Innovation – Prof Nick Amott
Summary
 Cubic Melons
 LNG (with thanks to Prof Brian Cox)
 Who are Fluor?
 Why Innovation is Important
 Real Examples of Successful
Innovations
 Some Innovations that Didn’t
Work
 Your Role in Innovation
Cubic Watermelons
 Why?
 Developed by farmers in
Japan in 2001
 Response to customer and
supermarket concerns
 Now viewed as a novelty
item due to high price and
inferior taste!
Titan – Saturn's Moon
Photographs from the Cassini probe.
Titan (Saturn Moon)
 What is the white spot?
 Titan is a long way from
the sun with an
atmosphere of
methane not air!
LNG – Liquefied Natural Gas
 LNG - Natural Gas that has
been converted to a Liquid
 Gas is cooled through
expensive liquefaction process
to -162°C @ 0.25 bar
 LNG has much greater energy
density than compressed gas
making it more efficient to
transport
 Expensive production process
and storage equipment main
barriers to widespread
commercial use.
 Prelude 488 m x 74m, more
than 4.5 soccer pitches end to
end - $12.6 billion
LNG on Titan?
 The Innovators friend
 There are 1012 litres of liquid
methane on Titan
 Approx. ¼ of Earth’s reserves
are present in LNG form
 Why don’t we go and recover the
LNG?
 How would we get it to Earth?
 Cost of putting 1 lb of payload
into space is $10,000
 Neil Downie’s 5th law of
Innovation, “Every problem
contains an opportunity” – (but
maybe an opportunity for someone
else – your children's children!)
What is Fluor?
 One of the world’s leading publicly
traded engineering, procurement,
construction, maintenance, and project
management companies
 #124 in the FORTUNE 500 in 2012
 Over 1,000 projects annually, serving
more than 600 clients in 66 different
countries
 Workforce of over 43,000 men and
women executing projects globally
 Offices in over 30 countries on 6
continents
 100 years of experience
Fluor Corporate Headquarters
Dallas, Texas
9
Comprehensive Services
Program/Project Management
Pre-Design Design Construction Start-Up
Operations &
Maintenance
Solutions
 Computer
Modeling
 Conceptual
Design
 Estimating
 Feasibility Studies
 Permitting
 Project Financing
 Scope Definition
 Siting
 Technology/
License
Evaluation
 Front-end
Engineering
 Detailed
Engineering
 Cost Control
 Planning &
Scheduling
 Sourcing &
Supply
 Systems
Integration
 Safety Planning
 Construction
Management
 Craft Staffing &
Training
 Equipment &
Tools Supply
 Field Mobilization
 Material Control
 Quality Control
 Safety Programs
 Contractor
Management
 Commissioning
 Engineering Support
 Precommissioning
 Systems Checkout
 Initial Production
 Plant Readiness
 Turnover
 Asset Performance
Improvement
 Facility Management
 Plant Operations &
Maintenance
 Small/Sustaining
Capital Projects
 Turnaround, Outages
& Shutdowns
Why is Innovation Important to Fluor
 One of Fluor’s guiding principles states that the company is always
looking for:
“Methods to Capture, Share and Apply our
Knowledge to deliver Customer Solutions”
 To be able to fulfil this principle Fluor must be innovative and
provide an environment for innovation to thrive
 Innovation also allows the company to:
• Gain a competitive advantage over our competitors
• Retain, attract, develop and motivate a workforce essential for success
• Ensure quality and fit-for-purpose solutions are delivered to our customers
• Build and sustain a global community for all our stakeholders
• To maximise and increase margins and profitability for the company and
shareholders
So what does this mean!
Do it better, faster, cheaper!
Better – Faster - Cheaper
 Innovate the “work process”
 Change the paradigms
 Use the tools
ROI
£/$/€
How do we improve the work process using the
available tools ?
• Objective – Turn a Process concept into a decision
making design and cost estimate better, faster and
cheaper
• Have a Clear Vision of the End Product
• Just Enough and No More (JEAN)
–RTFC
–Don’t Outdo Competitor Deliverables
–Neil Downie’s 4th law, don’t over-deliver
• Completed the FEED on a $120M Ethane Treatment
Project with over 20 major equipment items in less than
one month
Work Process for +/-30%Cost Estimates
Process Simulation
Heat & Mat Balance
Prelim Cost Estimate
Prelim Equipment /
Line Sizing
QuickPlantSM
•Process Flow Dgms
•Equipment Data Shts
•Equipment List
•Load List
FrontRunnerSM
IPE
Equipment Based
Cost Analysis
OptimEyesSM
Layout Studies
Critical Equipment
Sizing Checks
•I/O Count
•Concrete MTO
•Piping MTO
•Structural steel MTO
•Plot plan /elevation
Client Quotes
“You have a significant
competitive advantage over your
competition with this approach”.
