1 st  Risk Management Seminar of Distrito Federal
 
 
 
PROJECT RISK PLANNING Edward J. Fern, MS, PMP [email_address]
Planejamento do  Gerenciamento de Riscos Edward J. Fern, MS, PMP [email_address]
Introduction ,[object Object],[object Object],[object Object],[object Object]
Introdução ,[object Object],[object Object],[object Object],[object Object]
Introduction ,[object Object]
[object Object],Introdução
Risk Management Processes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Processos de Gerenciamento de Riscos ,[object Object]
Risk Management Processes ,[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],Processos de Gerenciamento de Riscos
Risk Management Processes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Processos de Gerenciamento de Riscos
Risk Management Processes ,[object Object]
[object Object],Processos do Gerenciamento de Riscos
BETTING LIVES HOW SEVEN PEOPLE LOST
Apostando Vidas COMO  SETE PESSOAS PERDERAM
OPPORTUNITY NASA was prepared to launch its first civilian, a teacher named Christa Mcauliffe, just ahead of President Reagan’s State of the Union address.
Oportunidade A NASA estava preparada para enviar o primeiro astronauta civil, uma professora chamada Chirsta Mcauliffe, um pouco antes do Discurso  do Presidente Regan para a União.
THREAT Temperatures on the night before the launch were expected to reach as cold as 18 o F (-9 o C), over thirty degrees colder than any other launch.
Ameaça As temperaturas na noite anterior poderiam chegar a 18 o F (-9 o C), mais de treze graus abaixo do que em qualquer outro lançamento espacial.
UNCERTAINTY ,[object Object]
Incerteza ,[object Object]
WARNING! ,[object Object]
Perigo! ,[object Object],[object Object]
RESULTS
RESULTADOS
RESULTS
RESULTADOS
QUESTIONS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Questões ,[object Object],[object Object],[object Object],[object Object],[object Object]
ASSIGNING RESPONSIBILITY ,[object Object],[object Object]
DETERMINANDO RESPONSABILIDADES ,[object Object],[object Object]
BETTING A FORTUNE
APOSTANDO UMA FORTUNA
OPPORTUNITY If Denver moves quickly, it can be a major hub for many airlines.  The passengers will spend money in Denver.
OPORTUNIDADE Se Denver agir rapidamente, ele pode se tornar um dos principais terminais para muitas companhias aéreas. Os passageiros irão gastar dinheiro em Denver.
THREAT The plan for the new Denver airport included a long list of features that were relatively new to the airline industry.  Among those new features was an Automated Baggage Handling System or ABHS.
AMEAÇA O plano para o novo aeroporto de Denver incluia uma longa lista de recursos relativamente novas para a indústria de aerolíneas. Entre estes novos recursos estava o sistema automático de manipulação de bagagens (ABHS).
UNCERTAINTIES ,[object Object],[object Object],[object Object]
INCERTEZAS ,[object Object],[object Object],[object Object]
WARNING! ,[object Object]
PERIGO! ,[object Object]
WARNING! The Munich Airport ABHS team had allowed two years of testing and six months of 24-hour operation to tune the system before cutover.  They advised the Denver team to allow that much time or more.
Perigo! A equipe responsável pelo sistema ABHS do aeroporto de Munique havia se planejado para um teste de dois anos do sistema e outros seis meses de operação com turnos de 24 horas para ajustar o sistema antes da implementação final. Eles aconselharam Denver a repetir ou ampliar estes prazos.
RESULTS ,[object Object],[object Object],[object Object]
RESULTADOS ,[object Object],[object Object],[object Object]
RESULTS ,[object Object],[object Object],[object Object]
RESULTADOS ,[object Object],[object Object],[object Object]
QUESTIONS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
QUESTÕES ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
A DEEPER TUNNEL
UM TÚNEL MAIS FUNDO
BETTING A COMPANY Failure to take risks is very risky.
Apostando em uma Empresa Falhar em assumir riscos é muito arriscado.
OPPORTUNITY ,[object Object]
OPORTUNIDADE ,[object Object],[object Object]
OPPORTUNITY ,[object Object]
OPORTUNIDADE ,[object Object],[object Object]
WARNING ,[object Object]
Perigo! ,[object Object],[object Object]
WARNING ,[object Object]
Perigo! ,[object Object],[object Object]
WARNING ,[object Object]
Perigo! ,[object Object],[object Object]
UNCERTAINTY ,[object Object],[object Object],[object Object]
Incerteza ,[object Object],[object Object]
RESULTS ,[object Object],[object Object],[object Object]
RESULTADOS ,[object Object],[object Object],[object Object]
BETTING A COMPANY
Apostando uma Empresa
OPPORTUNITY The personal computer business has flourished the period since its inception in the late 1970s.  Progress in the processing capability of these machines has been breathtaking in its speed. Processors, disk drives, memory, and many other components have brought leaps in capability while, at the same time, reducing prices.
Oportunidade O mercado do computador pessoal floreceu desde o seu início no final dos anos 70. O progresso na capacidade de processamento destas máquinas tem sido de tirar o fôlego.  Processadores, hard disks, memória e vários outros componentes provocaram saltos em capacidade enquanto diminuiam de preço.
THREAT Because of rapid change in the capability of components, it is possible for a PC manufacturer to build computers that will be obsolete before they can be sold.
Ameaça Por conta da rápida mudança na capacidade dos componentes, é possível que um fabricante construa computadores que estarão obsoletos no momento da venda.
UNCERTAINTY ,[object Object]
Incerteza ,[object Object]
REVENUE
Faturamento
EARNINGS
Ganhos
RESULTS Compaq  was acquired by  Hewlett Packard   in March of 2003.
RESULTADOS A Compaq  foi comprada pela  Hewlett Packard   em março de 2003.
[object Object],[object Object]
[object Object],[object Object]
[object Object],[object Object]
[object Object],[object Object],[object Object]
[object Object],[object Object]
[object Object],[object Object]
ARM  DEFINITION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
ARM – Gerenciamento Ativo de Riscos ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
RISK ,[object Object],[object Object],[object Object],[object Object]
RISCOS ,[object Object],[object Object],[object Object],[object Object]
TOMORROW ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Contenu connexe

