// The Art and Science Behind
   Successful Risk Workshops


     Dr. Dan Patterson, PMP
      CEO & President, Acumen

            July 2009




                  +1 512 291 6261 // info@projectacumen.com

                            www.projectacumen.com
Table of Contents

Introduction ..................................................................................................................... 3

The Risk Assessment Process .......................................................................................... 3

Step 1: Schedule Review .................................................................................................. 4

Step 2: Risk Identification ............................................................................................... 4
   Risk Events, Risk factors or Uncertainty Ranges? ........................................................ 5
   Avoidance of Analysis Paralysis ................................................................................... 5
          Table 1 – Uncertainty Factors ............................................................................... 5
   Black Swan Risks ......................................................................................................... 6
   Avoidance of Double Dipping ....................................................................................... 6
   “What is the appropriate level at which to risk load a schedule?” ............................... 6
   Loudest Doesn’t Always Win ......................................................................................... 6
   It’s OK to Admit We Have Risk in Our Project ................................................................ 7

Step 3: Model Development and Analysis ........................................................................ 7
   Avoidance of Central Limit Theorem ............................................................................. 7
   Integrating Uncertainty and Risk Events ...................................................................... 7

Step 4: Interpretation of Risk Results .............................................................................. 8
   The Danger of Reporting Confidence Levels ................................................................. 8
   Range, Range, Range .................................................................................................. 9
   How to Report Contingency .......................................................................................... 9

Conclusion ....................................................................................................................... 9

Checklist for a Successful Risk Workshop ....................................................................... 9

Additional Information .................................................................................................. 10


+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                                        2
Introduction
Despite the project risk software tools available today, the process of conducting a risk
workshop and subsequent risk model development continues to be a major headache
for many projects. The process is often, at best, a necessary evil only executed to
follow company or project protocol.

With this perception, getting a project team engaged and on board with the risk
assessment process often can be as challenging as building the risk model itself.

So, why the big challenge? After living and breathing project risk management for over
a decade, I have come to the conclusion that the reason is this: when conducting a risk
workshop, too many projects rush towards the end goal without really understanding
how to get there or in many cases, not fully understanding the benefits as to why they
are even doing a risk workshop in the first case.

This paper discusses how a well-structured balance of risk process combined with
sound workshop facilitation can provide more value to a project’s bottom line than most
typically ever realize. Imagine a silver bullet that enabled you to objectively determine
accurate project costs; requirements for, and allocation of, contingency; strategic
insight into which projects should be considered for organization portfolio inclusion;
and, as a project manager most importantly, a true indicator as to how realistic the plan
is, against which you are being held accountable for during execution. Sound too good
to be true? Read on…


The Risk Assessment Process
If the objective of a risk assessment is to determine risk exposure, required contingency
and confidence as to whether the plan is adequately realistic, then the process needs to
critique not only the risks impacting the project but also the plan itself.

Think of risk on a project as the ‘anti-plan’. We can go to great lengths to develop the
perfect schedule or cost estimate but then during execution if either the scope changes
(uncertainty) or unforeseen events occur (risk events), then the plan is immediately out
of date and not reflective of what needs to be done for a successful on time, on budget
completion. With this, the taming of two moving parts should be considered:

    1) All events, uncertainties and risk factors that may impact our ‘best laid plan’




+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       3
2) The plan itself – consider the extreme case of a project with no risk: if the plan is
       inaccurate or incomplete then there is still a high chance the project will still not
       finish on time/to budget.

To give ourselves the best chance of developing a sound model, consider the following
four steps that will give us a framework for our risk assessment.

        Step 1: Schedule Review
        Step 2: Risk Identification
        Step 3: Model Development and Analysis
        Step 4: Interpretation of the results


Step 1: Schedule Review
Building a risk model against a sound schedule basis and/or cost estimate is paramount
to successful risk assessment. Apply risk and uncertainty to a structurally weak schedule
and the results will be as weak as the plan itself.
Some practitioners and tools today offer checks for quality of schedules. However,
simply running a set of checks isn’t sufficient. Accepting scheduling best practices such
as the absence of open ends, out of sequence updates, lags on links etc, there is a
further layer of intelligence that needs to be applied. Running computed schedule checks
is certainly a good first step but then more importantly, working with the planning team to
understand the presence of these so called errors and justification as to the absence of
perhaps certain areas of detail, ensures that the schedule basis is as accurate and
realistic as possible.

Based on facilitation of countless project risk assessments, Acumen has developed a
series of thresholds that act as quality and performance indicators enabling accurate
determination of the suitability of a project plan for risk assessment.

