Installation of 200W solar panel in a house.
Anthropower
Introduction:
India lies in the sunny regions of the world. Most parts of India receive 4–7 kWh (kilowatt-hour)
of solar radiation per square meter per day with 250–300 sunny days in a year. The highest
annual radiation energy is received in western Rajasthan while the north-eastern region of the
country receives the lowest annual radiation.
The features that make it an attractive and a lucrative option include global distribution,
pollution free nature, and the virtually inexhaustible supply.
Solar Panel:
Fig1: A 270W polycrystalline module
Manufacturing Technology:
3 key elements in a solar cell form the basis of the technology:
1) Semiconductor which absorbs light and converts it into electron-hole pairs.
2) Semiconductor junction, which separates the photo-generated carriers (electrons and holes)
3) Contacts on the front and back of the cell that allow the current to flow to the external
circuit.
The two main categories of technology are defined by the choice of the semiconductor:
Either crystalline silicon in a wafer form or thin films of other materials.
A grid interactive roof top solar PV system comprises the following equipment:
1) SPV Power Source
2) Inverter (PCU- Power Conditioning Unit)
3) Mounting Structure
4) AC and DC Cables
5) Earthing equipment /material
6) Junction Boxes or combiners
7) Instruments and protection equipment (disconnect switches and fuses)
1) SPV Power Source:
Solar Panel as in fig 1
2) Inverter (PCU- Power Conditioning Unit)
Fig 2: Solar Power Conditioning Unit
It is the most important component.
Inverter does:
1) The inverter converts the DC power of the array into AC.
2) The output of the inverter synchronizes automatically its AC output to the exact AC voltage
and frequency of the grid.
Solar Inverters:
A Solar inverter or PV inverter is a type of electrical inverter that is made to change the direct
current (DC) electricity from a photovoltaic array into alternating current (AC) for use with home
appliances and possibly a utility grid.
Solar inverters may be classified into three broad types:
• Stand-alone inverters, used in isolated systems where the inverter draws its DC energy from
batteries charged by photovoltaic arrays and/or other sources, such as wind turbines, hydro
turbines, or engine generators. Many stand-alone inverters also incorporate integral battery
chargers to replenish the battery from an AC source, when available. Normally these do not
interface in any way with the utility grid, and as such, are not required to have anti-islanding
protection.
• Grid tie inverters, which match phase with a utility-supplied sine wave. Grid-tie inverters are
designed to shut down automatically upon loss of utility supply, for safety reasons. They do not
provide backup power during utility outages.
• Battery backup inverters. These are special inverters which are designed to draw energy from
a battery, manage the battery charge via an onboard charger, and export excess energy to the
utility grid. These inverters are capable of supplying AC energy to selected loads during a utility
outage, and are required to have anti-islanding protection.
Protection and Controls:
1. Inverter is provided with islanding protection to isolate it from the grid in case of no supply,
under voltage and over voltage conditions so that in no case there is any chance of accident.
In case of a power cut, the PV module too ceases to provide any power. In such a case, the
backup DG (Diesel Generator) set is utilized.
2. In addition to above, PV systems is provided with adequate rating fuses, fuses on inverter
input side (DC) as well as output side (AC) side for overload and short circuit protection and
disconnecting switches to isolate the DC and AC system during maintenance.
3) Mounting Structure:
The frame is made up of anodized aluminum; its thickness on the surface of the frame is 25
micron. The component frame have four sets of screws and one set of holes connecting to the
ground, completely meet the international authority’s demand.
Fig 3 : Mounting Structure
4) AC and DC Cables:
Fig 4: AC/DC wire concept
5) Earthing equipment /material:
6) Junction Boxes or combiners:
Junction box has good water-proof and sealed functions
7) Instruments and protection equipment (disconnect switches and fuses):
Seal material: Anti-aged EVA (Encapsulated Resin) and anti-climate good TPT (Tedlar-Polyester-
Tedlar) material
Connections:
On the solar module, connect the positive home run cable to the positive output cable, and
connect the negative cable to the negative of the home run cable pushing collectors all the way
in.
Fig 5 : Connection b/w wires and their encapsulation
When you have made direct connections, use a digital multimeter to measure the voltage and
current output of the module. Record the measurement results.
• This information is needed to check for solar module wiring mistakes, and it will also be
needed by the electrician who makes the connections to the inverter.
 Then the wire is connected to the Solar Power Conditioning Unit, which converts Dc power
of the module into AC which synchronizes automatically its AC output to the exact AC
voltage of the grid.
 The devices are connected with the inverter. The extra supply, if left is sent to the grid, for
other’s use, which the producer is paid for, by the government.
Fig 6: Illustration
The power generating capacity of a photovoltaic system is denoted in Kilowatt peak (measured
at standard test conditions of insolation 1000 W/m2
).
Standard Flow in a house:
Fig 7: Working model and use of excessive power produce to power grid.
Steps to follow:
Step 1: Mounting of the Solar Panels on the roof, tilted at an angle equal to latitude of the place
in south direction. The mounting has been discussed in the Fig 3.
Mounting methods:
1. Mounting with Bolts
The module must be attached and supported by at least four bolts through the indicated
mounting holes.
2. Mounting solar modules with bracket on flat roof and ground
Fasten bracket on flat roof or ground first, fasten solar modules on bracket, use nuts to fasten
bracket. The bracket would endure 20 years, and is made of anticorrosive material.
Temperature zinc steels and Stainless steel is recommended.
3. Other
