             Other Thermal Plants in India




                        Durgapur Works
                                                                                              Haldia Complex
                    Location: West Bengal                                                    Location: West Bengal
              Operator: Phillips Carbon Black Ltd                                     Operator: Haldia Petrochemicals Ltd
                Configuration: 1 X 30 MW CHP                                  Configuration: 2 X 52-MW steam, 2 X 23 MW gas
                          Fuel: tailgas                                                            turbine CHP
                         Operation: 2008                                                          Fuel: naphtha
                     Boiler supplier: BHEL                                                    Operation: 1999-2000
     T/G supplier: Hangzhou, Greenesol Power Systems                                            Boiler supplier: ??
         Quick facts: In Oct 2008, PCB started-up this                                          T/G supplier: ABB
      captive power plant at a cost of Rs1bn. The plant                            EPC: Larsen & Toubro, Sargent & Lundy
       was commissioned in April 2009. PCB is India’s                       Quick facts: Haldia Petrochem is a $1.2bn complex with a
       largest carbon black producer and a company of                          naphtha cracker unit and associated plants which
     RPG Enterprises. The new cogen plant fires tail gas                     manufacture LLDPE, HDPE, polypropylene, and other
         from the carbon black manufacturing process.                          chemicals. It is owned by West Bengal Industrial
                Surplus power is sold to CESC.                                Development Corp, Chatterjee Petrochem, and Tata
                                                                                                      Group.
            Photograph courtesy of Phillips Carbon Black Ltd
                         Posted 5 May 2010                                            Photograph courtesy of Larsen & Toubro
                                                                                               Posted 18 Aug 2007


    Abbreviations

    Data: industcards, Platts UDI World Electric Power Plants Data Base


    Updated 05/05/10

    Home




  industcards.com/st-other-india.htm                                                                                     1/1
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                         st-coal-india-ap




                 Coal-Fired Plants in Andhra
                          Pradesh




               Dr Narla Tata Rao (Vijayawada)
                    Location: Andhra Pradesh                               Nalgonda KVK
      Operator: Andhra Pradesh Power Generation Corp                  Location: Andhra Pradesh                                                           Paloncha
                    Configuration: 6 X 210 MW                     Operator: KSK Energy Ventures                                                  Location: Andhra Pradesh
                       Operation: 1979-1995                           Configuration: 1 X 43 MW                                              Operator: Nava Bharat Ventures Ltd
                            Fuel: coal                                     Operation: 2007                                                       Configuration: 1 X 50 MW
                       Boiler supplier: BHEL                                   Fuel: coal                                                             Operation: 1996
                        T/G supplier: BHEL                                Boiler supplier: ??                                                            Fuel: coal
                          EPC: WAPCOS                                    T/G supplier: BHEL                                                 Boiler supplier: Krupp India, Lentjes
       Quick facts: Vijayawada TPS Stage-I cost Rs193     Ouick facts: Construction started in Apr 2006 on                                    T/G supplier: LMZ, Electrosila
     crores while Stage-II cost Rs511 crores and Stage- this captive power project for Zuari Cement and Sri                         Quick facts: This CFB plant supplies a ferro-alloys
    III cost Rs840 crores. The plant had the highest load Vishnu Cement. Coal is from the Mahanadi fields.                          plant and sells surplus power to a local distribution
       factor in India from 1994-98 and again in 2001-02.         The total cost was Rs 167 crore.                                                       company.
          Vijayawada TPS received the government’s
       Meritorious Productivity Award for 20 consecutive        Photograph courtesy of KSK Energy Ventures                               Photograph courtesy of Nava Bharat Ventures Ltd
      years. The plant was renamed after former APSEB                      Posted 28 Jan 2007                                                         Posted 22 Jun 2007
               Chairman Dr N T Rao in Dec 2007.

     Photograph courtesy of Andhra Pradesh Power Generation Corp
                          Posted 14 Apr 2006




                    Ramagundam STPS                                          Rayalaseema-I
                  Location: Andhra Pradesh                              Location: Andhra Pradesh                                 Simhadri
         Operator: National Thermal Power Corp Ltd         Operator: Andhra Pradesh Power Generation Corp               Location: Andhra Pradesh
          Configuration: 3 X 200 MW, 4 X 500 MW                         Configuration: 2 X 210 MW                          Operator: NTPC Ltd
                     Operation: 1983-2005                                 Operation: 1994-1995                         Configuration: 2 X 500 MW
                     Fuel: bituminous coal                                      Fuel: coal                                   Operation: 2002
             Boiler supplier: B&W, Breda, BHEL                            Boiler supplier: BHEL                               Fuel: hard coal
           T/G supplier: Ansaldo, Siemens, BHEL                            T/G supplier: BHEL                             Boiler supplier: BHEL
     EPC: Development Consultants Private Ltd, BHEL          EPC: Shandong Electric Power Construction                     T/G supplier: BHEL
       Quick facts: This was the third of NTPC's super      Quick facts: Rayalaseema Stage-I cost Rs860     Quick facts: Two more units are being built at this
     thermal projects and supplies electricity to Andhra    crores while Stage-II cost Rs511.35 crores and                         site.
     Pradesh, Tamil Nadu, Karnakata, Kerala, Goa, and        Stage-III cost Rs840 crores. The plant had the
       Pondicherry. The site encompasses 10,630ac.          highest load factor in India from 1998-2001 and              Photograph courtesy of BHEL
        Average coal burn is 30,000tpd. A large-scale     again in 2002-04. Two more 210-MW units are under                 Posted 12 May 2004
      afforestation effort is underway in the plant area.           construction for service in 2007.

                      Photograph courtesy of BHEL                     Photograph courtesy of Andhra Pradesh Power Generation Corp
                          Posted 27 Jun 2007                                               Posted 14 Apr 2006


    Abbreviations

    Data: industcards, Platts UDI World Electric Power Plants Data Base


    Updated 02/14/10

  industcards.com/st-coal-india-ap.htm                                                                                   1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                               cc-india




    CCGT Plants in India - other states




                            Dabhol
                    Location: Maharashtra                                                                                        HPL Cogen
          Operator: Ratnagiri Gas and Power Pvt Ltd                                                                        Location: West Bengal
    Configuration: 1 X 670-MW, 2+1 CCGT, 2 X 740-MW                                                                 Operator: Haldia Petrochemicals Ltd
             2+1 CCGT with 9001 FA gas turbines                                                            Configuration: 110-MW, 2+1 CCGT with 6551B gas
            Fuel: naphtha, natural gas, distillate oil                                                               turbines, 17-MW steam set, CHP
                     Operation: 1999-2007                                         Dadri                     Fuel: naphtha, natural gas, LFO, refinery residues
               HRSG supplier: Vogt, Kawasaki                            Location: Uttar Pradesh                                Operation: 2000
                 T/G supplier: General Electric                           Operator: NTPC Ltd                                 HRSG supplier: L&T
                         EPC: Bechtel                    Configuration: Two 409-MW, 2+1 CCGT blocks with                   T/G supplier: GE, ABB
      Quick facts: Dabhol is on a 1,700ac coastal site                      V94 gas turbines                                    EPC: L&T/S&L
       about 160km south of Mumbai. It was originally                     Fuel: natural gas, oil            Quick facts: In Aug 1997, the engineering contract
    developed by Enron and budgeted at $2.8bn with 3 X                   Operation: 1992-1994               for this CCGT at the HPL works in Midanpore Dist
      695-MW CCGT blocks an an LNG terminal. After                        HRSG supplier: Biro              was awarded to L&T. This integrated naphtha-based
     7yrs of development, Unit-1 was dedicated in May                T/G supplier: Siemens, BHEL             petrochemical complex is at Haldia, a major river
     1999, about 2yrs behind the original schedule. The                  EPC: Lahmeyer, Tata                     port town about 60km from Kolkata at the
    $1.8bn Phase-II financing closed in Apr 1999 and in Quick facts: This is one of the early Indian CCGT    confluence of Hugli and Haldi Rivers. The cracker
    Jun, a $300mn order was placed with GE for two CC       plants. The site is on the Upper Ganga Branch    and associated process units produce ethylene,
       209FA blocks. From Jan to May 2001, the four      Canal in Gautambudhnagar District. Ga is supplied propylene, and other materials. HPL Cogeneration
     Phase II GTs were progressively synchronized and     from the HBJ Pipeline. The plant cost Rs 960.35    Ltd was set up as a 49:51 power generation joint
    steam blows completed on the HRSGs. The Dabhol- Crore and was built with financing assistance from       venture between HPL and L&T, but in May 2008,
    2 steam turbine was rolled in April and the Dabhol-3                           KfW.                       HPL bought out the L&T stake and also began
     steam set was nearly ready for testing when work                                                       preparations to partially switch the plant to natural
      was halted on 17 Jun 2001. In May 2001, MSEB                     Photograph courtesy of Siemens
                                                                                                            gas. Two auxiliary boilers and duct-firing systems
                                                                            Posted 25 Oct 2007
      unilaterally rescinded the DPC PPA and Dabhol                                                        allow for the production of up to 480 tph of process
           Phase I was shutdown. Finally, the state                                                             steam. In 2006, Evonik obtained a 6yr O&M
     government and other parties took over the project,                                                                 contract for the HPL plant.
     which gradually returned to service during 2006/07,
        first on naphtha and finally on natural gas as                                                                  Photograph courtesy of Evonik India
                                                                                                                               Posted 14 Mar 2010
                      originally designed.

                   Photograph by Boneyjoe
                     Posted 9 Sep 2007




                                                                              Kathalguri                                            Kayamkulam
                         Karuppur                                          Location: Assam                                         Location: Kerala
                    Location: Tamil Nadu                   Operator: Northeastern Electric Power Corp Ltd                        Operator: NTPC Ltd
                Operator: Aban Power Co Ltd             Configuration: Three 97-MW, 2+1 CCGT blocks with Configuration: 360-MW, 2+1 CCGT with 9001E gas
    Configuration: 120-MW, 1+1 CCGT with 6001FA gas     6001 gas turbines (Block 1) and M251 gas turbines                              turbines
                           turbine                                           (Blocks 2&3)                                           Fuel: naphtha
                          Fuel: gas                                        Fuel: natural gas                                       Operation: 1998
                      Operation: 2005                                   Operation: 1995-1998                                    HRSG supplier: NEM
                  HRSG supplier: Thermax                                  HRSG supplier: ??                                   T/G supplier: GE, BHEL
                   T/G supplier: GE, DDIT                       T/G supplier: GE, BHEL, MHI, Melco                  EPC: Development Consultants Private Ltd
                        EPC: BHEL                          Quick facts: This project was largely funded by    Quick facts: In Nov 1998, NTPC commissioned the
    Quick facts: This CCGT plant was commissioned on    Japan Bank for International Cooperation. In addition      first gas turbine at the Kayamkulam plant at
        11 Aug 2005 and uses natural gas from the        to building the CCGT plant to use Assam’s natural     Choolatheruvu, Alappuzha district. The plant was
                                                                                                              f ll          i i     d i O t b 1999 b t        littl
  www.industcards.com/cc-india.htm                                                                                       1/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                   cc-india
    Kuttalam gas field in Thanjavur Dist, Tamil Nadu. All      gas reserves, funding was made available for a      fully commissioned in October 1999, but was little
     power generated is sold to Tamil Nadu Electricity        substantial associated transmission system. At           used initially since its only available fuel was
       Board. GEA supplied an air-cooled condenser           completion, Kathalguri was able to supply 25% of       naphtha. Financial assistance for the Rs1,190cr
                                                              electricity demand in the Northwest Region and      scheme was obtained from the World Bank. Three
               Photograph courtesy of Aban Group            helped to alleviate regional power shortages that had       650-MW CC blocks are in development at
                      Posted 10 Feb 2007
                                                                    steadily worsened during the 1990s.           Kayamkulam, which is also known as Rajiv Gandhi.

