SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
IBM Power Systems




Power your planet.
Smarter systems for a Smarter Planet.




       Rafael Pineiro
       Sales Executive
       IBM Power Systems

1                                       © 2010 IBM Corporation
IBM Power Systems


    Customers are moving to higher value
                    …as shown by the largest shift of customer spending in UNIX History
                                        UNIX Server Rolling Four Quarter Average Revenue Share
                                                                                  POWER6
                                                                                 Live Partition
                                                                                    Mobility
                                              POWER5
                                           Micro-
                                           Micro-Partitioning




                          POWER4
                        Dynamic LPARs




                                                                Source: IDC Quarterly Server Tracker Q309 release, November 2009

2                                                                                                                 © 2010 IBM Corporation
IBM Power Systems




    successful Power Migration Factory migrations to date.
    There were over 500 Power migrations during 2009, with more than
    90% from Sun and HP customers (including x86 consolidation). In
    4Q09 alone, Power achieved nearly 200 competitive migrations.




3                                                                      © 2010 IBM Corporation
IBM Power Systems


Power Systems – February 2010
New POWER7 in middle of the line                   Power 780
    Power 750 Express
    Power 755 for HPC                    Power 770
    Power 770 modular
    Power 780 modular high-end
POWER6 continues
    Power 520, Blades          Power 750
    Power 550
    Power 560
    Power 570
    Power 575                               Power 560
    Power 595

                                                    Power 755

    JS Blades

                    IBM Systems Software




4                                                               © 2010 IBM Corporation
IBM Power Systems


More SAP performance than any 8-socket server in the industry
 Comparable to a 128-core, 32-socket Sun M9000



                                                                Power 750
                                                                 Express

     SAP SD 2-Tier Users on
     The IBM Power 750 Express.




                                          24-core     32-core   32-core     48-core   48-core    128-core
                                          Opteron    Sun T5440 Power 750    Opteron   Opteron   Sun M9000

                                                    4-sockets                8-sockets          32-sockets
SAP Result planned for publish Feb 2010

 5                                                                                                   © 2010 IBM Corporation
IBM Power Systems




Number of Sun SPARC Enterprise T2000’s that can be consolidated into a single
IBM Power 750 4 socket system saving 95% of the cores for software licensing, 97%
on floorspace, and 95% on energy.




6                                                                      © 2010 IBM Corporation
IBM Power Systems




                                                                                                          savings on energy costs with 28% more
                                                                                                     performance at a fraction of the price using a
                                                                                                               single IBM Power 750 instead of a
                                                                                                                 64-core HP Integrity Superdome.

                                                                                                        Superdome or Super Power?

                                                                                                Shown to actual scale



          HP Integrity Superdome 64c                                                                                    IBM Power 750 Express


                                                                                                                                                                     ✓
          
          1.6GHz dual-core Itanium2 in a 30”x77.2”x48” frame                                                             socket, 32 Core 4Ux19” wide
                                                                                                                        4
                                                                                                                        
                                                                                                                        POWER7 Processors
          
          Maximum energy requirement of 11,586 Watts
                                                                                                                        
                                                                                                                        Maximum energy requirement of 1,950 Watts
          
          SPECint_rate2006: 824                                                                                         
                                                                                                                        SPECint_rate2006: 1060

    See Power 750 server compared to HP Integrity Superdome substantiation detail.
    Source: SPECiint_rate2006. For the latest SPEC benchmark results, visit http://www.spec.org .


7                                                                                                                                                         © 2010 IBM Corporation
IBM Power Systems




Number of HP Integrity Superdome 64-core systems utilized at 30% that can be
consolidated into a single IBM Power 780 modular high-end system utilized at 80%
saving 87% of the cores for software licensing, reduces floorspace required from
80 square feet to just 7.6, and reduces energy costs by 92%.


                                                                                                    Super Power indeed.




    See Power 780 server compared to HP Integrity Superdome substantiation detail.
    Source: SPECiint_rate2006. For the latest SPEC benchmark results, visit http://www.spec.org .




