Plant Start Up, Shutdown and Change Over Wally van Jaarsveld
OPERATE A PRODUCTION PROCESS Almost every food-processing factory would have machines and equipment  that processes and packages  the food produced  Therefore, before commencing this session you need to select a piece of machinery or equipment that plays a significant role in a production process and use it as a ‘model’ to provide evidence for  your competency
OPERATE A PRODUCTION PROCESS 1. Prepare the equipment and process for operation 2. Operate and monitor the process 3. Shut down the process
OPERATE A PRODUCTION PROCESS SECTION 1: PREPARING THE EQUIPMENT AND PROCESS FOR OPERATION Steps 1.1Confirming the availability of materials to meet operating requirements Steps 1.2Identifying and confirming cleaning and maintenance requirements and status Steps 1.3Fitting and adjusting machine components and related attachments to meet 		operating 	requirements Steps 1.4Entering processing/operating parameters as required to meet safety and 			production requirements Steps 1.5Checking and adjusting equipment performance as required Steps 1.6Carrying out pre-start checks as required by workplace requirements
Activity 1.1 List the variety of raw materials used in the process selected, and  briefly comment on how you go about checking their quality Activity 1.2 Briefly describe the cleaning and maintenance requirements for  the machine you selected
Activity 1.3 List the types of attachments used in the machine selected; if any. Activity 1.4 What parameters are important in the operation with which you are concerned?  List them with specifications  Activity 1.5 List  the types of checks you have to conduct to ensure that the selected machine  is performing as it should.
Activity 1.6 List  the types of checks you have to conduct before starting the selected machine  to ensure it is performing as it should
OPERATE A PRODUCTION PROCESS SECTION 2: OPERATING AND MONITORING THE PROCESS Step 2.1.	 Starting and operating the process according to workplace procedures Step 2.2. 	Monitoring equipment to identify variation in operating conditions Step 2.3.	Identifying variation in equipment operation and report maintenance 			requirements according to workplace reporting requirements Step 2.4. 	Monitoring the process to confirm that specifications are met Step 2.5.Identifying, rectifying and/or reporting out-of-specification product/process 			outcomes to maintain the process within specification Step 2.6. 	Ensuring the workplace meets housekeeping standards Step 2.7.Maintaining workplace records according to workplace recording 			requirements
Activity 2.1 Describe how you will ensure that the machine you selected has started and is operating correctly.  What do you look for to ensure that that is happening Activity 2.2 Briefly describe the way you monitor the operation of your machine and list the parameters you observe Activity 2.3 Briefly list the type of variations in the working conditions of your machine and describe  your workplace requirements as far as recording and reporting machine maintenance  operations are concerned.
Activity 2.4 What parameters are important in the production process with which you are concerned?  List them with specifications  Activity 2.5 Go back to the parameters listed previously and list how you rectify and/or report the  problem if it happens Activity 2.6 Describe the by-products of the operation that you are concerned with and the workplace  procedure for maintaining the working area in a clean and safe condition to continue working  while the production process is proceeding
Activity 2.7 List the types of records that you need to complete to comply with your workplace  reporting requirements
OPERATE A PRODUCTION PROCESS SECTION 3: SHUTTING DOWN THE PROCESS Step 3.1. 		Identifying the appropriate shut down procedure Step 3.2 		Shutting down the process according to workplace procedures Step 3.3. 		Identifying and reporting maintenance requirements according to  		workplace reporting requirements
Activity 3.1 and 3.2 With reference to the SOP or machine manual, describe and list in order, the steps taken to  shut down the machine selected.  Be as specific as the SOP suggests  Activity 3.3 What is your company’s procedure for reporting maintenance requirements?
PRODUCT CHANGEOVER
CHANGEOVER ACTIVITIES ,[object Object]
 Getting replacement parts
 Cooling down
 Mechanical modifications
 Calibrating, adjusting
 Heating up
 Putting tools away

More Related Content

What's hot

Information about ISO 9001:2015 Mandatory Documents
Information about ISO 9001:2015 Mandatory DocumentsInformation about ISO 9001:2015 Mandatory Documents
Information about ISO 9001:2015 Mandatory DocumentsGlobal Manager Group
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationGlobal Manager Group
 