Statoil Project Manager
“You’ve done in 4 days what our
other team have been doing for
four months”.
Project Estimator
Real Example – 3rd Generation ModuleSM Design
Evolution of Modular Construction
 1st Generation Modular Execution
Evolution of Modularization in Land Locked
Locations
 2nd Generation Modular Construction Execution
• 1st Generation plus:
• Equipment or PAUs (Preassembled Units)
– Equipment on module
– Modules around equipment
Where next – 3rd Generation modulesSM
 Get more into a module
 Reduce the space occupied by the module and plant by
optimising layout
 Use the developing hardware available to the full extent
 Patent the application to protect intellectual property
Site Envelope Statistics
Traditional
320,000 m2
2nd Generation
200,000 m2
3rd Generation
84,000 m2
Real Example – 3rd Generation ModuleSM Design
 Reduced TIC
• Reduced plot area lowers quantities
• Total labor hours down
• Work done in Shop
• Dramatic decrease in construction management
 Improved Safety and Quality
 Minimized Environmental Footprint
 Operations & Maintenance Needs Maintained
 Neil Downie’s 0th and 2nd law
• Think! (laterally, contradictions, outside the box)
• Surprises = Patents
 This is a success story!
Real Example – Sub-Sea Processing
 Allows production from offshore oil wells without needing
surface production facilities
 Includes
• Oil/Gas/Water Separation
• Multiphase Pumping
• Gas Compression
• Flow Assurance
 Advantages:
• Improves production from existing wells
• Allows production from previously ignored wells due to harsh operating
conditions
 Disadvantages:
• Reliability issues have stopped widespread adoption, however these
are being fixed
 Currently used in North Sea, West Africa and Gulf of Mexico
Some Ideas Do Not Work – The Segway
 Self-balancing electric vehicle
developed in 2001
 Described as the future of
transport and an innovation on
par with PCs and the Internet
 Solution to a non-existent
problem, i.e. towns and cities
designed for cars and
pedestrians and no space for
new types of vehicle
 Did not take into account
regulations – In UK not allowed
on pavements and not allowed
on roads
 Fine as a novel sight seeing
resource in Prague or Berlin!
Some Ideas Do Not Work – Windows Vista
 Launched by Microsoft in 2007 as a
replacement to Windows XP
 Highest market share gained was
19% compared to 75% for XP
 Problems included:
• Only 5% of computers sold could operate
all features
• File transfer was slower in Vista than
previous operating systems
• Most home and business software was
incompatible with Vista
• High price outside the USA
• Oh! And it messed up our home PC!
Fluor’s experience with software
 Do not change if it currently works
 No matter how much you test, some old and favoured
software will not work on the new system
 Sometimes the momentum of new software will force you to
change your operating system
 Do not try and create your ideal new software from scratch
 Neil Downie’s 1st Law of Innovation – Copy (modify/enhance)
when you can, innovate when you can’t
Some Ideas Do Not Work – Sinclair C5
 Battery assisted tricycle allowing
the C5 to be operated without
using the pedals
 Sold approx. 17,000 units making
the C5 “the best selling electric
vehicle” until 2011
 A number of design flaws:
• Cold weather shortened the battery
life
• Driver exposed to adverse weather
• Could not climb hills as the motor
was not powerful enough and
overheated easily
 Declared unsafe by the Department
of Transport
Your Role in Innovation
 Fresh and New to Situations
 Your first employer will be looking to you – challenge the paradigm
 Able to challenge ideas and conventions before becoming
“Stuck in your (Company) ways”
 Always be positive, use phrases like:
• “It might work because…”
• “Let me add something to your idea”
 Suspend Critical Judgement – The part of you saying …..
“It Won’t Work”
 Consider there may be more than one good way of completing a task
 Allow ideas to develop – Innovation is rarely perfect so add to, shape
and alter ideas
 “The Important Thing is to Never Stop Asking Questions”
Albert Einstein
Aims of the Royal Institution
Be Inspired (courtesy
of Prof Brian Cox)
 Royal charter 1800
 Diffuse knowledge
 Create inventions and
improvements
 Apply Science (Engineering) to
the common purposes of life
 We are Engineers, we are
empowered to be creative and
do good things!
Graduate Recruitment Process
Farnborough workforce looking to double in size;
Requirement for suitably qualified staff at all levels;
www.fluor.com/careers
Graduate Assessment Day

