Dodd-Frank Section 1502:
Compliance Costs and
Externalities of Greater Information Symmetry
August 22, 2013
Chris Bayer
PhD Candidate
Tulane University
Presentation overview
• This presentation will focus on:
– company-level costs
– implementation modalities
– synergistic platforms
– externalities
• Companies are thus able to peer over their
respective fences and see how their neighbors are
getting on
2
http://www.payson.tulane.edu/dfs1502-survey-corporate-efforts3
Tulane's 2013 snapshot survey
• July 11, 2013 – August 16, 2013
• Snowball method (with 40 trade associations
serving as seeds)
• Online survey (using Qualtrics)
• Numerator = 62 companies
o 42 based in the US – 20 with significant business activity in the US
• Indicative – not representative – of affected
companies
4
Survey topics
Section # of questions
A. Company Profile 8
B. Overall Implementation Status 2
C. Internal Resources Utilized 1
D. External Resources Utilized 5
E. Synergy 9
F. Perceived Advantages 1
G. Legislative Alternatives 1
5
Company profile: primary commercial
activity along supply chain
6
Count
1 Smelting/Refining
5 Processing of Smelted/Refined Metal (including
scrap/recycled sources and carbonaceous materials)
1 Chemical and material manufacturing
34 Component / Sub-assembly Manufacturing
11 Contract Manufacturing for Other Companies
1 OEM
26 Final / Consumer Products Manufacturing
1 Distributor/ Retail
Company profile:
Companies with product(s)
containing 3TG mineral(s)
7
Count
43 Tungsten
42 Tantalum
56 Tin
47 Gold
Company profile: Industry sectors
8
Count
11 Aerospace
9 Medical
33 Automotive
11 Defense
5 Chemical
25 Electric /electronics / high-tech
1 Sports / Recreational Equipment
1 Energy
1 Agriculture
Company profile: public / private
9
Count
33 Public
29 Private
Count
30 Supplier
3 Issuer
29 Supplier and Issuer
Company profile: supplier / issuer
Company profile:
annual company revenue
10
Count
12 < US$ 50 million
3 US$ 50 million – US$ 100 million
5 US$ 100 million – US$ 500 million
5 US$ 500 million – US$ 1 billion
15 US$ 1 billion – US$ 5 billion
21 > US$ 5 billion
Four main tasks required to comply
with the SEC regulation
1) Conduct the regulatory applicability
determination / analysis
2) Develop and implement the Reasonable
Country of Origin Inquiry
3) Develop and implement the Due Diligence
system
4) Preparing for the CMR Audit and reporting to
the SEC
11
SEC - Degree of completion:
(1) regulatory applicability determinations / analysis
12
0 5 10 15 20 25 30 35 40
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 78%
%
Companies
SEC - Degree of completion:
(2) reasonable country of origin inquiry
13
0 5 10 15
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 55%
%
Companies
SEC - Degree of completion:
(3) due diligence system
14
0 5 10 15
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 41%%
Companies
SEC - Degree of completion:
(4) preparing for the CMR Audit and reporting to the SEC
15
0 5 10 15 20 25 30 35
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
N/A: 8%
average: 18%
%
Companies
Degree of completion:
OECD’s 5-step Due Diligence framework
1) Establish strong company management systems
2) Identify and assess risk in the supply chain
3) Design and implement a strategy to respond to
identified risks
4) Third-Party audit of smelters/refiners’ due
diligence practices
5) Report annually on supply chain due diligence
16
OECD - Degree of completion:
(1) Establish strong company management systems
17
0 5 10 15 20
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 67%
%
Companies
OECD - Degree of completion:
(2) Identify and assess risk in the supply chain
18
0 2 4 6 8 10 12
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 51%%
Companies
OECD - Degree of completion:
(3) Design and implement a strategy to
respond to identified risks
19
0 5 10 15 20 25
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 39%%
Companies
OECD - Degree of completion:
(4) Third-Party audit of smelters/refiners’
due diligence practices
20
0 10 20 30 40 50
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 16%%
Companies
OECD - Degree of completion:
(5) Report annually on supply chain due diligence
21
0 10 20 30 40 50
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100
average: 15%
Companies
%
Number of employees involved in CMP
22
0 10 20 30 40
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-200
Companies
# of employees
per company
Average LOE per employee on CM team
23
0
5
10
15
20
25
30
35
1 2 3 4 5 6 7 8 9 10
265 = 10% LOE
19 = 50% LOE
27 = 100 % LOE
Employee #
LOE %
Non-IT related expenditures on
external resources
• 41% of companies incurred costs in order to support
conflict minerals program
review, assessment, development and
implementation
• “External resources” include:
• consultants
• auditors
• industry association membership fees / related costs
• legal fees
• pilot program costs
24
Non-IT related expenditures on
external resources
25
Count
14 < US$ 50,000
6 US$ 50,000 – US$ 100,000
2 US$ 100,000 – US$ 250,000
2 US$ 250,000 – US$ 500,000
0 US$ 500,000 – US$ 1 million
1 > US$ 1 million
IT gap / needs analysis
• 57% of companies have conducted a
gap/needs analysis for IT systems or
modifications required to support conflict
minerals trace ability and/or reporting
• 34% of these companies engage external
resources to support this gap/needs analysis
for IT systems
26
IT related external resource
expenditures
27
Count
22 < US$ 50,000
2 US$ 50,000 – US$ 100,000
1 US$ 100,000 – US$ 250,000
0 US$ 250,000 – US$ 500,000
1 US$ 500,000 – US$ 1 million
0 > US$ 1 million
IT modalities
28
Count
5 We will/have hire(d) external resources to modify certain existing
IT systems
13 We will/have use(d) internal resources to modify certain existing
IT systems
6 We will/have buy/bought wholly new IT systems
8 We have no IT system needs
19 Unknown at this time
Actual / anticipated amount expended
for completion of the IT project
29
Count
3 US$ 0
22 < US$ 50,000
11 US$ 50,000 – US$ 100,000
6 US$ 100,000 – US$ 250,000
1 US$ 250,000 – US$ 500,000
0 US$ 500,000 – US$ 1 million
3 > US$ 1 million
13 Unknown / not estimated
Synergy
• 77% of companies use the EICC-GEeSI Template or a
modified version thereof
• 26% use the EICC-GEeSI Dashboard
• 21% use the IPC-1755 Conflict Minerals Data Exchange
Standard
• 46% use a commercially available CM data
management system:
– iPoint Conflict Minerals Platform (iPCMP)
– CMO COMPLIANCE (in partnership with Deloitte)
– Foresite systems
– Bravo Solutions
– Compliance Data Exchange (CDX)
– KPMG's Conflict Minerals Tracking Tool
30
Support – through purchasing
requirements – of in-region initiatives
• 2 (3%) - Solutions for Hope (SfH) closed pipe
system
• 2 (3%) - ITRI Tin Supply Chain Initiative (iTSCi)
• 1 (1.6%) - ICGLR Certification
• 0 (%) - BGR Certified Trading Chains
• 2 (3%) - Conflict Free Tin Initiative
• 2 (3%) - KEMET Partnership for Social and
Economic Stability
31
Support for other in-region initiatives
• 3 companies (5%) are members of the Public-
Private Alliance for Responsible Minerals
Trade (PPA)
32
Support – through purchasing
requirements – of supply chain initiatives
• 31% EICC-GeSI conflict-free smelter program
• 1.6% RJC Chain of Custody Certification
• 1.6% LBMA Good Delivery
33
DFS1502 externalities
Agree Neither
agree nor
disagree
Disagree
1. DF S1502 has leveled the playing field with regard to
sourcing minerals from the DRC and neighboring
countries. 3 24 31
2. Due to DF S1502–related actions, we have identified
opportunities for consolidation (vertical integration)
and supply chain cost reduction. 2 16 40
3. Due to DF S1502–related actions, we have improved
our risk management (e.g. pre-emptive identification
of risk such as reliance on sole-sourced suppliers). 4 23 31
4. Due to DF S1502–related actions, we have improved
our supply chain performance management in terms of
responsiveness and efficiency. 4 20 34
34
DFS1502 externalities (cont.)
Agree Neither
agree nor
disagree
Disagree
5. Due to DF S1502–related actions, we have improved
response to customer requests for CM-related
information. 23 20 15
6. Due to DF S1502–related actions, we now have data
and standards with which to conduct future supplier
certification. 13 27 19
7. Due to DF S1502–related actions, we now have
improved supplier policies. 7 28 24
8. Due to DF S1502–related actions, we now have the
confidence that our company is not negatively
impacting the Congo and surrounding countries. 5 28 25
9. Due to DF S1502–related actions, our Corporate Social
Responsibility standing has improved. 8 33 1735
Summary findings
• Companies are steadily implementing main tasks
required to comply with the SEC regulation
• Almost half of the companies are turning to
external help with their CMP
• The majority of companies are opting to build
rather than buy
• Companies are synergizing – to varying degrees –
with information sharing platforms
• Generally don't accord much significance to
possible externalities of DFS1502
36
Discussion questions
• How is an increase in symmetry of B2B
information in the 3TG-based industries affecting
the upstream, smelter and downstream tiers?
• Due to the increased symmetry of information, are
upstream companies at a greater advantage vis-à-
vis downstream companies?
• To what extent can IT-related expenses be reduced
through engagement of common platforms?
37
38
Thank you for your attention!

