// Taming an Unruly Schedule Using
  the 14-Point Schedule Assessment




          Dr. Dan Patterson, PMP
           CEO & President, Acumen

               February 2010




                        +1 512 291 6261 // info@projectacumen.com

                                 www.projectacumen.com
Table of Contents
  Introduction ................................................................................................................. 3
  The 14-Point Assessment ............................................................................................ 3
  Basis of Assessment and “Total” Activities ................................................................. 3
  The Assessment Checks ............................................................................................... 4
         Check #1: Logic .................................................................................................... 4
         Figure 1 - Logic Checks ........................................................................................ 5
         Checks #2, #3 and #4: Leads, Lags and Logic Types ........................................... 5
         Check #5: Hard Constraints ................................................................................. 6
         Figure 2 – Combining Metrics to Validate 14-Point Tripwire Exceptions .............. 7
         Checks #6, #7 and #8: High Float, Negative Float, High Duration and Schedule
         Path Analysis™ ................................................................................................... 7
         Figure 3 – Combining Float, Duration Checks with Network Path Analysis (NPA). 8
         Checks #9, #10 and #11: Invalid Dates, Resources and Missed Baseline ............ 9
         Checks #12, #13 and #14 .................................................................................... 9
  Conclusions ............................................................................................................... 10




+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                                      2
Introduction
This paper discusses why the emerging 14-Point Schedule Assessment, developed by
the Defense Contract Management Agency (DCMA), is fast becoming an established
standard within the scheduling community across multiple industries.
In addition to discussing the benefits of a 14-Point Assessment, this paper also
discusses how further value can be provided through additional schedule metrics as
well as alternate means of slicing and dicing projects for analysis including a technique
known as Schedule Path Analysis™ (SPA).


The 14-Point Assessment
The 14-Point Assessment is 14 separate checks that are run against a CPM (Critical
Path Method) project schedule in order to assess quality and structural integrity. The
checks mainly focus on the integrity of a planned schedule but also touch on how well a
project schedule is performing during the execution phase.


Is the 14-Point Assessment an all-encompassing schedule critique? No, but it does go
a long way towards providing a sound framework for developing schedule analysis.
Projects fail due to a combination of poor planning and execution1 and so anything that
can be done to better establish a sound basis of schedule, the greater chance of
project success.


Basis of Assessment and “Total” Activities
Schedules can contain many types of activity (normal, summary, milestones, level of
effort, etc.) in multiple states (planned, in progress and complete). Additional
complexities such as multiple calendars, resource constraints and many more factors
all contribute to scheduling being a highly complicated science.


1
 (ref. DE Patterson, Jan 2010, “Why Scheduling Mustn’t be Allowed to Become an Extinct
Science”, www.projectacumen.com/whitepapers )


+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       3
The 14-Point Assessment focuses on what are known as “Total Activities”. A total
activity is defined as a non-complete activity that is not a summary, level of effort, nor
milestone (i.e. is a normal activity either that is currently planned or in progress). By
filtering out the likes of summary activities that are really just grouping representations
of the true work defined in a ‘normal’ activity, the 14-Point Assessment provides a non-
skewed perspective of the remaining work left in the schedule. Eliminating milestones
has the added benefit of avoiding double dipping on results. At first glances, it may
seem wrong to eliminate milestones from say a logic check (as milestones can be
integral parts of a schedule and sequence of work and deliverables). However, any logic
issues leading into or out of a milestone activity will automatically be picked up by the
Total Activity leading into or out of the milestone in question. In short, focusing on Total
activities provides an effective means of running schedule analysis checks on those
activities that matter—i.e., those that carry remaining work.


The Assessment Checks
The majority of the checks focus on the planning phase of a project. However, checks
nine and eleven (“Invalid Dates” and “Missed Baseline”) focus on performance and
statusing during execution. The following section reviews the standard 14-Point
Schedule checks as well as describes additional complimentary checks that can
provide further insight into schedule compliance.


Check #1: Logic
The logic check catches those total activities that have missing logic. While the 5%
target threshold tripwire is important, the bigger question is why is logic so important in
a schedule?


Project completion dates within schedules are driven by two key factors: duration and
sequence of activities. Getting the sequence wrong in a schedule can result in
problems during execution (“you can’t build the walls before you lay the foundation”
type of scenario) but much worse than this, get a logic link wrong in the plan and the

+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       4
completion date (driven by the critical path) may likely be incorrect. This can have
horrendous implications on more than just completion dates extending into missed
schedule hot spots and overly optimistic cost forecasting.