This early assessment of the plan also ensures team buy-in on the risk assessment.
Without this initial prep work and collaboration with those involved in the development of
the plan, the workshop itself often gets misconceived as a witch hunt from which a
defensive team then offers little insight into the true risk drivers within their project.


Step 2: Risk Identification
The pitfalls to avoid during risk identification warrant a thesis unto themselves: having a
sound risk identification process is key to the successful assessment of project risk
exposure.

+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       4
Risk Events, Risk factors or Uncertainty Ranges?
  Over recent years, sources and types of risk have been reasonably well documented.
  Project teams are generally well educated as to the types of different risk ranging from
  risk events and uncertainty factors to weather events, rig availability and other risk
  sources. For this very reason, when the team is brought together in a risk workshop, it
  is critical to truly identify how these risk types not only interact and potentially drive
  each other but also how big an impact they truly have on the project. Approximating
  them all under the umbrella of a ‘risk range’ will lead to tenuous results at best.

  Avoidance of Analysis Paralysis
  Estimate uncertainty is largely a result of incomplete or varying scope. Typically,
  uncertainty is modeled using the likes of three point estimates (for example +/- 10%
  range around the deterministic duration). However, in a risk workshop that may have
  anywhere up to twenty highly opinionated team members, completing a walkthrough of
  a detailed schedule gaining consensus can be extremely challenging. To overcome this,
  consider using uncertainty factors. Rather than expecting a workshop team to quantify
  minimum and maximum ranges to the nth degree, adopt a factor-based system as
  shown in table 1 below.


Risk Factor                         Best Case (optimistic)         Worst Case (pessimistic)

Very Conservative                   75%                            100%

Conservative                        85%                            105%

Realistic                           95%                            105%

Aggressive                          95%                            115%

Very Aggressive                     100%                           125%

                                   Table 1 – Uncertainty Factors

  Again, based on experiences from countless risk workshops, I have found teams are
  more engaged and objective about risk ranging when thinking in terms of degree of
  realism/aggressiveness. Map this back to an agreed upon quantitative score using a
  mapping such as table 1 and the result is an extremely consistent and manageable
  means of risk loading uncertainty during a risk workshop.

  This technique also ensures that team members don’t inadvertently include risk events
  in their uncertainty ranges.


  +1 512 291 6261 // info@projectacumen.com
  www.projectacumen.com                       5
Black Swan Risks
There has been a lot of noise made about black swan, extreme or so called ‘strategic
risks’ in recent publications. Yet in so many risk workshops, we still today, have to guide
the team away from slipping into the World War III type risks that result in ridiculously
skewed results. Impact of risk is of course a key consideration, but is it valid to include a
major risk event in a risk model that only has a 1 in 500 chance of happening during the
life of the project? Separate out risks that may impact the organization from those of the
project.

Avoidance of Double Dipping
A similar pitfall to avoid is that of ‘double dipping’. Risk ‘double dipping’ occurs when the
impact of a risk event is included in the general uncertainty range (often applied as a
min, most likely, max range of uncertainty) as well as being defined as an impact from a
risk event.

“What is the appropriate level at which to risk load a schedule?”
This a question posed frequently. The answer is simple: we can only report down to the
level at which we risk loaded a schedule. If we want to be able to determine
contingency spread at a level 3 within a WBS, then the schedule needs to be risk
loaded to at least this level. The flipside to this is that if we are working on a 10,000
activity schedule, it is simply not practical to risk load that many activities in a risk
workshop.

Again, through an evolved process, Acumen has developed a highly effective means of
risk loading ‘enough but not too many’ activities to ensure a balance of sufficient detail
and manageability for the team. This balance typically results in the order of magnitude
of two hundred risk factors/ranges being identified that then get applied to the various
disciplines/WBS groupings/sub sections within the project as a whole.
One of the benefits of this approach is that of continued maintainability of the risk
model beyond the initial risk workshop.

Loudest Doesn’t Always Win
Successful risk workshop facilitators have one key objective: to determine consensus
from the workshop team on realistic risk input values that will then be used to develop
the risk model. Risk workshops benefit from not having traditional project or
organizational hierarchical protocol. A domain expert should have as much say as the
PM when it comes to risk identification. In a recent workshop I worked with a highly
passionate and somewhat argumentative team, so I implemented a ‘wooden spoon’

+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       6
system as to ‘who had the floor’. As the facilitator, I simply passed the spoon to the
team member wanting to voice an opinion. This forced the team to present well thought
out and structured arguments surrounding risk values and the net result was a
controlled, consensus driven set of highly accurate risk inputs.