Contenu connexe

Similaire à Dodd-Frank Section 1502: Compliance Costs and Externalites of Greater Information Symmetry

CMMI_Norton.pdf
CMMI_Norton.pdfCMMI_Norton.pdf
CMMI_Norton.pdfalanidea
 
FDA Update: Inspections, Observations and Metrics - OMTEC 2017
FDA Update: Inspections, Observations and Metrics - OMTEC 2017FDA Update: Inspections, Observations and Metrics - OMTEC 2017
FDA Update: Inspections, Observations and Metrics - OMTEC 2017April Bright
 
Survey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed complianceSurvey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed complianceNimonik
 
Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University Matt Whitteker
 
2nd Annual International Trade Compliance Conference
2nd Annual International Trade Compliance Conference2nd Annual International Trade Compliance Conference
2nd Annual International Trade Compliance Conferenceveronicaarlet
 
200506_The Business Link How to succeed in Outsourcing international operations
200506_The Business Link How to succeed in Outsourcing international operations200506_The Business Link How to succeed in Outsourcing international operations
200506_The Business Link How to succeed in Outsourcing international operationsJean-Claude DE VERA
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Matt Whitteker
 
The 2018 Deloitte Global Outsourcing Survey Presentation
The 2018 Deloitte Global Outsourcing Survey PresentationThe 2018 Deloitte Global Outsourcing Survey Presentation
The 2018 Deloitte Global Outsourcing Survey PresentationDeloitte United States
 
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...Jim Kaplan CIA CFE
 
Software Pricing and Licensing Survey Results and 2012 Predictions
Software Pricing and Licensing Survey Results and 2012 PredictionsSoftware Pricing and Licensing Survey Results and 2012 Predictions
Software Pricing and Licensing Survey Results and 2012 PredictionsFlexera
 
How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...
How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...
How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...Cognizant
 
Business and Data Analytics Collaborative April Meetup
Business and Data Analytics Collaborative April MeetupBusiness and Data Analytics Collaborative April Meetup
Business and Data Analytics Collaborative April MeetupKen Tucker
 
Federal Cloud Computing Report - Market Connections & General Dynamics Inform...
Federal Cloud Computing Report - Market Connections & General Dynamics Inform...Federal Cloud Computing Report - Market Connections & General Dynamics Inform...
Federal Cloud Computing Report - Market Connections & General Dynamics Inform...Market Connections, Inc.
 
No Choice But to Comply - FATCA
 No Choice But to Comply - FATCA No Choice But to Comply - FATCA
No Choice But to Comply - FATCAThinksoft Global
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain CouncilSergio Grisa
 
Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365AleksandarVarajic1
 
ebk_Best_Practices_for_Channel_Data_Collection Final
ebk_Best_Practices_for_Channel_Data_Collection Finalebk_Best_Practices_for_Channel_Data_Collection Final
ebk_Best_Practices_for_Channel_Data_Collection FinalChannelinsight
 
Are You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls FrameworkAre You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls FrameworkBlackLine
 

Similaire à Dodd-Frank Section 1502: Compliance Costs and Externalites of Greater Information Symmetry (20)

CMMI_Norton.pdf
CMMI_Norton.pdfCMMI_Norton.pdf
CMMI_Norton.pdf
 
FDA Update: Inspections, Observations and Metrics - OMTEC 2017
FDA Update: Inspections, Observations and Metrics - OMTEC 2017FDA Update: Inspections, Observations and Metrics - OMTEC 2017
FDA Update: Inspections, Observations and Metrics - OMTEC 2017
 
Survey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed complianceSurvey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed compliance
 
Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University Conflict Minerals Survey -- Tulane University
Conflict Minerals Survey -- Tulane University
 
RFP Creation
RFP CreationRFP Creation
RFP Creation
 
2nd Annual International Trade Compliance Conference
2nd Annual International Trade Compliance Conference2nd Annual International Trade Compliance Conference
2nd Annual International Trade Compliance Conference
 
200506_The Business Link How to succeed in Outsourcing international operations
200506_The Business Link How to succeed in Outsourcing international operations200506_The Business Link How to succeed in Outsourcing international operations
200506_The Business Link How to succeed in Outsourcing international operations
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives
 
The 2018 Deloitte Global Outsourcing Survey Presentation
The 2018 Deloitte Global Outsourcing Survey PresentationThe 2018 Deloitte Global Outsourcing Survey Presentation
The 2018 Deloitte Global Outsourcing Survey Presentation
 
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
 
Software Pricing and Licensing Survey Results and 2012 Predictions
Software Pricing and Licensing Survey Results and 2012 PredictionsSoftware Pricing and Licensing Survey Results and 2012 Predictions
Software Pricing and Licensing Survey Results and 2012 Predictions
 
Managing Earnings at Asset Light 3PLs
Managing Earnings at Asset Light 3PLsManaging Earnings at Asset Light 3PLs
Managing Earnings at Asset Light 3PLs
 
How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...
How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...
How a Well-Executed Supply Chain Control Tower Can Accelerate Digital’s Busin...
 
Business and Data Analytics Collaborative April Meetup
Business and Data Analytics Collaborative April MeetupBusiness and Data Analytics Collaborative April Meetup
Business and Data Analytics Collaborative April Meetup
 
Federal Cloud Computing Report - Market Connections & General Dynamics Inform...
Federal Cloud Computing Report - Market Connections & General Dynamics Inform...Federal Cloud Computing Report - Market Connections & General Dynamics Inform...
Federal Cloud Computing Report - Market Connections & General Dynamics Inform...
 
No Choice But to Comply - FATCA
 No Choice But to Comply - FATCA No Choice But to Comply - FATCA
No Choice But to Comply - FATCA
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain Council
 
Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365
 
ebk_Best_Practices_for_Channel_Data_Collection Final
ebk_Best_Practices_for_Channel_Data_Collection Finalebk_Best_Practices_for_Channel_Data_Collection Final
ebk_Best_Practices_for_Channel_Data_Collection Final
 
Are You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls FrameworkAre You Ready? Implementing COSO's Updated Internal Controls Framework
Are You Ready? Implementing COSO's Updated Internal Controls Framework
 

Plus de Tulane University Law School Payson Center for International Development

Plus de Tulane University Law School Payson Center for International Development (16)

Tulane Payson Center for Development: 2015 Nepal Global Development Summer In...
Tulane Payson Center for Development: 2015 Nepal Global Development Summer In...Tulane Payson Center for Development: 2015 Nepal Global Development Summer In...
Tulane Payson Center for Development: 2015 Nepal Global Development Summer In...
 
Tulane Payson Center for International Development: 2015 Myanmar Global Devel...
Tulane Payson Center for International Development: 2015 Myanmar Global Devel...Tulane Payson Center for International Development: 2015 Myanmar Global Devel...
Tulane Payson Center for International Development: 2015 Myanmar Global Devel...
 
New Graduate Student Orientation Fall 2014
New Graduate Student Orientation Fall 2014New Graduate Student Orientation Fall 2014
New Graduate Student Orientation Fall 2014
 
Payson14LightGlobe PowerPoint Template Example
Payson14LightGlobe PowerPoint Template ExamplePayson14LightGlobe PowerPoint Template Example
Payson14LightGlobe PowerPoint Template Example
 
Payson14AlmostWhite PowerPoint Template Example
Payson14AlmostWhite PowerPoint Template ExamplePayson14AlmostWhite PowerPoint Template Example
Payson14AlmostWhite PowerPoint Template Example
 
Payson14DarkGreen PowerPoint Template Example
Payson14DarkGreen PowerPoint Template ExamplePayson14DarkGreen PowerPoint Template Example
Payson14DarkGreen PowerPoint Template Example
 
Payson14GreenGIS PowerPoint Template Example
Payson14GreenGIS PowerPoint Template ExamplePayson14GreenGIS PowerPoint Template Example
Payson14GreenGIS PowerPoint Template Example
 
