Decks are a common addition to Auckland houses and come in a variety of shapes and sizes
and construction methods and materials. They can range from a small entry deck to a most
elaborate feature deck, and with a little bit of thought and artistic flair, can be a great asset to
any house. This section concentrates on timber decks.




                                 DO I NEED A PERMIT FOR MY DECK?

 All decks 1 metre or more above ground level require a permit (building consent). A deck
 less than 1 metre above ground level does not usually require a building consent (permit)
 but may require resourse consent, and a deck extending less than two metres from the
 face of a building does not require subfloor bracing.
 Although a deck may not require building consent, it must still comply with the building
 code. In other words, it must be built properly. If in doubt contact your local authority


                                   DECKING MATERIALS EXPLAINED

 The three most common used decking materials are:

 KWILA 90x19
 Hardwood - Finished size is usually 90mm x 18mm. Kwila is a redish colour, but once
 weathered changes to a silvery-grey colour. It is a very dense and durable timber. Kwila
 can span 400mm, which means the joists (the timber the Kwila is nailed to) must not be
 more than 450crs or 400mm between each joist.

 PINE H3 90x35
 Usual finished size is 90mmx35mm. This board, because if its thickness, can span up to
 550mm. This means the joists (the timber the decking is nailed to) must not be more that
 600crs or 550mm between each joist. Pine decking once weathered has a tendancy to
 show little cracks or splits along the grain. This is a natural and accepted trait of pine. This
 timber usually comes in two grades. Premium and merchant. Premium is clear with only
 small tight knots, merchant is a mixture of grades and containes some big knots.

 PINE H3 90x18
 Same as above but can only span up to 350mm, which means the Joists (the timber the
 decking is nailed to) must not have more than 400mm Crs or 350mm space between each
 joist.
 All of the above decking examples usually come with one face smooth, and the other face
 grooved (grip tread). See Picture below. Other less common profiles are obtainable but not
 as readily available.




 It is personal preference as to which side of the timber faces up, however if you plan to
 spend a lot of time lying or walking barefoot on the deck, grip tread may feel
uncomfortable.


                                 DECK STRUCTURE EXPLAINED




The basic deck consists of

• Posts either embedded in concrete or bolted to appropriate metal post brackets
embedded in concrete.
• Bearers, which either sit on top of, or are bolted to the side of the posts.
• Stringer, ledger plate or bearer plate, bolted or fixed to existing house.
• Joists, fixed to the ledger plate and on top of the bearers.
• Decking, as described in previous chapter.
• Boundary joist. Joist that goes around the perimeter of the deck.


POSTS
Usually 100x100 or 125x125 senton piles. Posts embedded into concrete footings must be
H5 treated, where as posts bolted to appropriate metal (shoe) brackets aand off the ground
need to be H4 treated.
The spacing of posts along the bearer line depends on the structure of the deck, but they
can only span a max of 2000mm without requiring engineers calculations.
A standard footing hole is 300x300 square and 450mm deep. There should be 100mm of
concrete between the bottom of the post and the bottom of the footing hole.


BEARERS
Must be H3 treated, unless very close to the ground in which case they will need to be H4.
The size of the bearer depends on the length of the joists and the span of the bearer, but
they cannot span more than 2000mm without requiring engineers calculations.
example:

Joist span Bearer span Size of Bearer
1.45m      1200mm      100x75
2.40m      1800mm      2/150x50
3.40m      1800mm      2/200x50


Stringer
Also called ledger. The board bolted to the house upon which the joists are fixed to or on.
The stringer must be H3 treated and fixed to the building using M12 bolts OR
Dynobolts/anchor bolts if against concrete or block wall.
Pack the stringer out from the building wall to stop moisture becoming trapped.
The spacing between the bolts depends on the span of the joists which are fixed to or on
the stringer.

example:
If the joists span 2m, the bolts should be 1.25m apart, where as if the joists span 6m, the
bolts should be 0.5m apart.


JOISTS
Must be H3 treated unless very close to the ground, in which case they should be H4
treated. Joists are fixed to the stringer either by butting up to and fixing with joist hangers,
or by sitting on top of the stringer and nailing through both faces of the joist.
The joists sit on top of the bearer and are fixed by way of nailing through each face of the
joist into the bearer.
The size of the joists depend on the joist span and the joist spacing.
example:

Joist spacing     Joist span    Size of Joist
450mm            1.40m          100x50
450mm            1.80m          125x50
450mm            2.40m          150x50
450mm            3.30m          200x50
450mm            4.25m          250x50
450mm            5.00m          300x50


BOUNDARY JOIST
Must be H3 treated.
The boundary joist is fixed to the perimeter of the deck to give a neat finish.
In most cases the boundary joist is decorative rather than structural, therefore another
preference might be to replace the boundary joists with decking boards.


                                HANDRAIL STRUCTURE EXPLAINED

All decks 1 metre or more above ground level must have a handrail.

A quick overview, a decks handrail must be at least 1000mm in height from the deck.

Any vertical slats cannot have a gap exceeding 100mm, and there must not be anything
horizontal forming a ladder effect. However there are many alternatives, such as solid
handrails lined with harditex and plastered over, solid panelling etc.