It’s OK to Admit We Have Risk in Our Project
All too often, project teams are optimistic in their assessment of risk exposure. A risk
workshop should not be a destructive project moaning session. Instead, it should be
viewed by, and presented to, the team as a means of gaining consensus on project
confidence and subsequently what is needed to increase that confidence level.


Step 3: Model Development and Analysis
Once we have obtained the risk and schedule inputs (the building blocks of the risk
model), we then need to build a sound model against which to analyze. Over the years,
I have seen many approaches to risk model development yet in reality, very few truly
hold water. Due to the logistical challenges of risk loading very large schedules, one
approach is to create a manual rollup summary of the project and risk load this. This
approach is extremely dangerous: the task of re-creating equivalent logic on a summary
schedule that truly represents the inner workings of the detailed basis schedule is
extremely difficult and at best is an approximation.
Equally, shortcuts such as focusing on and risk loading of, the critical or near critical
activities can give a skewed perception and can obscure risk hot spots or areas of the
project highly sensitive to risk.

Avoidance of Central Limit Theorem
A proven approach is to identify and risk load both risk events and estimate uncertainty
at a suitable reporting summary level within the schedule, with the detailed activities
inheriting these summary ranges/risk events. A major pitfall to avoid here is that of
Central Limit Theorem (CRT): a well-known phenomenon caused by hierarchical, equal
and opposite data cancelling each other out. In schedules, this has the effect of
summary activities not reflecting the true range of risk that is held within the child
activities. This can easily be overcome through the use of risk correlation but must be
considered when building the model.

Integrating Uncertainty and Risk Events
One of the most overlooked inputs in risk model development is that of risk event
integration. Risk loading estimate uncertainty and running a Monte Carlo simulation is
commonplace but, in reality the impact of such uncertainty diminishes into insignificance

+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       7
when the larger impact of risk events are considered. In light of this, it is paramount that
risk events get properly integrated into the uncertainty risk model prior to running a risk
analysis. Linked to this, is that of the analysis of mitigation. Too often the impact of
mitigation is subjectively assessed without analytically determining the cost/benefit of
planned mitigation as part of the integrated risk model.

In short, the risk model should contain the following inputs:


                         • Framework for risk model build
     Schedule
           • Sound logic driving the risk model


     Estimate            • Ranges representing scope uncertainty
    Uncertainty
         • Risk events not included in ranges


                         • Probability, cost, schedule impact
   Risk Events
          • Risks mapped to activities/WBS


     Mitigation          • Risk responses to risk events
      Plans
             • Consideration of cost/time overhead 




These four inputs form the basis of the risk model that can be analyzed using a Monte
Carlo simulation.

Often, mystery surrounds the mechanics of a Monte Carlo simulation and yet in reality,
it is extremely straightforward. The simulation is nothing more than a normal schedule
time analysis (CPM technique) with each iteration taking into account the risk and
uncertainty variables that the team has identified. Run enough of these simulations and
a well-defined pattern will emerge in the form of risk results.


Step 4: Interpretation of Risk Results
The Danger of Reporting Confidence Levels
One of the biggest misperceptions about risk reporting is to focus on the confidence
level derived from a risk histogram. Why is this an issue? It can be a highly misleading
metric. The confidence level metric describes the chance or probability of achieving the
project completion date. After many years of risk analyzing projects of known low risk, I
began to question why so many of these turned up very low ‘confidence levels’. Further
investigation into this has revealed a phenomena known as merge bias. In layman’s
+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                           8
terms, merge bias occurs due to multiple parallel paths ultimately having to converge
on an activity or project completion milestone. Even with minor risk and uncertainty, the
chance of each of these predecessor paths completing on time and not having an
impact on the node point is very low. In fact, it is a compound probability effect.
Extrapolate this throughout the project in its entirely and you soon realize that the
confidence level metric needs to be used in caution.

Range, Range, Range
The range of uncertainty gives context to the confidence level. In addition to reporting
the confidence level, report on the range of uncertainty and even better, report this
range as a percentage of remaining duration. Reporting to the board that you have a
15% range of uncertainty on your project is more useful than reporting that you only
have a 3% of hitting the completion date. A small confidence level doesn’t necessarily
indicate a high-risk project…

How to Report Contingency
Too often contingency values are thrown around in absence of a confidence level. A
contingency of 30 days is meaningless unless we can understand the confidence level
at which this is being reported. The exact same project may have 90 days required
contingency if the required confidence level is 90% instead of say 50%. The ‘take
home’ here is to always report and request contingency amounts within the context of a
specified contingency level.


Conclusion
Like most systems, a risk analysis is only as good as the basis upon which the model is
built. Throw erroneous risk ranges at a schedule and the results will be equally
erroneous. Instead, by pursuing a well structured, third party facilitated risk workshop,
you ensure accurate inputs and model development.

