SlideShare une entreprise Scribd logo
1  sur  34
MEGA-PROJECT
SCHEDULE INTEGRATION
AND MANAGEMENT
RCF METHOD-1
Rufran C. Frago, P. Eng., PMP®, CCEC, PMI-RMP®
Revision 0: August 6, 2013
2
3
AnnouncementAnnouncement
More learning related to the subject can be found in the book "Risk-based Management in the World
of Threats and Opportunities: A Project Controls Perspective." It is now available in paperback and
Kindle edition at Amazon.com. Follow the hyperlinks below for more information.
http://www.amazon.com/RUFRAN-C.-FRAGO-PMI-RMP/e/B01055MPYI
http://www.amazon.com/dp/B0104OFUDI/ref=rdr_kindle_ext_tmb
https://www.amazon.com/author/rufrancfrago
The book provides new/additional knowledge to project management practitioners (beginners to
experts), risk management specialists, project controls people, estimators, cost managers, planners
and schedulers, and for students of undergraduate courses in Risk Management.
The sectional contents offer practical and common sense approach to identifying/managing risks. It
is a must have for company managers, directors, supervisors, aspiring industry professionals, and
even those students fresh from high school. The material is especially design to start with the
foundational principles of risk gradually bringing the reader to deeper topics using a conversational
style with simple terminologies. You can grab a copy now.
https://youtu.be/wxWgYUhiWos
Source:
Frago, R., 2015.Risk-based Management in the World of Threats and Opportunities: A Project
Controls Perspective
Effectively managing the overall and overarching
schedule of a super mega-project portfolio has always
been a challenge to all Project Managers. In spite of
having divided the project into smaller pieces or sub-
projects, the size issue remains because each
supposedly smaller project is still quite sizeable, perhaps
several hundred million, half a Billion to a Billion or more
each.
In this presentation, I have experimented on a theoretical
mega-project portfolio using a pilot model that I have
divided into five (5) Major Sub-Projects or Areas, each one
of them approximately $1B to $2.5B each.
Primavera Enterprise Project Portfolio Management P6.7
SP4 was used in this study.
Effectively managing the overall and overarching
schedule of a super mega-project portfolio has always
been a challenge to all Project Managers. In spite of
having divided the project into smaller pieces or sub-
projects, the size issue remains because each
supposedly smaller project is still quite sizeable, perhaps
several hundred million, half a Billion to a Billion or more
each.
In this presentation, I have experimented on a theoretical
mega-project portfolio using a pilot model that I have
divided into five (5) Major Sub-Projects or Areas, each one
of them approximately $1B to $2.5B each.
Primavera Enterprise Project Portfolio Management P6.7
SP4 was used in this study.
4
FOREWORDFOREWORD
KIMs = Key Interface Milestones
MS = Milestone
RD = Remaining Duration
DD = Data Date
CP = Critical Path
CPM = Critical Path Method
SME = Subject Matter Expert
IPL = Inter-project Links
KIMs = Key Interface Milestones
MS = Milestone
RD = Remaining Duration
DD = Data Date
CP = Critical Path
CPM = Critical Path Method
SME = Subject Matter Expert
IPL = Inter-project Links
5
ACRONYMS and DEFINITIONSACRONYMS and DEFINITIONS
Construction of a Mega-Project Portfolio to the
tune of 10 Billion Dollars
The portfolio was divided into five (5) Major Project
Areas of approximately $1B to $2.5B each
Each area schedule was defined down to the work
package level
The number of activities in each of the five
schedule ranges from 7,000 to 10,000
Total number of activities of the project portfolio
is about 43,000 activities
The five (5) sub-projects are all EPC/S projects and
can be further divided into phase components.
Construction of a Mega-Project Portfolio to the
tune of 10 Billion Dollars
The portfolio was divided into five (5) Major Project
Areas of approximately $1B to $2.5B each
Each area schedule was defined down to the work
package level
The number of activities in each of the five
schedule ranges from 7,000 to 10,000
Total number of activities of the project portfolio
is about 43,000 activities
The five (5) sub-projects are all EPC/S projects and
can be further divided into phase components.
6
Pilot Model is representing:Pilot Model is representing:
1. Full integration using hard linking between areas is
daunting and half of the SMEs oppose it.
2. It was pointed out that calculation of CP needs all the