8                                                                                                                  © 2010 IBM Corporation
IBM Power Systems




                                    up to
            Reduction in energy usage moving from POWER5 to POWER7.
                      Savings extend to floor space, software license costs,
                    and maintenance. Increase your performance and capacity.


               2   POWER5 590 systems                       4   POWER5 570 systems
               64 cores @ 2.1 GHz                           64 cores @ 1.9 GHz
               30% utilization                              30% utilization



               1
               •
                   Power 770
                 24 cores @ 3.5 GHz
                                                            1
                                                            •
                                                                Power 770
                                                              24 cores @ 3.5 GHz
               • 60% utilization                            • 60% utilization
               30% effective capacity increase              50% effective capacity increase
               90% reduction in energy usage                84% reduction in energy usage
               ~$600K maintenance savings over 3 years      ~$250K maintenance savings over 3 years
               > $1M savings in software licensing          > $1M savings in software licensing

               With room to spare to consolidate x86 workloads
9                                                                                  © 2010 IBM Corporation
IBM Power Systems



Power your planet.


                                               +                        AIX - The Future of UNIX
                                                                          Total Integration with i
                                                                       Scalable Linux ready for x86
                                                                              Consolidation
        Workload-Optimizing Systems


                Virtualization without Limits                 Dynamic Energy Optimization
                Drive over 90% utilization                   70-90% energy cost reduction
                Dynamically scale per demand                 EnergyScale™ technologies



                Resiliency without Downtime                   Management with Automation
                Roadmap to continuous                        VMControl to manage
                availability                                  virtualization
                High availability systems &                  Automation to reduce task time
                scaling
                               Smarter Systems for a Smarter Planet.
10                                                                                       © 2010 IBM Corporation
IBM Power Systems


Analysts Quotations


     IBM’s POWER7 announcement demonstrated the confidence of a vendor in firm
     control and thinking far ahead of its peers, and with good reason. Less than a
     decade ago, IBM trailed both Sun and HP in UNIX system sales. Today, it leads
     both those rivals with some 40% of the $16 billion UNIX market. As Itanium and
     SPARC development hit potholes, snapped axels and headed into the ditch,
     IBM’s Power efforts stayed remarkably on track and true to the company’s long
     term roadmap. POWER7’s significant performance improvements mean that it is
     unlikely that any competing platforms or systems will pressure, let alone alter,
     IBM’s current UNIX performance leadership position where the company’s
     Power6/6+ systems own over a hundred #1 industry benchmarks.

                                                        Charles King, Pund-IT




11                                                                          © 2010 IBM Corporation
IBM Power Systems


Analysts Quotations


     IBM’s POWER7 announcement demonstrated the confidence of a vendor in firm
     control and thinking far ahead of its peers, and with good reason. Less than a
     decade ago, IBM trailed both Sun and HP in UNIX system sales. Today, it leads
     both those rivals with some 40% of the $16 billion UNIX market. As Itanium and
     SPARC development hit potholes, snapped axels and headed into the ditch,
     IBM’s Power efforts stayed remarkably on track and true to the company’s long
     term roadmap. POWER7’s significant performance improvements mean that it is
     unlikely that any competing platforms or systems will pressure, let alone alter,
     IBM’s current UNIX performance leadership position where the company’s
     Power6/6+ systems own over a hundred #1 industry benchmarks.

                                                        Charles King, Pund-IT




12                                                                          © 2010 IBM Corporation
IBM Power Systems


Analysts Quotations


     This week both IBM and Intel rolled out advanced processors for the heaviest
     server workloads. IBM introduced Power 7, the next revision of its RISC
     architecture, while Intel brought out the “Tukwila” generation of its Itanium line,
     now named the Itanium 9300.

     Gear heads have measured them against each other and found in favor of IBM.
     Power 7 has a total of 32 threads, derived from eight cores that process four
     threads each.

                                        Roger L. Kay
                                        President, Endpoint Technologies Associates




13                                                                               © 2010 IBM Corporation
IBM Power Systems


Analysts Quotations


     As a demonstration of commitment, Intel indicated this week that it will jump from
     the 65nm process, on which Tukwila is based,
     to 32nm, the leading edge, for its next generation Itanium, skipping the
     intermediate 45nm node (and tacitly recognizing that Itanium development has
     fallen behind). Meanwhile, Tukwila is a year late and barely provides a sparing
     partner for Power 7.


