SlideShare a Scribd company logo
1 of 32
Download to read offline
Container Habitats
exploring housing alternatives using retired intermodal containers




                      P.O. BOX 1502  MONTCLAIR, NJ 07042-9998
                 877.317.7275  973.746.1076 www.comloc.com 
Table of Contents


Intermodal Container Repositioning................................................................1

Cycle of Container Handling .............................................................................3

Factory-built Housing: Modular..........................................................................5

Housing Demand: Domestic & International ............................................. 11

Alternative Use for Intermodal Containers: Habitats............................... 15

Create the Prototype........................................................................................ 18

A Sea of Boxes..................................................................................................... 19

Housing the Earth’s People.............................................................................. 20

Building the Homes of the 21st Century in Factories ................................. 22

Affordability.......................................................................................................... 23

Building Systems .................................................................................................. 23

Containers ............................................................................................................ 24

Demand................................................................................................................ 24

Design .................................................................................................................... 25

Annualized Estimates............................................................................................1

Market Potential Indicators for Emerging Markets – 2004..........................2




                                                                                                             2
Chapter

    1
Background
 Intermodal Container Repositioning



               It is estimated that the global container population is approaching 16m TEU,
               with a projected rate of growth of 8.5% per year for the next 10 years, and
               there are approximately 2.5+m TEU empty boxes currently sitting idle in yards
               and depots around the world.



In the eyes of port operators, shippers and carries, the number of empty boxes sitting at the
terminal should ideally be nil or very few. Given the fact that empty boxes have to go
somewhere, storage and repair depots represent an essential ingredient in containerization.
Storing containers is land-intensive, suffers from poor environmental credentials in terms of
unsightly piles of containers, noise and road vehicle traffic and it never is a business place with
high levels of profitability. As ports have expanded and residential areas behind the ports
have gobbled up more land for housing, storing empty containers is becoming an
increasingly serious problem all around the world, requiring special attention.

According to a New Jersey Department of Environmental Protection study of Brownfields,
“Container mountains” have become a prominent feature of the port district skyline. These
are the stacks of hundreds of empty containers, up to seven high, which have been created
on large swaths of land near the port. This study estimates that 400 acres are now devoted to
long-term storage of containers.

Terminal operators have contracted with third parties to move the empties from the terminal
areas to offsite storage locations. The practice has provoked opposition from communities,
which find themselves home to huge, ugly stacks of metal that dominate the landscape and
fill properties that otherwise might be redeveloped for more productive uses. Not surprisingly,
the mountains have strengthened local opposition to any and all freight related
development, which officials fear will only attract more trucks and more containers storage. In
the case of new Jersey, the NJDEP project team found evidence that the continuing build up
of empty containers at the port was indeed crowding out other types of development.

Because of the growing demand for land, container companies can offer property owners
an immediate revenue stream, leaving the owners free to sell or redevelop their properties at
a future date if more lucrative offers arise.
This container storage leaves the land undeveloped for higher economic uses that would
benefit the local community and region. For instance, one property owner was offered $3,000
per acre per month for a 10-year lease on 13 acres. The site is in a prime location where a
developer has offered to build a 330,000- square-foot warehouse, pending environmental
clearance to proceed. For the landowner, a 10-year revenue stream is an attractive
proposition compared to continuing to deal with the onerous requirements of site clean up.

However, it means that needed redevelopment of properties is being stymied, removing the
potential for jobs and tax ratables. It also has made the entire port districts less attractive to
some developers who are wary of having such mountains as long-term neighbors. While some
container storage in and around ports is inevitable, the current levels of storage appears
harmful to prospects for realizing and sustaining increased trade.

The current global imbalance of trade is reflected by the following charts:




Source: UNCTAD, Review of Maritime Transport.

Containerized Cargo Flows along Major Trade Routes, 2000-2003 (in millions of TEUs)

Container flows are quite representative of global trade imbalances. For instance there are 2.5
times as much containers moving from Asia to the United States (10.2 million TEUs in 2003) than
there are from the United States to Asia




                                                 2
In 1,000 TEU’s, Source: UNCTAD, Review of Maritime Transport,
US Containerized Trade with Asia, 1996-2003

The trade balance of the United States with several countries of the Pacific is chronically
imbalanced, notably with China. This trend has implications on the movements of containers as
well as on transport costs. As of 2003, the ratio was 2.48 TEUs moving east for each TEU moving west
(this figure was 1.19 to 1 in 1996 and 1.73 in 2000). The Asian crisis exacerbated imbalances in
transpacific containerized shipping, mostly due to currency fluctuations. In addition, the costs of
moving a container from East Asia to the United States have been reduced by 50% during the
1990s, but due to trade imbalances Asian exporters pay on average 50% more in container
shipping costs than their American counterparts.


Cycle of Container Handling

Empty container trips occur for various reasons, including conditions of business agreements
between shippers/consignees and the ocean carriers (who are generally the owner or
supplier of shipping containers) that require all containers to be picked up and returned to
container yards (CY) at the carrier’s terminal, regardless of whether they are loaded or
empty. Basically, for inbound and outbound cargo, loaded containers are picked up by
trucking companies from the carrier’s terminal and are delivered to the consignee for
unloading.

They are then returned to the carrier’s terminal, usually by the same trucking company. The
same practice is in place for outbound cargo. Trucking companies pick up empty containers
required by an exporter from a carrier’s terminal and deliver these empty containers to the
exporter for loading. After a container has been loaded, a trucking company will transport
the loaded container to the carrier’s terminal where it will be stacked at the pier prior to
loading on to a container ship. It is clear that, in the case of both export and import cargo, at
least two-thirds of the required truck trips involve empty container movements, either for
empty pickup or empty return.

For port operators, empty container problems will worsen as terminal land availability grows
scarce. Empty containers are often allowed a longer dwell time at marine terminals
(anywhere from 14 to 50 days), and the current practice of local terminal operators is to store
containers, especially imports, on a wheeled chassis instead of in grounded stacks of
containers, as is the common practice of terminals in Asia and Europe.


                                                   3
According to the Gateway Cities study (Ports of Long Beach and Los Angeles
               region), “empty containers move back and forth because, at present, there is
               no alternative.”



The current practice—the manner in which empty containers are distributed and re-
located—has developed over the past few decades along with the growth of international
trade and containerization, and as an integral part of a competitive market environment that
has encouraged ocean carriers to search for all possible solutions to reduce such non-
revenue generating activities as repositioning empty containers.

The reuse of empty containers for local export is considered to be a potential solution for
rationalizing the movement of empty containers and thereby reducing unnecessary empty
trips. Reuse of empty containers is the direct reuse of import empty containers for local export
cargo without an intermediate return of the empty to the marine terminal.

However, the current practice that requires all empty import containers to return to marine
terminals whether empty or loaded is inefficient. There are number of practical reasons for this
practice. Firstly, all carriers have their own container yard located at the terminal, making it
impractical for them to duplicate operating costs for facilities and personnel at inland
container depots.

Building more inland depots involves greater investments in capital and operating funds, and
additionally, it creates a more complicated system for controlling their inventory operation.
Secondly, except for leased containers, which can be off-hired in the local region when not
needed, to keep an adequate supply of containers for their operations worldwide, the same
number of containers brought into the U.S. must be relocated back to Asia, regardless of their
being empty or loaded.

Due to the relative lack of local export cargo, most import containers are shipped back
empty. Thus, it is better off for carriers to have these containers returned to marine terminals for
their earliest possible repositioning to the area of relative shortage. On the other hand, with
leased containers, there are number of designated locations established by container leasing
companies to receive off-hired containers. In current practice, off-hired empty container
movements are often more flexible than those of carrier-owned empty containers.



                                                 4
Factory-built Housing: Modular


               By 2010, home design and construction is efficient, predictable, and
               controllable with a median cycle time of 20 working days from
               groundbreaking to occupancy with resulting cost savings that make
               homeownership available to 90 percent of the population.

               This will be achieved through improving the whole house design and the
               manner in which a house is constructed using new and innovative products,
               systems, and processes.




ABOUT THE MANUFACTURED HOME INDUSTRY

New homes can be and often are built partly or almost entirely in factories rather than on site.
Factory construction offers many opportunities for economizing and increasing efficiency in
the production process modeled after experience gained in other industrialized sectors of the
economy.

Production of new homes in a factory differs in many important ways from construction of
homes on site, and general opportunities for efficiency exist in this centralized, controlled
environment compared to construction on scattered sites. For example, factories built in low-
cost areas where prevailing wage rates are lower can achieve a competitive advantage by
selling finished products into markets where the wage rates for similar work performed on site
would be much higher.

These savings are attractive to the extent they outweigh the costs of transportation and
installation that are unique to factory-built housing. In addition, capital investment for plant
and specialized equipment used in assembly-line operations shifts the mix of labor and capital
inputs and raises labor productivity. Unskilled, less expensive labor can be used more
effectively when production takes place on an assembly line and can be organized into
simple, repetitive operations. Workers in the plant are generally employees of the firm, not
subcontractors, and as such can be scheduled, managed, trained and deployed by a single
authority in the interests of productivity and efficiency.

These factors, which characterize both HUD-Code and modular home production, differ
greatly from the institutional contracting and subcontracting arrangements that characterize
conventional site-built homes and home building firms. Industry sources report that the labor
content of HUD-Code homes typically ranges from 8 - 12%of total cost, compared to total
labor costs for site-built homes which have been estimated to constitute 40% or more of total
cost. Of course, to some degree a smaller labor share will be offset by higher costs of capital
for any firm with investment in fixed production facilities, but the successes of industrialization
throughout the economy are powerful evidence of the opportunities to reduce production
cost by substituting capital for labor.




                                                5
Modular Home Manufacturers (7%)

There are about 200 modular home manufacturers that make assembled sections of housing
inside factories. Most modular units are made in complete, box like sections, and multiple-
section units and stack-on units are common. Modulars are the strongest of all frame homes
built, and are 95% complete when they leave the factory. They are sold direct or through
local builders or builder/dealers. During 2004 about 206,000 modular homes and apartments
were sold.

HUD-Code (Mobile) Home (5%)

Ever since the passage in 1976 of the U. S. Department of Housing & Urban Development
Manufactured Home Construction & Safety Standards (HUD-Code), exterior frame
construction of mobile units has been on par with site-built homes, and HUD-Code homes are
now generally safer dwellings. HUD-Code homes are made by approximately 90 companies
operating about 350 factories using techniques similar to modular methods but with generally
lighter construction and always with a metal chassis as part of the floor system. It is believed
that double-section HUD-Code homes which look like site-built homes will account for most
low-cost housing in the future. HUD-Code homes are sold through dealers on display lots or
from model homes in subdivisions. In 2004 about 140,000 HUD-Code homes were sold, and
over half of those were double or multi-section units.