                                                                          Photograph courtesy of BHEL                               Photograph by David Appleyard
                                                                             Posted 13 May 2006                                          Posted 25 Jan 2006




                                                                                   Tanirbavi
                                                                              Location: Karnataka
                                                                             Operator: GMR Energy
                                                            Configuration: 220-MW, 4+1 CCGT power barge with
                                                                             M6000PC gas turbines
                                                                                  Fuel: naptha
                            Regency
                                                                                Operation: 2000                                              Uran
                     Location: Tamil Nadu
                                                                            HRSG supplier: Hyundai                                  Location: Maharashtra
               Operator: KSK Energy Ventures
                                                                    T/G supplier: General Electric, Alstom           Operator: Maharashtra State Power Generation Co
      Configuration: 59-MW, 1+1 CCGT with 6001 gas
                                                                              EPC: Hyundai, TCE                                               Ltd
                           turbine CHP
                                                              Quick facts: In Oct 1999, Hyundai won a $160mn         Configuration: 4 X 60 MW V93 GT (Unit-1 scrapped
                             Fuel: gas
                                                              contract to build the Tanirbavi barge-based CCGT        2003), 2 X 336-MW, 2+1 CCGT blocks withV94.2
                         Operation: 2006
                                                              plant. Financing closed in September 2000 and in                           gas turbines
                      HRSG supplier: ??
                                                              Apr 2001 the American ExIm approved $5.1mn in                          Fuel: natural gas, oil
                      T/G supplier: BHEL
                                                              support for the $207mn project, which at the time,                    Operation: 1982-1994
                   EPC: Toyo Engineering
                                                              was owned by PSEG Global and GMR in a 49:51                    HRSG supplier: Deutsche Babcock
      Quick facts: In Feb 2005, BHEL received a Rs84
                                                            joint venture. The 106m barge was built in Ulsan and                    T/G supplier: Siemens
     crore equipment contract for this industrial CHP at
                                                              moored in the Gurupur River in Mangalore. Metso                  EPC: Siemens, Lahmeyer, Tata
          Kallugurani village in Ramanathpuram Dist.
                                                               Automation supplied its maxDNA digital control         Quick facts: Uran power station is near Bokadvira
    Financial closure was in Aug 2005. Regency Power
                                                               system. Simple-cycle operations started in Jun        Village, 1km away from Uran town and 55Km from
      Corp was set-up to build the plant for a number of
                                                               2001 when it was considered the largest single-         Mumbai by road. The site is surrounded on three
     industrial customers including Regency Ceramics,
                                                             barge, generating facility in the world. In Oct 2002,      side by the Arabian Sea. Uran cost about Rs
    Brakes India, Lakshmi Mills, and Orchid Chemicals.
                                                             PSEG sold its stake in Tanirbavi for $45mn. In Jun        1,118.5 Crores. Grid connection is by 4 X 220Kv
      KSK was responsible for project implementation,
                                                              2008, the original PPA expired and, in Sep 2009,       lines to Apta S/S and 2 X 220kV lines to Kharghar
          permitting, procurement, and the wheeling
                                                               GMR announced it would move the barge power                                   S/S.
       arrangement with TNEB. Natural gas is from the
                                                             plant to Kakinda in Andhra Pradesh starting in Jan
                          Cauvery basin.                                                                             Photograph courtesy of Maharashtra State Power Generation Co
                                                                2010. The 1,200km move and dredging on the
                                                                                                                                                 Ltd
           Photograph courtesy of KSK Energy Ventures         Godavari River upstream from Kakinda cost about
                                                                                                                                          Posted 3 Feb 2010
                      Posted 21 Jan 2007                         R245cr. Fuel at the new site will be LNG and
                                                              operation is expected in April 2010. GMR plans to
                                                               retain the 30ac Mangalore site plus associated
                                                                     infrastructure for possible future use.

                                                                       Photograph courtesy of GMR Energy
                                                                               Posted 4 Feb 2004




                                                                                   Valuthur
                                                                             Location: Tamil Nadu
                                                                   Operator: Tamil Nadu Electricity Board
                                                             Configuration: 95-MW, 1+1 CCGT with 6001FA gas
                                                            turbine, 92-MW, 1+1 CCGT with V643.A gas turbine
                                                                                   Fuel: gas
                                                                            Operation: 2002-2008
                                                                           HRSG supplier: Alstom
                                                               T/G supplier: BHEL, Siemens/Ansaldo, Alstom
                                                                                  Power India
                                                              EPC: Fichtner India, BHEL, Vasavi Power, GEA
                                                                              India, Dastur & Co

  www.industcards.com/cc-india.htm                                                                                       2/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                          st-coal-india-chh-or




               Coal-Fired Plants in India -
                 Chhattisgarh & Orissa




                                                                              Hirakud Smelter
                                                                                                                                    Jharsuguda CPP
                                                                               Location: Orissa
                              Bhilai                                                                                                 Location: Orissa
                                                                      Operator: Hindalco Industries Ltd
                    Location: Chhattisgarh                                                                                 Operator: Vedanta Resources plc
                                                                  Configuration: 1 X 67.5 MW, 3 X 100 MW
          Operator: NTPC-SAIL Power Co (P) Ltd                                                                                  Configuration: 9 X 135 MW
                                                                            Operation: 1994-2008
                  Configuration: 2 X 250 MW                                                                                        Operation: 2008-2010
                                                                                  Fuel: coal
                     Operation: 2008-2009                                                                                                Fuel: coal
                                                                  Boiler supplier: ISGEC John Thompson,
                            Fuel: coal                                                                                           Boiler supplier: Shanghai
                                                                       ThyssenKrupp Industries India
                     Boiler supplier: BHEL                                                                                        T/G supplier: Shanghai
                                                                             T/G supplier: BHEL
                      T/G supplier: BHEL                                                                                             EPC: SEPCO-III
                                                                Quick facts: The Hirakud smelter and power
                           EPC: BHEL                                                                             Quick facts: In Feb 2004, Lanco Amarkantak Power
                                                            complex is located in Sambalpur Dist on the banks
    Quick facts: This plant was built to supply electricity                                                      issued an RFQ for the EPC contract for its proposed
                                                              of the world’s longest earthen dam, the 25.8km
      to the Bhilai Steel Works and other SAIL units.                                                             250-MW coal-fired plant at Pathadi village in Korba
                                                              Hirakud Dam spanning the Mahanadi river. The
     Excess output is sold into India's Western Grid.                                                                District. In the event, two 300-MW sets were
                                                             Hirakud smelter, set up by Indal in 1959, was the
    Unit-1 went commercial on 22 Apr 2009, followed by country’s second aluminium smelter operating on             ordered from Dongfang. The first unit came online
                    Unit-2 on 21 Oct 2009.                                                                        about 2yrs past the original schedule. Total cost of
                                                             power sourced from the hydro power station of the
                                                                                                                    Phase-I was about $275mn. The project has a
                                                             Hirakud Dam. In 1993, Indal built India’s first CFB
         Photograph courtesy of NTPC-SAIL Power Co (P) Ltd                                                         400kV switchyard and a 32km, 400kV tie-line to
                                                             captive power plant. Three more steam sets were
                       Posted 14 Feb 2010                                                                          PGCIL’s 400kV Korba-Seepat line. Phase-II is to
                                                            added starting about 10yrs later, each supplied by
                                                                                                                       consist of 2 X 660 MW supercritical sets.
                                                                              three CFB boilers.
                                                                                                                             Photograph by painkiller416 (Panoramio)
                                                                         Photograph courtesy of Power
                                                                                                                                       Posted 3 Oct 2010
                                                                             Posted 11 Nov 2009




                                                                                                                                          O P Jindal
                     Jharsuguda Sterlite                                                                                            Location: Chhattisgarh
                       Location: Orissa                                                                                           Operator: Jindal Power Ltd
                 Operator: Sterlite Energy Ltd                                                                                    Configuration: 4 X 250 MW
                                                                             Kharagprasad
                  Configuration: 4 X 600 MW                                                                                          Operation: 2007-2008
                                                                             Location: Orissa
                     Operation: 2010-2011                                                                                                  Fuel: coal
                                                                   Operator: Nava Bharat Ventures Ltd
                          Fuel: coal                                                                                                 Boiler supplier: BHEL
                                                                        Configuration: 1 X 30 MW
                    Boiler supplier: Harbin                                                                                           T/G supplier: BHEL
                                                                             Operation: 2003
                    T/G supplier: Dongfang                                                                                          EPC: BHEL, Punj Lloyd
                                                                                 Fuel: coal
                       EPC: SEPCO-III                                                                                 Quick facts: This is the largest coal-fired IPP in
                                                                            Boiler supplier: ??
    Quick facts:On 21 Aug 2010, Shri Naveen Patnaik ,                                                               India. A second phase with 4 X 600-MW units is on
                                                                             T/G supplier: ??
     Chief Minister of Orissa, dedicated this IPP to the                                                            order. The plant is named after Om Prakash Jindal,
                                                            Quick facts: The plant supplies a ferro-alloys plant
    People of Orissa. The total project cost is estimated                                                          the late founder of O P Jindal Group. The associated
                                                              and sells surplus power to a local distribution
    to be Rs8,200cr. The Sterlite project has India’s first                                                         mine is the largest in the private sector and it has a
                                                            company. A 64-MW unit is being added to the site.
     hydrid ESP with baghouse, four 150m natural draft                                                                 6mn tpy coal washery, also the largest in the
        cooling towers and two 275m stacks. Sterlite            Photograph courtesy of Nava Bharat Ventures Ltd       country. The facility has a 7km overland covered
     Energy is a subsidiary of Sterlite Industries, India's                  Posted 22 Jun 2007                     conveyor from the mine facility, the longest in India.
      largest non-ferrous metals and mining company,                                                                  The tie-line to the grid is a 258km, double-circuit
     and in turn a subsidiary of Vedanta Resources plc.                                                            400kV installation built in 1.5yrs. It was built without
                                                                                                                           any joint-venture with PowerGrid Corp.
              Photograph courtesy of www.indiacsr.in


  industcards.com/st-coal-india-chh-or.…                                                                                 1/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                      st-coal-india-chh-or
                           Posted 3 Oct 2010                                                                                       Photograph courtesy of Jindal Steel and Power Ltd
                                                                                                                                                 Posted 31 Oct 2009




                             Pathadi-I
                      Location: Chhattisgarh
         Operator: Lanco Amarkantak Power Pvt Ltd                                                                                             Rourkela Phase-II
                    Configuration: 2 X 300 MW                                                                                                   Location: Orissa
                       Operation: 2009-2010                                                 Raigarh                                Operator: NTPC-SAIL Power Co (P) Ltd
                             Fuel: coal                                              Location: Chhattisgarh                                Configuration: 2 X 60 MW
                     Boiler supplier: Dongfang                                 Operator: Jindal Steel and Power                              Operation: 1987-1988
                      T/G supplier: Dongfang                                 Configuration: 2 X 21 MW, 2 X 55 MW                                    Fuel: coal
              EPC: MMC Corp, Shapoorji Palonji                                       Operation: 1994-2004                                    Boiler supplier: Rafako
    Quick facts: In Feb 2004, Lanco Amarkantak Power                                    Fuel: waste coal                                      T/G supplier: BHEL
    issued an RFQ for the EPC contract for its proposed                              Boiler supplier: BHEL                     Quick facts: This is the second phase of a captive
     250-MW coal-fired plant at Pathadi village in Korba                           T/G supplier: BHEL, DDIT                    power plant at Rourkela Steel Works. Operations
         District. In the event, two 300-MW sets were                                                                           were taken over by NTPC-SAIL power in March
      ordered from Dongfang. The first unit came online                    Photograph courtesy of Jindal Steel and Power Ltd                          2001.
     about 2yrs past the original schedule. Total cost of                                Posted 1 Feb 2004
        Phase-I was about $275mn. The project has a                                                                               Photograph courtesy of NTPC-SAIL Power Co (P) Ltd
      400kV switchyard and a 32km, 400kV tie-line to                                                                                            Posted 14 Feb 2010
      PGCIL’s 400kV Korba-Seepat line. Phase-II is to
          consist of 2 X 660 MW supercritical sets.

               Photograph by V A Chakrarthy (Panoramio)
                          Posted 2 Jun 2010




                                                                                          Talcher STPS
                                                                                         Location: Orissa
                                                                           Operator: National Thermal Power Corp Ltd
                                                                                    Configuration: 6 X 500 MW
                                                                                       Operation: 1995-2006
                                                                                       Fuel: bituminous coal
                                                                                   Boiler supplier: Stein, BHEL
                                                                                    T/G supplier: ABB, BHEL
                                                                                   EPC: Fouress, Tata Projects
                                                                        Quick facts: This is India's second largest power
                                                                      plant. Fuel is mainly from Coal India Ltd’s Mahanadi
                                                                       Coalfield Ltd. Talcher was originally established by
                                                                      the Government of Orissa and subsequently sold to
                                                                        NTPC. However, the entire power generated from
                                                                                 TTPS is dedicated to the State.

                                                                                     Photograph courtesy of BHEL
                                                                                         Posted 25 Jun 2007




    Abbreviations

    Data: industcards, Platts UDI World Electric Power Plants Data Base


    Updated 10/03/10

    Home

  industcards.com/st-coal-india-chh-or.…                                                                                 2/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                         cc-india




          CCGT Plants in India - Gujarat




                           Baroda
                       Location: Gujarat
     Operator: Gujarat Industries Power Co Ltd (GIPCL)                                                                                     Dhuvaran
         Configuration: 1 X 145-MW 3+1 CCGT with                                 Bhander                                                Location: Gujarat
      6001BTG gas turbines, 1 X 160-MW, 1+1 CCGT                            Location: Gujarat                                Operator: Gujarat Urja Vikas Nigam Ltd
                    with 9001E gas turbine                             Operator: Essar Power Ltd                          Configuration: One 107 MW , 1+1 CCGT with
                    Operation: 1992-1997                   Configuration: 165-MW,1+1 CCGT, 340-MW, 2+1               6001FA gas turbine, one 112 MW , 1+1 CCGT with
                       Fuel: natural gas                    CCGT, 1 X 110 CHP gas turbine, all 9001E gas                              6001FA+e gas turbine
                    HRSG supplier: NEM                                           turbines                                                Fuel: natural gas
            T/G supplier: General Electric, BHEL                            Fuel: natural gas                                         Operation: 2004-2007
         Quick facts: GIPCL was formed by Gujarat                         Operation: 2007-2008                                         HRSG supplier: ??
    Electricity Board (now Gujarat Urja Vikas Nigam Ltd          HRSG supplier: Deltak, IHI, Hangzhou                                T/G supplier: GE, BHEL
    (GUVNL)), Gujarat State Fertilizers & Chemicals Lt           T/G supplier: Hitachi, BHEL, Siemens                EPC: Reliance Energy, BHEL, SEW Constructions
    (GSFC), Gujarat Alkalies & Chemicals Ltd (GACL), Quick facts: This plant was built out in three phases            Quick facts: This plant is near Khambhat in Anand
    and Petrofils Co-operatives Ltd. Output from the first  to support increasing power demand of Essar’s            District. The EPC award for the first block was made
       block at Baroda is distributed to the owners in                   Hazira steel complex.                          to BHEL in Oct 2001 for Rs 310 crore. In March
    proportion to their ownership while the second block                                                                 2004, BHEL was awarded a Rs 333 crore EPC
      was built as an IPP with power sales to GUVNL.                Photograph courtesy of Essar Power Ltd             contract for the second block, which has BHEL's
    Fuel is from Gujarat State Petroleum Corp and Niko                       Posted 3 Feb 2010                        first indigenously manufactured 6001FA machine.
      Resources, the operating partners of the Hazira
                             field.                                                                                      Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
                                                                                                                                        Posted 2 Nov 2008
       Photograph courtesy of Gujarat Industries Power Co Ltd
                       Posted 12 Sep 2007




