SlideShare a Scribd company logo
1 of 48
Download to read offline
INTERNSHIP PROGRAME




DEPARTMENT OF




      MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO




               (Internship Program Report)
           UNITED REFRIGRATOR COMPANY LTD.
    NO. OF WEEKS :- 1 WEEKS INTERSHIP PROGRAM
              Date : 13-06-2011 To 18-06-2011

   Submitted To:
                   HUMAN RESORCE DEPARTMENT
  Submitted By:
                   MOHAMMAD YOUNUS          (08IN70)
                       JASWANT              (09IN03)
                   MANOJ KUMAR THAKUR       (09IN46)




                  UNITED REFRIGRATOR COMPANY LTD.               1
                             DAWLANCE
                PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                            PREFACE
                    This report contains the information about those
departments which are visited by the internees. Whatever the machinery
seen and the processes are observed, attracting the human mind and
realizes the men what science has achieved and what kind of mericals has
been done by it. Basically United refrigerator company ltd. (dawlance) is
quite attention attracting industry it provides lot of opportunities to see, to
observe, to achieve and to get the lot of experience about the industry as
well as about the machinery.
The technology installed at United refrigerator company ltd. (dawlance) is
the latest one and it includes the hardworking labors, employess who give
their best for the over all effectiveness of the company.
This report may also contains the facts and the real figures of the various
departments which are very beneficial for our experience and the also for
the practical knowledge. The functions and the details of their working and
the process as well as the timing and work break down structure is also
mentioned in this report. This is edit by the students of the INDUSTRIAL
ENGINEERING AND MANAGEMENT DEPARTMENT of the
nominated university of jamshoro named MEHRAN UNIVERSITY OF
ENGINEERING AND TECHNOLOGY JAMSHORO SINDH
PAKISTAN. The details of the students are as under:-
                    MUHAMMAD YOUNUS (08IN70).

                 MANOJ KUMAR THAKUR (09IN46).

                      JASWANT SINHA (09IN03).




                 UNITED REFRIGRATOR COMPANY LTD.                              2
                            DAWLANCE
               PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




              ACKNOWLEDGEMENT
            We are very thankful from the core of my heart to
honorable ASSITANT VICE PRESIDENT , “United Refrigerator
company ltd. (DAWLANCE) “ , ABDUL ALEEM KHAN for
providing us opportunity for training and whose intelligent, wise
and sound leadership has converted manpower into wining
combination by this industry into a gold mine.

           We wish to express my deep gratefulness to
Whole HRD)for their consideration and supervision. It was a
memorable time in United refrigerator company ltd. (Dawlance)
due to his kind concern.

         We are also thankful to all concerned manufacturing
supervisor and engineer’s for their precious advice and for the
great encouragement and cooperation, because of which We have
successfully completed our internship training of UNITED
REFRIGRATOR COMPANY LTD. (DAWLANCE ) where we
learned a lot.




              UNITED REFRIGRATOR COMPANY LTD.                   3
                         DAWLANCE
            PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                    CONTENTS

Days of                    Departments                 Page no.
internships
Day no. 1       Production II
                (shearing, sheet Metal and welding )
                  • Shearing section
                  • Sheet metal section
                  • Welding section
                  • Cabinet
                  • PC sheet
                  • Freezer door                       7 to 11
                  • Basic panel
                  • side panel
                  • Compressor support
                  • Ref door and many more

Day no. 1       PRODUCTION III
                ( THE PAINTING SHOP )
                   • CABINET painting shop
                   • EVAPORATER painting shop
                   • CONDENSOR painting shop           12 to 16
                   • DIP- COATING (Shelf painting
                     shop )




                UNITED REFRIGRATOR COMPANY LTD.                   4
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




DAY NO. 2     PROUCTION IV
               (CONDENSOR
              MANUFACTURING AND OTHERS
              )
                   • Shelf making section
                   • Condenser making     17 to 23
                   • Iron handing section
                   • Chrome section
                   • U-V Light section.

Day no. 3     PROUCTION V ( PRE –
              FOAMING )
                • What is PRE – FOAMING ??         24 to 27
                • Process of PRE – FOAMING &
                  Stages.
Day no. 3     PRODUCTION V ( FOAMING )
                • What is FOAMING ??                28 to 29
                  Process of FOAMING ??
Day no. 3     PRODUCTION VI                 (
              ASSEMBLY LINE )                      30 to 31
                • What is Assembly line ???
Day no. 4     PRODUCTION I
              (PLASTIC MOULDING SECTION)
                • Compounding section
                • Injection section                 32 to 36
                • Hot stepping section
                • Steam print section.
                • Extrudes section
                • Cable section

Day no. 5     MAINTENANCE
               • What is MAINTENANCE ??
               • Objective of Plant Maintenance
                  ??
                  Importance of maintenance.       37 to 39
              UNITED REFRIGRATOR COMPANY LTD.                  5
                         DAWLANCE
            PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                 • Methods of maintenance.
                 • Maintenance at Dawlance.

Day no. 6        QUALITY CONTROL
                 DEPARTMENT
                 • QUALITY AND CONTROL
                   (Definations)
                 • What is QUALITY CONTROL         40 to 48
                   ???
                 • Quality Control At Dawlance.
                 • Quality Engineering Cell.
                 • Incoming Quality Control.
                 • Self Quality Inspection.
                 SUGGESTION’S




              UNITED REFRIGRATOR COMPANY LTD.                 6
                         DAWLANCE
            PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      7
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




SHEARING, SHELF METAL AND WELDING

Shearing => To shear off the requires size of sheet is called a shearing
process.

Sheet -Metal => the various process that has been perform over the metal sheet
sop that give is the requires shape is to be called a sheet metal.

Welding => A process of permanent fastening important type used the most
important type used in dawlance is tug welding.
   • It is the refer color; production eleven is the section where the man body of
      refrigerator is to be manufactured.
   • Though the production elevens section is used to manufacture a lot of
      component put the cabinets is of the important component of production eleven
      section.

RAW-MATERIAL OF PRODUCTION - II
       The raw- material of production of to (in the sheet form)
1) Metal steel
2) Galvanized iron
3) Vinyl coated Material (VCM)
4) Aluminum

SHEARING SECTION:
         One the raw-material is receive from the store the sharing section is something
that actually share of the sheet according to the requires size of specifications.
The cabinet sheet is to be share of the sizing of
    • Length = 3824mm
    • Width = 655mm
    • Thickness = 0.4mm

  Other thing also shares off according the specifications.

SHEET METAL SECTION:
       There are basically no of parts has manufactured in this section.
The sheet metal section is basically best upon the 4 major area which are as follows.
1: Automatic sheet feed
2: Whole processing and notch (bending)
3; forming section
4. Pressing section
The sheet metal is basically used to produces a no of parts of refrigerator, such as
                   UNITED REFRIGRATOR COMPANY LTD.                                      8
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




   1.   Cabinet
   2.   PC sheet
   3.   Freezer door
   4.   Basic panel
   5.   side panel
   6.   Compressor support
   7.   Ref door and many more

CABINET:
            The cabinet is to manufacturing once the sheet is receive from sharing the
automatic sheet feeder suck the sheet and feed the sheet then sheet through crame is to
be shift into the forming section where the form of profile and embossing can take
place and after ward that formed embossed is equally bended to form a cabinet.

PC-SHEET:
           The pc sheet is the sheet that makes separates the freezer unit ref :a in other
word we can say that the I.C sheet is used to make separate n/n ref and free from the
upper side of refrigerator

PROCESS:
        It can be making by follow the following operation.
  1. Notching process
  2. Forming process
  3. embossing process
  4. Whole process

   BACK PANEL:
                       It is back side of refrigerator body that is to be attached with the
   cabin net.
   It is to be noted that is in small size refrigerate there Is only back panle and there is
   no need for the bottom end as it also requirement in the refrigerator.
   PROCESS:
                The back panel is to be made by the
   1) Drilling the piece of M.S of sheet
   2) Notching that piece
   3) Whole also with the machine
   4) first bending
   5) 2nd bending

   After that this do of is to welded with the cabinet by spot welding process.

   SODE RANGE:
                   UNITED REFRIGRATOR COMPANY LTD.                                         9
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




         It just like the side panel it also require 1st cutting and the 2nd cutting and then
   just and 2nd pending.

   FREEZER DOOR:
                        it is the front door of the refrigerator and it is to be made by
   the VCD material sheet.
   The size of VC sheet used a freezer door
   • Length = 546 mm
   • Width = 768 mm
   PROCESS OF FREEZER DOOR
                The freezer door is according following the process
   1: Notching
   2: Handle pressing
   3: Embossing
   4: first banding
   5: final banding

    REFRIGRATOR DOOR:
                      It is also be made with the VCD type of material and it make we
of same process as that of freezer door each and every step in same.

COMPRESSOR SUPPORT:
               It is the part that can be placed in the both part of the ailment and it
support the compressor.
PROCESS:
            The process to manufacture the compressor is as
            1: whole plating
            2: further 2 more whole
            3: just bending
            4: final banding

WELDING SECTION:
                           Basically welding is the process of permanent fastening
therefore is the section all or same part are to fastened by tug welding so that the
required type and shape of cabinets is to be shift the painting shop.
            Basically at sheet metal the welding section is used to perform that activity
so that the form bended and imposed cabinet is to be welded with the back panel and
sight panel and the it is screwed with the compressor support.
At the end of the welded section the welded cabinet is to be shift to the paint shop for
the further paint processing.


                    UNITED REFRIGRATOR COMPANY LTD.                                        10
                               DAWLANCE
                  PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      11
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




PRODUCTION III THE PAINTING SHOP

           It is basically the painting section used to paint the various iron so that it
could be transfer into the final assembly shop.
 It includes the,
     • CABINET painting shop
     • EVAPORATER painting shop
     • CONDENSOR painting shop
     • DIP- COATING (Shelf painting shop )

We had already discussed the dip-coating (shelf painting) and were here now we
learned the cabinet and evaporator painting

                           • CANBINET PAINTING SHOP
                          As we know that whenever we are painting any thing first of
   we need phosphating process so that the cabinet is to be easily painted. The cabinet
   here though the following painted stages.
   STAGES # 1
             High pressuring over the refrigerator so that to remove as the welded
   particle.

   STAGES # 2 PHOSPHATING
                The phasphating process is actually though the following tank There
   are basically 4 different tankers. Out of them 2 of the chemical tank , 1 of water
   tank and 1 of di-ionized tank.
   The phosphating process begins after following the first step now the cabinet is
   dipped into the tank 1 ( which has the metaphoric chemical ) and then dipped into
   the tank2 ( which Laos has the same chemical ).
    Once the cabinet taken –off from the tank 2 then it is to be dipped into the tank 3
   which has the raw water.
   Finally the cabinet is to be placed into the di-ionbized tank and then the cabinet is
   to be phosphated.


   STAGE # 3 :- DRY OVEN
              At this stage the phosphated cabinet is placed into the dry even which
   has the temperature of 110 ;140 degree centigrade . the dry oven has two function

                    UNITED REFRIGRATOR COMPANY LTD.                                         12
                               DAWLANCE
                  PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




fisrt it is use to dry the water and moisture and secondly it is also make able the
cabinet sheet to be attain the more powder ( as in next step ).

STAGE # 4 :- POWDER ROOM
               After dry oven the cabinets are to be hanged into the conveyor hanger
and it is to be transferred towards the powder room.
A powder room is a highly automated room that is used for powdering or coating
of powder over the cabinets.
The powder room has 15 gm over the cabinets and this powder can be done by the
gun system in a powder room so that the layer of powder is to be coated over the
cabinet.
The functioning of powder room is done by the automated system which is
controlled by then computer based system and its basic to coated a layer of powder
over the cabinet.
In powder room by gun system the cabinets are coated with the JOTUN powder of
layer 35 to 70 micron.

STEP # 5 :- BACK OVEN
                  This is the end process of painting shop here the powder cabinets
are to be backed into the oven so that the powder is to melted and forming in the
paint over the cabinet.
Actually in back oven the polymerization process takes place because once the
temperature has been provided to the powder tends to polymerized and forming a
chain so that it is to be transmitted over the cabinet.

IMPORTANT TO REMEMBER
   • The cabinet paint shop has the capacity to paint 1800 to 1900 cabinet
     paint per 24 hours i-e capacity = 1800 to 1900 cainets paint per 24
     hours.




                UNITED REFRIGRATOR COMPANY LTD.                                       13
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                       • EVAPORATER PAINTING SHOP
              As we know that the evaporator in consider to be the heart of
   refrigerator and without the evaporator refraction is not exist. Evaporator is the part
   that makes cooling within the refrigerator.
   Evaporator is fitted inside the refrigerator and it is to be painted in white color.
   The process of evaporator painting is as same as that of cabinets one within certain
   amendments. However evaporator painting are requires phosphating and
   powdering etc.
   We can put forward the evaporator painting in the following stages.