Production Builders (44%)

These companies usually build single-family homes and low-rise apartment buildings in
subdivisions near major metropolitan centers. More than 95% of the nation's 7,000 large
production builders use factory-fabricated roof trusses. Use of other factory-made
components, such as floor trusses and wall panels, is growing rapidly because of soaring site
labor and construction loan costs. Some of the biggest production builders operate their own
component factories. However, all production builders sell their homes directly to end buyers
rather than through builder/dealer networks, which distinguishes them from panelized home
manufacturers. In 2004, production builders sold about 1.254 million units.

Panelized Home Manufacturers (44%)

The panelized home manufacturers are the biggest and most diverse segment of U.S.
housing. They include: 1) Hundreds of conventional panelizers who sell their packaged homes
through builders and builder-dealers; 2) Log home builders, over 200 strong, who sell direct or
through dealers; 3) The mass merchandiser chains and local lumber yards and home centers
who perform all functions of a package home producer; 4) Producers of dome homes and
other alternative systems including light-gage steel, lightweight concrete, foam-core panels,
foam blocks--plus component firms who cross over into package homes. In 2001 the
estimated 3,500 panelizers collectively built about 1,254,000 units, equaling the production
builders.

Special Unit Manufacturers

Special unit manufacturers are in-plant builders of commercial structures of all types. There are
about 170 of these companies who build an average of about 1,665 structures per year. They
sell direct or through dealers and also lease their units. Their output, usually built to more
stringent commercial building codes, includes classrooms, offices, banks, hospitals,
construction offices, equipment shelters, restaurants, kiosks, jails, airport terminals, strip
shopping centers, and dozens of other commercial buildings. This industry is growing fast as


                                               6
owners and investors discover the speed, cost and quality advantages of specifying modular
commercial structures. It must be remembered that all the previously mentioned housing
producers also build commercial buildings. Total output of commercial structures by both in-
plant special unit and housing companies was estimated at 283,000 units in 2004. GE Modular
Space is a major player in the sector.

Mobile/Modular/Panelized Dealers

Builders and dealers for HUD-Code (mobile) homes, modular homes and panelized homes
account for sales of 56% of all housing. Sometimes called "builder-dealers" for modular and
panelized homes, they may sell for one or several manufacturers. Normally they sell homes
only in a given territory, and it is their responsibility to prepare the site, do foundation and utility
work, and supervise completion work on the homes after delivery. Most HUD-Code home
dealers sell units from display lots, mobile home communities or both. A growing trend among
HUD-Code home dealers is to sell models in conventional real estate subdivisions.

THIS INDUSTRY IS GROWING SWIFTLY. From the late 1930s when modern industrialized housing
companies started emerging in New England and the Midwest, HUD-Code, modular and
panelized home companies have grown to where they now produce 56% of all single-family
homes and low-rise apartments. This does not count the industrialization of site-built homes
where 95% use factory made roof trusses, and a rapidly growing number use pre-hung doors,
floor trusses, wall panels and other components.

WHY THE FAST GROWTH? Faster construction time, lower costs and better quality. While "stick
builders" may need from six to 12 months or even more to build a house at a job site,
industrialized builders need only one to three months to finish a componentized home, six to
eight WEEKS to finish a panelized package home, and only one to three weeks to finish a
double- section HUD-Code or modular home! Speed means fewer material cost increases
and less or even no cost for construction loan money. Precision factory fabrication methods
also deliver vastly better quality in construction.

WHO BUYS THE PRODUCTS? Home builders or factory fabricators themselves. Independent
research shows flooring brands are specified by 90% of production builders, 83% of panelizers,
94% of modular manufacturers and 80% of HUD-Code manufacturers. Siding is specified by
90% of production builders, 76% of panelizers, 91% of modular manufacturers, and 92% of
HUD-Code manufacturers. These figures are representative for ALL products going into
housing today.

MODULAR BUILDING SYSTEM

A modular home is the culmination of one type of building system. Modular homes actually
begin as components; designed, engineered and assembled in the controlled environment.
It is when these components come together on a building site and the final finish is completed
by a builder, that the components become a home.

Modular units are usually placed on conventional foundations, either crawlspaces or full
basements, and are most commonly sold to builders representing customers with land or to
third-party builders who own scattered lots. The builders are typically responsible for
excavation, final grading, construction of a suitable foundation, and connection of utilities.
Consequently, modular builders are subject to the same local regulation in these areas as site-
builders.




                                                   7
Efficiency begins with modern factory assembly line techniques. A house travels to
workstations, with all the building trades represented. Work is never delayed by weather,
subcontractor no-shows or missing material. Quality engineering and modular construction
techniques significantly increase the energy efficiency of a modular home.

Modular producers either provide a full line of services at the site as a so-called “turnkey
operation,” or only provide a “rough-set” of site services. In the rough-set, the modular
producer provides a crane and its rough-set crew removes the units or boxes from the trailer,
places them on the foundation, and seals the home so that it is weather-tight, while a builder
does the finishing and the remaining site work (e.g., porch, deck, garage and landscaping).
The turnkey producer, on the other hand, not only sets the unit but also does the finishing
activities at the site.

Modular buildings that have already been inspected in-plant and certified according to state
regulations and procedures are usually issued permits for site work by local enforcement
agencies after local review of floor plans, elevations, plans for site-built construction and
installation, and installation instructions. Local or state code officials defer to in-plant
inspections and approvals but are responsible for inspecting work performed on site to
determine whether it is in compliance with the applicable regulations.

MODULAR COSTS

The calculated sales price of the modular home is approximately 90% of that for the site-built
home, primarily due to lower structure costs from prefabrication. The efficiencies of factory
production are counterbalanced by the desire for modular producers to do more
customizations to compete in a more upscale market, and the necessity to meet the
requirements of varied local codes.

Construction costs include labor and materials for both the structure and the foundation. For
site-built homes, all labor and materials are consumed on site. For factory-built homes, most
labor and materials are consumed in the factory. Modular homes are 85 – 95% complete
when they leave the factory while manufactured homes are approximately 98% complete.
Factory-incurred overhead costs are embedded in the structure costs or invoice price that
the modular builder or manufactured home retailer pays to the producer.

Profitability for modulars is slightly above the rate for site-built homes, consistent with the idea
that only some of the lower production cost will flow through into selling prices. To some
degree modular producers may set prices to “meet the competition” and translate lower
production cost into higher margins. Finally, inasmuch as profit represents economic return on
invested capital, persistent differences in profitability across sectors of the industry can be
expected to the degree that capitalization requirements and capital/output ratios vary
between sectors.

All builders incur financing costs, but they are lower for modular and manufactured homes
compared with site-built homes. Site-built homes can take three months or more to build and
the builder’s carrying costs during this period can be substantial. Manufactured home
producers, on the other hand, typically build units on direct order from the retailer in about
five days. As a result, the financing cost of operation and inventory is minimal for the
producer, and much of the cost of inventory is shifted to the retailer. The cost of the retailer
inventory of models used to sell homes is financed by banks through “floor financing,”
typically at 2% above prime, which is less expensive than construction loan financing for site
builders.



                                                 8
Modular manufacturers are in a similar position to that of manufactured home producers, but
their period of construction is slightly longer and more complex due to the amount of
customization and possible variation in local codes. Modular builders need fewer draws from
the bank than site builders and are able to build a home over a shorter finance period,
making it less expensive to borrow money for financing construction.

MODULAR MULTIFAMILY BUILDINGS

Although some might think that factory-built housing applies only to single-family homes, a
number of builders are realizing time, and sometimes cost, savings with modular apartments.
Modular multiple dwellings are available as customized buildings that look like site-built
structures, assembled in a factory while earthwork, foundations, and utilities are prepared
onsite. The scale and repetition that characterizes many multifamily buildings lends itself to an
automated solution, especially in areas located near the factories. The controlled indoor
environment and stable, experienced labor are conducive to assemblies with consistent
quality, often at reasonable cost. Workers familiar with their product can more easily integrate
unfamiliar materials and techniques with other trades working side-by-side. Also, the rapid
building cycle of modular construction can reduce or eliminate jobsite and theft.

Modular multiple dwellings consist of box-like sections stacked vertically and horizontally with
a crane. Each box is approximately 14' wide by 50' long (this varies considerably), one-story
high, and includes all partitions between a fully-framed floor and ceiling. Although companies
accommodate various configurations, most are orders for side-by-side duplexes in two-story
attached townhouses. Other arrangements include townhouse flats, duplexes over flats, and
"quads" with two flats over two flats. Less common are apartment buildings with shared
entrance halls.

The numbers of modular multi-housing units, while still small, are growing. Multifamily projects
accounted for 5 percent of the estimated 43,000 modular units shipped in 2004, said Thayer
Long, assistant vice president of the Manufactured Housing Institute's National Modular
Council. This market share has remained steady for several years, but its stability belies real
growth in the overall number of units being made: 37,800 modular units were shipped in 2003,
up from 35,000 in 2002.

PROSPECTS FOR MODULAR HOUSING

The nascent modular home building industry has the opportunity to garner an increasingly
larger share of new housing both domestically and internationally over the next several
decades.
The principal drivers will be the application and improvement of industrialization concepts
that have been successfully used in other industries to the process of home building.

A study performed by Virginia Tech for HUD, “Industrializing the Residential Construction
Site” (O’Brien, Wakefield, and Beliveau, July 2000), provides an excellent overview of
what is going on in the home building industry in the United States and abroad, as well as
manufacturing concepts successfully used in other industries. Industrialization concepts
that have worked in other industries and that currently may be in use by production
builders need to be considered.




                                               9
Examples include:

   Just-in-time (JIT) manufacturing that includes effective supply chain management.
    Although the supply chain management that works well for GM is not applicable to
    individual small builders, several of those builders may form alliances to gain
    leverage. (Supply chain management is addressed in the Information Technology
    Roadmap.)

   Flexible, agile, lean production systems.

   Concurrent engineering and design for manufacturers that use various techniques
    and processes to enhance the manufacturability of the product.

   Manufacturing requirements planning (MRP), manufacturing resource planning (MRP
    II), and enterprise resource planning systems (ERP), which are processes that are
    enabled by information technology.

   Concurrent design, where communication among designers and the producers
    (construction foremen, site supervisors, trade contractors) can significantly improve
    the efficiency of production. Communication up the chain, from the people at the
    job site back to the designers and sales force, typically is inadequate at best.

   Time and space-based scheduling that facilitates keeping track of who is where,
    doing what, and when. This type of scheduling is especially appropriate for
    construction activities, as crews move among sites.




                                                10
Housing Demand: Domestic & International


               “Affirm that, in the interest of affordable housing for the poor, it is necessary to
               promote cooperation among countries in order to popularise the use of
               adequate low-cost and sustainable building materials and appropriate
               technology for the construction of adequate low-cost housing and services
               within the reach of the poor.”