Contenu connexe

Tendances

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Topology optimization to guide the architecture of a BIW structure, challenge...
Topology optimization to guide the architecture of a BIW structure, challenge...Topology optimization to guide the architecture of a BIW structure, challenge...
Topology optimization to guide the architecture of a BIW structure, challenge...Altair
 
MCG mind for metal | company presentation
MCG mind for metal | company presentationMCG mind for metal | company presentation
MCG mind for metal | company presentationMCGmindformetal
 
Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...
Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...
Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...AVEVA Group plc
 
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...Altair
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 
Ballard FC Bus Presentation 11 2013
Ballard FC Bus Presentation 11 2013Ballard FC Bus Presentation 11 2013
Ballard FC Bus Presentation 11 2013Larry Stapleton
 
Gorrell_Gene_Res_Final
Gorrell_Gene_Res_FinalGorrell_Gene_Res_Final
Gorrell_Gene_Res_FinalGene Gorrell
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 

Tendances (18)

Ballard Power Systems Technology Solutions
Ballard Power Systems Technology SolutionsBallard Power Systems Technology Solutions
Ballard Power Systems Technology Solutions
 
CV 2015_3
CV 2015_3CV 2015_3
CV 2015_3
 
GE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear InnovationGE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear Innovation
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Topology optimization to guide the architecture of a BIW structure, challenge...
Topology optimization to guide the architecture of a BIW structure, challenge...Topology optimization to guide the architecture of a BIW structure, challenge...
Topology optimization to guide the architecture of a BIW structure, challenge...
 
MCG mind for metal | company presentation
MCG mind for metal | company presentationMCG mind for metal | company presentation
MCG mind for metal | company presentation
 
Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...
Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...
Jack Up Platform For Use as A Lighthouse by Nandakumar Kunnanchath, Noble Oce...
 
2015-12-1 IMechE Lightweighting_v2
2015-12-1 IMechE Lightweighting_v22015-12-1 IMechE Lightweighting_v2
2015-12-1 IMechE Lightweighting_v2
 
Tekla Global BIM Awards 2015
Tekla Global BIM Awards 2015Tekla Global BIM Awards 2015
Tekla Global BIM Awards 2015
 
Hyper
HyperHyper
Hyper
 
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
 
Tekla Global BIM Awards 2013
Tekla Global BIM Awards 2013Tekla Global BIM Awards 2013
Tekla Global BIM Awards 2013
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012
 