Trellis panels can be used, but most 'off the shelf' type trellis that most trellis manufacurers
sell, do not meet the requirements. However, most trellis manufacturers are able to make
trellis to ordered requirements. Depending on the size of the trellis panel, it's relevance to
the thickness of the trellis and the size of the gaps in the hellis which are also governed.

Another alternative is glass, although a very expensive alternative. Glass suppliers will
know the type and thickness of glass required for a handrail, but get ready for a shock
when you find out the price.

diagram and detail of a standard handrail
ABOUT DECKS BUILT CLOSE TO THE GROUND

Often a deck will need to be built close to the ground. This is usually the case when
building a deck on to a house which has a concrete floor. It is usually more costly and
labour intense building a low deck than a deck, say, 1 metre off the ground.

Firstly air needs to be able to circulate around bearers and joists to ensure a long life for
the deck.

If the bearers are near or touching the ground, upgrade them to H4, along with the joists.
(In a normal deck construction, joists and bearers are H3 treated).
Ensure there is a gap between the decking.

Sometimes it will be neccessary to excavate the ground. In doing this, taper the excavation
away from the house to let any water under the deck escape. If this is not possible
because of the contour of the ground and a pool effect is created, then the excavation must
be drained. In this case taper the excavation to a low point and run a drain to a lower point
outside the deck.

The drain can be made by digging a trench, putting scoria in the bottom of the trench,
laying drain coil on top of the scoria and then covering the drain coil with more scoria.
The home handyman should easily be able to do this with a small deck and minimal water
discharge, but a larger area may require a professional drainlay as it may require tapping
the possible water discharge into a stormwater drain.


                         PRICE VARIATIONS BETWEEN DIFFERENT TIMBERS

At the time of writing (October 2001) decking timber prices including GST are
approxamately: Kwila $4.50 per Metre; 100x40 radiata premium $3.90 per metre;
100x40 radiata merchant grade $2.90 per metre; 100x25 radiata premium $2.55 per
metre;
Most standard decking when dressed is 90mm wide. Allow 12 lineal (running) metres of
decking for every sguare metre of deck area.
The selection of decking boards will also have a bearing on the joist costs. For example,
100x40 radiata decking requires that the joists must be spaced at max 600mm, where as
thinner decking such as 100x25 radiata and kwila require the joists to be closer together
 therefore needing more joists hence a higher cost.
 The cheapest overall deck structure would be using 100x40 radiata merchant grade
 decking, but be prepared to accept a lot of knots.




                   Deck Anatomy




1 stringers Also called a ledger plate. The stringer is the piece of timber bolted to the house
            upon which the joists are fixed on or to. The stringer must be H3 treated and
            fixed to the building using M12 bolts OR Dynobolts or similar anchor bolts if the
            stringer is to be fixed to concrete or block wall. The stringer needs to be packed
            out from the building at every bolt fixing to prevent moisture being trapped
            between the stringer and the building. The spacing between the bolts depends
            on the span of the joists which are fixed on or to the stringer.
            example: If a stringer is 100x50 in size and if the joists fixed to that stringer span
            2m, the bolts that attach the stringer to the building should be 1.25m apart,
            where as if the joists span 6m, the bolts should be 0.5m apart.
2 footings   A standard footing hole size for 100x100 or 125x125 post is 300mm x 300mm
             square and 300mm deep in firm ground. In soft ground the holes will need to be
             bigger and deeper. 100mm of concrete is required as a pad beneath the post.
3 posts      POSTS Usually 100x100 or 125x125 senton piles. Posts embedded into
             concrete footings must be H5 treated, where as posts bolted to appropriate
             metal (shoe) brackets need to be H4 treated. The spacing of posts along the
             bearer line depends on the structure of the deck, but they can only span a max
             of 2000mm without requiring engineers calculations.
4 bearers    Must be H3 treated, unless very close to the ground in which case will need to
             be H4.
             The size of the bearer depends on the length of the joists and the span of the
             bearer, but they cannot span more than 2000mm without requiring engineers
             calculations.
             example:

             Joist span     Bearer span     Size of Bearer
1.45m         1200mm           100x75
              2.40m         1800mm           2/150x50
              3.40m         1800mm           2/200x50

5 joists      Must be H3 treated unless very close to the ground, in which case they must be
              H4 treated. The joists are fixed to the stringer either by butting up to and fixing
              with joist hangers, or by sitting on top of the ledger plate and nailing through
              both faces of the joist.
              The joists sit on top of the bearer and are fixed by way of nailing through each
              face of the joist into the bearer.
              The size of the joists depend on the joist span and the joist spacing.
              example:

              Joist spacing     Joist span    Size of Joist
              450mm             1.40m          100x50
              450mm             1.80m          125x50
              450mm             2.40m          150x50
              450mm             3.30m          200x50
              450mm             4.25m          250x50
              450mm             5.00m          300x50
6 decking     Most popular decking is kwila (hardwood) or pine. Both materials usually have
              one smooth side and one grooved side (grip tread). It is personal prefernce as to
              which side faces up. The thickness and strength of the various deck materials
              determines how far apart the joists must be.
7 boundary Must be H3 treated. The boundary joist is fixed to the perimeter of the deck to
  joist    give a neat finish. In most cases the boundary joist is decorative rather than
           structural, therefore another preference might be to replace the boundary joists
           with decking boards




