grouping.
Photo 12: The extreme left photo shows
the LTSH tubes spaced by an attachment
bar welded to top & bottom tubes at the
location shown. The support is found
slipped. This is because of the width of
the support plate was inadequate by
design.
Photo 13 & 14: Instead of removing and
rewelding a new support plate, Alternate
arrangement is suggested to prevent the
slipping. The elevation & sectional views
are shown here on the right-side
drawings.
Observations in Deaerator tower
For many years, the deaerator tower was not inspected. It was the first time when we had inspected.
The deaerator spray nozzles had come off completely. Fortunately, the dislodged components did not
trouble the boiler feed pump.
Photo 15 & 16: The above photographs show the dislodged spray nozzles from the deaerator tower.
Drag chain feeders
The unit is provided with drag chain feeders to feed coals to different mills. Of late, belt weigh
feeders are used to feed coal. By VFD it is possible to achieve uniform coal feed rate between
feeders. In drag chain feeder a drop test is a must, to ensure that the rate of feeding is uniform in all
feeders. This depends on the dam plate (coal bed height control) levels at all feeders. It was observed
that as the dam gates were worn out, this aspect was ignored.
Photo 17 & 18: The above photographs show the different type of dam arrangement between feeders.
Coal nozzles
Coal nozzles distortion in service has been there in some units. This has to do with the differential
temperature between the inside and outside surfaces of the outer shell. The outer shell would distort
when the tilt is such that there is no sweeping of air over the outer surface. The space between the
inner and outer shell is also critical and can cause accumulation of coal.
Photo 19: Distortion of outer shell only at bottom side
of the coal nozzle.
Photo 20: Distortion of outer shell only at bottom
side at all levels.
Photo 21: The photo shows the distortion of outer shell
due to differential temperature between inner & outer
surface in a different boiler. But then the space between
inner & outer shell is large enough that no coal ash
slags are seen.
Photo 22: The new coal nozzle developed by OEM
now addresses the problem. The air sweep is
maintained at all tilts and at the same time the outer
shell does not support the coal ash because the
outer shell is now trimmed to 115 mm. This to
overcome the problem shown in photo 19 & 20.
Secondary / OFA nozzles
The distortion of SA and OFA nozzles are also common for the same reason that the inside surface is
at different temperature as compared to outside surface temperature when the tilt is done. However,
seeing the different profiles, we can infer what could be right design to prevent distortion of the
nozzles. See photos below.
Photo 23 & 24: The top photo shows the distortion
of SA nozzle. It is seen that the flat top has suffered
distortion, while the corrugated profile is not
distorted. The bottom photo shows the tendency of
flat plate to distort.
Photo 25: The corrugated nozzles do not exhibit any
distortion. The internal cross stiffeners hold the shape.
It is seen that the plain plate is distorted.
High temperature economiser
This assembly is of staggered construction and is of plain tube. We have come across erosion of end
tubes in many cases wherein a tube bank is arranged in staggered pitch in elevation. The resistance
Photo 26: Erosion of bends near rearwall. Photo 27: Erosion of HT eco inlet tubes at front wall.
Photo 28: Filter baffles placed in the tube
bank below has caused preferential flow of
flue gas along the front wall in the upper
bank.
Photo 29 & 30: The photos show the end tube to panel
clearance. This had led to the erosion of end tube.
Staggered pitch banks are sensitive to such preferential
flow patterns.
for flow through the staggered tube bank, leads to end tube erosion along the four boundaries. Some
filter baffles have been used in the tube bank below. This has resulted in additional gas flow along
the front wall and resulted in erosion of the bottom tubes.
Furnace panel erosion around the wall blowers
The furnace is found free of ash slagging, as the coal used is a good one. However, there is distortion
of the panels in the upper part of the spiral walls. Due to this, the wall blower has been causing
frequent erosion of panel tubes over a large perimeter. We recommended that the soot blower tip is
advanced suitably to reduce the erosion.
Photo 31: The photo shows the erosion of furnace wall
panels over a large perimeter around.
Photo 32: The photo shows the distortion of spiral
wall panels at upper levels.
Mills
The important observations in mills were the plugging of classifier vanes & wear of the top plate,
which would affect the separation efficiency. The wear pattern of the rolls show that the rolls are not
advanced after the gradual wearing off. This would affect the output from the mills.
Photo 33: The photo shows the erosion of the plate
above the classifier
Photo 34: The photo shows the rags clogging the
classifier vanes.
Photo 35: The rolls of mills were found to be rolling of
ridge at the end of bowl.
Photo 36: The damage pattern indicates the rolls
are not adjusted forward after the wearing off.
Every boiler has some scope for improvement. Critical shut down inspection would benefit the users
in improving the PLF and in reducing loss due to unforeseen shut down. For comments write to
parthi2006@gmail.com / venus1@venus-boiler.com. Visit www.venus-boiler.com for more articles.
M/S Venus energy audit system – Trouble shooting of boiler failures and operational
issues. Company carries out design audit, construction audit, shut down audit and
operational audit.
M/S Sri Devi engineering consultancy and agency – engaged in non-pressure parts
spares supply for FBC / CFBC / PF boilers.
M/S Sri Devi boiler equipment and spares – engaged in supply of pressure part spares
for all type of boilers