               The UN Declaration on Cities and Other Human Settlements in the
               New Millennium



DOMESTIC

The Commerce Department said that construction was started on new homes in February at
an annualized rate of 2.2 million units. That was 15.8% higher than a year earlier and the fastest
pace of residential construction starts in 21 years. Starts for single-family homes, the largest
component of residential housing, reached an annual rate of 1.78 million units, a record. Even
though many economists believe these numbers will ease in the months ahead as inventories
of unsold homes start to pick up, it still is likely that 2005 could be the biggest year for home
construction in decades.

Why does the U.S. need so much new housing?

The simple answer, of course is, rising demand. But what is behind the demand is worth
considering. First and foremost, the demand for housing reflects two key demographic trends
-- new household formations and immigration. Economists at Harvard University's Joint Center
for Housing Studies believe that household formations in the current decade will outpace
formations during the 1990s, when they estimate that 12.5 million households were formed.

    Growth has been due in part to many Gen-Xers establishing households at younger ages
     than even their baby-boomer parents did. Over the next 10 years, the Joint Center
     estimates that between 13.4 million and 14.5 million new households will be formed,
     depending on the level of immigration.

     The U.S. Census Bureau estimates that immigration is running at about 850,000 a year, but
     the Joint Center says the actual number is between 1.2 million and 1.3 million. If
     immigration comes in on the high side, household formations will begin to approach levels
     last seen "when the baby boomers stormed into adulthood in the 1970s," says Eric Belsky,
     the center's executive director.

    Rising wealth is a second factor behind strong housing demand. As baby boomers come
     into their peak wealth years, a good percentage are buying second homes. According
     to a recent report by the National Association of Realtors, 2.82 million second homes were
     sold in 2004, up sharply from the previous year. Exactly how many of those homes were
     newly constructed is hard to know, although estimates range from 5% to 15%.




                                                   11
Current Population Survey and the Housing Vacancy Survey



   There's another, less-discussed factor fueling demand for new construction: The rapid
    replacement of unusable and undesirable homes. According to housing-industry
    economists, the U.S. housing stock is in the process of being rebuilt, as aging stock is torn
    down to make room for newer stock.

    The average age of an American home is about 33 years -- older than any previous time
    in U.S. history. The number of homes older than 50 years rose to 25.8 million in 2000 from
    about 18.8 million in 1990. The average age of the U.S. housing stock swayed between 23
    and 27 years from 1940 to 1990, then started a persistent rise. As the housing stock ages,
    new construction starts "will be permanently elevated because we need to replace
    housing stock which is wearing out," says Fannie Mae economist David Berson.

    The Census Bureau is forecasting net removals will total about 450,000 annually between
    now and 2013.




                                               12
INTERNATIONAL

        It is projected that the world population will rise from 5.7 billion in 1995 to 8.9 billion in 2050,
         growing at the rate of 1.3 % per annum in the period 1995-2000 to 0.3 % per annum in the
         period 2045-2050. The assumption is that there will be a massive fertility decline in the
         majority of countries, a scenario expected to produce ageing populations, i.e.
         populations in which the proportion of children is declining and that of older persons is
         increasing.

       More than one billion of the world’s city residents live in inadequate housing, mostly in the
        sprawling slums and squatter settlements in developing countries. Such areas are regarded
        as one of the most visible expressions of human poverty. The lack of adequate housing in
        the cities of developing countries is one of the most pressing problems of the 21st Century,
        and the cost of providing adequate shelter for all is immense. Yet, the cost of doing nothing
        may be even greater, for the new urban slums are potential breeding places for social and
        political unrest. The global data on housing adequacy is rather limited, however, and what
        is considered adequate in one part of the world - or at one point of time - may not be
        regarded so elsewhere.

       Almost two billion people currently live in urban regions of the developing world. This
        figure is projected to double over the next 30 years, at which time urban dwellers will
        account for nearly half the global population1. Moreover, most of these new urban
        dwellers are likely to be poor – resulting in a phenomenon termed as the ‘urbanization
        of poverty’. Slums are a physical and spatial manifestation of increasing urban poverty
        and intra-city inequality. However, slums do not accommodate all of the urban poor,
        nor are all slum dwellers always poor.

                                                                  The global housing stock in cities
                                                                   amounts to 700-720 million units of all
                                                                   types. It is estimated that 20 to 40
                                                                   million    urban    households    are
                                                                   homeless. A significant number of
                                                                   those housed, however, cannot be
                                                                   regarded as living in adequate
                                                                   shelter. Worldwide, 18% of all urban
                                                                   housing units (some 125 million units)
                                                                   are non-permanent structures, and
                                                                   25% (175 million units) do not
                                                                   conform to building regulations. Most
                                                                   deficient housing units are found in
                                                                   the cities of developing countries,
                                                                   with more than half of all less-than-
                                                                   adequate housing units located in
                                                                   the Asia and Pacific region.

                                                           The number of people living in
                                                               
                                                           inadequate shelter may be as high
                                                           as 1.3 billion world-wide because
                                                           most cannot afford otherwise.
                                                           Acute shortages of adequate
                                                           housing exacerbates the situation,
        as low supply tends to increase prices. Some 40-50% of urban residents in developing
        countries own heir dwellings, and another 20-30 % are legal tenants.


                                                       13
       Many cities also have large squatter settlements, where people rent rooms or whole units. In
        industrialized countries, higher prevalence of rental housing provides for a greater variety of
        demand and internal mobility. Nevertheless, some towns in the South have more than 70%
        of their housing stock as rental housing (such as in Kisumu, Kenya; Jinja, Uganda; or
        Conakry, Guinea).

        Generally, a housing structure is considered durable when certain strong building
         materials are used for roof, walls and floor. Even though some houses may be built
         with materials classified as durable, the dwellers may still not enjoy adequate
         protection against weather and climate due to the overall state of a dwelling.
         Alternatively, a material may not look durable, in the modern sense, but is, in the
         traditional sense, when combined with skills of repair. Such cases are vernacular
         housing made of natural materials in villages, maintained by its residents annually.

        Durability of building materials is to a very large extent subject to local conditions as
         well as to local construction and maintenance traditions and skills. Which materials
         are considered durable under local conditions has to be determined by local
         experts. This is also true for the common problem that dwellings in the semi-urban
         outskirts of cities of developing countries often follow rural construction patterns by
         using materials, which can be considered non-durable under urban conditions. In
         addition, compliance with local regulations and the quality of the location form part
         of the definition. These two indicators cannot be easily observed as they require
         specific knowledge about the legal condition and the land use plan as well as skills to
         determine hazardous areas.

        Developing countries have the advantage of not being tied to heavy investments in
         technologies of the past. Therefore, instead of resting on the limited productivity of
         craftsmanship or before yielding to the seduction of impulsive technology transfers, they
         are invited to consider a full range of prospective options offered by “Reproduction”:
         research and development of innovative processes truly capable of simplifying the
         production, therefore avoiding long sequential operations of craftsmanship nature.
         Options generated through a double matrix between the available resources (materials
         and processes) and the basic strategies of industrialized building systems (Site Assembled
         Kits of Parts, Factory-Made Modules and Hybrids).

    (Sourced in part: United Nations Human Settlements Programme)




                                                    14
Chapter

    2
Proposal
 Alternative Use for Intermodal Containers: Habitats

Even if the estimates of nearly 9% growth per year in empty containers were halved, global
unfilled containers will approach a glut of 5,000,000 by 2010. While any number of methods
will be employed to modulate excess supply, as long as the U.S. is faced with a trade deficit
with Asia, empty containers will remain a reality. Given that inevitability, alternative
redeployment of empty containers should be considered.

The use of intermodal containers as habitats is one way of addressing the issues of an ever
growing supply of empty containers, as well as, the ever growing demand for housing, both
domestically and internationally.

Three rather distinct approaches proposed here, of using containers as housing are
representations of design work by LOT-EK Architects from New York City (pronounced LOW-
tech – http://www.lot-ek.com/):

    1. Domestic

                                                               Projected Units         Average
                  Market                    Product                (initial)        Wholesale Price*
          Individual Home Owner       Container Home Kit             200               $225,000

          Live-Work Space           Container Home System            50              $100,000/unit
          Student Housing           Container Home System            50               $79,000/unit
          DOD Military Housing        Container Home Kit             100                $110,00


             a. Market Rate Homes – the following illustrations of Container Home Kits (CHK) is
                to answer a request for homes with a particular aesthetic appeal. The CHK will
                be available using 2–8 – 40’ containers either a in a compact or loft
                configuration. The structures can be arranged as townhouses or as one-off
                single family units. These homes can be marketed to individual home-owners,
                to builder/contractors, or to the Department of Defense (DoD’s Housing
                Privatization program)

             b. Multiple Units – the Container Housing System (CHS) uses multiple containers
                for a variety of apartment building configurations. These buildings will be
                marketed to builder/contractors, with a particular emphasis on Live-Work
                Space and Student Housing.

* price estimates of the basic dwelling, excluding land, site prep, and transport




                                                      15
Container Home Kit

                                                         The CHK, Container Home Kit,
                                                         combines      multiple    shipping
                                                         containers to build affordable
                                                         homes. Conceived as a kit of
                                                         parts, the basic unit, a 40-foot-
                                                         long    shipping    container,    is
                                                         transformed into an expandable
                                                         module. The container functions
                                                         as both the structure and shell for
                                                         the habitat.




Sections of its corrugated metal walls can be cut out without compromising its structural
integrity. The resulting openings can be used to join containers side by side to make up
larger spaces, or for vertical connections between them.

The Container Home Kit is available in two lines: CHK compact and CHK loft, in
configurations that range from 2 to 4 bedrooms using 4 to 8 containers. The houses are
positioned on site on 2 parallel strips of concrete that are also used for pedestrian as well
as car access through the lot. The houses built with this system are recyclable themselves
as they can be disassembled and reassembled elsewhere.

                                                             Container Housing System

                                                             The CHS, Container Housing
                                                             System, is designed to exploit
                                                             the containers natural stack-
                                                             ability, stretched geometry,
                                                             and      industrial/mechanical
                                                             detail. The apartment units
                                                             are placed side by side in two
                                                             parallel lines, along the front
                                                             and back of the building,
                                                             leaving a gap in the middle,
                                                             which becomes a circulation
                                                             hallway on each floor. The
                                                             containers with pierced floors
                                                             and ceilings stack vertically to
                                                             generate shafts for stairwells
                                                             and mechanicals.




In both cases, the interior finishes of the CHK or CHS will not betray the fact that these are
homes built from retired shipping containers.