                 Building a Deck
In this section we are going to show how to build a simple timber deck, two metres wide x five
metres long and less than one metre above ground level. A deck less than one metre above
ground level does not usually require a building consent (permit) but may require resourse
consent. A deck extending two metres or less from the face of a building does not require
subfloor bracing. Although a deck may not require building consent, it must still comply with
the building code. In other words, it must be built correctly. If in doubt contact the Local
Authority

If necessary use the previous page Anatomy of a Deck for reference throughout these
instructions.




Construction Details
Below is a list of the materials required for the construction of this deck. All timber used in this
deck (with the exception of kwila) is pine. Gauged means dressed (not rough) and finished
size of gauged timber is slightly smaller than that stated below. Tanalised means the
treatment of the timber.
All timbers listed below are common and readily available at any timber merchant.
Scroll down for step by step construction details.
Item          Description                                                       Quantity
Stringers     150x50 guaged tanalised H3 (decay hazard)                         1 @ 5.1m
Posts         100x100 guaged tanalised H5 (decay hazard)                        5 @ 1.0m
                                                                                (confirm
                                                                                height)
Bearers       100x100 sawn tanalised H4 (decay hazard)                          2 @ 2.7m
Joists        150x50 guaged tanalised H3 (decay hazard)                         10 @ 2.1m
                                                                                using 35mm
                                                                                pine decking
                                                                                OR
                                                                                12 @ 2.1m
                                                                                using kwila
                                                                                decking
Boundary      200x50 guaged tanalised H3 (decay hazard)                         2 @ 2.1m
joists                                                                          1 @ 5.4m
Decking       100x40 (dressed size 90x35) H3 pine                               120m
              OR 90x18 kwila hardwood
Concrete      40kg bags concrete mix                                            3 of
Other         m12 bolts or anchor bolts; 90 or 100mm galvanised jolthead        As required
              nails; 75mm jolthead galvanised nails; 60mm jolthead
              galvanised nails (if kwila is used)


Step (1) Fixing the stringer
         The stringer (also called ledger) is the beam that the joists sit on or are attached to
         and is bolted to the building. See Anatomy of a Deck for detail.
         Cut the stringer to length (5m) and fix level to the building at the required height
         using m12 bolts every 1200mm apart. Pack the stringer out from the wall (5mm -
         10mm) at every bolt fixing to prevent moisture being trapped between it and the
         building.
         The finished height of the deck should be at least 60mm below the building floor, so
         the stringer height depends on the thickness of the decking and the method of fixing
         the joists to the stringer. See the two options below. Insure the stringer is level by
         using a level or water level




Step (2) The footing holes.
         Dig five footing holes 300x300x300 deep to the dimensions as shown in the drawing
         below. If the ground is less than firm, then the holes may need to be larger and
         deeper.
         Make a mix of Concrete and pour a 100mm pad in the bottom of each hole. Place
         the posts on top of the concrete pads and pour more concrete around the posts to
         hold in place. Ensure the posts are plumb (vertical), parallel, and longer than
         required. (The tops will be trimed off later).
         Let the concrete cure.
Step (3) Fixing the bearers to the posts
         Trim the top of the posts to the required height which will be 100mm (thickness of
         bearer) below the underside of the joists. Mark the underside of the joist height on
         the building in relation to the stringer and use a straight edge and level or water-
         level to obtain the required height of the posts.
         Sit the bearer on top of the posts and make sure any necessary join will be over a
         post.
         Fix the bearer to each post with two nails angled from each face. Use 100 or 90mm
         galvanised jolthead nails.
         Let the two ends of the bearer overhang the edge of the deckline at this stage. They
         will be cut later.



Step (4) Fixing the joists
         Fix the first joist to or on one end of the stringer depending on your choice of fixing.
         See diagram below.




          METHOD 1: Sit a joist on one end of the stringer leaving a gap between the end of
          the joist and the wall of the building. Fix the joist to the stringer with two nails angled
          from each face. Use 100 or 90mm galvanised jolthead nails. It is a good idea to drill
          the nail holes first to minimize the risk of splitting the end of the joist.
          The other end of the joist will be sitting on the bearer, but do not nail yet until the
          joist is sguare (90 degrees) to the house.

          METHOD 2: Butt one end of a joist to one end of stringer so the top of the joist is
          flush (even) with the top of the stringer. Nail in place. Attach a joist hanger (a metal
          bracket with nail holes in it that fits around the end of the joist and against the
          stringer) and nail with the appropriate nails to the joist and the stringer.
          The other end of the joist will be sitting on the bearer, but do not nail yet until the
          joist is sguare (90 degrees) to the house.

