SlideShare une entreprise Scribd logo
1  sur  10
RESUME
Mobile no:8978624521
E-mail id: ravi_nathvelineni@yahoo.co.in
OBJECTIVE:
Seeking a position as a plant manager (operations) , to achieve challenging
Goals in a professional organization
PROFILE
Self-motivated and hard working, drive the work force with team work, effective
interaction with groups and with individuals with diverse back ground
Professional Experience
Total experience: 25.5years
JAN 2008 to present:
JOB TITLE: MANAGER (PRODUCTION)
ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhrapradesh, India, This
project capability of producing CSD glass 72000 BPH and10000 BPH pet, Juice
glass12000 BPH and 7200 BPH pet & Bottled water at 8400BPH
Responsibilities &Achievements
1. Production planning as per sale requirements
2. Coordinating day to day with supply chain
3. Worked with venders & supervised sub contracts on various projects to ensure
proper completion of work
4. Utilized different reliable , testing strategies in plants to maintain & improve
operations profitability
5. Implemented M&W activities (5s,) to improve productivity..(checklists,formats,sop’)
6. Assisted & guided the maintenance employees in carrying out maintenance & repair
Work
7. Implementation of HACCP & A.I.B systems in the plant
KEY SKILLS
1. Ability to work in a team
2. Excellent communication, managerial, interpersonal skills
3. Strong leader ship skills
4. Vision for production excellence
5. Ability to work under pressure
6. Good problem solving & analytical skills
Knowledge in operation & maintenance of Equipment like
Filler – Make – Ortman &humberg
-Make- Mayer
-Make-KHS
-Make-Jeihong
-Make Hildon
Bottle washer -Make-Tula
-Make -Hildon
-Make –KHS
Case packer -Make -Hildon
-Make –Dynatron
-Make-Kettner
Mojjonier - Make-Linkereuropa (Carbocooler)
-Make-KHS (Paramix)
-Make -Tetra pack (Pasteurizer)
- Make- Tetra pack (Homogenizer)
Blowmoulder – Make-Magplastic
-Make- Sidel 2/4 W/L
-Make –Sidel 2/4 N-Series
-Make-Sidel 2/4 HR Machines
SEPTEMBER 2009 to APRIL 2010
JOB TITLE: MANAGER (PROJECTS)
ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India,
Juice7200 BPH pet line complete structure, Water & CSD pet expansion
Foundation stone to commercial production
Erecting & commissioning of following equipment
Make: Jeihong filler
Make-Sidel 2/4 HR Machine
-Make -Tetra pack (Pasteurizer )
Make: Beta conveyors
Make: Jeihong Sleever
Make : Video jet ink printing machine
Make: laminar clean room
Make: Voltas air conditioning
Make: Tetra pack C.I.P system
Make: Tetra pack syrup tanks
Make: Tetra pack Homogenizer
Make: Kptech Hoist(for store material handling)
Make: Concepts India limited ,water treatment plant
Make: Ion exchange India limited , (Reverse osmosis plant)
Make: Mathesis engineers limited
Make: T.FT.C (Unscrambler from Taiwan)
Make : KHS Filler( Capacity Up gradation )
Make Hilden Labeler
Make: Dynatron case packer
Make: Dynatron cooling tunnel
Make: Powerica 1000KVA D.G set
Make: Mahir (cooling tower)
Make: C.P .Compressor (L.P & H.P)
Make: Super chiller
Make: D.C.E Refrigeration
Make: Pharma laboratory Filter press
Make: Blue star (syrup room air conditioning)
Make: Pioneer techno crafts (Electrical panel)
Coordinating with M.S. pipes, S.S pipes suppliers, Three civil contractors for different
Jobs viz, utilities, stores for incoming packing material, building for machinery, finished
Goods go down, trimix flooring Empty cases unloading and stacking purpose, welding
Contractor Taj industries, Moderen engineering works
JAN 2007 to DEC 2007:
JOB TITLE: DEPUTY MANAGER (PRODUCTION)
Responsibilities &Achievements
1. Meeting Production targets
2. Ensure to meet production planning
3. Working day to day with operators, generating spares requirement
4. Assisted & guided the operators in carrying out maintenance & repair
Work
5. Train new engineers to handle the line
7. Train the new operator on different equipment like blow moulders, filler etc
8. Conducted Manufacturing & warehouse workshop for internal & external
Managers
9. Conducted M&W,BQT programme for engineers, chemists & operators
10. Facilitate and support production activities in the plant, by ensuring adherence to
quality standards and running line at the rated speed, so as to achieve 80% plus line
Productivity
JAN 2005 to DEC 2006:
JOB TITLE: ASST.MANAGER (PRODUCTION)
ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India,
General Responsibilities
1. Organizing work with the subordinates
2. Coordinate with vice-president (works) for execution of any change of planning and
completion of jobs in time
3. Maintaining safe working environment
4. Monitoring & verification of records& reports
5. Train new engineers to handle the line