Similaire à Riscos do gerenciamento de projetos e lições aprendidas com acidentes

Gerenciamento de Riscos: uma abordagem prática
Gerenciamento de Riscos: uma abordagem práticaGerenciamento de Riscos: uma abordagem prática
Gerenciamento de Riscos: uma abordagem práticaelliando dias
 
Programa Aeronave 777-54
Programa Aeronave 777-54Programa Aeronave 777-54
Programa Aeronave 777-54Marco Coghi
 
Datum Innovation
Datum InnovationDatum Innovation
Datum Innovationjarlei
 
Seminario Riscos 2006 - Vladimir
Seminario Riscos 2006 - VladimirSeminario Riscos 2006 - Vladimir
Seminario Riscos 2006 - VladimirPeter Mello
 
O avião pdf semin 1 sem 1ano ga luis cruz v1.0
O avião   pdf semin 1 sem 1ano ga luis cruz v1.0O avião   pdf semin 1 sem 1ano ga luis cruz v1.0
O avião pdf semin 1 sem 1ano ga luis cruz v1.0Luis Miguel Cruz
 
Technology Radar_ThoughtWorks_Vol_22
Technology Radar_ThoughtWorks_Vol_22Technology Radar_ThoughtWorks_Vol_22
Technology Radar_ThoughtWorks_Vol_22Hudson Augusto
 
Curso de CRM para empresa da indústria de óleo e gás.
Curso de CRM para empresa da indústria de óleo e gás.Curso de CRM para empresa da indústria de óleo e gás.
Curso de CRM para empresa da indústria de óleo e gás.Monica Lavoyer Escudeiro
 
As 32 Leis da Engenharia de Software
As 32 Leis da Engenharia de SoftwareAs 32 Leis da Engenharia de Software
As 32 Leis da Engenharia de SoftwareHugo Ferreira
 
PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...
PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...
PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...Jackson F. de A. Mafra
 
The Mythical Man-Month
The Mythical Man-MonthThe Mythical Man-Month
The Mythical Man-Monthpizzol
 
The Mythical Man-Month
The Mythical Man-MonthThe Mythical Man-Month
The Mythical Man-Monthpizzol
 
Condomínio Novo Horizonte
Condomínio Novo HorizonteCondomínio Novo Horizonte
Condomínio Novo HorizonteMarco Coghi
 
2023-05 Warren Talks: Technical Debts 101
2023-05 Warren Talks: Technical Debts 1012023-05 Warren Talks: Technical Debts 101
2023-05 Warren Talks: Technical Debts 101Felipe Coelho Machado
 
Exercício 6.2
Exercício 6.2Exercício 6.2
Exercício 6.2pfranchi
 

Similaire à Riscos do gerenciamento de projetos e lições aprendidas com acidentes (20)