   STAGES # 1 :- EVAPORATER PHOSPHATING
                 The evaporator phosphating process is done in 4 different tanks.
   First of all the evaporator is dipped into the tank -1 which has the met clean
   chemical.
   After that the evaporator stays in tank-2 and tank-3 which is rinsing water tanks.
   After that it is to be dipped into the tank-4 which has the metachrome chemical.
   Finally again it is to be dipped into the rinsing water tank.

   STAGE # 2 :- DRY OVEN
                After phophating the evaporator is to be dried into the dry oven which
   is at the temperature of 140 to 160 degree centigrade so that to remove all the
   moisture effect and also make the evaporator to sustain the powder.
   STAGE # 03 :- POWDER COATING
              The powder coating over the evaporator is to be done on both the front
   and back side of the evaporator.

   STEP # 04 :- BACKING OVEN
              In last the evaporator is to be shifted towards the back oven which is al
   the temperature of 205 to 220 degree centigrade and where the powder is
   polymerized and evaporator is to be painted.

                          • CONDERSOR PAINTING
          Like all other painting section shops the condenser painting is also follwed
the same process as that of other painting process.

PROCESS OF CONDENSOR PAINTING
             The process of the condenser painting is being done in the following two
different stages.
                    i)     Phosphating

                   UNITED REFRIGRATOR COMPANY LTD.                                       14
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                    ii)    Painting

PHOSPHATING
             The phosphating if condenser is to be done by passing through the no. of
condenser to various chemicals which is in the tank .
First of all the manufactured condenser is dipped into the metaclean 375 tank and it
stayed over there at 1 to 5 min.
Now the condenser is then dipped into the fresh rinsing water into the 2nd tank.
After that it is to be dipped into the tank of metaphor 247 chemical tank. And after that
through pressure vessel it is to be dried.
At the end of phosphating the condenser suppose to shift into the dry oven and where
the all moisture are dried from the phosphate condenser.
PAINTING
                The painting begins when JOTUN powder is to be paint over the
condenser after phosphating on both sides of condenser and this condenser with the
help of crank is to be inserted into the back oven so that powder is to be converted into
the layer of painted color. The temperature of back oven is about to be of 250 degree
centigrade and it is placed within the back oven for the period of 11 min.
It is important that the JOTUN powder use in condenser painting section if of different
form and have it own load.

Important to Remember …..
    • The capacity of condenser paint shop is 1700 condenser paint
       per day.




                   UNITED REFRIGRATOR COMPANY LTD.                                     15
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      16
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




             Like all other production section the PRODUCTION IV is also on e of the
most important section of refrigerator production. It is use to make some important and
value able item of refrigerator.
There are various sections those are comes under production IV category
   i)      Shelf making section
   ii)     Condenser
   iii)    Bottom condenser
   iv)     Iron handle making section
   v)      Galvanized section
   vi)     Chrome section
   vii) U-V light section
   Through out all section of PRODUCTION IV have their own importance and
   without them the processing is incomplete but the most importance item produce
   by production iv is the condenser because without the functioning of refrigerator is
   impossible.
   Now we shall discuss each section in detail….

   SHELF MAKING SECTION
              The shelf of the refrigerator is to be manufactured in this section. This
   shop is used to make all different type of the shelf of different refrigerator model
   and its highly depends upon the customer requirement e.g if the administration of
   the production Iv receive the plan from production planning department to
   manufacture 9175 WBM’s shelf so they suppose to act according to the
   requirement.

          The capacity of the shelf section is to produce 31000 shelf per day and
          its make use of 7 different type of machine and also having the strength
          of 57 peoples.

   EQUPMENT IN USE
             The shelf manufacturing makes use of different machines and welding
   device.
      • Starter and cutting machine
      • Pressing machines of different type
      • Tag welding

   PROCESS OF SHELF MAKING
           The processing of shelf manufacturing begins when the raw coil of
   thickness 2.5 mm is been receive through store and then the starter cutting
   machines first make starter the coil and then cutted of required size ( depends upon
                   UNITED REFRIGRATOR COMPANY LTD.                                        17
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




the requirement ) , now the cutted coil is then bended and it is to be welded now
the frame of the shelf is been and also ready for the further processing.
        Now again the no. of strip is also to be cutted so that there can fixed into
the shelf and then the shelf is to be welded by the tug welding process.
         Now in order to support the shelf various section of straight shapes, L –
shapes, Z- shapes, the basic purpose of these section is that they used to provide the
support to the shelf of the refrigerator.

DIP- COATING / PAINTING SHOP
            It is basically the shop which is use to painting the manufactured shelf
but very few other parts are also been painted in this shop.

PROCESS OF DIP COATING PAINITNG
       The actually process is begins with the PHOSPHATING.
The phosphate process is based upon the various chemical in different tanks,
therefore first of all the manufactured shelf is first dipped into the tank -1 ( which
contain the dioxide chemical ) within 10 to 15 min , the shelf is to be placed in this
tank and then it is dipped into the 2nd tank (which contain only raw water ) and
within few minutes the it is to be dipped into the 3rd tank ( which is of Guadine 20
chemical ) and it is placed up to 5-7 min and finally again dipped into the rinse
water.
Once the phosphating the next is the coating painting
       The phosphated shelf is then placed within the Backing oven ( which has the
temperature of 225 degree centigrade) after a few min these shelf are then to be
dipped into the powder ( JOTUN POWDER ) and then these are placed into the dry
oven ( has the temperature of 225 degree centigrade) and in last it is to be dipped
into the water.

       Capacity of DIP-COATING section is 1000 shelf paint per day
CONDESNSOR MANUFACTURING
         Every manufacturer knows the importance of condenser in refrigeration
process and without condenser the existence of the refrigerator is almost
impossible because it is something that maintain the refrigeration cycle. Therefore
in order to make the condenser manufacture the condenser much careful analysis
are required.
This section is use to make two different condenser.
i)     Back panel condenser ( actually called as condenser )
ii)    Bottom condenser

           The actually the first step towards condenser manufacturing is taken by
           the engineering department.
               UNITED REFRIGRATOR COMPANY LTD.                                      18
                          DAWLANCE
             PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




           Engineering department through critical analysis used to check the
           actual condenser and then give the effective and efficient proposed way
           to manufacturing in the shape of drawings, equipments etc.


BOTTOM CONDENSOR
          Most of people even don’t know is there any condenser in the refrigerator
that place in the bottom of the refrigerator. The basic function of this condenser is
also to reduce the temperature like other condenser do so .

PROCESSING OF MANUFACTURING THE BOTTON
CONDENSOR
            The process of manufacture a bottom condenser requires a drawing and
the drawing varies from model to model of refrigerator therefore the size and coil
of bottom condenser also varies.
With the help of different pressing machine to complete the sheet and bending the
coil as per requirement through tug welding is then to be fitted.




BACK PANEL CONDENSOR (ACTUAL CONDENSOR)
         It is one of the most important and more meaningful part of the refrigerator
and the effectiveness of condenser is necessary for the active life of the
refrigerator.
PROCESS TO MANUFACTURE A CONDENSOR
         Once the plan has receive by the PPC to the production IV section and
according to this plan the condenser of particular quantity of particular model has
to manufacture.
          The first is to make use of MS sheets cutting strips then with the help of
shutter machine a late form in which certain operation carried out one by one such
as embossing, fins making is to be done.
          The bending section first to cut the coil and straight it with the straighter
shutter machine and then bend the coil through is winches and dies is that the
required bending is to be obtain.
          Once the plate and bending is prepared now with the help of tug welding
there plate with bended is to be welded.
         Now the end plates of condenser that has been manufactured by pressing
machine is also to be welded by tug welding process.

                UNITED REFRIGRATOR COMPANY LTD.                                       19
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




        Now at the end the strip of MS also welded so that to provide the proper
reinforcement to the condenser .
By following the above stages the condenser is said to be manufactured.

GALVANIZED SECTION
       It is the very little type of section and its purpose is to nickel the various
parts such as
i)      leg holder
ii)     top middle bottom hinchees.
iii)    Screws and others parts.
          The basic behind this section is to do the nickel plating so that to remove
all the abrasive material, oil, Greece etc.
CHEMINCAL IN USE
Following ar he chemical those are used in this section
     • Zinc brightener
     • Zinc Californiazinc anodenitric acid




ALUMINIUM HANDLING SECTION
       It is the section which is bound to make the aluminum handling for the
refrigerator for the opening and closing of the door.
PROCESS OF ALUMINIUM HANDLING SECTION
     Already manufactured profile of aluminum is to be purchased from abroad
and then this profile is cutted according to specification of handle requirement.
      Once the size is to be cutted then with the help of numerically control milling
machine a profile is being made to provide groove type of section so that the
handle is to be fixed.
CHROME SECTION
     Once the handle cover is been made by the modeling section to make the
handle cover then the crossing of that part is to be taken place.
PRCESS OF CHROMESECTION
     The chroming is to be done by following the certain steps
STEP # 1 :- ETCHING BATH
    First of all the handle cover is dipped into the chromic acid in the etching bath
which is al the temperature of 65 degree centigrade.
STEP # 2 :- WATER TANK
After the etching process the handle cover is to be dipped into the raw water .
STEP # 3 :- After that it is to be dipped into the HCL and also into the
neutralization drum.
                UNITED REFRIGRATOR COMPANY LTD.                                         20
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




STEP # 4 :- After wards it is to be placed into the activation bath which also
include certain amount of HCL.
STEP # 05 :- Now at this the nickel sulphate electroplating is to be done.
STEP $ 06 :- after that the it is to be dipped into the copper the layer of copper
in comes over the handle.
STEP # 07 :- Nickling is to be done at this stage hence the nickling also to be
placed over the handle.
STEP # 08:- At the very last stage the chroming is to be done over the handle.


U-V LIGHT SECTION
        The only haxon model of refrigerator inn which there is type of fan placed
within the refrigerator.
The function of that fan s that when door is closed its used to provide the air sot
that the ice is to be melted for the effective cooling of refrigerator.
So in this section fan with its parts to be assembled here.




               UNITED REFRIGRATOR COMPANY LTD.                                       21
                          DAWLANCE
             PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      22
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




PRODUCTION V               (PRE- FOAMING)
            Till production we are making, painting the certain parts so that they
should combined to form the original product.
   • The production V ( i-e PRE – FOAMING ) as the name suggest it is the pre
       of the foaming that is it the place where the various operation is to carried
       before it is to be placed to formed.
   • At the pre foaming the necessary item such as the liner, freezer and anti-
       moisture tube, evaporator are to be inserted into the actual body of cabinet.
PREFOAMING PROCESS
          The actual process of pre-foaming is starts when the painted cabinets
from the cabinet painting shop are comes to the pre-foaming zone.
We can underline the each and every step of pre foaming now
STEP # 01:- First of all the compressor support is un-screwed from the
painted cabinet.

STEP # 02:- The gum- type material named as slent is to be inserted into the
corner edge of the painted cabinet in order to make proper isolation.

STEP # 03:- Washer type material is tape within the four whole if the back panel
so that condenser is to be screwed easily in it.

STEP 04:- Bottom profile is inserted within the embossing area in the bottom.
STEP 07:- spaces in fixed in the back panel so that the pipe which is fitted in it.
STEP 06:- Groemr also fitted with the wholes.

STEP 07 :- Anti moisture strip a black pipe is to be inserted within the profile
cabinet.
The anti-moisture strip has two functions first as the name suggest its used to
prevent from the corrosion effect also the gas kit ( rubber type ) within the door is
causes to crack because of cooling inside so it is also prevent this as it is connected
with the compressor.
STEP # 09 :- the freezer box is to be further includes the following sub- systems
Sub – step 1:- the painted evaporator from the EMD is bend by the press
machine.
Sub-step 2:- the bended evaporator is then to be check for the little inspection.
There are basically two different inspection tests,



                UNITED REFRIGRATOR COMPANY LTD.                                       23
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




i)     A LEAD DETECTOR MACHINE :-
            A machine which is used to detect the all the pipe and join of the
evaporator by inserted the Freon gas.
The detector even has the capability to detect 1.0 micro gram of area.
Once the evaporator is OK then it is to be shifted for the next test.
The statistics show that there are basically 8 to 10 evaporators rejected in lead
detector test.
Once the purpose is established hen the Freon gas is to be ejected and stored and
from the evaporator.
ii) The 2nd inspection include is to check the mass flow rate within the evaporator
and it is to be done by inserting the Nitrogen gas from the capillary. It is also gives
the benefits in the shape that it tends to clean the evaporator by the nitrogen gas.
Sub- stage 03:- Obtaining a evaporator frame.
The evaporator from is to be make by joining the evaporator the side plate
thorough a silicon type of material.
Now this flow is to be fitted with the freezer side of the cabinet.
STEP # 10:- The ref portion of the refrigerator is to be undertaken and it can be
divided into the following sub steps.
Sub – step 01:- the liner which is come form the thermosetting section is first
sized and cutted by the press machine. With the size the whole also produce which
is of evaporator and thermocouple.
Sub-system 02:- after that the head after and thermostat cover is taped within
the liner.
Sub- system 03:- a light pipe is having the wire which is the fitted with the
thermostat on one hand and head after on the other hand.
STEP # 11:- Liner is fitted within the cabinet i-e liner completely fitted within
the cabinet.
That’s the end of the pre-foaming suction.




