Virtual Design and Construction incorporates BIM or
Building Information Modeling into the construction
process.

          A paradigm shift for the AEC industry.

It is the creation of intelligent product models that
identify constructible elements or problems of a
building which are shared among the different
disciplines: Integrated Project Delivery.

         VD&C integrates design, engineering and
            construction operations.
Team VD&C
• 40people in 7 divisions trained in
 the Vico Constructor suite.
• 45
   people in 5 divisions trained in
 NavisWorks Jetstream.
• SketchUp Training is available to
 anyone in Operations.
Projects
    75 VD&C modeled
•
    projects.

    33 used by
•
    operations teams.

    20.25 million
•
    Virtual SQ FT

    Construction value
•
    over $4.5 Billion.
• Lodge Resort and Spa in
                                Ritz Carlton
  North Lake Tahoe,
  California.

• The complex includes two
  main structures connected
  by an underground
  pedestrian tunnel, with the
  main structure housing
  more than 170 hotel
  rooms, meeting spaces,
  an attached four-level
  parking structure and a
  19,000-square-foot spa.

• Several conflicts between
  steel framing and roofing
  were identified and solved
  before construction.
Ritz Carlton at
  NorthStar
  Lake Tahoe
Four Seasons
   Denver
Kaiser MOB
Orange County
Kaiser MOB
Orange County
CHOC Proposal
  Orange County
CHOC Logistics
University
Research Park
 Orange County
Valley View Hotel
    San Diego
Valley View Hotel
    San Diego
How is VD&C changing our industry …
OWNER            ARCHITECT
         IDEAS


STRUCT             MEP
         VD&C

                  DESIGN
 SUB               BUILD
          GC




  Fragmented
    Industry
RFI Process
                  RFI

                               Architect




       RFI                      RFI

G.C.



                           Structural Eng.
How to get the end result …
VD&C Process
 Identify Project
      Goals

         Model Scope/Setup

         Obtain Digital Files

          VD&C Schedule

     Structural &
  Architectural Model



   Integrate            Integrate RFIs
                         & Submittals
  MEP Systems

Clash MEP Systems

                                         Proceed with
                        Architect’s
 Model Updates
                         Approval        Construction
VD&C helps us …
… manage the quality of design documents
…better communicate constructability issues to the
  client, design team, and subcontractors
…provide better service for our clients
…provide new business services
…detect constructability issues before reaching the
  site
…provide full Integrated Project Delivery
Examples …
Neiman Marcus
• Two VD&C Projects
   – First project in Los Angeles
• High Success Rate
   – Positive outcome on coordination of
     lights
   – Lessen Amount of Material Waste:
     HVAC
   – Able to visualize conflicts
     beforehand
• Owner insisted on having VD&C as
  part of Neiman Marcus Bellevue
Neiman Marcus Topanga
Woodland Hills, CA
•   ELS Architects & Cortland Morgan Architects
•   Two Stories High End Retail
•   120,000 SF
•   Design-Bid-Build
•   $22 Million
•   July 2008
Neiman Marcus Seattle
Seattle, WA
• SJW Architects & Designers
• Three Stories High End Retail + Basement
• 123,550 SF
• Design-Bid-Build
• $12.5 Million
• June 26, 2009
Project Goals
• Find and resolve conflicts before
  construction
• Coordinate more than 5,500 light fixtures
  – Lights took precedent over other trades
• Manage Risk: Use the model to
  communicate conflicts and to generate
  better solutions through a collaborative
  effort.
• Reduce number of RFIs and Response
  Latency
VD&C Scope
• Structure per plans and as built dwgs.
• Reflected ceilings
• Light fixtures layout and coordination
• Interior & fire rated walls
• MEPFP coordination
• Model updates per Bulletins, RFIs, and
  Weekly Coordination Meetings
• Pipe rack – Topanga
• Cable tray
• Plumbing
Communication




NM Topanga
• Close to Main Office
   – Weekly coordination
     meetings on site
                           NM Seattle
                           • Go to Meeting
                              – Weekly,
                                online coordination meetings
Topanga VD&C Model
• Preparation of cut sheets through 3D model
   – Used in coordination meetings on site
Bellevue VD&C Model
• Representational modeling based on
  dimensions
• 3D Coordination Meetings via online
  conferences
Communication: LA to Seattle