                                                Roger Kay
                                                Endpoint




14                                                                           © 2010 IBM Corporation

Contenu connexe

Tendances

NUMA Performance Considerations in VMware vSphere
NUMA Performance Considerations in VMware vSphereNUMA Performance Considerations in VMware vSphere
NUMA Performance Considerations in VMware vSphereAMD
 
Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...
Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...
Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...Keshav Murthy
 
AMD Analyst Day 2009: Rick Bergman
AMD Analyst Day 2009: Rick BergmanAMD Analyst Day 2009: Rick Bergman
AMD Analyst Day 2009: Rick BergmanAMD
 
Intel Cloud Summit: Intel Platform Update
Intel Cloud Summit: Intel Platform UpdateIntel Cloud Summit: Intel Platform Update
Intel Cloud Summit: Intel Platform UpdateIntelAPAC
 
2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito cta2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito ctaLorenzo Corbetta
 
Power Systems 2009 Hardware
Power Systems 2009 HardwarePower Systems 2009 Hardware
Power Systems 2009 HardwareAndrey Klyachkin
 
Sun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentationSun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentationxKinAnx
 
IBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCY
IBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCYIBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCY
IBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCYIBM India Smarter Computing
 
AMD Opteron 4000 Series Platform Press Presentation
AMD Opteron 4000 Series Platform Press PresentationAMD Opteron 4000 Series Platform Press Presentation
AMD Opteron 4000 Series Platform Press PresentationAMD
 
[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions
[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions
[Uruguay] 6.1 Foundation, 7.1 Overview & Future DirectionsIBMSSA
 
Achieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcast
Achieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcastAchieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcast
Achieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcastfinteligent
 
Move up to POWER7 and IBM i 7, IBM Power Event
Move up to POWER7 and IBM i 7, IBM Power EventMove up to POWER7 and IBM i 7, IBM Power Event
Move up to POWER7 and IBM i 7, IBM Power EventIBM Danmark
 
Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...
Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...
Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...Jeff Sable
 
H2 storage mfg presentation rambach-8 11-2011 v7 general
H2 storage mfg presentation rambach-8 11-2011 v7 generalH2 storage mfg presentation rambach-8 11-2011 v7 general
H2 storage mfg presentation rambach-8 11-2011 v7 generalgrambach
 

Tendances (20)

NUMA Performance Considerations in VMware vSphere
NUMA Performance Considerations in VMware vSphereNUMA Performance Considerations in VMware vSphere
NUMA Performance Considerations in VMware vSphere
 
Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...
Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...
Performance and scalability of Informix ultimate warehouse edtion on Intel Xe...
 
AMD Analyst Day 2009: Rick Bergman
AMD Analyst Day 2009: Rick BergmanAMD Analyst Day 2009: Rick Bergman
AMD Analyst Day 2009: Rick Bergman
 
Hpc Day Oct 09
Hpc Day Oct 09Hpc Day Oct 09
Hpc Day Oct 09
 
Intel Cloud Summit: Intel Platform Update
Intel Cloud Summit: Intel Platform UpdateIntel Cloud Summit: Intel Platform Update
Intel Cloud Summit: Intel Platform Update
 
2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito cta2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito cta
 
Power Systems 2009 Hardware
Power Systems 2009 HardwarePower Systems 2009 Hardware
Power Systems 2009 Hardware
 
Sun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentationSun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentation
 
IBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCY
IBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCYIBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCY
IBM® SYSTEM X M4 SERVERS DELIVER COMPELLING PERFORMANCE AND ENERGY EFFICIENCY
 
AMD Opteron 4000 Series Platform Press Presentation
AMD Opteron 4000 Series Platform Press PresentationAMD Opteron 4000 Series Platform Press Presentation
AMD Opteron 4000 Series Platform Press Presentation
 
[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions
[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions
[Uruguay] 6.1 Foundation, 7.1 Overview & Future Directions
 
Achieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcast
Achieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcastAchieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcast
Achieving Lowest Latencies at Highest Message Rates: Solarflare & Intel webcast
 