6. Train the new operator on different equipment like blow moulders, filler etc
JOB FUNCTIONS AND RESPOSIBILITIES
1. To ensure man machine as per standard and is responsible for over all operation of
the line
2. To reduce break down by following preventive checks and ensure smooth running
3. Ensure proper lubrication, daily weekly & monthly maintenance schedules
4 .Responsible for the yields like CO2, Rope caps, label, performs etc
5. Responsible for giving quality product as per PepsiCo standards
6. Ensure for good manufacturing practices and good house keeping practices
7. Identifying skill and hard working people and place them trained places and
developing mullti skills
8. Record and document all production data correctly and continuously M & W formats
9. To ensure all raw material are available for producing quality in liaison with stores
JAN 2002 to DEC 2005:
JOB TITLE: PLANT ENGINEER (PRODUCTION)
ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India,
Responsibilities &Achievements
1. Follow Production Schedule posted before start of production
2. Ensure all rawmaterial, packingmaterial available in stores before start of production
3. Record and document all production data correctly and calculate in PepsiCo formats
daily
4. Responsible for improve the line efficiency; improve yields like CO2, Rope caps,
label, preforms etc
5. Train new engineers to handle the line operation, maintenance and M&W
Documentation
6. Documentation & maintaining of all M&W formats (24*7 days)
7. M&W Stage 1B( improving performance) cleared by MR. David walker in year
Aug 2004(M&W Designed by his team)
8. Created territories for starting Stage 2 in Year SEP 2004
OCTOBER 2003 to FEBRAURY 2004
JOB TITLE: ENGINEER (PROJECTS)
ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India,
CARBONATED SOFT DRINKS GLASS LINE 36000 BPH
Erecting & commissioning of following equipment
Make : Dynatron, uncaser
Make: Selvel conveyors
Make: KHS Bottle washer
Make: Linker Europa Filler
Make: Linker Europa Mojjonnier
Make: Dynatron Crate washer
Make: Dynatron caser
AUG 1999 to DEC 2002:
JOB TITLE: ASST.PLANT ENGINEER (PRODUCTION)
JOB OBJECTIVES:
Responsible for CSD pet & glass swing line equipments, for smooth operation to meet
designed output
Responsible for CSD& Juice glass swing line equipments, for smooth operation to meet
designed output
JOB FUNCTIONS & RESPONSIBILITIES
Knowledge in operation & maintenance of following equipment
1. Mayer filler (24000BPH)
2. Hildon filler (12000 BPH)
3. Tulla bottle washer (19200 BPH)
4. Linker rinser
5. Hildon filler & capper
10. Linker warmer
11. B&H labeler
12. Italy make Bottle washer for 1000ml glass
Responsible for Documentation & maintaining of all records on computer
Started learning Manufacturing & warehouse practices from Stage 0, Stage 1A
Trained self and others viz. engineers, chemists, operators
Participated in translating M&W in local language for easy understanding for filler
Operators, forklift operators etc.
Collect data correctly continuously from shop floor
Cleared M&W Stage 0 Audit by PepsiCo in year Aug 2001
Cleared M&W Stage1A (Measuring performance)Audit by PepsiCo first FBO Plant in
Year Nov 2001
OCTOBER 1991 to AUGUST 1999
JOB TITLE: Maintenance Engineer
ORGANISATION: Coramandel Agro Products & Oils Limited, Chirala, Prakasam (dt),
A.P
Achievement:
Errection & Commisioning of 860KVA Skoda & 500KVA Cummins D.G.Sets,Ion Exchange Softening
Unit ,Dehexanetoasters
Fabrication of Heaters,Condensers,Bulk Storage tanks,Econmisers ,Bucket elevators, Screw
compressors,Rotorlifts,Coolers,Rotaryvanefeeders,Chimminey,Steamlines,Waterlines
Maintenance of DG.Sets,WatertubeThremaxboilers( 7Ton/Hr,4Ton/Hr),Watertreatmemt
Plant,L.P.Compressors,Screwconveyors,Bucketelevators
Monitoring workshop activities like Lathe,Shaping,Welding,Drilling,Powerhacksaw,Grinding,Gunmetal
moulding,and Bending , Modification activities
AUGUST 1989 to SEPTEMBER 1991
JOB TITLE: Junior Maintenance Engineer
ORGANISATION: Annapurna Cements Limited Asifabad, Adilabad (dt), A.P
Achievement:
Maintenance on Various Machines like Hammer mill, Ballmill, Pressure rollermill, Verticalkilns,
L.P.AirCompressors,Roots blowers, Bucket elevators,Belt conveyors & Screw conveyors
Fabrication of Bucket elevators & Screw conveyors
Familiar with ISO 9001-2000, HACCP, ISO 22000, PEPSI’S
M&W2000, GQA & AIB Practice
QUALIFICATION
BATCHLER OF MECHANICAL ENGINEERING
Permanent Address : V.Ravindranath, 401, Adityadivenkaapparment
1st
cross road, Srikrishadevarayanagar, Stambalagaravu
Extension, Guntur-522006, Andhrapradesh
Languages known : English, Hindi&Telugu
Martial status : Married
Gender : Male
Date of Birth 28-04-1967
Annual emoluments : 8 Lac. INR
Expected : As per company norms
Signature of the Applicant
(V.Ravindranath)