The recommended standoff height is 5 cm. If other mounting means are employed this may
affect the UL Listing.
Direction of module installation: PV module are rectangle shaped; PV module array
longitudinal installation (the way that installs the module by long side longitudinal) is mostly
used because the transverse installation (the way that installs the module by long side
transversely) has less rain cleaning ability.
Precautions:
 Exercise caution when wiring or handling modules exposed to sunlight. Completely
cover all modules with an opaque material during installation to prevent electricity from
being generated.
 When disconnecting wires connected to a photovoltaic module that is exposed to
sunlight, an electric arc may occur. Arcs can cause burns, start fires or otherwise create
safety problems. Exercise caution when disconnecting wiring on modules exposed to
sunlight.
 Do not use mirrors or other hardware to artificially concentrate sunlight on the module.
 Use appropriate safety equipment (insulated tools, insulating gloves, etc) approved for
use on electrical installations.
 The module should not be shaded at any time of the day.
If the module is in shade it, suffers from shading effect:
Shading effects on Solar PV systems:
From case studies it is known that PV systems with the same nominal power generate quite
different energy yields due to different shading patterns. The common problems are:
1. Reduction of power output: As the insolation is reduced by shading we get a reduced photo
current. As cells are in series connection, the current for all the cells is reduced.
2. Thermal stress on the module: Depending on the level of shading, the PV generator circuit
and the load the voltage of shaded cells might reverse. In this case they operate in the blocking
state as a resistive load. The losses in the individual cell can increase the cell temperature
dramatically and overheating might occur.
In order to overcome some of the problems related to shading, by-pass-diodes are connected
parallel to a number of solar cells. Under normal operating conditions the diodes are blocked as
compared to the voltage generated by the cells. When shading occurs the reversal of the voltage
can be observed in that specific section and now the by-pass diode in parallel will conduct the
current. The results are:
The current of the unshaded section flows through the by-pass diode and the power/voltage
characteristic shows a second local maximum
The shaded cell is only loaded with that fraction of power produced by the remaining unshaded
cells of that section
The use of by-pass diodes results in some drawbacks as well:
• Higher cost for the module production and assembly problems of the by-pass diodes
• Losses in the by-pass diode due to shading
• Matching problems between the solar inverter and the photovoltaic generator because of the
second local power maximum might not be included in the range of operation of the inverter.
 Do not install the module near equipment or in locations where flammable gases can be
generated or collected.
Step 2: Testing:
It is best to test the solar array before mounting to avoid having to take it down again. To do
this, turn it over and lay it on the ground face up. Make sure you have enough people helping to
avoid twisting or dropping the solar array.
Using a multimeter set to an appropriate DC Voltage range, measure the voltage between the
two cores of the output cable. It should be equivalent to the open-circuit voltage of onesolar
panel multiplied by the number of solar panels in series. That is, about 20 V for a 12 V system,
40 V for a 24 V system and 80 V for a 48 V system. 80 Volts is a dangerously high voltage, and 40
Volts is enough to give a nasty shock in the wrong circumstances; take care when performing
these measurements and cover the solar array with an opaque material before connecting the
meter if in any doubt.
Once this test is complete it is advisable to make the solar array safe before lifting it into place.
There are two ways of doing this; either cover it with an opaque material or connect the cores of
the output cable together to short-circuit the solar array. This will not cause any damage and is
my preference.
Step 3: Electrical Installation
Grounding:
There is the grounding hole and grounding marking along either edge of the frame indicating a
ground bonding location. Frames must be grounded and bolts, washer must be of stainless steel.
The wire must have no nick. Make the grounding wire connect to the bolt and tighten it.
Precautions:
 Ensure that positive and negative DC wires run closely together avoiding loops.
 Completely cover system modules with an opaque material to prevent electricity from
being generated while disconnecting conductors.
 Do not touch bare conductors or other potentially energized parts.
 Inverter output is mains voltage AC and can be lethal. Treat as for any other mains
supply.
 Solar arrays generate electricity when exposed to the sun, whether connected to
control equipment or not. Treat solar array output cables as live and cover solar
array when making connections.
 The open circuit voltage of a solar array is significantly greater than the system
voltage. For example a 48 Volt array can have an open circuit voltage of nearly 90
Volts, which can be lethal to children, the elderly or anyone with a heart condition.
 Batteries can produce currents of hundreds or even thousands of amps giving rise to
the risk of fire. Take great care to protect the battery terminals from shorting by tools
and remove all jewellery.
Use such protections for electrical installation:
Fig 8: Photovoltaic Fuses:
Fig 9: Photovoltaic Fuseholders :
Fig 10: Surge Protective Devices
Fig 11: PV Safety Solutions
Fig 12: Power Electronics Solutions
Fig 13: Wire Management
Chemical
Lead acid batteries contain dilute sulphuric acid and liberate hydrogen when charging.
Observe the following precautions:
 Take great care when filling batteries with electrolyte; wear suitable protective clothing
including eye protection and carry out in a well ventilated area, preferably outdoors.
 Do not smoke near batteries and ensure room is well ventilated.
 Take care to prevent arcing near battery terminals as explosion may result.
Keep first aid and eyewash equipment close at hand when working on batteries.