                UNITED REFRIGRATOR COMPANY LTD.                                       24
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      25
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




FOAMING SECTION
       The foaming section is a place when the pre-foamed cabinet is to foamed by
the automated machine.
The foam which is to be inserted within the pre-foamed foam than it is solidifying
within a few minutes.
The foam is basically made of two different type of chemicals.
i)     Polyoal
ii)    Iso – cynate
iii)   R141B ( a gas whch is used as a catalyst )
       • The foaming section has the capacity to filled 81 mould foam per
           hour i-e capacity = 81 mould foam per hour.
PROCESS OF FAOMING
        The process of foaming section begins by fixing the jigs and fixture within
the ref section so that while foaming the inside the refrigerator is not bend etc.
After that the highly automated the mixture of foam is to be inserted within the
cabinet.
The dawlance has 9 moulding foam hangers which is highly automated and used to
operate according to the sensors and actuators and various other things.
Basically the mixing of chemicals as to form the foam is to be as
100 % of polyoal
1260 % of iso –cyanides
16 % of R141B.
It can be termed as ,
                P           :         g       :    I

                100     :            16       : 1260




                UNITED REFRIGRATOR COMPANY LTD.                                  26
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      27
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




ASSEMBLY LINE
         This is the very last portion of this shop also the refrigerator
manufacturing.
       At this stage the all parts that we have made in deferent section such as sheet
items or main body items we made in sheet metal section, plastic items we have
marked in moulding, condenser e have made in production IV , shelf we have
make in production IV , freezer and ref door also assembled
Therefore is assembling shop we are the assemble all items to make the
refrigerator.
At the end certain inspection made refrigerator takes such as vacuum generation
and then the Freon gas is also inserted into the refrigerator.
At the end of assembled line the refrigerator are to be packed and transferred to the
store room as a inventory so that it is it be distributed.




                UNITED REFRIGRATOR COMPANY LTD.                                     28
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




PRODUCTION I (PLASTIC MOULDING SECTION)
           UNITED REFRIGRATOR COMPANY LTD.      29
                      DAWLANCE
         PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




          As the name suggest plastic molding the production is said to manufacture
all plastic type of equipment that can be used in refrigerator manufacturing.
There are 6 section includes in moulding each section have its own task to with
they can act these are as follows,
i)      Compounding section
ii)     Injection section
iii)    Hot stepping section
iv)     Steam print section.
v)      Extrudes section
vi)     Cable section
        • The compounding and injection are the most basic sections and these are
             those which used to produce they different plastics items in proper
             quality and quantity.

COMPOUNDING SECTION
         The raw material of various plastics material in the form of huge grain is
received in compounding portion through store room.
These raw materials includes,
        PS
        ABS
        HIPS
        LIPS
        PC
        NYLONE &
        PP.
        The compounding section used to mix the raw material with the pigment so
that required color of particular item is obtained.
The mixing can be done by two different type of devices.
i)      DRUM MIXTURE
ii)     VERTICAL MIXTURE




DRUM MIXTURE
         Drum mixture is a device which consist of two different drum and b/w the
there is a motor that has the rotatory function. The motor used to rotate the drum.
Each drum has the capacity to take two beg ( each beg of 25 kg i-e 50 kg ) so we
can say that drum mixture can take 100kg of a material in a time.
PROCESSING OF DRUM MIXTURE
       The processing of mixing of material through drum mixture is such that
mixture the beg of 25 kg of material insert into the drum then the amount of
               UNITED REFRIGRATOR COMPANY LTD.                                    30
                          DAWLANCE
             PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




   pigment according to the standard weighted and insert into the drum and then again
   another beg also inserted into the drum and similarly the next drum also filled.
   Now the drum mixture start rotating and mixed the material with the pigment and
   in 5 min the material is kept out just within the 5 min.
   Therefore we can say that the drum mixture has the capacity of 100 kg of material
   to be mix in 5 min.
  VERTICAL MIXTURE :
               It is also the mixing device and used to mix the material with the
pigments go that the required material can be obtained.
     Though it can be used to mix all type of material but in compounding section of
dawlance it is specifically used to mix the poly storing (IS) material with the pigment
of T- brown , T green, smooth gray. Height impact poly strien (HIPS) material with
the pigment of brilliant white.
INJECTION SECTION:
   • It is heart of the moulding section here all plain parts are been manufacture
     through injection mould mallina.

   • The highly automated machine CLF- INJECTION MOULDING MACHINE
     use in this section.

   • The machine can varies clapping force i.e the injection moulding machine
     (CLF- 8OT) has the minimum clapping force injection moulding machine
     (CLF- 800T) has the maximum clapping force.

   • There are basically 52 CLF-MOULDING MACHINE’S are used and can vary
     in diff: clapping force to make very small item to the heavy plastic item.


PROCESS OF CLF (INJECTION MOULDING MACHINE)
         Basically the processing of CLf is based in the four different sections.
1. Hooper
2. Bassell
3. Injection side
4. Eject side

1. HOOPER:
          First of all material (mixed material) has come from the compounding
section. Hooper actually use to collected the inserted material alive is the shifted in to
into the bassel.

2. BASSEL:
                   UNITED REFRIGRATOR COMPANY LTD.                                      31
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




           After Hooper the material hydraulic piers machine comes into the bassel. In
bassl this material first heated thorough 7- different zone and reach zone has two
heaters.

3. INJECTION:
       Once the material is to be melted with the help of heated now the material is to
be injected through layer 6 to 7 different stage into the injected mould.

EJECT:
          After completing the ague the maked part in then eject from the machine so
 that to perform the work.
From all these the other part i-e. carriage is used to be mixed

HOT STEPPING SECTION:
                   It is little section in which chosen stepping is to be done over the
freezer door pocket that desirable the various sign.

EXTRUADES SECTION:
              It is the of section actually injection moulding process and it is also
used to make the profile that has been mould plastic material and give the shape of
profile.

CABEL SECTION:
                The refrigerator wire connection from the electric require a plug and
 cable so in this there things are to manufactured.
Once the wire (cables to be purchased that first of on this cable are cables are to cutted
 the required size and then the folly steps are to be taken
1.      Core stepping
2.      Wire stepping
3.      Pinch moulding
4.      Pinch foulding
5.      Princh moulding machine

  SCREEN PAINTING:
              As one have seen that there is numbering over thermometer regulator,
also we have is painting over the shelf “wider shelf “ similarly these is certain
coding we have seen, so in thing reaction i-e “ screen painting , there coating has
been painted over the items.



                   UNITED REFRIGRATOR COMPANY LTD.                                      32
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




MAINTENANCE

           UNITED REFRIGRATOR COMPANY LTD.      33
                      DAWLANCE
         PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




               Today, in modern industry, equipment and a machinery are a very
  important part of the total productive effort than was the case years ago. Moreover,
  with the developments of special purpose and sophistical machines, equipment and
  machinery cost a lot more money and there fore their and does time becomes much
  more expensive. For this reason, it is vitally important that the plant machinery
  should be properly maintained.

  OBJECTIVES OF PLANT MAINTENANCE

  i)     The objective of plant maintenance is to achieve minimum breakdown and to keep the
         plant in good working condition at he lowest possible cost.
  ii)    Machines and other facilities should be kept in such a condition which permits them to
         be used at their optimum (profit making) capacity without any interruption or
         hindrance.
  iii)   Maintenance division of factory ensures the availability of the machines, buildings,
         and services required by other section of the factory for the performance of their
         function at optimum return on investment whether this investment be in material,
         machinery or personnel.

IMPORTANCE OF THE MAINTENANCE
  i)     The importance of the plant maintenance is varies with the type of the plant and its
         production.
  ii)    Equipment breaks down leads to the inevitable loose of production.
  iii)   An improperly maintained or neglected plant will sooner or later requires expensive
         and frequent repairs, because with the passage of the time all machines or other
         facilities (such as transportation facilities), buildings, etc wear out and need to be
         maintained to function properly.
  iv)    Plant maintenance plays a prominent role in production management the plant break
         down create problems such as,
             • Loss in production
             • Rescheduling of production
             • Split material (because sudden stoppage of process damages in-process
                   materials).
             • Failures to recover overheads (because of loss in production hours).
             • Need for over time.
             • Temporary work shortage- workers require alternative work.

   METAINENCE METHODS
              There are basically two different maintenance methods i-e
  i)     Tribology
  ii)    Tero technology

  TRIBOLOGY

                  UNITED REFRIGRATOR COMPANY LTD.                                           34
                             DAWLANCE
                PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




          It is the method of maintenance that deals with the lubrications impact of
the machine by proper maintenance.
It includes oiling, greasing etc.

TETO-TECHNOLOGY
           It is also the methods of maintenance that deals with the mechanical
effect of the maintenance such as repairing of the part of machine, overhauling of
the machine.

MAINTENACE AT DAWLANCE
           (United Refrigerator Company)
            At dawlance there is a separate maintenance which constitute of several
engineers, technicians, and a skilled labors.
Their work is basically based upon the team efforts in which each persons has
certain responsibilities.
This section is centrally connected but all other section of industry by means of
computer network software (ORACLE) and also within the telephone.
They use to work into different format first they have collect the data of all bug to
small machines procession and divided these data of each part of machine into
various activities and also assign a scheduled of maintenance of each activity so
that to work accordingly.
The second format on which they work is that whenever any break down occur in a
production as per receive the compliance of particular maintenance they work upon
it.
Except production work their are other areas such as puncher shop, compressor
maintenance shop, generator maintenance, electrical maintenance department.




               UNITED REFRIGRATOR COMPANY LTD.                                       35
                          DAWLANCE
             PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      36
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                 QUALITY CONTROL DEPARTMENT
QUALITY:-
       Though there are no. of definition of quality but in very simple works it can
be term as “ To meet the customer’s specification “.

CONTROL:-
          The provision to control the action or plan is to be control so that to meet
the requires as per planned.

QUALITY CONTROL:-
           Quality control refers to the control level of quality si that to lead to the
customer satisfaction.
• It is the provision under which the proper and effective quality it to be obtain so
   that to lead the market position.
• In an organization the term quality is as big as it can and under a no. of quality
   units are working their work to inspect the ongoing activity as per standard and
   then mark as OK, HOLD, USAI, REOWRK & SCRAPE.

QUALITY CONTROL AT DAWLANCE
       The quality is given the major relaibnility at dawlance and therefore the
central quality control department is been devied in deffrent quality section
i)      Quality engineering cell
ii)     Incoming quality control
iii)    Quality assurance
iv)     Self quality at each manufacturing section
v)      Quality process lab.
And many other departments ……

QUALITY ENGINEERING CELL
           It is basically the quality section is which all the documentation are to be
taken places
It is use to keep the documentation like of each section and even each section’s
item that has produces….
     a) Quality instruction
     b) Work instruction
     c) ITI ( Instruction Testing Inspection )
     d) Sampling Inspection
     e) Quality status
Now we shall discuss each section in detail..

                UNITED REFRIGRATOR COMPANY LTD.                                           37
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




QUALITY STATUS
       While inspected anything the doud full item are to be taken into 4 basic
consideration rather than just to be called as scraped i-e by reviewing whole
parameter the decision regarding the item is to be taken.
There are basically four quality status .
i)      HOLD
ii)     UAI (use as is)
iii)    REWORK
iv)     S CRAPED
It can be illus trade as ,




                   HOLD                             UAI



                                                 SCRAPED
                 REWORK




HOLD =              During inspection the defective part is to be hold.
               UNITED REFRIGRATOR COMPANY LTD.                                    38
                          DAWLANCE
             PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




 USE AS IS (UAI) = Though the part is not fully mismatched with the
 standard but the negotiation between the manufacture and quality incharge is to be
 taken and the item is it be USE AS IS (UAI).

 REWORK           =     There are few items those are require to rework so that to be
 come into the required expectation
 .
 SCRAPE           =       The item is to be scarped.

 QUALITY CONTROL MANUAL
         It is basically a manual that can help the operator to perform the work takes
 as it includes all type of activities.
 These are those type of manual which use to perform the training function to the
 operation because its includes set of instruction of every used item.