The flip side to missing logic is the scenario of having too much logic on an activity!
Having a high number of successors makes the activity key with regards to it having a
potential impact on multiple successors. Consider the example in Figure 1. The
standard 14-Point Check for Logic has correctly pinpointed activity 2 as having an open
ended logic link. Additionally, if we also apply a metric to report activities with three or
more links, then activity 5 triggers the tripwire. This additional check on logic ensures
that our schedule is both correctly linked as well as not ‘over linked’ with regards to
complexity.




                                    Figure 1 - Logic Checks

Checks #2, #3 and #4: Leads, Lags and Logic Types
In addition to validating whether correct logic is present, the 14-Point Assessment
checks for whether logic links carry lags and leads (negative lags). Leads and lags are


+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       5
used to either delay or accelerate the sequence of activities and can be dangerous for
several reasons. Firstly, they are often used to adjust CPM dates to fit a target
requirement and secondly if they are used to represent true delays (such as bidding
period or concrete curing for example), then they become difficult to manage, status
and control during execution. In short, they hide detail in the schedule. Using non
standard logic types other than FS (finish to start) can also be the cause of unrealistic
planning. The 14-Point Assessment states that at least 75% of logic links must be of
type FS (rather than SS, FF, SF).


Failing test #4 (logic types) shouldn’t automatically be seen as schedule failure. Instead,
use this test as a means of validating the use of different logic types. Review and
defend/reject the non standard logic types and consider the combined use of SS, FF
activity logic.


Check #5: Hard Constraints
A constraint is an artificial date applied to an activity. Constraints can be one or two
way e.g. start no earlier than (one way) or must start on (two way). One way constraints
can have a valid role within a schedule but should be avoided if possible. Two way
constraints should be avoided at all times as they go against the very essence of CPM
scheduling when calculating Start and Finish dates.
Interestingly, there are instances where the use of a constraint can be used to address
an open end within a schedule. Consider the example where a schedule is part of a
larger picture and an activity is dependent on say the deliverable from another project.
If we are not able to link the projects together (perhaps the deliverable is from a sub-
contractor), then our activity in question cannot tie back to a predecessor because it
doesn’t exist. Yet if there is a “not before” delivery date on the predecessor activity
from the external project, then using a Start no Earlier Than constraint to ‘tie-off’ the
open end is quite justified.


On the surface, figure 2 shows two schedule issues (one logic and one constraint). Yet
when a comparison of the two exceptions is carried out, it turns out they are the same



+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       6
activity and have valid reason for being present i.e., open-ended with a constraint to
model correct linkage back to an external driving deliverable.




          Figure 2 – Combining Metrics to Validate 14-Point Tripwire Exceptions

Checks #6, #7, and #8: High Float, Negative Float, High Duration, Schedule Path
Analysis™
Schedule checks for high float, negative float and high duration all provide opportunity
for schedule improvement. While high float activities are generally seen as bad, they
should also be seen as opportunities for adding additional concurrent work to the
schedule without impacting the critical path. This opportunity should only be pursued
however, once we are certain that the reason for high float is truly because of the small
amount of work in a path and not because of artificial schedule constraints (see checks
#1, 2, 3, 4, 5). Negative float while generally a bad thing should be seen as a great way
of pinpointing impossible scenarios within a schedule. Likewise high duration activities
should be further scoped out to provide additional detail and control.




+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       7
One extremely powerful means of analyzing these three metrics is to look at what we
define as Schedule Path Analysis2 (SPA). SPA determines all network path sequences
between any two points within a schedule. Combine this with metrics such as High
Float and Remaining Duration to have the ability to determine which sequence of
activities will give us the biggest benefit in terms of either acceleration or adding
additional work to the sequence.


Figure 3 shows an example of three parallel paths leading to a completion milestone.
By using the 14-Point Check # 6 (high float) metric, we can see that path #2 has two
activities with float of over two months (the DCMA tripwire for high float). While at first
glances, this appears to be a weakness, in reality, if the logic is sound (which it is
through checks 1 through 5) then there is actually an opportunity for paths 2 and 3 to
have additional work added to them and thus help accelerate the schedule. In fact by
looking at the difference between remaining duration (50 days) and ribbon length (139
days) for path #2, we can see that we have 89 days of potential opportunity for adding
additional work to that specific path without impacting the project finish date.




