Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Performance-Based Regulation in Electric Utilities: Reliability Improvement Using Integrated Asset Management Standard PAS 55.  Dr. Himadri Banerji PlanTech 2010 Mumbai 4 th  and 5 th  February
Presentation Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb
Targeted PBR and Targeted Incentives: Service Standards Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  If distribution were a competitive market, providers would compete on the basis of price, service quality, and customer service.  But there is no meaningful competition for distribution services.  Consequently, the quest for lower costs and higher profits will drive utilities to cut service quality and customer service.  Setting standards with built-in incentives (rewards and penalties) will encourage utilities to find acceptable lower cost ways to provide a specified level of service.
Background: Electricity Industry Restructuring Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  The restructuring and liberalization of electricity industry worldwide have increased the incentives for a cost effective and efficient use of available assets in all segments of the power industry.
What is performance-based regulation Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  The term – performance-based regulation – is the most recent in a long line of vocabulary used to describe regulatory approaches that rely on financial incentives and disincentives to induce desired behavior by a regulated firm.  The desired behaviors, or outcomes, are generally 1) lower costs, 2) improved service, and 3) more rational allocation of risks and rewards.  The renewed interest in PBR largely reflects dissatisfaction with cost-of-service or rate-of-return regulation, especially the perception that cost-of-service regulation stifles utility innovation and causes utility managers to be more responsive to regulators than to customers.  PBR may also be pursued by utilities seeking higher profits, more flexibility, or less risk.
PBR Structures :  Price and Revenue Caps Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  The major structural options are price caps and revenue caps.  Both options create the same incentives to cut costs, but revenue caps create much better incentives for investment in distributed resources.  Also, revenue and price caps merge as rate design for distribution utilities moves toward fixed monthly fees.  Revenue caps provide an opportunity to achieve many of the purposes of fixed charge rate designs while avoiding the substantial economic and public acceptance problems associated with such rate designs. However Most regulators start with Target Based PBR.
Service Standards: Service Reliability Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  1.  Reliability.  This includes a long list of specific standards including the extent and duration of outages, service restoration time, frequency of planned outages, performance of worst circuits, and voltage variations. 2.  Call Center Performance.  This addresses how quickly and how fully calls to the utility are answered and how well consumer questions or complaints are resolved. 3.  Field Service.  This covers a wide range of situations in which utility employees make visits to the customers location. Standards may include how well appointments are kept and time to connect new service, test meters, and replace street lights. 4.  Billing and Complaints.  This includes billing accuracy, metering accuracy, complaint rates to the utility and regulator, overall customer satisfaction, and power quality complaints.
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  It is important to make the penalty large enough that it will receive and keep management’s attention   PBR mechanisms may include service quality penalties of no less than one percent (100 basis points) of equity. The calculations are based on cost of ENS or energy not served. Service Reliability Cost of ENS and Penalties
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Service Reliability Measures Top US Utilities
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  ,[object Object],[object Object],[object Object],[object Object],[object Object],Asset Management Myths and Realities
Asset Management Myths and Realities Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  4. In line with the maintainers seeking greater corporate credibility, the large number of  software vendors  selling asset information management systems (including asset registers, GIS systems, work management, history gathering, materials control & cost reporting etc) have often relabeled their products as “Enterprise Asset Management Systems”. This has given rise to a misconception that Asset Management is an technology initiative to sort out the data and IT infrastructure (often leading to great expense and the ‘tail wagging the dog’).   5. If we dig deeper into the  information systems  world, we even find “Asset Management” interpreted as simply the bar-code labeling of computers and peripherals, and the tracking of their location/status (i.e. ‘asset tracking’).   6. Finally, a few critical  infrastructure  or  plant owners and operators  have adopted the term ‘Asset Management’ to describe their core role in life - both caring for, and making best sustained use of, physical plant, infrastructure and its associated facilities.  This is the interpretation that the new British Standard, PAS-55 is focused upon, and is the subject of this presentation.  
Why Asset Management? ,[object Object],[object Object],[object Object],Where is the  documentation of this  device ? Who is  responsible for this  device ? What is the utilization  of this  device ? Who is the  owner of this  device ? What is the status  of  this  device ? Is there experience  with this  device ? What is the total cost  of this  device ? Machinery Pipes Operator Equipment Tools Buildings ASSETS
Executive Summary asset perspective management information system ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
5 core questions of Asset Management
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Definition of Asset Management PAS 55 BS Standard
Characteristics of PAS 55 Asset Management BS Standard: Integrated and Life Cycle Centered Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  It  requires a life cycle view and optimal mixture of   investments operations maintenance resourcing , risks performance sustainability Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Degree of implementation:  Degree to which asset management strategies, objectives and plans are in place. Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Characteristics of PAS 55  Levels of an Asset Management System                                                                                                                          Source: BSI PAS 55:2008 Part 1 contains the core requirements against which an organization's Asset Management capabilities can be assessed.  Part 2 expands on these requirements with examples and guidance designed to aid the understanding of the intent of the Part 1 requirements. PAS 55 is a two-part specification.
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Characteristics of PAS 55 Asset Management BS Standard: Integrated Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  PAS 55 Asset Management BS Standard: Scope and Interfaces Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  PAS 55 Asset Management BS Standard: Stakeholder Requirements  Source: BSI PAS 55:2008 Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  PAS 55 Asset Management BS Standard: OSP, Planning and Implementation Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  PAS 55 Asset Management BS Standard: Management System Structure Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Asset Manager : Work Control To Life Cycle Analysis   Source: BSI PAS 55:2008
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Asset   Management Process Asset Manager: Work Control To Evaluations, Investigation, Problem Identification Analysis
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Development in Asset Management Processes
Information Systems Development in Asset Management Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Risk Management Processes Design and Development Phase
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Risk Management Processes Compliance to Standards, Procedures, Culture
Probabilistic Risk Management   Operational Phase Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Probabilistic risk assessments have the following characteristics: •  explicitly consider a broad set of potential challenges to safety; •  logically prioritize these challenges; •  consider a wide range of options to mitigate these challenges; •  assess sensitivity of results to key assumptions; •  identify and potentially quantify uncertainties in results. Performance requirements have the following characteristics: •  based on measurable, quantifiable parameters that are directly related to safety; •  timing of measurements is specified; •  numerical performance criteria are set for each parameter; •  corrective actions are required to be taken if performance criteria are not met; •  performance trends are monitored; •  performance criteria and/or corrective actions are adjusted based on performance trends.
Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb  Questions Discussions Thank You