          Ensure the joist is square (90 degrees) to the building before nailing to the
          bearer. This can be done by using the 3,4,5,method.
          Measure along the outside of the joist 1500mm (3x500) from the building, mark (A).
          Measure along the building 2000mm (4x500), mark (B).
          When the measurement from mark (A) to mark (B) is 2500mm (5x500), then the
first joist is square to the building. See diagram below.
          Make any necessary adjustment to the joist in the way of sliding the end of the joist
          either way along the bearer until square and then fix the joist to the bearer with two
          nails angled from each face. Use 100 or 90mm galvanised jolthead nails.




          Fix the rest of the joists in place parallel to the first.
          If 90x35 pine decking is to be used then the joist spacings should be 600mm crs,
          and if 90x18 kwila is to be used then the joist spacings should be 450mm crs. (crs
          means centres, and is the distance from the centre of one joist to the centre of the
          next joist.)
          All joists should be slightly longer than required at this stage and will be trimmed off
          later.



Step (5) Laying the deck
         Start laying the deck from the building side out, making sure there is a gap between
         the first deck board and the building so moisture does not become entrapped. Any
         necessary joins should be made on joists and staggered between rows (no two
         joins should be next to each other). Continue laying and fixing the deck boards
         using a 5mm spacer to obtain an even gap between them. Check deck boards are
         straight and parallel to the building.
         Let the decking overhang both end joists while laying, and then trim them flush with
         the outside of the end joists.




Step (6) Fixing the boundary joists
         Cut the joist ends vertical and flush with the outside edge of the last decking board.
         Nail the boundary joist around the perimeter of the deck making sure the top of the
         boundary joist is is flush with the top of the decking. See diagram below.
All about decking

Contenu connexe

Tendances

How To Install Cedar Shingles
How To Install Cedar ShinglesHow To Install Cedar Shingles
How To Install Cedar Shingleswildeagle
 
PARTITIONS AND ROOFING SHEETS
PARTITIONS AND ROOFING SHEETSPARTITIONS AND ROOFING SHEETS
PARTITIONS AND ROOFING SHEETSsaniyamulla2
 
Selecting the Best Roofing Material
Selecting the Best Roofing MaterialSelecting the Best Roofing Material
Selecting the Best Roofing MaterialSchulte Roofing
 
Fire rated construction
Fire rated constructionFire rated construction
Fire rated constructionR821992
 
Partition & suspended ceiling
Partition & suspended ceilingPartition & suspended ceiling
Partition & suspended ceilingWen Crystal
 
Heritage Window Restoration - Paul Denys
Heritage Window Restoration - Paul DenysHeritage Window Restoration - Paul Denys
Heritage Window Restoration - Paul DenysPaul Denys
 
Al baddad military solutions presentation
Al baddad military solutions   presentationAl baddad military solutions   presentation
Al baddad military solutions presentationsudhi_inc
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors Luke D'Arcy
 
AL BADDAD INTERNATIONAL COMPANY PROFILE
AL BADDAD INTERNATIONAL COMPANY PROFILEAL BADDAD INTERNATIONAL COMPANY PROFILE
AL BADDAD INTERNATIONAL COMPANY PROFILESameh_Mohsen
 

Tendances (18)

False ceiling 6th sem
False ceiling 6th sem False ceiling 6th sem
False ceiling 6th sem
 
Gypsum Board
Gypsum BoardGypsum Board
Gypsum Board
 
How To Install Cedar Shingles
How To Install Cedar ShinglesHow To Install Cedar Shingles
How To Install Cedar Shingles
 
Floors slideshare
Floors slideshareFloors slideshare
Floors slideshare
 
Luminated veneer lumber
Luminated veneer lumberLuminated veneer lumber
Luminated veneer lumber
 
stone cladding
  stone cladding  stone cladding
stone cladding
 
PARTITIONS AND ROOFING SHEETS
PARTITIONS AND ROOFING SHEETSPARTITIONS AND ROOFING SHEETS
PARTITIONS AND ROOFING SHEETS
 
Asbestos
AsbestosAsbestos
Asbestos
 
Selecting the Best Roofing Material
Selecting the Best Roofing MaterialSelecting the Best Roofing Material
Selecting the Best Roofing Material
 
Fire rated construction
Fire rated constructionFire rated construction
Fire rated construction
 
TruDefinition® Duration® Shingles
TruDefinition® Duration® ShinglesTruDefinition® Duration® Shingles
TruDefinition® Duration® Shingles
 
ACH 121 Lecture 08 (Wood Frame)
ACH 121 Lecture 08 (Wood Frame)ACH 121 Lecture 08 (Wood Frame)
ACH 121 Lecture 08 (Wood Frame)
 
Partition & suspended ceiling
Partition & suspended ceilingPartition & suspended ceiling
Partition & suspended ceiling
 
Heritage Window Restoration - Paul Denys
Heritage Window Restoration - Paul DenysHeritage Window Restoration - Paul Denys
Heritage Window Restoration - Paul Denys
 