       Figure 3 – Combining Float, Duration Checks with Network Path Analysis (NPA)




2
    SPA is a registered trademark of Acumen PM LLC
+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       8
Checks #9, #10 and #11: Invalid Dates, Resources and Missed Baseline
These three metrics pertain more to project performance tracking than planning. While
very useful, their depth of coverage for project performance tracking is somewhat
limited with many more additional metrics available for more detailed performance
tracking. The topic of another whitepaper3, additional performance metrics to consider
include “the number of activities that started or are planned ahead of a given baseline”
(rather than just focusing on those that slipped) and “the number of activities that
actually accelerated during execution” – that is they started late and yet made up
enough time to finish early.


Checks #12, #13 and #14
Check 12 is nothing more than a critical path integrity check ensuring that a delay on
the critical path will have a visible knock-on effect on project completion. If the
schedule passes the other schedule checks already discussed, then this test should not
be an issue. Checks 13 and 14 are known as Tripwire Checks. Check 13 examines the
length of the critical path relative to the total float of the project. If the forecast
completion date is after the end of the critical path, then there is a much higher chance
of project success, than an aggressive target date that is prior to the critical path
completion.


Similar comparisons between schedule and target completions should also be carried
out on interim milestones throughout the project.
Check #14 is a measure of how many tasks have been completed relative to the
number of tasks that were planned to have been completed. While a useful high-level
indicator of performance, additional checks can also be applied.


Rather than looking at just the number of activities, it is more valuable to look at the
number of days work remaining and compare this between the current schedule and a
given target or baseline. Similarly, looking at whether any variation from plan causes the
project to be more front-loaded or back-loaded with regards to work remaining is an

3
  See www.projectacumen.com/whitepapers for additional information on project performance
tracking.
+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                        9
excellent means of determining whether the ‘bow-wave’ of upcoming work is slipping
or accelerating. Finally, comparing remaining work with a baseline forecast by period
(e.g. by week, month, quarter), is a powerful means of forecasting when potential
execution bottlenecks may occur.


Conclusions
The14-Point Assessment is an excellent starting point for schedule assessment. It
contains a sound mix of schedule and performance critiques that can be used to
improve the quality and maturity of a schedule.


Additional metrics and perspectives give a more in-depth view into schedule quality.
Looking at results in a time-phased manner as well as by the likes of Acumen’s
patented ribbons provides a unique insight that cannot be gained from
a more traditional Gantt-chart based schedule analysis.


Other perspectives gained through the likes of Schedule Path Analysis™ provide a
more proactive approach to schedule acceleration and should be used in combination
with the standard schedule checks within the 14-Point Assessment.




+1 512 291 6261 // info@projectacumen.com
www.projectacumen.com                       10

Contenu connexe

Tendances

Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsAcumen
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Planproject management
 
A guide to create a quality project schedule
A guide to create a quality project scheduleA guide to create a quality project schedule
A guide to create a quality project scheduleNirtiSingla
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-scheduleRaaz Karkee
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Acumen
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Managementrielaantonio
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSHafiz JUNAID
 
PM scheduling techniques
PM scheduling techniquesPM scheduling techniques
PM scheduling techniquesNazish khalid
 
SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)Peter Mello
 
Scheduling of a five story residential apartment project
Scheduling of a five story residential apartment project Scheduling of a five story residential apartment project
Scheduling of a five story residential apartment project kaishwarya3
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
Literature Review in Project Scheduling Techniques
Literature Review in Project Scheduling TechniquesLiterature Review in Project Scheduling Techniques
Literature Review in Project Scheduling TechniquesObi-Ugbo Alex
 
06 project time management
06  project time management06  project time management
06 project time managementAla Ibrahim
 

Tendances (18)

Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
A guide to create a quality project schedule
A guide to create a quality project scheduleA guide to create a quality project schedule
A guide to create a quality project schedule
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-schedule
 
Stopping the insanity
Stopping the insanityStopping the insanity
Stopping the insanity
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
construction project planing
 construction project planing construction project planing
construction project planing
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
 
Project time management
Project time managementProject time management
Project time management
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
PM scheduling techniques
PM scheduling techniquesPM scheduling techniques
PM scheduling techniques
 
6 time PMBOK
6 time PMBOK6 time PMBOK
6 time PMBOK
 
SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)
 