Payson14BlacknBlue PowerPoint Template Example
Payson14BlacknBlue PowerPoint Template ExamplePayson14BlacknBlue PowerPoint Template Example
Payson14BlacknBlue PowerPoint Template Example
 
SOS Emergency Evacuation Tutorial
SOS Emergency Evacuation TutorialSOS Emergency Evacuation Tutorial
SOS Emergency Evacuation Tutorial
 
Scenes from the Fast 48 Bootcamp
Scenes from the Fast 48 BootcampScenes from the Fast 48 Bootcamp
Scenes from the Fast 48 Bootcamp
 
CAFTA-DR Presentation
CAFTA-DR PresentationCAFTA-DR Presentation
CAFTA-DR Presentation
 
New graduate student orientation for Fall 2013
New graduate student orientation for Fall 2013New graduate student orientation for Fall 2013
New graduate student orientation for Fall 2013
 
Survey research on child labor in West African Cocoa Growing Areas: An Introd...
Survey research on child labor in West African Cocoa Growing Areas: An Introd...Survey research on child labor in West African Cocoa Growing Areas: An Introd...
Survey research on child labor in West African Cocoa Growing Areas: An Introd...
 
Dodd-Frank Section 1502: Significance and Public Policy Implications
Dodd-Frank Section 1502: Significance and Public Policy ImplicationsDodd-Frank Section 1502: Significance and Public Policy Implications
Dodd-Frank Section 1502: Significance and Public Policy Implications
 
Tulane Payson Center Faculty Research Overview
Tulane Payson Center Faculty Research OverviewTulane Payson Center Faculty Research Overview
Tulane Payson Center Faculty Research Overview
 
Payson Center Summer Institutes in Nairobi, Kenya
Payson Center Summer Institutes in Nairobi, KenyaPayson Center Summer Institutes in Nairobi, Kenya
Payson Center Summer Institutes in Nairobi, Kenya
 

Dernier

Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Dernier (20)

Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

Dodd-Frank Section 1502: Compliance Costs and Externalites of Greater Information Symmetry