Contenu connexe

Tendances

Sewer pipes-and-fittings
Sewer pipes-and-fittingsSewer pipes-and-fittings
Sewer pipes-and-fittings
thanhuce
 
Halderman ch033 lecture
Halderman ch033 lectureHalderman ch033 lecture
Halderman ch033 lecture
mcfalltj
 
1.4 diesel engine moving components
1.4 diesel engine moving components1.4 diesel engine moving components
1.4 diesel engine moving components
engineman
 
BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.
vipul srivastava
 
Visual Dictionary - Soffit
Visual Dictionary - SoffitVisual Dictionary - Soffit
Visual Dictionary - Soffit
Soffit
 
00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy
mohamed elbarougy
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
Statoil
 
Nine Project (8-19-15)
Nine Project (8-19-15)Nine Project (8-19-15)
Nine Project (8-19-15)
Mario Castillo
 

Tendances (18)

The evolution of pipe couplings - repair market
The evolution of pipe couplings - repair marketThe evolution of pipe couplings - repair market
The evolution of pipe couplings - repair market
 
Sewer pipes-and-fittings
Sewer pipes-and-fittingsSewer pipes-and-fittings
Sewer pipes-and-fittings
 
6A CAT-M.PDF
6A CAT-M.PDF6A CAT-M.PDF
6A CAT-M.PDF
 
Assmann doublewall tank specification
Assmann doublewall tank specificationAssmann doublewall tank specification
Assmann doublewall tank specification
 
Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)
 
Halderman ch033 lecture
Halderman ch033 lectureHalderman ch033 lecture
Halderman ch033 lecture
 
Ateco dome power point presentation master
Ateco dome  power point presentation   masterAteco dome  power point presentation   master
Ateco dome power point presentation master
 
1.4 diesel engine moving components
1.4 diesel engine moving components1.4 diesel engine moving components
1.4 diesel engine moving components
 
Claas ares 697 617 atz (type a03) tractor service repair manual
Claas ares 697 617 atz (type a03) tractor service repair manualClaas ares 697 617 atz (type a03) tractor service repair manual
Claas ares 697 617 atz (type a03) tractor service repair manual
 
BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.
 
