Kingdom of Morocco   LEGAL AND INSTITUTIONAL FRAMWORK   WIND DEVLOPMENT AND PLANIFICATION                      Zohra ETTAI...
OUTLINE1.   MOROCCAN ENERGY SECTOR2. ENERGY STRATEGY3. WIND PROGRAM4. LEGAL AND INSTITUTIONAL FRAMEWORK                   ...
MOROCCAN ENERGY SECTOR2008 Low energy resources2008 Low energy resources          • Primary energy consumption:           ...
MOROCCAN ENERGY SECTORGrowing energy demand :    Economic and social development    Growth of population with better rev...
OIL AND ENERGY BILLS                                                          71Ministère de l’Énergie, des Mines, de l’Ea...
Support to petroleum products          Petroleum products subsidy                                                         ...
Evolution of electricity consumption                                                                                      ...
Evolution de la puissance installée (MW)                                                                5 232      5 232  ...
Evolution de l’énergie électrique nette appelée (GWH)                                                                     ...
Le système électrique national           Production                            Production                                 ...
Interconnexions• Renforcement du réseau électrique national HT  augmentation de la  capacité de l’interconnexion Maroc-Es...
STRONG REGIONALINTERCONNEXION                                                                       PINAR DEL REY  ...
DEPARTMENT OF ENERGY GOALS                              The Department of Energy, an actor responsible in the             ...
ENERGY STRATEGY• Security of supply by diversification of energy  sources and resources, optimizing the energy  balance an...
ENERGY STRATEGY•Regional integration, open market through opennessto the Euro Mediterranean Energy and harmonizationof law...
ENERGY STRATEGYDevelopment of wind energy by producing 1554 MW by 2012By the year 2020 the global wind capacity will reach...
GREEN ENERGY : THE MOROCCAN FUTURE ENERGY                                  Evolution of installed capacity                ...
PLAN D’EQUIPEMENT 2009-2015        MW12000                      charbon                                                   ...
Potentiel en énergies renouvelables Energie éolienne :    Côte maritime de 3 500 km avec des vents réguliers    Vitesse...
IMPORTANT WIND POTENTIAL                                                                                                  ...
IMPLEMENTED WIND FARM           POWER INSTALLED 123,5 MW Wind Farm        Power    implemented   speed CED-Tetouan      50...
GRID CONNECTED RNEPROJECTS IN DEVELOPMENT 2012            Projects              Power     Expected             Tanger     ...
Energy Efficiency :4th ressource of Energy Economy consumption of 8 % by the year 2012, 12% by the year2020 and 15% by th...
NEW LEGAL FRAMEWORK•   New law 13-09 for renewable energy Within this framework ,    private developers can produce and ex...
‫أھﺪاف ﻗﺎﻧﻮن رﻗﻢ 90.31‬        ‫ﯾﮭﺪف ﻣﺸﺮوع اﻟﻘﺎﻧﻮن رﻗﻢ 90.31 اﻟﻤﺘﻌﻠﻖ ﺑﺎﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة ﺑﺎﻷﺳﺎس إﻟﻰ :‬   ‫‪ ‬ﺗﻨﻤﯿﺔ اﻟﻄﺎﻗﺎت ...
‫ﻣﺰاﯾﺎ اﻹﻃﺎر اﻟﺘﺸﺮﯾﻌﻲ اﻟﺠﺪﯾﺪ‬                                                          ‫ﻣﻦ ﻣﺰاﯾﺎ ھﺬا اﻟﻘﺎﻧﻮن :‬‫‪ ‬ﻓﺘﺢ آﻓ...
‫ﻣﻜﻮﻧﺎت اﻟﻤﺸﺮوع‬                    ‫ﯾﺘﻜﻮن ھﺬا اﻟﻤﺸﺮوع ﻣﻦ 44 ﻣﺎدة ﻣﻮزﻋﺔ ﻋﻠﻰ 7 أﺑﻮاب :‬                                    ...
‫اﻷﻧﻈﻤﺔ اﻟﻤﻄﺒﻘﺔ ﻋﻠﻰ ﻣﻨﺸﺂت إﻧﺘﺎج اﻟﻜﮭﺮﺑﺎء اﻧﻄﻼﻗﺎ ﻣﻦ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة‬
‫ﺗﺴﻮﯾﻖ اﻟﻄﺎﻗﺔ اﻟﻜﮭﺮﺑﺎﺋﯿﺔ اﻟﻤﻨﺘﺠﺔ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة‬
‫ﻋﻼﻗﺔ اﻟﻤﺘﺪﺧﻠﯿﻦ اﻟﻤﻘﺘﺮﺣﺔ ﻟﻨﻈﺎم اﻟﺘﺮﺧﯿﺺ ﻓﻲ ھﺬا اﻟﻘﺎﻧﻮن‬
‫اﻟﻘﺎﻧﻮن رﻗﻢ 90.61 اﻟﻤﺘﻌﻠﻖ‬‫ﺑﺎﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ ﻟﻠﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ‬                 ‫اﻟﻄﺎﻗﯿﺔ‬
‫رﻗﻢ 90.61‬   ‫أھﺪاف ﻣﺸﺮوع ﻗﺎﻧﻮن‬‫ﯾﮭﺪف ﻣﺸﺮوع اﻟﻘﺎﻧﻮن رﻗﻢ 90.61 اﻟﻤﺘﻌﻠﻖ ﺑﺎﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ ﻟﻠﻄﺎﻗﺎت‬                          ...
‫ﻣﺰاﯾﺎ اﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ اﻟﺠﺪﯾﺪة‬    ‫اﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﺗﻔﻌﯿﻞ اﻟﺴﯿﺎﺳﺔ اﻟﺤﻜﻮﻣﯿﺔ ﻓﻲ ﻣﺠﺎل اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ‬                 ...
‫)ﺗﺘﻤﺔ(‬   ‫ﻣﺰاﯾﺎ اﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ‬‫‪ ‬ﺗﻘﺪﯾﻢ اﻗﺘﺮااﺣﺎ ت ﻟﻺدارة ﻓﻲ ﺷﺄن ﻣﻦا اﻃﻖ اﻟﺘﺮاب اﻟﻮﻃﻨﻲ اﻟﻘﺎﺑﻠﺔ ﻻﺳﺘﻘﺒﺎل‬‫ﻣﺸﺎرﯾﻊ إﻧﺘﺎج ...