Ballard FC Bus Presentation 11 2013
Ballard FC Bus Presentation 11 2013Ballard FC Bus Presentation 11 2013
Ballard FC Bus Presentation 11 2013
 
Gorrell_Gene_Res_Final
Gorrell_Gene_Res_FinalGorrell_Gene_Res_Final
Gorrell_Gene_Res_Final
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 

Similaire à Nick amott

CSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsCSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsEdElsbury
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)James Janisse
 
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization ProblemsAddressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization Problemsoptimizatiodirectdirect
 
13 0911 session 1 & 2 webinars-all slides
13 0911 session 1 & 2 webinars-all slides13 0911 session 1 & 2 webinars-all slides
13 0911 session 1 & 2 webinars-all slidesCleantechOpen
 
jerry.metcalf.102516.pptx
jerry.metcalf.102516.pptxjerry.metcalf.102516.pptx
jerry.metcalf.102516.pptxtitatis74
 
Technical debt a Business Perspective
Technical debt a Business PerspectiveTechnical debt a Business Perspective
Technical debt a Business PerspectiveMichael Vax
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introductionPaudzi Abdullah
 
How to test a Mainframe Application
How to test a Mainframe ApplicationHow to test a Mainframe Application
How to test a Mainframe ApplicationMichael Erichsen
 
150312 updating history_deep_retrofits
150312 updating history_deep_retrofits150312 updating history_deep_retrofits
150312 updating history_deep_retrofitsmelanie_bissonnette
 
Metal Additive Manufacturing - part 5
Metal Additive Manufacturing - part 5Metal Additive Manufacturing - part 5
Metal Additive Manufacturing - part 5Marco Preziosa
 
Using sap implementation to drive process change
Using sap implementation to drive process changeUsing sap implementation to drive process change
Using sap implementation to drive process changerobgirvan
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picshaganone
 
Transitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to PracticeTransitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to PracticeTechWell
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...LT COLONEL VIKRAM BAKSHI ( RETD)
 

Similaire à Nick amott (20)

Lean New Product & Process Development
Lean New Product & Process DevelopmentLean New Product & Process Development
Lean New Product & Process Development
 
CSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsCSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of Us
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)
 
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization ProblemsAddressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
 
Chapter#5
Chapter#5Chapter#5
Chapter#5
 
13 0911 session 1 & 2 webinars-all slides
13 0911 session 1 & 2 webinars-all slides13 0911 session 1 & 2 webinars-all slides
13 0911 session 1 & 2 webinars-all slides
 
Lean Startup at GE
Lean Startup at GELean Startup at GE
Lean Startup at GE
 
jerry.metcalf.102516.pptx
jerry.metcalf.102516.pptxjerry.metcalf.102516.pptx
jerry.metcalf.102516.pptx
 
Technical debt a Business Perspective
Technical debt a Business PerspectiveTechnical debt a Business Perspective
Technical debt a Business Perspective
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...
 
Ken Lee - Trends in Blade Technology and Changing R&D Needs
Ken Lee - Trends in Blade Technology and Changing R&D NeedsKen Lee - Trends in Blade Technology and Changing R&D Needs
Ken Lee - Trends in Blade Technology and Changing R&D Needs
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introduction
 
How to test a Mainframe Application
How to test a Mainframe ApplicationHow to test a Mainframe Application
How to test a Mainframe Application
 
150312 updating history_deep_retrofits
150312 updating history_deep_retrofits150312 updating history_deep_retrofits
150312 updating history_deep_retrofits
 
Metal Additive Manufacturing - part 5
Metal Additive Manufacturing - part 5Metal Additive Manufacturing - part 5
Metal Additive Manufacturing - part 5
 
Using sap implementation to drive process change
Using sap implementation to drive process changeUsing sap implementation to drive process change
Using sap implementation to drive process change
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
Transitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to PracticeTransitioning to Kanban: From Theory to Practice
Transitioning to Kanban: From Theory to Practice
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...
 