55 xx sw
55 xx sw55 xx sw
55 xx sw
 
2550 sw
2550 sw2550 sw
2550 sw
 
Ibm i (i5/os) 7.1 overview
Ibm i (i5/os) 7.1 overview Ibm i (i5/os) 7.1 overview
Ibm i (i5/os) 7.1 overview
 
Move up to POWER7 and IBM i 7, IBM Power Event
Move up to POWER7 and IBM i 7, IBM Power EventMove up to POWER7 and IBM i 7, IBM Power Event
Move up to POWER7 and IBM i 7, IBM Power Event
 
Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...
Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...
Comprehensive Power Introduction Q2 2012 - PM Motors/Generators, drives and c...
 
RCIM 2008 - - ALTERA
RCIM 2008 - - ALTERARCIM 2008 - - ALTERA
RCIM 2008 - - ALTERA
 
8800 core
8800 core8800 core
8800 core
 
H2 storage mfg presentation rambach-8 11-2011 v7 general
H2 storage mfg presentation rambach-8 11-2011 v7 generalH2 storage mfg presentation rambach-8 11-2011 v7 general
H2 storage mfg presentation rambach-8 11-2011 v7 general
 

En vedette

Post DJ Stenting Renal artery pseudoaneurysm- Glue embolisation done
Post DJ Stenting Renal artery pseudoaneurysm- Glue embolisation donePost DJ Stenting Renal artery pseudoaneurysm- Glue embolisation done
Post DJ Stenting Renal artery pseudoaneurysm- Glue embolisation doneguestd40ac3
 
Ib Msystemsperformancebenchmarks
Ib MsystemsperformancebenchmarksIb Msystemsperformancebenchmarks
Ib Msystemsperformancebenchmarkspineiro
 
Minus And Clinic 2009
Minus And Clinic 2009Minus And Clinic 2009
Minus And Clinic 2009Iman Fattah
 
MST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di Roma
MST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di RomaMST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di Roma
MST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di Romavideo_roma
 
An Introduction to Microphone
An Introduction to MicrophoneAn Introduction to Microphone
An Introduction to MicrophoneIman Fattah
 
Adding and Subtracting Monomials
Adding and Subtracting MonomialsAdding and Subtracting Monomials
Adding and Subtracting Monomialsapacura
 
Function Tables
Function TablesFunction Tables
Function Tablesapacura
 

En vedette (8)

Post DJ Stenting Renal artery pseudoaneurysm- Glue embolisation done
Post DJ Stenting Renal artery pseudoaneurysm- Glue embolisation donePost DJ Stenting Renal artery pseudoaneurysm- Glue embolisation done
Post DJ Stenting Renal artery pseudoaneurysm- Glue embolisation done
 
Apa yang salah?
Apa yang salah?Apa yang salah?
Apa yang salah?
 
Ib Msystemsperformancebenchmarks
Ib MsystemsperformancebenchmarksIb Msystemsperformancebenchmarks
Ib Msystemsperformancebenchmarks
 
Minus And Clinic 2009
Minus And Clinic 2009Minus And Clinic 2009
Minus And Clinic 2009
 
MST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di Roma
MST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di RomaMST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di Roma
MST - Malattie sessualmente trasmesse - Piccolo Manuale - Provincia di Roma
 
An Introduction to Microphone
An Introduction to MicrophoneAn Introduction to Microphone
An Introduction to Microphone
 
Adding and Subtracting Monomials
Adding and Subtracting MonomialsAdding and Subtracting Monomials
Adding and Subtracting Monomials
 
Function Tables
Function TablesFunction Tables
Function Tables
 

Similaire à Power your planet with IBM Power Systems

20221122-IBM Power10全新IBM Power10 入門和中階 .pdf
20221122-IBM Power10全新IBM Power10 入門和中階 .pdf20221122-IBM Power10全新IBM Power10 入門和中階 .pdf
20221122-IBM Power10全新IBM Power10 入門和中階 .pdfken761ken1
 
Fordele ved POWER7 og AIX, IBM Power Event
Fordele ved POWER7 og AIX, IBM Power EventFordele ved POWER7 og AIX, IBM Power Event
Fordele ved POWER7 og AIX, IBM Power EventIBM Danmark
 