Al baddad military solutions presentation
Al baddad military solutions   presentationAl baddad military solutions   presentation
Al baddad military solutions presentation
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
AL BADDAD INTERNATIONAL COMPANY PROFILE
AL BADDAD INTERNATIONAL COMPANY PROFILEAL BADDAD INTERNATIONAL COMPANY PROFILE
AL BADDAD INTERNATIONAL COMPANY PROFILE
 

En vedette

En vedette (7)

About kitchens
About kitchensAbout kitchens
About kitchens
 
Wallpapering techniques
Wallpapering techniquesWallpapering techniques
Wallpapering techniques
 
Build a brick barbecue
Build a brick barbecueBuild a brick barbecue
Build a brick barbecue
 
Colour schemes
Colour schemesColour schemes
Colour schemes
 
The Ultimate Property Investment Guide2
The Ultimate Property Investment Guide2The Ultimate Property Investment Guide2
The Ultimate Property Investment Guide2
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixings
 
Fireplace
FireplaceFireplace
Fireplace
 

Similaire à All about decking

How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexPriya Raj
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallZulaiha Amaria
 
Tutor l1 basic tools
Tutor l1 basic toolsTutor l1 basic tools
Tutor l1 basic toolsLuke D'Arcy
 
Typesrooftrusses 131014232104-phpapp01 (1)
Typesrooftrusses 131014232104-phpapp01 (1)Typesrooftrusses 131014232104-phpapp01 (1)
Typesrooftrusses 131014232104-phpapp01 (1)Azmat Aulakh
 
Group - 5 - Ceiling and flooring (2).pdf
Group - 5 - Ceiling and flooring (2).pdfGroup - 5 - Ceiling and flooring (2).pdf
Group - 5 - Ceiling and flooring (2).pdfSakshamSharma766048
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Luke D'Arcy
 
Shadesail posts
Shadesail postsShadesail posts
Shadesail postssailshade
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1Keith Daggett
 
Slides presentation roofing materials
Slides presentation   roofing materialsSlides presentation   roofing materials
Slides presentation roofing materialsRochelle Nato
 

Similaire à All about decking (20)

All about decking
All about deckingAll about decking
All about decking
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporex
 
Floors.pdf
Floors.pdfFloors.pdf
Floors.pdf
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Tutor l1 basic tools
Tutor l1 basic toolsTutor l1 basic tools
Tutor l1 basic tools
 
Typesrooftrusses 131014232104-phpapp01 (1)
Typesrooftrusses 131014232104-phpapp01 (1)Typesrooftrusses 131014232104-phpapp01 (1)
Typesrooftrusses 131014232104-phpapp01 (1)
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
 
Group - 5 - Ceiling and flooring (2).pdf
Group - 5 - Ceiling and flooring (2).pdfGroup - 5 - Ceiling and flooring (2).pdf
Group - 5 - Ceiling and flooring (2).pdf
 
ROOFS.ppt
ROOFS.pptROOFS.ppt
ROOFS.ppt
 
Timber roofs
Timber roofsTimber roofs
Timber roofs
 
Ceiling
CeilingCeiling
Ceiling
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2
 
False ceiling
False ceilingFalse ceiling
False ceiling
 
Shadesail posts
Shadesail postsShadesail posts
Shadesail posts
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1
 
Roofcovering
RoofcoveringRoofcovering
Roofcovering
 
Arches and lintels
Arches and lintelsArches and lintels
Arches and lintels
 
Slides presentation roofing materials
Slides presentation   roofing materialsSlides presentation   roofing materials
Slides presentation roofing materials
 
How to build a deck
How to build a deckHow to build a deck
How to build a deck
 

Plus de Praveen Sudarsan

Plus de Praveen Sudarsan (20)

How to hang wallpaper
How to hang wallpaperHow to hang wallpaper
How to hang wallpaper
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal pool
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit works
 
Home security
Home securityHome security
Home security
 
Heat guns
Heat gunsHeat guns
Heat guns
 
Hanging wallpaper
Hanging wallpaperHanging wallpaper
Hanging wallpaper
 
Hanging a door
Hanging a doorHanging a door
Hanging a door
 
Handrail anatomy
Handrail anatomyHandrail anatomy
Handrail anatomy
 
Timber care
Timber careTimber care
Timber care
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builder
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety comments
 
Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulation
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden walls
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plaster
 
Fitting a mortice latch
Fitting a mortice latchFitting a mortice latch
Fitting a mortice latch
 
Fit extra electrical sockets
Fit extra electrical socketsFit extra electrical sockets
Fit extra electrical sockets
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
 
Fit a bath and wash basin
Fit a bath and wash basinFit a bath and wash basin
Fit a bath and wash basin
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 

Dernier

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 

Dernier (20)