Plus de raghunathan janarthanan

global recruitment services (GPS) A division of saipem
global recruitment services (GPS) A division of saipemglobal recruitment services (GPS) A division of saipem
global recruitment services (GPS) A division of saipemraghunathan janarthanan
 

Plus de raghunathan janarthanan (20)

Epc areas of activity
Epc areas of activityEpc areas of activity
Epc areas of activity
 
Smart communities
Smart communitiesSmart communities
Smart communities
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
global recruitment services (GPS) A division of saipem
global recruitment services (GPS) A division of saipemglobal recruitment services (GPS) A division of saipem
global recruitment services (GPS) A division of saipem
 
Aveva pdms (1)
Aveva pdms (1)Aveva pdms (1)
Aveva pdms (1)
 
Pdms overview
Pdms overviewPdms overview
Pdms overview
 
Global support position in oil & gas
Global support position in oil & gasGlobal support position in oil & gas
Global support position in oil & gas
 
New role in piping linked with planning
New role in piping linked with planningNew role in piping linked with planning
New role in piping linked with planning
 
Innovative system implementation
Innovative system implementation Innovative system implementation
Innovative system implementation
 
Piping design engineering module
Piping design engineering modulePiping design engineering module
Piping design engineering module
 
Jr consulting services
Jr consulting services Jr consulting services
Jr consulting services
 
India development projects
India   development projectsIndia   development projects
India development projects
 
Country development projects
Country development projectsCountry development projects
Country development projects
 
Natural food corner
Natural food cornerNatural food corner
Natural food corner
 
New ventures
New venturesNew ventures
New ventures
 
Saving money
Saving moneySaving money
Saving money
 
Scheduling or routing technology
Scheduling or routing technologyScheduling or routing technology
Scheduling or routing technology
 
Finland successful school reform
Finland successful school reformFinland successful school reform
Finland successful school reform
 
Stem careers
Stem careersStem careers
Stem careers
 
Highest paid jobs in india
Highest paid jobs in indiaHighest paid jobs in india
Highest paid jobs in india
 

Dernier

70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
Module-1-Building Acoustics(Introduction)(Unit-1).pdf
Module-1-Building Acoustics(Introduction)(Unit-1).pdfModule-1-Building Acoustics(Introduction)(Unit-1).pdf
Module-1-Building Acoustics(Introduction)(Unit-1).pdfManish Kumar
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliNimot Muili
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Amil baba
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 

Dernier (20)

70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
Module-1-Building Acoustics(Introduction)(Unit-1).pdf
Module-1-Building Acoustics(Introduction)(Unit-1).pdfModule-1-Building Acoustics(Introduction)(Unit-1).pdf
Module-1-Building Acoustics(Introduction)(Unit-1).pdf
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 

