The Paper Clip Test




© Dunn Associates Inc, 2009
Concept of Selected Deformation




© Dunn Associates Inc, 2009
Early Use of Moment Connections


          Flatiron Building, NYC
           • One of the first steel frame
             buildings
           • Portal frame moment
             connections at all wind girders.
          Early Steel Frames- all
          moment connected




© Dunn Associates Inc, 2009
Construction Changes that led to
                                    Northridge Failures


          Fewer, but larger moment
          frames
           • Heavier connections
          Changed from Riveted to
          Welded construction
          Used lower toughness
          welding rod
           • Welds went down fast
           • Not permitted in pipelines
          Quality control problems




© Dunn Associates Inc, 2009
Acceleration Record from Northridge




                                From the Strong Motion Database (SMDB, 2000a)


© Dunn Associates Inc, 2009
Northridge Earthquake


          Magnitude 6.7                     Building Inventory
           • Estimated Economic             Damage
           • Loss = $49.3 billion            • 100 buildings with minor
                                               fractures
                                             • 100 buildings with major
                                               fractures
                                             • 30 buildings with
                                               major fractures in 90%
                                               of all connections




© Dunn Associates Inc, 2009
Fracture Causes


          Welding
           • Low Toughness Weld Metal
           • Slag Inclusions
           • Lack of fusion
          Mismatched Yield Strengths
          Erroneous Joint Detailing
          Weld Constraint by Heavy
          Sections
          Slab Interaction with Column




© Dunn Associates Inc, 2009
Changes: Code


          Code limited approved filler
          metals
          Inspection requirements
          tightened
          Limited connection types
          Quality control significantly
          increased




© Dunn Associates Inc, 2009
Changes: Weld Access Hole




© Dunn Associates Inc, 2009
Connections: WUF-W




© Dunn Associates Inc, 2009
Connections: Extended Flange




© Dunn Associates Inc, 2009
Connections: Flange Cover Plate




© Dunn Associates Inc, 2009
Connections: Reduced Beam
                                       Section




© Dunn Associates Inc, 2009
Connections: Bolted End Plate




© Dunn Associates Inc, 2009
Connections: SidePlate




© Dunn Associates Inc, 2009
Protected Zone Requirements


          No discontinuities in           Get protected zone from
          protected zone                  drawings or engineer
           •   Arc Strikes                Mark protected zones with
           •   Erection Aids              bright paint after erection and
           •   Air-arc Gouging            after fire coating
           •   Thermal Cutting
          Not permitted
           •   Welded studs
           •   Shot pins
           •   Screws
           •   Welds
           •   Holes



© Dunn Associates Inc, 2009
Protected Zones: Dog Bone




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Connections


          Bolted End Plate


          Reduced Beam
          Section (“Dog
          Bone”)


          SidePlate™




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Advantages
                                            • Approved
                                            • Reduces column-beam weld
                                              stresses
                                            Disadvantages
                                            • Milling of beam flange
                                            • 80%-90% reliable
                                            • Looks odd




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Watch for:
                                            • Protected Zone (nicks, arc
                                              strikes, shot pins, welds)
                                            • Smoothness of Cut
                                            • Bracing just outside cut




© Dunn Associates Inc, 2009
SidePlate Connection



                                       Advantages
                                        • Approved- seismic &
                                          progressive collapse
                                        • Eliminates beam-column weld
                                        • High reliability
                                        • Looks strong
                                       Disadvantages
                                        • Licensing fee
                                        • Flip columns in shop




© Dunn Associates Inc, 2009
Step 1: Column Tree Assembly




         Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here).
            Bring inRotate Applyand andPosition Weld intoTack into Place
                    Side Plates Weld 2Weld 2, toSide Plates Apply
                     Bring in Sidewith to Bring in Temporary Plates
                                     Horiz. Other Alignment,
     Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3
                     Apply Welds Apply 3, Tack NS/FS. Position
                            Begin Plates, Shear Plates,
                      After that, Column Sub-Assembly Complete.
© Dunn Associates Inc, 2009
Step 2: Full-Length Beam Assembly




               Begin Full-Length Full-LengthTack & and into Position 5 Shown)
                   Bring inFull-Length Beam Beam Weld Inverted As
                          Rotate Beam Assembly Tack Apply Position
                           Bring in Cover Plates, (Beam into Weld
                            Erection Angle, Assembly Complete