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 

All about decking

  • 1. Decks Decks are a common addition to Auckland houses and come in a variety of shapes and sizes and construction methods and materials. They can range from a small entry deck to a most elaborate feature deck, and with a little bit of thought and artistic flair, can be a great asset to any house. This section concentrates on timber decks. DO I NEED A PERMIT FOR MY DECK? All decks 1 metre or more above ground level require a permit (building consent). A deck less than 1 metre above ground level does not usually require a building consent (permit) but may require resourse consent, and a deck extending less than two metres from the face of a building does not require subfloor bracing. Although a deck may not require building consent, it must still comply with the building code. In other words, it must be built properly. If in doubt contact your local authority DECKING MATERIALS EXPLAINED The three most common used decking materials are: KWILA 90x19 Hardwood - Finished size is usually 90mm x 18mm. Kwila is a redish colour, but once weathered changes to a silvery-grey colour. It is a very dense and durable timber. Kwila can span 400mm, which means the joists (the timber the Kwila is nailed to) must not be more than 450crs or 400mm between each joist. PINE H3 90x35 Usual finished size is 90mmx35mm. This board, because if its thickness, can span up to 550mm. This means the joists (the timber the decking is nailed to) must not be more that 600crs or 550mm between each joist. Pine decking once weathered has a tendancy to show little cracks or splits along the grain. This is a natural and accepted trait of pine. This timber usually comes in two grades. Premium and merchant. Premium is clear with only small tight knots, merchant is a mixture of grades and containes some big knots. PINE H3 90x18 Same as above but can only span up to 350mm, which means the Joists (the timber the decking is nailed to) must not have more than 400mm Crs or 350mm space between each joist. All of the above decking examples usually come with one face smooth, and the other face grooved (grip tread). See Picture below. Other less common profiles are obtainable but not as readily available. It is personal preference as to which side of the timber faces up, however if you plan to spend a lot of time lying or walking barefoot on the deck, grip tread may feel
  • 2. uncomfortable. DECK STRUCTURE EXPLAINED The basic deck consists of • Posts either embedded in concrete or bolted to appropriate metal post brackets embedded in concrete. • Bearers, which either sit on top of, or are bolted to the side of the posts. • Stringer, ledger plate or bearer plate, bolted or fixed to existing house. • Joists, fixed to the ledger plate and on top of the bearers. • Decking, as described in previous chapter. • Boundary joist. Joist that goes around the perimeter of the deck. POSTS Usually 100x100 or 125x125 senton piles. Posts embedded into concrete footings must be H5 treated, where as posts bolted to appropriate metal (shoe) brackets aand off the ground need to be H4 treated. The spacing of posts along the bearer line depends on the structure of the deck, but they can only span a max of 2000mm without requiring engineers calculations. A standard footing hole is 300x300 square and 450mm deep. There should be 100mm of concrete between the bottom of the post and the bottom of the footing hole. BEARERS Must be H3 treated, unless very close to the ground in which case they will need to be H4. The size of the bearer depends on the length of the joists and the span of the bearer, but they cannot span more than 2000mm without requiring engineers calculations. example: Joist span Bearer span Size of Bearer 1.45m 1200mm 100x75 2.40m 1800mm 2/150x50 3.40m 1800mm 2/200x50 Stringer Also called ledger. The board bolted to the house upon which the joists are fixed to or on. The stringer must be H3 treated and fixed to the building using M12 bolts OR Dynobolts/anchor bolts if against concrete or block wall.
  • 3. Pack the stringer out from the building wall to stop moisture becoming trapped. The spacing between the bolts depends on the span of the joists which are fixed to or on the stringer. example: If the joists span 2m, the bolts should be 1.25m apart, where as if the joists span 6m, the bolts should be 0.5m apart. JOISTS Must be H3 treated unless very close to the ground, in which case they should be H4 treated. Joists are fixed to the stringer either by butting up to and fixing with joist hangers, or by sitting on top of the stringer and nailing through both faces of the joist. The joists sit on top of the bearer and are fixed by way of nailing through each face of the joist into the bearer. The size of the joists depend on the joist span and the joist spacing. example: Joist spacing Joist span Size of Joist 450mm 1.40m 100x50 450mm 1.80m 125x50 450mm 2.40m 150x50 450mm 3.30m 200x50 450mm 4.25m 250x50 450mm 5.00m 300x50 BOUNDARY JOIST Must be H3 treated. The boundary joist is fixed to the perimeter of the deck to give a neat finish. In most cases the boundary joist is decorative rather than structural, therefore another preference might be to replace the boundary joists with decking boards. HANDRAIL STRUCTURE EXPLAINED All decks 1 metre or more above ground level must have a handrail. A quick overview, a decks handrail must be at least 1000mm in height from the deck. Any vertical slats cannot have a gap exceeding 100mm, and there must not be anything horizontal forming a ladder effect. However there are many alternatives, such as solid handrails lined with harditex and plastered over, solid panelling etc. Trellis panels can be used, but most 'off the shelf' type trellis that most trellis manufacurers sell, do not meet the requirements. However, most trellis manufacturers are able to make trellis to ordered requirements. Depending on the size of the trellis panel, it's relevance to the thickness of the trellis and the size of the gaps in the hellis which are also governed. Another alternative is glass, although a very expensive alternative. Glass suppliers will know the type and thickness of glass required for a handrail, but get ready for a shock when you find out the price. diagram and detail of a standard handrail