Contenu connexe

Tendances (19)

Ganesh_Resume_DMI
Ganesh_Resume_DMIGanesh_Resume_DMI
Ganesh_Resume_DMI
 
nagraj bhat resume
nagraj bhat resumenagraj bhat resume
nagraj bhat resume
 
Sunil Adep. 29.10.16
Sunil Adep. 29.10.16Sunil Adep. 29.10.16
Sunil Adep. 29.10.16
 
Sameer ahmed gaurav sir hod
Sameer ahmed gaurav sir hodSameer ahmed gaurav sir hod
Sameer ahmed gaurav sir hod
 
Aju_Resume (1)
Aju_Resume (1)Aju_Resume (1)
Aju_Resume (1)
 
kkkkkkkkk
kkkkkkkkkkkkkkkkkk
kkkkkkkkk
 
Engr. Aqeel C.V
Engr. Aqeel C.VEngr. Aqeel C.V
Engr. Aqeel C.V
 
Ravindra CV
Ravindra CVRavindra CV
Ravindra CV
 
resume new
resume newresume new
resume new
 
resume+kk+updated+01 June 16
resume+kk+updated+01 June 16resume+kk+updated+01 June 16
resume+kk+updated+01 June 16
 
Pankaj 25 yrs
Pankaj 25 yrsPankaj 25 yrs
Pankaj 25 yrs
 
Resume of Arthur Galit latest1
Resume of Arthur Galit latest1Resume of Arthur Galit latest1
Resume of Arthur Galit latest1
 
Project report mcl
Project report mclProject report mcl
Project report mcl
 
Puneet_Singh
Puneet_SinghPuneet_Singh
Puneet_Singh
 
NARAYAN
NARAYANNARAYAN
NARAYAN
 
SahilResume
SahilResumeSahilResume
SahilResume
 
CHAYAN BHALLA
CHAYAN BHALLACHAYAN BHALLA
CHAYAN BHALLA
 
Resume
ResumeResume
Resume
 
Subrat Kumar Pradhan
Subrat Kumar PradhanSubrat Kumar Pradhan
Subrat Kumar Pradhan
 