Equally important is the intelligent interpretation of results. Risk exposure can be a
difficult topic to report and so it is key that the likes of risk range and required
contingencies are reported in a meaningful way within context of the given project.

Checklist for a Successful Risk Workshop
Listed on the next page is a checklist of guidelines recommended when considering
conducting a risk workshop. It is these factors that have enabled Acumen to have
continued world-class success with risk assessment workshops.


+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       9
Risk Assessment Checklist


       þ Tune the team into why you are having a risk workshop
       þ Conduct pre-workshop discovery sessions
       þ Employ a 3rd party workshop facilitator for truly independent assessment
       þ Perform a well structured workshop – know the project schedule prior
       þ Adopt risk factoring during the workshop – avoid statistics at all costs
       þ Don’t overlook risk registers and risk events – they carry large impact
       þ Brainstorm mitigation plans during the workshop
       þ Keep the workshop group to a manageable size
       þ Leave team hierarchies outside of the workshop – everyone has their say
       þ Understand model limitations such as merge bias and central limit
       þ Report intelligently: be wary of confidence level reporting in isolation
       þ Hold periodic workshops in alignment with the likes of project/gate reviews




Additional Information
If you would like further information about Acumen’s risk assessment workshops,
please visit our website at http://projectacumen.com or contact
info@projectacumen.com.




+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                        10

Contenu connexe

Tendances

Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategiesDebashishDas49
 
Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides SlideTeam
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Risk Management
Risk ManagementRisk Management
Risk ManagementSaqib Raza
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk ManagementHayat Denzi
 
Framework criteria-appraisal-socioeconomic-justification-education-projects
Framework criteria-appraisal-socioeconomic-justification-education-projectsFramework criteria-appraisal-socioeconomic-justification-education-projects
Framework criteria-appraisal-socioeconomic-justification-education-projectsAdili Zella
 
Software testing - Risk management
Software testing - Risk managementSoftware testing - Risk management
Software testing - Risk managementPractiTest
 
Risk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation SlidesRisk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation SlidesSlideTeam
 
Risk Management in Sprint Environment
Risk Management in Sprint EnvironmentRisk Management in Sprint Environment
Risk Management in Sprint EnvironmentMike Wienold
 
The importance of properly describing risks, presented by Peter Simon, 10th O...
The importance of properly describing risks, presented by Peter Simon, 10th O...The importance of properly describing risks, presented by Peter Simon, 10th O...
The importance of properly describing risks, presented by Peter Simon, 10th O...Association for Project Management
 
Risk Analysis
Risk AnalysisRisk Analysis
Risk AnalysisCIToolkit
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)Priya Tomar
 
اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222nashaat algrara
 
Project Risk Management_O2D
Project Risk Management_O2DProject Risk Management_O2D
Project Risk Management_O2DHungyu Lai
 

Tendances (20)

Basic risk management presentation 17th june 2015
Basic risk management presentation 17th june 2015Basic risk management presentation 17th june 2015
Basic risk management presentation 17th june 2015
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategies
 
Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk Management
 
Framework criteria-appraisal-socioeconomic-justification-education-projects
Framework criteria-appraisal-socioeconomic-justification-education-projectsFramework criteria-appraisal-socioeconomic-justification-education-projects
Framework criteria-appraisal-socioeconomic-justification-education-projects
 
Software testing - Risk management
Software testing - Risk managementSoftware testing - Risk management
Software testing - Risk management
 
Risk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation SlidesRisk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation Slides
 
Risk Management in Sprint Environment
Risk Management in Sprint EnvironmentRisk Management in Sprint Environment
Risk Management in Sprint Environment
 
The importance of properly describing risks, presented by Peter Simon, 10th O...
The importance of properly describing risks, presented by Peter Simon, 10th O...The importance of properly describing risks, presented by Peter Simon, 10th O...
The importance of properly describing risks, presented by Peter Simon, 10th O...
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk Analysis
Risk AnalysisRisk Analysis
Risk Analysis
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)
 
اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222
 
Project Risk Management_O2D
Project Risk Management_O2DProject Risk Management_O2D
Project Risk Management_O2D
 
Project Risk management
Project Risk management Project Risk management
Project Risk management
 

Similaire à The Art and Science Behind Successful Risk Workshops

How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownAcumen
 
Measuring Risk Exposure through Risk Range Certainty
Measuring Risk Exposure through Risk Range CertaintyMeasuring Risk Exposure through Risk Range Certainty
Measuring Risk Exposure through Risk Range CertaintyAcumen
 