Scheduling of a five story residential apartment project
Scheduling of a five story residential apartment project Scheduling of a five story residential apartment project
Scheduling of a five story residential apartment project
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Literature Review in Project Scheduling Techniques
Literature Review in Project Scheduling TechniquesLiterature Review in Project Scheduling Techniques
Literature Review in Project Scheduling Techniques
 
06 project time management
06  project time management06  project time management
06 project time management
 

En vedette

Successful Dispute Resolution
Successful Dispute ResolutionSuccessful Dispute Resolution
Successful Dispute ResolutionAcumen
 
Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen
 
Improved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentImproved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentAcumen
 
Schedule Risk Analysis
Schedule Risk AnalysisSchedule Risk Analysis
Schedule Risk AnalysisGd Suryawan
 
Schedule analysis what could possibly go wrong - Oracle Primavera Collaborat...
Schedule analysis what could possibly go wrong  - Oracle Primavera Collaborat...Schedule analysis what could possibly go wrong  - Oracle Primavera Collaborat...
Schedule analysis what could possibly go wrong - Oracle Primavera Collaborat...p6academy
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Pedram Danesh-Mand
 

En vedette (6)

Successful Dispute Resolution
Successful Dispute ResolutionSuccessful Dispute Resolution
Successful Dispute Resolution
 
Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012
 
Improved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentImproved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric Assessment
 
Schedule Risk Analysis
Schedule Risk AnalysisSchedule Risk Analysis
Schedule Risk Analysis
 
Schedule analysis what could possibly go wrong - Oracle Primavera Collaborat...
Schedule analysis what could possibly go wrong  - Oracle Primavera Collaborat...Schedule analysis what could possibly go wrong  - Oracle Primavera Collaborat...
Schedule analysis what could possibly go wrong - Oracle Primavera Collaborat...
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
 

Similaire à Taming an Unruly Schedule with the 14 Point Schedule Assessment

Why Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceWhy Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceAcumen
 
PertGanttchart
PertGanttchartPertGanttchart
PertGanttchartlearnt
 
Benchmarking Project Schedules
Benchmarking Project SchedulesBenchmarking Project Schedules
Benchmarking Project SchedulesAcumen
 
TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615EqraBaig
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckSHAZEBALIKHAN1
 
Analyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionAnalyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionMichael Pink
 
IRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project ScheduleIRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project ScheduleIRJET Journal
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxbriancrawford30935
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksSHAZEBALIKHAN1
 
Scheduling in poorly
Scheduling in poorlyScheduling in poorly
Scheduling in poorlyKrishnagnr
 
Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]Hariharan Ponnusamy
 
Best Project Scheduling Techniques.
Best Project Scheduling Techniques.Best Project Scheduling Techniques.
Best Project Scheduling Techniques.NIILM University
 
As built programmes (7 Apr 2020) Part 1
As built programmes (7 Apr 2020) Part 1As built programmes (7 Apr 2020) Part 1
As built programmes (7 Apr 2020) Part 1David Greig
 

Similaire à Taming an Unruly Schedule with the 14 Point Schedule Assessment (20)

Why Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceWhy Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct Science
 
PertGanttchart
PertGanttchartPertGanttchart
PertGanttchart
 
Benchmarking Project Schedules
Benchmarking Project SchedulesBenchmarking Project Schedules
Benchmarking Project Schedules
 
TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615
 
Project management
Project managementProject management
Project management
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
CSC-1986.original
CSC-1986.originalCSC-1986.original
CSC-1986.original
 
Analyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionAnalyzing data, performance and impacts in construction
Analyzing data, performance and impacts in construction
 
IRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project ScheduleIRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project Schedule
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
 
Project time
Project timeProject time
Project time
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & Tricks
 
Scheduling in poorly
Scheduling in poorlyScheduling in poorly
Scheduling in poorly
 
Critical path
Critical pathCritical path
Critical path
 
Critical path
Critical pathCritical path
Critical path
 
Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]
 
PMBOK7-201-300.pdf
PMBOK7-201-300.pdfPMBOK7-201-300.pdf
PMBOK7-201-300.pdf
 
Best Project Scheduling Techniques.
Best Project Scheduling Techniques.Best Project Scheduling Techniques.
Best Project Scheduling Techniques.
 