Similaire à 25 Years Manufacturing Experience (20)

Resume-AKT
Resume-AKTResume-AKT
Resume-AKT
 
Pankaj Naik CV new
Pankaj Naik CV newPankaj Naik CV new
Pankaj Naik CV new
 
CV 1
CV 1CV 1
CV 1
 
chakrarao_resume
chakrarao_resumechakrarao_resume
chakrarao_resume
 
Profile of Glenn GO
Profile of Glenn GOProfile of Glenn GO
Profile of Glenn GO
 
Lokesh-CV with Project
Lokesh-CV with ProjectLokesh-CV with Project
Lokesh-CV with Project
 
Resume AJ CEO/VP/GM
Resume AJ CEO/VP/GMResume AJ CEO/VP/GM
Resume AJ CEO/VP/GM
 
Resume
ResumeResume
Resume
 
CV Czech
CV CzechCV Czech
CV Czech
 
Venugopala Rao resume
Venugopala Rao resumeVenugopala Rao resume
Venugopala Rao resume
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
resume
resumeresume
resume
 
MPK Resume.
MPK Resume.MPK Resume.
MPK Resume.
 
RESUME1
RESUME1RESUME1
RESUME1
 
Resume - Pawat Suwantanut
Resume - Pawat SuwantanutResume - Pawat Suwantanut
Resume - Pawat Suwantanut
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
CV_GOVIND_COO
CV_GOVIND_COOCV_GOVIND_COO
CV_GOVIND_COO
 
Rahul Kadu-2016 F4 for h
Rahul Kadu-2016 F4 for hRahul Kadu-2016 F4 for h
Rahul Kadu-2016 F4 for h
 