                       Gandhar Complex
                        Location: Gujarat
                                                                                                                                            Hazira GSEG
      Operator: Indian Petrochemicals Corp Ltd (IPCL)                                  Hazira
                                                                                                                                           Location: Gujarat
     Configuration: 65-MW, 1+1 CCGT with 6001B gas                                Location: Gujarat
                                                                                                                           Operator: Gujarat State Energy Generation Ltd
               turbine, 2 X 45 MW LM6000 CHP                                 Operator: Essar Power Ltd
                                                                                                                        Configuration: 150-MW, 2+1 CCGT with GT8C gas
                   Fuel: naphtha, natural gas                   Configuration: 515-MW, 3+1 CCGT with 9001E gas
                                                                                                                                                turbines
                      Operation: 1996-2000                                            turbines
                                                                                                                                         Fuel: natural gas, oil
                      HRSG supplier: BHEL                                  Fuel: natural gas, naphtha, oil
                                                                                                                                         Operation: 2001-2002
                    T/G supplier: GE, BHEL                                     Operation: 1995-1997
                                                                                                                                       HRSG supplier: Hanjung
                           EPC: L&T                                           HRSG supplier: Hanjung
                                                                                                                                         T/G supplier: Alstom
       Quick facts: The IPCL complex a Gandhar was                                T/G supplier: GE
                                                                                                                              EPC: Fichtner India, Alstom, Evonik India
    developed after the discovery of oil and gas reserves                          EPC: Hanjung
                                                                                                                         Quick facts: GSEG is an IPP JV of Gujarat State
          in the region. Also promoting the site was            Quick facts: This was the first large-scale, multi-fuel
                                                                                                                        Petroleum Co, Gail, and Kribhco Fertilizer. GUVNL
      availability of ocean access, adequate freshwater         CCGT IPP in India. It went commercial in Oct 1997
                                                                                                                         is the offtaker. Plant COD was 1 Jun 2002 Evonik
      from the Narmada River, and salt. The foundation          and sells 300 MW to Gujarat Urja Vikas Nigam Ltd
                                                                                                                          India was owners engineer and later assisted in
    stone was laid in Oct 1989 and the final investment           (GUVNL) under a 20yr PPA signed in 1996. The
                                                                                                                          commissioning and repairs of initial mechanical
    clearance was granted in Mar 1992. The first phase           balance of plant output is sold to Essar Steel Ltd.
                                                                                                                                                 issues.
     included a 170,000 MTA VCM plant, 150,000 MTA
                                                                         Ph t     h     t   fE   P     Ltd
  industcards.com/cc-india-gujarat.htm                                                                                   1/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                   cc-india
    PVC plant, 115,000 MTA chlor-alkali plant, 130,000              Photograph courtesy of Essar Power Ltd
                                                                             Posted 3 Feb 2010                             Photograph courtesy of Evonik India
    MTA caustic soda plant, and captive power plant, all                                                                          Posted 14 Mar 2010
            commissioned by year-end 1996.

             Photograph courtesy of Larsen & Toubro
                      Posted 18 Aug 2007




                                                                               Paguthan
                                                                           Location: Gujarat
                                                              Operator: Gujarat Paguthan Energy Corp
                                                        Configuration: 655-MW, 2+1 CCGT block with V94.2
                                                                              gas turbines
                                                                       Fuel: natural gas, naphtha
                              Kawas                                         Operation: 1998
                        Location: Gujarat                         HRSG supplier: Deutsche Babcock
                       Operator: NTPC Ltd                               T/G supplier: Siemens
     Configuration: two 328-MW, 2+1 CCGT blocks with EPC: Siemens, TCE Consulting Engineers, Fichtner                                 Utran-1
                       9001E gas turbines               Quick facts: This was the third Indian IPP to go on-
                                                                                                                                Location: Gujarat
                 Fuel: natural gas, oil, naphtha         line, and the largest to that date. The developer of
                                                                                                                  Operator: Gujarat State Electricity Corp Ltd
                      Operation: 1992-1994              the $750mn plant was Gujarat Torrent Energy Corp
                                                                                                               Configuration: 165-MW, 3+1 CCGT with 6001 gas
                      HRSG supplier: CMI                   Ltd (GTEC), a consortium initially consisting of
                                                                                                                                      turbines
                      T/G supplier: Alstom                PowerGen (20%), local pharmaceutical company
                                                                                                                                Fuel: natural gas
                EPC: Alstom, Ebasco, Sogreah              Torrent Group (30%), Gujarat Power Corp (12%),
                                                                                                                              Operation: 1992-1993
       Quick facts: Kawas cost Rs 1560 Crore. Fuel is        and Siemens (10%). In Jul 1999, PowerGen
                                                                                                                               HRSG supplier: ??
    from the South Basin Gas Field and supplied by the announced that it was buying out Torrent’s interest,                 T/G supplier: GE, BHEL
       HBJ Pipeline. Power is sold to many states and      the first such transaction in India. In Dec 2000,
                                                                                                                           EPC: Fouress Engineering
      territories including Chaattisgarh, Dadra & Nagar   PowerGen sold most of its stake in Paguthan to
                                                                                                              Quick facts: Utran power station is on the Tapi River
        Haveli, Daman & Diu, Goa, Gujarat, Madhya         CLP Power and the plant is now 100% owned by
                                                                                                                 about 10km from Surat city in Surat district.
     Pradesh, and Maharashtra. A 1,200-MW extension CLP Holdings. The gas turbines are capable of firing
                            is planned.                       gas and naphtha independently as well as            Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
                                                         simultaneously. Gas is received by a pipeline from                      Posted 2 Nov 2008
                    Photograph courtesy of Alstom        the Gandhar gas fields. The plant is connected to
                         Posted 15 Jul 2006
                                                        the gird with 220kV and 400kV switchyards. Water
                                                           supply from the Narmada River is delivered by a
                                                           24km pipeline to onsite reservoirs. Mee fogging
                                                        systems for each GT were ordered in Jan 2000 and
                                                        commissioned by mid-year. A 1,000-MW extension
                                                                               is planned.

                                                              Photograph courtesy of Gujarat Paguthan Energy Corp
                                                                              Posted 23 Mar 2005




                                                                                  Utran-2
                                                                              Location: Gujarat
                                                               Operator: Gujarat State Electricity Corp Ltd
                                                           Configuration: 375-MW, 1+1 CCGT with GT26 gas
                                                                                   turbine
                                                                              Fuel: natural gas
                                                                               Operation: 2009
                                                                          HRSG supplier: Alstom
                                                                            T/G supplier: Alstom
                                                                   EPC: Alstom, Alstom Projects India
                                                           Quick facts: In June 2007, GSECL awarded Alstom
                                                             a Rs1,000cr contract for a 370-MW extension to
                                                           Utran, the first GT26-based plant order in India and
                                                            the fourth Alstom CCGT in the state. Utran-2 was
                                                            commissioned in Oct 2009 and dedicated in May
                                                                   2010. The total cost was Rs1,414cr.

  industcards.com/cc-india-gujarat.htm                                                                                   2/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                             st-coal-india-gujarat




                    Coal-Fired Plants in India -
                             Gujarat




                 Gujarat Cement Works
                                                                                                                                             Sikka
                      Location: Gujarat
                                                                                                                                        Location: Gujarat
              Operator: Ultratech Cement Ltd                                      Sabarmati
                                                                                                                            Operator: Gujarat Urja Vikas Nigam Ltd
                 Configuration: 4 X 23 MW                                      Location: Gujarat
                                                                                                                                  Configuration: 2 X 120 MW
                   Operation: 2008-2009                             Operator: Ahmedabad Electric Co Ltd
                                                                                                                                      Operation: 1988-1993
                        Fuel: lignite                              Configuration: 3 X 110 MW, 1 X 125 MW
                                                                                                                                           Fuel: coal
                   Boiler supplier: CMEC                                    Operation: 1979-2003
                                                                                                                        Boiler supplier: Combustion Engineering, BHEL
                    T/G supplier: CMEC                                          Fuel: hard coal
                                                                                                                                       T/G supplier: BHEL
      EPC: Development Consultants Private Ltd, Desai                       Boiler supplier: BHEL
                                                                                                                         Quick facts: Sikka is a small coastal town in
                        Construction                                          T/G supplier: BHEL
                                                                                                                        Jamnagar District. Two 250-MW units are under
        Quick facts: This CPP at Kovaya cost about
                                                                     Photograph courtesy of US Energy Association               construction for service in 2010.
                          Rs620cr.
                                                                                 Posted 3 Feb 2002
                                                                                                                          Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
             Photograph courtesy of Desai Construction Ltd                                                                               Posted 1 Nov 2008
                         Posted 27 Jun 2010




                            Surat
                      Location: Gujarat                                          Ukai
     Operator: Gujarat Industries Power Co Ltd (GIPCL)                    Location: Gujarat
                 Configuration: 4 X 125 MW                    Operator: Gujarat Urja Vikas Nigam Ltd                              Wanakbori
                    Operation: 1999-2010                 Configuration: 2 X 120 MW, 2 X 200 MW, 1 X 210                       Location: Gujarat
                         Fuel: lignite                                           MW                               Operator: Gujarat Urja Vikas Nigam Ltd
                    Boiler supplier: BHEL                               Operation: 1976-1985                             Configuration: 7 X 210 MW
                     T/G supplier: BHEL                                 Fuel: bituminous coal                               Operation: 1982-1988
         Quick facts: GIPCL was formed by Gujarat         Boiler supplier: Combustion Engineering, BHEL                     Fuel: bituminous coal
    Electricity Board (now Gujarat Urja Vikas Nigam Ltd                  T/G supplier: BHEL                   Boiler supplier: Combustion Engineering, BHEL
    (GUVNL)), Gujarat State Fertilizers & Chemicals Lt Quick facts: Ukai is sited on the Left Bank Canal of            T/G supplier: BHEL, Siemens
    (GSFC), Gujarat Alkalies & Chemicals Ltd (GACL),        the Tapti River in Tapi District. Units-1 was      Quick facts: This is the largest thermal power
     and Petrofils Co-operatives Ltd. Surat was built as extensively overhauled and returned to service in  station in Gujarat. It is near Wanakbori Dam on the
    an IPP with its own captive mines and has a power     May 2008 and a similar program is underway at             bank of Mahi River in Kheda District.
     purchase agreement with GUVNL. Units 3&4 were Unit-2. The plant burns imported and domestic coal.
     dedicated on 30 May 2010 and two 250-MW units              A 500-MW extension is in planning.              Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
                                                                                                                               Posted 2 Nov 2008
         are planned. All blocks have CFB boilers.
                                                                  Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
         Photograph courtesy of Gujarat Industries Power Co Ltd                  Posted 2 Nov 2008
                        Re-posted 2 Jun 2010




    Abbreviations



  industcards.com/st-coal-india-guj.htm                                                                                  1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                  nuclear-india




          Nuclear Power Plants in India




                                                                                                                                           Kudankulam
                                                                                                                                       Location: Tamil Nadu
                                                                                                                            Operator: Nuclear Power Corp of India Ltd
                                                                                                                                Configuration: 2 X 1,000 MW PWR
                                                                                                                                       Operation: 2010-2011
                                                                                                                                       Reactor supplier: AEE
                                                                                                                                  T/G supplier: LMZ, Electrosila
                                                                                                                                         EPC: AEE, NPCIL
                              Kaiga                                                                                      Quick facts: This is India’s largest nuclear power
                                                                                     Kakrapar                          project and the Kudankulam units will be the largest
                     Location: Karnataka
                                                                                Location: Gujarat                         generators in India when completed. Talks first
          Operator: Nuclear Power Corp of India Ltd
                                                                  Operator: Nuclear Power Corp of India Ltd                began on this $3bn project in 1988, but were
             Configuration: 3 X 220 MW PHWR
                                                                      Configuration: 2 X 220 MW PHWR                     suspended in 1992 following the collapse of the
                    Operation: 2000-2007
                                                                              Operation: 1993-1995                     Soviet Union. Discussions were restarted and in Nov
                   Reactor supplier: NPCIL
                                                                            Reactor supplier: NPCIL                      2001, a general agreement was signed between
                     T/G supplier: BHEL
                                                                               T/G supplier: BHEL                      NPCIL and AEE for supply of two VVER-1000 units
    Quick facts: Unit-3 went commercial on 6 May 2007
                                                              Quick facts: Two 700-MW PHWR units are planned of the latest design. Equipment was ordered in Feb
     at 1800hrs. First criticality was 26 Feb 2007, less
                                                                          for construction at this site.               2002, and first concrete was the following month. In
        than 5yrs after first concrete on 30 Mar 2002.
                                                                                                                          Apr 2002, AEE signed a $200mn contract with
                                                                Photograph courtesy of Nuclear Power Corp of India Ltd   Silovye Mashiny for the T/G sets and the Izhora
       Photograph courtesy of Nuclear Power Corp of India Ltd                  Re-posted 23 May 2007
                        Posted 8 Sep 2004                                                                              Factory of Obedinennye Mashinostroitelnye Zavody
                                                                                                                         (OMZ) is under contract to supply the reactors.
                                                                                                                        Russia has granted a state credit to India to cover
                                                                                                                        85% of the cost of equipment supply. Completion
                                                                                                                          was originally scheduled for 2007 but has been
                                                                                                                                  delayed by a variety of factors.