•   Model Setup
•   Append Drawings
     –   NavisWorks
           •   Clash Detection
•   Create Reports and Logs
•   Distribute Reports
     –   HTML Files
•   Distribute Navis File
     –   Saved Viewpoints included
•   Online Coordination Meetings
Communication: LA to Seattle

•   Model Setup
•   Append Drawings
     –   NavisWorks
           •   Clash Detection
•   Create Reports and Logs
•   Distribute Reports
     –   HTML Files
•   Distribute Navis File
     –   Saved Viewpoints included
•   Online Coordination Meetings
Communication: LA to Seattle

•   Model Setup
•   Append Drawings
     –   NavisWorks
           •   Clash Detection
•   Create Reports and Logs
•   Distribute Reports
     –   HTML Files
•   Distribute Navis File
     –   Saved Viewpoints included
•   Online Coordination Meetings
Communication: LA to Seattle

•   Model Setup
•   Append Drawings
     –   NavisWorks
           •   Clash Detection
•   Create Reports and Logs
•   Distribute Reports
     –   HTML Files
•   Distribute Navis File
     –   Saved Viewpoints included
•   Online Coordination Meetings
Communication: LA to Seattle

•   Model Setup
•   Append Drawings
     –   NavisWorks
           •   Clash Detection
•   Create Reports and Logs
•   Distribute Reports
     –   HTML Files
•   Distribute Navis File
     –   Saved Viewpoints included
•   Online Coordination Meetings
Communication: LA to Seattle

•   Model Setup
•   Append Drawings
     –   NavisWorks
           •   Clash Detection
•   Create Reports and Logs
•   Distribute Reports
     –   HTML Files
•   Distribute Navis File
     –   Saved Viewpoints included
•   Coordination Meetings
     –   Online vs. In Person
Further Applications of VD&C
Site Logistics



            2
1




3           4
Pedestrian & Vehicular Access
Hoisting
• Farmers Market
Delivery Access and Timing
Establish Preliminary Quantities
Assist with Schedule
ACC Window Shade Study



 Building With
   Shades




Building Without
    Shades
Trimble Total Station
Virtual Building->Virtual
             Management
• Model-Based benefits
  today:
  – 3D/4D -> DIGITAL
    ASSET
• Other benefits:
  – Operations
  – Energy Analysis
  – Safety/Maximized
    Efficiency
  – Facility Management
• Communication
Integrated Project Delivery

 A paradigm shift for the AEC industry that
                   requires:
• No Silos
• A mental Shift to New Ways of Relating
• Collaborative, Integrated, Partnered, Fluid


              Are you ready?
Q&A

Contenu connexe

Tendances

Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif
 
How BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectHow BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectJacob Ostwald
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction Marc Goldman
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for OwnersDLT Solutions
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...Ravindra SSK Medicharla
 
Safety implementation in BIM
Safety implementation in BIMSafety implementation in BIM
Safety implementation in BIMZain Juratli
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2Est
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 
BIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBuiltEnvironmentUBM
 
MOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction SolutionsMOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction Solutionscloudfusion
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryAWC|WEST
 
Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIMreem-yousef
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 

Tendances (20)

Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
How BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectHow BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction project
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
4D BIM : A New Change In the AEC Industry
4D BIM : A New Change In the AEC Industry4D BIM : A New Change In the AEC Industry
4D BIM : A New Change In the AEC Industry
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for Owners
 
BIM Report 3
BIM Report 3BIM Report 3
BIM Report 3
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...
 
Safety implementation in BIM
Safety implementation in BIMSafety implementation in BIM
Safety implementation in BIM
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
BIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journey
 
MOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction SolutionsMOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction Solutions
 
Bim
BimBim
Bim
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project Delivery
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIM
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 

En vedette

Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsRev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsArthur L. Finkle
 
BIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedBIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedThe NBS
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01saed saffarini
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
Jarmo Elukka Eskelinen a SCE 2012
Jarmo Elukka Eskelinen a SCE 2012Jarmo Elukka Eskelinen a SCE 2012
Jarmo Elukka Eskelinen a SCE 2012SmartCityExhibition
 