                                             16
The CHK and CHS are the brainchildren of LOT-EK Architects, from NYC, which has worked
in both the design and application of this technology for many years. The partners, Giuseppe
Lignano and Ada Tolla, have adopted the container as a design signature, using it along with
oil tanks, airplane fuselages and other industrial castoffs. In fact, LOT-EK is the most prominent
of an emerging school of architects using inexpensive recycled containers as temporary or
permanent homes, offices and galleries.




    2. International

                                                                 Projected Units       Average
                    Market                    Product                (initial)      Wholesale Price*
         Shelter (developing nations)    Container Home Kit           1250               $5,120
         Multifamily Apartments           Container Home              150             $8,000/unit
                                              System


             a. Shelter Habitats – a compact version of Container Home Kit (CHK), at
                approximately 59m (640 sq. ft.) is a suitable dwelling for either transitional or
                permanent housing. It would be targeted to nations looking to improve the
                problems of substandard housing.

             b. Multiple Units – in the developing world, including Eastern Europe, the
                Container Housing System (CHS) multi-container configurations, will marketed
                to apartment building developer/investors, again in those countries making a
                commitment to alleviate substandard housing.


* price estimates of the basic dwelling, excluding land, site prep, and transport




                                                     17
Create the Prototype

LOT-EK is currently seeking financial and in-kind participation from General Electric for the
development and production of a prototype of the Container Home Kit (CHK), 3X3 Loft
design. The firm has a thorough and well-positioned architectural design concept (Step1 in
the DFMA process below).

Engineering, developing, and testing a prototype house using the standard structural and
mechanical interfaces described previously would be the next phase of work. This would
include testing in the field and evaluation of the factory manufacturing, field assembly,
durability, and quality of the homes.

LOT-EK estimates the cost of the prototype to be $250,000, with its completion between 90 –
120 days. The expense and execution can be absorbed or mitigated by exploiting GE’s cross-
divisional access to material, including ISO containers, its engineering capabilities, as well as,
its supply chain resources.



                   Design concept




                                                            Suggestions for
                 Designs for assembly                       simplification of
                                                           product structure




                                                          Suggestions for more
                 Selection of materials
                                                          economic materials
                  and processes and
                                                             and processes
                  early cost estimates




                   Best engineering
                       concept




                                                            Detail design for
                     Engineer for
                                                               minimum
                     manufacture
                                                           manufacturing costs




                       Prototype
                                                     Typical steps in Design For
                                                    Manufacturing and Assembly
                                                          (DFMA) process

                      Production




                                               18
Chapter

     3
Implications
    A Sea of Boxes



     The problem of excess containers needs to be addressed from several different vantage points.
     One of many solutions for disposal is to use containers as structural building blocks. The efficiency
     with which intermodal containers are stacked, racked and transported can easily be transferred
     to their use as the shell and structure for an array of buildings, including housing.



The following scene is being replicated around the world, as local resources, and that of shipping
companies are being strained by keeping up with a flood of containers.

    The NY/NJ port has seven terminals with more than 1,200 acres devoted to container
     storage. Empty boxes are flooding West Coast ports with very few exports to fill them. The
     turmoil generated by the trade imbalance has spread beyond the docks and into offices
     around the Portland area.

    In Australia, the Nationwide News Pty Limited, Weekly Times, reported in January 2003
     that, “At Sydney, there has been nearly a 50% increase in empty containers in the past six
     months and that has been replicated in other ports.” Shipping chief executive in Australia
     explained the reason behind this stacking, as the drought that beat the volume of
     agricultural products being exported. He added that the containers full of imports still
     come in at the same rate while the empties keep piling up on wharves of the port due to
     the insufficient exports that take up. It was found that sending empty containers back
     overseas was far expensive. It costs $300 to $650 to return a container to overseas markets,
     making it "easy to imagine the cost impact of having to send back 200,000 containers
     over the next year."




                                                     19
Housing the Earth’s People

          Construction Growth by Region
          (Annual percentage changes)                    According to Global Insight International
                         1998-2003       2003-2008       construction is expected to grow by nearly 3%
        Asia                  -0.8           3.3
                                                         through 2008.
  Non-Japan Asia              3.2            5.1
  Eastern Europe              2.1            3.5         With ongoing construction growth projected in
                                                         Asia, Eastern Europe, the Middle East & Africa, and
Middle East & Africa          0.0            3.2
                                                         with GE expecting to receive as much as 60% of its
   North America              3.8            2.7
                                                         revenue growth from emerging markets, these are
   South America              -4.3           2.9         regions where GE can realize scalablity within
  Western Europe              1.3            1.8         opportunitic segments of the construction industry.
   WORLD TOTAL                1.2            2.6
Source: Global Insight Inc.                    Further analysis points to urban development as a
                                               specific area for growth, given the current
   projections for population migration over the next 20 years. The strains on poor and
   substandard infrastructures and its associated problems will create an incredible demand for
   scarce resources, thus creating the circumstances leading to further worldwide instability.

                                     Urban and rural development 1950-2030
                         For Less Developed regions and More Developed regions




       Source: Population Div ision, UN: World Population Prospects: The 2004 Revision and World Urbanization
       Prospects: The 2003 Revision.
       Note: More developed regions; they comprise all regions of Europe plus Northern America, Australia/New
       Zealand and Japan. Less developed regions; they comprise all regions of Africa, Asia (excluding Japan), Latin
       America and the Caribbean plus Melanesia, Micronesia and Polynesia.




                                                             20
More than "one billion human beings still lack adequate shelter and are living in
        unacceptable conditions of poverty" (Habitat Agenda, paragraph 53). The vast majority of
        live in developing countries and -- as a result of the urbanization of poverty -- an increasing
        number live in urban areas. Sprawling informal settlements and slums of developing countries
        are fast becoming the most visual manifestations of poverty itself. According to UN-HABITAT,
        some 924 million people were living in slums and informal settlements by 2001.



The objective of the Habitat Agenda, shelter policy is to create frameworks for efficient and
effective shelter delivery systems, while emphasizing "the increased use and maintenance of
existing stock through ownership, rental and other tenure options, responding to the diversity
of needs."

While the Habitat Agenda stresses that housing policies should pay attention to the role of the
informal sector to housing policies, this sector lacks the wherewithal to mobilize the resources,
both fiscal and technical, in order to affect fundamental change in housing these
populations.

Fundamental change is however possible through direct investments in construction projects
for both housing and supportive infrastructure for the foreseeable future. In fact, Global Insight
projects 2% and 3%, respectively in worldwide construction growth (U.S. dollars) between now
and 2013, again with the bulk of that growth coming from emerging markets. (see Market
Potential Indicators for Emerging Markets – 2004)


      According to the U.S. Census Department, the housing construction industry generated in
      excess of $232 billion in sales.



Addressing the domestic housing sector with a focus on market niches, the use of container-
based, modular home design, and advanced technological building systems, will yield sizable
share of market over the near to mid-term.

The following is an estimate for annualized sales by market segment, and shows how a
modest number of units could quickly scale. These units represent a total of 54,300 TEU’s or the
equivalent of 2.2% of the 2.5 million estimated empty intermodal containers around the world.


                       $100
            Millions




                        $50




                         $0
                              Single   Liv e/Work   Military   Student   Emerge/M Emerge/Sh

              Units            200        50          100        50         150        12,500

              Rev enues $45,000,000 $5,500,000 $11,000,000 $3,950,000    $1,200,000 $80,000,000




                                                    21
Building the Homes of the 21st Century in Factories



      Housing can’t be built fast enough, using the current primary means of construction, to keep
      up with worldwide demand.




Homes today are, for the most part, still being built in the same way they were in the 19th
century. The Partnership for Advancing Housing Technology (PATH), administered by the
Dept. of Housing and Urban Development (HUD) projects that factory-built housing, especially
modular with become the predominate way to construct housing, both single and multi-
family, accounting for as much as 90% within 20 years, as technology continues to improve.


                                                      The PATH Mission points in this direction:

                                                              Increase energy efficiency
                                                              Improve durability
                                                              Raise quality
                                                              Ensure labor safety
                                                              Minimize environmental impact

                                                      In order to achieve this, the currently ultra-
                                                      fragmented housing sector must look to
                                                      transfer the best business practices from
                                                      industrial manufacturing to construction.
                                                      One such innovation is the Whole House
                                                      Building System which is predicated on a
                                                      single on-site production facility utilizing
                                                      high capacity hoisting, non-sequential
                                                      building techniques and bulk material
                                                      handling     in   order     to    streamline
                                                      production.



Improvements in housing technology will likely be the only way to maintain supply to meet the
demands for new affordable homes, replace old structures, provide for disaster relief and
transitional habitats in sufficient numbers. There will be a few players that will be able to
deploy the resources, as well as have the economies of scale required to establish and
operate such factories on a global scale.




                                                22
Chapter

   4
Rationale
Here, we will answer the question, why this proposition is timely, viable and scalable?


 Affordability

 1) Modular housing is inherently less expensive then traditional stick-built housing, because
    of the economies of scale, systems and standards, optimum value engineering (OVE),
    etc. Savings with standard modular buildings can be offset with the travel and handling
    of over-sized modular sections. However, with the proposed LOT-EK modular structures,
    travel and handling are done in the same manner as any other intermodal containers.

 2) The builder/contractor/developer of single family homes, being sold at market-rate, will
    either be able to pass along the savings to the consumer or retain a higher margin
    based on local market conditions.

 3) Several base designs with a fairly limited package of upgrades will keep the domestic
    product moderately priced.

 4) The products targeted for emerging markets must be priced to compete with locally
    derived, competitive housing. Use of local labor and locally sourced materials along with
    the installation of manufactured housing systems will allow for this product to be volume
    driven (even though market entry estimates are set a fairly low unit levels).


 Building Systems

 1) The adaptation and application of manufacturing processes to home building,
    especially with modular dwellings will revolutionize the industry, by reducing waste,
    meeting increasingly important green standards, managing labor, etc. And only those
    players at the edge of innovation, as well as, with the capacity to scale-up operations
    will emerge as market leaders.

 2) Standardize the Module Footprint and Interfaces – The premise is to have only a few
    basic module sizes, allow for some variations in appearance and configuration to
    provide some of customization consumers want. Potential benefits of standardizing are:
       Reduces the number of components
       Allows for interchangeability of parts or components from a variety of
          manufacturers
       Reduces the onsite tasks to a rather simple and standardized assembly
       Provides options, variety, and personalization
       Simplifies the inspection and approval process as most of this is can be moved to
          factories


                                             23
3) Stakeholders can work with the national code bodies and selected state and local
   code offices to develop a streamlined approach to approvals and inspections. The goal
   is to move as much of the inspection process as possible into the factory. For example,
   modules manufactured under ISO 9000/14000 quality systems could be pre-approved or
   certified so that building inspection of each individual trade is not required. One
   inspector could handle sign-off on all systems assuming the certified modules were
   properly interfaced. This would apply internationally as well, especially when using ISO
   systems.