  • 1. 1 Dodd-Frank Section 1502: Compliance Costs and Externalities of Greater Information Symmetry August 22, 2013 Chris Bayer PhD Candidate Tulane University
  • 2. Presentation overview • This presentation will focus on: – company-level costs – implementation modalities – synergistic platforms – externalities • Companies are thus able to peer over their respective fences and see how their neighbors are getting on 2
  • 4. Tulane's 2013 snapshot survey • July 11, 2013 – August 16, 2013 • Snowball method (with 40 trade associations serving as seeds) • Online survey (using Qualtrics) • Numerator = 62 companies o 42 based in the US – 20 with significant business activity in the US • Indicative – not representative – of affected companies 4
  • 5. Survey topics Section # of questions A. Company Profile 8 B. Overall Implementation Status 2 C. Internal Resources Utilized 1 D. External Resources Utilized 5 E. Synergy 9 F. Perceived Advantages 1 G. Legislative Alternatives 1 5
  • 6. Company profile: primary commercial activity along supply chain 6 Count 1 Smelting/Refining 5 Processing of Smelted/Refined Metal (including scrap/recycled sources and carbonaceous materials) 1 Chemical and material manufacturing 34 Component / Sub-assembly Manufacturing 11 Contract Manufacturing for Other Companies 1 OEM 26 Final / Consumer Products Manufacturing 1 Distributor/ Retail
  • 7. Company profile: Companies with product(s) containing 3TG mineral(s) 7 Count 43 Tungsten 42 Tantalum 56 Tin 47 Gold
  • 8. Company profile: Industry sectors 8 Count 11 Aerospace 9 Medical 33 Automotive 11 Defense 5 Chemical 25 Electric /electronics / high-tech 1 Sports / Recreational Equipment 1 Energy 1 Agriculture
  • 9. Company profile: public / private 9 Count 33 Public 29 Private Count 30 Supplier 3 Issuer 29 Supplier and Issuer Company profile: supplier / issuer
  • 10. Company profile: annual company revenue 10 Count 12 < US$ 50 million 3 US$ 50 million – US$ 100 million 5 US$ 100 million – US$ 500 million 5 US$ 500 million – US$ 1 billion 15 US$ 1 billion – US$ 5 billion 21 > US$ 5 billion
  • 11. Four main tasks required to comply with the SEC regulation 1) Conduct the regulatory applicability determination / analysis 2) Develop and implement the Reasonable Country of Origin Inquiry 3) Develop and implement the Due Diligence system 4) Preparing for the CMR Audit and reporting to the SEC 11
  • 12. SEC - Degree of completion: (1) regulatory applicability determinations / analysis 12 0 5 10 15 20 25 30 35 40 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 78% % Companies
  • 13. SEC - Degree of completion: (2) reasonable country of origin inquiry 13 0 5 10 15 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 55% % Companies
  • 14. SEC - Degree of completion: (3) due diligence system 14 0 5 10 15 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 41%% Companies
  • 15. SEC - Degree of completion: (4) preparing for the CMR Audit and reporting to the SEC 15 0 5 10 15 20 25 30 35 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 N/A: 8% average: 18% % Companies
  • 16. Degree of completion: OECD’s 5-step Due Diligence framework 1) Establish strong company management systems 2) Identify and assess risk in the supply chain 3) Design and implement a strategy to respond to identified risks 4) Third-Party audit of smelters/refiners’ due diligence practices 5) Report annually on supply chain due diligence 16
  • 17. OECD - Degree of completion: (1) Establish strong company management systems 17 0 5 10 15 20 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 67% % Companies
  • 18. OECD - Degree of completion: (2) Identify and assess risk in the supply chain 18 0 2 4 6 8 10 12 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 51%% Companies
  • 19. OECD - Degree of completion: (3) Design and implement a strategy to respond to identified risks 19 0 5 10 15 20 25 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 39%% Companies
  • 20. OECD - Degree of completion: (4) Third-Party audit of smelters/refiners’ due diligence practices 20 0 10 20 30 40 50 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 16%% Companies
  • 21. OECD - Degree of completion: (5) Report annually on supply chain due diligence 21 0 10 20 30 40 50 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 average: 15% Companies %
  • 22. Number of employees involved in CMP 22 0 10 20 30 40 0-10 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-200 Companies # of employees per company
  • 23. Average LOE per employee on CM team 23 0 5 10 15 20 25 30 35 1 2 3 4 5 6 7 8 9 10 265 = 10% LOE 19 = 50% LOE 27 = 100 % LOE Employee # LOE %