  • 4. ABOUT DECKS BUILT CLOSE TO THE GROUND Often a deck will need to be built close to the ground. This is usually the case when building a deck on to a house which has a concrete floor. It is usually more costly and labour intense building a low deck than a deck, say, 1 metre off the ground. Firstly air needs to be able to circulate around bearers and joists to ensure a long life for the deck. If the bearers are near or touching the ground, upgrade them to H4, along with the joists. (In a normal deck construction, joists and bearers are H3 treated). Ensure there is a gap between the decking. Sometimes it will be neccessary to excavate the ground. In doing this, taper the excavation away from the house to let any water under the deck escape. If this is not possible because of the contour of the ground and a pool effect is created, then the excavation must be drained. In this case taper the excavation to a low point and run a drain to a lower point outside the deck. The drain can be made by digging a trench, putting scoria in the bottom of the trench, laying drain coil on top of the scoria and then covering the drain coil with more scoria. The home handyman should easily be able to do this with a small deck and minimal water discharge, but a larger area may require a professional drainlay as it may require tapping the possible water discharge into a stormwater drain. PRICE VARIATIONS BETWEEN DIFFERENT TIMBERS At the time of writing (October 2001) decking timber prices including GST are approxamately: Kwila $4.50 per Metre; 100x40 radiata premium $3.90 per metre; 100x40 radiata merchant grade $2.90 per metre; 100x25 radiata premium $2.55 per metre; Most standard decking when dressed is 90mm wide. Allow 12 lineal (running) metres of decking for every sguare metre of deck area. The selection of decking boards will also have a bearing on the joist costs. For example, 100x40 radiata decking requires that the joists must be spaced at max 600mm, where as
  • 5. thinner decking such as 100x25 radiata and kwila require the joists to be closer together therefore needing more joists hence a higher cost. The cheapest overall deck structure would be using 100x40 radiata merchant grade decking, but be prepared to accept a lot of knots. Deck Anatomy 1 stringers Also called a ledger plate. The stringer is the piece of timber bolted to the house upon which the joists are fixed on or to. The stringer must be H3 treated and fixed to the building using M12 bolts OR Dynobolts or similar anchor bolts if the stringer is to be fixed to concrete or block wall. The stringer needs to be packed out from the building at every bolt fixing to prevent moisture being trapped between the stringer and the building. The spacing between the bolts depends on the span of the joists which are fixed on or to the stringer. example: If a stringer is 100x50 in size and if the joists fixed to that stringer span 2m, the bolts that attach the stringer to the building should be 1.25m apart, where as if the joists span 6m, the bolts should be 0.5m apart. 2 footings A standard footing hole size for 100x100 or 125x125 post is 300mm x 300mm square and 300mm deep in firm ground. In soft ground the holes will need to be bigger and deeper. 100mm of concrete is required as a pad beneath the post. 3 posts POSTS Usually 100x100 or 125x125 senton piles. Posts embedded into concrete footings must be H5 treated, where as posts bolted to appropriate metal (shoe) brackets need to be H4 treated. The spacing of posts along the bearer line depends on the structure of the deck, but they can only span a max of 2000mm without requiring engineers calculations. 4 bearers Must be H3 treated, unless very close to the ground in which case will need to be H4. The size of the bearer depends on the length of the joists and the span of the bearer, but they cannot span more than 2000mm without requiring engineers calculations. example: Joist span Bearer span Size of Bearer
  • 6. 1.45m 1200mm 100x75 2.40m 1800mm 2/150x50 3.40m 1800mm 2/200x50 5 joists Must be H3 treated unless very close to the ground, in which case they must be H4 treated. The joists are fixed to the stringer either by butting up to and fixing with joist hangers, or by sitting on top of the ledger plate and nailing through both faces of the joist. The joists sit on top of the bearer and are fixed by way of nailing through each face of the joist into the bearer. The size of the joists depend on the joist span and the joist spacing. example: Joist spacing Joist span Size of Joist 450mm 1.40m 100x50 450mm 1.80m 125x50 450mm 2.40m 150x50 450mm 3.30m 200x50 450mm 4.25m 250x50 450mm 5.00m 300x50 6 decking Most popular decking is kwila (hardwood) or pine. Both materials usually have one smooth side and one grooved side (grip tread). It is personal prefernce as to which side faces up. The thickness and strength of the various deck materials determines how far apart the joists must be. 7 boundary Must be H3 treated. The boundary joist is fixed to the perimeter of the deck to joist give a neat finish. In most cases the boundary joist is decorative rather than structural, therefore another preference might be to replace the boundary joists with decking boards Building a Deck In this section we are going to show how to build a simple timber deck, two metres wide x five metres long and less than one metre above ground level. A deck less than one metre above ground level does not usually require a building consent (permit) but may require resourse consent. A deck extending two metres or less from the face of a building does not require subfloor bracing. Although a deck may not require building consent, it must still comply with the building code. In other words, it must be built correctly. If in doubt contact the Local Authority If necessary use the previous page Anatomy of a Deck for reference throughout these instructions. Construction Details Below is a list of the materials required for the construction of this deck. All timber used in this deck (with the exception of kwila) is pine. Gauged means dressed (not rough) and finished size of gauged timber is slightly smaller than that stated below. Tanalised means the treatment of the timber. All timbers listed below are common and readily available at any timber merchant. Scroll down for step by step construction details.