Handling
Batteries and solar arrays present certain hazards in handling as follows:
 Lead acid batteries are extremely heavy. Use appropriate lifting gear and ensure adequate
help is available.
 Most solar panels are made from glass. Treat as fragile.
Installing solar arrays may involve working at height. Observe all necessary precautions and
employ the services of a qualified rigger or roofer if necessary.
General Precautions:
Batteryless grid type system vs Off grid system:
Batteryless grid- tied systems are simple to understand and design, with only two primary
components: PV modules and an inverter that feeds AC electricity back into the electrical
system to offset some or all of the electricity otherwise purchased from the utility. These
systems are cheaper, easier to install and maintain, and operate more efficiently than battery-
based systems of comparable size. Their main drawback is that when the grid goes down, they
cannot provide any energy for you to use. If the grid in your area is mostly reliable and outages
are infrequent, these systems can offer the best payback for the least price.
Battery:
Installation of the battery may be as simple as taking a wet-charged or sealed battery out of a
box and placing it on a firm and level surface. Alternatively it may involve mixing acid to the
right concentration and filling the batteries on site.
Siting:
The batteries need to be mounted such that they are secure, i.e. they can’t fall over, they are
protected from unauthorised access and away from sources of ignition. The room or container
that they are in should be ventilated so as to allow the hydrogen produced by charging to
escape. This applies even to sealed batteries as they are able to vent excess gasses should the
charging system malfunction.
Practically this is most likely to mean one of two things:
• On a solid floor or racking within a locked and well ventilated room.
• In a purpose designed battery box.
It is important that it is possible to gain access to the batteries in order to perform maintenance.
In the case of a sealed battery this means the terminals, but for a vented battery it may mean
access to the level markings on the side and the filling caps.
Sealed batteries
Sealed batteries of both gel and AGM types are always supplied filled and usually charged. It
may be necessary to give them a refresher charge before putting them into service. This
should be performed with a regulated mains charger if possible. If this can’t be done for any
reason then the system should be used as little as possible for the first 24 hours in order to
allow the batteries to become fully charged.
Wet batteries
When batteries are supplied already filled with electrolyte, they are usually charged and are
treated in the same way as described for sealed batteries.
Dry-charged batteries
Some wet batteries are supplied dry-charged. This means that they have been charged, the
electrolyte emptied out and the battery dried and sealed. It is important that it remains
sealed if it is to be stored before being put into service. Once it is required, the seals should
be removed and dilute sulphuric acid of the correct specific gravity used to fill the cells to the
filling mark. The acid will usually be supplied with the battery. The battery should then be
allowed to stand for a period of time to allow any air to escape.
A dry charged battery, once filled, will achieve about an 80% state of charge. For this reason it
must be charged before putting into service. Normally this will be specified by the
manufacturer as being at a specific voltage for a particular amount of time. Again it should be
accomplished by means of a mains operated charger if possible, although it may be possible
to use the solar system to provide this charge if the loads are disabled for a certain amount of
time.
Dry uncharged batteries
Sometimes batteries, normally large cells, are supplied in a dry uncharged state. It is critical
that the manufacturer’s instructions are followed to the letter as the initial charge is
important to the formation of the plate structure. Normally they will be filled as with dry-
charged batteries and then subjected to an extended charge, often taking some days. This
must be performed with the correct type of charger and it is advisable to avoid purchasing
batteries in this state if possible. If wet batteries have to be transported by sea or air the best
option is to obtain them in a dry-charged state with the acid in suitable packaging as advised
by your shipping company.
Mixing acid
It may sometimes be necessary to mix your own electrolyte from concentrated sulphuric acid
and distilled water. This should be avoided unless absolutely necessary, for instance in
developing countries where it may be impossible to purchase ready made electrolyte and
shipping it from the manufacturer is impractical. It is essential that the sulphuric acid and
distilled water are of the highest purity.
Before you start collect together the following items:
 Safety clothing, including a chemical splashes apron, face shield and suitable gloves.
 A suitable non-metallic mixing vessel and stirrer. Glass is ideal although you may have to
use whatever is available such as a plastic bucket and wooden stick. I write from
experience on this.
 A glass thermometer calibrated from at least 10 - 80º C.
 A battery hydrometer, which can be bought from a battery specialist or tool shop.
 A container to hold the finished electrolyte. A plastic drum is ideal and should be marked
“Sulphuric acid. Highly corrosive.”
It is important that you always add acid to water and never the other way round. In this way,
you are never diluting concentrated acid, which can cause it to boil explosively with very
serious consequences. Mix a little at a time, add the acid in small amounts and stir
thoroughly. Bear in mind that it will become hot.
Each time you add some acid, check the specific gravity by drawing a little electrolyte into the
hydrometer and expelling it, then drawing in enough just to lift the float. Read off the specific
gravity from the scale and record. Then measure the temperature of the electrolyte and add
0.001 to the reading on the hydrometer for each degree Celsius above the specified
temperature.