 SAMPLING TABLE
          As we know when raw material receive there are basically a no. of lots and
 each lot having a no. of item therefore is extremely difficult to check each and
 every item and also time consuming because if we are doing to inspect every item
 so it is very difficult for us to meet the required demand.
 Therefore the process begins by checking first 3 lots completely i-e 100 % and then
 if the fault rate is same or reducing the accordingly move toward the sample mood
 in which according to lot size the item are randomly selected.
 The sampling mood sheet can be illustrate as ,

                              SAMPLING TABLE

LOT SIZE                          ACCEPT QUALITY LEVEL
               SAMPLE SIZE             ACCEPT                        REJECT
  2 to 8            2                     0                             1
 51 to 90           3                     0                             1
500001 to          13                     1                             2
   over




                 UNITED REFRIGRATOR COMPANY LTD.                                     39
                            DAWLANCE
               PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




            • ITI (INTRUCION TESTING INSPECTION)
           It is basically a document in which whole process and way of doing of
each and every part is given.
It is a document which includes all the defects even that has observed before in the
form of major and minor defects.
Basically there are 872 type of ITI’S are there.

                               • DC / IDC FORM
DC = DECIPLANE CHECK
IDC = INTER DECIPLANE CHECK
        It is the document which bund to check the discipline of particular item i-e
the item like sheet coil is been check by the sheet metal inspector. After that it is
inter disciplinary check by the concerned related section.

       • RELIABILITY IN AN ACTION PROGRAM (RIAP)
      It includes basically a proframa which describe how training programs are to
be undertaken.
What are the progress of training i-e how to be calculate.
What is the procedure of doing the basic task etc.

       • INCOMING QUALITY CONTROL DEPARTMENT
         Incoming quality control is basically a quality section whose function is to
inspect all incoming raw material that can be utilized for different purpose in
different place. They used to work according to the instruction has given in ITI of
particular item and each ITI is different for different items.
We also know the dawlance (united refrigerator) can purchase the material both
expert from other countries and also taken from the local suppliers.
PROCESS OF INCOMING Q.C
       The procedure of incoming quality control section to inspect the raw item
can be under line in the following steps.
STEP # 1:- RECEIVE PROCESS
        It is the visually process once the raw material is receive the proforma that
has been given within the raw material by the supplier is to check whatever written
in the from of quality is placed or not.
STEP # 2:- QUALTY INSEPCTION
            It is the main inspection in which the raw material quality is to be
inspect to mismatch with the standards
Initially the first three lot are to fully inspected i-e 100 % checking and after that
the defect level over in first 3 lots are satisfactory the we shall proceeds to the


                UNITED REFRIGRATOR COMPANY LTD.                                          40
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




sample mood when according to the lot size sample is randomly selected and then
be inspected.
       It is very much important to remember the incoming Q.C is not able to
inspect all items just like chemical type of material is to be inspected in Q.C lab
and hence the C-FORM is to be make for that.
Incoming Q.C usually make visual dimensional inspection.
Now we shall discuss the item as follows,

• EVAPORATER
          Evaporator is the type of item which is no. of time to be inspected starts
from the Q.C and then final assembly inspection.
The dawlance exports evaporator from china the suppler name “Jau-su-shanfe”.
Though testing supplier are also inspected but the existing supplier “Jau-su-shanfe”
is the major and more reliable supplier of evaporator.
Evaporator is 100% inspected and there is no concept of sample mood.
PROCESS OF EVAPORATER INSPECTION AT INCOMING
Q.C
First of all the sizing of evaporator is to be inspected visually and then observe the
dent to be placed over the evaporator more importantly if that case the dent to be
over the bended area ( as is pre-foaming shop) the evaporator is to be rejected
because no more risk is to be taken.
• JOTUM POWDER
We know the usage of JOTUN powder i-e its use for the paining purpose if items .
The inspection of JOTUN is begins by batch the powder in term of their respective
code and colors.
After that the C- form is made and its sample of every batch shifted to the Q.C lab
where the chemical is to be inspected in order to match the existing composition
with the standard one.

• CABLE ASSEMBLY LINE SWITCH
            As we have seen in pre-foaming stage when liner is prepared for fixed
into the cabinet so the hold assembly with thermo state is taped over there.
Therefore the cable is to be termed as cable assembly switch and it is to be
inspected in terms of equal dimension.
The multimeter is used to check continuity of cable etc
And many other item are to be inspected at Incoming Quality Control ( we are not
in a position to describe each ).

                      SELF QUALITY SECTION

                UNITED REFRIGRATOR COMPANY LTD.                                      41
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




           Every manufacturing side have its own self quality section whose
purpose is to check the quality of manufactured item that make in his section as per
required specification.
There are basically two different type of inspection is to be taken place
i)     First piece Inspection
ii)    Roval inspection

FIRST PIECE INSPECTION
           As the name suggest the inspected that has been taken from the first
piece according to the required drawing specification
Then the first piece is to be filled into the shape of document certificates are as
follows ,…..




FRONT SIDE
                     UNITED REFRIGRATION INDUSTRIES LTD
                             IN PROCESS QUALITY CONTROL DEPARTMENT
                                         (SHEET METAL)             Certificate no. -----
                         FIRST PIECE / MACHINES SETTING CERTIFICATE

     DATE___________________SHIFT______________________ TIME_______________________

     MACHINE:______________________________________________________________________

     PART____________________________OPERATION____________________________________

     DIE/ MACHINE SETTER__________________________________________________________

     DRAWING NO.___________________________MODEL_________________________________

     SIGNATURE PROD. SUPERVISOR _________________________________________________

     REMARK BY QC INSPECTOR ______________________________________________




BACK SIDE

REQUIRED            FOUND SIZE               VARIATION               MEASURING
                UNITED REFRIGRATOR COMPANY LTD.                                            42
                           DAWLANCE
              PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




      SIZE                                                          TOOL NAME




ROVAL INSPECTION
As we know that the variation over the item can be occur at any stage because of any
fault in an machine therefore after first piece inspection the roval inspection i-e after
every hour of same item also done to maintain the quality.
The roval inspection certificate is filled according to the dimension.




                   UNITED REFRIGRATOR COMPANY LTD.                                     43
                              DAWLANCE
                 PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




  UNITED REFRIGRATOR COMPANY LTD.      44
             DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




SUGGESTION NO. 1:-

    There should be a supply chain department.

            A supply chain is a process that includes the chain of supply
 from purchasing of raw material to the shifting to end consumer. It
 defines as the supplier-customer interaction and intermediaries’ b/w
 them.
            I have seen while doing internship at dawlance there is no
 concept of supply chain management and there is no supply chain
 department and instead of having the separate supply chain department
 the PPC ( production planning and control ) dealing with the affairs of
 supply chain .

 IFFECT OVER THE INDUSTRY IN THE ABSENCE OF
 SUPPLY CHAIN DEPARTMENT

             In dawlance the process of manufacturing is to be start when
 the tentative schedule is been given to each manufacturing section that
 they has to produce this much amount of this and this much amount of
 that in a particular period of time. Every manufacturing within the
 industry is been produce its own tentative work plan on which they
 have to work but unfortunately this tentative plane does not define the
 interaction b/w two manufacture i-e supplier –customer relationship.
 For example :- Pre-foaming is the customer of cabinet painting shop
 and cabinet painting shop and cabinet painting shop is the customer of
 sheet metal and welding section hence its form a chain of supplier and
 customers.
 For example :- thermo foaming is the supplier of pre-forming or in
 other words pre-foaming is the customer of thermo foaming but the
 supplier of thermo foaming is out siders .
 In dawlance (united refrigerator company) instead of having a supply
 chain department there is general meeting among the supervisors and
              UNITED REFRIGRATOR COMPANY LTD.                           45
                         DAWLANCE
            PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




engineers of manufacturing staff and this meeting every supplier is
interacting with his customer so that to know the current situation of
each other and share their problems to each other.
         Hence just based on the general meeting the result as any
stoppage or draw back in production they used to blaming to one
another which in term leads to create conflict.
Therefore if there will be a supply chain department so I think is a
perfect accountability of each section and hence over all performance
get improved.

SUGGESTION # 2 :-

There should be an effective maintenance department.
          As we have discussed that there is a maintenance department
but to be very much frank it is not suppose to fulfill the required
production expectation which in tern causes to create the conflict b/w
the maintenance and manufacturing section.
Manufacturing section complains that ,

• Maintenance not working properly .
• They don’t find the root mean cause of the problem instead they just
  try to put their effort so that the production has start.
• They donot react on time usually we call them a lot and at the end
  they used to react.
On the other hand,


The maintenance compliance that,
   • They don’t have enough work force to reduce the causes of
      unhappenings.
   • Manufacturing too easily too band toward their improvemental
      thinking and its being extremely difficult to maintenance to meet
      all this.
And there are various other factor that lead to create the conflict among
the manufacturing and maintenance section.
             UNITED REFRIGRATOR COMPANY LTD.                             46
                        DAWLANCE
           PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




SOLUTION
         The main dramatic lack is also that there is no shutdown
maintenance of machine been allow by administration because
shutdown maintenance required 2 to 4 hours and obviously while
doing shutdown maintenance the production gets stops and
management not want any action that leads to stop the production . But
if wee look from a close eye the machines get stops any time because of
any lack then to give ordering to the maintenance and then it assign the
optimal crew according to the work and then act this also requires a lot
of time and in this period also gets stops therefore I think there ha to be
same period of shutdown maintenance.




              UNITED REFRIGRATOR COMPANY LTD.                            47
                         DAWLANCE
            PREPARED BY MOHAMMAD YOUNUS (08IN70)
INTERNSHIP PROGRAME




                         PREPARED BY

Name: Mohammad Younus

Fathers Name: Mohammad Anwar Qureshi

Surname: Qureshi

Nationality: Pakistani

Date of birth: 24th November 1988

Place of Birth: Hyderabad

Domicile: Hyderabad Urban

Profession: Student

Degree: Graduation (B.E Industrial
         Engineering & Management)

Year of Study: Final year.

Roll No. 08IN70

University: Mehran University of Engineering
           and Technology (M.U.E.T) Jamshoro.




               UNITED REFRIGRATOR COMPANY LTD.      48
                          DAWLANCE
             PREPARED BY MOHAMMAD YOUNUS (08IN70)

More Related Content

What's hot

Functions of Management on dawlance company
Functions of Management on dawlance companyFunctions of Management on dawlance company
Functions of Management on dawlance companysunila ashfaq
 
Larsen and toubro L&T.ppt
Larsen and toubro L&T.pptLarsen and toubro L&T.ppt
Larsen and toubro L&T.pptsaileshs0308
 
IREL ORGANISATION STUDY
IREL ORGANISATION STUDYIREL ORGANISATION STUDY
IREL ORGANISATION STUDYakl_9597
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Rahul Banerjee
 
Industry visit to CEAT Ltd
Industry visit to CEAT LtdIndustry visit to CEAT Ltd
Industry visit to CEAT LtdKetan Mokal
 
MBA Internship Report
MBA Internship ReportMBA Internship Report
MBA Internship ReportAjesh U Bhanu
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro pptsachin kr
 
PROJECT ON ULTRATECH CEMENT
PROJECT ON ULTRATECH CEMENT PROJECT ON ULTRATECH CEMENT
PROJECT ON ULTRATECH CEMENT Mohammed Ashraf
 
Larsen and toubro limited
Larsen and toubro limitedLarsen and toubro limited
Larsen and toubro limitedarchana122
 
Internship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryInternship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryAkshay Mistri
 
Cisco systems inc strategic management original 11
Cisco systems inc strategic management original 11Cisco systems inc strategic management original 11
Cisco systems inc strategic management original 11don danilee
 
Industrial Training PRESENTATION
Industrial Training PRESENTATIONIndustrial Training PRESENTATION
Industrial Training PRESENTATIONMuaz Sadini
 

What's hot (20)

Functions of Management on dawlance company
Functions of Management on dawlance companyFunctions of Management on dawlance company
Functions of Management on dawlance company
 
Tata steel ppt
Tata steel pptTata steel ppt
Tata steel ppt
 
Larsen and toubro L&T.ppt
Larsen and toubro L&T.pptLarsen and toubro L&T.ppt
Larsen and toubro L&T.ppt
 
Larsen and toubro
Larsen and toubroLarsen and toubro
Larsen and toubro
 
IREL ORGANISATION STUDY
IREL ORGANISATION STUDYIREL ORGANISATION STUDY
IREL ORGANISATION STUDY
 
Document
DocumentDocument
Document
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)
 
Industry visit to CEAT Ltd
Industry visit to CEAT LtdIndustry visit to CEAT Ltd
Industry visit to CEAT Ltd
 
MBA Internship Report
MBA Internship ReportMBA Internship Report
MBA Internship Report
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro ppt
 
