3. Loads and their Maximum Consumption Reliance 2 x 225 kVA MD Electricity Bill Unit = 1kW 2 x 60kVA UPS (For Facility) 3 x 40 KVA UPS AHU & Chiller Plant (AHU 180TR, Chiller 80 & 60 TR) LDB (For Lighting) Current: 61.3 kVA Current: 32.3 kVA Current: 43.2 kVA Current: 120 kVA Current: 41.33 kVA Split A/C & PAC (2x2TR, 3x4TR),(2 x 7.5TR) Total: 298.43 kVA Max
4.
5.
6.
7.
8.
9.
10.
11.
12.
13. Consumption LDB LDB Consumption = 61.3 kVA 55.8 17.9 22.1 15.8 kW 61.3 TOTAL 0.93 0.90 0.90 PF 79.9 100.5 83.6 Current (A) 19.3 241.8 B 24.4 242.7 Y 17.6 241.6 R KVA Voltage (V) LDB
14. Consumption AHU AHU Consumption =62.7 kVA 54.5 16.7 19.6 18.2 kW 62.7 TOTAL 0.89 0.89 0.87 PF 78.5 92.4 76.8 Current (A) 18.7 238.9 B 22.6 238.2 Y 21.4 236.7 R KVA Voltage (V) AHU TR
15. Consumption Chiller Plant Chiller Plant Consumption = 120 kVA 37.1 40.0 41.8 kW TOTAL 0.99 0.99 0.99 PF 158.6 166.7 178.3 Current (A) 37.6 238.0 B 40.2 240.0 Y 42.2 241.0 R KVA Voltage (V) 80 & 60 TR
16. Consumption Split AC 5.90 TOTAL 0.87 0.85 0.83 PF 10.31 7.52 7.63 Current (A) 2.40 233.9 B 1.74 231.6 Y 1.76 230.2 R KVA Voltage (V) 5.5TR-1 6.17 TOTAL 0.86 0.85 0.87 PF 7.88 7.83 10.65 Current (A) 1.86 234.4 B 1.84 235.0 Y 2.47 233.0 R KVA Voltage (V) 5.5TR-2
17. Consumption PAC (Server Room) 14.84 TOTAL 0.71 0.77 0.80 PF 19.12 22.53 21.95 Current (A) 4.49 235.0 B 5.24 232.7 Y 5.11 231.6 R KVA Voltage (V) 7.5 TR-1 14.42 TOTAL 0.71 0.77 0.77 PF 18.76 21.89 21.44 Current (A) 4.37 234.2 B 5.07 233.0 Y 4.98 232.6 R KVA Voltage (V) 7.5 TR-2
18.
19.
20. Potential Power Savings MD * (Rs. 300/kVA/month) x (demand difference of 50 kVA) x (12 month/year) 1,80,000 TOTAL 1,80,000 Shifting to 400 kVA MD instead of 450 kVA * 1 Capex Opex (Annual) Area of Saving #