More Related Content

What's hot

Cost benefit analysis vs confidentiality
Cost benefit analysis vs confidentialityCost benefit analysis vs confidentiality
Cost benefit analysis vs confidentiality
Prithvi Ghag
 
2010 Contingent Workforce Assessment
2010 Contingent Workforce Assessment2010 Contingent Workforce Assessment
2010 Contingent Workforce Assessment
Monster
 
Market Research Report : Facilities management market in gulf cooperation cou...
Market Research Report : Facilities management market in gulf cooperation cou...Market Research Report : Facilities management market in gulf cooperation cou...
Market Research Report : Facilities management market in gulf cooperation cou...
Netscribes, Inc.
 
Shared services workshop
Shared services workshopShared services workshop
Shared services workshop
Inez Hofner
 
Reducing BPO Costs
Reducing BPO CostsReducing BPO Costs
Reducing BPO Costs
Vivastream
 

What's hot (13)

Cost benefit analysis vs confidentiality
Cost benefit analysis vs confidentialityCost benefit analysis vs confidentiality
Cost benefit analysis vs confidentiality
 
2010 Contingent Workforce Assessment
2010 Contingent Workforce Assessment2010 Contingent Workforce Assessment
2010 Contingent Workforce Assessment
 
Strategic Management and Information Technology Outsourcing
Strategic Management and Information Technology OutsourcingStrategic Management and Information Technology Outsourcing
Strategic Management and Information Technology Outsourcing
 
Market Research Report : Facilities management market in gulf cooperation cou...
Market Research Report : Facilities management market in gulf cooperation cou...Market Research Report : Facilities management market in gulf cooperation cou...
Market Research Report : Facilities management market in gulf cooperation cou...
 