Coordination Challenges In Project Design, Funding And
Coordination Challenges In  Project  Design,  Funding AndCoordination Challenges In  Project  Design,  Funding And
Coordination Challenges In Project Design, Funding AndDavid Lambert Tumwesigye
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Helsingin kaupungin kehittäjätapaaminen CitySDK
Helsingin kaupungin kehittäjätapaaminen CitySDKHelsingin kaupungin kehittäjätapaaminen CitySDK
Helsingin kaupungin kehittäjätapaaminen CitySDKHelsinkiLovesDevelopers
 
Smart Cities, Smart Citizens and the case for the CitySDK
Smart Cities, Smart Citizens and the case for the CitySDKSmart Cities, Smart Citizens and the case for the CitySDK
Smart Cities, Smart Citizens and the case for the CitySDKFrank Kresin
 
3D and bim technology for construction safety morning section final version...
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...Stephen Au
 
BIM Bots (Summer 2016)
BIM Bots (Summer 2016)BIM Bots (Summer 2016)
BIM Bots (Summer 2016)Léon Berlo
 
CIB W78 - Collaborative engineering with IFC in the Netherlands
CIB W78 - Collaborative engineering with IFC in the NetherlandsCIB W78 - Collaborative engineering with IFC in the Netherlands
CIB W78 - Collaborative engineering with IFC in the NetherlandsLéon Berlo
 
Introducing Process mining in the AECFM
Introducing Process mining in the AECFMIntroducing Process mining in the AECFM
Introducing Process mining in the AECFMLéon Berlo
 
ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...
ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...
ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...European Network of Living Labs (ENoLL)
 
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...IanHallUK
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingDavid Tracy
 

En vedette (20)

Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsRev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
 
BIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedBIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually Sorted
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
 
How BIM Enhances the Design Process
How BIM Enhances the Design ProcessHow BIM Enhances the Design Process
How BIM Enhances the Design Process
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
Open innovation athene2
Open innovation athene2Open innovation athene2
Open innovation athene2
 
Jarmo Elukka Eskelinen a SCE 2012
Jarmo Elukka Eskelinen a SCE 2012Jarmo Elukka Eskelinen a SCE 2012
Jarmo Elukka Eskelinen a SCE 2012
 
Coordination Challenges In Project Design, Funding And
Coordination Challenges In  Project  Design,  Funding AndCoordination Challenges In  Project  Design,  Funding And
Coordination Challenges In Project Design, Funding And
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Helsingin kaupungin kehittäjätapaaminen CitySDK
Helsingin kaupungin kehittäjätapaaminen CitySDKHelsingin kaupungin kehittäjätapaaminen CitySDK
Helsingin kaupungin kehittäjätapaaminen CitySDK
 
Smart Cities, Smart Citizens and the case for the CitySDK
Smart Cities, Smart Citizens and the case for the CitySDKSmart Cities, Smart Citizens and the case for the CitySDK
Smart Cities, Smart Citizens and the case for the CitySDK
 
3D and bim technology for construction safety morning section final version...
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...
 
BIM Bots (Summer 2016)
BIM Bots (Summer 2016)BIM Bots (Summer 2016)
BIM Bots (Summer 2016)
 
BIM Bots
BIM BotsBIM Bots
BIM Bots
 
CIB W78 - Collaborative engineering with IFC in the Netherlands
CIB W78 - Collaborative engineering with IFC in the NetherlandsCIB W78 - Collaborative engineering with IFC in the Netherlands
CIB W78 - Collaborative engineering with IFC in the Netherlands
 
Introducing Process mining in the AECFM
Introducing Process mining in the AECFMIntroducing Process mining in the AECFM
Introducing Process mining in the AECFM
 
ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...
ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...
ENoLL introduction to the Open Innovation Ecosystems go really Local - Across...
 
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: AB, AS and BC pr...
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process Mapping
 

Similaire à 081204 Virtual Design & Construction

Barriers To Innovation
Barriers To InnovationBarriers To Innovation
Barriers To Innovationrdbms
 
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San Francisco
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San FranciscoTechnoStruct I MEP Design Engineering I BIM Consulting I LBE San Francisco
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San FranciscoTechnostruct LLC
 
City Clerk Demonstration 4 27 09
City Clerk  Demonstration 4 27 09City Clerk  Demonstration 4 27 09
City Clerk Demonstration 4 27 09dvickers2000
 