  • 24. Non-IT related expenditures on external resources • 41% of companies incurred costs in order to support conflict minerals program review, assessment, development and implementation • “External resources” include: • consultants • auditors • industry association membership fees / related costs • legal fees • pilot program costs 24
  • 25. Non-IT related expenditures on external resources 25 Count 14 < US$ 50,000 6 US$ 50,000 – US$ 100,000 2 US$ 100,000 – US$ 250,000 2 US$ 250,000 – US$ 500,000 0 US$ 500,000 – US$ 1 million 1 > US$ 1 million
  • 26. IT gap / needs analysis • 57% of companies have conducted a gap/needs analysis for IT systems or modifications required to support conflict minerals trace ability and/or reporting • 34% of these companies engage external resources to support this gap/needs analysis for IT systems 26
  • 27. IT related external resource expenditures 27 Count 22 < US$ 50,000 2 US$ 50,000 – US$ 100,000 1 US$ 100,000 – US$ 250,000 0 US$ 250,000 – US$ 500,000 1 US$ 500,000 – US$ 1 million 0 > US$ 1 million
  • 28. IT modalities 28 Count 5 We will/have hire(d) external resources to modify certain existing IT systems 13 We will/have use(d) internal resources to modify certain existing IT systems 6 We will/have buy/bought wholly new IT systems 8 We have no IT system needs 19 Unknown at this time
  • 29. Actual / anticipated amount expended for completion of the IT project 29 Count 3 US$ 0 22 < US$ 50,000 11 US$ 50,000 – US$ 100,000 6 US$ 100,000 – US$ 250,000 1 US$ 250,000 – US$ 500,000 0 US$ 500,000 – US$ 1 million 3 > US$ 1 million 13 Unknown / not estimated
  • 30. Synergy • 77% of companies use the EICC-GEeSI Template or a modified version thereof • 26% use the EICC-GEeSI Dashboard • 21% use the IPC-1755 Conflict Minerals Data Exchange Standard • 46% use a commercially available CM data management system: – iPoint Conflict Minerals Platform (iPCMP) – CMO COMPLIANCE (in partnership with Deloitte) – Foresite systems – Bravo Solutions – Compliance Data Exchange (CDX) – KPMG's Conflict Minerals Tracking Tool 30
  • 31. Support – through purchasing requirements – of in-region initiatives • 2 (3%) - Solutions for Hope (SfH) closed pipe system • 2 (3%) - ITRI Tin Supply Chain Initiative (iTSCi) • 1 (1.6%) - ICGLR Certification • 0 (%) - BGR Certified Trading Chains • 2 (3%) - Conflict Free Tin Initiative • 2 (3%) - KEMET Partnership for Social and Economic Stability 31
  • 32. Support for other in-region initiatives • 3 companies (5%) are members of the Public- Private Alliance for Responsible Minerals Trade (PPA) 32
  • 33. Support – through purchasing requirements – of supply chain initiatives • 31% EICC-GeSI conflict-free smelter program • 1.6% RJC Chain of Custody Certification • 1.6% LBMA Good Delivery 33
  • 34. DFS1502 externalities Agree Neither agree nor disagree Disagree 1. DF S1502 has leveled the playing field with regard to sourcing minerals from the DRC and neighboring countries. 3 24 31 2. Due to DF S1502–related actions, we have identified opportunities for consolidation (vertical integration) and supply chain cost reduction. 2 16 40 3. Due to DF S1502–related actions, we have improved our risk management (e.g. pre-emptive identification of risk such as reliance on sole-sourced suppliers). 4 23 31 4. Due to DF S1502–related actions, we have improved our supply chain performance management in terms of responsiveness and efficiency. 4 20 34 34
  • 35. DFS1502 externalities (cont.) Agree Neither agree nor disagree Disagree 5. Due to DF S1502–related actions, we have improved response to customer requests for CM-related information. 23 20 15 6. Due to DF S1502–related actions, we now have data and standards with which to conduct future supplier certification. 13 27 19 7. Due to DF S1502–related actions, we now have improved supplier policies. 7 28 24 8. Due to DF S1502–related actions, we now have the confidence that our company is not negatively impacting the Congo and surrounding countries. 5 28 25 9. Due to DF S1502–related actions, our Corporate Social Responsibility standing has improved. 8 33 1735
  • 36. Summary findings • Companies are steadily implementing main tasks required to comply with the SEC regulation • Almost half of the companies are turning to external help with their CMP • The majority of companies are opting to build rather than buy • Companies are synergizing – to varying degrees – with information sharing platforms • Generally don't accord much significance to possible externalities of DFS1502 36
  • 37. Discussion questions • How is an increase in symmetry of B2B information in the 3TG-based industries affecting the upstream, smelter and downstream tiers? • Due to the increased symmetry of information, are upstream companies at a greater advantage vis-à- vis downstream companies? • To what extent can IT-related expenses be reduced through engagement of common platforms? 37
  • 38. 38 Thank you for your attention!