4) GE is well poised to be a leader in the industrialization of the home building process for
   several very obvious reasons, namely:
          Resources (knowledge based, human, fiscal, engineering)
          Vision to see that emerging markets will represent the lion’s share of its
              life-blood, and the commitment and dedication to pursue it.
          Vertical and horizontal integration across divisions
          Technological innovation


Containers

1) Empty containers are abundant, will become even more so and remain so as long as
   the world maintains a trade imbalance with the leading export nations, who also are the
   leading container suppliers.

2) Intermodal containers are by their nature durable, maneuverable, modifiable and
   affordable, all of the elements that make them appropriate building blocks for housing.

3) Some ports in emerging markets may not have terminal yards that store a sufficient
   supply of suitable empty containers. Container transportation costs can be mitigated by
   using local labor for fabrication and construction.

4) With the emphasis on recycling, each container will be determined to be habitable and
   imposing little or no environmental impact.


Demand

1) There is a nearly insatiable need, both domestically and internationally, for deliverable
   housing that is affordable, durable, attractive, safe, and environmentally friendly. The
   aggregate demand for quality housing throughout the world is in the millions of units.

2) Home building systems will allow for suppliers to keep up with demand by creating
   housing in a highly efficient manner.

3) Given the changing dynamics of the workplace, Live/work Space is becoming an
   alternative for many transitioning from the office, for artists and artisans, and for home-
   based entrepreneurs.

4) Quality student housing is required by America’s academic institutions not only for
   undergraduates, but also graduate students, faculty, administrators, support staff and
   young alumni who need housing close to campus.



                                            24
5) The Department of Defense has a mandate to renovate and build new military housing
   on nearly all of the bases throughout the country.

6) Not everyone will be suited for, or in a position to acquire a home, as such the
   builder/contractor/developer of multifamily properties requires quality buildings for their
   tenants.


Design

1) LOT-EK Architects have created a series of designs that will convert these steel boxes into
   eminently livable space, thus mitigating concerns about whether a prospective home-
   owner would find these designs aesthetically appealing, functional and affordable.

2) LOT-EK has designed a fairly wide variety of structures – container habitats are one of a
   long list of buildings using large industrial cast-offs.

3) The adaptability of these boxes allows for configurations ranging from a simple, yet
   elegant shelter to multi-unit apartment buildings that retain the same design elements
   over greater dimensions.

4) The concept of designing for manufacturing efficiency has been applied successfully in
   many industries for decades. The idea is to reduce the overall number of parts and the
   number of different kinds of parts, and to use parts that are easy to assemble and install,
   resulting in lower costs for materials and labor




                                                 25
Conclusion
The building of any business starts with a seed of an idea and a vision. Whether that vision can
be transformed into a profitable entity calls on the confluence of elements that first and
foremost answer the question, “is this doable?”

We believe that the proposition just laid out not only can be doable, but in fact, must be
doable for the following reasons:

       The quality of life as we are accustom to in the developed world will be severely and
        adversely affected if we do not get a handle on our levels of waste – millions of
        empty and retired containers is a gross, untenable and ultimately unsustainable level
        of waste.

       Again, our quality of life will be even further constrained unless we, in the developed
        world (in both the public and private sectors) are willing and able to re-orient the
        plane of wealth distribution. We enjoy a high level of a quality of life, while the majority
        of the world does not – this imbalance can only haunt us for generations, unless we
        make a concerted effort to invest in improving those quality-of-life fundaments
        presently enjoyed by a minority of the world’s population. Adequate shelter is one of
        those fundaments. If for no other reason, our own self interest should be a primary
        driver in this regard.

       Americans will continue to require, into the foreseeable future, better and more
        affordable housing in ever increasing numbers, as older stock is retired and the
        demands for new development strain our abilities to deliver. Industrialized home
        building systems are really the only method to meet this level of demand – quality,
        quantity, durability, affordability and sensitivity (environmental).

It really boils down to these three key elements that will drive, what at a conservative
estimate, is a $146m business: create quality housing out of recycled and cast-off materials,
and use technology-driven systems to efficiently do so.

Our current plans call for prototyping as the first step to this process. We trust that GE/SeaCo,
as well as, GE Modular Space will intend to be collaborative partners with LOT-Ek and
ComLoc, Corp. in this initial step forward.




                                                26
Annualized Estimates
                                                                                               (Year 1)

   Empty
Containers               Deployed                    Market                                                                                                                  Gross
 (TEU's) (1)    % Mkt.     TEU's  Unit Type        Segment (2)       TEU/Unit              Unit Size     Unit Cost (3)       Cost /Unit Price/Unit (4) Unit Sales          Revenues
 2,500,000                                                                             sq. ft. meters   sq. ft. meters
                 0.10%        2,400     CHK        Single family       12               1,960      --   $91.84                   $180,000        $225,000          200      $45,000,000
                 0.01%          300     CHS          Live/Work         6                  960      --   $91.67                    $88,000        $110,000           50       $5,500,000
                 0.03%          800     CHK            Military        8                1,280      --   $68.75                    $88,000        $110,000          100      $11,000,000
                 0.01%          200     CHS           Student          4                  640      --   $98.75                    $63,200         $79,000           50       $3,950,000
                                                     Emerging
                 0.02%          600     CHS         Mkts./Multi         4                640    59         $10.00 $108.47          $6,400          $8,000          150       $1,200,000
                                                     Emerging
                 2.00%       50,000     CHK        Mkts./Shelter        4                640    59          $8.00   $86.78         $5,120          $6,400        12,500     $80,000,000

       Totals    2.17%       54,300                                                                                                                              13,050    $146,650,000


                                                                                        $100

                                                                                         $80
      Notes:
                                                                            Millions
          (1) Estimated # of global empty containers                                     $60
          (2) Single family homes represented here
              are 3X3 Loft Units                                                         $40
          (3) Estimated unit cost, a handle on actuals
                                                                                         $20
              will be derived from prototyping
          (4) Estimate of wholesale unit prices @ 25% gross margin                        $0
                                                                                                                                                                          Emerging         Emerging
                                                                                               Single family        Live/Work         Military         Student
                                                                                                                                                                          Mkts./Multi     Mkts./Shelter
                                                                            Units                    200               50               100                 50               150             12,500
                                                                            Revenues            $45,000,000         $5,500,000      $11,000,000       $3,950,000          $1,200,000      $80,000,000
Market Potential Indicators for Emerging Markets – 2004

                                                                                                                Overall
                        Market                  Market                                                          Market
              Market    Growth     Market     Consumption Commercial Economic           Market      Country    Potential
               Size      Rate     Intensity    Capacity   Infrastructure Freedom      Receptivity    Risk       Index
 Countries Rank Index Rank Index Rank Index Rank Index        Rank Index Rank Index Rank Index Rank Index Rank Index
HONGKONG 21       1    10    80    1   100   12    54           2    98    2    92    1   100    2    88    1   100
SINGAPORE   24    1     5    84    9    57   10    62          3    92     9    69     2     60     1    100   2     80
 S. KOREA    6    12   11    78    7    66    2    99          6    76     8    71     9     18     4    62    3     74
   CHINA     1   100    7    82   24     1   11    59          14   38     24   1      12    8      11   49    4     73
   ISRAEL   22    1    14    75    3    75    4    82          5    79     4    78     4     29     6    57    5     69
 HUNGARY    23    1    22    50    2    76    1   100          4    81     5    78     5     24     3    64    6     68
CZECH REP.  20    2    21    51   17    51    3    97          1    100    3    83     6     24     5    62    7     67
    INDIA    2    47    2    96   19    40    6    77          22   14     16   46     24    1      14   38    8     60
  POLAND    10    5    23    34    5    67    5    80           7   66      7   73     18    4       8   56    9     50
    CHILE   18    2    12    78   10    56   22    13           8   54      1   100    11    11      7   57    10    45
  MEXICO     5    13   17    61    6    66   20    27          15   37     10    66     7    23     10   50    11    45
   RUSSIA    3    37   15    73   22    28   15    53          11   41     21   21     15    6      15   32    12    42
 THAILAND   14    4     8    82   21    38   13    54          16   33     12   61      8    22     12   47    13    42
 MALAYSIA   17    3     1   100   23    15   18    42          12   38     19   33     3     46     9    52    14    40
   TURKEY    9    8    13    75   14    54    9    67           9   47     18   38     13    7      16   26    15    39
  EGYPT       13   5    3    90   4     74      8    70        19   22     23   14     19    4      17   25    16    35
INDONESIA     7    12   6    83   16    51     7     72        20   18     20   30     14    6      22   13    17    33
PHILIPPINES   11   5    9    82   13    54     17    47        24    1     13   57     10    17     20   23    18    31
ARGENTINA     12   5    4    84   12    55     19    39        10   41     15   52     21    3      24   1     19    29
  BRAZIL      4    26   18   58   20    38     23    13        13   38     14   56     23    1      18   25    20    29
    PERU      19   2    16   62    8    62     14    53        21   15     11   62     22    2      21   20    21    27
 S. AFRICA    8    8    20   51   11    56     24     1        23   13      6   74     17    5      13   44    22    22
COLOMBIA      16   4    19   51   15    52     21    17        17   32     17   39     16    5      19   23    23    16
VENEZUELA     15   4    24   1    18    45     16    52        18   25     22   20     20    4      23   2     24     1




                                                          2
3
DIMENSIONS AND MEASURES OF MARKET POTENTIAL


 Dimension                Weight     Measures Used


 Market Size              10/50  Urban population (million) -20031
                                 Electricity consumption (billion kwh) - 20022
 Market Growth Rate       6/50   Average annual growth rate of commercial energy
                                use (%) - between years 1996-20011
                                 Real GDP growth rate (%) - 20031
 Market Intensity         7/50   GNI per capita estimates using PPP (US Dollars) - 20031
                                 Private consumption as a percentage of GDP (%) -
                                20021
 Market Consumption       5/50   Percentage share of middle-class in
 Capacity                       consumption/income (latest year available)1
 Commercial               7/50   Telephone mainlines (per 100 habitants) - 20033
 Infrastructure                  Cellular mobile subscribers (per 100 habitants) - 20033
                                 Number of PC's (per 100 habitants) - 20033
                                 Paved road density (km per million people) - 20021
                                 Internet hosts (per million people) - 20033
                                 Population per retail outlet - (latest year available)4
                                 Television sets (per 1000 persons) - 20031
 Economic Freedom         5/50   Economic Freedom Index - 20045
                                 Political Freedom Index - 20046
 Market Receptivity       6/50   Per capita imports from US (US Dollars) - 20037
                                 Trade as a percentage of GDP (%) - 20031
 Country Risk             4/50   Country risk rating - 20048


Data used are those available for most recent year.
1 Source: World Bank, World Development Indicators - 2003
2 Source: U.S. Energy Information Administration, International Energy Annual - 2003
3 Source: International Telecommunication Union, ICT Indicators - 2003
4 Source: Euromonitor, European Marketing Data and Statistics - 2004

  Source: Euromonitor, Asian Marketing Data and Statistics - 2004
5 Source: Heritage Foundation, The Index of Economic Freedom - 2004
6 Source: Freedom House, Survey of Freedom in the World - 2004
7 Source: U.S. Census Bureau Foreign Trade Division, Country Data - 2004
8 Source: Euromoney, Country Risk Survey - 2004




For more information on methodology index, refer to: "Measuring The Potential of Emerging
Markets : An Indexing Approach" - S. Tamer Cavusgil Business Horizons, January-February 1997, Vol.
40 Number 1, 87-91.