Quantification of Risks in Project Management
Quantification of Risks in Project ManagementQuantification of Risks in Project Management
Quantification of Risks in Project ManagementVenkatesh Ganapathy
 
PRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdfPRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdfmohamed Ismail
 
Acumen Risk: Brochure
Acumen Risk: BrochureAcumen Risk: Brochure
Acumen Risk: BrochureCisco
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen
 
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk AnalysisAdopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk AnalysisRicardo Viana Vargas
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan templateVivek Srivastava
 
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd Healthcare consultant
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
Project Risk Management Handbook
Project Risk Management HandbookProject Risk Management Handbook
Project Risk Management HandbookDaniel Ackermann
 
IntroductionThe standards of venture risk administration can be .docx
IntroductionThe standards of venture risk administration can be .docxIntroductionThe standards of venture risk administration can be .docx
IntroductionThe standards of venture risk administration can be .docxmariuse18nolet
 
project managment.ppt
project managment.pptproject managment.ppt
project managment.pptHinaAsghar16
 

Similaire à The Art and Science Behind Successful Risk Workshops (20)

How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us Down
 
Measuring Risk Exposure through Risk Range Certainty
Measuring Risk Exposure through Risk Range CertaintyMeasuring Risk Exposure through Risk Range Certainty
Measuring Risk Exposure through Risk Range Certainty
 
Quantification of Risks in Project Management
Quantification of Risks in Project ManagementQuantification of Risks in Project Management
Quantification of Risks in Project Management
 
PRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdfPRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdf
 
Acumen Risk: Brochure
Acumen Risk: BrochureAcumen Risk: Brochure
Acumen Risk: Brochure
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops Overview
 
Project/Program Risk management
Project/Program Risk managementProject/Program Risk management
Project/Program Risk management
 
Reliability
ReliabilityReliability
Reliability
 
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk AnalysisAdopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan template
 
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Risk Matrix.docx
Risk Matrix.docxRisk Matrix.docx
Risk Matrix.docx
 
Project Risk Management Handbook
Project Risk Management HandbookProject Risk Management Handbook
Project Risk Management Handbook
 
IntroductionThe standards of venture risk administration can be .docx
IntroductionThe standards of venture risk administration can be .docxIntroductionThe standards of venture risk administration can be .docx
IntroductionThe standards of venture risk administration can be .docx
 
9. Risk.ppt
9. Risk.ppt9. Risk.ppt
9. Risk.ppt
 
9. Risk.ppt
9. Risk.ppt9. Risk.ppt
9. Risk.ppt
 
9. Risk.ppt
9. Risk.ppt9. Risk.ppt
9. Risk.ppt
 
project managment.ppt
project managment.pptproject managment.ppt
project managment.ppt
 

Plus de Acumen

Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityAcumen
 
Simplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskSimplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskAcumen
 
Benchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueBenchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueAcumen
 
Fuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyFuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyAcumen
 
Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Acumen
 
Meet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationMeet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationAcumen
 
Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Acumen
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentAcumen
 
Smarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceSmarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceAcumen
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsAcumen
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen
 
Acumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen
 
2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit Keynote2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit KeynoteAcumen
 
Calgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessCalgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessAcumen
 
Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360Acumen
 
Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Acumen
 
Successful Dispute Resolution
Successful Dispute ResolutionSuccessful Dispute Resolution
Successful Dispute ResolutionAcumen
 
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAchieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAcumen
 
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Acumen
 

Plus de Acumen (20)

Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule Quality
 
Simplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskSimplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen risk
 
Benchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueBenchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned Value
 
Fuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyFuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / Energy
 
Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?
 
Meet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationMeet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent Acceleration
 
Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
 
Smarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceSmarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project Performance
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case Study
 
Acumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule Integration
 
2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit Keynote2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit Keynote
 
Calgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessCalgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project Success
 
Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360
 
Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0
 
Successful Dispute Resolution
Successful Dispute ResolutionSuccessful Dispute Resolution
Successful Dispute Resolution
 
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAchieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
 
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
 

Dernier

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Dernier (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