CV CS
CV CSCV CS
CV CS
 
pk
pkpk
pk
 

25 Years Manufacturing Experience

  • 1. RESUME Mobile no:8978624521 E-mail id: ravi_nathvelineni@yahoo.co.in OBJECTIVE: Seeking a position as a plant manager (operations) , to achieve challenging Goals in a professional organization PROFILE Self-motivated and hard working, drive the work force with team work, effective interaction with groups and with individuals with diverse back ground Professional Experience Total experience: 25.5years JAN 2008 to present: JOB TITLE: MANAGER (PRODUCTION) ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhrapradesh, India, This project capability of producing CSD glass 72000 BPH and10000 BPH pet, Juice glass12000 BPH and 7200 BPH pet & Bottled water at 8400BPH Responsibilities &Achievements 1. Production planning as per sale requirements 2. Coordinating day to day with supply chain 3. Worked with venders & supervised sub contracts on various projects to ensure proper completion of work 4. Utilized different reliable , testing strategies in plants to maintain & improve operations profitability
  • 2. 5. Implemented M&W activities (5s,) to improve productivity..(checklists,formats,sop’) 6. Assisted & guided the maintenance employees in carrying out maintenance & repair Work 7. Implementation of HACCP & A.I.B systems in the plant KEY SKILLS 1. Ability to work in a team 2. Excellent communication, managerial, interpersonal skills 3. Strong leader ship skills 4. Vision for production excellence 5. Ability to work under pressure 6. Good problem solving & analytical skills Knowledge in operation & maintenance of Equipment like Filler – Make – Ortman &humberg -Make- Mayer -Make-KHS -Make-Jeihong -Make Hildon Bottle washer -Make-Tula -Make -Hildon -Make –KHS Case packer -Make -Hildon -Make –Dynatron
  • 3. -Make-Kettner Mojjonier - Make-Linkereuropa (Carbocooler) -Make-KHS (Paramix) -Make -Tetra pack (Pasteurizer) - Make- Tetra pack (Homogenizer) Blowmoulder – Make-Magplastic -Make- Sidel 2/4 W/L -Make –Sidel 2/4 N-Series -Make-Sidel 2/4 HR Machines SEPTEMBER 2009 to APRIL 2010 JOB TITLE: MANAGER (PROJECTS) ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India, Juice7200 BPH pet line complete structure, Water & CSD pet expansion Foundation stone to commercial production Erecting & commissioning of following equipment Make: Jeihong filler Make-Sidel 2/4 HR Machine -Make -Tetra pack (Pasteurizer ) Make: Beta conveyors Make: Jeihong Sleever Make : Video jet ink printing machine Make: laminar clean room Make: Voltas air conditioning Make: Tetra pack C.I.P system
  • 4. Make: Tetra pack syrup tanks Make: Tetra pack Homogenizer Make: Kptech Hoist(for store material handling) Make: Concepts India limited ,water treatment plant Make: Ion exchange India limited , (Reverse osmosis plant) Make: Mathesis engineers limited Make: T.FT.C (Unscrambler from Taiwan) Make : KHS Filler( Capacity Up gradation ) Make Hilden Labeler Make: Dynatron case packer Make: Dynatron cooling tunnel Make: Powerica 1000KVA D.G set Make: Mahir (cooling tower) Make: C.P .Compressor (L.P & H.P) Make: Super chiller Make: D.C.E Refrigeration Make: Pharma laboratory Filter press Make: Blue star (syrup room air conditioning) Make: Pioneer techno crafts (Electrical panel) Coordinating with M.S. pipes, S.S pipes suppliers, Three civil contractors for different Jobs viz, utilities, stores for incoming packing material, building for machinery, finished Goods go down, trimix flooring Empty cases unloading and stacking purpose, welding Contractor Taj industries, Moderen engineering works
  • 5. JAN 2007 to DEC 2007: JOB TITLE: DEPUTY MANAGER (PRODUCTION) Responsibilities &Achievements 1. Meeting Production targets 2. Ensure to meet production planning 3. Working day to day with operators, generating spares requirement 4. Assisted & guided the operators in carrying out maintenance & repair Work 5. Train new engineers to handle the line 7. Train the new operator on different equipment like blow moulders, filler etc 8. Conducted Manufacturing & warehouse workshop for internal & external Managers 9. Conducted M&W,BQT programme for engineers, chemists & operators 10. Facilitate and support production activities in the plant, by ensuring adherence to quality standards and running line at the rated speed, so as to achieve 80% plus line Productivity