More Related Content

What's hot

bimco-greener way of transportation
bimco-greener way of transportationbimco-greener way of transportation
bimco-greener way of transportationHossein J.Kamali
 
Shipping trade types tramp and liner shipping
Shipping trade types tramp and liner shippingShipping trade types tramp and liner shipping
Shipping trade types tramp and liner shippingSourabh Kayakkalakath
 
Importance of shipping in international business
Importance of shipping in international businessImportance of shipping in international business
Importance of shipping in international businessLalithEdirisinghe3
 
Importance of shipping in international business.pptx
Importance of shipping in international business.pptxImportance of shipping in international business.pptx
Importance of shipping in international business.pptxCINEC Campus
 
Dry port logistics 2015
Dry port logistics 2015 Dry port logistics 2015
Dry port logistics 2015 Mehmet INANIR
 
Dry ports integrated design
Dry ports   integrated designDry ports   integrated design
Dry ports integrated designManuel Retagi
 
Fec blogger presentation
Fec blogger presentationFec blogger presentation
Fec blogger presentationFCCRichard
 
DeltaMarine Highway Report
DeltaMarine Highway ReportDeltaMarine Highway Report
DeltaMarine Highway Report3GIntermodal
 
Role and means of river transportation in Europe
Role and means of river transportation in EuropeRole and means of river transportation in Europe
Role and means of river transportation in EuropeEugene Tkachenko
 
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRYINTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRYRAGHUNANDAN RAMACHANDRAN
 
Florida East Coast Raiway Past & Future
Florida East Coast Raiway Past & FutureFlorida East Coast Raiway Past & Future
Florida East Coast Raiway Past & FutureFCCRichard
 
Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)StudsPlanet.com
 
New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)
New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)
New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)Danny Diep To
 
Forecasting container traffic at major ports in india
Forecasting container traffic at major ports in indiaForecasting container traffic at major ports in india
Forecasting container traffic at major ports in indiaHeisenberg26
 
SmartRivers Final Report
SmartRivers Final ReportSmartRivers Final Report
SmartRivers Final Report3GIntermodal
 
Contributions to the Study of PPPs in the Portuguese Port Sector: the Alcânt...
Contributions to the Study of PPPs in the Portuguese Port Sector:  the Alcânt...Contributions to the Study of PPPs in the Portuguese Port Sector:  the Alcânt...
Contributions to the Study of PPPs in the Portuguese Port Sector: the Alcânt...Cláudio Carneiro
 

What's hot (20)

bimco-greener way of transportation
bimco-greener way of transportationbimco-greener way of transportation
bimco-greener way of transportation
 
Port of boston
Port of bostonPort of boston
Port of boston
 
Shipping trade types tramp and liner shipping
Shipping trade types tramp and liner shippingShipping trade types tramp and liner shipping
Shipping trade types tramp and liner shipping
 
Importance of shipping in international business
Importance of shipping in international businessImportance of shipping in international business
Importance of shipping in international business
 
Importance of shipping in international business.pptx
Importance of shipping in international business.pptxImportance of shipping in international business.pptx
Importance of shipping in international business.pptx
 
Dry port logistics 2015
Dry port logistics 2015 Dry port logistics 2015
Dry port logistics 2015
 
INNOVATIONS IN GREEN AND CLEAN SHIPPING
INNOVATIONS IN GREEN AND CLEAN SHIPPINGINNOVATIONS IN GREEN AND CLEAN SHIPPING
INNOVATIONS IN GREEN AND CLEAN SHIPPING
 
Dry ports integrated design
Dry ports   integrated designDry ports   integrated design
Dry ports integrated design
 
Fec blogger presentation
Fec blogger presentationFec blogger presentation
Fec blogger presentation
 
DeltaMarine Highway Report
DeltaMarine Highway ReportDeltaMarine Highway Report
DeltaMarine Highway Report
 
Role and means of river transportation in Europe
Role and means of river transportation in EuropeRole and means of river transportation in Europe
Role and means of river transportation in Europe
 
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRYINTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
 
Florida East Coast Raiway Past & Future
Florida East Coast Raiway Past & FutureFlorida East Coast Raiway Past & Future
Florida East Coast Raiway Past & Future
 
Sea Bridge Freight Slides
Sea Bridge Freight SlidesSea Bridge Freight Slides
Sea Bridge Freight Slides
 
Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)Dryportpresentation roso 135 (1)
Dryportpresentation roso 135 (1)
 
New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)
New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)
New trends on MODERN Shipping & Transhipment Port (eng) danny diep to (f)
 
Forecasting container traffic at major ports in india
Forecasting container traffic at major ports in indiaForecasting container traffic at major ports in india
Forecasting container traffic at major ports in india
 
IWT by numbers
IWT by numbersIWT by numbers
IWT by numbers
 
SmartRivers Final Report
SmartRivers Final ReportSmartRivers Final Report
SmartRivers Final Report
 
Contributions to the Study of PPPs in the Portuguese Port Sector: the Alcânt...
Contributions to the Study of PPPs in the Portuguese Port Sector:  the Alcânt...Contributions to the Study of PPPs in the Portuguese Port Sector:  the Alcânt...
Contributions to the Study of PPPs in the Portuguese Port Sector: the Alcânt...
 

Viewers also liked

Perth Esri Australia SIBA DIGO Presentation
Perth Esri Australia SIBA DIGO PresentationPerth Esri Australia SIBA DIGO Presentation
Perth Esri Australia SIBA DIGO PresentationTom Gardner
 
Online Course Development and Delivery Reviews: An Interactive Approach
Online Course Development and Delivery Reviews: An Interactive ApproachOnline Course Development and Delivery Reviews: An Interactive Approach
Online Course Development and Delivery Reviews: An Interactive ApproachCarla Bradley
 
отраслевой доклад 2014. тв в россии
отраслевой доклад 2014. тв в россииотраслевой доклад 2014. тв в россии
отраслевой доклад 2014. тв в россииОлег Муковозов
 
Репутация глобальный взгляд IPSOS 2013-rus
Репутация глобальный взгляд IPSOS 2013-rusРепутация глобальный взгляд IPSOS 2013-rus
Репутация глобальный взгляд IPSOS 2013-rusОлег Муковозов
 
kbs+ Ventures Class 6 | Raising Capital Part 2
kbs+ Ventures Class 6 | Raising Capital Part 2kbs+ Ventures Class 6 | Raising Capital Part 2
kbs+ Ventures Class 6 | Raising Capital Part 2The Media Kitchen
 
отраслевой доклад 2014. интернет в россии
отраслевой доклад 2014. интернет в россииотраслевой доклад 2014. интернет в россии
отраслевой доклад 2014. интернет в россииОлег Муковозов
 
Restrictive Clauses in Employment Agreements in India
Restrictive Clauses in Employment Agreements in IndiaRestrictive Clauses in Employment Agreements in India
Restrictive Clauses in Employment Agreements in IndiaAnil Chawla
 
The Journey of Geo Enablement
The Journey of Geo EnablementThe Journey of Geo Enablement
The Journey of Geo EnablementTom Gardner
 
Discussion on Hnam Inpumkhatna
Discussion on Hnam  InpumkhatnaDiscussion on Hnam  Inpumkhatna
Discussion on Hnam InpumkhatnaEllis Pachuau
 
Maden SMAU marta leo
Maden SMAU marta leoMaden SMAU marta leo
Maden SMAU marta leoMarta Leo
 
отраслевой доклад 2013. тв в россии
отраслевой доклад 2013. тв в россииотраслевой доклад 2013. тв в россии
отраслевой доклад 2013. тв в россииОлег Муковозов
 
Средний класс в современной России. Институт социологии РАН, 2014
Средний класс в современной России. Институт социологии РАН, 2014Средний класс в современной России. Институт социологии РАН, 2014
Средний класс в современной России. Институт социологии РАН, 2014Олег Муковозов
 
A I Z A W L V E N G L A I K O H H R A N A N N U A L R E P O R T S 2009
A I Z A W L  V E N G L A I  K O H H R A N   A N N U A L  R E P O R T S 2009A I Z A W L  V E N G L A I  K O H H R A N   A N N U A L  R E P O R T S 2009
A I Z A W L V E N G L A I K O H H R A N A N N U A L R E P O R T S 2009Ellis Pachuau
 
Venglai Christmas Issue 2010
Venglai  Christmas Issue 2010Venglai  Christmas Issue 2010
Venglai Christmas Issue 2010Ellis Pachuau
 
отраслевой доклад Российский интернет 2012
отраслевой доклад Российский интернет 2012отраслевой доклад Российский интернет 2012
отраслевой доклад Российский интернет 2012Олег Муковозов
 
V E N G L A I 5.9.2010
V E N G L A I 5.9.2010V E N G L A I 5.9.2010
V E N G L A I 5.9.2010Ellis Pachuau
 

Viewers also liked (20)

Perth Esri Australia SIBA DIGO Presentation
Perth Esri Australia SIBA DIGO PresentationPerth Esri Australia SIBA DIGO Presentation
Perth Esri Australia SIBA DIGO Presentation
 
Online Course Development and Delivery Reviews: An Interactive Approach
Online Course Development and Delivery Reviews: An Interactive ApproachOnline Course Development and Delivery Reviews: An Interactive Approach
Online Course Development and Delivery Reviews: An Interactive Approach
 
Icici Bank
Icici BankIcici Bank
Icici Bank
 
отраслевой доклад 2014. тв в россии
отраслевой доклад 2014. тв в россииотраслевой доклад 2014. тв в россии
отраслевой доклад 2014. тв в россии
 
Репутация глобальный взгляд IPSOS 2013-rus
Репутация глобальный взгляд IPSOS 2013-rusРепутация глобальный взгляд IPSOS 2013-rus
Репутация глобальный взгляд IPSOS 2013-rus
 