As built programmes (7 Apr 2020) Part 1
As built programmes (7 Apr 2020) Part 1As built programmes (7 Apr 2020) Part 1
As built programmes (7 Apr 2020) Part 1
 

Plus de Acumen

Simplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskSimplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskAcumen
 
Benchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueBenchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueAcumen
 
Fuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyFuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyAcumen
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Acumen
 
Meet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationMeet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationAcumen
 
Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Acumen
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentAcumen
 
Smarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceSmarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceAcumen
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen
 
Acumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen
 
2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit Keynote2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit KeynoteAcumen
 
Calgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessCalgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessAcumen
 
Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360Acumen
 
Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Acumen
 
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAchieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAcumen
 
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Acumen
 
Fuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPCFuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPCAcumen
 
Fuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project ComplianceFuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project ComplianceAcumen
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen
 
Acumen Fuse Independent Review
Acumen Fuse Independent ReviewAcumen Fuse Independent Review
Acumen Fuse Independent ReviewAcumen
 

Plus de Acumen (20)

Simplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskSimplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen risk
 
Benchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueBenchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned Value
 
Fuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyFuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / Energy
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?
 
Meet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationMeet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent Acceleration
 
Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
 
Smarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceSmarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project Performance
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case Study
 
Acumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule Integration
 
2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit Keynote2011 Acumen Annual Summit Keynote
2011 Acumen Annual Summit Keynote
 
Calgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessCalgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project Success
 
Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360Intelligent Project Acceleration: An Introduction to Acumen 360
Intelligent Project Acceleration: An Introduction to Acumen 360
 
Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0
 
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAchieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
 
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
 
Fuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPCFuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPC
 
Fuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project ComplianceFuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project Compliance
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops Overview
 
Acumen Fuse Independent Review
Acumen Fuse Independent ReviewAcumen Fuse Independent Review
Acumen Fuse Independent Review
 

Dernier

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 

Dernier (20)