                                                                                                                         Photograph by Petr Pavlicek and courtesy of Intl Atomic Energy
                                                                                                                                                   Agency
                                                                                                                                            Re-posted 17 Mar 2010




                                                                                                                                              Rajasthan
                                                                                                                                         Location: Rajasthan
                         Madras                                                    Narora
                                                                                                                             Operator: Nuclear Power Corp of India Ltd
                   Location: Tamil Nadu                                   Location: Uttar Pradesh
                                                                                                                          Configuration: 1 X 100 MW, 1 X 200 MW, 2 X 220
         Operator: Nuclear Power Corp of India Ltd                Operator: Nuclear Power Corp of India Ltd
                                                                                                                                             MW PHWR
            Configuration: 2 X 170 MW PHWR                           Configuration: 2 X 220 MW PHWR
                                                                                                                                        Operation: 1973-2010
                   Operation: 1984-1986                                     Operation: 1991-1992
                                                                                                                                Reactor supplier: CGE, L&T, NPCIL
                 Reactor supplier: NPCIL                                  Reactor supplier: NPCIL
                                                                                                                                       T/G supplier: EE, BHEL
                    T/G supplier: BHEL                                       T/G supplier: BHEL
                                                                                                                          Quick facts: RAPS-5 went commercial on 4 Feb
       Photograph courtesy of Nuclear Power Corp of India Ltd   Photograph courtesy of Nuclear Power Corp of India Ltd
                                                                                                                             2010 with UNi-6 to follow later in the year.
                        Posted 8 Sep 2004                                        Posted 8 Sep 2004
                                                                                                                            Photograph courtesy of Nuclear Power Corp of India Ltd
                                                                                                                                             Posted 8 Sep 2004



  industcards.com/nuclear-india.htm                                                                                      1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                    nuclear-india




                                                                                                        Tarapur 3&4
                                                                                                    Location: Maharashtra
                                                                                         Operator: Nuclear Power Corp of India Ltd
                        Tarapur 1&2                                                          Configuration: 2 X 540 MW PHWR
                    Location: Maharashtra                                                           Operation: 2005-2006
           Operator: Nuclear Power Corp of India Ltd                                               Reactor supplier: NPCIL
              Configuration: 2 X 160 MW BWR                                                          T/G supplier: BHEL
                       Operation: 1969                                              Quick facts: In Oct 1998, groundbreaking for the first
              Reactor supplier: General Electric                                      500-MW class PHWRs at Tarapur was held after
                T/G supplier: General Electric                                      many delays. Unit-4 went critical on 6 Mar 2005 and
                     EPC: General Electric                                           commercial on 12 Sep 2005 and the new reactors
               Quick facts: A turnkey project.                                      were dedicated to the nation in August 2007. At the
                                                                                     time, they were the biggest generating units in the
        Photograph courtesy of Nuclear Power Corp of India Ltd                      country. In Sep 2009, the new units were reported to
                         Posted 8 Sep 2004
                                                                                           be producing electricity at Rs2.70/kW.

                                                                                     Photograph courtesy of Department of Atomic Energy (DAE)
                                                                                                       Posted 13 Sep 2008




    Abbreviations


    Updated 06/02/10

    Home




  industcards.com/nuclear-india.htm                                                                                      2/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                    biomass-india




           Biomass Power Plants in India




                           Akaltara                                                   Malavalli
                    Location: Chhattisgarh                                       Location: Karnataka
                                                                                                                                          Samalkot Mill
         Operator: KVK Energy & Infrastructure Ltd                         Operator: Malavalli Power Plant
                                                                                                                                    Location: Andhra Pradesh
                  Configuration: 1 X 20 MW                                   Configuration: 1 X 4.5 MW
                                                                                                                                Operator: Nava Bharat Ventures Ltd
                       Operation: 2005                                             Operation: 2001
                                                                                                                                     Configuration: 1 X 9 MW
                     Fuel: rice husk, coal                                Fuel: bagasse, agricultural waste
                                                                                                                                          Operation: 1998
                      Boiler supplier: ??                                         Boiler supplier: ??
                                                                                                                                          Fuel: biomass
                       T/G supplier: ??                                          T/G supplier: Triveni
                                                                                                                                     Boiler supplier: Thermax
       Quick facts: This plant is in Janjgir Champa Dist          Quick facts: The project is a joint development of
                                                                                                                                    T/G supplier: Shin Nippon
       and cost Rs 46.45 crore. KVK has a 10yr power              Ambience Management Services Pvt Ltd and the
        purchase agreement with Chhattisgarh SEB,                   Karnataka Renewable Energy Department.                   Photograph courtesy of Nava Bharat Ventures Ltd
                                                                                                                                          Posted 22 Jun 2007
         Photograph courtesy of KVK Energy & Infrastructure Ltd        Photograph courtesy of Malavalli Power Plant
                         Posted 27 Jan 2007                                       Posted 25 Mar 2006




                                                                                                                                           Thoothukkudi
                                                                                                                                        Location: Tamil Nadu
                                                                                                                                  Operator: Ind-Barath Energies Ltd
                                                                                                                                      Configuration: 1 X 20 MW
                        Satya Maharshi
                                                                                                                                           Operation: 2006
                   Location: Andhra Pradesh
                                                                                                                                            Fuel: biomass
               Operator: Velcan Energy India Ltd
                                                                                                                                   Boiler supplier: Walchandnagar
                   Configuration: 1 X 7.5 MW
                                                                                                                                       T/G supplier: Hangzhou
                        Operation: 2004
                                                                                                                       Quick facts: This is India's first biomass power plant
                  Fuel: cotton stick, rice husk
                                                                                                                        with advanced steam conditions of 105 ATA/525C.
            Boiler supplier: ISGEC John Thompson
                                                                                                                        The main fuel is Juliflora supplemented with pulse
                T/G supplier: Alstom, VA TECH
                                                                                                                        stalk, cotton stalk, cane trash, and coconut shells
                        EPC: Areva T&D
                                                                                                                             with a requirement of about 1.50 lakh tpa.
    Quick facts: Electricity is sold under a 10yr contract
                                                                                                                         Commercial operation was in May 2006 and the
         to Aptransco. The plant cost €7.5mn and was
                                                                                                                         plant is running at 75% PLF. All output is sold to
     financed through a consortium of four Indian banks
                                                                                                                        Tamil Nadu Electricity Board (TNEB) under a 15yr
       including Andhra Bank, Corporation Bank, Sindh
                                                                                                                       PPA. The project cost Rs 71.91 crore. Ireda Ltd and
                 Bank and State Bank of India.
                                                                                                                       other banks extended a term loan of Rs 50.34 crore
               Photograph courtesy of Velcan Energy SA
                                                                                                                       and MNRE provided an interest subsidy of Rs 1.83
                         Posted 17 Jun 2006                                                                            crore. The air-cooled condenser system came from
                                                                                                                                                China.

                                                                                                                       Photograph courtesy of Ministry of New and Renewable Energy
                                                                                                                                            Posted 7 Nov 2009




    Abbreviations

  industcards.com/biomass-india.htm                                                                                      1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                       ic-india




            Diesel and Gas-Engine Power
                    Plants in India




                            Arkay
                    Location: Tamil Nadu
             Operator: Ind-Barath Energies Ltd                                       Bairabi
     Configuration: 10 X 8.7 MW 20V34SG engines, 1 X                           Location: Mizoram
                                                                                                                                           Butibori-2
                     8.1 MW steam set                             Operator: Mizoram Power & Electricity Dept
                                                                                                                                    Location: Maharashtra
                      Fuel: natural gas                          Configuration: 4 X 5.75 MW 16V32LN engines
                                                                                                                             Operator: Indo Rama Synthetics Ltd
                       Operation: 2006                                           Fuel: heavy oil
                                                                                                                          Configuration: 3 X 13.5 MW 16V46 engines
                     HRSG supplier: ??                                          Operation: 2004
                                                                                                                                         Fuel: heavy oil
         E/G and T/G supplier: Wartsila, Hangzhou                        E/G supplier: Wartsila, BHEL
                                                                                                                                        Operation: 1996
          Quick facts: In Mar 2006, Arkay Energy                                  EPC: BHEL
                                                                                                                                     E/G supplier: Wartsila
       (Rameswarm) Ltd, a unit of Ind-Barath Power,              Quick facts: This is the largest power plant in
       completed this power station at Valantharavai,                               Mizoram.                                      Photograph courtesy of Wartsila
                                                                                                                                       Posted 13 Jul 2005
     Ramnad District. The plant uses gas from isolated          Photograph courtesy of Mizoram Power & Electricity Dept
         GAIL wells in Ramanathapuram and at the                                 Posted 10 Jun 2010
     completion was the largest plant of its kind in India.

                  Photograph courtesy of Wartsila
                       Posted 24 Feb 2010




                                                                               Haebowal Complex
                                                                                  Location: Punjab
                                                                 Operator: Punjab Energy Development Agency                                 Kasargod
                                                                 Configuration: 1 X 1 MW JMC320GS-BL engine                             Location: Kerala
                      Dalmia Cement
                                                                                    Fuel: biogas                              Operator: KSK Energy Ventures Ltd
                    Location: Tamil Nadu
                                                                                  Operation: 2004                          Configuration: 3 X 7 MW CM32 engines
                  Operator: Dalmia Cement
                                                                             E/G supplier: Jenbacher                                     Fuel: heavy oil
      Configuration: 2 X 2 MW 6R32, 1 X 4 MW 12V32
                                                                             EPC: Clarke Energy India                                   Operation: 2001
                           engines
                                                              Quick facts: This biogas cogeneration system is at                      E/G supplier: MAK
                       Fuel: heavy oil
                                                                  the 50ac Haebowal dairy complex, one of two          Quick facts: This is the first IPP in Kerala. The Rs
                    Operation: 1983-1987
                   E/G supplier: Wartsila                      centralized facilities in Ludhiana that in total serve 70.70 crore plant has a 15yr PPA with Kerala State
                                                               1,490 dairy operations with 150,000 head of cattle.       Electricity Board (KSEB). Low sulfur HFO is
                  Photograph courtesy of Wartsila             Of a total of 2,500 tpd of manure produced per day ,      supplied by Bharat Petroleum Corp Ltd (BPCL).
                       Posted 10 Jul 2005
                                                              the biogas demonstration project processes 235t to                 Photograph courtesy of KSK Energy
                                                                generate electricity and hot water. Entec Biogas                        Posted 28 Jan 2007
                                                                       GmbH supplied the biogas system.

                                                                          Photograph courtesy of GE Energy
                                                                                Posted 21 Feb 2007




  www.industcards.com/ic-india.htm                                                                                       1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
06-10-2010                                                                                 ic-india




                                                                                                                                                Nagarpattinam
                          Leimakhong                                                           Modipon                                        Location: Tamil Nadu
                        Location: Manipur                                               Location: Uttar Pradesh                          Operator: MMS Steel & Power
            Operator: Manipur Electricity Department                              Operator: Modipon Fibres Co Ltd                          Configuration: 2 X 6 MW
                Configuration: 6 X 6 MW engines                               Configuration: 1 X 11.5 MW 16V32 engine                           Fuel: natural gas
                         Fuel: heavy oil                                                    Fuel: heavy oil                                     Operation: 2003
                         Operation: 2002                                                   Operation: 1986                                      E/G supplier: ??
                  E/G supplier: Wartsila, BHEL                                           E/G supplier: Wartsila                 Quick facts: This captive power plant was later
                 EPC: BHEL, Simplex Projects                              Quick facts: This captive power plant has well over extended to 28 MW and cost a total of Rs 65 crore.
           Quick facts: The work scope for this project                    100,000 running hours having been operated at       Fuel is supplied by GAIL and Oil and Natural Gas
                included a 33/11kV switchyard.                                         baseload for many years.                   Corp. Power offtakers include Gujarat Heavy
                                                                                                                                        Chemicals and Brakes India Ltd.
                       Photograph courtesy of BHEL                                    Photograph courtesy of Wartsila
                           Posted 24 Feb 2010                                              Posted 22 Aug 2009                            Photograph courtesy of KSK Energy
                                                                                                                                                Posted 28 Jan 2007




                                                                                                                                                     Vasavi
                                                                                                                                              Location: Tamil Nadu
                                                                                                                                              Operator: GMR Group
                                                                                                                                 Configuration: 4 X 50 MW 12K90MC-S engines
                                                                                                                                                  Fuel: heavy oil
                                                                                                                                              Operation: 1998-1999
                       RVK Konkepudi
                                                                                                                                    E/G supplier: MAN B&W, Hyundai, ABB
                  Location: Andhra Pradesh
                                                                                                                                               EPC: Hyundai E&C
             Operator: KSK Energy Ventures Ltd
                                                                                                                              Quick facts: This is the largest power station of its
          Configuration: 8 X 3 MW G3616 engines
                                                                                                                               kind in the world. Engine output is 70,000HP and
                         Fuel: heavy oil
                                                                                                                                each machine is is as high as a 5-story building.
                     Operation: 2000-2001
                                                                                                                               The plant cost $235mn and went commercial on 4
                       E/G supplier: Cat
                                                                                                                                Mar 1999, somewhat ahead of schedule. At the
       Quick facts: This is the first successful engine-
                                                                                                                             time, CMS Energy held a 49% ownership stake, but
     based plant of its type in the state. Fuel is supplied
                                                                                                                                 the company announed in Nov 2001 that it was
       from local stranded gas assets and from GAIL.
                                                                                                                                divesting the stake. Low sulfur fuel oil is provided
         Customers include India Cements and Zuari
                                                                                                                                under a 15yr contract with Hindustan Petroleum
                           Cements.
                                                                                                                               Corp Ltd. Vasavi is connected to the local 110kV
                    Photograph courtesy of KSK Energy                                                                          grid and operated by Hyundai O&M staff. A Metso
                           Posted 28 Jan 2007                                                                                  Automation MAX 1000 + PLUS system is used to
                                                                                                                                    control and monitor the engines and BOP
                                                                                                                               equipment and the plant has an innovative system
                                                                                                                                     that uses wastewater for engine cooling.