© Dunn Associates Inc, 2009
Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End




© Dunn Associates Inc, 2009
SidePlate Connection




© Dunn Associates Inc, 2009
SidePlate Connection


                                                 Watch for:
                                                 1) Joint Gap
                                                 2) Protected Zone (nicks, arc
                                                    strikes, shot pins, welds)
                                                 3) SidePlate attachments

                              1

                                  3       2




© Dunn Associates Inc, 2009
SidePlate Protected Zone




© Dunn Associates Inc, 2009
SidePlate: WELDING OK




© Dunn Associates Inc, 2009
What keeps us from backtracking?


          Special Inspection                Good Communication
           •   Ensure done well              • RFIs that are researched &
           •   Ultrasonic                      propose solutions
           •   Mag Particle ends             • Notify us ahead of certain
                                               activities (pours, fire coating)
          Shop Drawings                      • Tell us about problems as soon
           •   Complete                        as you know (even your screw-
           •   Well detailed                   ups)
           •   Contractor review             Think/Plan Ahead
          Shop vs Field Welds                • Catch problems
           • Define up-front                 • Give us time to determine a
                                               solution
           • Shop welds- faster, higher
             quality
           • Field welds- some pieces too
             big for shop

© Dunn Associates Inc, 2009
Our Liability


          STRUCTURAL ENGINEER                     CONTRACTOR
          Becomes liable when:                    Becomes liable when:
           • Omit information                     • Deviate from approved plans
           • Don’t follow the State of the          and specs
             Art (code is minimum)                • Material/workmanship/Quality
                                                    problems



                Regardless of who is liable, if
                there is a problem, we all get
                   dragged into the mess
© Dunn Associates Inc, 2009

Contenu connexe

Tendances

Part 3 Guy Tower Structure
Part 3 Guy Tower Structure Part 3 Guy Tower Structure
Part 3 Guy Tower Structure Fred Teichman
 
Steel strucure lec # (21)
Steel strucure lec #  (21)Steel strucure lec #  (21)
Steel strucure lec # (21)Civil Zone
 
Lecture 12 equivalent frame method
Lecture 12 equivalent frame methodLecture 12 equivalent frame method
Lecture 12 equivalent frame methodalialhussainawi
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge ReportYvonne Chin
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
Crosby Shackles from Project Sales Corp, Vizag
Crosby Shackles from Project Sales Corp, VizagCrosby Shackles from Project Sales Corp, Vizag
Crosby Shackles from Project Sales Corp, Vizagagrawalsatish
 
Introduction
IntroductionIntroduction
Introductionsky hawk
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Josia Tannos, EIT
 
DESIGN OF CONTINUOUS MEMBERS IN PRESTRESSED
DESIGN OF CONTINUOUS MEMBERS IN PRESTRESSEDDESIGN OF CONTINUOUS MEMBERS IN PRESTRESSED
DESIGN OF CONTINUOUS MEMBERS IN PRESTRESSEDLOGESH S
 
Fettucine Truss Bridge report
Fettucine Truss Bridge reportFettucine Truss Bridge report
Fettucine Truss Bridge reportKen Wong
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges David Collings
 
Prestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upPrestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upAyaz Malik
 

Tendances (20)

255788330 asi-steel-connections
255788330 asi-steel-connections255788330 asi-steel-connections
255788330 asi-steel-connections
 
detailing for steel construction
detailing for steel constructiondetailing for steel construction
detailing for steel construction
 
Part 3 Guy Tower Structure
Part 3 Guy Tower Structure Part 3 Guy Tower Structure
Part 3 Guy Tower Structure
 
Steel strucure lec # (21)
Steel strucure lec #  (21)Steel strucure lec #  (21)
Steel strucure lec # (21)
 
Lecture 12 equivalent frame method
Lecture 12 equivalent frame methodLecture 12 equivalent frame method
Lecture 12 equivalent frame method
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
Beams ppt
Beams pptBeams ppt
Beams ppt
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
Crosby Shackles from Project Sales Corp, Vizag
Crosby Shackles from Project Sales Corp, VizagCrosby Shackles from Project Sales Corp, Vizag
Crosby Shackles from Project Sales Corp, Vizag
 