linked schedules to be opened before F9 (P6
calculation). The schedule is just too large to maintain
good control.
3. However, everyone knows that without those IPL, a
fast-accurate CP identification is not available.
4. The project would like to use a KIM table outside of
Primavera to manage the overall project portfolio.
5. I have big reservations using a separate KIM table as a
tool to consolidate date information.
6. Using a separate application seems like managing the
overall schedule using two versions of the truth. IMHO,
it is dangerous.
1. Full integration using hard linking between areas is
daunting and half of the SMEs oppose it.
2. It was pointed out that calculation of CP needs all the
linked schedules to be opened before F9 (P6
calculation). The schedule is just too large to maintain
good control.
3. However, everyone knows that without those IPL, a
fast-accurate CP identification is not available.
4. The project would like to use a KIM table outside of
Primavera to manage the overall project portfolio.
5. I have big reservations using a separate KIM table as a
tool to consolidate date information.
6. Using a separate application seems like managing the
overall schedule using two versions of the truth. IMHO,
it is dangerous.
7
ISSUES TO TACKLEISSUES TO TACKLE
∗ To come up with a workable alternative
to the most common KIM Schedule
Management method of using a flat file
from a separate application.
∗ To come up with a method that preserve
the Critical Path calculation and
identification.
∗ To propose a method that does not
require opening the whole project
portfolio at the same time to do a one
time F9 (calculate)
∗ To come up with a workable alternative
to the most common KIM Schedule
Management method of using a flat file
from a separate application.
∗ To come up with a method that preserve
the Critical Path calculation and
identification.
∗ To propose a method that does not
require opening the whole project
portfolio at the same time to do a one
time F9 (calculate)
8
OBJECTIVESOBJECTIVES
∗ To simplify the management of the Overall
schedule though the use of a KIM Schedule
without losing that essential inter-project
relationships nor limited by the Project
Portfolio’s sheer size
∗ To propose a workable method that will
support accurate, quick date analysis and
timely decision making.
∗ To do away the time-consuming collection
of data by offering a common work
environment and promoting “what you see
is what you get” information quality
∗ To simplify the management of the Overall
schedule though the use of a KIM Schedule
without losing that essential inter-project
relationships nor limited by the Project
Portfolio’s sheer size
∗ To propose a workable method that will
support accurate, quick date analysis and
timely decision making.
∗ To do away the time-consuming collection
of data by offering a common work
environment and promoting “what you see
is what you get” information quality
9
OBJECTIVES … (CONTINUATION)OBJECTIVES … (CONTINUATION)
10
SAMPLE HIGH LEVEL KIMs MAPPINGSAMPLE HIGH LEVEL KIMs MAPPING
4 KIMs
2 KIMs
3 KIMs
3 KIMs
3 KIMs
3 KIMs
KIM1
KIM2
KIM3
KIM4
18 KIMS
TOTAL
02Sep13-08Jan15
06May14-01May15
KIM5
KIM6 KIM13
KIM14
KIM15
KIM7
KIM8
KIM9
KIM10
KIM11
KIM12
KIM16
KIM17
KIM18
22Mar15-30Aug16
06Jan16-05Mar17
08May15-02May16
Note that a Mega-Project can easily have 100 to 200 KIMs. The
one shown below was put together to facilitate understanding.
Note that a Mega-Project can easily have 100 to 200 KIMs. The
one shown below was put together to facilitate understanding.
11
4 KIMs
2 KIMs
3 KIMs
3 KIMs
3 KIMs
3 KIMs
18 KIMS TOTAL
02Sep13-08Jan15
06May14-01May15
22Mar15-30Aug16
06Jan16-05Mar17
08May15-02May16
EACH PROJECT AREA HAS A SEPARATE EPSEACH PROJECT AREA HAS A SEPARATE EPS
12
CREATE THE OVERALL
MILESTONE SCHEDULE
CREATE THE OVERALL
MILESTONE SCHEDULE
Create a separate EPS Node for the Overall MS
Schedule.
Create the Overall MS Schedule.
Open the empty schedule and add all the approved
KIM activities (see below).
Create a separate EPS Node for the Overall MS
Schedule.
Create the Overall MS Schedule.
Open the empty schedule and add all the approved
KIM activities (see below).
13
THE KIM SCHEDULE IS PLACED IN
A SEPARATE EPS NODE
THE KIM SCHEDULE IS PLACED IN
A SEPARATE EPS NODE
14
KINDS OF PROJECT INTERFACEKINDS OF PROJECT INTERFACE
ONE-SIDED INTERFACE (SINGLE DEPENDENCY)
TWO-SIDED INTERFACE (MUTUAL DEPENDENCY)
06May14-01May15
22Mar15-30Aug16
08May15-02May16
3 KIMs
3 KIMs
4 KIMs
2 KIMs 06May14-01May15
02Sep13-08Jan15
15
SETTING UP THE SCHEDULESETTING UP THE SCHEDULE