MW Green IT.docx
MW Green IT.docxMW Green IT.docx
MW Green IT.docx
 
Module 3 business continuity student slides ver 1.0
Module 3 business continuity   student slides ver 1.0Module 3 business continuity   student slides ver 1.0
Module 3 business continuity student slides ver 1.0
 
Module 2 information security risk management student slides ver 1.0
Module 2 information security risk management    student slides ver 1.0Module 2 information security risk management    student slides ver 1.0
Module 2 information security risk management student slides ver 1.0
 
Ethics: Real Life Application of the AICPA Code of Professional Conduct
Ethics: Real Life Application of the AICPA Code of Professional ConductEthics: Real Life Application of the AICPA Code of Professional Conduct
Ethics: Real Life Application of the AICPA Code of Professional Conduct
 
IT Strategic Sourcing Can Relieve the Squeeze on Healthcare
IT Strategic Sourcing Can Relieve the Squeeze on HealthcareIT Strategic Sourcing Can Relieve the Squeeze on Healthcare
IT Strategic Sourcing Can Relieve the Squeeze on Healthcare
 
Shared services workshop
Shared services workshopShared services workshop
Shared services workshop
 
Reducing BPO Costs
Reducing BPO CostsReducing BPO Costs
Reducing BPO Costs
 
Insperity Gov Con
Insperity Gov ConInsperity Gov Con
Insperity Gov Con
 
Global Compliance Across the ADP Portfolio
Global Compliance Across the ADP PortfolioGlobal Compliance Across the ADP Portfolio
Global Compliance Across the ADP Portfolio
 

Similar to Performance Based Regulation, Implementing an Asset Management Standards and Systems

2015_Redefining Executive View of Facility Management_White Paper (2)
2015_Redefining Executive View of Facility Management_White Paper (2)2015_Redefining Executive View of Facility Management_White Paper (2)
2015_Redefining Executive View of Facility Management_White Paper (2)
GomindSHIFT
 
IT Financial Management and Cost Recovery
IT Financial Management and Cost RecoveryIT Financial Management and Cost Recovery
IT Financial Management and Cost Recovery
David Messineo
 
Imagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in tImagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in t
LizbethQuinonez813
 
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Claire Louis
 
2009 05 08 Updated Cth Preso (6)
2009 05 08 Updated Cth Preso (6)2009 05 08 Updated Cth Preso (6)
2009 05 08 Updated Cth Preso (6)
C.T. Hellmuth
 
Organizing Asset Management Today
Organizing Asset Management TodayOrganizing Asset Management Today
Organizing Asset Management Today
David Messineo
 

Similar to Performance Based Regulation, Implementing an Asset Management Standards and Systems (20)

Life Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation ReportLife Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation Report
 
Service Operations Management
Service Operations ManagementService Operations Management
Service Operations Management
 
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining ApplicationsIAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
 
STRATEGIC EVALUATION IN OPTIMIZING THE INTERNAL SUPPLY CHAIN USING TOPSIS: E...
 STRATEGIC EVALUATION IN OPTIMIZING THE INTERNAL SUPPLY CHAIN USING TOPSIS: E... STRATEGIC EVALUATION IN OPTIMIZING THE INTERNAL SUPPLY CHAIN USING TOPSIS: E...
STRATEGIC EVALUATION IN OPTIMIZING THE INTERNAL SUPPLY CHAIN USING TOPSIS: E...
 
Indirect procurement
Indirect procurementIndirect procurement
Indirect procurement
 
2015_Redefining Executive View of Facility Management_White Paper (2)
2015_Redefining Executive View of Facility Management_White Paper (2)2015_Redefining Executive View of Facility Management_White Paper (2)
2015_Redefining Executive View of Facility Management_White Paper (2)
 
Insights of Facility Management Innovations
Insights of Facility Management InnovationsInsights of Facility Management Innovations
Insights of Facility Management Innovations
 
Viziya
ViziyaViziya
Viziya
 
IT Financial Management and Cost Recovery
IT Financial Management and Cost RecoveryIT Financial Management and Cost Recovery
IT Financial Management and Cost Recovery
 
DEFINITION.docx
DEFINITION.docxDEFINITION.docx
DEFINITION.docx
 
Imagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in tImagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in t
 
Behavioral Aspects of IT Employees towards Problems and Prospects of Activity...
Behavioral Aspects of IT Employees towards Problems and Prospects of Activity...Behavioral Aspects of IT Employees towards Problems and Prospects of Activity...
Behavioral Aspects of IT Employees towards Problems and Prospects of Activity...
 