The Art and Science Behind Successful Risk Workshops

  • 1. // The Art and Science Behind Successful Risk Workshops Dr. Dan Patterson, PMP CEO & President, Acumen July 2009 +1 512 291 6261 // info@projectacumen.com www.projectacumen.com
  • 2. Table of Contents Introduction ..................................................................................................................... 3 The Risk Assessment Process .......................................................................................... 3 Step 1: Schedule Review .................................................................................................. 4 Step 2: Risk Identification ............................................................................................... 4 Risk Events, Risk factors or Uncertainty Ranges? ........................................................ 5 Avoidance of Analysis Paralysis ................................................................................... 5 Table 1 – Uncertainty Factors ............................................................................... 5 Black Swan Risks ......................................................................................................... 6 Avoidance of Double Dipping ....................................................................................... 6 “What is the appropriate level at which to risk load a schedule?” ............................... 6 Loudest Doesn’t Always Win ......................................................................................... 6 It’s OK to Admit We Have Risk in Our Project ................................................................ 7 Step 3: Model Development and Analysis ........................................................................ 7 Avoidance of Central Limit Theorem ............................................................................. 7 Integrating Uncertainty and Risk Events ...................................................................... 7 Step 4: Interpretation of Risk Results .............................................................................. 8 The Danger of Reporting Confidence Levels ................................................................. 8 Range, Range, Range .................................................................................................. 9 How to Report Contingency .......................................................................................... 9 Conclusion ....................................................................................................................... 9 Checklist for a Successful Risk Workshop ....................................................................... 9 Additional Information .................................................................................................. 10 +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 2
  • 3. Introduction Despite the project risk software tools available today, the process of conducting a risk workshop and subsequent risk model development continues to be a major headache for many projects. The process is often, at best, a necessary evil only executed to follow company or project protocol. With this perception, getting a project team engaged and on board with the risk assessment process often can be as challenging as building the risk model itself. So, why the big challenge? After living and breathing project risk management for over a decade, I have come to the conclusion that the reason is this: when conducting a risk workshop, too many projects rush towards the end goal without really understanding how to get there or in many cases, not fully understanding the benefits as to why they are even doing a risk workshop in the first case. This paper discusses how a well-structured balance of risk process combined with sound workshop facilitation can provide more value to a project’s bottom line than most typically ever realize. Imagine a silver bullet that enabled you to objectively determine accurate project costs; requirements for, and allocation of, contingency; strategic insight into which projects should be considered for organization portfolio inclusion; and, as a project manager most importantly, a true indicator as to how realistic the plan is, against which you are being held accountable for during execution. Sound too good to be true? Read on… The Risk Assessment Process If the objective of a risk assessment is to determine risk exposure, required contingency and confidence as to whether the plan is adequately realistic, then the process needs to critique not only the risks impacting the project but also the plan itself. Think of risk on a project as the ‘anti-plan’. We can go to great lengths to develop the perfect schedule or cost estimate but then during execution if either the scope changes (uncertainty) or unforeseen events occur (risk events), then the plan is immediately out of date and not reflective of what needs to be done for a successful on time, on budget completion. With this, the taming of two moving parts should be considered: 1) All events, uncertainties and risk factors that may impact our ‘best laid plan’ +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 3
  • 4. 2) The plan itself – consider the extreme case of a project with no risk: if the plan is inaccurate or incomplete then there is still a high chance the project will still not finish on time/to budget. To give ourselves the best chance of developing a sound model, consider the following four steps that will give us a framework for our risk assessment. Step 1: Schedule Review Step 2: Risk Identification Step 3: Model Development and Analysis Step 4: Interpretation of the results Step 1: Schedule Review Building a risk model against a sound schedule basis and/or cost estimate is paramount to successful risk assessment. Apply risk and uncertainty to a structurally weak schedule and the results will be as weak as the plan itself. Some practitioners and tools today offer checks for quality of schedules. However, simply running a set of checks isn’t sufficient. Accepting scheduling best practices such as the absence of open ends, out of sequence updates, lags on links etc, there is a further layer of intelligence that needs to be applied. Running computed schedule checks is certainly a good first step but then more importantly, working with the planning team to understand the presence of these so called errors and justification as to the absence of perhaps certain areas of detail, ensures that the schedule basis is as accurate and realistic as possible. Based on facilitation of countless project risk assessments, Acumen has developed a series of thresholds that act as quality and performance indicators enabling accurate determination of the suitability of a project plan for risk assessment. This early assessment of the plan also ensures team buy-in on the risk assessment. Without this initial prep work and collaboration with those involved in the development of the plan, the workshop itself often gets misconceived as a witch hunt from which a defensive team then offers little insight into the true risk drivers within their project. Step 2: Risk Identification The pitfalls to avoid during risk identification warrant a thesis unto themselves: having a sound risk identification process is key to the successful assessment of project risk exposure. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 4