Nick amott

  • 1. Innovation – Prof Nick Amott
  • 2. Summary  Cubic Melons  LNG (with thanks to Prof Brian Cox)  Who are Fluor?  Why Innovation is Important  Real Examples of Successful Innovations  Some Innovations that Didn’t Work  Your Role in Innovation
  • 3. Cubic Watermelons  Why?  Developed by farmers in Japan in 2001  Response to customer and supermarket concerns  Now viewed as a novelty item due to high price and inferior taste!
  • 4. Titan – Saturn's Moon Photographs from the Cassini probe.
  • 5. Titan (Saturn Moon)  What is the white spot?  Titan is a long way from the sun with an atmosphere of methane not air!
  • 6. LNG – Liquefied Natural Gas  LNG - Natural Gas that has been converted to a Liquid  Gas is cooled through expensive liquefaction process to -162°C @ 0.25 bar  LNG has much greater energy density than compressed gas making it more efficient to transport  Expensive production process and storage equipment main barriers to widespread commercial use.  Prelude 488 m x 74m, more than 4.5 soccer pitches end to end - $12.6 billion
  • 7. LNG on Titan?  The Innovators friend  There are 1012 litres of liquid methane on Titan  Approx. ¼ of Earth’s reserves are present in LNG form  Why don’t we go and recover the LNG?  How would we get it to Earth?  Cost of putting 1 lb of payload into space is $10,000  Neil Downie’s 5th law of Innovation, “Every problem contains an opportunity” – (but maybe an opportunity for someone else – your children's children!)
  • 8. What is Fluor?  One of the world’s leading publicly traded engineering, procurement, construction, maintenance, and project management companies  #124 in the FORTUNE 500 in 2012  Over 1,000 projects annually, serving more than 600 clients in 66 different countries  Workforce of over 43,000 men and women executing projects globally  Offices in over 30 countries on 6 continents  100 years of experience Fluor Corporate Headquarters Dallas, Texas
  • 9. 9 Comprehensive Services Program/Project Management Pre-Design Design Construction Start-Up Operations & Maintenance Solutions  Computer Modeling  Conceptual Design  Estimating  Feasibility Studies  Permitting  Project Financing  Scope Definition  Siting  Technology/ License Evaluation  Front-end Engineering  Detailed Engineering  Cost Control  Planning & Scheduling  Sourcing & Supply  Systems Integration  Safety Planning  Construction Management  Craft Staffing & Training  Equipment & Tools Supply  Field Mobilization  Material Control  Quality Control  Safety Programs  Contractor Management  Commissioning  Engineering Support  Precommissioning  Systems Checkout  Initial Production  Plant Readiness  Turnover  Asset Performance Improvement  Facility Management  Plant Operations & Maintenance  Small/Sustaining Capital Projects  Turnaround, Outages & Shutdowns
  • 10. Why is Innovation Important to Fluor  One of Fluor’s guiding principles states that the company is always looking for: “Methods to Capture, Share and Apply our Knowledge to deliver Customer Solutions”  To be able to fulfil this principle Fluor must be innovative and provide an environment for innovation to thrive  Innovation also allows the company to: • Gain a competitive advantage over our competitors • Retain, attract, develop and motivate a workforce essential for success • Ensure quality and fit-for-purpose solutions are delivered to our customers • Build and sustain a global community for all our stakeholders • To maximise and increase margins and profitability for the company and shareholders So what does this mean! Do it better, faster, cheaper!
  • 11. Better – Faster - Cheaper  Innovate the “work process”  Change the paradigms  Use the tools ROI £/$/€
  • 12. How do we improve the work process using the available tools ? • Objective – Turn a Process concept into a decision making design and cost estimate better, faster and cheaper • Have a Clear Vision of the End Product • Just Enough and No More (JEAN) –RTFC –Don’t Outdo Competitor Deliverables –Neil Downie’s 4th law, don’t over-deliver • Completed the FEED on a $120M Ethane Treatment Project with over 20 major equipment items in less than one month
  • 13. Work Process for +/-30%Cost Estimates Process Simulation Heat & Mat Balance Prelim Cost Estimate Prelim Equipment / Line Sizing QuickPlantSM •Process Flow Dgms •Equipment Data Shts •Equipment List •Load List FrontRunnerSM IPE Equipment Based Cost Analysis OptimEyesSM Layout Studies Critical Equipment Sizing Checks •I/O Count •Concrete MTO •Piping MTO •Structural steel MTO •Plot plan /elevation