Sample Resume
Sample ResumeSample Resume
Sample Resume
 
kbs+ Ventures Class 6 | Raising Capital Part 2
kbs+ Ventures Class 6 | Raising Capital Part 2kbs+ Ventures Class 6 | Raising Capital Part 2
kbs+ Ventures Class 6 | Raising Capital Part 2
 
отраслевой доклад 2014. интернет в россии
отраслевой доклад 2014. интернет в россииотраслевой доклад 2014. интернет в россии
отраслевой доклад 2014. интернет в россии
 
Restrictive Clauses in Employment Agreements in India
Restrictive Clauses in Employment Agreements in IndiaRestrictive Clauses in Employment Agreements in India
Restrictive Clauses in Employment Agreements in India
 
The Journey of Geo Enablement
The Journey of Geo EnablementThe Journey of Geo Enablement
The Journey of Geo Enablement
 
Drug addiction
Drug addictionDrug addiction
Drug addiction
 
Discussion on Hnam Inpumkhatna
Discussion on Hnam  InpumkhatnaDiscussion on Hnam  Inpumkhatna
Discussion on Hnam Inpumkhatna
 
Maden SMAU marta leo
Maden SMAU marta leoMaden SMAU marta leo
Maden SMAU marta leo
 
отраслевой доклад 2013. тв в россии
отраслевой доклад 2013. тв в россииотраслевой доклад 2013. тв в россии
отраслевой доклад 2013. тв в россии
 
Средний класс в современной России. Институт социологии РАН, 2014
Средний класс в современной России. Институт социологии РАН, 2014Средний класс в современной России. Институт социологии РАН, 2014
Средний класс в современной России. Институт социологии РАН, 2014
 
A I Z A W L V E N G L A I K O H H R A N A N N U A L R E P O R T S 2009
A I Z A W L  V E N G L A I  K O H H R A N   A N N U A L  R E P O R T S 2009A I Z A W L  V E N G L A I  K O H H R A N   A N N U A L  R E P O R T S 2009
A I Z A W L V E N G L A I K O H H R A N A N N U A L R E P O R T S 2009
 
Venglai Christmas Issue 2010
Venglai  Christmas Issue 2010Venglai  Christmas Issue 2010
Venglai Christmas Issue 2010
 
отраслевой доклад Российский интернет 2012
отраслевой доклад Российский интернет 2012отраслевой доклад Российский интернет 2012
отраслевой доклад Российский интернет 2012
 
V E N G L A I 5.9.2010
V E N G L A I 5.9.2010V E N G L A I 5.9.2010
V E N G L A I 5.9.2010
 
Social Media
Social MediaSocial Media
Social Media
 

Similar to GE ConHab proposal | ComLoc, Corp.

Fleet Management
Fleet ManagementFleet Management
Fleet ManagementRaduGodina1
 
Bridge 8 2020 March Virtual Container Yard A review of Literature.docx
Bridge 8 2020 March  Virtual Container Yard  A review of Literature.docxBridge 8 2020 March  Virtual Container Yard  A review of Literature.docx
Bridge 8 2020 March Virtual Container Yard A review of Literature.docxCINEC Campus
 
Unit 2 ; Marine Cargo Management
Unit 2 ; Marine Cargo ManagementUnit 2 ; Marine Cargo Management
Unit 2 ; Marine Cargo ManagementFredrick Olali
 
Containing the Container Nuisance
Containing the Container Nuisance Containing the Container Nuisance
Containing the Container Nuisance Santiago Enrique
 
ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...
ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...
ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...CINEC Campus
 
IC WASET Tokyo-Japan 2019 The Virtual Container Yard Identifying the Persuas...
IC WASET Tokyo-Japan 2019 The Virtual Container Yard  Identifying the Persuas...IC WASET Tokyo-Japan 2019 The Virtual Container Yard  Identifying the Persuas...
IC WASET Tokyo-Japan 2019 The Virtual Container Yard Identifying the Persuas...CINEC Campus
 
Port Development, Review of Maritime Transport 2014
Port Development, Review of Maritime Transport 2014Port Development, Review of Maritime Transport 2014
Port Development, Review of Maritime Transport 2014Manas Tripathy
 
Chapter 13Multimodal TransportationMultimodal Transporta.docx
Chapter 13Multimodal TransportationMultimodal Transporta.docxChapter 13Multimodal TransportationMultimodal Transporta.docx
Chapter 13Multimodal TransportationMultimodal Transporta.docxcravennichole326
 
vns iso tank transport
vns iso tank transportvns iso tank transport
vns iso tank transportnguhuantrung
 
ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...
ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...
ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...CINEC Campus
 
10 curious facts about the shipping industry
10 curious facts about the shipping industry10 curious facts about the shipping industry
10 curious facts about the shipping industryiContainers
 
What do you think of...
What do you think of...What do you think of...
What do you think of...Maciej Kniter
 
Shipping Container Sales: Trends
Shipping Container Sales: Trends Shipping Container Sales: Trends
Shipping Container Sales: Trends Webstrategies
 
Architectural Framework For The Development Of Boat Terminals
Architectural Framework For The Development Of Boat TerminalsArchitectural Framework For The Development Of Boat Terminals
Architectural Framework For The Development Of Boat TerminalsSara Perez
 

Similar to GE ConHab proposal | ComLoc, Corp. (20)

Fleet Management
Fleet ManagementFleet Management
Fleet Management
 
Bridge 8 2020 March Virtual Container Yard A review of Literature.docx
Bridge 8 2020 March  Virtual Container Yard  A review of Literature.docxBridge 8 2020 March  Virtual Container Yard  A review of Literature.docx
Bridge 8 2020 March Virtual Container Yard A review of Literature.docx
 
Unit 2 ; Marine Cargo Management
Unit 2 ; Marine Cargo ManagementUnit 2 ; Marine Cargo Management
Unit 2 ; Marine Cargo Management
 
Containing the Container Nuisance
Containing the Container Nuisance Containing the Container Nuisance
Containing the Container Nuisance
 
ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...
ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...
ICME Ruhuna 2017 Factors that Influence Container Inventory Management Strate...
 
IC WASET Tokyo-Japan 2019 The Virtual Container Yard Identifying the Persuas...
IC WASET Tokyo-Japan 2019 The Virtual Container Yard  Identifying the Persuas...IC WASET Tokyo-Japan 2019 The Virtual Container Yard  Identifying the Persuas...
IC WASET Tokyo-Japan 2019 The Virtual Container Yard Identifying the Persuas...
 
Port Development, Review of Maritime Transport 2014
Port Development, Review of Maritime Transport 2014Port Development, Review of Maritime Transport 2014
Port Development, Review of Maritime Transport 2014
 
Chapter 13Multimodal TransportationMultimodal Transporta.docx
Chapter 13Multimodal TransportationMultimodal Transporta.docxChapter 13Multimodal TransportationMultimodal Transporta.docx
Chapter 13Multimodal TransportationMultimodal Transporta.docx
 
2012 MPB
2012 MPB2012 MPB
2012 MPB
 
vns iso tank transport
vns iso tank transportvns iso tank transport
vns iso tank transport
 
ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...
ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...
ICBM 2016 2 The Global Impact of Container Inventory Imbalance and the Factor...
 
Ports cautious investment
Ports cautious investmentPorts cautious investment
Ports cautious investment
 
Arctic route
Arctic routeArctic route
Arctic route
 
Port Congestion Article
Port Congestion ArticlePort Congestion Article
Port Congestion Article
 
Port managment
Port managmentPort managment
Port managment
 
10 curious facts about the shipping industry
10 curious facts about the shipping industry10 curious facts about the shipping industry
10 curious facts about the shipping industry
 
What do you think of...
What do you think of...What do you think of...
What do you think of...
 
Shipping Container Sales: Trends
Shipping Container Sales: Trends Shipping Container Sales: Trends
Shipping Container Sales: Trends
 
Architectural Framework For The Development Of Boat Terminals
Architectural Framework For The Development Of Boat TerminalsArchitectural Framework For The Development Of Boat Terminals
Architectural Framework For The Development Of Boat Terminals
 
Containeriz
ContainerizContaineriz
Containeriz
 

GE ConHab proposal | ComLoc, Corp.