Ashok Leyland
Ashok Leyland Ashok Leyland
Ashok Leyland
 
PROJECT ON ULTRATECH CEMENT
PROJECT ON ULTRATECH CEMENT PROJECT ON ULTRATECH CEMENT
PROJECT ON ULTRATECH CEMENT
 
Larsen and toubro limited
Larsen and toubro limitedLarsen and toubro limited
Larsen and toubro limited
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
DELL supply chain management
DELL supply chain management DELL supply chain management
DELL supply chain management
 
Internship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryInternship Report on Material Handling and Machinery
Internship Report on Material Handling and Machinery
 
Cisco systems inc strategic management original 11
Cisco systems inc strategic management original 11Cisco systems inc strategic management original 11
Cisco systems inc strategic management original 11
 
Dawlance Company
 Dawlance Company Dawlance Company
Dawlance Company
 
ASHOK LEYLAND
ASHOK LEYLANDASHOK LEYLAND
ASHOK LEYLAND
 
Industrial Training PRESENTATION
Industrial Training PRESENTATIONIndustrial Training PRESENTATION
Industrial Training PRESENTATION
 

Similar to Dawlance internship report

industrial training internship report
industrial training internship reportindustrial training internship report
industrial training internship reportTariqJamil19
 
BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015CHANDRA SHEKHAR KUMAR
 
Summer training project report anurag
Summer training project report anuragSummer training project report anurag
Summer training project report anuragAnurag Mishra
 
SUMMER INTERNSHIP PROGRAM.docx
SUMMER INTERNSHIP PROGRAM.docxSUMMER INTERNSHIP PROGRAM.docx
SUMMER INTERNSHIP PROGRAM.docxGaurav Kumar Bhatt
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampIRJET Journal
 
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015Amjad Mehmood
 
Ch1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of GaziantepCh1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of GaziantepErdi Karaçal
 
Hmt training report
Hmt training report Hmt training report
Hmt training report SumitSutar6
 
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDVOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDSurendra Kumar Dewangan
 
Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Saifuddin Rakib
 

Similar to Dawlance internship report (20)

909090 final
909090 final909090 final
909090 final
 
industrial training internship report
industrial training internship reportindustrial training internship report
industrial training internship report
 
Dalwance
DalwanceDalwance
Dalwance
 
REPORT BY ANIQUE
REPORT BY ANIQUEREPORT BY ANIQUE
REPORT BY ANIQUE
 
training report
training report training report
training report
 
BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015BrakesIndia_IntReport_CK_SSN_June2015
BrakesIndia_IntReport_CK_SSN_June2015
 
Summer training project report anurag
Summer training project report anuragSummer training project report anurag
Summer training project report anurag
 
SUMMER INTERNSHIP PROGRAM.docx
SUMMER INTERNSHIP PROGRAM.docxSUMMER INTERNSHIP PROGRAM.docx
SUMMER INTERNSHIP PROGRAM.docx
 
Jbm report
Jbm reportJbm report
Jbm report
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle Clamp
 
Dicomol
DicomolDicomol
Dicomol
 
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
 
Ch1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of GaziantepCh1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
 
Hmt training report
Hmt training report Hmt training report
Hmt training report
 
PROJECT
PROJECTPROJECT
PROJECT
 
Summer training
Summer trainingSummer training
Summer training
 
Jyoti ind.training report
Jyoti ind.training reportJyoti ind.training report
Jyoti ind.training report
 
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDVOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
 
Internship at RNAIPL
Internship at RNAIPLInternship at RNAIPL
Internship at RNAIPL
 
Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)
 

More from Mohammad Younus

Jab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeJab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeMohammad Younus
 
1947 ke mazalim ki kahani
1947 ke mazalim ki kahani1947 ke mazalim ki kahani
1947 ke mazalim ki kahaniMohammad Younus
 
Technical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleTechnical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleMohammad Younus
 
AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy Mohammad Younus
 
Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Mohammad Younus
 
Lucky cement factory internship report
Lucky cement factory internship reportLucky cement factory internship report
Lucky cement factory internship reportMohammad Younus
 
Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Mohammad Younus
 
Incentives and remuneration
Incentives and remunerationIncentives and remuneration
Incentives and remunerationMohammad Younus
 
incentives and remuneration
incentives and remuneration incentives and remuneration
incentives and remuneration Mohammad Younus
 
Autocade 2D complete course
Autocade 2D complete course Autocade 2D complete course
Autocade 2D complete course Mohammad Younus
 
speed up sales using CRM system
speed up sales using CRM system speed up sales using CRM system
speed up sales using CRM system Mohammad Younus
 
Education system in pakistan
Education system in pakistan Education system in pakistan
Education system in pakistan Mohammad Younus
 
industrial accidents and their types , preventions
industrial accidents and their types , preventionsindustrial accidents and their types , preventions
industrial accidents and their types , preventionsMohammad Younus
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques Mohammad Younus
 

More from Mohammad Younus (20)

Jab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeJab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-gee
 
1947 ke mazalim ki kahani
1947 ke mazalim ki kahani1947 ke mazalim ki kahani
1947 ke mazalim ki kahani
 
Qasam us waqt_ki
Qasam us waqt_kiQasam us waqt_ki
Qasam us waqt_ki
 
Technical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleTechnical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time example
 
AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy
 
Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory
 
Lucky cement factory internship report
Lucky cement factory internship reportLucky cement factory internship report
Lucky cement factory internship report
 
Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation
 
Incentives and remuneration
Incentives and remunerationIncentives and remuneration
Incentives and remuneration
 
PSD Assignments
PSD Assignments PSD Assignments
PSD Assignments
 
incentives and remuneration
incentives and remuneration incentives and remuneration
incentives and remuneration
 
Autocade 2D complete course
Autocade 2D complete course Autocade 2D complete course
Autocade 2D complete course
 
Conflict management
Conflict managementConflict management
Conflict management
 
speed up sales using CRM system
speed up sales using CRM system speed up sales using CRM system
speed up sales using CRM system
 
human machine system
human machine system human machine system
human machine system
 
Education system in pakistan
Education system in pakistan Education system in pakistan
Education system in pakistan
 
industrial accidents and their types , preventions
industrial accidents and their types , preventionsindustrial accidents and their types , preventions
industrial accidents and their types , preventions
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
Hfe practicle final
Hfe practicle finalHfe practicle final
Hfe practicle final
 