  • 5. Risk Events, Risk factors or Uncertainty Ranges? Over recent years, sources and types of risk have been reasonably well documented. Project teams are generally well educated as to the types of different risk ranging from risk events and uncertainty factors to weather events, rig availability and other risk sources. For this very reason, when the team is brought together in a risk workshop, it is critical to truly identify how these risk types not only interact and potentially drive each other but also how big an impact they truly have on the project. Approximating them all under the umbrella of a ‘risk range’ will lead to tenuous results at best. Avoidance of Analysis Paralysis Estimate uncertainty is largely a result of incomplete or varying scope. Typically, uncertainty is modeled using the likes of three point estimates (for example +/- 10% range around the deterministic duration). However, in a risk workshop that may have anywhere up to twenty highly opinionated team members, completing a walkthrough of a detailed schedule gaining consensus can be extremely challenging. To overcome this, consider using uncertainty factors. Rather than expecting a workshop team to quantify minimum and maximum ranges to the nth degree, adopt a factor-based system as shown in table 1 below. Risk Factor Best Case (optimistic) Worst Case (pessimistic) Very Conservative 75% 100% Conservative 85% 105% Realistic 95% 105% Aggressive 95% 115% Very Aggressive 100% 125% Table 1 – Uncertainty Factors Again, based on experiences from countless risk workshops, I have found teams are more engaged and objective about risk ranging when thinking in terms of degree of realism/aggressiveness. Map this back to an agreed upon quantitative score using a mapping such as table 1 and the result is an extremely consistent and manageable means of risk loading uncertainty during a risk workshop. This technique also ensures that team members don’t inadvertently include risk events in their uncertainty ranges. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 5
  • 6. Black Swan Risks There has been a lot of noise made about black swan, extreme or so called ‘strategic risks’ in recent publications. Yet in so many risk workshops, we still today, have to guide the team away from slipping into the World War III type risks that result in ridiculously skewed results. Impact of risk is of course a key consideration, but is it valid to include a major risk event in a risk model that only has a 1 in 500 chance of happening during the life of the project? Separate out risks that may impact the organization from those of the project. Avoidance of Double Dipping A similar pitfall to avoid is that of ‘double dipping’. Risk ‘double dipping’ occurs when the impact of a risk event is included in the general uncertainty range (often applied as a min, most likely, max range of uncertainty) as well as being defined as an impact from a risk event. “What is the appropriate level at which to risk load a schedule?” This a question posed frequently. The answer is simple: we can only report down to the level at which we risk loaded a schedule. If we want to be able to determine contingency spread at a level 3 within a WBS, then the schedule needs to be risk loaded to at least this level. The flipside to this is that if we are working on a 10,000 activity schedule, it is simply not practical to risk load that many activities in a risk workshop. Again, through an evolved process, Acumen has developed a highly effective means of risk loading ‘enough but not too many’ activities to ensure a balance of sufficient detail and manageability for the team. This balance typically results in the order of magnitude of two hundred risk factors/ranges being identified that then get applied to the various disciplines/WBS groupings/sub sections within the project as a whole. One of the benefits of this approach is that of continued maintainability of the risk model beyond the initial risk workshop. Loudest Doesn’t Always Win Successful risk workshop facilitators have one key objective: to determine consensus from the workshop team on realistic risk input values that will then be used to develop the risk model. Risk workshops benefit from not having traditional project or organizational hierarchical protocol. A domain expert should have as much say as the PM when it comes to risk identification. In a recent workshop I worked with a highly passionate and somewhat argumentative team, so I implemented a ‘wooden spoon’ +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 6
  • 7. system as to ‘who had the floor’. As the facilitator, I simply passed the spoon to the team member wanting to voice an opinion. This forced the team to present well thought out and structured arguments surrounding risk values and the net result was a controlled, consensus driven set of highly accurate risk inputs. It’s OK to Admit We Have Risk in Our Project All too often, project teams are optimistic in their assessment of risk exposure. A risk workshop should not be a destructive project moaning session. Instead, it should be viewed by, and presented to, the team as a means of gaining consensus on project confidence and subsequently what is needed to increase that confidence level. Step 3: Model Development and Analysis Once we have obtained the risk and schedule inputs (the building blocks of the risk model), we then need to build a sound model against which to analyze. Over the years, I have seen many approaches to risk model development yet in reality, very few truly hold water. Due to the logistical challenges of risk loading very large schedules, one approach is to create a manual rollup summary of the project and risk load this. This approach is extremely dangerous: the task of re-creating equivalent logic on a summary schedule that truly represents the inner workings of the detailed basis schedule