Iatf 16949 training
Iatf 16949 trainingIatf 16949 training
Iatf 16949 trainingdishashah4993
 
IATF 16949 Certification in India
IATF 16949 Certification in India IATF 16949 Certification in India
IATF 16949 Certification in India URS Certifications
 
ISO 17065 Documents by Global Manager Group
ISO 17065 Documents by Global Manager Group ISO 17065 Documents by Global Manager Group
ISO 17065 Documents by Global Manager Group Global Manager Group
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485WQA APAC
 
10. quality and iso 9000
10. quality and iso 900010. quality and iso 9000
10. quality and iso 9000Akash Bakshi
 
Awareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standardAwareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standardAmit Mishra
 
IATF PPT K-10655
IATF PPT K-10655IATF PPT K-10655
IATF PPT K-10655Hariom Rathore
 
As9100 quality management system
As9100 quality management systemAs9100 quality management system
As9100 quality management systemselinasimpson331
 
Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02darkanimie
 
ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure Ramona Kellner
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016Toyo Gustaman
 
Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000Omnex Inc.
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949Pavan Patil
 

What's hot (20)

Error Proofing with Barcodes
Error Proofing with BarcodesError Proofing with Barcodes
Error Proofing with Barcodes
 
Information about ISO 9001:2015 Mandatory Documents
Information about ISO 9001:2015 Mandatory DocumentsInformation about ISO 9001:2015 Mandatory Documents
Information about ISO 9001:2015 Mandatory Documents
 
Iso90011
Iso90011Iso90011
Iso90011
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 Documentation
 
Iatf 16949 training
Iatf 16949 trainingIatf 16949 training
Iatf 16949 training
 
ISO 9001:2015
ISO 9001:2015ISO 9001:2015
ISO 9001:2015
 
IATF 16949 Certification in India
IATF 16949 Certification in India IATF 16949 Certification in India
IATF 16949 Certification in India
 
ISO 17065 Documents by Global Manager Group
ISO 17065 Documents by Global Manager Group ISO 17065 Documents by Global Manager Group
ISO 17065 Documents by Global Manager Group
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485
 
10. quality and iso 9000
10. quality and iso 900010. quality and iso 9000
10. quality and iso 9000
 
Awareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standardAwareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standard
 
IATF PPT K-10655
IATF PPT K-10655IATF PPT K-10655
IATF PPT K-10655
 
As9100 quality management system
As9100 quality management systemAs9100 quality management system
As9100 quality management system
 
SOPs
SOPsSOPs
SOPs
 
Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02Introductiontoiso9001presentationsample 120206213450-phpapp02
Introductiontoiso9001presentationsample 120206213450-phpapp02
 
As9100c
As9100cAs9100c
As9100c
 
ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016
 
Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949
 

Viewers also liked

Equipment selection (RAC)
Equipment selection (RAC)Equipment selection (RAC)
Equipment selection (RAC)Konal Singh
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering fieldswetha110
 
Hydrology and Water Resources Engineering
Hydrology and Water Resources EngineeringHydrology and Water Resources Engineering
Hydrology and Water Resources EngineeringGAURAV. H .TANDON
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 

Viewers also liked (6)

Equipment selection (RAC)
Equipment selection (RAC)Equipment selection (RAC)
Equipment selection (RAC)
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering field
 
Hydrology and Water Resources Engineering
Hydrology and Water Resources EngineeringHydrology and Water Resources Engineering
Hydrology and Water Resources Engineering
 
Compressor
CompressorCompressor
Compressor
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 

Similar to Plant start presentation

SMED - 6.pptx.pptx
SMED - 6.pptx.pptxSMED - 6.pptx.pptx
SMED - 6.pptx.pptxssuser820b7a
 
Validation of equipments
Validation of equipmentsValidation of equipments
Validation of equipmentssuhasini
 
01.06 l2-calibrate process-variable_recorders
01.06 l2-calibrate process-variable_recorders01.06 l2-calibrate process-variable_recorders
01.06 l2-calibrate process-variable_recordersolam666
 