‫ﻗﺎﻧﻮن رﻗﻢ 90.75 ﺗﺤﺪث ﺑﻤﻮﺟﺒﮫ اﻟﺸﺮﻛﺔ‬              ‫اﻟﻤﺴﻤﺎة‬    ‫اﻟﻮﻛﺎﻟﺔ اﻟﻤﻐﺮﺑﯿﺔ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬
‫اﻟﻤﺸﺮوع اﻟﻤﻐﺮﺑﻲ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬‫ﯾﻨﺪرج ھﺬا اﻟﻤﺸﺮوع ﻓﻲ ﺳﯿﺎق إﻧﺠﺎزات اﻟﻤﺸﺎرﯾﻊ اﻟﻜﺒﺮى اﻟﺘﻲ ﺗﻌﺮﻓﮭﺎ ﺑﻼدﻧﺎ وﯾﮭﺪف‬               ...
‫أﻣﺸﺮوع ﺿﺤﻤﻺﻧﺘﺎج اﻟﻜﮭﺮﺑﺎء ﻣﻦ ﻣﺼﺪر ﺷﻤﺴﻲ‬                          ‫• اﻟﻘﺪرة اﻟﻤﻨﺸﺄة : 0002 ﻣﻲغاواط‬              ‫)83 ٪ ﻣﻦ ...
‫ﻣﻜﻮﻧﺎت ﻣﺸﺮوع اﻟﻘﺎﻧﻮن‬      ‫ﯾﺤﺘﻮي ﻣﺸﺮوع اﻟﻘﺎﻧﻮن ھﺬا ﻋﻠﻰ أرﺑﻌﺔ أﺑﻮاب، ﺗﺸﻤﻞ اﺛﻨﺎ ﻋﺸﺮ ﻓﺼﻼ ﺗﺘﻌﻠﻖ ب:‬                        ‫...
‫اﻟﻤﺸﺮوع اﻟﻤﻐﺮﺑﻲ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬                                                    ‫ﻣﺸﺮوع ﻣﻨﺪﻣﺞ‬  ‫ﺗﻘﻠﯿﺺ ﺗﺎﻧﻲ أوﻛﺴﯿﺪ‬    ...
‫أھﺪاف ﻣﺸﺮوع ﻗﺎﻧﻮن رﻗﻢ 90.75‬‫‪ ‬ﯾﮭﺪف ﻣﺸﺮوع اﻟﻘﺎﻧﻮن رﻗﻢ 90.75 اﻟﺬي ﯾﺘﻜﻮن ﻣﻦ 21 ﻣﺎدة إﻟﻰ‬‫إﺣﺪاث اﻟﻮﻛﺎﻟﺔ اﻟﻤﻐﺮﺑﯿﺔ ﻟﻠﻄﺎﻗﺔ اﻟ...
‫ﻣﮭﺎم اﻟﻮﻛﺎﻟﺔ اﻟﻤﻐﺮﺑﯿﺔ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬                      ‫ﻣﻦ ﺑﯿﻦ اﻟﻤﮭﺎم اﻷﺳﺎﺳﯿﺔ ﻟﮭﺬه اﻟﻮﻛﺎﻟﺔ:‬‫‪ ‬وﺿﻊ ﺗﺼﻮر ﻟﻤﺸﺎرﯾﻊ ﻣﻨﺪ...
Thank you for your attention    www·mem·gov·ma
Prochain SlideShare
Chargement dans…5
×

Capacity building 2010 day 1 legal and institutional

493 vues

Publié le

Capacity Building in the Field of Wind Energy, Stage II
29 March - 2 April, 2010

0 commentaire
0 j’aime
Statistiques
Remarques
  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

Aucun téléchargement
Vues
Nombre de vues
493
Sur SlideShare
0
Issues des intégrations
0
Intégrations
2
Actions
Partages
0
Téléchargements
0
Commentaires
0
J’aime
0
Intégrations 0
Aucune incorporation

Aucune remarque pour cette diapositive

Capacity building 2010 day 1 legal and institutional

  1. 1. Kingdom of Morocco LEGAL AND INSTITUTIONAL FRAMWORK WIND DEVLOPMENT AND PLANIFICATION Zohra ETTAIKHead of Renewable Energy and Energy Efficiency DivisionMinistry of Energy, Mines, Water and Environnement RCREE; RABAT, March 27Th ?ARCH 2010
  2. 2. OUTLINE1. MOROCCAN ENERGY SECTOR2. ENERGY STRATEGY3. WIND PROGRAM4. LEGAL AND INSTITUTIONAL FRAMEWORK 2
  3. 3. MOROCCAN ENERGY SECTOR2008 Low energy resources2008 Low energy resources • Primary energy consumption: 14,7 million TEP • Heavy dependency on importation 97,5% Local production (mainly hydro-electric) 2,5% Predominance of petroleum products Predominance of petroleum products 60% Increased energy costs Increased energy costs 71 billion DH Petroleum products subsidy Petroleum products subsidy 23 billion DH Sustained increase in demand Sustained increase in demand • Energy 5% • Electricity (2003 – 2008) 7,5% 3