Visual Dictionary - Soffit
Visual Dictionary - SoffitVisual Dictionary - Soffit
Visual Dictionary - Soffit
 
INDUSTRIAL TRAINING UNDER PUBLIC WORKS DEVELOPMENT
INDUSTRIAL TRAINING UNDER PUBLIC WORKS DEVELOPMENTINDUSTRIAL TRAINING UNDER PUBLIC WORKS DEVELOPMENT
INDUSTRIAL TRAINING UNDER PUBLIC WORKS DEVELOPMENT
 
Pipes and pipe joints
Pipes and pipe jointsPipes and pipe joints
Pipes and pipe joints
 
00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy
 
Build your own turbine
Build your own turbineBuild your own turbine
Build your own turbine
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
DESIGN OF IC ENGINE COMPONENT-CYLINDER
DESIGN OF IC ENGINE COMPONENT-CYLINDER DESIGN OF IC ENGINE COMPONENT-CYLINDER
DESIGN OF IC ENGINE COMPONENT-CYLINDER
 
Nine Project (8-19-15)
Nine Project (8-19-15)Nine Project (8-19-15)
Nine Project (8-19-15)
 

En vedette

chuyên bán đồng hồ casio chính hãng giá tốt
chuyên bán đồng hồ casio chính hãng giá tốtchuyên bán đồng hồ casio chính hãng giá tốt
chuyên bán đồng hồ casio chính hãng giá tốt
alfredo254
 
WEDF_new2016_brochure_EN_web
WEDF_new2016_brochure_EN_webWEDF_new2016_brochure_EN_web
WEDF_new2016_brochure_EN_web
Fazal Mushin
 
протокол стратегической сессии
протокол стратегической сессиипротокол стратегической сессии
протокол стратегической сессии
Astratskr Astratskr
 

En vedette (12)

Flujo de efectivo
Flujo de efectivoFlujo de efectivo
Flujo de efectivo
 
MCSA
MCSAMCSA
MCSA
 
Podao16
Podao16Podao16
Podao16
 
chuyên bán đồng hồ casio chính hãng giá tốt
chuyên bán đồng hồ casio chính hãng giá tốtchuyên bán đồng hồ casio chính hãng giá tốt
chuyên bán đồng hồ casio chính hãng giá tốt
 
WEDF_new2016_brochure_EN_web
WEDF_new2016_brochure_EN_webWEDF_new2016_brochure_EN_web
WEDF_new2016_brochure_EN_web
 
Katalog Dining Set - Meja Makan Rotan123
Katalog Dining Set - Meja Makan Rotan123Katalog Dining Set - Meja Makan Rotan123
Katalog Dining Set - Meja Makan Rotan123
 
одномембранні органели
одномембранні органелиодномембранні органели
одномембранні органели
 
Flujo de efectivo
Flujo de efectivoFlujo de efectivo
Flujo de efectivo
 
протокол стратегической сессии
протокол стратегической сессиипротокол стратегической сессии
протокол стратегической сессии
 
Ultrasound guided pulsed radiofrequency treatment of the pudendal nerve in ch...
Ultrasound guided pulsed radiofrequency treatment of the pudendal nerve in ch...Ultrasound guided pulsed radiofrequency treatment of the pudendal nerve in ch...
Ultrasound guided pulsed radiofrequency treatment of the pudendal nerve in ch...
 
Gobierno abierto para una ciudadanía corresponsable
Gobierno abierto  para una ciudadanía corresponsableGobierno abierto  para una ciudadanía corresponsable
Gobierno abierto para una ciudadanía corresponsable
 
Implicaciones de las NIIF en el papel del administrador financiero
Implicaciones de las NIIF en el papel del administrador financieroImplicaciones de las NIIF en el papel del administrador financiero
Implicaciones de las NIIF en el papel del administrador financiero
 

Similaire à Critical observations during a shut down audit of a pf boiler final

To join the sheet metal for boiler
To join the sheet metal for boilerTo join the sheet metal for boiler
To join the sheet metal for boiler
PRATHAMESH DESHPANDE
 
Aiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agriumAiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agrium
Satria Sakata
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
Ujwal Joshi
 
Soot-Blower-Lance-Tube-Corrosion
Soot-Blower-Lance-Tube-CorrosionSoot-Blower-Lance-Tube-Corrosion
Soot-Blower-Lance-Tube-Corrosion
ishaqj
 

