SlideShare une entreprise Scribd logo
1  sur  1
Maharashtra State Road Development Corporation

The new 6-lane Expressway between Bombay and Pune has oft been cited as a glowing example
of a successful BOOT project. The project which was originally slated to cost 1200 Crores has
been rumoured to have swallowed Rs 1500 Crores to date. The bulk of this cost can be broken
down into; land acquisition, cost of rehabilitation, and of course the construction cost. The
construction cost alone is estimated to be about 80% of the total cost.


A Special Purpose Vehicle (SPV) called Maharashtra State Road Development Corporation
(MSRDC) was set up for the purpose of developing road infrastructure in Maharashtra. The
construction work for the new expressway was awarded by MSRDC to 6 major contracting firms
and they were granted a 30-year period to recover their investment and earn a profit.

The Expressway was partially commissioned (first 47 km) in 2000 and completely operational
(100 km) in early 2002. By the end of 2002, the expressway was serving traffic loads of
approximately 3000 cars and 1200 trucks in each direction. Toll charges at commissioning were
Rs 80 per car and Rs 180 per truck / bus or heavy vehicle for travel in a single direction. There
have been three fare hikes in rapid succession taking the one way toll for cars to Rs 90, 100 and
118 respectively. The charges for heavy vehicles were similarly hiked to 190, 200 and now stand
at 240.


At each hike in the toll charges, there was a slow-down in the growth rate of the number of cars
and trucks using the Expressway. The BOOT operators are now cautious about further increases
in toll charges. Expressway users on the other hand have requested a discounted monthly plan
as also a return-toll ticket at reduced rates. The BOOT operators however are saying that they
are unlikely to recover their money at current rates and therefore definitely cannot afford any
discount scheme or "season-tickets" for Expressway users.


The MSRDC now has to sort out this problem and is required to provide guidelines for action. The
government knows that any action is going to set the precedent for future BOOT projects and is
also aware that large private players that might be in the contention for BOOT Infrastructure
projects are watching the Expressway situation extremely closely.

Contenu connexe

En vedette

Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1Rajendra Inani
 
Dcv iimiccdvsallocfinal
Dcv   iimiccdvsallocfinalDcv   iimiccdvsallocfinal
Dcv iimiccdvsallocfinalRajendra Inani
 
Group 8 epgp - meeting management - communication presentation
Group 8   epgp - meeting management - communication presentationGroup 8   epgp - meeting management - communication presentation
Group 8 epgp - meeting management - communication presentationRajendra Inani
 
Merrimack tractors analysis - final
Merrimack tractors   analysis - finalMerrimack tractors   analysis - final
Merrimack tractors analysis - finalRajendra Inani
 
Fra coca - cola case study
Fra   coca - cola case studyFra   coca - cola case study
Fra coca - cola case studyRajendra Inani
 
Da = merrimack tractors -_analysis
Da = merrimack tractors -_analysisDa = merrimack tractors -_analysis
Da = merrimack tractors -_analysisRajendra Inani
 
Explore indore rajendra inani
Explore indore   rajendra inaniExplore indore   rajendra inani
Explore indore rajendra inaniRajendra Inani
 
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
Epgp 09 10 -fra  term 1 - end term submission - rajendra inaniEpgp 09 10 -fra  term 1 - end term submission - rajendra inani
Epgp 09 10 -fra term 1 - end term submission - rajendra inaniRajendra Inani
 
Epgp2009 10 group 3-cisi v3
Epgp2009 10 group 3-cisi v3Epgp2009 10 group 3-cisi v3
Epgp2009 10 group 3-cisi v3Rajendra Inani
 
Epgp 2009-10 - international immersion-debriefing
Epgp   2009-10 - international immersion-debriefingEpgp   2009-10 - international immersion-debriefing
Epgp 2009-10 - international immersion-debriefingRajendra Inani
 
Hrm assignment #5 presentation 23 jan 10
Hrm   assignment #5 presentation 23 jan 10Hrm   assignment #5 presentation 23 jan 10
Hrm assignment #5 presentation 23 jan 10Rajendra Inani
 
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27
Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27Rajendra Inani
 

En vedette (13)

Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1
 
Dcv iimiccdvsallocfinal
Dcv   iimiccdvsallocfinalDcv   iimiccdvsallocfinal
Dcv iimiccdvsallocfinal
 
Group 8 epgp - meeting management - communication presentation
Group 8   epgp - meeting management - communication presentationGroup 8   epgp - meeting management - communication presentation
Group 8 epgp - meeting management - communication presentation
 
Merrimack tractors analysis - final
Merrimack tractors   analysis - finalMerrimack tractors   analysis - final
Merrimack tractors analysis - final
 
Fra coca - cola case study
Fra   coca - cola case studyFra   coca - cola case study
Fra coca - cola case study
 
Msrdc case study
Msrdc case studyMsrdc case study
Msrdc case study
 
Da = merrimack tractors -_analysis
Da = merrimack tractors -_analysisDa = merrimack tractors -_analysis
Da = merrimack tractors -_analysis
 