Introduction
IntroductionIntroduction
Introduction
 
IRC-6-2016.pdf
IRC-6-2016.pdfIRC-6-2016.pdf
IRC-6-2016.pdf
 
Lec 5
Lec 5Lec 5
Lec 5
 
Segmental bridge
Segmental bridgeSegmental bridge
Segmental bridge
 
Catalogo arcelor
Catalogo arcelorCatalogo arcelor
Catalogo arcelor
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
DESIGN OF CONTINUOUS MEMBERS IN PRESTRESSED
DESIGN OF CONTINUOUS MEMBERS IN PRESTRESSEDDESIGN OF CONTINUOUS MEMBERS IN PRESTRESSED
DESIGN OF CONTINUOUS MEMBERS IN PRESTRESSED
 
Fettucine Truss Bridge report
Fettucine Truss Bridge reportFettucine Truss Bridge report
Fettucine Truss Bridge report
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges
 
Prestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upPrestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take up
 

En vedette

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracingsuddal
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42nik kin
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsPaul McMullin
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methodsPaul McMullin
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structuresRizwan Khurram
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+suplimentUTCB
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016Jo Gijbels
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesMike Whaling
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistantKris Kiran
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...Hiroyuki Nakaji
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Hajar Ch
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...Full Scale Dynamics
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonNishkianDean
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Maurizio Pollino
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016IRS srl
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringPieter Jan Jordaens
 

En vedette (20)

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracing
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural Elements
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methods
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+supliment
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing Properties
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistant
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016
 
Green Retrofitting 101
Green Retrofitting 101Green Retrofitting 101
Green Retrofitting 101
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoring
 
Retrofitting and rehabilitation
Retrofitting and rehabilitationRetrofitting and rehabilitation
Retrofitting and rehabilitation
 
Considerations for Seismic Retrofitting
Considerations for Seismic RetrofittingConsiderations for Seismic Retrofitting
Considerations for Seismic Retrofitting
 

Similaire à Seismic Structural Considerations in Steel

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fastenersklubbering
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009mikeasavage
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsDesign World
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
 

Similaire à Seismic Structural Considerations in Steel (7)

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fasteners
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
 
Bogner Industrial
Bogner IndustrialBogner Industrial
Bogner Industrial
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid Couplings
 
Overmold Design Guide
Overmold Design GuideOvermold Design Guide
Overmold Design Guide
 
Fasteners Presentation
Fasteners PresentationFasteners Presentation
Fasteners Presentation
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
 

Dernier

8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryrioverosanniejoy
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一Fi L
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 

Dernier (20)

8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industry
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 