                                                                                                                                     Photograph courtesy of Elco Power Systems
                                                                                                                                               Posted 17 Dec 2008




    Abbreviations

    Data: industcards, Platts UDI World Electric Power Plants Data Base

    Updated 06/10/10

    Home




  www.industcards.com/ic-india.htm                                                                                       2/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393

More Related Content

What's hot

Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Samplevandalmax
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC Shivam Singh
 
NTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARNTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARAnkit Kumar
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAtul Kumar Singh
 
Mo Ti Presentation
Mo Ti PresentationMo Ti Presentation
Mo Ti Presentationxingjun78
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVIKASH BAGHEL
 
REC & RPO update April 2012 - General Carbon
REC & RPO update   April 2012 - General CarbonREC & RPO update   April 2012 - General Carbon
REC & RPO update April 2012 - General Carbongeneralcarbon
 
Rec & Rpo Update April 2012 General Carbon
Rec & Rpo Update   April 2012   General CarbonRec & Rpo Update   April 2012   General Carbon
Rec & Rpo Update April 2012 General Carbonsatishkashyap
 
Summer traininig-report ntpc anta content
Summer traininig-report ntpc anta contentSummer traininig-report ntpc anta content
Summer traininig-report ntpc anta contentnishant pareek
 
ABWR Reactor Core Neutronics
ABWR Reactor Core NeutronicsABWR Reactor Core Neutronics
ABWR Reactor Core Neutronicsmyatom
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingAbhitendra Singh
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
DOE Philippine Power Situationer, S.Almendras 2012
DOE Philippine Power Situationer, S.Almendras 2012DOE Philippine Power Situationer, S.Almendras 2012
DOE Philippine Power Situationer, S.Almendras 2012noelgamboaylopez
 

What's hot (20)

Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Sample
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
NTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARNTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHAR
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Training report btps
Training report btpsTraining report btps
Training report btps
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
Mo Ti Presentation
Mo Ti PresentationMo Ti Presentation
Mo Ti Presentation
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
REC & RPO update April 2012 - General Carbon
REC & RPO update   April 2012 - General CarbonREC & RPO update   April 2012 - General Carbon
REC & RPO update April 2012 - General Carbon
 
Rec & Rpo Update April 2012 General Carbon
Rec & Rpo Update   April 2012   General CarbonRec & Rpo Update   April 2012   General Carbon
Rec & Rpo Update April 2012 General Carbon
 
Summer traininig-report ntpc anta content
Summer traininig-report ntpc anta contentSummer traininig-report ntpc anta content
Summer traininig-report ntpc anta content
 
ABWR Reactor Core Neutronics
ABWR Reactor Core NeutronicsABWR Reactor Core Neutronics
ABWR Reactor Core Neutronics
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
DOE Philippine Power Situationer, S.Almendras 2012
DOE Philippine Power Situationer, S.Almendras 2012DOE Philippine Power Situationer, S.Almendras 2012
DOE Philippine Power Situationer, S.Almendras 2012
 
Dept. of Energy presentation to JFC
Dept. of Energy presentation to JFCDept. of Energy presentation to JFC
Dept. of Energy presentation to JFC
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 

Viewers also liked

Ramgarh Gas Power Plant, Jaisalmer
Ramgarh Gas Power Plant, JaisalmerRamgarh Gas Power Plant, Jaisalmer
Ramgarh Gas Power Plant, JaisalmerSaurabh Tiwari
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Gas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, RajasthanGas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, RajasthanSaurabh Tiwari
 
Business Plan: Biomass Power Plant
Business Plan: Biomass Power PlantBusiness Plan: Biomass Power Plant
Business Plan: Biomass Power PlantSunil Kumar
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - ManualSheel Shah
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working pptluckyvarsha
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Shubham Thakur
 

Viewers also liked (8)

NTPC Dadri Gas plant
NTPC Dadri Gas plantNTPC Dadri Gas plant
NTPC Dadri Gas plant
 
Ramgarh Gas Power Plant, Jaisalmer
Ramgarh Gas Power Plant, JaisalmerRamgarh Gas Power Plant, Jaisalmer
Ramgarh Gas Power Plant, Jaisalmer
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Gas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, RajasthanGas turbine Power-plant, NTPC Anta, Rajasthan
Gas turbine Power-plant, NTPC Anta, Rajasthan
 
Business Plan: Biomass Power Plant
Business Plan: Biomass Power PlantBusiness Plan: Biomass Power Plant
Business Plan: Biomass Power Plant
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working ppt
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 

Similar to Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393

Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...Project Sales Corp
 
coal handling
coal handling coal handling
coal handling ssoniii
 
Ntpc power plant
Ntpc power plantNtpc power plant
Ntpc power plantNikesh Har
 
Ntpc(btps) report
Ntpc(btps) reportNtpc(btps) report
Ntpc(btps) reportAlok Tiwari
 
Final report on ntpc faridabad
Final report on ntpc faridabadFinal report on ntpc faridabad
Final report on ntpc faridabadPawan Agrawal
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,ReportMAHENDRA MEENA
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report FinalSOUPARNO ROY
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
Goindwal sahib thermal power plant
Goindwal sahib thermal power plantGoindwal sahib thermal power plant
Goindwal sahib thermal power plantNADIM AKHTAR
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar hariom nagar
 

Similar to Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393 (20)

Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
 
coal handling
coal handling coal handling
coal handling
 
Ntpc power plant
Ntpc power plantNtpc power plant
Ntpc power plant
 
gopi recent
gopi recentgopi recent
gopi recent
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Ntpc(btps) report
Ntpc(btps) reportNtpc(btps) report
Ntpc(btps) report
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Final report on ntpc faridabad
Final report on ntpc faridabadFinal report on ntpc faridabad
Final report on ntpc faridabad
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report Final
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Alstom india
Alstom indiaAlstom india
Alstom india
 
1AB-CV5
1AB-CV51AB-CV5
1AB-CV5
 
Report ntpc
Report ntpcReport ntpc
Report ntpc
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
Goindwal sahib thermal power plant
Goindwal sahib thermal power plantGoindwal sahib thermal power plant
Goindwal sahib thermal power plant
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
 

More from Project Sales Corp

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfProject Sales Corp
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Project Sales Corp
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyProject Sales Corp
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfProject Sales Corp
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024Project Sales Corp
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfProject Sales Corp
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalProject Sales Corp
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024Project Sales Corp
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024Project Sales Corp
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsProject Sales Corp
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabProject Sales Corp
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfProject Sales Corp
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdfProject Sales Corp
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023Project Sales Corp
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfProject Sales Corp
 

More from Project Sales Corp (20)

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdf
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdf
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdf
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - Global
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety Tools
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
 
MOTORS IN STOCK.pdf
MOTORS IN STOCK.pdfMOTORS IN STOCK.pdf
MOTORS IN STOCK.pdf
 
RING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdfRING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdf
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdf
 
Stock - Filters.pdf
Stock - Filters.pdfStock - Filters.pdf
Stock - Filters.pdf
 
Stock - Ballasts.pdf
Stock - Ballasts.pdfStock - Ballasts.pdf
Stock - Ballasts.pdf
 
Stock - Junction Boxes.pdf
Stock - Junction Boxes.pdfStock - Junction Boxes.pdf
Stock - Junction Boxes.pdf
 

Recently uploaded

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 

Recently uploaded (20)

