Nowlan and Heap Study stated…
“…Without a precise definition of what
 condition represents a failure, there is no
 way to assess its consequences or to define
 the physical evidence for which to inspect.
 The term failure must, in fact, be given a far
 more explicit definition than “an inability to
 function” in order to clarify the basis of
 Reliability-Centered Maintenance.”




                                       Copyright 2009 GPAllied©
Nowlan and Heap Study further stated…

“…A failure is an unsatisfactory condition. In
 other words, a failure is an identifiable
 deviation from the original condition which is
 unsatisfactory to a particular user.”




                                      Copyright 2009 GPAllied©
What is a Failure?
 • “A functional failure is the inability of an item
   (or the equipment containing it) to meet a
   specified performance standard and is
   usually identified by an operator”.




                                          Copyright 2009 GPAllied©
What is a Failure?
 • “A potential failure is an identifiable physical
   condition which indicates a functional failure
   is imminent and is usually identified by a
   Maintenance Technician using predictive or
   quantitative preventive maintenance”




                                          Copyright 2009 GPAllied©
Potential Failures




                     Copyright 2009 GPAllied©
Functional Failure




                     Copyright 2009 GPAllied©
Our Goal




           Copyright 2009 GPAllied©
Where do you start? With Baby Steps
Begin Measuring MTBF
- Of you total operation
- By area
- By asset

Calculation: Time / Number of Failures

Example: 24 hours / 3 failures = MTBF of 8



                                      Copyright 2009 GPAllied©
How many can Measure MTBF?
• Send me your report please

• What are the barriers?




                               Copyright 2009 GPAllied©
Let’s define Roles and Responsibilities


                    Maintenance   Maintenance   Maintenance   Maintenance   Reliability   PdM
Tasks               Supervisors   Planner       Technician    Manager       Engineer      Technician

Inputting Failure        A              I           R                            C            C
Data -
CMMS/EAM
Work Order               R              C           R             A              R            R
Close Out
Validating               C              I           C             A              R            C
Failure Data and
Codes
QA of Failure            I              C                         A              R            C
Data Input
Analyze Failure          R              I           C             R            A/R            R
Reports
Making                   I              I            I            A              R            C
Maintenance
Strategy
Adjustments
                       Responsibility               “the Doer”
                       Accountable                  “the Buck stops here
                       Consulted                    “in the Loop”
                       Informed                     “kept in the picture”


                                                                               Copyright 2009 GPAllied©
The next step
• Define your failure reports (outputs)
   – Dominant Failure Pattern?




      • Causes of Infant Mortality?
         – Lack of Lubrication
         – Bolts not torque to specifications
         – Electrical connections RTF (run to failure)




                                                         Copyright 2009 GPAllied©
Next Steps
• Develop a Process which delivers the Report
  you want.
   – Dominant Failure Pattern




                                     Copyright 2009 GPAllied©
Other Reports
• % of Assets with No Identifiable Defect




• Failure Rate for Specific Components
                                                   Drive Belt-Broken-Ageing Failure Rate

                       0.0010696

                                                                                                                             2-parameter
                                                                                                                             Weibull
                      0.00096266                                                                                             Median rank


                                                                                                                             η: 5212
                       0.0008557
                                                                                                                             β: 3.745
                                                                                                                             γ: 0
                      0.00074874
                                                                                                                             ρ: 0.9781
                                                                                                                             ε: 0.05664
                      0.00064178
       Failure Rate




                                                                                                                             B10: 2858
                      0.00053481                                                                                             B15: 3208
                                                                                                                             B20: 3492

                      0.00042785
                                                                                                                             P0: 0%


                      0.00032089
                                                                                                                             Distribution rate
                                                                                                                             Reg ionalised rate

                      0.00021393



                      0.00010696



                               0
                                   0   602.49   1205   1807.5   2410   3012.5   3614.9   4217.4   4819.9   5422.4   6024.9

                                                                       Time




                                                                                                                                                  Copyright 2009 GPAllied©
Comments
“ Like the tortoise - slow and steady wins the
  race!”
  Kim Hunt – Reliability Leader / Domtar




                                       Copyright 2009 GPAllied©
What are your next steps?
• ???




                            Copyright 2009 GPAllied©
Recommendation
• Measure MTBF
• Educate your leaders and followers
  – If you want a private session, let me know
• Join me a Reliability 2.0 Conference in April.
http://maintenanceconference.com/reliability/




                                            Copyright 2009 GPAllied©

Contenu connexe

En vedette

Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3ASQ Reliability Division
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Ricky Smith CMRP, CMRT
 
Fundamentals of reliability engineering and applications part3of3
Fundamentals of reliability engineering and applications part3of3Fundamentals of reliability engineering and applications part3of3
Fundamentals of reliability engineering and applications part3of3ASQ Reliability Division
 
Predicting product life using reliability analysis methods
Predicting product life using reliability analysis methodsPredicting product life using reliability analysis methods
Predicting product life using reliability analysis methodsASQ Reliability Division
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3ASQ Reliability Division
 

En vedette (9)

Thermodynamic Reliability
Thermodynamic  ReliabilityThermodynamic  Reliability
Thermodynamic Reliability
 
Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3Fundamentals of reliability engineering and applications part2of3
Fundamentals of reliability engineering and applications part2of3
 
An introduction to weibull analysis
An introduction to weibull analysisAn introduction to weibull analysis
An introduction to weibull analysis
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System
 
Fundamentals of reliability engineering and applications part3of3
Fundamentals of reliability engineering and applications part3of3Fundamentals of reliability engineering and applications part3of3
Fundamentals of reliability engineering and applications part3of3
 
Predicting product life using reliability analysis methods
Predicting product life using reliability analysis methodsPredicting product life using reliability analysis methods
Predicting product life using reliability analysis methods
 
On Duty Cycle Concept in Reliability
On Duty Cycle Concept in ReliabilityOn Duty Cycle Concept in Reliability
On Duty Cycle Concept in Reliability
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3
 
overview of reliability engineering
overview of reliability engineeringoverview of reliability engineering
overview of reliability engineering
 

Similaire à Failure Reporting Webex Slides - March 9, 2010

Worked examples tqm
Worked examples tqmWorked examples tqm
Worked examples tqmSameer Alam
 
Studying the impact of dependency network measures on software quality
Studying the impact of dependency network measures on software quality	Studying the impact of dependency network measures on software quality
Studying the impact of dependency network measures on software quality ICSM 2010
 
Web site msa presentation gauge error
Web site msa presentation   gauge errorWeb site msa presentation   gauge error
Web site msa presentation gauge errormartinbusiness
 
Social Media Strategy
 Social Media Strategy Social Media Strategy
Social Media StrategyVishal Sharma
 
energy future holindings 080205
energy future holindings 080205energy future holindings 080205
energy future holindings 080205finance29
 
energy future holindings _080205
energy future holindings _080205energy future holindings _080205
energy future holindings _080205finance29
 
Presentation on Q1 2009 Earning Report of Ebay Inc.
Presentation on Q1 2009 Earning Report of Ebay Inc.Presentation on Q1 2009 Earning Report of Ebay Inc.
Presentation on Q1 2009 Earning Report of Ebay Inc.earningreport earningreport
 
eBay 2009q1 Earnings Slides
eBay 2009q1 Earnings SlideseBay 2009q1 Earnings Slides
eBay 2009q1 Earnings SlidesPhil Wolff
 
Six Sigma seminar by Nehall
Six Sigma seminar by NehallSix Sigma seminar by Nehall
Six Sigma seminar by NehallNehal Dixit
 
Reaching for yield
Reaching for yieldReaching for yield
Reaching for yieldYichuan Wang
 
Vale Q4 2012 results presentation
Vale Q4 2012 results presentationVale Q4 2012 results presentation
Vale Q4 2012 results presentationTradeWindsnews
 
ameren IP_0507
ameren IP_0507ameren IP_0507
ameren IP_0507finance30
 
energy future holindings _020205
energy future holindings _020205energy future holindings _020205
energy future holindings _020205finance29
 
energy future holindings _020205
energy future holindings _020205energy future holindings _020205
energy future holindings _020205finance29
 
6 Prudential's "Inside Our Best Ideas" Conference
6	Prudential's "Inside Our Best Ideas" Conference6	Prudential's "Inside Our Best Ideas" Conference
6 Prudential's "Inside Our Best Ideas" Conferencefinance10
 
Supply Chain Vendor Management Success Storyborad
Supply Chain Vendor Management Success  StoryboradSupply Chain Vendor Management Success  Storyborad
Supply Chain Vendor Management Success Storyboradyuvrajgill
 

Similaire à Failure Reporting Webex Slides - March 9, 2010 (20)

Carina Bark
Carina BarkCarina Bark
Carina Bark
 
Worked examples tqm
Worked examples tqmWorked examples tqm
Worked examples tqm
 
Studying the impact of dependency network measures on software quality
Studying the impact of dependency network measures on software quality	Studying the impact of dependency network measures on software quality
Studying the impact of dependency network measures on software quality
 
Business Transformation through IT Agility
Business Transformation through IT AgilityBusiness Transformation through IT Agility
Business Transformation through IT Agility
 
Web site msa presentation gauge error
Web site msa presentation   gauge errorWeb site msa presentation   gauge error
Web site msa presentation gauge error
 
Social Media Strategy
 Social Media Strategy Social Media Strategy
Social Media Strategy
 
energy future holindings 080205
energy future holindings 080205energy future holindings 080205
energy future holindings 080205
 
energy future holindings _080205
energy future holindings _080205energy future holindings _080205
energy future holindings _080205
 
Presentation on Q1 2009 Earning Report of Ebay Inc.
Presentation on Q1 2009 Earning Report of Ebay Inc.Presentation on Q1 2009 Earning Report of Ebay Inc.
Presentation on Q1 2009 Earning Report of Ebay Inc.
 
eBay 2009q1 Earnings Slides
eBay 2009q1 Earnings SlideseBay 2009q1 Earnings Slides
eBay 2009q1 Earnings Slides
 