  • 7. Item Description Quantity Stringers 150x50 guaged tanalised H3 (decay hazard) 1 @ 5.1m Posts 100x100 guaged tanalised H5 (decay hazard) 5 @ 1.0m (confirm height) Bearers 100x100 sawn tanalised H4 (decay hazard) 2 @ 2.7m Joists 150x50 guaged tanalised H3 (decay hazard) 10 @ 2.1m using 35mm pine decking OR 12 @ 2.1m using kwila decking Boundary 200x50 guaged tanalised H3 (decay hazard) 2 @ 2.1m joists 1 @ 5.4m Decking 100x40 (dressed size 90x35) H3 pine 120m OR 90x18 kwila hardwood Concrete 40kg bags concrete mix 3 of Other m12 bolts or anchor bolts; 90 or 100mm galvanised jolthead As required nails; 75mm jolthead galvanised nails; 60mm jolthead galvanised nails (if kwila is used) Step (1) Fixing the stringer The stringer (also called ledger) is the beam that the joists sit on or are attached to and is bolted to the building. See Anatomy of a Deck for detail. Cut the stringer to length (5m) and fix level to the building at the required height using m12 bolts every 1200mm apart. Pack the stringer out from the wall (5mm - 10mm) at every bolt fixing to prevent moisture being trapped between it and the building. The finished height of the deck should be at least 60mm below the building floor, so the stringer height depends on the thickness of the decking and the method of fixing the joists to the stringer. See the two options below. Insure the stringer is level by using a level or water level Step (2) The footing holes. Dig five footing holes 300x300x300 deep to the dimensions as shown in the drawing below. If the ground is less than firm, then the holes may need to be larger and deeper. Make a mix of Concrete and pour a 100mm pad in the bottom of each hole. Place the posts on top of the concrete pads and pour more concrete around the posts to hold in place. Ensure the posts are plumb (vertical), parallel, and longer than required. (The tops will be trimed off later). Let the concrete cure.
  • 8. Step (3) Fixing the bearers to the posts Trim the top of the posts to the required height which will be 100mm (thickness of bearer) below the underside of the joists. Mark the underside of the joist height on the building in relation to the stringer and use a straight edge and level or water- level to obtain the required height of the posts. Sit the bearer on top of the posts and make sure any necessary join will be over a post. Fix the bearer to each post with two nails angled from each face. Use 100 or 90mm galvanised jolthead nails. Let the two ends of the bearer overhang the edge of the deckline at this stage. They will be cut later. Step (4) Fixing the joists Fix the first joist to or on one end of the stringer depending on your choice of fixing. See diagram below. METHOD 1: Sit a joist on one end of the stringer leaving a gap between the end of the joist and the wall of the building. Fix the joist to the stringer with two nails angled from each face. Use 100 or 90mm galvanised jolthead nails. It is a good idea to drill the nail holes first to minimize the risk of splitting the end of the joist. The other end of the joist will be sitting on the bearer, but do not nail yet until the joist is sguare (90 degrees) to the house. METHOD 2: Butt one end of a joist to one end of stringer so the top of the joist is flush (even) with the top of the stringer. Nail in place. Attach a joist hanger (a metal bracket with nail holes in it that fits around the end of the joist and against the stringer) and nail with the appropriate nails to the joist and the stringer. The other end of the joist will be sitting on the bearer, but do not nail yet until the joist is sguare (90 degrees) to the house. Ensure the joist is square (90 degrees) to the building before nailing to the bearer. This can be done by using the 3,4,5,method. Measure along the outside of the joist 1500mm (3x500) from the building, mark (A). Measure along the building 2000mm (4x500), mark (B). When the measurement from mark (A) to mark (B) is 2500mm (5x500), then the
  • 9. first joist is square to the building. See diagram below. Make any necessary adjustment to the joist in the way of sliding the end of the joist either way along the bearer until square and then fix the joist to the bearer with two nails angled from each face. Use 100 or 90mm galvanised jolthead nails. Fix the rest of the joists in place parallel to the first. If 90x35 pine decking is to be used then the joist spacings should be 600mm crs, and if 90x18 kwila is to be used then the joist spacings should be 450mm crs. (crs means centres, and is the distance from the centre of one joist to the centre of the next joist.) All joists should be slightly longer than required at this stage and will be trimmed off later. Step (5) Laying the deck Start laying the deck from the building side out, making sure there is a gap between the first deck board and the building so moisture does not become entrapped. Any necessary joins should be made on joists and staggered between rows (no two joins should be next to each other). Continue laying and fixing the deck boards using a 5mm spacer to obtain an even gap between them. Check deck boards are straight and parallel to the building. Let the decking overhang both end joists while laying, and then trim them flush with the outside of the end joists. Step (6) Fixing the boundary joists Cut the joist ends vertical and flush with the outside edge of the last decking board. Nail the boundary joist around the perimeter of the deck making sure the top of the boundary joist is is flush with the top of the decking. See diagram below.