Contenu connexe

Tendances

Solar pv -simulation and designing
Solar pv -simulation and designingSolar pv -simulation and designing
Solar pv -simulation and designingTusharKumarSingh4
 
Course tcd 08electric
Course tcd 08electricCourse tcd 08electric
Course tcd 08electrican55sh
 
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Farming Futures
 
Solar Powered Home Back Up Power
Solar Powered Home Back Up PowerSolar Powered Home Back Up Power
Solar Powered Home Back Up PowerSolar Electrics
 
SOLAR BASED MOBILE CHARGER IN RURAL AREAS
SOLAR BASED MOBILE CHARGER IN RURAL AREASSOLAR BASED MOBILE CHARGER IN RURAL AREAS
SOLAR BASED MOBILE CHARGER IN RURAL AREASJOLLUSUDARSHANREDDY
 
Supercapacitor module applications for customers
Supercapacitor module applications for customersSupercapacitor module applications for customers
Supercapacitor module applications for customersillcap
 
GaN as Semiconductor Material for Solar Photovoltaic: A Review
GaN as Semiconductor Material for Solar Photovoltaic: A ReviewGaN as Semiconductor Material for Solar Photovoltaic: A Review
GaN as Semiconductor Material for Solar Photovoltaic: A ReviewIRJET Journal
 
ABB Training Colombia Inverters - Focus on residential and commercial solutio...
ABB Training Colombia Inverters - Focus on residential and commercial solutio...ABB Training Colombia Inverters - Focus on residential and commercial solutio...
ABB Training Colombia Inverters - Focus on residential and commercial solutio...Jesús Leyton P
 
solar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panelsolar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panelSwedel D'souza
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgridAmarjeet S Pandey
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...JLanka Technologies (Pvt) Limited
 

Tendances (20)

Solar pv -simulation and designing
Solar pv -simulation and designingSolar pv -simulation and designing
Solar pv -simulation and designing
 
Solar photovoltaic system
Solar photovoltaic systemSolar photovoltaic system
Solar photovoltaic system
 
Course tcd 08electric
Course tcd 08electricCourse tcd 08electric
Course tcd 08electric
 
Solar Micro Inverter
Solar Micro InverterSolar Micro Inverter
Solar Micro Inverter
 
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
 
The Elektrotipp - Circuit - Breaker Boxes
The Elektrotipp - Circuit - Breaker BoxesThe Elektrotipp - Circuit - Breaker Boxes
The Elektrotipp - Circuit - Breaker Boxes
 
Solar Powered Home Back Up Power
Solar Powered Home Back Up PowerSolar Powered Home Back Up Power
Solar Powered Home Back Up Power
 
Solar Inverters
 Solar Inverters Solar Inverters
Solar Inverters
 
About Solar Inverter
About Solar Inverter About Solar Inverter
About Solar Inverter
 
Pvsp final
Pvsp finalPvsp final
Pvsp final
 
Solar inverter Selection guide
Solar inverter Selection guideSolar inverter Selection guide
Solar inverter Selection guide
 
Safety with PV systems
Safety with PV systemsSafety with PV systems
Safety with PV systems
 
SOLAR BASED MOBILE CHARGER IN RURAL AREAS
SOLAR BASED MOBILE CHARGER IN RURAL AREASSOLAR BASED MOBILE CHARGER IN RURAL AREAS
SOLAR BASED MOBILE CHARGER IN RURAL AREAS
 
Supercapacitor module applications for customers
Supercapacitor module applications for customersSupercapacitor module applications for customers
Supercapacitor module applications for customers
 
GaN as Semiconductor Material for Solar Photovoltaic: A Review
GaN as Semiconductor Material for Solar Photovoltaic: A ReviewGaN as Semiconductor Material for Solar Photovoltaic: A Review
GaN as Semiconductor Material for Solar Photovoltaic: A Review
 
ABB Training Colombia Inverters - Focus on residential and commercial solutio...
ABB Training Colombia Inverters - Focus on residential and commercial solutio...ABB Training Colombia Inverters - Focus on residential and commercial solutio...
ABB Training Colombia Inverters - Focus on residential and commercial solutio...
 
solar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panelsolar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panel
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgrid
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
 
Nuclear Battery PPT
Nuclear Battery PPTNuclear Battery PPT
Nuclear Battery PPT
 

En vedette

Money market & Capital market
Money market & Capital marketMoney market & Capital market
Money market & Capital marketNowshed Hossain
 
Money market & its instruments
Money market & its instrumentsMoney market & its instruments
Money market & its instrumentsabhishek rane
 
Capital market instruments
Capital market instrumentsCapital market instruments
Capital market instrumentskartikganga
 

En vedette (7)