1. Develop and finalize the project Execution Schedule.
This is most likely a level-3 schedule which is down to
the Work Package Level.
2. Each of the five major project areas should have a
separate EPS Node each containing an EPC/S
integrated area schedules.
3. Create an Integrated Key Interface Milestone Schedule
containing all the KIMs in a separate EPS. These
contains all KIMs only.
4. The Deliverer and the Requestor shares a common
milestone in the KIM schedule.
5. Baseline the Level 3 and the KIM Schedule.
6. Upon stakeholder’s sign-off & approval, publish the
KIMs BL Schedule.
7. Use the KIM Schedule to monitor & control the project.
1. Develop and finalize the project Execution Schedule.
This is most likely a level-3 schedule which is down to
the Work Package Level.
2. Each of the five major project areas should have a
separate EPS Node each containing an EPC/S
integrated area schedules.
3. Create an Integrated Key Interface Milestone Schedule
containing all the KIMs in a separate EPS. These
contains all KIMs only.
4. The Deliverer and the Requestor shares a common
milestone in the KIM schedule.
5. Baseline the Level 3 and the KIM Schedule.
6. Upon stakeholder’s sign-off & approval, publish the
KIMs BL Schedule.
7. Use the KIM Schedule to monitor & control the project.
16
CREATE THE INDIVIDUAL PROJECT BASELINECREATE THE INDIVIDUAL PROJECT BASELINE
When KIM Dates are approved, create the Overall Project BaselineWhen KIM Dates are approved, create the Overall Project Baseline
17
CREATE THE KIM BASELINECREATE THE KIM BASELINE
18
19
MAKE SURE THAT THE KIMS ARE
LINED UP WITH THEIR BL BEFORE
THE FIRST UPDATE
MAKE SURE THAT THE KIMS ARE
LINED UP WITH THEIR BL BEFORE
THE FIRST UPDATE
20
Move the Data Date on the Project WindowMove the Data Date on the Project Window
a) Original DD = 18-Jul-13a) Original DD = 18-Jul-13
b) Change each Project to DD = 30-Sep-13b) Change each Project to DD = 30-Sep-13
21
Move the Data Date … (continuation)Move the Data Date … (continuation)
c) Change the first line & fill in to change allc) Change the first line & fill in to change all
d) Update All 5 Project Areas including the KIM Scheduled) Update All 5 Project Areas including the KIM Schedule
22
SEQUENTIAL UPDATING OF THE KIM SCHEDULESEQUENTIAL UPDATING OF THE KIM SCHEDULE
1) Update Project A and the KIM Schedule1) Update Project A and the KIM Schedule
23
SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation)
2) Update Project B and the KIM Schedule2) Update Project B and the KIM Schedule
24
SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation)
3) Update Project C and the KIM Schedule3) Update Project C and the KIM Schedule
25
SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation)
4) Update Project D and the KIM Schedule4) Update Project D and the KIM Schedule
26
SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation)
5) Update Project E and the KIM Schedule5) Update Project E and the KIM Schedule
27
OPEN THE KIM SCHEDULE AND RUN THE KIM
SCHEDULE VARIANCE REPORT
OPEN THE KIM SCHEDULE AND RUN THE KIM
SCHEDULE VARIANCE REPORT
1) Run the Start & Finish Dates Variance Report VS. BL1) Run the Start & Finish Dates Variance Report VS. BL
28
F9 EACH AREA & RUNS AN ANALYSIS WITHOUT
OPENING THE KIM SCHEDULE
F9 EACH AREA & RUNS AN ANALYSIS WITHOUT
OPENING THE KIM SCHEDULE
Note that the primary critical path was identified.
With the date variances, this makes a good decision tool.
Note that the primary critical path was identified.
With the date variances, this makes a good decision tool.
PROJECT A
29
F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION)
PROJECT B
The calculation works partially on the basis of the updated KIMs
which appears as constrains in each of the area schedule.
The calculation works partially on the basis of the updated KIMs
which appears as constrains in each of the area schedule.
30
F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION)
PROJECT C
31
F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION)
PROJECT D
32
F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION)
PROJECT E
33
1) Managing Project Interfaces by Peter Morris
2) SQRA Fundamentals Using 3-point Estimate by Rufran C. Frago
3) Managing Primavera Dbase Security using RMC by Rufran C. Frago
4) ABB, Interface Management , by Josh Caglar, P.E. and Mike Connolly,
2007, ABB Inc., Houston
5) Risk and Interdependency in Programs by Martin Vaughan, April 21, 2011,
Project Manager-Education and Opinion Website.
Additional Reading MaterialsAdditional Reading Materials
34