  4. 4. MOROCCAN ENERGY SECTORGrowing energy demand :  Economic and social development  Growth of population with better revenues  Program of 150 000 new houses per year  Program for Industrial Development through new Industrial Zones and activities  “Plan Azur” Tourism Infrastructure strengthening  “Plan Vert””Green Plan” for Agricultural Sector modernization  Quick urbanisation, demography  New Urban Zones Dynamic :opportunities for RE & EE in Building drivers: Infrastructure Programs opened to RE & EE 4
  5. 5. OIL AND ENERGY BILLS 71Ministère de l’Énergie, des Mines, de l’Eau et de l’EnvironnementMinistè l’Énergie, l’ l’ 5
  6. 6. Support to petroleum products Petroleum products subsidy 232520 billion Dh15 10,710 7,4 7,7 3,4 5 0 2004 2005 2006 2007 2008 Ministère de l’Énergie, des Mines, de l’Eau et de l’Environnement Ministè l’Énergie, l’ l’ 6
  7. 7. Evolution of electricity consumption 8,8% 9,0% 8,0% 8,1% 8,0% 7,1% 7,0% 6,5% 6,5% 6,2% 7,0% 6,1% 6,0% 7,5% 5,8% 5,0% 5,1% 5,0% 4,0% 3,2% 3,0% 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008Ministère de l’Énergie, des Mines, de l’Eau et de l’EnvironnementMinistè l’Énergie, l’ l’ 7
  8. 8. Evolution de la puissance installée (MW) 5 232 5 232 5 292 5 292 4 621 4 5084 410 2002 2003 2004 2005 2006 2007 2008Ministère de l’Énergie, des Mines, de l’Eau et de l’EnvironnementMinistè l’Énergie, l’ l’ 8
  9. 9. Evolution de l’énergie électrique nette appelée (GWH) 24 168 22 608 21 105 19 518 17 945 16 779 15 539 2002 2003 2004 2005 2006 2007 2008 Ministère de l’Énergie, des Mines, de l’Eau et de l’Environnement Ministè l’Énergie, l’ l’ 9
  10. 10. Le système électrique national Production Production Auto- Interconnexions ONE Concessionnelle Producteurs usines hydrauliques JLEC, CED et EET Espagne et Algérie Industriels centrales thermiques parcs éoliens ONE Acheteur unique Transporteur unique7 régies de distribution 4 Stés délégataires Distribution ONE Transport ONE• Marrakech; • LYDEC (Casablanca);• Fès; • REDAL (Rabat); Agences ONE• Meknès; • AMENDIS (Tétouan);• Kénitra; • AMENDIS (Tanger)• El Jadida;• Safi;• Larache Ministère de l’Énergie, des Mines, de l’Eau et de l’Environnement Ministè l’Énergie, l’ l’ Clients MT et BT 91 Clients THT et HT 10
  11. 11. Interconnexions• Renforcement du réseau électrique national HT  augmentation de la capacité de l’interconnexion Maroc-Espagne de 600 à 700 MW.• Renforcement de l’interconnexion Maroc-Algérie par une 3ème ligne de 400 KV (en cours de réalisation et sera mise en service en 2008). Ministère de l’Énergie, des Mines, de l’Eau et de l’Environnement Ministè l’Énergie, l’ l’ 11