Recently uploaded

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 

Recently uploaded (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 

Dawlance internship report

  • 1. INTERNSHIP PROGRAME DEPARTMENT OF MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO (Internship Program Report) UNITED REFRIGRATOR COMPANY LTD. NO. OF WEEKS :- 1 WEEKS INTERSHIP PROGRAM Date : 13-06-2011 To 18-06-2011 Submitted To: HUMAN RESORCE DEPARTMENT Submitted By: MOHAMMAD YOUNUS (08IN70) JASWANT (09IN03) MANOJ KUMAR THAKUR (09IN46) UNITED REFRIGRATOR COMPANY LTD. 1 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 2. INTERNSHIP PROGRAME PREFACE This report contains the information about those departments which are visited by the internees. Whatever the machinery seen and the processes are observed, attracting the human mind and realizes the men what science has achieved and what kind of mericals has been done by it. Basically United refrigerator company ltd. (dawlance) is quite attention attracting industry it provides lot of opportunities to see, to observe, to achieve and to get the lot of experience about the industry as well as about the machinery. The technology installed at United refrigerator company ltd. (dawlance) is the latest one and it includes the hardworking labors, employess who give their best for the over all effectiveness of the company. This report may also contains the facts and the real figures of the various departments which are very beneficial for our experience and the also for the practical knowledge. The functions and the details of their working and the process as well as the timing and work break down structure is also mentioned in this report. This is edit by the students of the INDUSTRIAL ENGINEERING AND MANAGEMENT DEPARTMENT of the nominated university of jamshoro named MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY JAMSHORO SINDH PAKISTAN. The details of the students are as under:- MUHAMMAD YOUNUS (08IN70). MANOJ KUMAR THAKUR (09IN46). JASWANT SINHA (09IN03). UNITED REFRIGRATOR COMPANY LTD. 2 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 3. INTERNSHIP PROGRAME ACKNOWLEDGEMENT We are very thankful from the core of my heart to honorable ASSITANT VICE PRESIDENT , “United Refrigerator company ltd. (DAWLANCE) “ , ABDUL ALEEM KHAN for providing us opportunity for training and whose intelligent, wise and sound leadership has converted manpower into wining combination by this industry into a gold mine. We wish to express my deep gratefulness to Whole HRD)for their consideration and supervision. It was a memorable time in United refrigerator company ltd. (Dawlance) due to his kind concern. We are also thankful to all concerned manufacturing supervisor and engineer’s for their precious advice and for the great encouragement and cooperation, because of which We have successfully completed our internship training of UNITED REFRIGRATOR COMPANY LTD. (DAWLANCE ) where we learned a lot. UNITED REFRIGRATOR COMPANY LTD. 3 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 4. INTERNSHIP PROGRAME CONTENTS Days of Departments Page no. internships Day no. 1 Production II (shearing, sheet Metal and welding ) • Shearing section • Sheet metal section • Welding section • Cabinet • PC sheet • Freezer door 7 to 11 • Basic panel • side panel • Compressor support • Ref door and many more Day no. 1 PRODUCTION III ( THE PAINTING SHOP ) • CABINET painting shop • EVAPORATER painting shop • CONDENSOR painting shop 12 to 16 • DIP- COATING (Shelf painting shop ) UNITED REFRIGRATOR COMPANY LTD. 4 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 5. INTERNSHIP PROGRAME DAY NO. 2 PROUCTION IV (CONDENSOR MANUFACTURING AND OTHERS ) • Shelf making section • Condenser making 17 to 23 • Iron handing section • Chrome section • U-V Light section. Day no. 3 PROUCTION V ( PRE – FOAMING ) • What is PRE – FOAMING ?? 24 to 27 • Process of PRE – FOAMING & Stages. Day no. 3 PRODUCTION V ( FOAMING ) • What is FOAMING ?? 28 to 29 Process of FOAMING ?? Day no. 3 PRODUCTION VI ( ASSEMBLY LINE ) 30 to 31 • What is Assembly line ??? Day no. 4 PRODUCTION I (PLASTIC MOULDING SECTION) • Compounding section • Injection section 32 to 36 • Hot stepping section • Steam print section. • Extrudes section • Cable section Day no. 5 MAINTENANCE • What is MAINTENANCE ?? • Objective of Plant Maintenance ?? Importance of maintenance. 37 to 39 UNITED REFRIGRATOR COMPANY LTD. 5 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 6. INTERNSHIP PROGRAME • Methods of maintenance. • Maintenance at Dawlance. Day no. 6 QUALITY CONTROL DEPARTMENT • QUALITY AND CONTROL (Definations) • What is QUALITY CONTROL 40 to 48 ??? • Quality Control At Dawlance. • Quality Engineering Cell. • Incoming Quality Control. • Self Quality Inspection. SUGGESTION’S UNITED REFRIGRATOR COMPANY LTD. 6 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 7. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 7 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 8. INTERNSHIP PROGRAME SHEARING, SHELF METAL AND WELDING Shearing => To shear off the requires size of sheet is called a shearing process. Sheet -Metal => the various process that has been perform over the metal sheet sop that give is the requires shape is to be called a sheet metal. Welding => A process of permanent fastening important type used the most important type used in dawlance is tug welding. • It is the refer color; production eleven is the section where the man body of refrigerator is to be manufactured. • Though the production elevens section is used to manufacture a lot of component put the cabinets is of the important component of production eleven section. RAW-MATERIAL OF PRODUCTION - II The raw- material of production of to (in the sheet form) 1) Metal steel 2) Galvanized iron 3) Vinyl coated Material (VCM) 4) Aluminum SHEARING SECTION: One the raw-material is receive from the store the sharing section is something that actually share of the sheet according to the requires size of specifications. The cabinet sheet is to be share of the sizing of • Length = 3824mm • Width = 655mm • Thickness = 0.4mm Other thing also shares off according the specifications. SHEET METAL SECTION: There are basically no of parts has manufactured in this section. The sheet metal section is basically best upon the 4 major area which are as follows. 1: Automatic sheet feed 2: Whole processing and notch (bending) 3; forming section 4. Pressing section The sheet metal is basically used to produces a no of parts of refrigerator, such as UNITED REFRIGRATOR COMPANY LTD. 8 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 9. INTERNSHIP PROGRAME 1. Cabinet 2. PC sheet 3. Freezer door 4. Basic panel 5. side panel 6. Compressor support 7. Ref door and many more CABINET: The cabinet is to manufacturing once the sheet is receive from sharing the automatic sheet feeder suck the sheet and feed the sheet then sheet through crame is to be shift into the forming section where the form of profile and embossing can take place and after ward that formed embossed is equally bended to form a cabinet. PC-SHEET: The pc sheet is the sheet that makes separates the freezer unit ref :a in other word we can say that the I.C sheet is used to make separate n/n ref and free from the upper side of refrigerator PROCESS: It can be making by follow the following operation. 1. Notching process 2. Forming process 3. embossing process 4. Whole process BACK PANEL: It is back side of refrigerator body that is to be attached with the cabin net. It is to be noted that is in small size refrigerate there Is only back panle and there is no need for the bottom end as it also requirement in the refrigerator. PROCESS: The back panel is to be made by the 1) Drilling the piece of M.S of sheet 2) Notching that piece 3) Whole also with the machine 4) first bending 5) 2nd bending After that this do of is to welded with the cabinet by spot welding process. SODE RANGE: UNITED REFRIGRATOR COMPANY LTD. 9 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 10. INTERNSHIP PROGRAME It just like the side panel it also require 1st cutting and the 2nd cutting and then just and 2nd pending. FREEZER DOOR: it is the front door of the refrigerator and it is to be made by the VCD material sheet. The size of VC sheet used a freezer door • Length = 546 mm • Width = 768 mm PROCESS OF FREEZER DOOR The freezer door is according following the process 1: Notching 2: Handle pressing 3: Embossing 4: first banding 5: final banding REFRIGRATOR DOOR: It is also be made with the VCD type of material and it make we of same process as that of freezer door each and every step in same. COMPRESSOR SUPPORT: It is the part that can be placed in the both part of the ailment and it support the compressor. PROCESS: The process to manufacture the compressor is as 1: whole plating 2: further 2 more whole 3: just bending 4: final banding WELDING SECTION: Basically welding is the process of permanent fastening therefore is the section all or same part are to fastened by tug welding so that the required type and shape of cabinets is to be shift the painting shop. Basically at sheet metal the welding section is used to perform that activity so that the form bended and imposed cabinet is to be welded with the back panel and sight panel and the it is screwed with the compressor support. At the end of the welded section the welded cabinet is to be shift to the paint shop for the further paint processing. UNITED REFRIGRATOR COMPANY LTD. 10 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 11. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 11 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 12. INTERNSHIP PROGRAME PRODUCTION III THE PAINTING SHOP It is basically the painting section used to paint the various iron so that it could be transfer into the final assembly shop. It includes the, • CABINET painting shop • EVAPORATER painting shop • CONDENSOR painting shop • DIP- COATING (Shelf painting shop ) We had already discussed the dip-coating (shelf painting) and were here now we learned the cabinet and evaporator painting • CANBINET PAINTING SHOP As we know that whenever we are painting any thing first of we need phosphating process so that the cabinet is to be easily painted. The cabinet here though the following painted stages. STAGES # 1 High pressuring over the refrigerator so that to remove as the welded particle. STAGES # 2 PHOSPHATING The phasphating process is actually though the following tank There are basically 4 different tankers. Out of them 2 of the chemical tank , 1 of water tank and 1 of di-ionized tank. The phosphating process begins after following the first step now the cabinet is dipped into the tank 1 ( which has the metaphoric chemical ) and then dipped into the tank2 ( which Laos has the same chemical ). Once the cabinet taken –off from the tank 2 then it is to be dipped into the tank 3 which has the raw water. Finally the cabinet is to be placed into the di-ionbized tank and then the cabinet is to be phosphated. STAGE # 3 :- DRY OVEN At this stage the phosphated cabinet is placed into the dry even which has the temperature of 110 ;140 degree centigrade . the dry oven has two function UNITED REFRIGRATOR COMPANY LTD. 12 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 13. INTERNSHIP PROGRAME fisrt it is use to dry the water and moisture and secondly it is also make able the cabinet sheet to be attain the more powder ( as in next step ). STAGE # 4 :- POWDER ROOM After dry oven the cabinets are to be hanged into the conveyor hanger and it is to be transferred towards the powder room. A powder room is a highly automated room that is used for powdering or coating of powder over the cabinets. The powder room has 15 gm over the cabinets and this powder can be done by the gun system in a powder room so that the layer of powder is to be coated over the cabinet. The functioning of powder room is done by the automated system which is controlled by then computer based system and its basic to coated a layer of powder over the cabinet. In powder room by gun system the cabinets are coated with the JOTUN powder of layer 35 to 70 micron. STEP # 5 :- BACK OVEN This is the end process of painting shop here the powder cabinets are to be backed into the oven so that the powder is to melted and forming in the paint over the cabinet. Actually in back oven the polymerization process takes place because once the temperature has been provided to the powder tends to polymerized and forming a chain so that it is to be transmitted over the cabinet. IMPORTANT TO REMEMBER • The cabinet paint shop has the capacity to paint 1800 to 1900 cabinet paint per 24 hours i-e capacity = 1800 to 1900 cainets paint per 24 hours. UNITED REFRIGRATOR COMPANY LTD. 13 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 14. INTERNSHIP PROGRAME • EVAPORATER PAINTING SHOP As we know that the evaporator in consider to be the heart of refrigerator and without the evaporator refraction is not exist. Evaporator is the part that makes cooling within the refrigerator. Evaporator is fitted inside the refrigerator and it is to be painted in white color. The process of evaporator painting is as same as that of cabinets one within certain amendments. However evaporator painting are requires phosphating and powdering etc. We can put forward the evaporator painting in the following stages. STAGES # 1 :- EVAPORATER PHOSPHATING The evaporator phosphating process is done in 4 different tanks. First of all the evaporator is dipped into the tank -1 which has the met clean chemical. After that the evaporator stays in tank-2 and tank-3 which is rinsing water tanks. After that it is to be dipped into the tank-4 which has the metachrome chemical. Finally again it is to be dipped into the rinsing water tank. STAGE # 2 :- DRY OVEN After phophating the evaporator is to be dried into the dry oven which is at the temperature of 140 to 160 degree centigrade so that to remove all the moisture effect and also make the evaporator to sustain the powder. STAGE # 03 :- POWDER COATING The powder coating over the evaporator is to be done on both the front and back side of the evaporator. STEP # 04 :- BACKING OVEN In last the evaporator is to be shifted towards the back oven which is al the temperature of 205 to 220 degree centigrade and where the powder is polymerized and evaporator is to be painted. • CONDERSOR PAINTING Like all other painting section shops the condenser painting is also follwed the same process as that of other painting process. PROCESS OF CONDENSOR PAINTING The process of the condenser painting is being done in the following two different stages. i) Phosphating UNITED REFRIGRATOR COMPANY LTD. 14 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 15. INTERNSHIP PROGRAME ii) Painting PHOSPHATING The phosphating if condenser is to be done by passing through the no. of condenser to various chemicals which is in the tank . First of all the manufactured condenser is dipped into the metaclean 375 tank and it stayed over there at 1 to 5 min. Now the condenser is then dipped into the fresh rinsing water into the 2nd tank. After that it is to be dipped into the tank of metaphor 247 chemical tank. And after that through pressure vessel it is to be dried. At the end of phosphating the condenser suppose to shift into the dry oven and where the all moisture are dried from the phosphate condenser. PAINTING The painting begins when JOTUN powder is to be paint over the condenser after phosphating on both sides of condenser and this condenser with the help of crank is to be inserted into the back oven so that powder is to be converted into the layer of painted color. The temperature of back oven is about to be of 250 degree centigrade and it is placed within the back oven for the period of 11 min. It is important that the JOTUN powder use in condenser painting section if of different form and have it own load. Important to Remember ….. • The capacity of condenser paint shop is 1700 condenser paint per day. UNITED REFRIGRATOR COMPANY LTD. 15 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 16. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 16 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 17. INTERNSHIP PROGRAME Like all other production section the PRODUCTION IV is also on e of the most important section of refrigerator production. It is use to make some important and value able item of refrigerator. There are various sections those are comes under production IV category i) Shelf making section ii) Condenser iii) Bottom condenser iv) Iron handle making section v) Galvanized section vi) Chrome section vii) U-V light section Through out all section of PRODUCTION IV have their own importance and without them the processing is incomplete but the most importance item produce by production iv is the condenser because without the functioning of refrigerator is impossible. Now we shall discuss each section in detail…. SHELF MAKING SECTION The shelf of the refrigerator is to be manufactured in this section. This shop is used to make all different type of the shelf of different refrigerator model and its highly depends upon the customer requirement e.g if the administration of the production Iv receive the plan from production planning department to manufacture 9175 WBM’s shelf so they suppose to act according to the requirement. The capacity of the shelf section is to produce 31000 shelf per day and its make use of 7 different type of machine and also having the strength of 57 peoples. EQUPMENT IN USE The shelf manufacturing makes use of different machines and welding device. • Starter and cutting machine • Pressing machines of different type • Tag welding PROCESS OF SHELF MAKING The processing of shelf manufacturing begins when the raw coil of thickness 2.5 mm is been receive through store and then the starter cutting machines first make starter the coil and then cutted of required size ( depends upon UNITED REFRIGRATOR COMPANY LTD. 17 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 18. INTERNSHIP PROGRAME the requirement ) , now the cutted coil is then bended and it is to be welded now the frame of the shelf is been and also ready for the further processing. Now again the no. of strip is also to be cutted so that there can fixed into the shelf and then the shelf is to be welded by the tug welding process. Now in order to support the shelf various section of straight shapes, L – shapes, Z- shapes, the basic purpose of these section is that they used to provide the support to the shelf of the refrigerator. DIP- COATING / PAINTING SHOP It is basically the shop which is use to painting the manufactured shelf but very few other parts are also been painted in this shop. PROCESS OF DIP COATING PAINITNG The actually process is begins with the PHOSPHATING. The phosphate process is based upon the various chemical in different tanks, therefore first of all the manufactured shelf is first dipped into the tank -1 ( which contain the dioxide chemical ) within 10 to 15 min , the shelf is to be placed in this tank and then it is dipped into the 2nd tank (which contain only raw water ) and within few minutes the it is to be dipped into the 3rd tank ( which is of Guadine 20 chemical ) and it is placed up to 5-7 min and finally again dipped into the rinse water. Once the phosphating the next is the coating painting The phosphated shelf is then placed within the Backing oven ( which has the temperature of 225 degree centigrade) after a few min these shelf are then to be dipped into the powder ( JOTUN POWDER ) and then these are placed into the dry oven ( has the temperature of 225 degree centigrade) and in last it is to be dipped into the water. Capacity of DIP-COATING section is 1000 shelf paint per day CONDESNSOR MANUFACTURING Every manufacturer knows the importance of condenser in refrigeration process and without condenser the existence of the refrigerator is almost impossible because it is something that maintain the refrigeration cycle. Therefore in order to make the condenser manufacture the condenser much careful analysis are required. This section is use to make two different condenser. i) Back panel condenser ( actually called as condenser ) ii) Bottom condenser The actually the first step towards condenser manufacturing is taken by the engineering department. UNITED REFRIGRATOR COMPANY LTD. 18 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 19. INTERNSHIP PROGRAME Engineering department through critical analysis used to check the actual condenser and then give the effective and efficient proposed way to manufacturing in the shape of drawings, equipments etc. BOTTOM CONDENSOR Most of people even don’t know is there any condenser in the refrigerator that place in the bottom of the refrigerator. The basic function of this condenser is also to reduce the temperature like other condenser do so . PROCESSING OF MANUFACTURING THE BOTTON CONDENSOR The process of manufacture a bottom condenser requires a drawing and the drawing varies from model to model of refrigerator therefore the size and coil of bottom condenser also varies. With the help of different pressing machine to complete the sheet and bending the coil as per requirement through tug welding is then to be fitted. BACK PANEL CONDENSOR (ACTUAL CONDENSOR) It is one of the most important and more meaningful part of the refrigerator and the effectiveness of condenser is necessary for the active life of the refrigerator. PROCESS TO MANUFACTURE A CONDENSOR Once the plan has receive by the PPC to the production IV section and according to this plan the condenser of particular quantity of particular model has to manufacture. The first is to make use of MS sheets cutting strips then with the help of shutter machine a late form in which certain operation carried out one by one such as embossing, fins making is to be done. The bending section first to cut the coil and straight it with the straighter shutter machine and then bend the coil through is winches and dies is that the required bending is to be obtain. Once the plate and bending is prepared now with the help of tug welding there plate with bended is to be welded. Now the end plates of condenser that has been manufactured by pressing machine is also to be welded by tug welding process. UNITED REFRIGRATOR COMPANY LTD. 19 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 20. INTERNSHIP PROGRAME Now at the end the strip of MS also welded so that to provide the proper reinforcement to the condenser . By following the above stages the condenser is said to be manufactured. GALVANIZED SECTION It is the very little type of section and its purpose is to nickel the various parts such as i) leg holder ii) top middle bottom hinchees. iii) Screws and others parts. The basic behind this section is to do the nickel plating so that to remove all the abrasive material, oil, Greece etc. CHEMINCAL IN USE Following ar he chemical those are used in this section • Zinc brightener • Zinc Californiazinc anodenitric acid ALUMINIUM HANDLING SECTION It is the section which is bound to make the aluminum handling for the refrigerator for the opening and closing of the door. PROCESS OF ALUMINIUM HANDLING SECTION Already manufactured profile of aluminum is to be purchased from abroad and then this profile is cutted according to specification of handle requirement. Once the size is to be cutted then with the help of numerically control milling machine a profile is being made to provide groove type of section so that the handle is to be fixed. CHROME SECTION Once the handle cover is been made by the modeling section to make the handle cover then the crossing of that part is to be taken place. PRCESS OF CHROMESECTION The chroming is to be done by following the certain steps STEP # 1 :- ETCHING BATH First of all the handle cover is dipped into the chromic acid in the etching bath which is al the temperature of 65 degree centigrade. STEP # 2 :- WATER TANK After the etching process the handle cover is to be dipped into the raw water . STEP # 3 :- After that it is to be dipped into the HCL and also into the neutralization drum. UNITED REFRIGRATOR COMPANY LTD. 20 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 21. INTERNSHIP PROGRAME STEP # 4 :- After wards it is to be placed into the activation bath which also include certain amount of HCL. STEP # 05 :- Now at this the nickel sulphate electroplating is to be done. STEP $ 06 :- after that the it is to be dipped into the copper the layer of copper in comes over the handle. STEP # 07 :- Nickling is to be done at this stage hence the nickling also to be placed over the handle. STEP # 08:- At the very last stage the chroming is to be done over the handle. U-V LIGHT SECTION The only haxon model of refrigerator inn which there is type of fan placed within the refrigerator. The function of that fan s that when door is closed its used to provide the air sot that the ice is to be melted for the effective cooling of refrigerator. So in this section fan with its parts to be assembled here. UNITED REFRIGRATOR COMPANY LTD. 21 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 22. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 22 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 23. INTERNSHIP PROGRAME PRODUCTION V (PRE- FOAMING) Till production we are making, painting the certain parts so that they should combined to form the original product. • The production V ( i-e PRE – FOAMING ) as the name suggest it is the pre of the foaming that is it the place where the various operation is to carried before it is to be placed to formed. • At the pre foaming the necessary item such as the liner, freezer and anti- moisture tube, evaporator are to be inserted into the actual body of cabinet. PREFOAMING PROCESS The actual process of pre-foaming is starts when the painted cabinets from the cabinet painting shop are comes to the pre-foaming zone. We can underline the each and every step of pre foaming now STEP # 01:- First of all the compressor support is un-screwed from the painted cabinet. STEP # 02:- The gum- type material named as slent is to be inserted into the corner edge of the painted cabinet in order to make proper isolation. STEP # 03:- Washer type material is tape within the four whole if the back panel so that condenser is to be screwed easily in it. STEP 04:- Bottom profile is inserted within the embossing area in the bottom. STEP 07:- spaces in fixed in the back panel so that the pipe which is fitted in it. STEP 06:- Groemr also fitted with the wholes. STEP 07 :- Anti moisture strip a black pipe is to be inserted within the profile cabinet. The anti-moisture strip has two functions first as the name suggest its used to prevent from the corrosion effect also the gas kit ( rubber type ) within the door is causes to crack because of cooling inside so it is also prevent this as it is connected with the compressor. STEP # 09 :- the freezer box is to be further includes the following sub- systems Sub – step 1:- the painted evaporator from the EMD is bend by the press machine. Sub-step 2:- the bended evaporator is then to be check for the little inspection. There are basically two different inspection tests, UNITED REFRIGRATOR COMPANY LTD. 23 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 24. INTERNSHIP PROGRAME i) A LEAD DETECTOR MACHINE :- A machine which is used to detect the all the pipe and join of the evaporator by inserted the Freon gas. The detector even has the capability to detect 1.0 micro gram of area. Once the evaporator is OK then it is to be shifted for the next test. The statistics show that there are basically 8 to 10 evaporators rejected in lead detector test. Once the purpose is established hen the Freon gas is to be ejected and stored and from the evaporator. ii) The 2nd inspection include is to check the mass flow rate within the evaporator and it is to be done by inserting the Nitrogen gas from the capillary. It is also gives the benefits in the shape that it tends to clean the evaporator by the nitrogen gas. Sub- stage 03:- Obtaining a evaporator frame. The evaporator from is to be make by joining the evaporator the side plate thorough a silicon type of material. Now this flow is to be fitted with the freezer side of the cabinet. STEP # 10:- The ref portion of the refrigerator is to be undertaken and it can be divided into the following sub steps. Sub – step 01:- the liner which is come form the thermosetting section is first sized and cutted by the press machine. With the size the whole also produce which is of evaporator and thermocouple. Sub-system 02:- after that the head after and thermostat cover is taped within the liner. Sub- system 03:- a light pipe is having the wire which is the fitted with the thermostat on one hand and head after on the other hand. STEP # 11:- Liner is fitted within the cabinet i-e liner completely fitted within the cabinet. That’s the end of the pre-foaming suction. UNITED REFRIGRATOR COMPANY LTD. 24 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 25. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 25 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 26. INTERNSHIP PROGRAME FOAMING SECTION The foaming section is a place when the pre-foamed cabinet is to foamed by the automated machine. The foam which is to be inserted within the pre-foamed foam than it is solidifying within a few minutes. The foam is basically made of two different type of chemicals. i) Polyoal ii) Iso – cynate iii) R141B ( a gas whch is used as a catalyst ) • The foaming section has the capacity to filled 81 mould foam per hour i-e capacity = 81 mould foam per hour. PROCESS OF FAOMING The process of foaming section begins by fixing the jigs and fixture within the ref section so that while foaming the inside the refrigerator is not bend etc. After that the highly automated the mixture of foam is to be inserted within the cabinet. The dawlance has 9 moulding foam hangers which is highly automated and used to operate according to the sensors and actuators and various other things. Basically the mixing of chemicals as to form the foam is to be as 100 % of polyoal 1260 % of iso –cyanides 16 % of R141B. It can be termed as , P : g : I 100 : 16 : 1260 UNITED REFRIGRATOR COMPANY LTD. 26 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 27. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 27 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 28. INTERNSHIP PROGRAME ASSEMBLY LINE This is the very last portion of this shop also the refrigerator manufacturing. At this stage the all parts that we have made in deferent section such as sheet items or main body items we made in sheet metal section, plastic items we have marked in moulding, condenser e have made in production IV , shelf we have make in production IV , freezer and ref door also assembled Therefore is assembling shop we are the assemble all items to make the refrigerator. At the end certain inspection made refrigerator takes such as vacuum generation and then the Freon gas is also inserted into the refrigerator. At the end of assembled line the refrigerator are to be packed and transferred to the store room as a inventory so that it is it be distributed. UNITED REFRIGRATOR COMPANY LTD. 28 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 29. INTERNSHIP PROGRAME PRODUCTION I (PLASTIC MOULDING SECTION) UNITED REFRIGRATOR COMPANY LTD. 29 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 30. INTERNSHIP PROGRAME As the name suggest plastic molding the production is said to manufacture all plastic type of equipment that can be used in refrigerator manufacturing. There are 6 section includes in moulding each section have its own task to with they can act these are as follows, i) Compounding section ii) Injection section iii) Hot stepping section iv) Steam print section. v) Extrudes section vi) Cable section • The compounding and injection are the most basic sections and these are those which used to produce they different plastics items in proper quality and quantity. COMPOUNDING SECTION The raw material of various plastics material in the form of huge grain is received in compounding portion through store room. These raw materials includes, PS ABS HIPS LIPS PC NYLONE & PP. The compounding section used to mix the raw material with the pigment so that required color of particular item is obtained. The mixing can be done by two different type of devices. i) DRUM MIXTURE ii) VERTICAL MIXTURE DRUM MIXTURE Drum mixture is a device which consist of two different drum and b/w the there is a motor that has the rotatory function. The motor used to rotate the drum. Each drum has the capacity to take two beg ( each beg of 25 kg i-e 50 kg ) so we can say that drum mixture can take 100kg of a material in a time. PROCESSING OF DRUM MIXTURE The processing of mixing of material through drum mixture is such that mixture the beg of 25 kg of material insert into the drum then the amount of UNITED REFRIGRATOR COMPANY LTD. 30 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 31. INTERNSHIP PROGRAME pigment according to the standard weighted and insert into the drum and then again another beg also inserted into the drum and similarly the next drum also filled. Now the drum mixture start rotating and mixed the material with the pigment and in 5 min the material is kept out just within the 5 min. Therefore we can say that the drum mixture has the capacity of 100 kg of material to be mix in 5 min. VERTICAL MIXTURE : It is also the mixing device and used to mix the material with the pigments go that the required material can be obtained. Though it can be used to mix all type of material but in compounding section of dawlance it is specifically used to mix the poly storing (IS) material with the pigment of T- brown , T green, smooth gray. Height impact poly strien (HIPS) material with the pigment of brilliant white. INJECTION SECTION: • It is heart of the moulding section here all plain parts are been manufacture through injection mould mallina. • The highly automated machine CLF- INJECTION MOULDING MACHINE use in this section. • The machine can varies clapping force i.e the injection moulding machine (CLF- 8OT) has the minimum clapping force injection moulding machine (CLF- 800T) has the maximum clapping force. • There are basically 52 CLF-MOULDING MACHINE’S are used and can vary in diff: clapping force to make very small item to the heavy plastic item. PROCESS OF CLF (INJECTION MOULDING MACHINE) Basically the processing of CLf is based in the four different sections. 1. Hooper 2. Bassell 3. Injection side 4. Eject side 1. HOOPER: First of all material (mixed material) has come from the compounding section. Hooper actually use to collected the inserted material alive is the shifted in to into the bassel. 2. BASSEL: UNITED REFRIGRATOR COMPANY LTD. 31 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 32. INTERNSHIP PROGRAME After Hooper the material hydraulic piers machine comes into the bassel. In bassl this material first heated thorough 7- different zone and reach zone has two heaters. 