Enterprise power systems transition to power7 technology
Enterprise power systems transition to power7 technologyEnterprise power systems transition to power7 technology
Enterprise power systems transition to power7 technologysolarisyougood
 
云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本
云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本
云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本Riquelme624
 
An energy, memory, and performance analysis
An energy, memory, and performance analysisAn energy, memory, and performance analysis
An energy, memory, and performance analysisElisabeth Stahl
 
IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012COMMON Europe
 
STG101 Power Product_PRESENTATION VERSION 1.ppt
STG101 Power Product_PRESENTATION VERSION 1.pptSTG101 Power Product_PRESENTATION VERSION 1.ppt
STG101 Power Product_PRESENTATION VERSION 1.pptsalesjpayroll
 
Power management: Lenovo ThinkServer Smart Grid Technology
Power management: Lenovo ThinkServer Smart Grid TechnologyPower management: Lenovo ThinkServer Smart Grid Technology
Power management: Lenovo ThinkServer Smart Grid TechnologyPrincipled Technologies
 
IBM Power leading Cognitive Systems
IBM Power leading Cognitive SystemsIBM Power leading Cognitive Systems
IBM Power leading Cognitive SystemsHugo Blanco
 
021413 aix trends_jay_kruemcke
021413 aix trends_jay_kruemcke021413 aix trends_jay_kruemcke
021413 aix trends_jay_kruemckeJay Kruemcke
 
IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...
IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...
IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...Jaroslav Prodelal
 
Red Hat for IBM Power Systems (System p) Update v6
Red Hat for IBM Power Systems (System p) Update v6Red Hat for IBM Power Systems (System p) Update v6
Red Hat for IBM Power Systems (System p) Update v6Filipe Miranda
 

Similaire à Power your planet with IBM Power Systems (20)

PowerHA for i
PowerHA for iPowerHA for i
PowerHA for i
 
IBM Power 755 Server Data Sheet
IBM Power 755 Server Data SheetIBM Power 755 Server Data Sheet
IBM Power 755 Server Data Sheet
 
20221122-IBM Power10全新IBM Power10 入門和中階 .pdf
20221122-IBM Power10全新IBM Power10 入門和中階 .pdf20221122-IBM Power10全新IBM Power10 入門和中階 .pdf
20221122-IBM Power10全新IBM Power10 入門和中階 .pdf
 
Fordele ved POWER7 og AIX, IBM Power Event
Fordele ved POWER7 og AIX, IBM Power EventFordele ved POWER7 og AIX, IBM Power Event
Fordele ved POWER7 og AIX, IBM Power Event
 
Enterprise power systems transition to power7 technology
Enterprise power systems transition to power7 technologyEnterprise power systems transition to power7 technology
Enterprise power systems transition to power7 technology
 
11136442.ppt
11136442.ppt11136442.ppt
11136442.ppt
 
云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本
云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本
云计算核心技术架构分论坛 一石三鸟 性能 功耗及成本
 
Vortrag nimz-rpg-021110
Vortrag nimz-rpg-021110Vortrag nimz-rpg-021110
Vortrag nimz-rpg-021110
 
An energy, memory, and performance analysis
An energy, memory, and performance analysisAn energy, memory, and performance analysis
An energy, memory, and performance analysis
 
IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012
 
STG101 Power Product_PRESENTATION VERSION 1.ppt
STG101 Power Product_PRESENTATION VERSION 1.pptSTG101 Power Product_PRESENTATION VERSION 1.ppt
STG101 Power Product_PRESENTATION VERSION 1.ppt
 
Power management: Lenovo ThinkServer Smart Grid Technology
Power management: Lenovo ThinkServer Smart Grid TechnologyPower management: Lenovo ThinkServer Smart Grid Technology
Power management: Lenovo ThinkServer Smart Grid Technology
 
IBM System x3550 M2 Product Guide
IBM System x3550 M2 Product GuideIBM System x3550 M2 Product Guide
IBM System x3550 M2 Product Guide
 