GM PaxGo Series Duplex Packing Scale 25KG/50KG
GM PaxGo Series Duplex Packing Scale 25KG/50KGGM PaxGo Series Duplex Packing Scale 25KG/50KG
GM PaxGo Series Duplex Packing Scale 25KG/50KGGeneral Measure
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.KhushbooKunkulol
 
AF-5K Packing filler Operating instruction.pdf
AF-5K Packing filler Operating instruction.pdfAF-5K Packing filler Operating instruction.pdf
AF-5K Packing filler Operating instruction.pdfGeneral Measure
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of DiesMd. Nazmul Hasan Dipu
 
AF-25K 50K Packing Filler Operating instruction.pdf
AF-25K 50K Packing Filler Operating instruction.pdfAF-25K 50K Packing Filler Operating instruction.pdf
AF-25K 50K Packing Filler Operating instruction.pdfGeneral Measure
 
Production planning
Production planningProduction planning
Production planningDavid Jaison
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 
John Paulo S. Mallorca 1
John Paulo S. Mallorca 1John Paulo S. Mallorca 1
John Paulo S. Mallorca 1John Mallorca
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validationaqsa fatima
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Sanathoiba Singha
 
Lean Bski Essentials
Lean Bski EssentialsLean Bski Essentials
Lean Bski Essentialsbstawski
 
Hoi thao san xuat thong minh_Wonderware MES.pptx
Hoi thao san xuat thong minh_Wonderware MES.pptxHoi thao san xuat thong minh_Wonderware MES.pptx
Hoi thao san xuat thong minh_Wonderware MES.pptxNgcThinNguyn10
 
Validation utility system
Validation utility systemValidation utility system
Validation utility systemPRANJAY PATIL
 
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)Dr. V.N. Tikku
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.AKunal Roy
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Malla Reddy College of Pharmacy
 

Similar to Plant start presentation (20)

SMED - 6.pptx.pptx
SMED - 6.pptx.pptxSMED - 6.pptx.pptx
SMED - 6.pptx.pptx
 
Validation of equipments
Validation of equipmentsValidation of equipments
Validation of equipments
 
01.06 l2-calibrate process-variable_recorders
01.06 l2-calibrate process-variable_recorders01.06 l2-calibrate process-variable_recorders
01.06 l2-calibrate process-variable_recorders
 
GM PaxGo Series Duplex Packing Scale 25KG/50KG
GM PaxGo Series Duplex Packing Scale 25KG/50KGGM PaxGo Series Duplex Packing Scale 25KG/50KG
GM PaxGo Series Duplex Packing Scale 25KG/50KG
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
 
AF-5K Packing filler Operating instruction.pdf
AF-5K Packing filler Operating instruction.pdfAF-5K Packing filler Operating instruction.pdf
AF-5K Packing filler Operating instruction.pdf
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
AF-25K 50K Packing Filler Operating instruction.pdf
AF-25K 50K Packing Filler Operating instruction.pdfAF-25K 50K Packing Filler Operating instruction.pdf
AF-25K 50K Packing Filler Operating instruction.pdf
 
Production planning
Production planningProduction planning
Production planning
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
John Paulo S. Mallorca 1
John Paulo S. Mallorca 1John Paulo S. Mallorca 1
John Paulo S. Mallorca 1
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validation
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation'
 
Lean Bski Essentials
Lean Bski EssentialsLean Bski Essentials
Lean Bski Essentials
 
IQ-OQ-PQ-for-FBD.pptx
IQ-OQ-PQ-for-FBD.pptxIQ-OQ-PQ-for-FBD.pptx
IQ-OQ-PQ-for-FBD.pptx
 
Hoi thao san xuat thong minh_Wonderware MES.pptx
Hoi thao san xuat thong minh_Wonderware MES.pptxHoi thao san xuat thong minh_Wonderware MES.pptx
Hoi thao san xuat thong minh_Wonderware MES.pptx
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.A
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 

Recently uploaded

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Recently uploaded (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 