Contenu connexe

Tendances

An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14p6academy
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationChris Carson
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio ManagementDiana Rusnakova
 
Microsoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sMicrosoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sAbhik Tushar Das
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Charlie Jackson
 
Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chartdanishrafiq
 
Integrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master ScheduleIntegrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master ScheduleGlen Alleman
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan DevelopmentGlen Alleman
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROLpmSPECFramework
 
AWP-Education-Primer.pdf
AWP-Education-Primer.pdfAWP-Education-Primer.pdf
AWP-Education-Primer.pdfMy own
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 

Tendances (20)

The Project Management Plan in 20 steps
The Project Management Plan in 20 stepsThe Project Management Plan in 20 steps
The Project Management Plan in 20 steps
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan Presentation
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio Management
 
Primavera Training P6
Primavera Training P6Primavera Training P6
Primavera Training P6
 
Microsoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sMicrosoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner's
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
Calculating contingency for management reserve
Calculating contingency for management reserveCalculating contingency for management reserve
Calculating contingency for management reserve
 
Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chart
 
Integrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master ScheduleIntegrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master Schedule
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 
Primavera p6 manual edited
Primavera p6 manual editedPrimavera p6 manual edited
Primavera p6 manual edited
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL
 
AWP-Education-Primer.pdf
AWP-Education-Primer.pdfAWP-Education-Primer.pdf
AWP-Education-Primer.pdf
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Pert master risk analysis tool
Pert master   risk analysis toolPert master   risk analysis tool
Pert master risk analysis tool
 

Similaire à Mega-Project Schedule Integration

Best Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM ProjectsBest Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM ProjectsARC Advisory Group
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using PertVishnu RC Vijayan
 
Running head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docxRunning head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docxtodd521
 
Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]Hariharan Ponnusamy
 
PMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPeter Mello
 
S10 Organisations Software and Methodologies
S10 Organisations Software and MethodologiesS10 Organisations Software and Methodologies
S10 Organisations Software and MethodologiesRoland Berberich
 
Criticalchainprojectmanagement
CriticalchainprojectmanagementCriticalchainprojectmanagement
Criticalchainprojectmanagementkaton808
 
Implementation of a high performace clusther for a university
Implementation of a high performace clusther for a universityImplementation of a high performace clusther for a university
Implementation of a high performace clusther for a universitySharyuMahale
 
projectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptxprojectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptxChandrasen Sharma
 
TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615EqraBaig
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides SlideTeam
 
Pm0015 quantitative methods in project management
Pm0015   quantitative methods in project managementPm0015   quantitative methods in project management
Pm0015 quantitative methods in project managementsmumbahelp
 

Similaire à Mega-Project Schedule Integration (20)

Best Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM ProjectsBest Practices: Implement Massive SCM Projects
Best Practices: Implement Massive SCM Projects
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Cost Estimation
Cost EstimationCost Estimation
Cost Estimation
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using Pert
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Running head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docxRunning head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docx
 
Scope creep - cylfe campain
Scope creep - cylfe campainScope creep - cylfe campain
Scope creep - cylfe campain
 
Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]Production & Operation Management Chapter 34, 35[1]
Production & Operation Management Chapter 34, 35[1]
 
PMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/Manaus
 
S10 Organisations Software and Methodologies
S10 Organisations Software and MethodologiesS10 Organisations Software and Methodologies
S10 Organisations Software and Methodologies
 
Criticalchainprojectmanagement
CriticalchainprojectmanagementCriticalchainprojectmanagement
Criticalchainprojectmanagement
 
Implementation of a high performace clusther for a university
Implementation of a high performace clusther for a universityImplementation of a high performace clusther for a university
Implementation of a high performace clusther for a university
 
Rachhu
RachhuRachhu
Rachhu
 
Rachhu
RachhuRachhu
Rachhu
 
projectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptxprojectmanagement-141108102434-conversion-gate01-converted.pptx
projectmanagement-141108102434-conversion-gate01-converted.pptx
 
PERT
PERTPERT
PERT
 
TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides
 
Pm0015 quantitative methods in project management
Pm0015   quantitative methods in project managementPm0015   quantitative methods in project management
Pm0015 quantitative methods in project management
 

Plus de PM SOLUTION PRO| Risk-based Management and Services Inc.