AVEVA World Conference NA - Patrick Reilly, Vista Projects
AVEVA World Conference NA - Patrick Reilly, Vista ProjectsAVEVA World Conference NA - Patrick Reilly, Vista Projects
AVEVA World Conference NA - Patrick Reilly, Vista ProjectsAVEVA-Americas
 
And ... A Single Solution
And ... A Single SolutionAnd ... A Single Solution
And ... A Single Solutioncalinbratu
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 
Gw Pres Agile 4slideshare
Gw Pres Agile 4slideshareGw Pres Agile 4slideshare
Gw Pres Agile 4slideshareDave Burke
 
Aec bim presentation
Aec bim presentationAec bim presentation
Aec bim presentationAnkur Sardana
 
.NET DEVELOPER
.NET DEVELOPER.NET DEVELOPER
.NET DEVELOPERvinaykeith
 
.NET DEVELOPER
.NET DEVELOPER.NET DEVELOPER
.NET DEVELOPERvinaykeith
 
Revit basic plumbing modeling
Revit basic plumbing modelingRevit basic plumbing modeling
Revit basic plumbing modelingNI BT
 
Chemionix: Engineering Design & CAD Drafting Outsourcing Company
Chemionix: Engineering Design & CAD Drafting Outsourcing CompanyChemionix: Engineering Design & CAD Drafting Outsourcing Company
Chemionix: Engineering Design & CAD Drafting Outsourcing Companychemionix
 
BIM modeling, Construction Design and Services
BIM modeling, Construction Design and Services	BIM modeling, Construction Design and Services
BIM modeling, Construction Design and Services Technostruct LLC
 

Similaire à 081204 Virtual Design & Construction (20)

Barriers To Innovation
Barriers To InnovationBarriers To Innovation
Barriers To Innovation
 
Hvac duct shop drawing services
Hvac duct shop drawing servicesHvac duct shop drawing services
Hvac duct shop drawing services
 
RobertGoldingResume
RobertGoldingResumeRobertGoldingResume
RobertGoldingResume
 
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San Francisco
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San FranciscoTechnoStruct I MEP Design Engineering I BIM Consulting I LBE San Francisco
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San Francisco
 
City Clerk Demonstration 4 27 09
City Clerk  Demonstration 4 27 09City Clerk  Demonstration 4 27 09
City Clerk Demonstration 4 27 09
 
AVEVA World Conference NA - Patrick Reilly, Vista Projects
AVEVA World Conference NA - Patrick Reilly, Vista ProjectsAVEVA World Conference NA - Patrick Reilly, Vista Projects
AVEVA World Conference NA - Patrick Reilly, Vista Projects
 
And ... A Single Solution
And ... A Single SolutionAnd ... A Single Solution
And ... A Single Solution
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
Gw Pres Agile 4slideshare
Gw Pres Agile 4slideshareGw Pres Agile 4slideshare
Gw Pres Agile 4slideshare
 
Aec bim presentation
Aec bim presentationAec bim presentation
Aec bim presentation
 
.NET DEVELOPER
.NET DEVELOPER.NET DEVELOPER
.NET DEVELOPER
 
AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)
 
ToddClapp
ToddClappToddClapp
ToddClapp
 
.NET DEVELOPER
.NET DEVELOPER.NET DEVELOPER
.NET DEVELOPER
 
Revit basic plumbing modeling
Revit basic plumbing modelingRevit basic plumbing modeling
Revit basic plumbing modeling
 
Chemionix: Engineering Design & CAD Drafting Outsourcing Company
Chemionix: Engineering Design & CAD Drafting Outsourcing CompanyChemionix: Engineering Design & CAD Drafting Outsourcing Company
Chemionix: Engineering Design & CAD Drafting Outsourcing Company
 
BIM modeling, Construction Design and Services
BIM modeling, Construction Design and Services	BIM modeling, Construction Design and Services
BIM modeling, Construction Design and Services
 
Introduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANTIntroduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANT
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
 
Introduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANTIntroduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANT
 