Money market & Capital market
Money market & Capital marketMoney market & Capital market
Money market & Capital market
 
Capital market
Capital marketCapital market
Capital market
 
Capital Market
Capital MarketCapital Market
Capital Market
 
Capital market ppt
Capital market pptCapital market ppt
Capital market ppt
 
Money market & its instruments
Money market & its instrumentsMoney market & its instruments
Money market & its instruments
 
Capital market ppt
Capital market pptCapital market ppt
Capital market ppt
 
Capital market instruments
Capital market instrumentsCapital market instruments
Capital market instruments
 

Similaire à Installation of 200W_solar_panel_in_a_house

PV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.ppt
PV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.pptPV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.ppt
PV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.pptArpoMukherjee1
 
Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - mme
 
4_5958416552171670667.ppt
4_5958416552171670667.ppt4_5958416552171670667.ppt
4_5958416552171670667.ppthussenbelew
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxHafizAsimKhayyam
 
solarplantpptbyriteshkumawat-160807125848.pdf
solarplantpptbyriteshkumawat-160807125848.pdfsolarplantpptbyriteshkumawat-160807125848.pdf
solarplantpptbyriteshkumawat-160807125848.pdfAllAboutworlds
 
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptxSession 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptxLoveroopSingh1
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatRitesh Kumawat
 
Applications of photovoltaic power a review
Applications of photovoltaic power   a reviewApplications of photovoltaic power   a review
Applications of photovoltaic power a reviewRaghuvirsinh Parmar
 
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEMUnit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEMPremanandDesai
 
Solar energy(Renewable source)
Solar energy(Renewable source)Solar energy(Renewable source)
Solar energy(Renewable source)bgoyani3
 
Solar energy
Solar energySolar energy
Solar energybgoyani3
 
Graduation Project - PV Solar With MPPT System
Graduation Project - PV Solar With MPPT SystemGraduation Project - PV Solar With MPPT System
Graduation Project - PV Solar With MPPT SystemAhmed Nabil
 
Solar Panel Installations
Solar Panel InstallationsSolar Panel Installations
Solar Panel InstallationsChad Weiss
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid SystemsSeminar Links
 

Similaire à Installation of 200W_solar_panel_in_a_house (20)

PV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.ppt
PV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.pptPV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.ppt
PV SYSTEMS, COMPONENTS DEVICES AND APPLICATIONS.ppt
 
Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system -
 
4_5958416552171670667.ppt
4_5958416552171670667.ppt4_5958416552171670667.ppt
4_5958416552171670667.ppt
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptx
 
solarplantpptbyriteshkumawat-160807125848.pdf
solarplantpptbyriteshkumawat-160807125848.pdfsolarplantpptbyriteshkumawat-160807125848.pdf
solarplantpptbyriteshkumawat-160807125848.pdf
 
Application of Solar Power
Application of Solar PowerApplication of Solar Power
Application of Solar Power
 
Application of Solar Power
Application of Solar PowerApplication of Solar Power
Application of Solar Power
 
Splar pv
Splar pvSplar pv
Splar pv
 
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptxSession 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
 
Applications of photovoltaic power a review
Applications of photovoltaic power   a reviewApplications of photovoltaic power   a review
Applications of photovoltaic power a review
 
Lecture 4 .pdf
Lecture 4                              .pdfLecture 4                              .pdf
Lecture 4 .pdf
 
solar inverter PPT (2).pptx
solar inverter PPT (2).pptxsolar inverter PPT (2).pptx
solar inverter PPT (2).pptx
 
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEMUnit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
 
Solar energy(Renewable source)
Solar energy(Renewable source)Solar energy(Renewable source)
Solar energy(Renewable source)
 
Solar
SolarSolar
Solar
 
Solar energy
Solar energySolar energy
Solar energy
 
Graduation Project - PV Solar With MPPT System
Graduation Project - PV Solar With MPPT SystemGraduation Project - PV Solar With MPPT System
Graduation Project - PV Solar With MPPT System
 
Solar Panel Installations
Solar Panel InstallationsSolar Panel Installations
Solar Panel Installations
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid Systems
 

Plus de Puneet Sharma

Plus de Puneet Sharma (9)

Sankalp'14, iit roorkee
Sankalp'14, iit roorkeeSankalp'14, iit roorkee
Sankalp'14, iit roorkee
 
Thomso, IIT Roorkee
Thomso, IIT RoorkeeThomso, IIT Roorkee
Thomso, IIT Roorkee
 
Catercap
CatercapCatercap
Catercap
 
Affiliate Marketing
Affiliate MarketingAffiliate Marketing
Affiliate Marketing
 
Women empowerment-puneet sharma
Women empowerment-puneet sharmaWomen empowerment-puneet sharma
Women empowerment-puneet sharma
 
Child abuse by puneet sharma
Child abuse  by puneet sharmaChild abuse  by puneet sharma
Child abuse by puneet sharma
 
Physics in our lives
Physics in our livesPhysics in our lives
Physics in our lives
 
Health & hygiene
Health & hygieneHealth & hygiene
Health & hygiene
 
Child labour
Child labourChild labour
Child labour
 

Dernier

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 

Dernier (20)