Plus de PM SOLUTION PRO| Risk-based Management and Services Inc. (20)

121717 Kindle Issue 2 : Figures become so small than desired
121717 Kindle Issue 2 : Figures become so small than desired121717 Kindle Issue 2 : Figures become so small than desired
121717 Kindle Issue 2 : Figures become so small than desired
 
121717 Kindle Issue : Table lines were showing in kindle
121717 Kindle Issue : Table lines were showing in kindle121717 Kindle Issue : Table lines were showing in kindle
121717 Kindle Issue : Table lines were showing in kindle
 
101116 Risk-based Planning & Scheduling (My SAIT Slides)
101116 Risk-based Planning & Scheduling (My SAIT Slides)101116 Risk-based Planning & Scheduling (My SAIT Slides)
101116 Risk-based Planning & Scheduling (My SAIT Slides)
 
063016 Man is the Center of the Risk Universe
063016 Man is the Center of the Risk Universe063016 Man is the Center of the Risk Universe
063016 Man is the Center of the Risk Universe
 
043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)
043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)
043015 Rufran's Acumen Fuse Tips and Tricks 01-15 (Duration Translation Issue)
 
032815 DBM Schedule Development Workshop
032815 DBM Schedule Development Workshop032815 DBM Schedule Development Workshop
032815 DBM Schedule Development Workshop
 
111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule
111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule
111414 PRESENTATION: How to create a P50 Risk-based Baseline Schedule
 
102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique
102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique 102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique
102614 Root Cause Analysis using Fault Tree Analysis (FTA) Technique
 
091814 Failure Mode Effect and Analysis (FMEA)
091814 Failure Mode Effect and Analysis (FMEA)091814 Failure Mode Effect and Analysis (FMEA)
091814 Failure Mode Effect and Analysis (FMEA)
 
091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)
091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)
091414 Rufran's Acumen Fuse Tips & Tricks 01-14 (Issues on imported durations)
 
082314 Road to Operational Excellence
082314 Road to Operational Excellence082314 Road to Operational Excellence
082314 Road to Operational Excellence
 
072414 Resource Distribution Copy-Paste Problem
072414 Resource Distribution Copy-Paste Problem072414 Resource Distribution Copy-Paste Problem
072414 Resource Distribution Copy-Paste Problem
 
080714-Rufran's Primavera Scheduling Tips Tricks 02-14
080714-Rufran's Primavera Scheduling Tips  Tricks 02-14080714-Rufran's Primavera Scheduling Tips  Tricks 02-14
080714-Rufran's Primavera Scheduling Tips Tricks 02-14
 
011614 Scaffolding, what is it? Direct or Indirect?
011614 Scaffolding, what is it? Direct or Indirect?011614 Scaffolding, what is it? Direct or Indirect?
011614 Scaffolding, what is it? Direct or Indirect?
 
121013 Blackberry Business Audit (BMC 205 @ UofC)
121013 Blackberry Business Audit (BMC 205 @ UofC)121013 Blackberry Business Audit (BMC 205 @ UofC)
121013 Blackberry Business Audit (BMC 205 @ UofC)
 
103013 Case Study, Potash Corporation (BMC205, UofC)
103013 Case Study, Potash Corporation (BMC205, UofC)103013 Case Study, Potash Corporation (BMC205, UofC)
103013 Case Study, Potash Corporation (BMC205, UofC)
 
072213 Understanding Acumen Fuse Scoring Methods
072213 Understanding Acumen Fuse Scoring Methods072213 Understanding Acumen Fuse Scoring Methods
072213 Understanding Acumen Fuse Scoring Methods
 
072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)
072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)
072213 Rufran's Primavera Scheduling Tips & Tricks 06-13 (P6 error AAVA0-3769-8)
 
071913 Rufran's Primavera Scheduling Tips & Tricks 05-13
071913 Rufran's Primavera Scheduling Tips & Tricks 05-13071913 Rufran's Primavera Scheduling Tips & Tricks 05-13
071913 Rufran's Primavera Scheduling Tips & Tricks 05-13
 
071513 How to Prepare for Schedule Quantitative Risk Analysis
071513 How to Prepare for Schedule Quantitative Risk Analysis071513 How to Prepare for Schedule Quantitative Risk Analysis
071513 How to Prepare for Schedule Quantitative Risk Analysis
 

Dernier

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 

Dernier (20)

Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 

Mega-Project Schedule Integration

  • 1. MEGA-PROJECT SCHEDULE INTEGRATION AND MANAGEMENT RCF METHOD-1 Rufran C. Frago, P. Eng., PMP®, CCEC, PMI-RMP® Revision 0: August 6, 2013
  • 2. 2
  • 3. 3 AnnouncementAnnouncement More learning related to the subject can be found in the book "Risk-based Management in the World of Threats and Opportunities: A Project Controls Perspective." It is now available in paperback and Kindle edition at Amazon.com. Follow the hyperlinks below for more information. http://www.amazon.com/RUFRAN-C.-FRAGO-PMI-RMP/e/B01055MPYI http://www.amazon.com/dp/B0104OFUDI/ref=rdr_kindle_ext_tmb https://www.amazon.com/author/rufrancfrago The book provides new/additional knowledge to project management practitioners (beginners to experts), risk management specialists, project controls people, estimators, cost managers, planners and schedulers, and for students of undergraduate courses in Risk Management. The sectional contents offer practical and common sense approach to identifying/managing risks. It is a must have for company managers, directors, supervisors, aspiring industry professionals, and even those students fresh from high school. The material is especially design to start with the foundational principles of risk gradually bringing the reader to deeper topics using a conversational style with simple terminologies. You can grab a copy now. https://youtu.be/wxWgYUhiWos Source: Frago, R., 2015.Risk-based Management in the World of Threats and Opportunities: A Project Controls Perspective
  • 4. Effectively managing the overall and overarching schedule of a super mega-project portfolio has always been a challenge to all Project Managers. In spite of having divided the project into smaller pieces or sub- projects, the size issue remains because each supposedly smaller project is still quite sizeable, perhaps several hundred million, half a Billion to a Billion or more each. In this presentation, I have experimented on a theoretical mega-project portfolio using a pilot model that I have divided into five (5) Major Sub-Projects or Areas, each one of them approximately $1B to $2.5B each. Primavera Enterprise Project Portfolio Management P6.7 SP4 was used in this study. Effectively managing the overall and overarching schedule of a super mega-project portfolio has always been a challenge to all Project Managers. In spite of having divided the project into smaller pieces or sub- projects, the size issue remains because each supposedly smaller project is still quite sizeable, perhaps several hundred million, half a Billion to a Billion or more each. In this presentation, I have experimented on a theoretical mega-project portfolio using a pilot model that I have divided into five (5) Major Sub-Projects or Areas, each one of them approximately $1B to $2.5B each. Primavera Enterprise Project Portfolio Management P6.7 SP4 was used in this study. 4 FOREWORDFOREWORD
  • 5. KIMs = Key Interface Milestones MS = Milestone RD = Remaining Duration DD = Data Date CP = Critical Path CPM = Critical Path Method SME = Subject Matter Expert IPL = Inter-project Links KIMs = Key Interface Milestones MS = Milestone RD = Remaining Duration DD = Data Date CP = Critical Path CPM = Critical Path Method SME = Subject Matter Expert IPL = Inter-project Links 5 ACRONYMS and DEFINITIONSACRONYMS and DEFINITIONS
  • 6. Construction of a Mega-Project Portfolio to the tune of 10 Billion Dollars The portfolio was divided into five (5) Major Project Areas of approximately $1B to $2.5B each Each area schedule was defined down to the work package level The number of activities in each of the five schedule ranges from 7,000 to 10,000 Total number of activities of the project portfolio is about 43,000 activities The five (5) sub-projects are all EPC/S projects and can be further divided into phase components. Construction of a Mega-Project Portfolio to the tune of 10 Billion Dollars The portfolio was divided into five (5) Major Project Areas of approximately $1B to $2.5B each Each area schedule was defined down to the work package level The number of activities in each of the five schedule ranges from 7,000 to 10,000 Total number of activities of the project portfolio is about 43,000 activities The five (5) sub-projects are all EPC/S projects and can be further divided into phase components. 6 Pilot Model is representing:Pilot Model is representing:
  • 7. 1. Full integration using hard linking between areas is daunting and half of the SMEs oppose it. 2. It was pointed out that calculation of CP needs all the linked schedules to be opened before F9 (P6 calculation). The schedule is just too large to maintain good control. 3. However, everyone knows that without those IPL, a fast-accurate CP identification is not available. 4. The project would like to use a KIM table outside of Primavera to manage the overall project portfolio. 5. I have big reservations using a separate KIM table as a tool to consolidate date information. 6. Using a separate application seems like managing the overall schedule using two versions of the truth. IMHO, it is dangerous. 1. Full integration using hard linking between areas is daunting and half of the SMEs oppose it. 2. It was pointed out that calculation of CP needs all the linked schedules to be opened before F9 (P6 calculation). The schedule is just too large to maintain good control. 3. However, everyone knows that without those IPL, a fast-accurate CP identification is not available. 4. The project would like to use a KIM table outside of Primavera to manage the overall project portfolio. 5. I have big reservations using a separate KIM table as a tool to consolidate date information. 6. Using a separate application seems like managing the overall schedule using two versions of the truth. IMHO, it is dangerous. 7 ISSUES TO TACKLEISSUES TO TACKLE
  • 8. ∗ To come up with a workable alternative to the most common KIM Schedule Management method of using a flat file from a separate application. ∗ To come up with a method that preserve the Critical Path calculation and identification. ∗ To propose a method that does not require opening the whole project portfolio at the same time to do a one time F9 (calculate) ∗ To come up with a workable alternative to the most common KIM Schedule Management method of using a flat file from a separate application. ∗ To come up with a method that preserve the Critical Path calculation and identification. ∗ To propose a method that does not require opening the whole project portfolio at the same time to do a one time F9 (calculate) 8 OBJECTIVESOBJECTIVES
  • 9. ∗ To simplify the management of the Overall schedule though the use of a KIM Schedule without losing that essential inter-project relationships nor limited by the Project Portfolio’s sheer size ∗ To propose a workable method that will support accurate, quick date analysis and timely decision making. ∗ To do away the time-consuming collection of data by offering a common work environment and promoting “what you see is what you get” information quality ∗ To simplify the management of the Overall schedule though the use of a KIM Schedule without losing that essential inter-project relationships nor limited by the Project Portfolio’s sheer size ∗ To propose a workable method that will support accurate, quick date analysis and timely decision making. ∗ To do away the time-consuming collection of data by offering a common work environment and promoting “what you see is what you get” information quality 9 OBJECTIVES … (CONTINUATION)OBJECTIVES … (CONTINUATION)
  • 10. 10 SAMPLE HIGH LEVEL KIMs MAPPINGSAMPLE HIGH LEVEL KIMs MAPPING 4 KIMs 2 KIMs 3 KIMs 3 KIMs 3 KIMs 3 KIMs KIM1 KIM2 KIM3 KIM4 18 KIMS TOTAL 02Sep13-08Jan15 06May14-01May15 KIM5 KIM6 KIM13 KIM14 KIM15 KIM7 KIM8 KIM9 KIM10 KIM11 KIM12 KIM16 KIM17 KIM18 22Mar15-30Aug16 06Jan16-05Mar17 08May15-02May16 Note that a Mega-Project can easily have 100 to 200 KIMs. The one shown below was put together to facilitate understanding. Note that a Mega-Project can easily have 100 to 200 KIMs. The one shown below was put together to facilitate understanding.
  • 11. 11 4 KIMs 2 KIMs 3 KIMs 3 KIMs 3 KIMs 3 KIMs 18 KIMS TOTAL 02Sep13-08Jan15 06May14-01May15 22Mar15-30Aug16 06Jan16-05Mar17 08May15-02May16 EACH PROJECT AREA HAS A SEPARATE EPSEACH PROJECT AREA HAS A SEPARATE EPS
  • 12. 12 CREATE THE OVERALL MILESTONE SCHEDULE CREATE THE OVERALL MILESTONE SCHEDULE Create a separate EPS Node for the Overall MS Schedule. Create the Overall MS Schedule. Open the empty schedule and add all the approved KIM activities (see below). Create a separate EPS Node for the Overall MS Schedule. Create the Overall MS Schedule. Open the empty schedule and add all the approved KIM activities (see below).
  • 13. 13 THE KIM SCHEDULE IS PLACED IN A SEPARATE EPS NODE THE KIM SCHEDULE IS PLACED IN A SEPARATE EPS NODE
  • 14. 14 KINDS OF PROJECT INTERFACEKINDS OF PROJECT INTERFACE ONE-SIDED INTERFACE (SINGLE DEPENDENCY) TWO-SIDED INTERFACE (MUTUAL DEPENDENCY) 06May14-01May15 22Mar15-30Aug16 08May15-02May16 3 KIMs 3 KIMs 4 KIMs 2 KIMs 06May14-01May15 02Sep13-08Jan15