Notes de l'éditeur

  1. This presentation is entitled: Dodd-Frank Section 1502 - which most of you have probably never heard of
  2. companies develop conflict mineral programs
  3. In July and August of this year, at the one year milestoneof the SEC rules, Tulane launched a benchmark survey.
  4. In terms of annual company revenue, the respondents spanned the gamut, with more participants which made more than a US 1 billion.
  5. As companies are more than aware
  6. The great majority of companies had determined whether the regulation applies to them, with a declared completion degree of 78%.
  7. With respect to the reasonable country of origin task, on average companies reported having surpassed the completion half-way mark.
  8. Concerning the development of a due diligence system, companies reported on average being 41% there.
  9. And with the CMR audits and Form SD filing still a ways off, only a fifth of companies reported having completed this task.
  10. We also applied the OECD’s 5-step Due Diligence framework to gauge the degree of implementation progress.
  11. Companies on average reported a 67% completion rate.
  12. In terms of the number of employees each company has working on their Conflict Mineral program.
  13. The Level of Effort per employee working on Conflict Minerals varied. While some employees worked full-time, others worked part time, whereas most dedicated a fraction of their time to their CM program.
  14. With respect to expenditures on external resources, 41% of companies have engaged outside help.
  15. Yet most of them are expending U$ 50,000 or less on this element.
  16.  ... a joint initiative among governments, companies, and civil society to support supply chain solutions to conflict minerals challenges in the Democratic Republic of Congo (DRC) and the Great Lakes Region (GLR) of Central Africa. 
  17. Responsible Jewellery Council The London bullion market