  12. 12. STRONG REGIONALINTERCONNEXION  PINAR DEL REY TARIFA Morocco – Spain : 700 MW (97) to 1400 MW (06) Morocco – Algeria : 400 MW (88/92) to 1200 MW FARDIOUA MEDITERRANNEE PARC EOLIEN  140 MW      400 MW     GHAZAOUAT H.AMEUR  ATLANTIQUE    TELEMCEN    IME2    OUJDA              • Founding member of the COMELEC• Fourth player on the OMEL since 1999• The sole southern Mediterranean interface to theUCTE Ministère de l’Énergie, desCo-ordination of Transmission of Electricity ) Ministè (Union for the Mines, de l’Eau et de l’Environnement l’Énergie, l’ l’ 12
  13. 13. DEPARTMENT OF ENERGY GOALS The Department of Energy, an actor responsible in the Economic and Social development has the goals to ensure: O1. Security of supply and availability of energy, O2. Widespread access to energy , O3. Demand management, O4. Stimulating the energy supply to create jobs, O5. The appropriation of advanced technologies and the promotion of expertise O6. Consumer prices reflecting the reality of international costs , 07. The preservation of environnement, security and health of citizensMinistère de l’Énergie, des Mines, de l’Eau et de l’EnvironnementMinistè l’Énergie, l’ l’ 13
  14. 14. ENERGY STRATEGY• Security of supply by diversification of energy sources and resources, optimizing the energy balance and controlling of capacity planning;• Accessibility of energy for all at the best cost• Sustainable development, by promoting renewable energy sources and energy efficiency in all economic and social activities;• Preservation of the environment, using clean energy technologies, and reducing high pressure on the fossil energy; 14
  15. 15. ENERGY STRATEGY•Regional integration, open market through opennessto the Euro Mediterranean Energy and harmonizationof laws and energy regulation•Energy efficiency: considered as the essential basesof the new energy strategy , aims to reduce energyuse in buildings, industry and transport by 12% by2020 and 15 % by 2030 15
  16. 16. ENERGY STRATEGYDevelopment of wind energy by producing 1554 MW by 2012By the year 2020 the global wind capacity will reach 2200 MW.Moroccan solar energy program:2000 MW by 2020 Reinforcement of the electric grid interconnection and itsprogressive conversion from a dependancy infrastructure to aneconomic benefit resource.Impact: Improves the sustainable development indicator,reduces energy dependency,decreases the cost of energyconsumed and reduces CO2 emissions (37%) 16
  17. 17. GREEN ENERGY : THE MOROCCAN FUTURE ENERGY Evolution of installed capacity 5.292 MW 14.580 MW 2% 42%The part of installed capacity 14% 24% 14%of renewable energy will 14%represent 42% of total 24% 14%electric installed capacity 7% 11%by the year 2020 34% 26% 7% Nuclear Coal Natural Gas Fuel Hydro Wind Solar 17