  • 15. 15 SETTING UP THE SCHEDULESETTING UP THE SCHEDULE 1. Develop and finalize the project Execution Schedule. This is most likely a level-3 schedule which is down to the Work Package Level. 2. Each of the five major project areas should have a separate EPS Node each containing an EPC/S integrated area schedules. 3. Create an Integrated Key Interface Milestone Schedule containing all the KIMs in a separate EPS. These contains all KIMs only. 4. The Deliverer and the Requestor shares a common milestone in the KIM schedule. 5. Baseline the Level 3 and the KIM Schedule. 6. Upon stakeholder’s sign-off & approval, publish the KIMs BL Schedule. 7. Use the KIM Schedule to monitor & control the project. 1. Develop and finalize the project Execution Schedule. This is most likely a level-3 schedule which is down to the Work Package Level. 2. Each of the five major project areas should have a separate EPS Node each containing an EPC/S integrated area schedules. 3. Create an Integrated Key Interface Milestone Schedule containing all the KIMs in a separate EPS. These contains all KIMs only. 4. The Deliverer and the Requestor shares a common milestone in the KIM schedule. 5. Baseline the Level 3 and the KIM Schedule. 6. Upon stakeholder’s sign-off & approval, publish the KIMs BL Schedule. 7. Use the KIM Schedule to monitor & control the project.
  • 16. 16 CREATE THE INDIVIDUAL PROJECT BASELINECREATE THE INDIVIDUAL PROJECT BASELINE When KIM Dates are approved, create the Overall Project BaselineWhen KIM Dates are approved, create the Overall Project Baseline
  • 17. 17 CREATE THE KIM BASELINECREATE THE KIM BASELINE
  • 18. 18
  • 19. 19 MAKE SURE THAT THE KIMS ARE LINED UP WITH THEIR BL BEFORE THE FIRST UPDATE MAKE SURE THAT THE KIMS ARE LINED UP WITH THEIR BL BEFORE THE FIRST UPDATE
  • 20. 20 Move the Data Date on the Project WindowMove the Data Date on the Project Window a) Original DD = 18-Jul-13a) Original DD = 18-Jul-13 b) Change each Project to DD = 30-Sep-13b) Change each Project to DD = 30-Sep-13
  • 21. 21 Move the Data Date … (continuation)Move the Data Date … (continuation) c) Change the first line & fill in to change allc) Change the first line & fill in to change all d) Update All 5 Project Areas including the KIM Scheduled) Update All 5 Project Areas including the KIM Schedule
  • 22. 22 SEQUENTIAL UPDATING OF THE KIM SCHEDULESEQUENTIAL UPDATING OF THE KIM SCHEDULE 1) Update Project A and the KIM Schedule1) Update Project A and the KIM Schedule
  • 23. 23 SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation) 2) Update Project B and the KIM Schedule2) Update Project B and the KIM Schedule
  • 24. 24 SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation) 3) Update Project C and the KIM Schedule3) Update Project C and the KIM Schedule
  • 25. 25 SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation) 4) Update Project D and the KIM Schedule4) Update Project D and the KIM Schedule
  • 26. 26 SEQUENTIAL UPDATING … (continuation)SEQUENTIAL UPDATING … (continuation) 5) Update Project E and the KIM Schedule5) Update Project E and the KIM Schedule
  • 27. 27 OPEN THE KIM SCHEDULE AND RUN THE KIM SCHEDULE VARIANCE REPORT OPEN THE KIM SCHEDULE AND RUN THE KIM SCHEDULE VARIANCE REPORT 1) Run the Start & Finish Dates Variance Report VS. BL1) Run the Start & Finish Dates Variance Report VS. BL
  • 28. 28 F9 EACH AREA & RUNS AN ANALYSIS WITHOUT OPENING THE KIM SCHEDULE F9 EACH AREA & RUNS AN ANALYSIS WITHOUT OPENING THE KIM SCHEDULE Note that the primary critical path was identified. With the date variances, this makes a good decision tool. Note that the primary critical path was identified. With the date variances, this makes a good decision tool. PROJECT A
  • 29. 29 F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION) PROJECT B The calculation works partially on the basis of the updated KIMs which appears as constrains in each of the area schedule. The calculation works partially on the basis of the updated KIMs which appears as constrains in each of the area schedule.
  • 30. 30 F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION) PROJECT C
  • 31. 31 F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION) PROJECT D
  • 32. 32 F9 EACH AREA & RUNS THEIR… (CONTINUATION)F9 EACH AREA & RUNS THEIR… (CONTINUATION) PROJECT E
  • 33. 33 1) Managing Project Interfaces by Peter Morris 2) SQRA Fundamentals Using 3-point Estimate by Rufran C. Frago 3) Managing Primavera Dbase Security using RMC by Rufran C. Frago 4) ABB, Interface Management , by Josh Caglar, P.E. and Mike Connolly, 2007, ABB Inc., Houston 5) Risk and Interdependency in Programs by Martin Vaughan, April 21, 2011, Project Manager-Education and Opinion Website. Additional Reading MaterialsAdditional Reading Materials
  • 34. 34