Similaire à Critical observations during a shut down audit of a pf boiler final (20)

Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
 
Thermal fatigue failure in a FBC boiler
Thermal fatigue failure in a FBC boilerThermal fatigue failure in a FBC boiler
Thermal fatigue failure in a FBC boiler
 
To join the sheet metal for boiler
To join the sheet metal for boilerTo join the sheet metal for boiler
To join the sheet metal for boiler
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Design And Fabrication of Turbulator for swirl motion flow study Setup
Design And Fabrication of Turbulator for swirl motion flow study SetupDesign And Fabrication of Turbulator for swirl motion flow study Setup
Design And Fabrication of Turbulator for swirl motion flow study Setup
 
Boiler welding
Boiler weldingBoiler welding
Boiler welding
 
Aiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agriumAiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agrium
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
 
Tube expansion
Tube expansionTube expansion
Tube expansion
 
GNFC problems.pdf
GNFC problems.pdfGNFC problems.pdf
GNFC problems.pdf
 
Soot-Blower-Lance-Tube-Corrosion
Soot-Blower-Lance-Tube-CorrosionSoot-Blower-Lance-Tube-Corrosion
Soot-Blower-Lance-Tube-Corrosion
 
IRJET- Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchan...
IRJET- Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchan...IRJET- Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchan...
IRJET- Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchan...
 
Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchanger usi...
Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchanger usi...Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchanger usi...
Study of Flow and Heat Transfer Analysis in Shell and Tube Heat Exchanger usi...
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 english
 
Trouble shooting vibration in a pulverised coal fired boiler
Trouble shooting vibration in a pulverised coal fired boilerTrouble shooting vibration in a pulverised coal fired boiler
Trouble shooting vibration in a pulverised coal fired boiler
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Case studies in boiler vibration and BFP cavitation by k.k.parthiban
Case studies in boiler vibration and BFP cavitation by k.k.parthibanCase studies in boiler vibration and BFP cavitation by k.k.parthiban
Case studies in boiler vibration and BFP cavitation by k.k.parthiban
 
Heat exchangers ipec.info
Heat exchangers ipec.infoHeat exchangers ipec.info
Heat exchangers ipec.info
 
Induction Forming Seminar
Induction Forming SeminarInduction Forming Seminar
Induction Forming Seminar
 
Hot runner nozzle cooling method and its influence
Hot runner nozzle cooling method and its influenceHot runner nozzle cooling method and its influence
Hot runner nozzle cooling method and its influence
 

Dernier

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Critical observations during a shut down audit of a pf boiler final