  • 6. JAN 2005 to DEC 2006: JOB TITLE: ASST.MANAGER (PRODUCTION) ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India, General Responsibilities 1. Organizing work with the subordinates 2. Coordinate with vice-president (works) for execution of any change of planning and completion of jobs in time 3. Maintaining safe working environment 4. Monitoring & verification of records& reports 5. Train new engineers to handle the line 6. Train the new operator on different equipment like blow moulders, filler etc JOB FUNCTIONS AND RESPOSIBILITIES 1. To ensure man machine as per standard and is responsible for over all operation of the line 2. To reduce break down by following preventive checks and ensure smooth running 3. Ensure proper lubrication, daily weekly & monthly maintenance schedules 4 .Responsible for the yields like CO2, Rope caps, label, performs etc 5. Responsible for giving quality product as per PepsiCo standards 6. Ensure for good manufacturing practices and good house keeping practices 7. Identifying skill and hard working people and place them trained places and developing mullti skills 8. Record and document all production data correctly and continuously M & W formats 9. To ensure all raw material are available for producing quality in liaison with stores
  • 7. JAN 2002 to DEC 2005: JOB TITLE: PLANT ENGINEER (PRODUCTION) ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India, Responsibilities &Achievements 1. Follow Production Schedule posted before start of production 2. Ensure all rawmaterial, packingmaterial available in stores before start of production 3. Record and document all production data correctly and calculate in PepsiCo formats daily 4. Responsible for improve the line efficiency; improve yields like CO2, Rope caps, label, preforms etc 5. Train new engineers to handle the line operation, maintenance and M&W Documentation 6. Documentation & maintaining of all M&W formats (24*7 days) 7. M&W Stage 1B( improving performance) cleared by MR. David walker in year Aug 2004(M&W Designed by his team) 8. Created territories for starting Stage 2 in Year SEP 2004 OCTOBER 2003 to FEBRAURY 2004 JOB TITLE: ENGINEER (PROJECTS) ORGANIZATION: Pearl beverages limited (PEPSI), Guntur, Andhra Pradesh, India, CARBONATED SOFT DRINKS GLASS LINE 36000 BPH Erecting & commissioning of following equipment Make : Dynatron, uncaser
  • 8. Make: Selvel conveyors Make: KHS Bottle washer Make: Linker Europa Filler Make: Linker Europa Mojjonnier Make: Dynatron Crate washer Make: Dynatron caser AUG 1999 to DEC 2002: JOB TITLE: ASST.PLANT ENGINEER (PRODUCTION) JOB OBJECTIVES: Responsible for CSD pet & glass swing line equipments, for smooth operation to meet designed output Responsible for CSD& Juice glass swing line equipments, for smooth operation to meet designed output JOB FUNCTIONS & RESPONSIBILITIES Knowledge in operation & maintenance of following equipment 1. Mayer filler (24000BPH) 2. Hildon filler (12000 BPH) 3. Tulla bottle washer (19200 BPH) 4. Linker rinser 5. Hildon filler & capper 10. Linker warmer 11. B&H labeler 12. Italy make Bottle washer for 1000ml glass
  • 9. Responsible for Documentation & maintaining of all records on computer Started learning Manufacturing & warehouse practices from Stage 0, Stage 1A Trained self and others viz. engineers, chemists, operators Participated in translating M&W in local language for easy understanding for filler Operators, forklift operators etc. Collect data correctly continuously from shop floor Cleared M&W Stage 0 Audit by PepsiCo in year Aug 2001 Cleared M&W Stage1A (Measuring performance)Audit by PepsiCo first FBO Plant in Year Nov 2001 OCTOBER 1991 to AUGUST 1999 JOB TITLE: Maintenance Engineer ORGANISATION: Coramandel Agro Products & Oils Limited, Chirala, Prakasam (dt), A.P Achievement: Errection & Commisioning of 860KVA Skoda & 500KVA Cummins D.G.Sets,Ion Exchange Softening Unit ,Dehexanetoasters Fabrication of Heaters,Condensers,Bulk Storage tanks,Econmisers ,Bucket elevators, Screw compressors,Rotorlifts,Coolers,Rotaryvanefeeders,Chimminey,Steamlines,Waterlines Maintenance of DG.Sets,WatertubeThremaxboilers( 7Ton/Hr,4Ton/Hr),Watertreatmemt Plant,L.P.Compressors,Screwconveyors,Bucketelevators Monitoring workshop activities like Lathe,Shaping,Welding,Drilling,Powerhacksaw,Grinding,Gunmetal moulding,and Bending , Modification activities
  • 10. AUGUST 1989 to SEPTEMBER 1991 JOB TITLE: Junior Maintenance Engineer ORGANISATION: Annapurna Cements Limited Asifabad, Adilabad (dt), A.P Achievement: Maintenance on Various Machines like Hammer mill, Ballmill, Pressure rollermill, Verticalkilns, L.P.AirCompressors,Roots blowers, Bucket elevators,Belt conveyors & Screw conveyors Fabrication of Bucket elevators & Screw conveyors Familiar with ISO 9001-2000, HACCP, ISO 22000, PEPSI’S M&W2000, GQA & AIB Practice QUALIFICATION BATCHLER OF MECHANICAL ENGINEERING Permanent Address : V.Ravindranath, 401, Adityadivenkaapparment 1st cross road, Srikrishadevarayanagar, Stambalagaravu Extension, Guntur-522006, Andhrapradesh Languages known : English, Hindi&Telugu Martial status : Married Gender : Male Date of Birth 28-04-1967 Annual emoluments : 8 Lac. INR Expected : As per company norms Signature of the Applicant (V.Ravindranath)