3. INJECTION: Once the material is to be melted with the help of heated now the material is to be injected through layer 6 to 7 different stage into the injected mould. EJECT: After completing the ague the maked part in then eject from the machine so that to perform the work. From all these the other part i-e. carriage is used to be mixed HOT STEPPING SECTION: It is little section in which chosen stepping is to be done over the freezer door pocket that desirable the various sign. EXTRUADES SECTION: It is the of section actually injection moulding process and it is also used to make the profile that has been mould plastic material and give the shape of profile. CABEL SECTION: The refrigerator wire connection from the electric require a plug and cable so in this there things are to manufactured. Once the wire (cables to be purchased that first of on this cable are cables are to cutted the required size and then the folly steps are to be taken 1. Core stepping 2. Wire stepping 3. Pinch moulding 4. Pinch foulding 5. Princh moulding machine SCREEN PAINTING: As one have seen that there is numbering over thermometer regulator, also we have is painting over the shelf “wider shelf “ similarly these is certain coding we have seen, so in thing reaction i-e “ screen painting , there coating has been painted over the items. UNITED REFRIGRATOR COMPANY LTD. 32 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 33. INTERNSHIP PROGRAME MAINTENANCE UNITED REFRIGRATOR COMPANY LTD. 33 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 34. INTERNSHIP PROGRAME Today, in modern industry, equipment and a machinery are a very important part of the total productive effort than was the case years ago. Moreover, with the developments of special purpose and sophistical machines, equipment and machinery cost a lot more money and there fore their and does time becomes much more expensive. For this reason, it is vitally important that the plant machinery should be properly maintained. OBJECTIVES OF PLANT MAINTENANCE i) The objective of plant maintenance is to achieve minimum breakdown and to keep the plant in good working condition at he lowest possible cost. ii) Machines and other facilities should be kept in such a condition which permits them to be used at their optimum (profit making) capacity without any interruption or hindrance. iii) Maintenance division of factory ensures the availability of the machines, buildings, and services required by other section of the factory for the performance of their function at optimum return on investment whether this investment be in material, machinery or personnel. IMPORTANCE OF THE MAINTENANCE i) The importance of the plant maintenance is varies with the type of the plant and its production. ii) Equipment breaks down leads to the inevitable loose of production. iii) An improperly maintained or neglected plant will sooner or later requires expensive and frequent repairs, because with the passage of the time all machines or other facilities (such as transportation facilities), buildings, etc wear out and need to be maintained to function properly. iv) Plant maintenance plays a prominent role in production management the plant break down create problems such as, • Loss in production • Rescheduling of production • Split material (because sudden stoppage of process damages in-process materials). • Failures to recover overheads (because of loss in production hours). • Need for over time. • Temporary work shortage- workers require alternative work. METAINENCE METHODS There are basically two different maintenance methods i-e i) Tribology ii) Tero technology TRIBOLOGY UNITED REFRIGRATOR COMPANY LTD. 34 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 35. INTERNSHIP PROGRAME It is the method of maintenance that deals with the lubrications impact of the machine by proper maintenance. It includes oiling, greasing etc. TETO-TECHNOLOGY It is also the methods of maintenance that deals with the mechanical effect of the maintenance such as repairing of the part of machine, overhauling of the machine. MAINTENACE AT DAWLANCE (United Refrigerator Company) At dawlance there is a separate maintenance which constitute of several engineers, technicians, and a skilled labors. Their work is basically based upon the team efforts in which each persons has certain responsibilities. This section is centrally connected but all other section of industry by means of computer network software (ORACLE) and also within the telephone. They use to work into different format first they have collect the data of all bug to small machines procession and divided these data of each part of machine into various activities and also assign a scheduled of maintenance of each activity so that to work accordingly. The second format on which they work is that whenever any break down occur in a production as per receive the compliance of particular maintenance they work upon it. Except production work their are other areas such as puncher shop, compressor maintenance shop, generator maintenance, electrical maintenance department. UNITED REFRIGRATOR COMPANY LTD. 35 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 36. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 36 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 37. INTERNSHIP PROGRAME QUALITY CONTROL DEPARTMENT QUALITY:- Though there are no. of definition of quality but in very simple works it can be term as “ To meet the customer’s specification “. CONTROL:- The provision to control the action or plan is to be control so that to meet the requires as per planned. QUALITY CONTROL:- Quality control refers to the control level of quality si that to lead to the customer satisfaction. • It is the provision under which the proper and effective quality it to be obtain so that to lead the market position. • In an organization the term quality is as big as it can and under a no. of quality units are working their work to inspect the ongoing activity as per standard and then mark as OK, HOLD, USAI, REOWRK & SCRAPE. QUALITY CONTROL AT DAWLANCE The quality is given the major relaibnility at dawlance and therefore the central quality control department is been devied in deffrent quality section i) Quality engineering cell ii) Incoming quality control iii) Quality assurance iv) Self quality at each manufacturing section v) Quality process lab. And many other departments …… QUALITY ENGINEERING CELL It is basically the quality section is which all the documentation are to be taken places It is use to keep the documentation like of each section and even each section’s item that has produces…. a) Quality instruction b) Work instruction c) ITI ( Instruction Testing Inspection ) d) Sampling Inspection e) Quality status Now we shall discuss each section in detail.. UNITED REFRIGRATOR COMPANY LTD. 37 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 38. INTERNSHIP PROGRAME QUALITY STATUS While inspected anything the doud full item are to be taken into 4 basic consideration rather than just to be called as scraped i-e by reviewing whole parameter the decision regarding the item is to be taken. There are basically four quality status . i) HOLD ii) UAI (use as is) iii) REWORK iv) S CRAPED It can be illus trade as , HOLD UAI SCRAPED REWORK HOLD = During inspection the defective part is to be hold. UNITED REFRIGRATOR COMPANY LTD. 38 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 39. INTERNSHIP PROGRAME USE AS IS (UAI) = Though the part is not fully mismatched with the standard but the negotiation between the manufacture and quality incharge is to be taken and the item is it be USE AS IS (UAI). REWORK = There are few items those are require to rework so that to be come into the required expectation . SCRAPE = The item is to be scarped. QUALITY CONTROL MANUAL It is basically a manual that can help the operator to perform the work takes as it includes all type of activities. These are those type of manual which use to perform the training function to the operation because its includes set of instruction of every used item. SAMPLING TABLE As we know when raw material receive there are basically a no. of lots and each lot having a no. of item therefore is extremely difficult to check each and every item and also time consuming because if we are doing to inspect every item so it is very difficult for us to meet the required demand. Therefore the process begins by checking first 3 lots completely i-e 100 % and then if the fault rate is same or reducing the accordingly move toward the sample mood in which according to lot size the item are randomly selected. The sampling mood sheet can be illustrate as , SAMPLING TABLE LOT SIZE ACCEPT QUALITY LEVEL SAMPLE SIZE ACCEPT REJECT 2 to 8 2 0 1 51 to 90 3 0 1 500001 to 13 1 2 over UNITED REFRIGRATOR COMPANY LTD. 39 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 40. INTERNSHIP PROGRAME • ITI (INTRUCION TESTING INSPECTION) It is basically a document in which whole process and way of doing of each and every part is given. It is a document which includes all the defects even that has observed before in the form of major and minor defects. Basically there are 872 type of ITI’S are there. • DC / IDC FORM DC = DECIPLANE CHECK IDC = INTER DECIPLANE CHECK It is the document which bund to check the discipline of particular item i-e the item like sheet coil is been check by the sheet metal inspector. After that it is inter disciplinary check by the concerned related section. • RELIABILITY IN AN ACTION PROGRAM (RIAP) It includes basically a proframa which describe how training programs are to be undertaken. What are the progress of training i-e how to be calculate. What is the procedure of doing the basic task etc. • INCOMING QUALITY CONTROL DEPARTMENT Incoming quality control is basically a quality section whose function is to inspect all incoming raw material that can be utilized for different purpose in different place. They used to work according to the instruction has given in ITI of particular item and each ITI is different for different items. We also know the dawlance (united refrigerator) can purchase the material both expert from other countries and also taken from the local suppliers. PROCESS OF INCOMING Q.C The procedure of incoming quality control section to inspect the raw item can be under line in the following steps. STEP # 1:- RECEIVE PROCESS It is the visually process once the raw material is receive the proforma that has been given within the raw material by the supplier is to check whatever written in the from of quality is placed or not. STEP # 2:- QUALTY INSEPCTION It is the main inspection in which the raw material quality is to be inspect to mismatch with the standards Initially the first three lot are to fully inspected i-e 100 % checking and after that the defect level over in first 3 lots are satisfactory the we shall proceeds to the UNITED REFRIGRATOR COMPANY LTD. 40 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 41. INTERNSHIP PROGRAME sample mood when according to the lot size sample is randomly selected and then be inspected. It is very much important to remember the incoming Q.C is not able to inspect all items just like chemical type of material is to be inspected in Q.C lab and hence the C-FORM is to be make for that. Incoming Q.C usually make visual dimensional inspection. Now we shall discuss the item as follows, • EVAPORATER Evaporator is the type of item which is no. of time to be inspected starts from the Q.C and then final assembly inspection. The dawlance exports evaporator from china the suppler name “Jau-su-shanfe”. Though testing supplier are also inspected but the existing supplier “Jau-su-shanfe” is the major and more reliable supplier of evaporator. Evaporator is 100% inspected and there is no concept of sample mood. PROCESS OF EVAPORATER INSPECTION AT INCOMING Q.C First of all the sizing of evaporator is to be inspected visually and then observe the dent to be placed over the evaporator more importantly if that case the dent to be over the bended area ( as is pre-foaming shop) the evaporator is to be rejected because no more risk is to be taken. • JOTUM POWDER We know the usage of JOTUN powder i-e its use for the paining purpose if items . The inspection of JOTUN is begins by batch the powder in term of their respective code and colors. After that the C- form is made and its sample of every batch shifted to the Q.C lab where the chemical is to be inspected in order to match the existing composition with the standard one. • CABLE ASSEMBLY LINE SWITCH As we have seen in pre-foaming stage when liner is prepared for fixed into the cabinet so the hold assembly with thermo state is taped over there. Therefore the cable is to be termed as cable assembly switch and it is to be inspected in terms of equal dimension. The multimeter is used to check continuity of cable etc And many other item are to be inspected at Incoming Quality Control ( we are not in a position to describe each ). SELF QUALITY SECTION UNITED REFRIGRATOR COMPANY LTD. 41 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 42. INTERNSHIP PROGRAME Every manufacturing side have its own self quality section whose purpose is to check the quality of manufactured item that make in his section as per required specification. There are basically two different type of inspection is to be taken place i) First piece Inspection ii) Roval inspection FIRST PIECE INSPECTION As the name suggest the inspected that has been taken from the first piece according to the required drawing specification Then the first piece is to be filled into the shape of document certificates are as follows ,….. FRONT SIDE UNITED REFRIGRATION INDUSTRIES LTD IN PROCESS QUALITY CONTROL DEPARTMENT (SHEET METAL) Certificate no. ----- FIRST PIECE / MACHINES SETTING CERTIFICATE DATE___________________SHIFT______________________ TIME_______________________ MACHINE:______________________________________________________________________ PART____________________________OPERATION____________________________________ DIE/ MACHINE SETTER__________________________________________________________ DRAWING NO.___________________________MODEL_________________________________ SIGNATURE PROD. SUPERVISOR _________________________________________________ REMARK BY QC INSPECTOR ______________________________________________ BACK SIDE REQUIRED FOUND SIZE VARIATION MEASURING UNITED REFRIGRATOR COMPANY LTD. 42 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 43. INTERNSHIP PROGRAME SIZE TOOL NAME ROVAL INSPECTION As we know that the variation over the item can be occur at any stage because of any fault in an machine therefore after first piece inspection the roval inspection i-e after every hour of same item also done to maintain the quality. The roval inspection certificate is filled according to the dimension. UNITED REFRIGRATOR COMPANY LTD. 43 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 44. INTERNSHIP PROGRAME UNITED REFRIGRATOR COMPANY LTD. 44 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 45. INTERNSHIP PROGRAME SUGGESTION NO. 1:- There should be a supply chain department. A supply chain is a process that includes the chain of supply from purchasing of raw material to the shifting to end consumer. It defines as the supplier-customer interaction and intermediaries’ b/w them. I have seen while doing internship at dawlance there is no concept of supply chain management and there is no supply chain department and instead of having the separate supply chain department the PPC ( production planning and control ) dealing with the affairs of supply chain . IFFECT OVER THE INDUSTRY IN THE ABSENCE OF SUPPLY CHAIN DEPARTMENT In dawlance the process of manufacturing is to be start when the tentative schedule is been given to each manufacturing section that they has to produce this much amount of this and this much amount of that in a particular period of time. Every manufacturing within the industry is been produce its own tentative work plan on which they have to work but unfortunately this tentative plane does not define the interaction b/w two manufacture i-e supplier –customer relationship. For example :- Pre-foaming is the customer of cabinet painting shop and cabinet painting shop and cabinet painting shop is the customer of sheet metal and welding section hence its form a chain of supplier and customers. For example :- thermo foaming is the supplier of pre-forming or in other words pre-foaming is the customer of thermo foaming but the supplier of thermo foaming is out siders . In dawlance (united refrigerator company) instead of having a supply chain department there is general meeting among the supervisors and UNITED REFRIGRATOR COMPANY LTD. 45 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 46. INTERNSHIP PROGRAME engineers of manufacturing staff and this meeting every supplier is interacting with his customer so that to know the current situation of each other and share their problems to each other. Hence just based on the general meeting the result as any stoppage or draw back in production they used to blaming to one another which in term leads to create conflict. Therefore if there will be a supply chain department so I think is a perfect accountability of each section and hence over all performance get improved. SUGGESTION # 2 :- There should be an effective maintenance department. As we have discussed that there is a maintenance department but to be very much frank it is not suppose to fulfill the required production expectation which in tern causes to create the conflict b/w the maintenance and manufacturing section. Manufacturing section complains that , • Maintenance not working properly . • They don’t find the root mean cause of the problem instead they just try to put their effort so that the production has start. • They donot react on time usually we call them a lot and at the end they used to react. On the other hand, The maintenance compliance that, • They don’t have enough work force to reduce the causes of unhappenings. • Manufacturing too easily too band toward their improvemental thinking and its being extremely difficult to maintenance to meet all this. And there are various other factor that lead to create the conflict among the manufacturing and maintenance section. UNITED REFRIGRATOR COMPANY LTD. 46 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 47. INTERNSHIP PROGRAME SOLUTION The main dramatic lack is also that there is no shutdown maintenance of machine been allow by administration because shutdown maintenance required 2 to 4 hours and obviously while doing shutdown maintenance the production gets stops and management not want any action that leads to stop the production . But if wee look from a close eye the machines get stops any time because of any lack then to give ordering to the maintenance and then it assign the optimal crew according to the work and then act this also requires a lot of time and in this period also gets stops therefore I think there ha to be same period of shutdown maintenance. UNITED REFRIGRATOR COMPANY LTD. 47 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)
  • 48. INTERNSHIP PROGRAME PREPARED BY Name: Mohammad Younus Fathers Name: Mohammad Anwar Qureshi Surname: Qureshi Nationality: Pakistani Date of birth: 24th November 1988 Place of Birth: Hyderabad Domicile: Hyderabad Urban Profession: Student Degree: Graduation (B.E Industrial Engineering & Management) Year of Study: Final year. Roll No. 08IN70 University: Mehran University of Engineering and Technology (M.U.E.T) Jamshoro. UNITED REFRIGRATOR COMPANY LTD. 48 DAWLANCE PREPARED BY MOHAMMAD YOUNUS (08IN70)