E880 datasheet
E880 datasheetE880 datasheet
E880 datasheet
 
Deeplearningusingcloudpakfordata
DeeplearningusingcloudpakfordataDeeplearningusingcloudpakfordata
Deeplearningusingcloudpakfordata
 
IBM Power leading Cognitive Systems
IBM Power leading Cognitive SystemsIBM Power leading Cognitive Systems
IBM Power leading Cognitive Systems
 
021413 aix trends_jay_kruemcke
021413 aix trends_jay_kruemcke021413 aix trends_jay_kruemcke
021413 aix trends_jay_kruemcke
 
IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...
IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...
IBM: Servery a datová úložiště vhodná pro virtualizaci a budování privátních ...
 
Cyclone iii
Cyclone iiiCyclone iii
Cyclone iii
 
Red Hat for IBM Power Systems (System p) Update v6
Red Hat for IBM Power Systems (System p) Update v6Red Hat for IBM Power Systems (System p) Update v6
Red Hat for IBM Power Systems (System p) Update v6
 

Power your planet with IBM Power Systems

  • 1. IBM Power Systems Power your planet. Smarter systems for a Smarter Planet. Rafael Pineiro Sales Executive IBM Power Systems 1 © 2010 IBM Corporation
  • 2. IBM Power Systems Customers are moving to higher value …as shown by the largest shift of customer spending in UNIX History UNIX Server Rolling Four Quarter Average Revenue Share POWER6 Live Partition Mobility POWER5 Micro- Micro-Partitioning POWER4 Dynamic LPARs Source: IDC Quarterly Server Tracker Q309 release, November 2009 2 © 2010 IBM Corporation
  • 3. IBM Power Systems successful Power Migration Factory migrations to date. There were over 500 Power migrations during 2009, with more than 90% from Sun and HP customers (including x86 consolidation). In 4Q09 alone, Power achieved nearly 200 competitive migrations. 3 © 2010 IBM Corporation
  • 4. IBM Power Systems Power Systems – February 2010 New POWER7 in middle of the line Power 780  Power 750 Express  Power 755 for HPC Power 770  Power 770 modular  Power 780 modular high-end POWER6 continues  Power 520, Blades Power 750  Power 550  Power 560  Power 570  Power 575 Power 560  Power 595 Power 755 JS Blades IBM Systems Software 4 © 2010 IBM Corporation
  • 5. IBM Power Systems More SAP performance than any 8-socket server in the industry Comparable to a 128-core, 32-socket Sun M9000 Power 750 Express SAP SD 2-Tier Users on The IBM Power 750 Express. 24-core 32-core 32-core 48-core 48-core 128-core Opteron Sun T5440 Power 750 Opteron Opteron Sun M9000 4-sockets 8-sockets 32-sockets SAP Result planned for publish Feb 2010 5 © 2010 IBM Corporation
  • 6. IBM Power Systems Number of Sun SPARC Enterprise T2000’s that can be consolidated into a single IBM Power 750 4 socket system saving 95% of the cores for software licensing, 97% on floorspace, and 95% on energy. 6 © 2010 IBM Corporation
  • 7. IBM Power Systems savings on energy costs with 28% more performance at a fraction of the price using a single IBM Power 750 instead of a 64-core HP Integrity Superdome. Superdome or Super Power? Shown to actual scale HP Integrity Superdome 64c IBM Power 750 Express ✓  1.6GHz dual-core Itanium2 in a 30”x77.2”x48” frame  socket, 32 Core 4Ux19” wide 4  POWER7 Processors  Maximum energy requirement of 11,586 Watts  Maximum energy requirement of 1,950 Watts  SPECint_rate2006: 824  SPECint_rate2006: 1060 See Power 750 server compared to HP Integrity Superdome substantiation detail. Source: SPECiint_rate2006. For the latest SPEC benchmark results, visit http://www.spec.org . 7 © 2010 IBM Corporation
  • 8. IBM Power Systems Number of HP Integrity Superdome 64-core systems utilized at 30% that can be consolidated into a single IBM Power 780 modular high-end system utilized at 80% saving 87% of the cores for software licensing, reduces floorspace required from 80 square feet to just 7.6, and reduces energy costs by 92%. Super Power indeed. See Power 780 server compared to HP Integrity Superdome substantiation detail. Source: SPECiint_rate2006. For the latest SPEC benchmark results, visit http://www.spec.org . 8 © 2010 IBM Corporation