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 

Installation of 200W_solar_panel_in_a_house

  • 1. Installation of 200W solar panel in a house. Anthropower Introduction: India lies in the sunny regions of the world. Most parts of India receive 4–7 kWh (kilowatt-hour) of solar radiation per square meter per day with 250–300 sunny days in a year. The highest annual radiation energy is received in western Rajasthan while the north-eastern region of the country receives the lowest annual radiation. The features that make it an attractive and a lucrative option include global distribution, pollution free nature, and the virtually inexhaustible supply. Solar Panel: Fig1: A 270W polycrystalline module Manufacturing Technology: 3 key elements in a solar cell form the basis of the technology: 1) Semiconductor which absorbs light and converts it into electron-hole pairs. 2) Semiconductor junction, which separates the photo-generated carriers (electrons and holes) 3) Contacts on the front and back of the cell that allow the current to flow to the external circuit. The two main categories of technology are defined by the choice of the semiconductor: Either crystalline silicon in a wafer form or thin films of other materials.
  • 2. A grid interactive roof top solar PV system comprises the following equipment: 1) SPV Power Source 2) Inverter (PCU- Power Conditioning Unit) 3) Mounting Structure 4) AC and DC Cables 5) Earthing equipment /material 6) Junction Boxes or combiners 7) Instruments and protection equipment (disconnect switches and fuses) 1) SPV Power Source: Solar Panel as in fig 1 2) Inverter (PCU- Power Conditioning Unit) Fig 2: Solar Power Conditioning Unit It is the most important component. Inverter does: 1) The inverter converts the DC power of the array into AC. 2) The output of the inverter synchronizes automatically its AC output to the exact AC voltage and frequency of the grid. Solar Inverters: A Solar inverter or PV inverter is a type of electrical inverter that is made to change the direct current (DC) electricity from a photovoltaic array into alternating current (AC) for use with home appliances and possibly a utility grid.
  • 3. Solar inverters may be classified into three broad types: • Stand-alone inverters, used in isolated systems where the inverter draws its DC energy from batteries charged by photovoltaic arrays and/or other sources, such as wind turbines, hydro turbines, or engine generators. Many stand-alone inverters also incorporate integral battery chargers to replenish the battery from an AC source, when available. Normally these do not interface in any way with the utility grid, and as such, are not required to have anti-islanding protection. • Grid tie inverters, which match phase with a utility-supplied sine wave. Grid-tie inverters are designed to shut down automatically upon loss of utility supply, for safety reasons. They do not provide backup power during utility outages. • Battery backup inverters. These are special inverters which are designed to draw energy from a battery, manage the battery charge via an onboard charger, and export excess energy to the utility grid. These inverters are capable of supplying AC energy to selected loads during a utility outage, and are required to have anti-islanding protection. Protection and Controls: 1. Inverter is provided with islanding protection to isolate it from the grid in case of no supply, under voltage and over voltage conditions so that in no case there is any chance of accident. In case of a power cut, the PV module too ceases to provide any power. In such a case, the backup DG (Diesel Generator) set is utilized. 2. In addition to above, PV systems is provided with adequate rating fuses, fuses on inverter input side (DC) as well as output side (AC) side for overload and short circuit protection and disconnecting switches to isolate the DC and AC system during maintenance. 3) Mounting Structure: The frame is made up of anodized aluminum; its thickness on the surface of the frame is 25 micron. The component frame have four sets of screws and one set of holes connecting to the ground, completely meet the international authority’s demand. Fig 3 : Mounting Structure 4) AC and DC Cables:
  • 4. Fig 4: AC/DC wire concept 5) Earthing equipment /material: 6) Junction Boxes or combiners: Junction box has good water-proof and sealed functions 7) Instruments and protection equipment (disconnect switches and fuses): Seal material: Anti-aged EVA (Encapsulated Resin) and anti-climate good TPT (Tedlar-Polyester- Tedlar) material Connections: On the solar module, connect the positive home run cable to the positive output cable, and connect the negative cable to the negative of the home run cable pushing collectors all the way in. Fig 5 : Connection b/w wires and their encapsulation When you have made direct connections, use a digital multimeter to measure the voltage and current output of the module. Record the measurement results. • This information is needed to check for solar module wiring mistakes, and it will also be needed by the electrician who makes the connections to the inverter.  Then the wire is connected to the Solar Power Conditioning Unit, which converts Dc power of the module into AC which synchronizes automatically its AC output to the exact AC voltage of the grid.
  • 5.  The devices are connected with the inverter. The extra supply, if left is sent to the grid, for other’s use, which the producer is paid for, by the government. Fig 6: Illustration The power generating capacity of a photovoltaic system is denoted in Kilowatt peak (measured at standard test conditions of insolation 1000 W/m2 ). Standard Flow in a house: Fig 7: Working model and use of excessive power produce to power grid.