Confiabilidade na manutenção automotiva
Confiabilidade na manutenção automotivaConfiabilidade na manutenção automotiva
Confiabilidade na manutenção automotiva
 
Gerenciamento de Riscos: uma abordagem prática
Gerenciamento de Riscos: uma abordagem práticaGerenciamento de Riscos: uma abordagem prática
Gerenciamento de Riscos: uma abordagem prática
 
Programa Aeronave 777-54
Programa Aeronave 777-54Programa Aeronave 777-54
Programa Aeronave 777-54
 
Datum Innovation
Datum InnovationDatum Innovation
Datum Innovation
 
Implementação do Lean na Construção
Implementação do Lean na ConstruçãoImplementação do Lean na Construção
Implementação do Lean na Construção
 
Seminario Riscos 2006 - Vladimir
Seminario Riscos 2006 - VladimirSeminario Riscos 2006 - Vladimir
Seminario Riscos 2006 - Vladimir
 
O avião pdf semin 1 sem 1ano ga luis cruz v1.0
O avião   pdf semin 1 sem 1ano ga luis cruz v1.0O avião   pdf semin 1 sem 1ano ga luis cruz v1.0
O avião pdf semin 1 sem 1ano ga luis cruz v1.0
 
Technology Radar_ThoughtWorks_Vol_22
Technology Radar_ThoughtWorks_Vol_22Technology Radar_ThoughtWorks_Vol_22
Technology Radar_ThoughtWorks_Vol_22
 
Curso de CRM para empresa da indústria de óleo e gás.
Curso de CRM para empresa da indústria de óleo e gás.Curso de CRM para empresa da indústria de óleo e gás.
Curso de CRM para empresa da indústria de óleo e gás.
 
As 32 Leis da Engenharia de Software
As 32 Leis da Engenharia de SoftwareAs 32 Leis da Engenharia de Software
As 32 Leis da Engenharia de Software
 
Engenharia de software
Engenharia de softwareEngenharia de software
Engenharia de software
 
Reunião COMJOVEM - Gestão de processos de risco
Reunião COMJOVEM - Gestão de processos de riscoReunião COMJOVEM - Gestão de processos de risco
Reunião COMJOVEM - Gestão de processos de risco
 
PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...
PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...
PHP Conference 2020 - A eterna luta: compatibilidade retroativa vs. dívida té...
 
The Mythical Man-Month
The Mythical Man-MonthThe Mythical Man-Month
The Mythical Man-Month
 
The Mythical Man-Month
The Mythical Man-MonthThe Mythical Man-Month
The Mythical Man-Month
 
Condomínio Novo Horizonte
Condomínio Novo HorizonteCondomínio Novo Horizonte
Condomínio Novo Horizonte
 
2023-05 Warren Talks: Technical Debts 101
2023-05 Warren Talks: Technical Debts 1012023-05 Warren Talks: Technical Debts 101
2023-05 Warren Talks: Technical Debts 101
 
Developer 0.0 - Tiago Pascoal
Developer 0.0 - Tiago PascoalDeveloper 0.0 - Tiago Pascoal
Developer 0.0 - Tiago Pascoal
 
Lean Thinking
Lean ThinkingLean Thinking
Lean Thinking
 
Exercício 6.2
Exercício 6.2Exercício 6.2
Exercício 6.2
 

Plus de Peter Mello

Equipes alto desempenho
Equipes alto desempenhoEquipes alto desempenho
Equipes alto desempenhoPeter Mello
 
Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)
Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)
Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)Peter Mello
 
Variação de Prazo (com base ao Earned Schedule / Aplicativo)
Variação de Prazo (com base ao Earned Schedule / Aplicativo)Variação de Prazo (com base ao Earned Schedule / Aplicativo)
Variação de Prazo (com base ao Earned Schedule / Aplicativo)Peter Mello
 
Análise de Valor Agregado (e projeções)
Análise de Valor Agregado (e projeções)Análise de Valor Agregado (e projeções)
Análise de Valor Agregado (e projeções)Peter Mello
 
Além do Método do Caminho Crítico: Success Driven Project Management
Além do Método do Caminho Crítico: Success Driven Project ManagementAlém do Método do Caminho Crítico: Success Driven Project Management
Além do Método do Caminho Crítico: Success Driven Project ManagementPeter Mello
 
Métodos de Corrente Crítica
Métodos de Corrente CríticaMétodos de Corrente Crítica
Métodos de Corrente CríticaPeter Mello
 
White Paper - Spider Project
White Paper - Spider ProjectWhite Paper - Spider Project
White Paper - Spider ProjectPeter Mello
 