  • 9. IBM Power Systems up to Reduction in energy usage moving from POWER5 to POWER7. Savings extend to floor space, software license costs, and maintenance. Increase your performance and capacity. 2 POWER5 590 systems 4 POWER5 570 systems 64 cores @ 2.1 GHz 64 cores @ 1.9 GHz 30% utilization 30% utilization 1 • Power 770 24 cores @ 3.5 GHz 1 • Power 770 24 cores @ 3.5 GHz • 60% utilization • 60% utilization 30% effective capacity increase 50% effective capacity increase 90% reduction in energy usage 84% reduction in energy usage ~$600K maintenance savings over 3 years ~$250K maintenance savings over 3 years > $1M savings in software licensing > $1M savings in software licensing With room to spare to consolidate x86 workloads 9 © 2010 IBM Corporation
  • 10. IBM Power Systems Power your planet. + AIX - The Future of UNIX Total Integration with i Scalable Linux ready for x86 Consolidation Workload-Optimizing Systems Virtualization without Limits Dynamic Energy Optimization Drive over 90% utilization 70-90% energy cost reduction Dynamically scale per demand EnergyScale™ technologies Resiliency without Downtime Management with Automation Roadmap to continuous VMControl to manage availability virtualization High availability systems & Automation to reduce task time scaling Smarter Systems for a Smarter Planet. 10 © 2010 IBM Corporation
  • 11. IBM Power Systems Analysts Quotations IBM’s POWER7 announcement demonstrated the confidence of a vendor in firm control and thinking far ahead of its peers, and with good reason. Less than a decade ago, IBM trailed both Sun and HP in UNIX system sales. Today, it leads both those rivals with some 40% of the $16 billion UNIX market. As Itanium and SPARC development hit potholes, snapped axels and headed into the ditch, IBM’s Power efforts stayed remarkably on track and true to the company’s long term roadmap. POWER7’s significant performance improvements mean that it is unlikely that any competing platforms or systems will pressure, let alone alter, IBM’s current UNIX performance leadership position where the company’s Power6/6+ systems own over a hundred #1 industry benchmarks. Charles King, Pund-IT 11 © 2010 IBM Corporation
  • 12. IBM Power Systems Analysts Quotations IBM’s POWER7 announcement demonstrated the confidence of a vendor in firm control and thinking far ahead of its peers, and with good reason. Less than a decade ago, IBM trailed both Sun and HP in UNIX system sales. Today, it leads both those rivals with some 40% of the $16 billion UNIX market. As Itanium and SPARC development hit potholes, snapped axels and headed into the ditch, IBM’s Power efforts stayed remarkably on track and true to the company’s long term roadmap. POWER7’s significant performance improvements mean that it is unlikely that any competing platforms or systems will pressure, let alone alter, IBM’s current UNIX performance leadership position where the company’s Power6/6+ systems own over a hundred #1 industry benchmarks. Charles King, Pund-IT 12 © 2010 IBM Corporation
  • 13. IBM Power Systems Analysts Quotations This week both IBM and Intel rolled out advanced processors for the heaviest server workloads. IBM introduced Power 7, the next revision of its RISC architecture, while Intel brought out the “Tukwila” generation of its Itanium line, now named the Itanium 9300. Gear heads have measured them against each other and found in favor of IBM. Power 7 has a total of 32 threads, derived from eight cores that process four threads each. Roger L. Kay President, Endpoint Technologies Associates 13 © 2010 IBM Corporation
  • 14. IBM Power Systems Analysts Quotations As a demonstration of commitment, Intel indicated this week that it will jump from the 65nm process, on which Tukwila is based, to 32nm, the leading edge, for its next generation Itanium, skipping the intermediate 45nm node (and tacitly recognizing that Itanium development has fallen behind). Meanwhile, Tukwila is a year late and barely provides a sparing partner for Power 7. Roger Kay Endpoint 14 © 2010 IBM Corporation