  • 6. Steps to follow: Step 1: Mounting of the Solar Panels on the roof, tilted at an angle equal to latitude of the place in south direction. The mounting has been discussed in the Fig 3. Mounting methods: 1. Mounting with Bolts The module must be attached and supported by at least four bolts through the indicated mounting holes. 2. Mounting solar modules with bracket on flat roof and ground Fasten bracket on flat roof or ground first, fasten solar modules on bracket, use nuts to fasten bracket. The bracket would endure 20 years, and is made of anticorrosive material. Temperature zinc steels and Stainless steel is recommended. 3. Other The recommended standoff height is 5 cm. If other mounting means are employed this may affect the UL Listing. Direction of module installation: PV module are rectangle shaped; PV module array longitudinal installation (the way that installs the module by long side longitudinal) is mostly used because the transverse installation (the way that installs the module by long side transversely) has less rain cleaning ability. Precautions:  Exercise caution when wiring or handling modules exposed to sunlight. Completely cover all modules with an opaque material during installation to prevent electricity from being generated.  When disconnecting wires connected to a photovoltaic module that is exposed to sunlight, an electric arc may occur. Arcs can cause burns, start fires or otherwise create safety problems. Exercise caution when disconnecting wiring on modules exposed to sunlight.  Do not use mirrors or other hardware to artificially concentrate sunlight on the module.  Use appropriate safety equipment (insulated tools, insulating gloves, etc) approved for use on electrical installations.  The module should not be shaded at any time of the day. If the module is in shade it, suffers from shading effect: Shading effects on Solar PV systems: From case studies it is known that PV systems with the same nominal power generate quite different energy yields due to different shading patterns. The common problems are: 1. Reduction of power output: As the insolation is reduced by shading we get a reduced photo current. As cells are in series connection, the current for all the cells is reduced.
  • 7. 2. Thermal stress on the module: Depending on the level of shading, the PV generator circuit and the load the voltage of shaded cells might reverse. In this case they operate in the blocking state as a resistive load. The losses in the individual cell can increase the cell temperature dramatically and overheating might occur. In order to overcome some of the problems related to shading, by-pass-diodes are connected parallel to a number of solar cells. Under normal operating conditions the diodes are blocked as compared to the voltage generated by the cells. When shading occurs the reversal of the voltage can be observed in that specific section and now the by-pass diode in parallel will conduct the current. The results are: The current of the unshaded section flows through the by-pass diode and the power/voltage characteristic shows a second local maximum The shaded cell is only loaded with that fraction of power produced by the remaining unshaded cells of that section The use of by-pass diodes results in some drawbacks as well: • Higher cost for the module production and assembly problems of the by-pass diodes • Losses in the by-pass diode due to shading • Matching problems between the solar inverter and the photovoltaic generator because of the second local power maximum might not be included in the range of operation of the inverter.  Do not install the module near equipment or in locations where flammable gases can be generated or collected. Step 2: Testing: It is best to test the solar array before mounting to avoid having to take it down again. To do this, turn it over and lay it on the ground face up. Make sure you have enough people helping to avoid twisting or dropping the solar array. Using a multimeter set to an appropriate DC Voltage range, measure the voltage between the two cores of the output cable. It should be equivalent to the open-circuit voltage of onesolar panel multiplied by the number of solar panels in series. That is, about 20 V for a 12 V system, 40 V for a 24 V system and 80 V for a 48 V system. 80 Volts is a dangerously high voltage, and 40 Volts is enough to give a nasty shock in the wrong circumstances; take care when performing these measurements and cover the solar array with an opaque material before connecting the meter if in any doubt. Once this test is complete it is advisable to make the solar array safe before lifting it into place. There are two ways of doing this; either cover it with an opaque material or connect the cores of the output cable together to short-circuit the solar array. This will not cause any damage and is my preference. Step 3: Electrical Installation
  • 8. Grounding: There is the grounding hole and grounding marking along either edge of the frame indicating a ground bonding location. Frames must be grounded and bolts, washer must be of stainless steel. The wire must have no nick. Make the grounding wire connect to the bolt and tighten it. Precautions:  Ensure that positive and negative DC wires run closely together avoiding loops.  Completely cover system modules with an opaque material to prevent electricity from being generated while disconnecting conductors.  Do not touch bare conductors or other potentially energized parts.  Inverter output is mains voltage AC and can be lethal. Treat as for any other mains supply.  Solar arrays generate electricity when exposed to the sun, whether connected to control equipment or not. Treat solar array output cables as live and cover solar array when making connections.  The open circuit voltage of a solar array is significantly greater than the system voltage. For example a 48 Volt array can have an open circuit voltage of nearly 90 Volts, which can be lethal to children, the elderly or anyone with a heart condition.  Batteries can produce currents of hundreds or even thousands of amps giving rise to the risk of fire. Take great care to protect the battery terminals from shorting by tools and remove all jewellery. Use such protections for electrical installation: Fig 8: Photovoltaic Fuses: Fig 9: Photovoltaic Fuseholders :
  • 9. Fig 10: Surge Protective Devices Fig 11: PV Safety Solutions Fig 12: Power Electronics Solutions Fig 13: Wire Management Chemical Lead acid batteries contain dilute sulphuric acid and liberate hydrogen when charging. Observe the following precautions:  Take great care when filling batteries with electrolyte; wear suitable protective clothing including eye protection and carry out in a well ventilated area, preferably outdoors.  Do not smoke near batteries and ensure room is well ventilated.