Plant start presentation

  • 1. Plant Start Up, Shutdown and Change Over Wally van Jaarsveld
  • 2. OPERATE A PRODUCTION PROCESS Almost every food-processing factory would have machines and equipment that processes and packages the food produced Therefore, before commencing this session you need to select a piece of machinery or equipment that plays a significant role in a production process and use it as a ‘model’ to provide evidence for your competency
  • 3. OPERATE A PRODUCTION PROCESS 1. Prepare the equipment and process for operation 2. Operate and monitor the process 3. Shut down the process
  • 4. OPERATE A PRODUCTION PROCESS SECTION 1: PREPARING THE EQUIPMENT AND PROCESS FOR OPERATION Steps 1.1Confirming the availability of materials to meet operating requirements Steps 1.2Identifying and confirming cleaning and maintenance requirements and status Steps 1.3Fitting and adjusting machine components and related attachments to meet operating requirements Steps 1.4Entering processing/operating parameters as required to meet safety and production requirements Steps 1.5Checking and adjusting equipment performance as required Steps 1.6Carrying out pre-start checks as required by workplace requirements
  • 5. Activity 1.1 List the variety of raw materials used in the process selected, and briefly comment on how you go about checking their quality Activity 1.2 Briefly describe the cleaning and maintenance requirements for the machine you selected
  • 6. Activity 1.3 List the types of attachments used in the machine selected; if any. Activity 1.4 What parameters are important in the operation with which you are concerned? List them with specifications Activity 1.5 List the types of checks you have to conduct to ensure that the selected machine is performing as it should.
  • 7. Activity 1.6 List the types of checks you have to conduct before starting the selected machine to ensure it is performing as it should
  • 8. OPERATE A PRODUCTION PROCESS SECTION 2: OPERATING AND MONITORING THE PROCESS Step 2.1. Starting and operating the process according to workplace procedures Step 2.2. Monitoring equipment to identify variation in operating conditions Step 2.3. Identifying variation in equipment operation and report maintenance requirements according to workplace reporting requirements Step 2.4. Monitoring the process to confirm that specifications are met Step 2.5.Identifying, rectifying and/or reporting out-of-specification product/process outcomes to maintain the process within specification Step 2.6. Ensuring the workplace meets housekeeping standards Step 2.7.Maintaining workplace records according to workplace recording requirements
  • 9. Activity 2.1 Describe how you will ensure that the machine you selected has started and is operating correctly. What do you look for to ensure that that is happening Activity 2.2 Briefly describe the way you monitor the operation of your machine and list the parameters you observe Activity 2.3 Briefly list the type of variations in the working conditions of your machine and describe your workplace requirements as far as recording and reporting machine maintenance operations are concerned.
  • 10. Activity 2.4 What parameters are important in the production process with which you are concerned? List them with specifications Activity 2.5 Go back to the parameters listed previously and list how you rectify and/or report the problem if it happens Activity 2.6 Describe the by-products of the operation that you are concerned with and the workplace procedure for maintaining the working area in a clean and safe condition to continue working while the production process is proceeding
  • 11. Activity 2.7 List the types of records that you need to complete to comply with your workplace reporting requirements
  • 12. OPERATE A PRODUCTION PROCESS SECTION 3: SHUTTING DOWN THE PROCESS Step 3.1. Identifying the appropriate shut down procedure Step 3.2 Shutting down the process according to workplace procedures Step 3.3. Identifying and reporting maintenance requirements according to workplace reporting requirements
  • 13. Activity 3.1 and 3.2 With reference to the SOP or machine manual, describe and list in order, the steps taken to shut down the machine selected. Be as specific as the SOP suggests Activity 3.3 What is your company’s procedure for reporting maintenance requirements?
  • 14.
  • 16.
  • 23. Getting back to process conditions
  • 24.
  • 25. Setup
  • 26.
  • 27. GONE IN 14 SECONDS
  • 28.
  • 29. Allow faster production cycles
  • 30. Faster cycles increase production flexibility
  • 31.
  • 34. Proper tools + special tools
  • 37. Measure and track each changeover
  • 38.
  • 39. Makes the operation less flexible, less responsive