  • 1. CRITICAL OBSERVATIONS DURING SHUT DOWN AUDIT OF A 330 MW PULVERIZED COAL FIRED BOILER By K.K.Parthiban, B.Tech ( IIT-M), M.E Thermal Engineering- RECT Trichy Introduction Boiler maintenance cost can be reduced, if every failure & shortcoming are analysed and addressed. In a power plant, engineers are stressed and hard-pressed for early restart of the unit and hence they do not have time to analyze the failures. However, employing specialists for unit inspection during shut down would help to identify defects in boiler & reasons for past failures. Actions could be taken to stop repetitive failures. In future, unscheduled outages can be avoided. Performance of the plant can be greatly improved. There have been cases wherein two or three annual shut down audits have led to much better understanding of the boilers. There have been cases where the plant engineers stopped calling us when they became clear of what to inspect in the annual shut downs. The value addition of a shutdown audit by experienced boiler consultants can be known only if it is experienced. We bring below the value addition by us in a tower type PF boiler outside India. Features of the unit The boiler is a once through unit with a centrifugal separator. The furnace is made of spiral wall rifle tube construction. All the tube banks of superheaters, reheaters and economizers are horizontally arranged in a single pass directly above the furnace. The screen tubes are arranged above the furnace. The screen outlet tubes act as support tubes for all the tube banks except for the low temperature economiser. The tower type configuration is a bold configuration selected by the designers. It certainly improves the free board for better burn out of the coal particles. The lateral pitch of bank assemblies decrease, as the gas moves up. Thus, required gas side velocities are maintained for good heat transfer. The low temperature economiser is constructed out of square finned tube. The unit is provided with two rotary airheaters. Gas recirculation fans are provided for startup purpose and for low load operation. 5 mills are provided. Electrostatic precipitator is provided for dust capture. Condensate polishing units are provided for ensuring the feed water / return condensate quality. Detailed observations at shut down We bring out our observations in the unit which was inspected by us. We feel this technical paper would help the unit operators to understand about methodical approach to be taken for inspection of the boiler and correlate to the failures being experienced in the unit. We have compiled below the important observations in this unit. Photo 1: Distant view of the unit
  • 2. Final superheater stub cracks It was learnt from plant engineers, that there had been cracks of the stubs at final SH outlet since long. It had become a routine to inspect the stub weldment at headers by DP test. The stub weldments are repaired when the cracks are observed. On review of detailed drawing and installation of SH inlet & outlet headers, it became clear that there had been design mistake. The header supports were restricting the thermal expansion and hence the short stubs were subject to force. Photo 2: Location of stub cracks in superheater outlet header Photo 3: DP test done at header stubs show cracks. These cracks are not deep routed. Photo 4: The SH outlet header moves to the right by 42 mm as per calculation. Available slot is 30 mm only. Photo 5: The SH outlet header is required to move away from Waterwall by 16.5 mm. But space available is less. Photo 6: The above drawing shows SH inlet header support detail. The header moves by 31 mm away from waterwall. The slot provision is 40 mm. Since the details of SH outlet header support was not available, this drawing is referred here for comparison purpose.
  • 3. Photo 7: A true to scale drawing was made to find the fillet length of SH stubs. Photo 8: The actual weld lengths were found to be 25-27 mm. It should have been around 12.8 mm. High steam temperature headers are subject to creep and thermal fatigue. The stubs should be with full penetration welds. At the same time, the weld reinforcements should be within limits. Low temperature superheater spacer support failures In low temperature superheater bottom bank is of T2 material and top bank is of T22 material. The tubes are supported by hanger tubes. However vertical pitch is maintained by sliding spacer of SS 304 material. The sliding supports welding with T22 tube material had cracked at 295 locations. Photo 9: The above drawing shows sliding support detail. The insert photo shows the dislodging of the sliding support from the tube by weld crack. This is a dissimilar weld. The reason is the wrong choice of electrode.
  • 4. Photo 10: Photo shows the weld failure of sliding spacer supports between LTSH tubes. Photo 11: The photo shows the LTSH supporting (binding) by hanger tubes. Table 1: T22 material comes under P5A group. P8 is the Stainless grouping. Photo 12: The extreme left photo shows the LTSH tubes spaced by an attachment bar welded to top & bottom tubes at the location shown. The support is found slipped. This is because of the width of the support plate was inadequate by design. Photo 13 & 14: Instead of removing and rewelding a new support plate, Alternate arrangement is suggested to prevent the slipping. The elevation & sectional views are shown here on the right-side drawings.