  • 14. Client Quotes “You have a significant competitive advantage over your competition with this approach”. Statoil Project Manager “You’ve done in 4 days what our other team have been doing for four months”. Project Estimator
  • 15. Real Example – 3rd Generation ModuleSM Design Evolution of Modular Construction  1st Generation Modular Execution
  • 16. Evolution of Modularization in Land Locked Locations  2nd Generation Modular Construction Execution • 1st Generation plus: • Equipment or PAUs (Preassembled Units) – Equipment on module – Modules around equipment
  • 17. Where next – 3rd Generation modulesSM  Get more into a module  Reduce the space occupied by the module and plant by optimising layout  Use the developing hardware available to the full extent  Patent the application to protect intellectual property
  • 18. Site Envelope Statistics Traditional 320,000 m2 2nd Generation 200,000 m2 3rd Generation 84,000 m2
  • 19. Real Example – 3rd Generation ModuleSM Design  Reduced TIC • Reduced plot area lowers quantities • Total labor hours down • Work done in Shop • Dramatic decrease in construction management  Improved Safety and Quality  Minimized Environmental Footprint  Operations & Maintenance Needs Maintained  Neil Downie’s 0th and 2nd law • Think! (laterally, contradictions, outside the box) • Surprises = Patents  This is a success story!
  • 20. Real Example – Sub-Sea Processing  Allows production from offshore oil wells without needing surface production facilities  Includes • Oil/Gas/Water Separation • Multiphase Pumping • Gas Compression • Flow Assurance  Advantages: • Improves production from existing wells • Allows production from previously ignored wells due to harsh operating conditions  Disadvantages: • Reliability issues have stopped widespread adoption, however these are being fixed  Currently used in North Sea, West Africa and Gulf of Mexico
  • 21. Some Ideas Do Not Work – The Segway  Self-balancing electric vehicle developed in 2001  Described as the future of transport and an innovation on par with PCs and the Internet  Solution to a non-existent problem, i.e. towns and cities designed for cars and pedestrians and no space for new types of vehicle  Did not take into account regulations – In UK not allowed on pavements and not allowed on roads  Fine as a novel sight seeing resource in Prague or Berlin!
  • 22. Some Ideas Do Not Work – Windows Vista  Launched by Microsoft in 2007 as a replacement to Windows XP  Highest market share gained was 19% compared to 75% for XP  Problems included: • Only 5% of computers sold could operate all features • File transfer was slower in Vista than previous operating systems • Most home and business software was incompatible with Vista • High price outside the USA • Oh! And it messed up our home PC!
  • 23. Fluor’s experience with software  Do not change if it currently works  No matter how much you test, some old and favoured software will not work on the new system  Sometimes the momentum of new software will force you to change your operating system  Do not try and create your ideal new software from scratch  Neil Downie’s 1st Law of Innovation – Copy (modify/enhance) when you can, innovate when you can’t
  • 24. Some Ideas Do Not Work – Sinclair C5  Battery assisted tricycle allowing the C5 to be operated without using the pedals  Sold approx. 17,000 units making the C5 “the best selling electric vehicle” until 2011  A number of design flaws: • Cold weather shortened the battery life • Driver exposed to adverse weather • Could not climb hills as the motor was not powerful enough and overheated easily  Declared unsafe by the Department of Transport
  • 25. Your Role in Innovation  Fresh and New to Situations  Your first employer will be looking to you – challenge the paradigm  Able to challenge ideas and conventions before becoming “Stuck in your (Company) ways”  Always be positive, use phrases like: • “It might work because…” • “Let me add something to your idea”  Suspend Critical Judgement – The part of you saying ….. “It Won’t Work”  Consider there may be more than one good way of completing a task  Allow ideas to develop – Innovation is rarely perfect so add to, shape and alter ideas  “The Important Thing is to Never Stop Asking Questions” Albert Einstein
  • 26. Aims of the Royal Institution Be Inspired (courtesy of Prof Brian Cox)  Royal charter 1800  Diffuse knowledge  Create inventions and improvements  Apply Science (Engineering) to the common purposes of life  We are Engineers, we are empowered to be creative and do good things!
  • 27. Graduate Recruitment Process Farnborough workforce looking to double in size; Requirement for suitably qualified staff at all levels; www.fluor.com/careers Graduate Assessment Day