Spider CPM e Desk200: Gratuito para uso Profissional
Spider CPM e Desk200: Gratuito para uso ProfissionalSpider CPM e Desk200: Gratuito para uso Profissional
Spider CPM e Desk200: Gratuito para uso ProfissionalPeter Mello
 
Análise e Simulação de Riscos
Análise e Simulação de RiscosAnálise e Simulação de Riscos
Análise e Simulação de RiscosPeter Mello
 
1o projeto Spider Project SCPM
1o projeto Spider Project SCPM1o projeto Spider Project SCPM
1o projeto Spider Project SCPMPeter Mello
 
Introdução ao Spider CPM (5)
Introdução ao Spider CPM (5)Introdução ao Spider CPM (5)
Introdução ao Spider CPM (5)Peter Mello
 
Introdução ao Spider CPM (4)
Introdução ao Spider CPM (4)Introdução ao Spider CPM (4)
Introdução ao Spider CPM (4)Peter Mello
 
Introdução ao Spider CPM (3)
Introdução ao Spider CPM (3)Introdução ao Spider CPM (3)
Introdução ao Spider CPM (3)Peter Mello
 
Introdução ao Spider CPM (2)
Introdução ao Spider CPM (2)Introdução ao Spider CPM (2)
Introdução ao Spider CPM (2)Peter Mello
 
Introdução ao Spider CPM (1)
Introdução ao Spider CPM (1)Introdução ao Spider CPM (1)
Introdução ao Spider CPM (1)Peter Mello
 
Técnicas para o Desenvolvimento de Cronogramas
Técnicas para o Desenvolvimento de CronogramasTécnicas para o Desenvolvimento de Cronogramas
Técnicas para o Desenvolvimento de CronogramasPeter Mello
 
Resumo Animacao Indicadores Sucesso
Resumo Animacao Indicadores SucessoResumo Animacao Indicadores Sucesso
Resumo Animacao Indicadores SucessoPeter Mello
 
PMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPeter Mello
 
SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)Peter Mello
 

Plus de Peter Mello (20)

Equipes alto desempenho
Equipes alto desempenhoEquipes alto desempenho
Equipes alto desempenho
 
Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)
Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)
Recursos Compartilhados e Portfolio (Sucesu-RS / GUGP)
 
Variação de Prazo (com base ao Earned Schedule / Aplicativo)
Variação de Prazo (com base ao Earned Schedule / Aplicativo)Variação de Prazo (com base ao Earned Schedule / Aplicativo)
Variação de Prazo (com base ao Earned Schedule / Aplicativo)
 
Análise de Valor Agregado (e projeções)
Análise de Valor Agregado (e projeções)Análise de Valor Agregado (e projeções)
Análise de Valor Agregado (e projeções)
 
Scrum Smart
Scrum Smart Scrum Smart
Scrum Smart
 
Além do Método do Caminho Crítico: Success Driven Project Management
Além do Método do Caminho Crítico: Success Driven Project ManagementAlém do Método do Caminho Crítico: Success Driven Project Management
Além do Método do Caminho Crítico: Success Driven Project Management
 
Métodos de Corrente Crítica
Métodos de Corrente CríticaMétodos de Corrente Crítica
Métodos de Corrente Crítica
 
White Paper - Spider Project
White Paper - Spider ProjectWhite Paper - Spider Project
White Paper - Spider Project
 
Spider CPM e Desk200: Gratuito para uso Profissional
Spider CPM e Desk200: Gratuito para uso ProfissionalSpider CPM e Desk200: Gratuito para uso Profissional
Spider CPM e Desk200: Gratuito para uso Profissional
 
Análise e Simulação de Riscos
Análise e Simulação de RiscosAnálise e Simulação de Riscos
Análise e Simulação de Riscos
 
1o projeto Spider Project SCPM
1o projeto Spider Project SCPM1o projeto Spider Project SCPM
1o projeto Spider Project SCPM
 
Introdução ao Spider CPM (5)
Introdução ao Spider CPM (5)Introdução ao Spider CPM (5)
Introdução ao Spider CPM (5)
 
Introdução ao Spider CPM (4)
Introdução ao Spider CPM (4)Introdução ao Spider CPM (4)
Introdução ao Spider CPM (4)
 
Introdução ao Spider CPM (3)
Introdução ao Spider CPM (3)Introdução ao Spider CPM (3)
Introdução ao Spider CPM (3)
 
Introdução ao Spider CPM (2)
Introdução ao Spider CPM (2)Introdução ao Spider CPM (2)
Introdução ao Spider CPM (2)
 