  18. 18. PLAN D’EQUIPEMENT 2009-2015 MW12000 charbon Unité à charbon à Safi: 660 MW Hydraulique11000 Eolien privé 660 Eolien Gaz Naturel 66010000 Unités à charbon à Safi: 2x660 Fuel oil MW 660 STEP AbdelMoumen : 412 MW 9000 412 EnergiPro : 400 MW 400 Tillouguit : 34 MW 350 8000 Extension de Jorf Lasfar : 2x350 MW 350 EnergiPro : 200 MW 400 Tarfaya 1 : 200 MW EnergiPro : 400 MW 100 7000 300 Tarfaya 2 : 100 MW 200 TAG Kénitra : 300 MW Tanger : 140 MW 200 172 GD Agadir : 80 MW 140 6000 300 Ain Béni Mathar 300 MW / 2009 - 172 MW / 2010 116 300 TAG Mohammédia : 300 MW + GD Tan Tan :116 MW 40 Complexe Tanafnit El borj : 40 MW 5000 Puissance 2008 2009 2010 2011 2012 2013 2014 2015AdditionnelleCumulée (MW) - 896 1548 2348 3482 3894 5214 5874 18
  19. 19. Potentiel en énergies renouvelables Energie éolienne :  Côte maritime de 3 500 km avec des vents réguliers  Vitesse moyenne d’environ 8 m/s  Potentiel d’environ 6 000 MW a 25 000 MW  Localisation géographique : - Provinces du Sud : entre Tarfaya et Dakhla - Prés du Détroit de Gibraltar - Couloir de Taza (Col de Touahar) - Essaouira, Midelt …….. Energie solaire :  Ensoleillement de 3 000 h/an.  Potentiel de 5 kwh/m²/j Hydroélectricité :  Hydraulique: 200 sites exploitables
  20. 20. IMPORTANT WIND POTENTIAL Planifié RéaliséGREAT WIND POTENTIAL Potential remains relatively unexploited Parcs éoliens Capacité Date prévue réalisés ou installée dinstallation planifiés Al Koudia Al Baida Tétouan 54 2000 Cap Sim Essaouira 60 2007 >6 m/s Beni-Mejned 5-6 m/s Tanger-Tetouan 140 2009 4-5 m/s 3-4 m/s EnergiPRO 200 2010 <3 m/s Inconnu don’t 200 potentiel offshore Tarfaya 1 2010 100 Tarfaya 2 2011• A wind potential of 6 000 MW in studied areas 400 EnergiPro 2011 (1.5 twice demand at the rush), around 25000 MW in all terretory 400• A large distribution throughout the country to EnergiPro 2012 feed the remote non-interconnected network 1554 MW
  21. 21. IMPLEMENTED WIND FARM POWER INSTALLED 123,5 MW Wind Farm Power implemented speed CED-Tetouan 50 MW Aug 2000 11 m/sKoudia El Badia 3.5 MW March 2001 11 m/sLafarge-Tetouan 10 MW sept 2005 11 m/s Essaouira 60 MW April 2007 9.5 m/s
  22. 22. GRID CONNECTED RNEPROJECTS IN DEVELOPMENT 2012 Projects Power Expected Tanger 140 MW 2009 Tarfaya 300 MW 2010 WIND AUTOPRODUCERS 1000 MW 2012 Total Wind 1440 MWSOLOLAR Ain Beni Mathar 2009 20 MW
  23. 23. Energy Efficiency :4th ressource of Energy Economy consumption of 8 % by the year 2012, 12% by the year2020 and 15% by the year 2030. Economics Sectors to be mobilized  Industry : mise à niveau des entreprises,  Tertiaire & Résidentiel: une exigence de confort croissant,  Transport: parc vétuste et non performant , croissance de la mobilité, Maîtrise de l’évolution de l’Intensité énergétique: indicateur deréférence