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 

Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393

  • 1. 06-10-2010 st-other-india Other Thermal Plants in India Durgapur Works Haldia Complex Location: West Bengal Location: West Bengal Operator: Phillips Carbon Black Ltd Operator: Haldia Petrochemicals Ltd Configuration: 1 X 30 MW CHP Configuration: 2 X 52-MW steam, 2 X 23 MW gas Fuel: tailgas turbine CHP Operation: 2008 Fuel: naphtha Boiler supplier: BHEL Operation: 1999-2000 T/G supplier: Hangzhou, Greenesol Power Systems Boiler supplier: ?? Quick facts: In Oct 2008, PCB started-up this T/G supplier: ABB captive power plant at a cost of Rs1bn. The plant EPC: Larsen & Toubro, Sargent & Lundy was commissioned in April 2009. PCB is India’s Quick facts: Haldia Petrochem is a $1.2bn complex with a largest carbon black producer and a company of naphtha cracker unit and associated plants which RPG Enterprises. The new cogen plant fires tail gas manufacture LLDPE, HDPE, polypropylene, and other from the carbon black manufacturing process. chemicals. It is owned by West Bengal Industrial Surplus power is sold to CESC. Development Corp, Chatterjee Petrochem, and Tata Group. Photograph courtesy of Phillips Carbon Black Ltd Posted 5 May 2010 Photograph courtesy of Larsen & Toubro Posted 18 Aug 2007 Abbreviations Data: industcards, Platts UDI World Electric Power Plants Data Base Updated 05/05/10 Home industcards.com/st-other-india.htm 1/1 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 2. 06-10-2010 st-coal-india-ap Coal-Fired Plants in Andhra Pradesh Dr Narla Tata Rao (Vijayawada) Location: Andhra Pradesh Nalgonda KVK Operator: Andhra Pradesh Power Generation Corp Location: Andhra Pradesh Paloncha Configuration: 6 X 210 MW Operator: KSK Energy Ventures Location: Andhra Pradesh Operation: 1979-1995 Configuration: 1 X 43 MW Operator: Nava Bharat Ventures Ltd Fuel: coal Operation: 2007 Configuration: 1 X 50 MW Boiler supplier: BHEL Fuel: coal Operation: 1996 T/G supplier: BHEL Boiler supplier: ?? Fuel: coal EPC: WAPCOS T/G supplier: BHEL Boiler supplier: Krupp India, Lentjes Quick facts: Vijayawada TPS Stage-I cost Rs193 Ouick facts: Construction started in Apr 2006 on T/G supplier: LMZ, Electrosila crores while Stage-II cost Rs511 crores and Stage- this captive power project for Zuari Cement and Sri Quick facts: This CFB plant supplies a ferro-alloys III cost Rs840 crores. The plant had the highest load Vishnu Cement. Coal is from the Mahanadi fields. plant and sells surplus power to a local distribution factor in India from 1994-98 and again in 2001-02. The total cost was Rs 167 crore. company. Vijayawada TPS received the government’s Meritorious Productivity Award for 20 consecutive Photograph courtesy of KSK Energy Ventures Photograph courtesy of Nava Bharat Ventures Ltd years. The plant was renamed after former APSEB Posted 28 Jan 2007 Posted 22 Jun 2007 Chairman Dr N T Rao in Dec 2007. Photograph courtesy of Andhra Pradesh Power Generation Corp Posted 14 Apr 2006 Ramagundam STPS Rayalaseema-I Location: Andhra Pradesh Location: Andhra Pradesh Simhadri Operator: National Thermal Power Corp Ltd Operator: Andhra Pradesh Power Generation Corp Location: Andhra Pradesh Configuration: 3 X 200 MW, 4 X 500 MW Configuration: 2 X 210 MW Operator: NTPC Ltd Operation: 1983-2005 Operation: 1994-1995 Configuration: 2 X 500 MW Fuel: bituminous coal Fuel: coal Operation: 2002 Boiler supplier: B&W, Breda, BHEL Boiler supplier: BHEL Fuel: hard coal T/G supplier: Ansaldo, Siemens, BHEL T/G supplier: BHEL Boiler supplier: BHEL EPC: Development Consultants Private Ltd, BHEL EPC: Shandong Electric Power Construction T/G supplier: BHEL Quick facts: This was the third of NTPC's super Quick facts: Rayalaseema Stage-I cost Rs860 Quick facts: Two more units are being built at this thermal projects and supplies electricity to Andhra crores while Stage-II cost Rs511.35 crores and site. Pradesh, Tamil Nadu, Karnakata, Kerala, Goa, and Stage-III cost Rs840 crores. The plant had the Pondicherry. The site encompasses 10,630ac. highest load factor in India from 1998-2001 and Photograph courtesy of BHEL Average coal burn is 30,000tpd. A large-scale again in 2002-04. Two more 210-MW units are under Posted 12 May 2004 afforestation effort is underway in the plant area. construction for service in 2007. Photograph courtesy of BHEL Photograph courtesy of Andhra Pradesh Power Generation Corp Posted 27 Jun 2007 Posted 14 Apr 2006 Abbreviations Data: industcards, Platts UDI World Electric Power Plants Data Base Updated 02/14/10 industcards.com/st-coal-india-ap.htm 1/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 3. 06-10-2010 cc-india CCGT Plants in India - other states Dabhol Location: Maharashtra HPL Cogen Operator: Ratnagiri Gas and Power Pvt Ltd Location: West Bengal Configuration: 1 X 670-MW, 2+1 CCGT, 2 X 740-MW Operator: Haldia Petrochemicals Ltd 2+1 CCGT with 9001 FA gas turbines Configuration: 110-MW, 2+1 CCGT with 6551B gas Fuel: naphtha, natural gas, distillate oil turbines, 17-MW steam set, CHP Operation: 1999-2007 Dadri Fuel: naphtha, natural gas, LFO, refinery residues HRSG supplier: Vogt, Kawasaki Location: Uttar Pradesh Operation: 2000 T/G supplier: General Electric Operator: NTPC Ltd HRSG supplier: L&T EPC: Bechtel Configuration: Two 409-MW, 2+1 CCGT blocks with T/G supplier: GE, ABB Quick facts: Dabhol is on a 1,700ac coastal site V94 gas turbines EPC: L&T/S&L about 160km south of Mumbai. It was originally Fuel: natural gas, oil Quick facts: In Aug 1997, the engineering contract developed by Enron and budgeted at $2.8bn with 3 X Operation: 1992-1994 for this CCGT at the HPL works in Midanpore Dist 695-MW CCGT blocks an an LNG terminal. After HRSG supplier: Biro was awarded to L&T. This integrated naphtha-based 7yrs of development, Unit-1 was dedicated in May T/G supplier: Siemens, BHEL petrochemical complex is at Haldia, a major river 1999, about 2yrs behind the original schedule. The EPC: Lahmeyer, Tata port town about 60km from Kolkata at the $1.8bn Phase-II financing closed in Apr 1999 and in Quick facts: This is one of the early Indian CCGT confluence of Hugli and Haldi Rivers. The cracker Jun, a $300mn order was placed with GE for two CC plants. The site is on the Upper Ganga Branch and associated process units produce ethylene, 209FA blocks. From Jan to May 2001, the four Canal in Gautambudhnagar District. Ga is supplied propylene, and other materials. HPL Cogeneration Phase II GTs were progressively synchronized and from the HBJ Pipeline. The plant cost Rs 960.35 Ltd was set up as a 49:51 power generation joint steam blows completed on the HRSGs. The Dabhol- Crore and was built with financing assistance from venture between HPL and L&T, but in May 2008, 2 steam turbine was rolled in April and the Dabhol-3 KfW. HPL bought out the L&T stake and also began steam set was nearly ready for testing when work preparations to partially switch the plant to natural was halted on 17 Jun 2001. In May 2001, MSEB Photograph courtesy of Siemens gas. Two auxiliary boilers and duct-firing systems Posted 25 Oct 2007 unilaterally rescinded the DPC PPA and Dabhol allow for the production of up to 480 tph of process Phase I was shutdown. Finally, the state steam. In 2006, Evonik obtained a 6yr O&M government and other parties took over the project, contract for the HPL plant. which gradually returned to service during 2006/07, first on naphtha and finally on natural gas as Photograph courtesy of Evonik India Posted 14 Mar 2010 originally designed. Photograph by Boneyjoe Posted 9 Sep 2007 Kathalguri Kayamkulam Karuppur Location: Assam Location: Kerala Location: Tamil Nadu Operator: Northeastern Electric Power Corp Ltd Operator: NTPC Ltd Operator: Aban Power Co Ltd Configuration: Three 97-MW, 2+1 CCGT blocks with Configuration: 360-MW, 2+1 CCGT with 9001E gas Configuration: 120-MW, 1+1 CCGT with 6001FA gas 6001 gas turbines (Block 1) and M251 gas turbines turbines turbine (Blocks 2&3) Fuel: naphtha Fuel: gas Fuel: natural gas Operation: 1998 Operation: 2005 Operation: 1995-1998 HRSG supplier: NEM HRSG supplier: Thermax HRSG supplier: ?? T/G supplier: GE, BHEL T/G supplier: GE, DDIT T/G supplier: GE, BHEL, MHI, Melco EPC: Development Consultants Private Ltd EPC: BHEL Quick facts: This project was largely funded by Quick facts: In Nov 1998, NTPC commissioned the Quick facts: This CCGT plant was commissioned on Japan Bank for International Cooperation. In addition first gas turbine at the Kayamkulam plant at 11 Aug 2005 and uses natural gas from the to building the CCGT plant to use Assam’s natural Choolatheruvu, Alappuzha district. The plant was f ll i i d i O t b 1999 b t littl www.industcards.com/cc-india.htm 1/3 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 4. 06-10-2010 cc-india Kuttalam gas field in Thanjavur Dist, Tamil Nadu. All gas reserves, funding was made available for a fully commissioned in October 1999, but was little power generated is sold to Tamil Nadu Electricity substantial associated transmission system. At used initially since its only available fuel was Board. GEA supplied an air-cooled condenser completion, Kathalguri was able to supply 25% of naphtha. Financial assistance for the Rs1,190cr electricity demand in the Northwest Region and scheme was obtained from the World Bank. Three Photograph courtesy of Aban Group helped to alleviate regional power shortages that had 650-MW CC blocks are in development at Posted 10 Feb 2007 steadily worsened during the 1990s. Kayamkulam, which is also known as Rajiv Gandhi. Photograph courtesy of BHEL Photograph by David Appleyard Posted 13 May 2006 Posted 25 Jan 2006 Tanirbavi Location: Karnataka Operator: GMR Energy Configuration: 220-MW, 4+1 CCGT power barge with M6000PC gas turbines Fuel: naptha Regency Operation: 2000 Uran Location: Tamil Nadu HRSG supplier: Hyundai Location: Maharashtra Operator: KSK Energy Ventures T/G supplier: General Electric, Alstom Operator: Maharashtra State Power Generation Co Configuration: 59-MW, 1+1 CCGT with 6001 gas EPC: Hyundai, TCE Ltd turbine CHP Quick facts: In Oct 1999, Hyundai won a $160mn Configuration: 4 X 60 MW V93 GT (Unit-1 scrapped Fuel: gas contract to build the Tanirbavi barge-based CCGT 2003), 2 X 336-MW, 2+1 CCGT blocks withV94.2 Operation: 2006 plant. Financing closed in September 2000 and in gas turbines HRSG supplier: ?? Apr 2001 the American ExIm approved $5.1mn in Fuel: natural gas, oil T/G supplier: BHEL support for the $207mn project, which at the time, Operation: 1982-1994 EPC: Toyo Engineering was owned by PSEG Global and GMR in a 49:51 HRSG supplier: Deutsche Babcock Quick facts: In Feb 2005, BHEL received a Rs84 joint venture. The 106m barge was built in Ulsan and T/G supplier: Siemens crore equipment contract for this industrial CHP at moored in the Gurupur River in Mangalore. Metso EPC: Siemens, Lahmeyer, Tata Kallugurani village in Ramanathpuram Dist. Automation supplied its maxDNA digital control Quick facts: Uran power station is near Bokadvira Financial closure was in Aug 2005. Regency Power system. Simple-cycle operations started in Jun Village, 1km away from Uran town and 55Km from Corp was set-up to build the plant for a number of 2001 when it was considered the largest single- Mumbai by road. The site is surrounded on three industrial customers including Regency Ceramics, barge, generating facility in the world. In Oct 2002, side by the Arabian Sea. Uran cost about Rs Brakes India, Lakshmi Mills, and Orchid Chemicals. PSEG sold its stake in Tanirbavi for $45mn. In Jun 1,118.5 Crores. Grid connection is by 4 X 220Kv KSK was responsible for project implementation, 2008, the original PPA expired and, in Sep 2009, lines to Apta S/S and 2 X 220kV lines to Kharghar permitting, procurement, and the wheeling GMR announced it would move the barge power S/S. arrangement with TNEB. Natural gas is from the plant to Kakinda in Andhra Pradesh starting in Jan Cauvery basin. Photograph courtesy of Maharashtra State Power Generation Co 2010. The 1,200km move and dredging on the Ltd Photograph courtesy of KSK Energy Ventures Godavari River upstream from Kakinda cost about Posted 3 Feb 2010 Posted 21 Jan 2007 R245cr. Fuel at the new site will be LNG and operation is expected in April 2010. GMR plans to retain the 30ac Mangalore site plus associated infrastructure for possible future use. Photograph courtesy of GMR Energy Posted 4 Feb 2004 Valuthur Location: Tamil Nadu Operator: Tamil Nadu Electricity Board Configuration: 95-MW, 1+1 CCGT with 6001FA gas turbine, 92-MW, 1+1 CCGT with V643.A gas turbine Fuel: gas Operation: 2002-2008 HRSG supplier: Alstom T/G supplier: BHEL, Siemens/Ansaldo, Alstom Power India EPC: Fichtner India, BHEL, Vasavi Power, GEA India, Dastur & Co www.industcards.com/cc-india.htm 2/3 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 5. 06-10-2010 st-coal-india-chh-or Coal-Fired Plants in India - Chhattisgarh & Orissa Hirakud Smelter Jharsuguda CPP Location: Orissa Bhilai Location: Orissa Operator: Hindalco Industries Ltd Location: Chhattisgarh Operator: Vedanta Resources plc Configuration: 1 X 67.5 MW, 3 X 100 MW Operator: NTPC-SAIL Power Co (P) Ltd Configuration: 9 X 135 MW Operation: 1994-2008 Configuration: 2 X 250 MW Operation: 2008-2010 Fuel: coal Operation: 2008-2009 Fuel: coal Boiler supplier: ISGEC John Thompson, Fuel: coal Boiler supplier: Shanghai ThyssenKrupp Industries India Boiler supplier: BHEL T/G supplier: Shanghai T/G supplier: BHEL T/G supplier: BHEL EPC: SEPCO-III Quick facts: The Hirakud smelter and power EPC: BHEL Quick facts: In Feb 2004, Lanco Amarkantak Power complex is located in Sambalpur Dist on the banks Quick facts: This plant was built to supply electricity issued an RFQ for the EPC contract for its proposed of the world’s longest earthen dam, the 25.8km to the Bhilai Steel Works and other SAIL units. 