Six Sigma seminar by Nehall
Six Sigma seminar by NehallSix Sigma seminar by Nehall
Six Sigma seminar by Nehall
 
Reaching for yield
Reaching for yieldReaching for yield
Reaching for yield
 
Vale Q4 2012 results presentation
Vale Q4 2012 results presentationVale Q4 2012 results presentation
Vale Q4 2012 results presentation
 
Q1 2009 Earning Report of Kansas City Southern
Q1 2009 Earning Report of Kansas City SouthernQ1 2009 Earning Report of Kansas City Southern
Q1 2009 Earning Report of Kansas City Southern
 
ameren IP_0507
ameren IP_0507ameren IP_0507
ameren IP_0507
 
energy future holindings _020205
energy future holindings _020205energy future holindings _020205
energy future holindings _020205
 
energy future holindings _020205
energy future holindings _020205energy future holindings _020205
energy future holindings _020205
 
6 Prudential's "Inside Our Best Ideas" Conference
6	Prudential's "Inside Our Best Ideas" Conference6	Prudential's "Inside Our Best Ideas" Conference
6 Prudential's "Inside Our Best Ideas" Conference
 
Bpo Slides
Bpo SlidesBpo Slides
Bpo Slides
 
Supply Chain Vendor Management Success Storyborad
Supply Chain Vendor Management Success  StoryboradSupply Chain Vendor Management Success  Storyborad
Supply Chain Vendor Management Success Storyborad
 

Plus de Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 

Plus de Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 

Failure Reporting Webex Slides - March 9, 2010

  • 1. Failure Reporting, Analysis, Corrective Action System “FRACAS” Presented by: Ricky Smith, CMRP March 9, 2010 Copyright 2009 GPAllied©
  • 2. Nowlan and Heap Study stated… “…Without a precise definition of what condition represents a failure, there is no way to assess its consequences or to define the physical evidence for which to inspect. The term failure must, in fact, be given a far more explicit definition than “an inability to function” in order to clarify the basis of Reliability-Centered Maintenance.” Copyright 2009 GPAllied©
  • 3. Nowlan and Heap Study further stated… “…A failure is an unsatisfactory condition. In other words, a failure is an identifiable deviation from the original condition which is unsatisfactory to a particular user.” Copyright 2009 GPAllied©
  • 4. What is a Failure? • “A functional failure is the inability of an item (or the equipment containing it) to meet a specified performance standard and is usually identified by an operator”. Copyright 2009 GPAllied©
  • 5. What is a Failure? • “A potential failure is an identifiable physical condition which indicates a functional failure is imminent and is usually identified by a Maintenance Technician using predictive or quantitative preventive maintenance” Copyright 2009 GPAllied©
  • 6. Potential Failures Copyright 2009 GPAllied©
  • 7. Functional Failure Copyright 2009 GPAllied©
  • 8. Our Goal Copyright 2009 GPAllied©
  • 9. Where do you start? With Baby Steps Begin Measuring MTBF - Of you total operation - By area - By asset Calculation: Time / Number of Failures Example: 24 hours / 3 failures = MTBF of 8 Copyright 2009 GPAllied©
  • 10. How many can Measure MTBF? • Send me your report please • What are the barriers? Copyright 2009 GPAllied©
  • 11. Let’s define Roles and Responsibilities Maintenance Maintenance Maintenance Maintenance Reliability PdM Tasks Supervisors Planner Technician Manager Engineer Technician Inputting Failure A I R C C Data - CMMS/EAM Work Order R C R A R R Close Out Validating C I C A R C Failure Data and Codes QA of Failure I C A R C Data Input Analyze Failure R I C R A/R R Reports Making I I I A R C Maintenance Strategy Adjustments Responsibility “the Doer” Accountable “the Buck stops here Consulted “in the Loop” Informed “kept in the picture” Copyright 2009 GPAllied©
  • 12. The next step • Define your failure reports (outputs) – Dominant Failure Pattern? • Causes of Infant Mortality? – Lack of Lubrication – Bolts not torque to specifications – Electrical connections RTF (run to failure) Copyright 2009 GPAllied©
  • 13. Next Steps • Develop a Process which delivers the Report you want. – Dominant Failure Pattern Copyright 2009 GPAllied©
  • 14. Other Reports • % of Assets with No Identifiable Defect • Failure Rate for Specific Components Drive Belt-Broken-Ageing Failure Rate 0.0010696 2-parameter Weibull 0.00096266 Median rank η: 5212 0.0008557 β: 3.745 γ: 0 0.00074874 ρ: 0.9781 ε: 0.05664 0.00064178 Failure Rate B10: 2858 0.00053481 B15: 3208 B20: 3492 0.00042785 P0: 0% 0.00032089 Distribution rate Reg ionalised rate 0.00021393 0.00010696 0 0 602.49 1205 1807.5 2410 3012.5 3614.9 4217.4 4819.9 5422.4 6024.9 Time Copyright 2009 GPAllied©
  • 15. Comments “ Like the tortoise - slow and steady wins the race!” Kim Hunt – Reliability Leader / Domtar Copyright 2009 GPAllied©
  • 16. What are your next steps? • ??? Copyright 2009 GPAllied©