  24. 24. NEW LEGAL FRAMEWORK• New law 13-09 for renewable energy Within this framework , private developers can produce and export electricity from renewable energy resources, which allow the development of renewable energy in Morocco and the Attraction of the investors in this domain;• Law 16-09 related to Agency of Renewable Energy and Energy Efficiency;• Law 57-09 creating Moroccan Agency for Solar Energy• Project law 47-09 to strenghten energy efficiency approved by Government and ministers councelle 24
  25. 25. ‫أھﺪاف ﻗﺎﻧﻮن رﻗﻢ 90.31‬ ‫ﯾﮭﺪف ﻣﺸﺮوع اﻟﻘﺎﻧﻮن رﻗﻢ 90.31 اﻟﻤﺘﻌﻠﻖ ﺑﺎﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة ﺑﺎﻷﺳﺎس إﻟﻰ :‬ ‫‪ ‬ﺗﻨﻤﯿﺔ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة ﺑﻐﯿﺔ ﺗﻜﯿﯿﻒ ھﺬا اﻟﻘﻄﺎع ﻣﻊ اﻟﺘﻄﻮرات اﻟﺘﻜﻨﻮﻟﻮﺟﯿﺔ اﻟﻤﻘﺒﻠﺔ‬ ‫‪ ‬ﺗﺸﺠﯿﻊ اﻟﻤﺒﺎدرات اﻟﺨﺎﺻﺔ ﻋﺒﺮ :‬‫‪ ‬اﻟﻨﮭﻮض ﺑﺈﻧﺘﺎج اﻟﻄﺎﻗﺔ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر ﻣﺘﺠﺪدة وﺑﺘﺴﻮﯾﻘﮭﺎ وﺗﺼﺪﯾﺮھﺎ ﺑﻮاﺳﻄﺔ‬ ‫وﺣﺪات ﻋﺎﻣﺔ أو ﺧﺎﺻﺔ‬‫‪ ‬إﺧﻀﺎع ﻣﻨﺸﺂت إﻧﺘﺎج اﻟﻄﺎﻗﺔ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر ﻣﺘﺠﺪدة ﻟﻨﻈﺎم اﻟﺘﺮﺧﯿﺺ أو‬ ‫اﻟﺘﺼﺮﯾﺢ‬‫‪ ‬ﺗﺨﻮﯾﻞ اﻟﻤﺴﺘﻐﻞ اﻟﺤﻖ ﻓﻲ إﻧﺘﺎج اﻟﻜﮭﺮﺑﺎء اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر ﻃﺎﻗﺎت ﻣﺘﺠﺪدة‬‫ﻟﺤﺴﺎب ﻣﺴﺘﮭﻠﻚ واﺣﺪ أو ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﻤﺴﺘﮭﻠﻜﯿﻦ اﻟﻤﺴﺘﻔﯿﺪﯾﻦ ﻣﻦ اﻟﺮﺑﻂ ﺑﺎﻟﺸﺒﻜﺔ‬‫اﻟﻜﮭﺮﺑﺎﺋﯿﺔ اﻟﻮﻃﻨﯿﺔ ذات اﻟﺠﮭﺪ اﻟﻤﺘﻮﺳﻂ واﻟﺠﮭﺪ اﻟﻌﺎﻟﻲ واﻟﺠﮭﺪ ﺟﺪ اﻟﻌﺎﻟﻲ ﻓﻲ إﻃﺎر‬‫اﺗﻔﺎﻗﯿﺔ ﯾﻠﺘﺰم ﻓﯿﮭﺎ اﻟﻤﺴﺘﮭﻠﻜﻮن ﺑﺄﺧﺬ واﺳﺘﮭﻼك اﻟﻜﮭﺮﺑﺎء اﻟﺘﻲ ﯾﺘﻢ إﻧﺘﺎﺟﮭﺎ ﺣﺼﺮا‬ ‫ﻻﺳﺘﻌﻤﺎﻻﺗﮭﻢ اﻟﺨﺎﺻﺔ.‬
  26. 26. ‫ﻣﺰاﯾﺎ اﻹﻃﺎر اﻟﺘﺸﺮﯾﻌﻲ اﻟﺠﺪﯾﺪ‬ ‫ﻣﻦ ﻣﺰاﯾﺎ ھﺬا اﻟﻘﺎﻧﻮن :‬‫‪ ‬ﻓﺘﺢ آﻓﺎق ﻹﻗﺎﻣﺔ ﻣﻨﺸﺂت ﻹﻧﺘﺎج اﻟﻄﺎﻗﺔ اﻟﻜﮭﺮﺑﺎﺋﯿﺔ واﺳﺘﻐﻼﻟﮭﺎ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣ ﺼﺎدر‬‫اﻟﻄﺎﻗ ﺎت اﻟﻤﺘﺠ ﺪدة ﻣ ﻦ ﻟ ﺪن أﺷ ﺨﺎص ذاﺗﯿ ﯿﻦ أو ﻣﻌﻨ ﻮﯾﯿﻦ، ﻣ ﻦ اﻟﻘﻄ ﺎع اﻟﻌ ﺎم أو‬ ‫اﻟﺨﺎص،‬‫‪ ‬ﺗﺤﺪﯾﺪ اﻟﻤﺒﺎدئ اﻟﻌﺎﻣﺔ اﻟﺘ ﻲ ﯾﺠ ﺐ اﻻﺳﺘﺮﺷ ﺎد ﺑﮭ ﺎ واﻟﻨﻈ ﺎم اﻟﻘ ﺎﻧﻮﻧﻲ اﻟﻤﻄﺒ ﻖ، ﺑﻤ ﺎ‬ ‫ﻓﻲ ذﻟﻚ ﻋﻤﻠﯿﺎت اﻟﺘﺴﻮﯾﻖ واﻟﺘﺼﺪﯾﺮ.‬ ‫‪ ‬ﺗﺸﺠﯿﻊ ﺗﻨﻤﯿﺔ ﻣﻨﺸﺂت إﻧﺘﺎج اﻟﻄﺎﻗﺔ ﻣﻦ ﻣﺼﺎدر ﻣﺘﺠﺪدة‬
  27. 27. ‫ﻣﻜﻮﻧﺎت اﻟﻤﺸﺮوع‬ ‫ﯾﺘﻜﻮن ھﺬا اﻟﻤﺸﺮوع ﻣﻦ 44 ﻣﺎدة ﻣﻮزﻋﺔ ﻋﻠﻰ 7 أﺑﻮاب :‬ ‫1. اﻟﺘﻌﺎرﯾﻒ : اﻟﻤﺎدة 1‬ ‫2. اﻟﻤﺒﺎدئ اﻟﻌﺎﻣﺔ : ﻣﻦ اﻟﻤﺎدة 2 إﻟﻰ اﻟﻤﺎدة 7‬ ‫3. ﻧﻈﺎم اﻟﺘﺮﺧﯿﺺ : ﻣﻦ اﻟﻤﺎدة 8 إﻟﻰ اﻟﻤﺎدة 91‬ ‫4. ﻧﻈﺎم اﻟﺘﺼﺮﯾﺢ : ﻣﻦ اﻟﻤﺎدة 02 إﻟﻰ اﻟﻤﺎدة 22‬‫5. ﺗﺴﻮﯾﻖ اﻟﻄﺎﻗﺔ اﻟﻜﮭﺮﺑﺎﺋﯿﺔ اﻟﻤﻨﺘﺠﺔ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة : ﻣﻦ‬ ‫اﻟﻤﺎدة 32 إﻟﻰ اﻟﻤﺎدة 92‬ ‫6. ﻣﺮاﻗﺒﺔ وﻣﻌﺎﯾﻨﺔ اﻟﻤﺨﺎﻟﻔﺎت واﻟﻌﻘﻮﺑﺎت : ﻣﻦ اﻟﻤﺎدة 03 إﻟﻰ اﻟﻤﺎدة 34‬ ‫7. أﺣﻜﺎم ﻧﮭﺎﺋﯿﺔ : اﻟﻤﺎدة 44‬
  28. 28. ‫اﻷﻧﻈﻤﺔ اﻟﻤﻄﺒﻘﺔ ﻋﻠﻰ ﻣﻨﺸﺂت إﻧﺘﺎج اﻟﻜﮭﺮﺑﺎء اﻧﻄﻼﻗﺎ ﻣﻦ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة‬
  29. 29. ‫ﺗﺴﻮﯾﻖ اﻟﻄﺎﻗﺔ اﻟﻜﮭﺮﺑﺎﺋﯿﺔ اﻟﻤﻨﺘﺠﺔ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة‬
  30. 30. ‫ﻋﻼﻗﺔ اﻟﻤﺘﺪﺧﻠﯿﻦ اﻟﻤﻘﺘﺮﺣﺔ ﻟﻨﻈﺎم اﻟﺘﺮﺧﯿﺺ ﻓﻲ ھﺬا اﻟﻘﺎﻧﻮن‬
  31. 31. ‫اﻟﻘﺎﻧﻮن رﻗﻢ 90.61 اﻟﻤﺘﻌﻠﻖ‬‫ﺑﺎﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ ﻟﻠﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ‬ ‫اﻟﻄﺎﻗﯿﺔ‬