081204 Virtual Design & Construction

  • 1. Virtual Design & Construction Rocio Gonzalez VD&C Coordinator
  • 2. Virtual Design and Construction incorporates BIM or Building Information Modeling into the construction process. A paradigm shift for the AEC industry. It is the creation of intelligent product models that identify constructible elements or problems of a building which are shared among the different disciplines: Integrated Project Delivery. VD&C integrates design, engineering and construction operations.
  • 3.
  • 4. Team VD&C • 40people in 7 divisions trained in the Vico Constructor suite. • 45 people in 5 divisions trained in NavisWorks Jetstream. • SketchUp Training is available to anyone in Operations.
  • 5. Projects 75 VD&C modeled • projects. 33 used by • operations teams. 20.25 million • Virtual SQ FT Construction value • over $4.5 Billion.
  • 6. • Lodge Resort and Spa in Ritz Carlton North Lake Tahoe, California. • The complex includes two main structures connected by an underground pedestrian tunnel, with the main structure housing more than 170 hotel rooms, meeting spaces, an attached four-level parking structure and a 19,000-square-foot spa. • Several conflicts between steel framing and roofing were identified and solved before construction.
  • 7. Ritz Carlton at NorthStar Lake Tahoe
  • 8. Four Seasons Denver
  • 11. CHOC Proposal Orange County
  • 14. Valley View Hotel San Diego
  • 15. Valley View Hotel San Diego
  • 16. How is VD&C changing our industry …
  • 17. OWNER ARCHITECT IDEAS STRUCT MEP VD&C DESIGN SUB BUILD GC Fragmented Industry
  • 18. RFI Process RFI Architect RFI RFI G.C. Structural Eng.
  • 19. How to get the end result …
  • 20. VD&C Process Identify Project Goals Model Scope/Setup Obtain Digital Files VD&C Schedule Structural & Architectural Model Integrate Integrate RFIs & Submittals MEP Systems Clash MEP Systems Proceed with Architect’s Model Updates Approval Construction
  • 21. VD&C helps us … … manage the quality of design documents …better communicate constructability issues to the client, design team, and subcontractors …provide better service for our clients …provide new business services …detect constructability issues before reaching the site …provide full Integrated Project Delivery
  • 23.
  • 24.
  • 25. Neiman Marcus • Two VD&C Projects – First project in Los Angeles • High Success Rate – Positive outcome on coordination of lights – Lessen Amount of Material Waste: HVAC – Able to visualize conflicts beforehand • Owner insisted on having VD&C as part of Neiman Marcus Bellevue
  • 26. Neiman Marcus Topanga Woodland Hills, CA • ELS Architects & Cortland Morgan Architects • Two Stories High End Retail • 120,000 SF • Design-Bid-Build • $22 Million • July 2008
  • 27. Neiman Marcus Seattle Seattle, WA • SJW Architects & Designers • Three Stories High End Retail + Basement • 123,550 SF • Design-Bid-Build • $12.5 Million • June 26, 2009
  • 28. Project Goals • Find and resolve conflicts before construction • Coordinate more than 5,500 light fixtures – Lights took precedent over other trades • Manage Risk: Use the model to communicate conflicts and to generate better solutions through a collaborative effort. • Reduce number of RFIs and Response Latency
  • 29. VD&C Scope • Structure per plans and as built dwgs. • Reflected ceilings • Light fixtures layout and coordination • Interior & fire rated walls • MEPFP coordination • Model updates per Bulletins, RFIs, and Weekly Coordination Meetings • Pipe rack – Topanga • Cable tray • Plumbing
  • 30. Communication NM Topanga • Close to Main Office – Weekly coordination meetings on site NM Seattle • Go to Meeting – Weekly, online coordination meetings
  • 31. Topanga VD&C Model • Preparation of cut sheets through 3D model – Used in coordination meetings on site
  • 32. Bellevue VD&C Model • Representational modeling based on dimensions • 3D Coordination Meetings via online conferences
  • 33. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  • 34. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  • 35. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  • 36. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  • 37. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  • 38. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Coordination Meetings – Online vs. In Person
  • 40. Site Logistics 2 1 3 4
  • 46. ACC Window Shade Study Building With Shades Building Without Shades
  • 48. Virtual Building->Virtual Management • Model-Based benefits today: – 3D/4D -> DIGITAL ASSET • Other benefits: – Operations – Energy Analysis – Safety/Maximized Efficiency – Facility Management • Communication
  • 49. Integrated Project Delivery A paradigm shift for the AEC industry that requires: • No Silos • A mental Shift to New Ways of Relating • Collaborative, Integrated, Partnered, Fluid Are you ready?