  • 5. Observations in Deaerator tower For many years, the deaerator tower was not inspected. It was the first time when we had inspected. The deaerator spray nozzles had come off completely. Fortunately, the dislodged components did not trouble the boiler feed pump. Photo 15 & 16: The above photographs show the dislodged spray nozzles from the deaerator tower. Drag chain feeders The unit is provided with drag chain feeders to feed coals to different mills. Of late, belt weigh feeders are used to feed coal. By VFD it is possible to achieve uniform coal feed rate between feeders. In drag chain feeder a drop test is a must, to ensure that the rate of feeding is uniform in all feeders. This depends on the dam plate (coal bed height control) levels at all feeders. It was observed that as the dam gates were worn out, this aspect was ignored. Photo 17 & 18: The above photographs show the different type of dam arrangement between feeders.
  • 6. Coal nozzles Coal nozzles distortion in service has been there in some units. This has to do with the differential temperature between the inside and outside surfaces of the outer shell. The outer shell would distort when the tilt is such that there is no sweeping of air over the outer surface. The space between the inner and outer shell is also critical and can cause accumulation of coal. Photo 19: Distortion of outer shell only at bottom side of the coal nozzle. Photo 20: Distortion of outer shell only at bottom side at all levels. Photo 21: The photo shows the distortion of outer shell due to differential temperature between inner & outer surface in a different boiler. But then the space between inner & outer shell is large enough that no coal ash slags are seen. Photo 22: The new coal nozzle developed by OEM now addresses the problem. The air sweep is maintained at all tilts and at the same time the outer shell does not support the coal ash because the outer shell is now trimmed to 115 mm. This to overcome the problem shown in photo 19 & 20. Secondary / OFA nozzles The distortion of SA and OFA nozzles are also common for the same reason that the inside surface is
  • 7. at different temperature as compared to outside surface temperature when the tilt is done. However, seeing the different profiles, we can infer what could be right design to prevent distortion of the nozzles. See photos below. Photo 23 & 24: The top photo shows the distortion of SA nozzle. It is seen that the flat top has suffered distortion, while the corrugated profile is not distorted. The bottom photo shows the tendency of flat plate to distort. Photo 25: The corrugated nozzles do not exhibit any distortion. The internal cross stiffeners hold the shape. It is seen that the plain plate is distorted. High temperature economiser This assembly is of staggered construction and is of plain tube. We have come across erosion of end tubes in many cases wherein a tube bank is arranged in staggered pitch in elevation. The resistance Photo 26: Erosion of bends near rearwall. Photo 27: Erosion of HT eco inlet tubes at front wall.
  • 8. Photo 28: Filter baffles placed in the tube bank below has caused preferential flow of flue gas along the front wall in the upper bank. Photo 29 & 30: The photos show the end tube to panel clearance. This had led to the erosion of end tube. Staggered pitch banks are sensitive to such preferential flow patterns. for flow through the staggered tube bank, leads to end tube erosion along the four boundaries. Some filter baffles have been used in the tube bank below. This has resulted in additional gas flow along the front wall and resulted in erosion of the bottom tubes. Furnace panel erosion around the wall blowers The furnace is found free of ash slagging, as the coal used is a good one. However, there is distortion of the panels in the upper part of the spiral walls. Due to this, the wall blower has been causing frequent erosion of panel tubes over a large perimeter. We recommended that the soot blower tip is advanced suitably to reduce the erosion. Photo 31: The photo shows the erosion of furnace wall panels over a large perimeter around. Photo 32: The photo shows the distortion of spiral wall panels at upper levels.
  • 9. Mills The important observations in mills were the plugging of classifier vanes & wear of the top plate, which would affect the separation efficiency. The wear pattern of the rolls show that the rolls are not advanced after the gradual wearing off. This would affect the output from the mills. Photo 33: The photo shows the erosion of the plate above the classifier Photo 34: The photo shows the rags clogging the classifier vanes. Photo 35: The rolls of mills were found to be rolling of ridge at the end of bowl. Photo 36: The damage pattern indicates the rolls are not adjusted forward after the wearing off. Every boiler has some scope for improvement. Critical shut down inspection would benefit the users in improving the PLF and in reducing loss due to unforeseen shut down. For comments write to parthi2006@gmail.com / venus1@venus-boiler.com. Visit www.venus-boiler.com for more articles. M/S Venus energy audit system – Trouble shooting of boiler failures and operational issues. Company carries out design audit, construction audit, shut down audit and operational audit. M/S Sri Devi engineering consultancy and agency – engaged in non-pressure parts spares supply for FBC / CFBC / PF boilers. M/S Sri Devi boiler equipment and spares – engaged in supply of pressure part spares for all type of boilers