  32. 32. ‫رﻗﻢ 90.61‬ ‫أھﺪاف ﻣﺸﺮوع ﻗﺎﻧﻮن‬‫ﯾﮭﺪف ﻣﺸﺮوع اﻟﻘﺎﻧﻮن رﻗﻢ 90.61 اﻟﻤﺘﻌﻠﻖ ﺑﺎﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ ﻟﻠﻄﺎﻗﺎت‬ ‫اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ اﻟﻄﺎﻗﯿﺔ ﺑﺎﻷﺳﺎس إﻟﻰ :‬ ‫‪ ‬إﻋﺎدة ھﯿﻜﻠﺔ وﺗﻨﻈﯿﻢ ﻣﺮﻛﺰ ﺗﻨﻤﯿﺔ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة‬ ‫‪ ‬وﺿﻊ إﻃﺎر ﻣﺆﺳﺴﺎﺗﻲ ﻋﺼﺮي‬ ‫‪ ‬ﺗﺒﻨﻲ ﺣﻜﺎﻣﺔ ﺟﯿﺪة وﺣﺪﯾﺜﺔ‬ ‫ﻣﻦ ﺧﻼل :‬‫‪ ‬ﺗﻮﺳﯿﻊ ﻣﮭﺎم اﻟﻮﻛﺎﻟﺔ ﻟﺘﺸﻤﻞ اﻟﻨﺠﺎﻋﺔ اﻟﻄﺎﻗﯿﺔ إﻟﻰ ﺟﺎﻧﺐ ﺗﻨﻤﯿﺔ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة‬ ‫‪ ‬ﺧﻠﻖ ﻣﺮاﻛﺰ ﺟﮭﻮﯾﺔ ﺗﻌﻤﻞ ﻋﻠﻰ اﻟﺼﻌﯿﺪ اﻟﻮﻃﻨﻲ‬‫‪ ‬ﺗﻘﻮﯾﺔ اﻟﻜﻔﺎءات اﻟﺒﺸﺮﯾﺔ و ﺗﻮﻇﯿﻒ ﻋﺪة إﻣﻜﺎﻧﯿﺎت وﺗﺪاﺑﯿﺮ ﻟﺘﺤﺴﯿﻦ أداء ھﺬه‬‫اﻟﻮﻛﺎﻟﺔ وذﻟﻚ ﺑﺎﻻﻋﺘﻤﺎد ﻋﻠﻰ ﺑﺮاﻣﺞ ﺗﺪﻋﯿﻢ اﻟﺘﻜﻮﯾﻦ واﻟﺤﻮاﻓﺰ اﻟﻤﺎﻟﯿﺔ اﻟﻀﺮورﯾﺔ‬
  33. 33. ‫ﻣﺰاﯾﺎ اﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ اﻟﺠﺪﯾﺪة‬ ‫اﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﺗﻔﻌﯿﻞ اﻟﺴﯿﺎﺳﺔ اﻟﺤﻜﻮﻣﯿﺔ ﻓﻲ ﻣﺠﺎل اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ‬ ‫اﻟﻄﺎﻗﯿﺔ ﻋﺒﺮ:‬‫‪ ‬اﻗﺘﺮاح ﻣﺨﻄﻂ وﻃﻨﻲ وﻣﺨﻄﻄﺎت ﻗﻄﺎﻋﯿﺔ ﻋﻠﻰ اﻹدارة ﻣﻦ أﺟﻞ ﺗﻨﻤﯿﺔ اﻟﻄﺎﻗﺎت‬ ‫اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ اﻟﻄﺎﻗﯿﺔ ؛‬ ‫؛‬ ‫‪ ‬ﺻﯿﺎﻏﺔ ﺑﺮاﻣﺞ ﺗﻨﻤﯿﺔ ﻓﻲ ﻣﺠﺎﻟﻲ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ اﻟﻄﺎﻗﯿﺔ‬ ‫وإﻧﺠﺎزھﺎ وﻛﺬا ﺑﺮاﻣﺞ اﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ اﻟﺒﯿﺌﺔ اﻟﻤﺘﺼﻠﺔ ﺑﺎﻷﻧﺸﻄﺔ اﻟﻄﺎﻗﯿﺔ؛‬‫‪ ‬ﺗﺘﺒﻊ ﺑﺮاﻣﺞ وﻣﺸﺎرﯾﻊ وأﻋﻤﺎل اﻟﺘﻨﻤﯿﺔ ﻓﻲ ﻣﺠﺎﻟﻲ اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ‬ ‫اﻟﻄﺎﻗﯿﺔ اﻟﻤﻨﺼﻮص ﻋﻠﯿﮭﺎ ﻓﻲ اﻟﻤﺨﻄﻂ اﻟﻮﻃﻨﻲ وﻓﻲ اﻟﻤﺨﻄﻄﺎت اﻟﻘﻄﺎﻋﯿﺔ،‬ ‫وﺗﻨﺴﯿﻘﮭﺎ واﻹﺷﺮاف ﻋﻠﯿﮭﺎ ﻋﻠﻰ اﻟﻤﺴﺘﻮى اﻟﻮﻃﻨﻲ ﺑﺘﺸﺎور ﻣﻊ اﻹدارات‬ ‫اﻟﻤﻌﻨﯿﺔ.‬
  34. 34. ‫)ﺗﺘﻤﺔ(‬ ‫ﻣﺰاﯾﺎ اﻟﻮﻛﺎﻟﺔ اﻟﻮﻃﻨﯿﺔ‬‫‪ ‬ﺗﻘﺪﯾﻢ اﻗﺘﺮااﺣﺎ ت ﻟﻺدارة ﻓﻲ ﺷﺄن ﻣﻦا اﻃﻖ اﻟﺘﺮاب اﻟﻮﻃﻨﻲ اﻟﻘﺎﺑﻠﺔ ﻻﺳﺘﻘﺒﺎل‬‫ﻣﺸﺎرﯾﻊ إﻧﺘﺎج اﻟﻄﺎﻗﺔ اﻟﻜﮭﺮﺑﺎﺋﯿﺔ اﻧﻄﻼﻗﺎ ﻣﻦ ﻣﺼﺎدر رﯾﺤﯿﺔ وﻓﻘﺎ وﻓﻘﺎ ﻷﺣﻜﺎم‬ ‫اﻟﻨﺼﻮص اﻟﺘﺸﺮﯾﻌﯿﺔ واﻟﺘﻨﻈﯿﻤﯿﺔ ؛‬ ‫‪ ‬ﺗﺘﺒﻊ أﻋﻤﺎل اﻹﻓﺘﺤﺎص اﻟﻄﺎﻗﻲ اﻟﻤﻨﺠﺰة ﻋﻠﻰ اﻟﺼﻌﯿﺪ اﻟﻮﻃﻨﻲ وﻓﻘﺎ ﻷﺣﻜﺎم‬ ‫اﻟﻨﺼﻮص اﻟﺘﺸﺮﯾﻌﯿﺔ واﻟﺘﻨﻈﯿﻤﯿﺔ اﻟﺠﺎري ﺑﮭﺎ اﻟﻌﻤﻞ وﺗﻨﺴﯿﻘﮭﺎ واﻟﺴﮭﺮ ﻋﻠﻰ‬ ‫ﺗﻔﻌﯿﻞ ﺗﻮﺻﯿﺎت أﻋﻤﺎل اﻹﻓﺘﺤﺎص اﻟﻤﺬﻛﻮرة‬‫‪ ‬اﻟﻤﺴﺎھﻤﺔ ﻓﻲ إﺣﺪاث ﻛﻞ ﻣﺠﻤﻮﻋﺔ ذات ﻧﻔﻊ اﻗﺘﺼﺎدي وﻛﻞ ﻣﺠﻤﻮﻋﺔ ذات ﻧﻔﻊ‬ ‫ﻋﺎم ﯾﺪﺧﻞ ﻏﺮﺿﮭﺎ ﻓﻲ إﻃﺎر ﻣﮭﺎم اﻟﻮﻛﺎﻟﺔ‬ ‫‪ ‬اﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﻛﻞ ﻣﺠﻤﻮﻋﺔ أﺧﺮى أو ﺷﺮﻛﺔ ﯾﺪﺧﻞ ﻏﺮﺿﮭﺎ ﻓﻲ إﻃﺎر ﻣﮭﺎم‬ ‫اﻟﻮﻛﺎﻟﺔ‬ ‫‪ ‬اﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﺗﻨﻤﯿﺔ اﻟﺘﻌﺎون اﻟﺪوﻟﻲ ﻓﻲ ﻣﺠﺎل اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة واﻟﻨﺠﺎﻋﺔ‬ ‫اﻟﻄﺎﻗﯿﺔ.‬
  35. 35. ‫ﻗﺎﻧﻮن رﻗﻢ 90.75 ﺗﺤﺪث ﺑﻤﻮﺟﺒﮫ اﻟﺸﺮﻛﺔ‬ ‫اﻟﻤﺴﻤﺎة‬ ‫اﻟﻮﻛﺎﻟﺔ اﻟﻤﻐﺮﺑﯿﺔ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬
  36. 36. ‫اﻟﻤﺸﺮوع اﻟﻤﻐﺮﺑﻲ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬‫ﯾﻨﺪرج ھﺬا اﻟﻤﺸﺮوع ﻓﻲ ﺳﯿﺎق إﻧﺠﺎزات اﻟﻤﺸﺎرﯾﻊ اﻟﻜﺒﺮى اﻟﺘﻲ ﺗﻌﺮﻓﮭﺎ ﺑﻼدﻧﺎ وﯾﮭﺪف‬ ‫إﻟﻰ:‬ ‫‪ ‬إﻧﺘﺎج اﻟﻜﮭﺮﺑﺎء وﺗﻘﻠﯿﺺ اﻟﺘﺒﻌﯿﺔ اﻟﻄﺎﻗﯿﺔ ﻟﻠﻐﺎز واﻟﻔﺤﻢ واﻟﺒﺘﺮول‬ ‫‪ ‬ﻣﻮاﻛﺒﺔ اﻟﺘﻄﻮر اﻟﺘﻜﻨﻮﻟﻮﺟﻲ وﻧﻘﻞ اﻟﺨﺒﺮات وذﻟﻚ ﺑﺈدﻣﺎج اﻟﺼﻨﺎﻋﺔ‬ ‫اﻟﻮﻃﻨﯿﺔ ﻓﻲ اﻟﻤﺸﺮوع‬ ‫‪ ‬إرﺳﺎء اﻷﺳﺲ اﻟﻀﺮورﯾﺔ ﻟﺘﻄﻮﯾﺮ اﻟﺒﺤﺚ اﻟﻌﻠﻤﻲ واﻟﺘﻨﻤﯿﺔ ﻓﻲ ﻣﯿﺪان‬ ‫اﻟﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬ ‫‪ ‬وﺿﻊ ﺑﺮاﻣﺞ ﻟﻠﺘﻜﻮﯾﻦ وﺗﻄﻮﯾﺮ اﻟﻜﻔﺎءات اﻟﻤﻐﺮﺑﯿﺔ ﻓﻲ ھﺬا اﻟﻤﯿﺪان‬ ‫‪ ‬ﺗﻘﻠﯿﺺ اﻹﻧﺒﻌﺎﺛﺎت اﻟﻐﺎزﯾﺔ واﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﺗﻔﻌﯿﻞ ﻣﯿﺜﺎق اﻟﺒﯿﺌﺔ‬