Seismic Structural Considerations in Steel

  • 1. Seismic Structural Considerations JCC Training by Paul W. McMullin, SE, PhD October 15, 2009
  • 2. The Paper Clip Test © Dunn Associates Inc, 2009
  • 3. Concept of Selected Deformation © Dunn Associates Inc, 2009
  • 4. Early Use of Moment Connections Flatiron Building, NYC • One of the first steel frame buildings • Portal frame moment connections at all wind girders. Early Steel Frames- all moment connected © Dunn Associates Inc, 2009
  • 5. Construction Changes that led to Northridge Failures Fewer, but larger moment frames • Heavier connections Changed from Riveted to Welded construction Used lower toughness welding rod • Welds went down fast • Not permitted in pipelines Quality control problems © Dunn Associates Inc, 2009
  • 6. Acceleration Record from Northridge From the Strong Motion Database (SMDB, 2000a) © Dunn Associates Inc, 2009
  • 7. Northridge Earthquake Magnitude 6.7 Building Inventory • Estimated Economic Damage • Loss = $49.3 billion • 100 buildings with minor fractures • 100 buildings with major fractures • 30 buildings with major fractures in 90% of all connections © Dunn Associates Inc, 2009
  • 8. Fracture Causes Welding • Low Toughness Weld Metal • Slag Inclusions • Lack of fusion Mismatched Yield Strengths Erroneous Joint Detailing Weld Constraint by Heavy Sections Slab Interaction with Column © Dunn Associates Inc, 2009
  • 9. Changes: Code Code limited approved filler metals Inspection requirements tightened Limited connection types Quality control significantly increased © Dunn Associates Inc, 2009
  • 10. Changes: Weld Access Hole © Dunn Associates Inc, 2009
  • 11. Connections: WUF-W © Dunn Associates Inc, 2009
  • 12. Connections: Extended Flange © Dunn Associates Inc, 2009
  • 13. Connections: Flange Cover Plate © Dunn Associates Inc, 2009
  • 14. Connections: Reduced Beam Section © Dunn Associates Inc, 2009
  • 15. Connections: Bolted End Plate © Dunn Associates Inc, 2009
  • 16. Connections: SidePlate © Dunn Associates Inc, 2009
  • 17. Protected Zone Requirements No discontinuities in Get protected zone from protected zone drawings or engineer • Arc Strikes Mark protected zones with • Erection Aids bright paint after erection and • Air-arc Gouging after fire coating • Thermal Cutting Not permitted • Welded studs • Shot pins • Screws • Welds • Holes © Dunn Associates Inc, 2009
  • 18. Protected Zones: Dog Bone © Dunn Associates Inc, 2009
  • 19. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 20. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 21. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 22. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 23. Connections Bolted End Plate Reduced Beam Section (“Dog Bone”) SidePlate™ © Dunn Associates Inc, 2009
  • 24. Reduced Beam Section Connection Advantages • Approved • Reduces column-beam weld stresses Disadvantages • Milling of beam flange • 80%-90% reliable • Looks odd © Dunn Associates Inc, 2009
  • 25. Reduced Beam Section Connection Watch for: • Protected Zone (nicks, arc strikes, shot pins, welds) • Smoothness of Cut • Bracing just outside cut © Dunn Associates Inc, 2009
  • 26. SidePlate Connection Advantages • Approved- seismic & progressive collapse • Eliminates beam-column weld • High reliability • Looks strong Disadvantages • Licensing fee • Flip columns in shop © Dunn Associates Inc, 2009
  • 27. Step 1: Column Tree Assembly Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here). Bring inRotate Applyand andPosition Weld intoTack into Place Side Plates Weld 2Weld 2, toSide Plates Apply Bring in Sidewith to Bring in Temporary Plates Horiz. Other Alignment, Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3 Apply Welds Apply 3, Tack NS/FS. Position Begin Plates, Shear Plates, After that, Column Sub-Assembly Complete. © Dunn Associates Inc, 2009
  • 28. Step 2: Full-Length Beam Assembly Begin Full-Length Full-LengthTack & and into Position 5 Shown) Bring inFull-Length Beam Beam Weld Inverted As Rotate Beam Assembly Tack Apply Position Bring in Cover Plates, (Beam into Weld Erection Angle, Assembly Complete © Dunn Associates Inc, 2009
  • 29. Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End © Dunn Associates Inc, 2009
  • 30. SidePlate Connection © Dunn Associates Inc, 2009
  • 31. SidePlate Connection Watch for: 1) Joint Gap 2) Protected Zone (nicks, arc strikes, shot pins, welds) 3) SidePlate attachments 1 3 2 © Dunn Associates Inc, 2009
  • 32. SidePlate Protected Zone © Dunn Associates Inc, 2009
  • 33. SidePlate: WELDING OK © Dunn Associates Inc, 2009
  • 34. What keeps us from backtracking? Special Inspection Good Communication • Ensure done well • RFIs that are researched & • Ultrasonic propose solutions • Mag Particle ends • Notify us ahead of certain activities (pours, fire coating) Shop Drawings • Tell us about problems as soon • Complete as you know (even your screw- • Well detailed ups) • Contractor review Think/Plan Ahead Shop vs Field Welds • Catch problems • Define up-front • Give us time to determine a solution • Shop welds- faster, higher quality • Field welds- some pieces too big for shop © Dunn Associates Inc, 2009
  • 35. Our Liability STRUCTURAL ENGINEER CONTRACTOR Becomes liable when: Becomes liable when: • Omit information • Deviate from approved plans • Don’t follow the State of the and specs Art (code is minimum) • Material/workmanship/Quality problems Regardless of who is liable, if there is a problem, we all get dragged into the mess © Dunn Associates Inc, 2009