  • 10.  Take care to prevent arcing near battery terminals as explosion may result. Keep first aid and eyewash equipment close at hand when working on batteries. Handling Batteries and solar arrays present certain hazards in handling as follows:  Lead acid batteries are extremely heavy. Use appropriate lifting gear and ensure adequate help is available.  Most solar panels are made from glass. Treat as fragile. Installing solar arrays may involve working at height. Observe all necessary precautions and employ the services of a qualified rigger or roofer if necessary. General Precautions: Batteryless grid type system vs Off grid system: Batteryless grid- tied systems are simple to understand and design, with only two primary components: PV modules and an inverter that feeds AC electricity back into the electrical system to offset some or all of the electricity otherwise purchased from the utility. These systems are cheaper, easier to install and maintain, and operate more efficiently than battery- based systems of comparable size. Their main drawback is that when the grid goes down, they cannot provide any energy for you to use. If the grid in your area is mostly reliable and outages are infrequent, these systems can offer the best payback for the least price. Battery: Installation of the battery may be as simple as taking a wet-charged or sealed battery out of a box and placing it on a firm and level surface. Alternatively it may involve mixing acid to the right concentration and filling the batteries on site. Siting: The batteries need to be mounted such that they are secure, i.e. they can’t fall over, they are protected from unauthorised access and away from sources of ignition. The room or container that they are in should be ventilated so as to allow the hydrogen produced by charging to escape. This applies even to sealed batteries as they are able to vent excess gasses should the charging system malfunction. Practically this is most likely to mean one of two things: • On a solid floor or racking within a locked and well ventilated room. • In a purpose designed battery box. It is important that it is possible to gain access to the batteries in order to perform maintenance. In the case of a sealed battery this means the terminals, but for a vented battery it may mean access to the level markings on the side and the filling caps. Sealed batteries Sealed batteries of both gel and AGM types are always supplied filled and usually charged. It may be necessary to give them a refresher charge before putting them into service. This should be performed with a regulated mains charger if possible. If this can’t be done for any reason then the system should be used as little as possible for the first 24 hours in order to allow the batteries to become fully charged.
  • 11. Wet batteries When batteries are supplied already filled with electrolyte, they are usually charged and are treated in the same way as described for sealed batteries. Dry-charged batteries Some wet batteries are supplied dry-charged. This means that they have been charged, the electrolyte emptied out and the battery dried and sealed. It is important that it remains sealed if it is to be stored before being put into service. Once it is required, the seals should be removed and dilute sulphuric acid of the correct specific gravity used to fill the cells to the filling mark. The acid will usually be supplied with the battery. The battery should then be allowed to stand for a period of time to allow any air to escape. A dry charged battery, once filled, will achieve about an 80% state of charge. For this reason it must be charged before putting into service. Normally this will be specified by the manufacturer as being at a specific voltage for a particular amount of time. Again it should be accomplished by means of a mains operated charger if possible, although it may be possible to use the solar system to provide this charge if the loads are disabled for a certain amount of time. Dry uncharged batteries Sometimes batteries, normally large cells, are supplied in a dry uncharged state. It is critical that the manufacturer’s instructions are followed to the letter as the initial charge is important to the formation of the plate structure. Normally they will be filled as with dry- charged batteries and then subjected to an extended charge, often taking some days. This must be performed with the correct type of charger and it is advisable to avoid purchasing batteries in this state if possible. If wet batteries have to be transported by sea or air the best option is to obtain them in a dry-charged state with the acid in suitable packaging as advised by your shipping company. Mixing acid It may sometimes be necessary to mix your own electrolyte from concentrated sulphuric acid and distilled water. This should be avoided unless absolutely necessary, for instance in developing countries where it may be impossible to purchase ready made electrolyte and shipping it from the manufacturer is impractical. It is essential that the sulphuric acid and distilled water are of the highest purity. Before you start collect together the following items:  Safety clothing, including a chemical splashes apron, face shield and suitable gloves.  A suitable non-metallic mixing vessel and stirrer. Glass is ideal although you may have to use whatever is available such as a plastic bucket and wooden stick. I write from experience on this.  A glass thermometer calibrated from at least 10 - 80º C.  A battery hydrometer, which can be bought from a battery specialist or tool shop.
  • 12.  A container to hold the finished electrolyte. A plastic drum is ideal and should be marked “Sulphuric acid. Highly corrosive.” It is important that you always add acid to water and never the other way round. In this way, you are never diluting concentrated acid, which can cause it to boil explosively with very serious consequences. Mix a little at a time, add the acid in small amounts and stir thoroughly. Bear in mind that it will become hot. Each time you add some acid, check the specific gravity by drawing a little electrolyte into the hydrometer and expelling it, then drawing in enough just to lift the float. Read off the specific gravity from the scale and record. Then measure the temperature of the electrolyte and add 0.001 to the reading on the hydrometer for each degree Celsius above the specified temperature.