  37. 37. ‫أﻣﺸﺮوع ﺿﺤﻤﻺﻧﺘﺎج اﻟﻜﮭﺮﺑﺎء ﻣﻦ ﻣﺼﺪر ﺷﻤﺴﻲ‬ ‫• اﻟﻘﺪرة اﻟﻤﻨﺸﺄة : 0002 ﻣﻲغاواط‬ ‫)83 ٪ ﻣﻦ ﻣﺠﻤﻮع اﻟﻘﺪرة اﻟﻤﻨﺸﺄة ﺣﺎﻟﯿﺎ (‬ ‫اﻟﻄﺎﻗﺔ اﻹﻧﺘﺎﺟﯿﺔ: ﺣﻮاﻟﻲ 0054 ﻣﻲاواط،ﺳﺎﻋﺔ ﺳﻨﻮﯾﺎ‬ ‫) ﻣﺎ ﯾﻤﺜﻞ 81 ٪ ﻣﻦ اﻹﻧﺘﺎج اﻟﻮﻃﻨﻲ اﻟﺤﺎﻟﻲ(‬ ‫اﻟﺘﻜﻠﻔﺔ اﻟﺘﻘﺪﯾﺮﯾﺔ : 07 ﻣﻠﯿﺎر درھﻢ‬ ‫)9 ﻣﻠﯿﺎرات دوﻻر (‬‫اﻟﻤﻮاﻗﻊ اﻟﺨﻤﺲ اﻟﺘﻲ ﺗﻢ اﻧﺘﻘﺎؤھﺎ ﺗﺒﻠﻎ ﻣﺴﺎﺣﺘﮭﺎ اﻹﺟﻤﺎﻟﯿﺔ 00001‬ ‫ھﻜﺘﺎر‬ ‫: 005 ﻣﯿﻐﺎواط‬ ‫ورزازات‬ ‫–‬ ‫: 004 ﻣﯿﻐﺎواط‬ ‫ﻋﯿﻦ ﺑﻨﻲ ﻣﻄﮭﺮ‬ ‫–‬ ‫ﻓﻢ اﻟﻮاد )اﻟﻌﯿﻮن( : 005 ﻣﯿﻐﺎواط‬ ‫–‬ ‫: 001 ﻣﯿﻐﺎواط‬ ‫ﺑﻮﺟﺪور‬ ‫–‬ ‫ﺳﺒﺨﺔ ﻃﺎح )ﻃﺮﻓﺎﯾﺔ(: 005 ﻣﯿﻐﺎواط‬ ‫–‬ ‫اﻟﺪﺧﻮل ﺣﯿﺰ اﻻﺳﺘﻐﻼل:‬ ‫– اﻟﻤﺤﻄﺔ اﻷوﻟﻰ ﻓﻲ ﻋﺎم 5102 )ورزازات(‬ ‫– اﻟﻤﺸﺮوع ﺑﺄﻛﻤﻠﮫ ﻓﻲ ﻧﮭﺎﯾﺔ 9102‬
  38. 38. ‫ﻣﻜﻮﻧﺎت ﻣﺸﺮوع اﻟﻘﺎﻧﻮن‬ ‫ﯾﺤﺘﻮي ﻣﺸﺮوع اﻟﻘﺎﻧﻮن ھﺬا ﻋﻠﻰ أرﺑﻌﺔ أﺑﻮاب، ﺗﺸﻤﻞ اﺛﻨﺎ ﻋﺸﺮ ﻓﺼﻼ ﺗﺘﻌﻠﻖ ب:‬ ‫‪ ‬اﻟﺘﺴﻤﯿﺔ واﻷھﺪاف و ﯾﺤﺘﻮي ﻋﻠﻰ أرﺑﻌﺔ ﻓﺼﻮل )4(‬ ‫‪ ‬أﻋﻀﺎء اﻟﺘﺴﯿﯿﺮ و اﻟﺘﺪﺑﯿﺮ ﯾﺤﺘﻮي ﻋﻠﻰ ﺳﺘﺔ ﻓﺼﻮل )6(‬ ‫‪ ‬اﻟﺘﻨﻈﯿﻢ اﻟﻤﺎﻟﻲ و ﯾﺤﺘﻮي ﻋﻠﻰ ﻓﺼﻞ واﺣﺪ‬‫‪ ‬أﻣﺎ اﻟﺒﺎب اﻷﺧﯿﺮ ﻓﯿﺸﻤﻞ ﻓﺼﻼ واﺣﺪا ﯾﺘﻌﻠﻖ ﺑﺘﺎرﯾﺦ اﻟﺸﺮوع ﺑﺎﻟﻌﻤﻞ ﺑﮭﺬا اﻟﻘﺎﻧﻮن‬‫اﻟﺬي ﯾﺘﺰاﻣﻦ ﻣﻊ إﺑﻄﺎل ﻣﻔﻌﻮل اﻟﻘﺎﻧﻮن رﻗﻢ08-62 اﻟﻤﺘﻌﻠﻖ ﺑﺈﺣﺪاث ﻣﺮﻛﺰ ﺗﻨﻤﯿﺔ‬ ‫اﻟﻄﺎﻗﺎت اﻟﻤﺘﺠﺪدة.‬
  39. 39. ‫اﻟﻤﺸﺮوع اﻟﻤﻐﺮﺑﻲ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬ ‫ﻣﺸﺮوع ﻣﻨﺪﻣﺞ‬ ‫ﺗﻘﻠﯿﺺ ﺗﺎﻧﻲ أوﻛﺴﯿﺪ‬ ‫• اﻟﺘﻮﻓﯿﻖ ﺑﯿﻦ اﻟﺘﻨﻤﯿﺔ اﻻﻗﺘﺼﺎدﯾﺔ‬‫اﻟﻜﺎرﺑﻮن اﻟﻤﺘﻮﻗﻊ‬ ‫ﻣﻦ اﻟﻤﺸﺮوع‬ ‫واﻻﺟﺘﻤﺎﻋﯿﺔ واﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ اﻟﺒﯿﺌﺔ وﻣﺤﺎرﺑﺔ‬ ‫اﻟﺘﺤﻮﻻت اﻟﻤﻨﺎﺧﯿﺔ‬ ‫• ﺗﻮﻓﯿﺮ ﺳﻨﻮي ﯾﻨﺎھﺰ ﻣﻠﯿﻮن ﻃﻦ ﻣﻘﺎﺑﻞ‬ ‫ﺑﺘﺮول ﻣﻦ اﻟﻤﺤﺮوﻗﺎت اﻷﺣﻔﻮرﯾﺔ‬ ‫• اﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﺗﻨﻘﯿﺔ اﻟﻤﻨﺎخ ﺑﺎﺟﺘﻨﺎب اﻧﺒﻌﺎث‬ ‫7.3 ﻣﻠﯿﻮن ﻃﻦ ﺳﻨﻮﯾﺎ ﻣﻦ ﺛﺎﻧﻲ أﻛﺴﯿﺪ‬ ‫اﻟﻜﺮﺑﻮن‬
  40. 40. ‫أھﺪاف ﻣﺸﺮوع ﻗﺎﻧﻮن رﻗﻢ 90.75‬‫‪ ‬ﯾﮭﺪف ﻣﺸﺮوع اﻟﻘﺎﻧﻮن رﻗﻢ 90.75 اﻟﺬي ﯾﺘﻜﻮن ﻣﻦ 21 ﻣﺎدة إﻟﻰ‬‫إﺣﺪاث اﻟﻮﻛﺎﻟﺔ اﻟﻤﻐﺮﺑﯿﺔ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ ﺗﺨﻀﻊ ﻟﻠﻘﺎﻧﻮن اﻟﻤﺘﻌﻠﻖ‬ ‫ﺑﺎﻟﺸﺮﻛﺎت اﻟﻤﺴﺎھﻤﺔ‬‫‪ ‬ﯾﺘﻤﺜﻞ ﻏﺮض اﻟﺸﺮﻛﺔ ﻓﻲ إﻧﺠﺎز ﺑﺮﻧﺎﻣﺞ ﺗﻨﻤﯿﺔ ﻣﺸﺎرﯾﻊ ﻣﻨﺪﻣﺠﺔ ﻹﻧﺘﺎج‬‫اﻟﻤﻐﺮﺑﻲ‬ ‫اﻟﻜﮭﺮﺑﺎء ﻣﻦ ﻣﺼﺎدر اﻟﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ ﻓﻲ إﻃﺎر اﻟﻤﺸﺮوع‬ ‫ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ ﺑﻘﺪرة إﺟﻤﺎﻟﯿﺔ ﺗﺒﻠﻎ 0002 ﻣﯿﻐﺎواط‬
  41. 41. ‫ﻣﮭﺎم اﻟﻮﻛﺎﻟﺔ اﻟﻤﻐﺮﺑﯿﺔ ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬ ‫ﻣﻦ ﺑﯿﻦ اﻟﻤﮭﺎم اﻷﺳﺎﺳﯿﺔ ﻟﮭﺬه اﻟﻮﻛﺎﻟﺔ:‬‫‪ ‬وﺿﻊ ﺗﺼﻮر ﻟﻤﺸﺎرﯾﻊ ﻣﻨﺪﻣﺠﺔ ﻟﺘﻨﻤﯿﺔ اﻟﻄﺎﻗﺔ اﻟﺸﻤﺴﯿﺔ‬ ‫واﻹﺷﺮاف ﻋﻠﻰ إﻧﺠﺎزھﺎ واﻟﺒﺤﺚ ﻋﻦ ﻣﺼﺎدر ﺗﻤﻮﯾﻠﮭﺎ‬‫‪ ‬إﻋﺪاد اﻟﺪراﺳﺎت اﻟﺘﻘﻨﯿﺔ واﻻﻗﺘﺼﺎدﯾﺔ واﻟﻤﺎﻟﯿﺔ اﻟﻀﺮورﯾﺔ‬ ‫ﻟﺘﺄھﯿﻞ اﻟﻤﻮاﻗﻊ‬ ‫‪ ‬اﻧﺠﺎز اﻟﺒﻨﯿﺎت اﻟﺘﺤﺘﯿﺔ اﻟﻀﺮورﯾﺔ‬‫‪ ‬اﻟﻤﺴﺎھﻤﺔ ﻓﻲ ﺗﻨﻤﯿﺔ اﻟﺒﺤﺚ اﻟﺘﻄﺒﯿﻘﻲ وﺗﺸﺠﯿﻊ اﻻﺑﺘﻜﺎرات‬ ‫اﻟﺘﻜﻨﻮﻟﻮﺟﯿﺔ‬
  42. 42. Thank you for your attention www·mem·gov·ma

×