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
 
Airport Asset management chapter 1
Airport Asset management chapter 1Airport Asset management chapter 1
Airport Asset management chapter 1
 
Executive policy report
Executive policy report Executive policy report
Executive policy report
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
 
2009 05 08 Updated Cth Preso (6)
2009 05 08 Updated Cth Preso (6)2009 05 08 Updated Cth Preso (6)
2009 05 08 Updated Cth Preso (6)
 
Organizing Asset Management Today
Organizing Asset Management TodayOrganizing Asset Management Today
Organizing Asset Management Today
 
Standardizing Preventive Maintenance in the Energy Sector - Andy Hill, Oniqua
Standardizing Preventive Maintenance in the Energy Sector - Andy Hill, OniquaStandardizing Preventive Maintenance in the Energy Sector - Andy Hill, Oniqua
Standardizing Preventive Maintenance in the Energy Sector - Andy Hill, Oniqua
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 

More from HIMADRI BANERJI

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
HIMADRI BANERJI
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
HIMADRI BANERJI
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
HIMADRI BANERJI
 

More from HIMADRI BANERJI (20)

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptx
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing Change
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdf
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdf
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerji
 
Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROL
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
 

Recently uploaded

Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
dlhescort
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Recently uploaded (20)

Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 

Performance Based Regulation, Implementing an Asset Management Standards and Systems