Introdução ao Spider CPM (1)
Introdução ao Spider CPM (1)Introdução ao Spider CPM (1)
Introdução ao Spider CPM (1)
 
Técnicas para o Desenvolvimento de Cronogramas
Técnicas para o Desenvolvimento de CronogramasTécnicas para o Desenvolvimento de Cronogramas
Técnicas para o Desenvolvimento de Cronogramas
 
Resumo Animacao Indicadores Sucesso
Resumo Animacao Indicadores SucessoResumo Animacao Indicadores Sucesso
Resumo Animacao Indicadores Sucesso
 
PMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/Manaus
 
SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)
 

Riscos do gerenciamento de projetos e lições aprendidas com acidentes

  • 1. 1 st Risk Management Seminar of Distrito Federal
  • 2.  
  • 3.  
  • 4.  
  • 5. PROJECT RISK PLANNING Edward J. Fern, MS, PMP [email_address]
  • 6. Planejamento do Gerenciamento de Riscos Edward J. Fern, MS, PMP [email_address]
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 17.
  • 18.
  • 19. BETTING LIVES HOW SEVEN PEOPLE LOST
  • 20. Apostando Vidas COMO SETE PESSOAS PERDERAM
  • 21. OPPORTUNITY NASA was prepared to launch its first civilian, a teacher named Christa Mcauliffe, just ahead of President Reagan’s State of the Union address.
  • 22. Oportunidade A NASA estava preparada para enviar o primeiro astronauta civil, uma professora chamada Chirsta Mcauliffe, um pouco antes do Discurso do Presidente Regan para a União.
  • 23. THREAT Temperatures on the night before the launch were expected to reach as cold as 18 o F (-9 o C), over thirty degrees colder than any other launch.
  • 24. Ameaça As temperaturas na noite anterior poderiam chegar a 18 o F (-9 o C), mais de treze graus abaixo do que em qualquer outro lançamento espacial.
  • 25.
  • 26.
  • 27.
  • 28.
  • 33.
  • 34.
  • 35.
  • 36.
  • 39. OPPORTUNITY If Denver moves quickly, it can be a major hub for many airlines. The passengers will spend money in Denver.
  • 40. OPORTUNIDADE Se Denver agir rapidamente, ele pode se tornar um dos principais terminais para muitas companhias aéreas. Os passageiros irão gastar dinheiro em Denver.
  • 41. THREAT The plan for the new Denver airport included a long list of features that were relatively new to the airline industry. Among those new features was an Automated Baggage Handling System or ABHS.
  • 42. AMEAÇA O plano para o novo aeroporto de Denver incluia uma longa lista de recursos relativamente novas para a indústria de aerolíneas. Entre estes novos recursos estava o sistema automático de manipulação de bagagens (ABHS).
  • 43.
  • 44.
  • 45.
  • 46.
  • 47. WARNING! The Munich Airport ABHS team had allowed two years of testing and six months of 24-hour operation to tune the system before cutover. They advised the Denver team to allow that much time or more.
  • 48. Perigo! A equipe responsável pelo sistema ABHS do aeroporto de Munique havia se planejado para um teste de dois anos do sistema e outros seis meses de operação com turnos de 24 horas para ajustar o sistema antes da implementação final. Eles aconselharam Denver a repetir ou ampliar estes prazos.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 56. UM TÚNEL MAIS FUNDO
  • 57. BETTING A COMPANY Failure to take risks is very risky.
  • 58. Apostando em uma Empresa Falhar em assumir riscos é muito arriscado.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 75. OPPORTUNITY The personal computer business has flourished the period since its inception in the late 1970s. Progress in the processing capability of these machines has been breathtaking in its speed. Processors, disk drives, memory, and many other components have brought leaps in capability while, at the same time, reducing prices.
  • 76. Oportunidade O mercado do computador pessoal floreceu desde o seu início no final dos anos 70. O progresso na capacidade de processamento destas máquinas tem sido de tirar o fôlego. Processadores, hard disks, memória e vários outros componentes provocaram saltos em capacidade enquanto diminuiam de preço.
  • 77. THREAT Because of rapid change in the capability of components, it is possible for a PC manufacturer to build computers that will be obsolete before they can be sold.
  • 78. Ameaça Por conta da rápida mudança na capacidade dos componentes, é possível que um fabricante construa computadores que estarão obsoletos no momento da venda.
  • 79.
  • 80.
  • 85. RESULTS Compaq was acquired by Hewlett Packard in March of 2003.