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 

Taming an Unruly Schedule with the 14 Point Schedule Assessment

  • 1. // Taming an Unruly Schedule Using the 14-Point Schedule Assessment Dr. Dan Patterson, PMP CEO & President, Acumen February 2010 +1 512 291 6261 // info@projectacumen.com www.projectacumen.com
  • 2. Table of Contents Introduction ................................................................................................................. 3 The 14-Point Assessment ............................................................................................ 3 Basis of Assessment and “Total” Activities ................................................................. 3 The Assessment Checks ............................................................................................... 4 Check #1: Logic .................................................................................................... 4 Figure 1 - Logic Checks ........................................................................................ 5 Checks #2, #3 and #4: Leads, Lags and Logic Types ........................................... 5 Check #5: Hard Constraints ................................................................................. 6 Figure 2 – Combining Metrics to Validate 14-Point Tripwire Exceptions .............. 7 Checks #6, #7 and #8: High Float, Negative Float, High Duration and Schedule Path Analysis™ ................................................................................................... 7 Figure 3 – Combining Float, Duration Checks with Network Path Analysis (NPA). 8 Checks #9, #10 and #11: Invalid Dates, Resources and Missed Baseline ............ 9 Checks #12, #13 and #14 .................................................................................... 9 Conclusions ............................................................................................................... 10 +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 2
  • 3. Introduction This paper discusses why the emerging 14-Point Schedule Assessment, developed by the Defense Contract Management Agency (DCMA), is fast becoming an established standard within the scheduling community across multiple industries. In addition to discussing the benefits of a 14-Point Assessment, this paper also discusses how further value can be provided through additional schedule metrics as well as alternate means of slicing and dicing projects for analysis including a technique known as Schedule Path Analysis™ (SPA). The 14-Point Assessment The 14-Point Assessment is 14 separate checks that are run against a CPM (Critical Path Method) project schedule in order to assess quality and structural integrity. The checks mainly focus on the integrity of a planned schedule but also touch on how well a project schedule is performing during the execution phase. Is the 14-Point Assessment an all-encompassing schedule critique? No, but it does go a long way towards providing a sound framework for developing schedule analysis. Projects fail due to a combination of poor planning and execution1 and so anything that can be done to better establish a sound basis of schedule, the greater chance of project success. Basis of Assessment and “Total” Activities Schedules can contain many types of activity (normal, summary, milestones, level of effort, etc.) in multiple states (planned, in progress and complete). Additional complexities such as multiple calendars, resource constraints and many more factors all contribute to scheduling being a highly complicated science. 1 (ref. DE Patterson, Jan 2010, “Why Scheduling Mustn’t be Allowed to Become an Extinct Science”, www.projectacumen.com/whitepapers ) +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 3
  • 4. The 14-Point Assessment focuses on what are known as “Total Activities”. A total activity is defined as a non-complete activity that is not a summary, level of effort, nor milestone (i.e. is a normal activity either that is currently planned or in progress). By filtering out the likes of summary activities that are really just grouping representations of the true work defined in a ‘normal’ activity, the 14-Point Assessment provides a non- skewed perspective of the remaining work left in the schedule. Eliminating milestones has the added benefit of avoiding double dipping on results. At first glances, it may seem wrong to eliminate milestones from say a logic check (as milestones can be integral parts of a schedule and sequence of work and deliverables). However, any logic issues leading into or out of a milestone activity will automatically be picked up by the Total Activity leading into or out of the milestone in question. In short, focusing on Total activities provides an effective means of running schedule analysis checks on those activities that matter—i.e., those that carry remaining work. The Assessment Checks The majority of the checks focus on the planning phase of a project. However, checks nine and eleven (“Invalid Dates” and “Missed Baseline”) focus on performance and statusing during execution. The following section reviews the standard 14-Point Schedule checks as well as describes additional complimentary checks that can provide further insight into schedule compliance. Check #1: Logic The logic check catches those total activities that have missing logic. While the 5% target threshold tripwire is important, the bigger question is why is logic so important in a schedule? Project completion dates within schedules are driven by two key factors: duration and sequence of activities. Getting the sequence wrong in a schedule can result in problems during execution (“you can’t build the walls before you lay the foundation” type of scenario) but much worse than this, get a logic link wrong in the plan and the +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 4
  • 5. completion date (driven by the critical path) may likely be incorrect. This can have horrendous implications on more than just completion dates extending into missed schedule hot spots and overly optimistic cost forecasting. The flip side to missing logic is the scenario of having too much logic on an activity! Having a high number of successors makes the activity key with regards to it having a potential impact on multiple successors. Consider the example in Figure 1. The standard 14-Point Check for Logic has correctly pinpointed activity 2 as having an open ended logic link. Additionally, if we also apply a metric to report activities with three or more links, then activity 5 triggers the tripwire. This additional check on logic ensures that our schedule is both correctly linked as well as not ‘over linked’ with regards to complexity. Figure 1 - Logic Checks Checks #2, #3 and #4: Leads, Lags and Logic Types In addition to validating whether correct logic is present, the 14-Point Assessment checks for whether logic links carry lags and leads (negative lags). Leads and lags are +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 5