is extremely difficult and at best is an approximation. Equally, shortcuts such as focusing on and risk loading of, the critical or near critical activities can give a skewed perception and can obscure risk hot spots or areas of the project highly sensitive to risk. Avoidance of Central Limit Theorem A proven approach is to identify and risk load both risk events and estimate uncertainty at a suitable reporting summary level within the schedule, with the detailed activities inheriting these summary ranges/risk events. A major pitfall to avoid here is that of Central Limit Theorem (CRT): a well-known phenomenon caused by hierarchical, equal and opposite data cancelling each other out. In schedules, this has the effect of summary activities not reflecting the true range of risk that is held within the child activities. This can easily be overcome through the use of risk correlation but must be considered when building the model. Integrating Uncertainty and Risk Events One of the most overlooked inputs in risk model development is that of risk event integration. Risk loading estimate uncertainty and running a Monte Carlo simulation is commonplace but, in reality the impact of such uncertainty diminishes into insignificance +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 7
  • 8. when the larger impact of risk events are considered. In light of this, it is paramount that risk events get properly integrated into the uncertainty risk model prior to running a risk analysis. Linked to this, is that of the analysis of mitigation. Too often the impact of mitigation is subjectively assessed without analytically determining the cost/benefit of planned mitigation as part of the integrated risk model. In short, the risk model should contain the following inputs: • Framework for risk model build Schedule • Sound logic driving the risk model Estimate • Ranges representing scope uncertainty Uncertainty • Risk events not included in ranges • Probability, cost, schedule impact Risk Events • Risks mapped to activities/WBS Mitigation • Risk responses to risk events Plans • Consideration of cost/time overhead These four inputs form the basis of the risk model that can be analyzed using a Monte Carlo simulation. Often, mystery surrounds the mechanics of a Monte Carlo simulation and yet in reality, it is extremely straightforward. The simulation is nothing more than a normal schedule time analysis (CPM technique) with each iteration taking into account the risk and uncertainty variables that the team has identified. Run enough of these simulations and a well-defined pattern will emerge in the form of risk results. Step 4: Interpretation of Risk Results The Danger of Reporting Confidence Levels One of the biggest misperceptions about risk reporting is to focus on the confidence level derived from a risk histogram. Why is this an issue? It can be a highly misleading metric. The confidence level metric describes the chance or probability of achieving the project completion date. After many years of risk analyzing projects of known low risk, I began to question why so many of these turned up very low ‘confidence levels’. Further investigation into this has revealed a phenomena known as merge bias. In layman’s +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 8
  • 9. terms, merge bias occurs due to multiple parallel paths ultimately having to converge on an activity or project completion milestone. Even with minor risk and uncertainty, the chance of each of these predecessor paths completing on time and not having an impact on the node point is very low. In fact, it is a compound probability effect. Extrapolate this throughout the project in its entirely and you soon realize that the confidence level metric needs to be used in caution. Range, Range, Range The range of uncertainty gives context to the confidence level. In addition to reporting the confidence level, report on the range of uncertainty and even better, report this range as a percentage of remaining duration. Reporting to the board that you have a 15% range of uncertainty on your project is more useful than reporting that you only have a 3% of hitting the completion date. A small confidence level doesn’t necessarily indicate a high-risk project… How to Report Contingency Too often contingency values are thrown around in absence of a confidence level. A contingency of 30 days is meaningless unless we can understand the confidence level at which this is being reported. The exact same project may have 90 days required contingency if the required confidence level is 90% instead of say 50%. The ‘take home’ here is to always report and request contingency amounts within the context of a specified contingency level. Conclusion Like most systems, a risk analysis is only as good as the basis upon which the model is built. Throw erroneous risk ranges at a schedule and the results will be equally erroneous. Instead, by pursuing a well structured, third party facilitated risk workshop, you ensure accurate inputs and model development. Equally important is the intelligent interpretation of results. Risk exposure can be a difficult topic to report and so it is key that the likes of risk range and required contingencies are reported in a meaningful way within context of the given project. Checklist for a Successful Risk Workshop Listed on the next page is a checklist of guidelines recommended when considering conducting a risk workshop. It is these factors that have enabled Acumen to have continued world-class success with risk assessment workshops. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 9
  • 10. Risk Assessment Checklist þ Tune the team into why you are having a risk workshop þ Conduct pre-workshop discovery sessions þ Employ a 3rd party workshop facilitator for truly independent assessment þ Perform a well structured workshop – know the project schedule prior þ Adopt risk factoring during the workshop – avoid statistics at all costs þ Don’t overlook risk registers and risk events – they carry large impact þ Brainstorm mitigation plans during the workshop þ Keep the workshop group to a manageable size þ Leave team hierarchies outside of the workshop – everyone has their say þ Understand model limitations such as merge bias and central limit þ Report intelligently: be wary of confidence level reporting in isolation þ Hold periodic workshops in alignment with the likes of project/gate reviews Additional Information If you would like further information about Acumen’s risk assessment workshops, please visit our website at http://projectacumen.com or contact info@projectacumen.com. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 10