250-MW coal-fired plant at Pathadi village in Korba Hirakud Dam spanning the Mahanadi river. The Excess output is sold into India's Western Grid. District. In the event, two 300-MW sets were Hirakud smelter, set up by Indal in 1959, was the Unit-1 went commercial on 22 Apr 2009, followed by country’s second aluminium smelter operating on ordered from Dongfang. The first unit came online Unit-2 on 21 Oct 2009. about 2yrs past the original schedule. Total cost of power sourced from the hydro power station of the Phase-I was about $275mn. The project has a Hirakud Dam. In 1993, Indal built India’s first CFB Photograph courtesy of NTPC-SAIL Power Co (P) Ltd 400kV switchyard and a 32km, 400kV tie-line to captive power plant. Three more steam sets were Posted 14 Feb 2010 PGCIL’s 400kV Korba-Seepat line. Phase-II is to added starting about 10yrs later, each supplied by consist of 2 X 660 MW supercritical sets. three CFB boilers. Photograph by painkiller416 (Panoramio) Photograph courtesy of Power Posted 3 Oct 2010 Posted 11 Nov 2009 O P Jindal Jharsuguda Sterlite Location: Chhattisgarh Location: Orissa Operator: Jindal Power Ltd Operator: Sterlite Energy Ltd Configuration: 4 X 250 MW Kharagprasad Configuration: 4 X 600 MW Operation: 2007-2008 Location: Orissa Operation: 2010-2011 Fuel: coal Operator: Nava Bharat Ventures Ltd Fuel: coal Boiler supplier: BHEL Configuration: 1 X 30 MW Boiler supplier: Harbin T/G supplier: BHEL Operation: 2003 T/G supplier: Dongfang EPC: BHEL, Punj Lloyd Fuel: coal EPC: SEPCO-III Quick facts: This is the largest coal-fired IPP in Boiler supplier: ?? Quick facts:On 21 Aug 2010, Shri Naveen Patnaik , India. A second phase with 4 X 600-MW units is on T/G supplier: ?? Chief Minister of Orissa, dedicated this IPP to the order. The plant is named after Om Prakash Jindal, Quick facts: The plant supplies a ferro-alloys plant People of Orissa. The total project cost is estimated the late founder of O P Jindal Group. The associated and sells surplus power to a local distribution to be Rs8,200cr. The Sterlite project has India’s first mine is the largest in the private sector and it has a company. A 64-MW unit is being added to the site. hydrid ESP with baghouse, four 150m natural draft 6mn tpy coal washery, also the largest in the cooling towers and two 275m stacks. Sterlite Photograph courtesy of Nava Bharat Ventures Ltd country. The facility has a 7km overland covered Energy is a subsidiary of Sterlite Industries, India's Posted 22 Jun 2007 conveyor from the mine facility, the longest in India. largest non-ferrous metals and mining company, The tie-line to the grid is a 258km, double-circuit and in turn a subsidiary of Vedanta Resources plc. 400kV installation built in 1.5yrs. It was built without any joint-venture with PowerGrid Corp. Photograph courtesy of www.indiacsr.in industcards.com/st-coal-india-chh-or.… 1/3 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 6. 06-10-2010 st-coal-india-chh-or Posted 3 Oct 2010 Photograph courtesy of Jindal Steel and Power Ltd Posted 31 Oct 2009 Pathadi-I Location: Chhattisgarh Operator: Lanco Amarkantak Power Pvt Ltd Rourkela Phase-II Configuration: 2 X 300 MW Location: Orissa Operation: 2009-2010 Raigarh Operator: NTPC-SAIL Power Co (P) Ltd Fuel: coal Location: Chhattisgarh Configuration: 2 X 60 MW Boiler supplier: Dongfang Operator: Jindal Steel and Power Operation: 1987-1988 T/G supplier: Dongfang Configuration: 2 X 21 MW, 2 X 55 MW Fuel: coal EPC: MMC Corp, Shapoorji Palonji Operation: 1994-2004 Boiler supplier: Rafako Quick facts: In Feb 2004, Lanco Amarkantak Power Fuel: waste coal T/G supplier: BHEL issued an RFQ for the EPC contract for its proposed Boiler supplier: BHEL Quick facts: This is the second phase of a captive 250-MW coal-fired plant at Pathadi village in Korba T/G supplier: BHEL, DDIT power plant at Rourkela Steel Works. Operations District. In the event, two 300-MW sets were were taken over by NTPC-SAIL power in March ordered from Dongfang. The first unit came online Photograph courtesy of Jindal Steel and Power Ltd 2001. about 2yrs past the original schedule. Total cost of Posted 1 Feb 2004 Phase-I was about $275mn. The project has a Photograph courtesy of NTPC-SAIL Power Co (P) Ltd 400kV switchyard and a 32km, 400kV tie-line to Posted 14 Feb 2010 PGCIL’s 400kV Korba-Seepat line. Phase-II is to consist of 2 X 660 MW supercritical sets. Photograph by V A Chakrarthy (Panoramio) Posted 2 Jun 2010 Talcher STPS Location: Orissa Operator: National Thermal Power Corp Ltd Configuration: 6 X 500 MW Operation: 1995-2006 Fuel: bituminous coal Boiler supplier: Stein, BHEL T/G supplier: ABB, BHEL EPC: Fouress, Tata Projects Quick facts: This is India's second largest power plant. Fuel is mainly from Coal India Ltd’s Mahanadi Coalfield Ltd. Talcher was originally established by the Government of Orissa and subsequently sold to NTPC. However, the entire power generated from TTPS is dedicated to the State. Photograph courtesy of BHEL Posted 25 Jun 2007 Abbreviations Data: industcards, Platts UDI World Electric Power Plants Data Base Updated 10/03/10 Home industcards.com/st-coal-india-chh-or.… 2/3 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 7. 06-10-2010 cc-india CCGT Plants in India - Gujarat Baroda Location: Gujarat Operator: Gujarat Industries Power Co Ltd (GIPCL) Dhuvaran Configuration: 1 X 145-MW 3+1 CCGT with Bhander Location: Gujarat 6001BTG gas turbines, 1 X 160-MW, 1+1 CCGT Location: Gujarat Operator: Gujarat Urja Vikas Nigam Ltd with 9001E gas turbine Operator: Essar Power Ltd Configuration: One 107 MW , 1+1 CCGT with Operation: 1992-1997 Configuration: 165-MW,1+1 CCGT, 340-MW, 2+1 6001FA gas turbine, one 112 MW , 1+1 CCGT with Fuel: natural gas CCGT, 1 X 110 CHP gas turbine, all 9001E gas 6001FA+e gas turbine HRSG supplier: NEM turbines Fuel: natural gas T/G supplier: General Electric, BHEL Fuel: natural gas Operation: 2004-2007 Quick facts: GIPCL was formed by Gujarat Operation: 2007-2008 HRSG supplier: ?? Electricity Board (now Gujarat Urja Vikas Nigam Ltd HRSG supplier: Deltak, IHI, Hangzhou T/G supplier: GE, BHEL (GUVNL)), Gujarat State Fertilizers & Chemicals Lt T/G supplier: Hitachi, BHEL, Siemens EPC: Reliance Energy, BHEL, SEW Constructions (GSFC), Gujarat Alkalies & Chemicals Ltd (GACL), Quick facts: This plant was built out in three phases Quick facts: This plant is near Khambhat in Anand and Petrofils Co-operatives Ltd. Output from the first to support increasing power demand of Essar’s District. The EPC award for the first block was made block at Baroda is distributed to the owners in Hazira steel complex. to BHEL in Oct 2001 for Rs 310 crore. In March proportion to their ownership while the second block 2004, BHEL was awarded a Rs 333 crore EPC was built as an IPP with power sales to GUVNL. Photograph courtesy of Essar Power Ltd contract for the second block, which has BHEL's Fuel is from Gujarat State Petroleum Corp and Niko Posted 3 Feb 2010 first indigenously manufactured 6001FA machine. Resources, the operating partners of the Hazira field. Photograph courtesy of Gujarat Urja Vikas Nigam Ltd Posted 2 Nov 2008 Photograph courtesy of Gujarat Industries Power Co Ltd Posted 12 Sep 2007 Gandhar Complex Location: Gujarat Hazira GSEG Operator: Indian Petrochemicals Corp Ltd (IPCL) Hazira Location: Gujarat Configuration: 65-MW, 1+1 CCGT with 6001B gas Location: Gujarat Operator: Gujarat State Energy Generation Ltd turbine, 2 X 45 MW LM6000 CHP Operator: Essar Power Ltd Configuration: 150-MW, 2+1 CCGT with GT8C gas Fuel: naphtha, natural gas Configuration: 515-MW, 3+1 CCGT with 9001E gas turbines Operation: 1996-2000 turbines Fuel: natural gas, oil HRSG supplier: BHEL Fuel: natural gas, naphtha, oil Operation: 2001-2002 T/G supplier: GE, BHEL Operation: 1995-1997 HRSG supplier: Hanjung EPC: L&T HRSG supplier: Hanjung T/G supplier: Alstom Quick facts: The IPCL complex a Gandhar was T/G supplier: GE EPC: Fichtner India, Alstom, Evonik India developed after the discovery of oil and gas reserves EPC: Hanjung Quick facts: GSEG is an IPP JV of Gujarat State in the region. Also promoting the site was Quick facts: This was the first large-scale, multi-fuel Petroleum Co, Gail, and Kribhco Fertilizer. GUVNL availability of ocean access, adequate freshwater CCGT IPP in India. It went commercial in Oct 1997 is the offtaker. Plant COD was 1 Jun 2002 Evonik from the Narmada River, and salt. The foundation and sells 300 MW to Gujarat Urja Vikas Nigam Ltd India was owners engineer and later assisted in stone was laid in Oct 1989 and the final investment (GUVNL) under a 20yr PPA signed in 1996. The commissioning and repairs of initial mechanical clearance was granted in Mar 1992. The first phase balance of plant output is sold to Essar Steel Ltd. issues. included a 170,000 MTA VCM plant, 150,000 MTA Ph t h t fE P Ltd industcards.com/cc-india-gujarat.htm 1/3 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 8. 06-10-2010 cc-india PVC plant, 115,000 MTA chlor-alkali plant, 130,000 Photograph courtesy of Essar Power Ltd Posted 3 Feb 2010 Photograph courtesy of Evonik India MTA caustic soda plant, and captive power plant, all Posted 14 Mar 2010 commissioned by year-end 1996. Photograph courtesy of Larsen & Toubro Posted 18 Aug 2007 Paguthan Location: Gujarat Operator: Gujarat Paguthan Energy Corp Configuration: 655-MW, 2+1 CCGT block with V94.2 gas turbines Fuel: natural gas, naphtha Kawas Operation: 1998 Location: Gujarat HRSG supplier: Deutsche Babcock Operator: NTPC Ltd T/G supplier: Siemens Configuration: two 328-MW, 2+1 CCGT blocks with EPC: Siemens, TCE Consulting Engineers, Fichtner Utran-1 9001E gas turbines Quick facts: This was the third Indian IPP to go on- Location: Gujarat Fuel: natural gas, oil, naphtha line, and the largest to that date. The developer of Operator: Gujarat State Electricity Corp Ltd Operation: 1992-1994 the $750mn plant was Gujarat Torrent Energy Corp Configuration: 165-MW, 3+1 CCGT with 6001 gas HRSG supplier: CMI Ltd (GTEC), a consortium initially consisting of turbines T/G supplier: Alstom PowerGen (20%), local pharmaceutical company Fuel: natural gas EPC: Alstom, Ebasco, Sogreah Torrent Group (30%), Gujarat Power Corp (12%), Operation: 1992-1993 Quick facts: Kawas cost Rs 1560 Crore. Fuel is and Siemens (10%). In Jul 1999, PowerGen HRSG supplier: ?? from the South Basin Gas Field and supplied by the announced that it was buying out Torrent’s interest, T/G supplier: GE, BHEL HBJ Pipeline. Power is sold to many states and the first such transaction in India. In Dec 2000, EPC: Fouress Engineering territories including Chaattisgarh, Dadra & Nagar PowerGen sold most of its stake in Paguthan to Quick facts: Utran power station is on the Tapi River Haveli, Daman & Diu, Goa, Gujarat, Madhya CLP Power and the plant is now 100% owned by about 10km from Surat city in Surat district. Pradesh, and Maharashtra. A 1,200-MW extension CLP Holdings. The gas turbines are capable of firing is planned. gas and naphtha independently as well as Photograph courtesy of Gujarat Urja Vikas Nigam Ltd simultaneously. Gas is received by a pipeline from Posted 2 Nov 2008 Photograph courtesy of Alstom the Gandhar gas fields. The plant is connected to Posted 15 Jul 2006 the gird with 220kV and 400kV switchyards. Water supply from the Narmada River is delivered by a 24km pipeline to onsite reservoirs. Mee fogging systems for each GT were ordered in Jan 2000 and commissioned by mid-year. A 1,000-MW extension is planned. Photograph courtesy of Gujarat Paguthan Energy Corp Posted 23 Mar 2005 Utran-2 Location: Gujarat Operator: Gujarat State Electricity Corp Ltd Configuration: 375-MW, 1+1 CCGT with GT26 gas turbine Fuel: natural gas Operation: 2009 HRSG supplier: Alstom T/G supplier: Alstom EPC: Alstom, Alstom Projects India Quick facts: In June 2007, GSECL awarded Alstom a Rs1,000cr contract for a 370-MW extension to Utran, the first GT26-based plant order in India and the fourth Alstom CCGT in the state. Utran-2 was commissioned in Oct 2009 and dedicated in May 2010. The total cost was Rs1,414cr. industcards.com/cc-india-gujarat.htm 2/3 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 9. 