P3M3  Profeo Assessments Presented by Profeo Ltd.
P3M3 ®  - Maturity Model ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
P3M3 Structure Models Portfolio Management Programme Management Project Management Maturity Levels Aware  (Level 1) Repeatable  (Level 2) Defined  (Level 3) Managed  (Level 4) Optimised (Level 5) Perspectives Management Control Benefits Managemet Financial Management Stakeholder Management Risk Management Organisational Governance Resource Management
P3M3 Maturity levels The organization assesses its capacity to manage programmes and projects and prioritize them accordingly. Level % of Organisations Project Management Programme Management Portfolio Management 5 2% Undertake continuous process improvement with proactive problem and technology management. 4 4% Obtain and retain specific management metrics on its management performance and run a quality management organization to better predict and control future performance. 3 9% Have its own portfolio management process and centrally controlled programme and project processes with individual programmes and projects being able to flex within these processes. 2 85% Ensure that each programme and/or project in its portfolio is run with its own processes and procedures to a minimum specified standard. (There may be limited consistency or coordination). 1 Recognize projects and run Them differently from ongoing business. (Projects may be running informally with no standard processes or tracking system). Recognize programmes and run them differently from projects. (Programmes may be running informally with no standard processes or tracking system). Have an Executive Board that recognizes programmes and projects and maintains a list, without perhaps a formal tracking mechanism and documented process.
P3M3 Key Aspects Governance looks at how the delivery of projects is aligned to the strategic direction of the organisation. It considers how start-up and closure controls are applied to projects and how alignment is maintained during a project’s lifecycle. This differs from management control, which views how control of a project is maintained internally. Governance Perspective Description Management Control Management Control covers how the direction of travel is maintained throughout the project’s lifecycle, with appropriate break points to enable it to be stopped or redirected by a project board (or equivalent) if necessary. Benefits Management Benefits management is the process that ensures that the desired business change outcomes have been clearly defined are measurable and are ultimately delivered through a structured approach and with full organisational ownership. Stakeholder Management Stakeholder management includes communications planning, the effective identification and use of different communications channels, and techniques to enable the project’s objectives to be achieved. Risk Management Risk Management is the process to systematically identify and manage opportunities and threats. Finance Management Finance is an essential resource that should be a key focus for initiating and controlling projects. Financial management ensures that the likely costs of the project are captured and evaluated within a formal business case and that costs are categorised and managed over the investment life cycle. Resource Management Resource management covers management of all types of resources required for delivery. These include human resources, buildings, equipment, supplies, information, tools and supporting teams.
Reasons for using P3M3 Example After a merger US Listed companies (or their subsidiaries) whose revenue is largely project based Just implemented a project management standard but performance has not gone up Organisations facing stakeholder scrutiny Benefit Helps determine which processes and tools to adopt as the new corporate standard. P3M3 compliance at Level 3 or higher will indicate robust project processes regarding the revenue and profit statements in quarterly/annual returns (SOX requirement) Identifies underlying reasons for non-performance and fosters understanding on how to unlock latent capability. Independent assessment and certification to demonstrate capability (<5% of organisations are Level 3 or higher!)
Profeo‘s Assessments On-line Survey Discovery Assessment Diagnostic Assessment Certification Assessment Purpose Benchmarking Identify shortcomings & areas of improvement Identify sources & improvement plan Certificate Resource requirements from 12 to 200 (internal staff) 3 interview partners Minimum 9 interview partners + 200 for on-line survey Minimum 9 interview partners Duration Client preference 2 - 3 weeks 4 - 6  weeks 3 - 4 weeks Consultant lead Authorised consultant Benefit To baseline an organisation’s likely maturity and benchmark with companies of the same industry A discovery of capability in order to prioritise improvement plans Diagnose reasons for weaknesses in order to define measurements for improvement To assess an organisation’s maturity level in order to award a certificate for the level achieved
Interested ?  ,[object Object],[object Object],[object Object]

Contenu connexe

En vedette

Actionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challengeActionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challengeILX Group
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 AppAndyMurray
 
Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity ModelNoel Hatch
 
Why Program Management is Essential for IT Projects
Why Program Management is Essential for IT ProjectsWhy Program Management is Essential for IT Projects
Why Program Management is Essential for IT Projectsbbigelow
 
Benefit Realisation Management
Benefit Realisation ManagementBenefit Realisation Management
Benefit Realisation ManagementBruce Levitan
 
Why program management is essential for it projects
Why program management is essential for it projectsWhy program management is essential for it projects
Why program management is essential for it projectsbbigelow
 
Portfolio, Project and Programme Management
Portfolio, Project and Programme ManagementPortfolio, Project and Programme Management
Portfolio, Project and Programme ManagementBruce Levitan
 
The 7 Deadly Sins Of Project Portfolio Management
The 7 Deadly Sins Of Project Portfolio ManagementThe 7 Deadly Sins Of Project Portfolio Management
The 7 Deadly Sins Of Project Portfolio ManagementJie Wang
 
From KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to StrategyFrom KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to StrategyXenith Document Systems Ltd
 
Basic process mapping using BPMN
Basic process mapping using BPMNBasic process mapping using BPMN
Basic process mapping using BPMNBruce Levitan
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner
 
Customer Journey Mapping overview
Customer Journey Mapping overviewCustomer Journey Mapping overview
Customer Journey Mapping overviewBruce Levitan
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5pankajsh10
 

En vedette (17)

Actionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challengeActionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challenge
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 App
 
Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity Model
 
Foggy projects
Foggy projectsFoggy projects
Foggy projects
 
Libre de Diabetes - Andres Di Angelo
Libre de Diabetes - Andres Di AngeloLibre de Diabetes - Andres Di Angelo
Libre de Diabetes - Andres Di Angelo
 
Why Program Management is Essential for IT Projects
Why Program Management is Essential for IT ProjectsWhy Program Management is Essential for IT Projects
Why Program Management is Essential for IT Projects
 
Benefit Realisation Management
Benefit Realisation ManagementBenefit Realisation Management
Benefit Realisation Management
 
Why program management is essential for it projects
Why program management is essential for it projectsWhy program management is essential for it projects
Why program management is essential for it projects
 
Portfolio, Project and Programme Management
Portfolio, Project and Programme ManagementPortfolio, Project and Programme Management
Portfolio, Project and Programme Management
 
The 7 Deadly Sins Of Project Portfolio Management
The 7 Deadly Sins Of Project Portfolio ManagementThe 7 Deadly Sins Of Project Portfolio Management
The 7 Deadly Sins Of Project Portfolio Management
 
How To Improve Your Organization's PPM Maturity Level
How To Improve Your Organization's PPM Maturity LevelHow To Improve Your Organization's PPM Maturity Level
How To Improve Your Organization's PPM Maturity Level
 
From KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to StrategyFrom KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to Strategy
 
Basic process mapping using BPMN
Basic process mapping using BPMNBasic process mapping using BPMN
Basic process mapping using BPMN
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)
 
Customer Journey Mapping overview
Customer Journey Mapping overviewCustomer Journey Mapping overview
Customer Journey Mapping overview
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 

Dernier

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 

Dernier (20)

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 

P3M3 - Assessment of Portfolio, Programme and Project Management

  • 1. P3M3 Profeo Assessments Presented by Profeo Ltd.
  • 2.
  • 3. P3M3 Structure Models Portfolio Management Programme Management Project Management Maturity Levels Aware (Level 1) Repeatable (Level 2) Defined (Level 3) Managed (Level 4) Optimised (Level 5) Perspectives Management Control Benefits Managemet Financial Management Stakeholder Management Risk Management Organisational Governance Resource Management
  • 4. P3M3 Maturity levels The organization assesses its capacity to manage programmes and projects and prioritize them accordingly. Level % of Organisations Project Management Programme Management Portfolio Management 5 2% Undertake continuous process improvement with proactive problem and technology management. 4 4% Obtain and retain specific management metrics on its management performance and run a quality management organization to better predict and control future performance. 3 9% Have its own portfolio management process and centrally controlled programme and project processes with individual programmes and projects being able to flex within these processes. 2 85% Ensure that each programme and/or project in its portfolio is run with its own processes and procedures to a minimum specified standard. (There may be limited consistency or coordination). 1 Recognize projects and run Them differently from ongoing business. (Projects may be running informally with no standard processes or tracking system). Recognize programmes and run them differently from projects. (Programmes may be running informally with no standard processes or tracking system). Have an Executive Board that recognizes programmes and projects and maintains a list, without perhaps a formal tracking mechanism and documented process.
  • 5. P3M3 Key Aspects Governance looks at how the delivery of projects is aligned to the strategic direction of the organisation. It considers how start-up and closure controls are applied to projects and how alignment is maintained during a project’s lifecycle. This differs from management control, which views how control of a project is maintained internally. Governance Perspective Description Management Control Management Control covers how the direction of travel is maintained throughout the project’s lifecycle, with appropriate break points to enable it to be stopped or redirected by a project board (or equivalent) if necessary. Benefits Management Benefits management is the process that ensures that the desired business change outcomes have been clearly defined are measurable and are ultimately delivered through a structured approach and with full organisational ownership. Stakeholder Management Stakeholder management includes communications planning, the effective identification and use of different communications channels, and techniques to enable the project’s objectives to be achieved. Risk Management Risk Management is the process to systematically identify and manage opportunities and threats. Finance Management Finance is an essential resource that should be a key focus for initiating and controlling projects. Financial management ensures that the likely costs of the project are captured and evaluated within a formal business case and that costs are categorised and managed over the investment life cycle. Resource Management Resource management covers management of all types of resources required for delivery. These include human resources, buildings, equipment, supplies, information, tools and supporting teams.
  • 6. Reasons for using P3M3 Example After a merger US Listed companies (or their subsidiaries) whose revenue is largely project based Just implemented a project management standard but performance has not gone up Organisations facing stakeholder scrutiny Benefit Helps determine which processes and tools to adopt as the new corporate standard. P3M3 compliance at Level 3 or higher will indicate robust project processes regarding the revenue and profit statements in quarterly/annual returns (SOX requirement) Identifies underlying reasons for non-performance and fosters understanding on how to unlock latent capability. Independent assessment and certification to demonstrate capability (<5% of organisations are Level 3 or higher!)
  • 7. Profeo‘s Assessments On-line Survey Discovery Assessment Diagnostic Assessment Certification Assessment Purpose Benchmarking Identify shortcomings & areas of improvement Identify sources & improvement plan Certificate Resource requirements from 12 to 200 (internal staff) 3 interview partners Minimum 9 interview partners + 200 for on-line survey Minimum 9 interview partners Duration Client preference 2 - 3 weeks 4 - 6 weeks 3 - 4 weeks Consultant lead Authorised consultant Benefit To baseline an organisation’s likely maturity and benchmark with companies of the same industry A discovery of capability in order to prioritise improvement plans Diagnose reasons for weaknesses in order to define measurements for improvement To assess an organisation’s maturity level in order to award a certificate for the level achieved
  • 8.

Notes de l'éditeur

  1. Profeo short d