Explore indore rajendra inani
Explore indore   rajendra inaniExplore indore   rajendra inani
Explore indore rajendra inani
 
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
Epgp 09 10 -fra  term 1 - end term submission - rajendra inaniEpgp 09 10 -fra  term 1 - end term submission - rajendra inani
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
 
Epgp2009 10 group 3-cisi v3
Epgp2009 10 group 3-cisi v3Epgp2009 10 group 3-cisi v3
Epgp2009 10 group 3-cisi v3
 
Epgp 2009-10 - international immersion-debriefing
Epgp   2009-10 - international immersion-debriefingEpgp   2009-10 - international immersion-debriefing
Epgp 2009-10 - international immersion-debriefing
 
Hrm assignment #5 presentation 23 jan 10
Hrm   assignment #5 presentation 23 jan 10Hrm   assignment #5 presentation 23 jan 10
Hrm assignment #5 presentation 23 jan 10
 
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27
Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27
 

Similaire à Maharashtra state road development corporation

International logistics case study
International logistics case studyInternational logistics case study
International logistics case studyAFSAL TI
 
Rail budget 2016 17 highlights
Rail budget 2016 17 highlightsRail budget 2016 17 highlights
Rail budget 2016 17 highlightsNeha Sharma
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxraju2rahman
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project. MILAN JOSEPH
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxSabujMahmud2
 
Construct toll free highways
Construct toll free highwaysConstruct toll free highways
Construct toll free highwaysdatlavijayavarma
 
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Resurgent India
 
Road ppt 14 12 15 final
Road ppt 14 12 15 finalRoad ppt 14 12 15 final
Road ppt 14 12 15 finalarpitgoel075
 
Bangladesh Road Transport Corporation-BRTC
Bangladesh Road Transport Corporation-BRTCBangladesh Road Transport Corporation-BRTC
Bangladesh Road Transport Corporation-BRTCTushar Mojumdar
 
Construction Industry Review-2014 12 pg
Construction Industry Review-2014  12 pgConstruction Industry Review-2014  12 pg
Construction Industry Review-2014 12 pgRemona Divekar
 
Traffic fines 2019 - India
Traffic fines 2019 - IndiaTraffic fines 2019 - India
Traffic fines 2019 - IndiaRushLane
 
Construction Industry Review 10 -2014
Construction Industry Review 10 -2014Construction Industry Review 10 -2014
Construction Industry Review 10 -2014Remona Divekar
 
Why new road user tax
Why new road user taxWhy new road user tax
Why new road user taxM S Siddiqui
 

Similaire à Maharashtra state road development corporation (20)

Road _highways
Road  _highwaysRoad  _highways
Road _highways
 
Road _highways
Road  _highwaysRoad  _highways
Road _highways
 
International logistics case study
International logistics case studyInternational logistics case study
International logistics case study
 
Cir 35 2014
Cir  35 2014Cir  35 2014
Cir 35 2014
 
Cir 35 2014
Cir  35 2014Cir  35 2014
Cir 35 2014
 
Sea link (2)
Sea link (2)Sea link (2)
Sea link (2)
 
Rail budget 2016 17 highlights
Rail budget 2016 17 highlightsRail budget 2016 17 highlights
Rail budget 2016 17 highlights
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project.
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptx
 
Construct toll free highways
Construct toll free highwaysConstruct toll free highways
Construct toll free highways
 
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
 
Motor vehicle amendment bill 2016
Motor vehicle amendment bill 2016Motor vehicle amendment bill 2016
Motor vehicle amendment bill 2016
 
Road ppt 14 12 15 final
Road ppt 14 12 15 finalRoad ppt 14 12 15 final
Road ppt 14 12 15 final
 
Bangladesh Road Transport Corporation-BRTC
Bangladesh Road Transport Corporation-BRTCBangladesh Road Transport Corporation-BRTC
Bangladesh Road Transport Corporation-BRTC
 
Special purpose vehicle (SPV)
Special purpose vehicle (SPV)Special purpose vehicle (SPV)
Special purpose vehicle (SPV)
 
Construction Industry Review-2014 12 pg
Construction Industry Review-2014  12 pgConstruction Industry Review-2014  12 pg
Construction Industry Review-2014 12 pg
 
Traffic fines 2019 - India
Traffic fines 2019 - IndiaTraffic fines 2019 - India
Traffic fines 2019 - India
 
Construction Industry Review 10 -2014
Construction Industry Review 10 -2014Construction Industry Review 10 -2014
Construction Industry Review 10 -2014
 
Why new road user tax
Why new road user taxWhy new road user tax
Why new road user tax
 

Plus de Rajendra Inani

Epgp bm brand_extensions_ppt
Epgp bm brand_extensions_pptEpgp bm brand_extensions_ppt
Epgp bm brand_extensions_pptRajendra Inani
 
Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09Rajendra Inani
 
Epgp term v mos group assignment april 2010
Epgp term v mos  group assignment april 2010Epgp term v mos  group assignment april 2010
Epgp term v mos group assignment april 2010Rajendra Inani
 
Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10Rajendra Inani
 
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10Rajendra Inani
 
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10Rajendra Inani
 
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09Rajendra Inani
 
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10Rajendra Inani
 
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Rajendra Inani
 
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10Rajendra Inani
 
Epgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viiiEpgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viiiRajendra Inani
 
Epgp 09 10 -ccv term 1 - project submission - rajendra inani
Epgp 09 10 -ccv  term 1 - project submission - rajendra inaniEpgp 09 10 -ccv  term 1 - project submission - rajendra inani
Epgp 09 10 -ccv term 1 - project submission - rajendra inaniRajendra Inani
 
Delta and singapore analysis
Delta and singapore  analysisDelta and singapore  analysis
Delta and singapore analysisRajendra Inani
 
Dcv iimiccdvsallocfinal
Dcv   iimiccdvsallocfinalDcv   iimiccdvsallocfinal
Dcv iimiccdvsallocfinalRajendra Inani
 
Colgate palmolive the precision toothbrush
Colgate palmolive the precision toothbrushColgate palmolive the precision toothbrush
Colgate palmolive the precision toothbrushRajendra Inani
 
Cisi group presentation
Cisi   group presentationCisi   group presentation
Cisi group presentationRajendra Inani
 
Da exercise 7 sep 09 (2)
Da exercise 7 sep 09 (2)Da exercise 7 sep 09 (2)
Da exercise 7 sep 09 (2)Rajendra Inani
 

Plus de Rajendra Inani (20)

Epgp bm brand_extensions_ppt
Epgp bm brand_extensions_pptEpgp bm brand_extensions_ppt
Epgp bm brand_extensions_ppt
 
Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09
 
Epgp term v mos group assignment april 2010
Epgp term v mos  group assignment april 2010Epgp term v mos  group assignment april 2010
Epgp term v mos group assignment april 2010
 
Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10
 
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
 
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
 
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
 
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
 
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
 
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
 
Epgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viiiEpgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viii
 
Epgp 09 10 -ccv term 1 - project submission - rajendra inani
Epgp 09 10 -ccv  term 1 - project submission - rajendra inaniEpgp 09 10 -ccv  term 1 - project submission - rajendra inani
Epgp 09 10 -ccv term 1 - project submission - rajendra inani
 
Delta and singapore analysis
Delta and singapore  analysisDelta and singapore  analysis
Delta and singapore analysis
 
Dcv iimiccdvsallocfinal
Dcv   iimiccdvsallocfinalDcv   iimiccdvsallocfinal
Dcv iimiccdvsallocfinal
 
Creax creativity test
Creax creativity testCreax creativity test
Creax creativity test
 
Colgate palmolive the precision toothbrush
Colgate palmolive the precision toothbrushColgate palmolive the precision toothbrush
Colgate palmolive the precision toothbrush
 
Cisi group presentation
Cisi   group presentationCisi   group presentation
Cisi group presentation
 
Wishesto keep new
Wishesto keep newWishesto keep new
Wishesto keep new
 
Man woman
Man womanMan woman
Man woman
 
Da exercise 7 sep 09 (2)
Da exercise 7 sep 09 (2)Da exercise 7 sep 09 (2)
Da exercise 7 sep 09 (2)
 

Maharashtra state road development corporation

  • 1. Maharashtra State Road Development Corporation The new 6-lane Expressway between Bombay and Pune has oft been cited as a glowing example of a successful BOOT project. The project which was originally slated to cost 1200 Crores has been rumoured to have swallowed Rs 1500 Crores to date. The bulk of this cost can be broken down into; land acquisition, cost of rehabilitation, and of course the construction cost. The construction cost alone is estimated to be about 80% of the total cost. A Special Purpose Vehicle (SPV) called Maharashtra State Road Development Corporation (MSRDC) was set up for the purpose of developing road infrastructure in Maharashtra. The construction work for the new expressway was awarded by MSRDC to 6 major contracting firms and they were granted a 30-year period to recover their investment and earn a profit. The Expressway was partially commissioned (first 47 km) in 2000 and completely operational (100 km) in early 2002. By the end of 2002, the expressway was serving traffic loads of approximately 3000 cars and 1200 trucks in each direction. Toll charges at commissioning were Rs 80 per car and Rs 180 per truck / bus or heavy vehicle for travel in a single direction. There have been three fare hikes in rapid succession taking the one way toll for cars to Rs 90, 100 and 118 respectively. The charges for heavy vehicles were similarly hiked to 190, 200 and now stand at 240. At each hike in the toll charges, there was a slow-down in the growth rate of the number of cars and trucks using the Expressway. The BOOT operators are now cautious about further increases in toll charges. Expressway users on the other hand have requested a discounted monthly plan as also a return-toll ticket at reduced rates. The BOOT operators however are saying that they are unlikely to recover their money at current rates and therefore definitely cannot afford any discount scheme or "season-tickets" for Expressway users. The MSRDC now has to sort out this problem and is required to provide guidelines for action. The government knows that any action is going to set the precedent for future BOOT projects and is also aware that large private players that might be in the contention for BOOT Infrastructure projects are watching the Expressway situation extremely closely.