06-10-2010 st-coal-india-gujarat Coal-Fired Plants in India - Gujarat Gujarat Cement Works Sikka Location: Gujarat Location: Gujarat Operator: Ultratech Cement Ltd Sabarmati Operator: Gujarat Urja Vikas Nigam Ltd Configuration: 4 X 23 MW Location: Gujarat Configuration: 2 X 120 MW Operation: 2008-2009 Operator: Ahmedabad Electric Co Ltd Operation: 1988-1993 Fuel: lignite Configuration: 3 X 110 MW, 1 X 125 MW Fuel: coal Boiler supplier: CMEC Operation: 1979-2003 Boiler supplier: Combustion Engineering, BHEL T/G supplier: CMEC Fuel: hard coal T/G supplier: BHEL EPC: Development Consultants Private Ltd, Desai Boiler supplier: BHEL Quick facts: Sikka is a small coastal town in Construction T/G supplier: BHEL Jamnagar District. Two 250-MW units are under Quick facts: This CPP at Kovaya cost about Photograph courtesy of US Energy Association construction for service in 2010. Rs620cr. Posted 3 Feb 2002 Photograph courtesy of Gujarat Urja Vikas Nigam Ltd Photograph courtesy of Desai Construction Ltd Posted 1 Nov 2008 Posted 27 Jun 2010 Surat Location: Gujarat Ukai Operator: Gujarat Industries Power Co Ltd (GIPCL) Location: Gujarat Configuration: 4 X 125 MW Operator: Gujarat Urja Vikas Nigam Ltd Wanakbori Operation: 1999-2010 Configuration: 2 X 120 MW, 2 X 200 MW, 1 X 210 Location: Gujarat Fuel: lignite MW Operator: Gujarat Urja Vikas Nigam Ltd Boiler supplier: BHEL Operation: 1976-1985 Configuration: 7 X 210 MW T/G supplier: BHEL Fuel: bituminous coal Operation: 1982-1988 Quick facts: GIPCL was formed by Gujarat Boiler supplier: Combustion Engineering, BHEL Fuel: bituminous coal Electricity Board (now Gujarat Urja Vikas Nigam Ltd T/G supplier: BHEL Boiler supplier: Combustion Engineering, BHEL (GUVNL)), Gujarat State Fertilizers & Chemicals Lt Quick facts: Ukai is sited on the Left Bank Canal of T/G supplier: BHEL, Siemens (GSFC), Gujarat Alkalies & Chemicals Ltd (GACL), the Tapti River in Tapi District. Units-1 was Quick facts: This is the largest thermal power and Petrofils Co-operatives Ltd. Surat was built as extensively overhauled and returned to service in station in Gujarat. It is near Wanakbori Dam on the an IPP with its own captive mines and has a power May 2008 and a similar program is underway at bank of Mahi River in Kheda District. purchase agreement with GUVNL. Units 3&4 were Unit-2. The plant burns imported and domestic coal. dedicated on 30 May 2010 and two 250-MW units A 500-MW extension is in planning. Photograph courtesy of Gujarat Urja Vikas Nigam Ltd Posted 2 Nov 2008 are planned. All blocks have CFB boilers. Photograph courtesy of Gujarat Urja Vikas Nigam Ltd Photograph courtesy of Gujarat Industries Power Co Ltd Posted 2 Nov 2008 Re-posted 2 Jun 2010 Abbreviations industcards.com/st-coal-india-guj.htm 1/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 10. 06-10-2010 nuclear-india Nuclear Power Plants in India Kudankulam Location: Tamil Nadu Operator: Nuclear Power Corp of India Ltd Configuration: 2 X 1,000 MW PWR Operation: 2010-2011 Reactor supplier: AEE T/G supplier: LMZ, Electrosila EPC: AEE, NPCIL Kaiga Quick facts: This is India’s largest nuclear power Kakrapar project and the Kudankulam units will be the largest Location: Karnataka Location: Gujarat generators in India when completed. Talks first Operator: Nuclear Power Corp of India Ltd Operator: Nuclear Power Corp of India Ltd began on this $3bn project in 1988, but were Configuration: 3 X 220 MW PHWR Configuration: 2 X 220 MW PHWR suspended in 1992 following the collapse of the Operation: 2000-2007 Operation: 1993-1995 Soviet Union. Discussions were restarted and in Nov Reactor supplier: NPCIL Reactor supplier: NPCIL 2001, a general agreement was signed between T/G supplier: BHEL T/G supplier: BHEL NPCIL and AEE for supply of two VVER-1000 units Quick facts: Unit-3 went commercial on 6 May 2007 Quick facts: Two 700-MW PHWR units are planned of the latest design. Equipment was ordered in Feb at 1800hrs. First criticality was 26 Feb 2007, less for construction at this site. 2002, and first concrete was the following month. In than 5yrs after first concrete on 30 Mar 2002. Apr 2002, AEE signed a $200mn contract with Photograph courtesy of Nuclear Power Corp of India Ltd Silovye Mashiny for the T/G sets and the Izhora Photograph courtesy of Nuclear Power Corp of India Ltd Re-posted 23 May 2007 Posted 8 Sep 2004 Factory of Obedinennye Mashinostroitelnye Zavody (OMZ) is under contract to supply the reactors. Russia has granted a state credit to India to cover 85% of the cost of equipment supply. Completion was originally scheduled for 2007 but has been delayed by a variety of factors. Photograph by Petr Pavlicek and courtesy of Intl Atomic Energy Agency Re-posted 17 Mar 2010 Rajasthan Location: Rajasthan Madras Narora Operator: Nuclear Power Corp of India Ltd Location: Tamil Nadu Location: Uttar Pradesh Configuration: 1 X 100 MW, 1 X 200 MW, 2 X 220 Operator: Nuclear Power Corp of India Ltd Operator: Nuclear Power Corp of India Ltd MW PHWR Configuration: 2 X 170 MW PHWR Configuration: 2 X 220 MW PHWR Operation: 1973-2010 Operation: 1984-1986 Operation: 1991-1992 Reactor supplier: CGE, L&T, NPCIL Reactor supplier: NPCIL Reactor supplier: NPCIL T/G supplier: EE, BHEL T/G supplier: BHEL T/G supplier: BHEL Quick facts: RAPS-5 went commercial on 4 Feb Photograph courtesy of Nuclear Power Corp of India Ltd Photograph courtesy of Nuclear Power Corp of India Ltd 2010 with UNi-6 to follow later in the year. Posted 8 Sep 2004 Posted 8 Sep 2004 Photograph courtesy of Nuclear Power Corp of India Ltd Posted 8 Sep 2004 industcards.com/nuclear-india.htm 1/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 11. 06-10-2010 nuclear-india Tarapur 3&4 Location: Maharashtra Operator: Nuclear Power Corp of India Ltd Tarapur 1&2 Configuration: 2 X 540 MW PHWR Location: Maharashtra Operation: 2005-2006 Operator: Nuclear Power Corp of India Ltd Reactor supplier: NPCIL Configuration: 2 X 160 MW BWR T/G supplier: BHEL Operation: 1969 Quick facts: In Oct 1998, groundbreaking for the first Reactor supplier: General Electric 500-MW class PHWRs at Tarapur was held after T/G supplier: General Electric many delays. Unit-4 went critical on 6 Mar 2005 and EPC: General Electric commercial on 12 Sep 2005 and the new reactors Quick facts: A turnkey project. were dedicated to the nation in August 2007. At the time, they were the biggest generating units in the Photograph courtesy of Nuclear Power Corp of India Ltd country. In Sep 2009, the new units were reported to Posted 8 Sep 2004 be producing electricity at Rs2.70/kW. Photograph courtesy of Department of Atomic Energy (DAE) Posted 13 Sep 2008 Abbreviations Updated 06/02/10 Home industcards.com/nuclear-india.htm 2/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 12. 06-10-2010 biomass-india Biomass Power Plants in India Akaltara Malavalli Location: Chhattisgarh Location: Karnataka Samalkot Mill Operator: KVK Energy & Infrastructure Ltd Operator: Malavalli Power Plant Location: Andhra Pradesh Configuration: 1 X 20 MW Configuration: 1 X 4.5 MW Operator: Nava Bharat Ventures Ltd Operation: 2005 Operation: 2001 Configuration: 1 X 9 MW Fuel: rice husk, coal Fuel: bagasse, agricultural waste Operation: 1998 Boiler supplier: ?? Boiler supplier: ?? Fuel: biomass T/G supplier: ?? T/G supplier: Triveni Boiler supplier: Thermax Quick facts: This plant is in Janjgir Champa Dist Quick facts: The project is a joint development of T/G supplier: Shin Nippon and cost Rs 46.45 crore. KVK has a 10yr power Ambience Management Services Pvt Ltd and the purchase agreement with Chhattisgarh SEB, Karnataka Renewable Energy Department. Photograph courtesy of Nava Bharat Ventures Ltd Posted 22 Jun 2007 Photograph courtesy of KVK Energy & Infrastructure Ltd Photograph courtesy of Malavalli Power Plant Posted 27 Jan 2007 Posted 25 Mar 2006 Thoothukkudi Location: Tamil Nadu Operator: Ind-Barath Energies Ltd Configuration: 1 X 20 MW Satya Maharshi Operation: 2006 Location: Andhra Pradesh Fuel: biomass Operator: Velcan Energy India Ltd Boiler supplier: Walchandnagar Configuration: 1 X 7.5 MW T/G supplier: Hangzhou Operation: 2004 Quick facts: This is India's first biomass power plant Fuel: cotton stick, rice husk with advanced steam conditions of 105 ATA/525C. Boiler supplier: ISGEC John Thompson The main fuel is Juliflora supplemented with pulse T/G supplier: Alstom, VA TECH stalk, cotton stalk, cane trash, and coconut shells EPC: Areva T&D with a requirement of about 1.50 lakh tpa. Quick facts: Electricity is sold under a 10yr contract Commercial operation was in May 2006 and the to Aptransco. The plant cost €7.5mn and was plant is running at 75% PLF. All output is sold to financed through a consortium of four Indian banks Tamil Nadu Electricity Board (TNEB) under a 15yr including Andhra Bank, Corporation Bank, Sindh PPA. The project cost Rs 71.91 crore. Ireda Ltd and Bank and State Bank of India. other banks extended a term loan of Rs 50.34 crore Photograph courtesy of Velcan Energy SA and MNRE provided an interest subsidy of Rs 1.83 Posted 17 Jun 2006 crore. The air-cooled condenser system came from China. Photograph courtesy of Ministry of New and Renewable Energy Posted 7 Nov 2009 Abbreviations industcards.com/biomass-india.htm 1/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 13. 06-10-2010 ic-india Diesel and Gas-Engine Power Plants in India Arkay Location: Tamil Nadu Operator: Ind-Barath Energies Ltd Bairabi Configuration: 10 X 8.7 MW 20V34SG engines, 1 X Location: Mizoram Butibori-2 8.1 MW steam set Operator: Mizoram Power & Electricity Dept Location: Maharashtra Fuel: natural gas Configuration: 4 X 5.75 MW 16V32LN engines Operator: Indo Rama Synthetics Ltd Operation: 2006 Fuel: heavy oil Configuration: 3 X 13.5 MW 16V46 engines HRSG supplier: ?? Operation: 2004 Fuel: heavy oil E/G and T/G supplier: Wartsila, Hangzhou E/G supplier: Wartsila, BHEL Operation: 1996 Quick facts: In Mar 2006, Arkay Energy EPC: BHEL E/G supplier: Wartsila (Rameswarm) Ltd, a unit of Ind-Barath Power, Quick facts: This is the largest power plant in completed this power station at Valantharavai, Mizoram. Photograph courtesy of Wartsila Posted 13 Jul 2005 Ramnad District. The plant uses gas from isolated Photograph courtesy of Mizoram Power & Electricity Dept GAIL wells in Ramanathapuram and at the Posted 10 Jun 2010 completion was the largest plant of its kind in India. Photograph courtesy of Wartsila Posted 24 Feb 2010 Haebowal Complex Location: Punjab Operator: Punjab Energy Development Agency Kasargod Configuration: 1 X 1 MW JMC320GS-BL engine Location: Kerala Dalmia Cement Fuel: biogas Operator: KSK Energy Ventures Ltd Location: Tamil Nadu Operation: 2004 Configuration: 3 X 7 MW CM32 engines Operator: Dalmia Cement E/G supplier: Jenbacher Fuel: heavy oil Configuration: 2 X 2 MW 6R32, 1 X 4 MW 12V32 EPC: Clarke Energy India Operation: 2001 engines Quick facts: This biogas cogeneration system is at E/G supplier: MAK Fuel: heavy oil the 50ac Haebowal dairy complex, one of two Quick facts: This is the first IPP in Kerala. The Rs Operation: 1983-1987 E/G supplier: Wartsila centralized facilities in Ludhiana that in total serve 70.70 crore plant has a 15yr PPA with Kerala State 1,490 dairy operations with 150,000 head of cattle. Electricity Board (KSEB). Low sulfur HFO is Photograph courtesy of Wartsila Of a total of 2,500 tpd of manure produced per day , supplied by Bharat Petroleum Corp Ltd (BPCL). Posted 10 Jul 2005 the biogas demonstration project processes 235t to Photograph courtesy of KSK Energy generate electricity and hot water. Entec Biogas Posted 28 Jan 2007 GmbH supplied the biogas system. Photograph courtesy of GE Energy Posted 21 Feb 2007 www.industcards.com/ic-india.htm 1/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
  • 14. 06-10-2010 ic-india Nagarpattinam Leimakhong Modipon Location: Tamil Nadu Location: Manipur Location: Uttar Pradesh Operator: MMS Steel & Power Operator: Manipur Electricity Department Operator: Modipon Fibres Co Ltd Configuration: 2 X 6 MW Configuration: 6 X 6 MW engines Configuration: 1 X 11.5 MW 16V32 engine Fuel: natural gas Fuel: heavy oil Fuel: heavy oil Operation: 2003 Operation: 2002 Operation: 1986 E/G supplier: ?? E/G supplier: Wartsila, BHEL E/G supplier: Wartsila Quick facts: This captive power plant was later EPC: BHEL, Simplex Projects Quick facts: This captive power plant has well over extended to 28 MW and cost a total of Rs 65 crore. Quick facts: The work scope for this project 100,000 running hours having been operated at Fuel is supplied by GAIL and Oil and Natural Gas included a 33/11kV switchyard. baseload for many years. Corp. Power offtakers include Gujarat Heavy Chemicals and Brakes India Ltd. Photograph courtesy of BHEL Photograph courtesy of Wartsila Posted 24 Feb 2010 Posted 22 Aug 2009 Photograph courtesy of KSK Energy Posted 28 Jan 2007 Vasavi Location: Tamil Nadu Operator: GMR Group Configuration: 4 X 50 MW 12K90MC-S engines Fuel: heavy oil Operation: 1998-1999 RVK Konkepudi E/G supplier: MAN B&W, Hyundai, ABB Location: Andhra Pradesh EPC: Hyundai E&C Operator: KSK Energy Ventures Ltd Quick facts: This is the largest power station of its Configuration: 8 X 3 MW G3616 engines kind in the world. Engine output is 70,000HP and Fuel: heavy oil each machine is is as high as a 5-story building. Operation: 2000-2001 The plant cost $235mn and went commercial on 4 E/G supplier: Cat Mar 1999, somewhat ahead of schedule. At the Quick facts: This is the first successful engine- time, CMS Energy held a 49% ownership stake, but based plant of its type in the state. Fuel is supplied the company announed in Nov 2001 that it was from local stranded gas assets and from GAIL. divesting the stake. Low sulfur fuel oil is provided Customers include India Cements and Zuari under a 15yr contract with Hindustan Petroleum Cements. Corp Ltd. Vasavi is connected to the local 110kV Photograph courtesy of KSK Energy grid and operated by Hyundai O&M staff. A Metso Posted 28 Jan 2007 Automation MAX 1000 + PLUS system is used to control and monitor the engines and BOP equipment and the plant has an innovative system that uses wastewater for engine cooling. Photograph courtesy of Elco Power Systems Posted 17 Dec 2008 Abbreviations Data: industcards, Platts UDI World Electric Power Plants Data Base Updated 06/10/10 Home www.industcards.com/ic-india.htm 2/2 Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com