  • 1. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Performance-Based Regulation in Electric Utilities: Reliability Improvement Using Integrated Asset Management Standard PAS 55. Dr. Himadri Banerji PlanTech 2010 Mumbai 4 th and 5 th February
  • 2.
  • 3. Targeted PBR and Targeted Incentives: Service Standards Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb If distribution were a competitive market, providers would compete on the basis of price, service quality, and customer service. But there is no meaningful competition for distribution services. Consequently, the quest for lower costs and higher profits will drive utilities to cut service quality and customer service. Setting standards with built-in incentives (rewards and penalties) will encourage utilities to find acceptable lower cost ways to provide a specified level of service.
  • 4. Background: Electricity Industry Restructuring Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb The restructuring and liberalization of electricity industry worldwide have increased the incentives for a cost effective and efficient use of available assets in all segments of the power industry.
  • 5. What is performance-based regulation Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb The term – performance-based regulation – is the most recent in a long line of vocabulary used to describe regulatory approaches that rely on financial incentives and disincentives to induce desired behavior by a regulated firm. The desired behaviors, or outcomes, are generally 1) lower costs, 2) improved service, and 3) more rational allocation of risks and rewards. The renewed interest in PBR largely reflects dissatisfaction with cost-of-service or rate-of-return regulation, especially the perception that cost-of-service regulation stifles utility innovation and causes utility managers to be more responsive to regulators than to customers. PBR may also be pursued by utilities seeking higher profits, more flexibility, or less risk.
  • 6. PBR Structures : Price and Revenue Caps Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb The major structural options are price caps and revenue caps. Both options create the same incentives to cut costs, but revenue caps create much better incentives for investment in distributed resources. Also, revenue and price caps merge as rate design for distribution utilities moves toward fixed monthly fees. Revenue caps provide an opportunity to achieve many of the purposes of fixed charge rate designs while avoiding the substantial economic and public acceptance problems associated with such rate designs. However Most regulators start with Target Based PBR.
  • 7. Service Standards: Service Reliability Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb 1. Reliability. This includes a long list of specific standards including the extent and duration of outages, service restoration time, frequency of planned outages, performance of worst circuits, and voltage variations. 2. Call Center Performance. This addresses how quickly and how fully calls to the utility are answered and how well consumer questions or complaints are resolved. 3. Field Service. This covers a wide range of situations in which utility employees make visits to the customers location. Standards may include how well appointments are kept and time to connect new service, test meters, and replace street lights. 4. Billing and Complaints. This includes billing accuracy, metering accuracy, complaint rates to the utility and regulator, overall customer satisfaction, and power quality complaints.
  • 8. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb It is important to make the penalty large enough that it will receive and keep management’s attention PBR mechanisms may include service quality penalties of no less than one percent (100 basis points) of equity. The calculations are based on cost of ENS or energy not served. Service Reliability Cost of ENS and Penalties
  • 9. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Service Reliability Measures Top US Utilities
  • 10.
  • 11. Asset Management Myths and Realities Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb 4. In line with the maintainers seeking greater corporate credibility, the large number of software vendors selling asset information management systems (including asset registers, GIS systems, work management, history gathering, materials control & cost reporting etc) have often relabeled their products as “Enterprise Asset Management Systems”. This has given rise to a misconception that Asset Management is an technology initiative to sort out the data and IT infrastructure (often leading to great expense and the ‘tail wagging the dog’).   5. If we dig deeper into the information systems world, we even find “Asset Management” interpreted as simply the bar-code labeling of computers and peripherals, and the tracking of their location/status (i.e. ‘asset tracking’).   6. Finally, a few critical infrastructure or plant owners and operators have adopted the term ‘Asset Management’ to describe their core role in life - both caring for, and making best sustained use of, physical plant, infrastructure and its associated facilities. This is the interpretation that the new British Standard, PAS-55 is focused upon, and is the subject of this presentation.  
  • 12.
  • 13.
  • 14. 5 core questions of Asset Management
  • 15.
  • 16. Characteristics of PAS 55 Asset Management BS Standard: Integrated and Life Cycle Centered Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb It requires a life cycle view and optimal mixture of investments operations maintenance resourcing , risks performance sustainability Source: BSI PAS 55:2008
  • 17. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Degree of implementation:  Degree to which asset management strategies, objectives and plans are in place. Source: BSI PAS 55:2008
  • 18. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Characteristics of PAS 55 Levels of an Asset Management System                                                                                                                        Source: BSI PAS 55:2008 Part 1 contains the core requirements against which an organization's Asset Management capabilities can be assessed. Part 2 expands on these requirements with examples and guidance designed to aid the understanding of the intent of the Part 1 requirements. PAS 55 is a two-part specification.
  • 19. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Characteristics of PAS 55 Asset Management BS Standard: Integrated Source: BSI PAS 55:2008
  • 20. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb PAS 55 Asset Management BS Standard: Scope and Interfaces Source: BSI PAS 55:2008
  • 21. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb PAS 55 Asset Management BS Standard: Stakeholder Requirements Source: BSI PAS 55:2008 Source: BSI PAS 55:2008
  • 22. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb PAS 55 Asset Management BS Standard: OSP, Planning and Implementation Source: BSI PAS 55:2008
  • 23. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb PAS 55 Asset Management BS Standard: Management System Structure Source: BSI PAS 55:2008
  • 24. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Asset Manager : Work Control To Life Cycle Analysis Source: BSI PAS 55:2008
  • 25. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Asset Management Process Asset Manager: Work Control To Evaluations, Investigation, Problem Identification Analysis
  • 26. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Development in Asset Management Processes
  • 27. Information Systems Development in Asset Management Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb
  • 28. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Risk Management Processes Design and Development Phase
  • 29. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Risk Management Processes Compliance to Standards, Procedures, Culture
  • 30. Probabilistic Risk Management Operational Phase Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Probabilistic risk assessments have the following characteristics: • explicitly consider a broad set of potential challenges to safety; • logically prioritize these challenges; • consider a wide range of options to mitigate these challenges; • assess sensitivity of results to key assumptions; • identify and potentially quantify uncertainties in results. Performance requirements have the following characteristics: • based on measurable, quantifiable parameters that are directly related to safety; • timing of measurements is specified; • numerical performance criteria are set for each parameter; • corrective actions are required to be taken if performance criteria are not met; • performance trends are monitored; • performance criteria and/or corrective actions are adjusted based on performance trends.
  • 31. Presented by Dr.Himadri Banerji Ex CEO in Reliance Energy and Leader GLG at the PlanTech 2010 Mumbai, 4th and 5th Feb Questions Discussions Thank You

Editor's Notes

  1. Performance benchmarks may be set at the most recent three-year average performance. Such benchmarks should be established for a limited number of broad measures that are easily tracked and important to customers, including: • customer complaints • outage duration, • outage frequency (five minutes or longer), • frequency of momentaries, • storm outage response time, and • hours lost due to accidents.
  2. A multi-sector initiative in Europe, backed by the British Standards Institute has now published PAS-55, to clear the air a bit and define what a joined-up physical asset management system needs to include. Adopted by industry regulators as a checklist of good governance. (As per advise of OFGEM the British Regulator all electricity and gas distributors must be PAS 55 by 2010 to reduce regulatory oversight). Certification to the PAS 55 specification is a very significant achievement and confirms the connection between corporate goals and asset management activity at all levels