  • 6. used to either delay or accelerate the sequence of activities and can be dangerous for several reasons. Firstly, they are often used to adjust CPM dates to fit a target requirement and secondly if they are used to represent true delays (such as bidding period or concrete curing for example), then they become difficult to manage, status and control during execution. In short, they hide detail in the schedule. Using non standard logic types other than FS (finish to start) can also be the cause of unrealistic planning. The 14-Point Assessment states that at least 75% of logic links must be of type FS (rather than SS, FF, SF). Failing test #4 (logic types) shouldn’t automatically be seen as schedule failure. Instead, use this test as a means of validating the use of different logic types. Review and defend/reject the non standard logic types and consider the combined use of SS, FF activity logic. Check #5: Hard Constraints A constraint is an artificial date applied to an activity. Constraints can be one or two way e.g. start no earlier than (one way) or must start on (two way). One way constraints can have a valid role within a schedule but should be avoided if possible. Two way constraints should be avoided at all times as they go against the very essence of CPM scheduling when calculating Start and Finish dates. Interestingly, there are instances where the use of a constraint can be used to address an open end within a schedule. Consider the example where a schedule is part of a larger picture and an activity is dependent on say the deliverable from another project. If we are not able to link the projects together (perhaps the deliverable is from a sub- contractor), then our activity in question cannot tie back to a predecessor because it doesn’t exist. Yet if there is a “not before” delivery date on the predecessor activity from the external project, then using a Start no Earlier Than constraint to ‘tie-off’ the open end is quite justified. On the surface, figure 2 shows two schedule issues (one logic and one constraint). Yet when a comparison of the two exceptions is carried out, it turns out they are the same +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 6
  • 7. activity and have valid reason for being present i.e., open-ended with a constraint to model correct linkage back to an external driving deliverable. Figure 2 – Combining Metrics to Validate 14-Point Tripwire Exceptions Checks #6, #7, and #8: High Float, Negative Float, High Duration, Schedule Path Analysis™ Schedule checks for high float, negative float and high duration all provide opportunity for schedule improvement. While high float activities are generally seen as bad, they should also be seen as opportunities for adding additional concurrent work to the schedule without impacting the critical path. This opportunity should only be pursued however, once we are certain that the reason for high float is truly because of the small amount of work in a path and not because of artificial schedule constraints (see checks #1, 2, 3, 4, 5). Negative float while generally a bad thing should be seen as a great way of pinpointing impossible scenarios within a schedule. Likewise high duration activities should be further scoped out to provide additional detail and control. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 7
  • 8. One extremely powerful means of analyzing these three metrics is to look at what we define as Schedule Path Analysis2 (SPA). SPA determines all network path sequences between any two points within a schedule. Combine this with metrics such as High Float and Remaining Duration to have the ability to determine which sequence of activities will give us the biggest benefit in terms of either acceleration or adding additional work to the sequence. Figure 3 shows an example of three parallel paths leading to a completion milestone. By using the 14-Point Check # 6 (high float) metric, we can see that path #2 has two activities with float of over two months (the DCMA tripwire for high float). While at first glances, this appears to be a weakness, in reality, if the logic is sound (which it is through checks 1 through 5) then there is actually an opportunity for paths 2 and 3 to have additional work added to them and thus help accelerate the schedule. In fact by looking at the difference between remaining duration (50 days) and ribbon length (139 days) for path #2, we can see that we have 89 days of potential opportunity for adding additional work to that specific path without impacting the project finish date. Figure 3 – Combining Float, Duration Checks with Network Path Analysis (NPA) 2 SPA is a registered trademark of Acumen PM LLC +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 8
  • 9. Checks #9, #10 and #11: Invalid Dates, Resources and Missed Baseline These three metrics pertain more to project performance tracking than planning. While very useful, their depth of coverage for project performance tracking is somewhat limited with many more additional metrics available for more detailed performance tracking. The topic of another whitepaper3, additional performance metrics to consider include “the number of activities that started or are planned ahead of a given baseline” (rather than just focusing on those that slipped) and “the number of activities that actually accelerated during execution” – that is they started late and yet made up enough time to finish early. Checks #12, #13 and #14 Check 12 is nothing more than a critical path integrity check ensuring that a delay on the critical path will have a visible knock-on effect on project completion. If the schedule passes the other schedule checks already discussed, then this test should not be an issue. Checks 13 and 14 are known as Tripwire Checks. Check 13 examines the length of the critical path relative to the total float of the project. If the forecast completion date is after the end of the critical path, then there is a much higher chance of project success, than an aggressive target date that is prior to the critical path completion. Similar comparisons between schedule and target completions should also be carried out on interim milestones throughout the project. Check #14 is a measure of how many tasks have been completed relative to the number of tasks that were planned to have been completed. While a useful high-level indicator of performance, additional checks can also be applied. Rather than looking at just the number of activities, it is more valuable to look at the number of days work remaining and compare this between the current schedule and a given target or baseline. Similarly, looking at whether any variation from plan causes the project to be more front-loaded or back-loaded with regards to work remaining is an 3 See www.projectacumen.com/whitepapers for additional information on project performance tracking. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 9
  • 10. excellent means of determining whether the ‘bow-wave’ of upcoming work is slipping or accelerating. Finally, comparing remaining work with a baseline forecast by period (e.g. by week, month, quarter), is a powerful means of forecasting when potential execution bottlenecks may occur. Conclusions The14-Point Assessment is an excellent starting point for schedule assessment. It contains a sound mix of schedule and performance critiques that can be used to improve the quality and maturity of a schedule. Additional metrics and perspectives give a more in-depth view into schedule quality. Looking at results in a time-phased manner as well as by the likes of Acumen’s patented ribbons provides a unique insight that cannot be gained from a more traditional Gantt-chart based schedule analysis. Other perspectives gained through the likes of Schedule Path Analysis™ provide a more proactive approach to schedule acceleration and should be used in combination with the standard schedule checks within the 14-Point Assessment. +1 512 291 6261 // info@projectacumen.com www.projectacumen.com 10