  • 1. Container Habitats exploring housing alternatives using retired intermodal containers P.O. BOX 1502  MONTCLAIR, NJ 07042-9998 877.317.7275  973.746.1076 www.comloc.com 
  • 2. Table of Contents Intermodal Container Repositioning................................................................1 Cycle of Container Handling .............................................................................3 Factory-built Housing: Modular..........................................................................5 Housing Demand: Domestic & International ............................................. 11 Alternative Use for Intermodal Containers: Habitats............................... 15 Create the Prototype........................................................................................ 18 A Sea of Boxes..................................................................................................... 19 Housing the Earth’s People.............................................................................. 20 Building the Homes of the 21st Century in Factories ................................. 22 Affordability.......................................................................................................... 23 Building Systems .................................................................................................. 23 Containers ............................................................................................................ 24 Demand................................................................................................................ 24 Design .................................................................................................................... 25 Annualized Estimates............................................................................................1 Market Potential Indicators for Emerging Markets – 2004..........................2 2
  • 3. Chapter 1 Background Intermodal Container Repositioning It is estimated that the global container population is approaching 16m TEU, with a projected rate of growth of 8.5% per year for the next 10 years, and there are approximately 2.5+m TEU empty boxes currently sitting idle in yards and depots around the world. In the eyes of port operators, shippers and carries, the number of empty boxes sitting at the terminal should ideally be nil or very few. Given the fact that empty boxes have to go somewhere, storage and repair depots represent an essential ingredient in containerization. Storing containers is land-intensive, suffers from poor environmental credentials in terms of unsightly piles of containers, noise and road vehicle traffic and it never is a business place with high levels of profitability. As ports have expanded and residential areas behind the ports have gobbled up more land for housing, storing empty containers is becoming an increasingly serious problem all around the world, requiring special attention. According to a New Jersey Department of Environmental Protection study of Brownfields, “Container mountains” have become a prominent feature of the port district skyline. These are the stacks of hundreds of empty containers, up to seven high, which have been created on large swaths of land near the port. This study estimates that 400 acres are now devoted to long-term storage of containers. Terminal operators have contracted with third parties to move the empties from the terminal areas to offsite storage locations. The practice has provoked opposition from communities, which find themselves home to huge, ugly stacks of metal that dominate the landscape and fill properties that otherwise might be redeveloped for more productive uses. Not surprisingly, the mountains have strengthened local opposition to any and all freight related development, which officials fear will only attract more trucks and more containers storage. In the case of new Jersey, the NJDEP project team found evidence that the continuing build up of empty containers at the port was indeed crowding out other types of development. Because of the growing demand for land, container companies can offer property owners an immediate revenue stream, leaving the owners free to sell or redevelop their properties at a future date if more lucrative offers arise.
  • 4. This container storage leaves the land undeveloped for higher economic uses that would benefit the local community and region. For instance, one property owner was offered $3,000 per acre per month for a 10-year lease on 13 acres. The site is in a prime location where a developer has offered to build a 330,000- square-foot warehouse, pending environmental clearance to proceed. For the landowner, a 10-year revenue stream is an attractive proposition compared to continuing to deal with the onerous requirements of site clean up. However, it means that needed redevelopment of properties is being stymied, removing the potential for jobs and tax ratables. It also has made the entire port districts less attractive to some developers who are wary of having such mountains as long-term neighbors. While some container storage in and around ports is inevitable, the current levels of storage appears harmful to prospects for realizing and sustaining increased trade. The current global imbalance of trade is reflected by the following charts: Source: UNCTAD, Review of Maritime Transport. Containerized Cargo Flows along Major Trade Routes, 2000-2003 (in millions of TEUs) Container flows are quite representative of global trade imbalances. For instance there are 2.5 times as much containers moving from Asia to the United States (10.2 million TEUs in 2003) than there are from the United States to Asia 2
  • 5. In 1,000 TEU’s, Source: UNCTAD, Review of Maritime Transport, US Containerized Trade with Asia, 1996-2003 The trade balance of the United States with several countries of the Pacific is chronically imbalanced, notably with China. This trend has implications on the movements of containers as well as on transport costs. As of 2003, the ratio was 2.48 TEUs moving east for each TEU moving west (this figure was 1.19 to 1 in 1996 and 1.73 in 2000). The Asian crisis exacerbated imbalances in transpacific containerized shipping, mostly due to currency fluctuations. In addition, the costs of moving a container from East Asia to the United States have been reduced by 50% during the 1990s, but due to trade imbalances Asian exporters pay on average 50% more in container shipping costs than their American counterparts. Cycle of Container Handling Empty container trips occur for various reasons, including conditions of business agreements between shippers/consignees and the ocean carriers (who are generally the owner or supplier of shipping containers) that require all containers to be picked up and returned to container yards (CY) at the carrier’s terminal, regardless of whether they are loaded or empty. Basically, for inbound and outbound cargo, loaded containers are picked up by trucking companies from the carrier’s terminal and are delivered to the consignee for unloading. They are then returned to the carrier’s terminal, usually by the same trucking company. The same practice is in place for outbound cargo. Trucking companies pick up empty containers required by an exporter from a carrier’s terminal and deliver these empty containers to the exporter for loading. After a container has been loaded, a trucking company will transport the loaded container to the carrier’s terminal where it will be stacked at the pier prior to loading on to a container ship. It is clear that, in the case of both export and import cargo, at least two-thirds of the required truck trips involve empty container movements, either for empty pickup or empty return. For port operators, empty container problems will worsen as terminal land availability grows scarce. Empty containers are often allowed a longer dwell time at marine terminals (anywhere from 14 to 50 days), and the current practice of local terminal operators is to store containers, especially imports, on a wheeled chassis instead of in grounded stacks of containers, as is the common practice of terminals in Asia and Europe. 3
  • 6. According to the Gateway Cities study (Ports of Long Beach and Los Angeles region), “empty containers move back and forth because, at present, there is no alternative.” The current practice—the manner in which empty containers are distributed and re- located—has developed over the past few decades along with the growth of international trade and containerization, and as an integral part of a competitive market environment that has encouraged ocean carriers to search for all possible solutions to reduce such non- revenue generating activities as repositioning empty containers. The reuse of empty containers for local export is considered to be a potential solution for rationalizing the movement of empty containers and thereby reducing unnecessary empty trips. Reuse of empty containers is the direct reuse of import empty containers for local export cargo without an intermediate return of the empty to the marine terminal. However, the current practice that requires all empty import containers to return to marine terminals whether empty or loaded is inefficient. There are number of practical reasons for this practice. Firstly, all carriers have their own container yard located at the terminal, making it impractical for them to duplicate operating costs for facilities and personnel at inland container depots. Building more inland depots involves greater investments in capital and operating funds, and additionally, it creates a more complicated system for controlling their inventory operation. Secondly, except for leased containers, which can be off-hired in the local region when not needed, to keep an adequate supply of containers for their operations worldwide, the same number of containers brought into the U.S. must be relocated back to Asia, regardless of their being empty or loaded. Due to the relative lack of local export cargo, most import containers are shipped back empty. Thus, it is better off for carriers to have these containers returned to marine terminals for their earliest possible repositioning to the area of relative shortage. On the other hand, with leased containers, there are number of designated locations established by container leasing companies to receive off-hired containers. In current practice, off-hired empty container movements are often more flexible than those of carrier-owned empty containers. 4
  • 7. Factory-built Housing: Modular By 2010, home design and construction is efficient, predictable, and controllable with a median cycle time of 20 working days from groundbreaking to occupancy with resulting cost savings that make homeownership available to 90 percent of the population. This will be achieved through improving the whole house design and the manner in which a house is constructed using new and innovative products, systems, and processes. ABOUT THE MANUFACTURED HOME INDUSTRY New homes can be and often are built partly or almost entirely in factories rather than on site. Factory construction offers many opportunities for economizing and increasing efficiency in the production process modeled after experience gained in other industrialized sectors of the economy. Production of new homes in a factory differs in many important ways from construction of homes on site, and general opportunities for efficiency exist in this centralized, controlled environment compared to construction on scattered sites. For example, factories built in low- cost areas where prevailing wage rates are lower can achieve a competitive advantage by selling finished products into markets where the wage rates for similar work performed on site would be much higher. These savings are attractive to the extent they outweigh the costs of transportation and installation that are unique to factory-built housing. In addition, capital investment for plant and specialized equipment used in assembly-line operations shifts the mix of labor and capital inputs and raises labor productivity. Unskilled, less expensive labor can be used more effectively when production takes place on an assembly line and can be organized into simple, repetitive operations. Workers in the plant are generally employees of the firm, not subcontractors, and as such can be scheduled, managed, trained and deployed by a single authority in the interests of productivity and efficiency. These factors, which characterize both HUD-Code and modular home production, differ greatly from the institutional contracting and subcontracting arrangements that characterize conventional site-built homes and home building firms. Industry sources report that the labor content of HUD-Code homes typically ranges from 8 - 12%of total cost, compared to total labor costs for site-built homes which have been estimated to constitute 40% or more of total cost. Of course, to some degree a smaller labor share will be offset by higher costs of capital for any firm with investment in fixed production facilities, but the successes of industrialization throughout the economy are powerful evidence of the opportunities to reduce production cost by substituting capital for labor. 5
  • 8. Modular Home Manufacturers (7%) There are about 200 modular home manufacturers that make assembled sections of housing inside factories. Most modular units are made in complete, box like sections, and multiple- section units and stack-on units are common. Modulars are the strongest of all frame homes built, and are 95% complete when they leave the factory. They are sold direct or through local builders or builder/dealers. During 2004 about 206,000 modular homes and apartments were sold. HUD-Code (Mobile) Home (5%) Ever since the passage in 1976 of the U. S. Department of Housing & Urban Development Manufactured Home Construction & Safety Standards (HUD-Code), exterior frame construction of mobile units has been on par with site-built homes, and HUD-Code homes are now generally safer dwellings. HUD-Code homes are made by approximately 90 companies operating about 350 factories using techniques similar to modular methods but with generally lighter construction and always with a metal chassis as part of the floor system. It is believed that double-section HUD-Code homes which look like site-built homes will account for most low-cost housing in the future. HUD-Code homes are sold through dealers on display lots or from model homes in subdivisions. In 2004 about 140,000 HUD-Code homes were sold, and over half of those were double or multi-section units. Production Builders (44%) These companies usually build single-family homes and low-rise apartment buildings in subdivisions near major metropolitan centers. More than 95% of the nation's 7,000 large production builders use factory-fabricated roof trusses. Use of other factory-made components, such as floor trusses and wall panels, is growing rapidly because of soaring site labor and construction loan costs. Some of the biggest production builders operate their own component factories. However, all production builders sell their homes directly to end buyers rather than through builder/dealer networks, which distinguishes them from panelized home manufacturers. In 2004, production builders sold about 1.254 million units. Panelized Home Manufacturers (44%) The panelized home manufacturers are the biggest and most diverse segment of U.S. housing. They include: 1) Hundreds of conventional panelizers who sell their packaged homes through builders and builder-dealers; 2) Log home builders, over 200 strong, who sell direct or through dealers; 3) The mass merchandiser chains and local lumber yards and home centers who perform all functions of a package home producer; 4) Producers of dome homes and other alternative systems including light-gage steel, lightweight concrete, foam-core panels, foam blocks--plus component firms who cross over into package homes. In 2001 the estimated 3,500 panelizers collectively built about 1,254,000 units, equaling the production builders. Special Unit Manufacturers Special unit manufacturers are in-plant builders of commercial structures of all types. There are about 170 of these companies who build an average of about 1,665 structures per year. They sell direct or through dealers and also lease their units. Their output, usually built to more stringent commercial building codes, includes classrooms, offices, banks, hospitals, construction offices, equipment shelters, restaurants, kiosks, jails, airport terminals, strip shopping centers, and dozens of other commercial buildings. This industry is growing fast as 6
  • 9. owners and investors discover the speed, cost and quality advantages of specifying modular commercial structures. It must be remembered that all the previously mentioned housing producers also build commercial buildings. Total output of commercial structures by both in- plant special unit and housing companies was estimated at 283,000 units in 2004. GE Modular Space is a major player in the sector. Mobile/Modular/Panelized Dealers Builders and dealers for HUD-Code (mobile) homes, modular homes and panelized homes account for sales of 56% of all housing. Sometimes called "builder-dealers" for modular and panelized homes, they may sell for one or several manufacturers. Normally they sell homes only in a given territory, and it is their responsibility to prepare the site, do foundation and utility work, and supervise completion work on the homes after delivery. Most HUD-Code home dealers sell units from display lots, mobile home communities or both. A growing trend among HUD-Code home dealers is to sell models in conventional real estate subdivisions. THIS INDUSTRY IS GROWING SWIFTLY. From the late 1930s when modern industrialized housing companies started emerging in New England and the Midwest, HUD-Code, modular and panelized home companies have grown to where they now produce 56% of all single-family homes and low-rise apartments. This does not count the industrialization of site-built homes where 95% use factory made roof trusses, and a rapidly growing number use pre-hung doors, floor trusses, wall panels and other components. WHY THE FAST GROWTH? Faster construction time, lower costs and better quality. While "stick builders" may need from six to 12 months or even more to build a house at a job site, industrialized builders need only one to three months to finish a componentized home, six to eight WEEKS to finish a panelized package home, and only one to three weeks to finish a double- section HUD-Code or modular home! Speed means fewer material cost increases and less or even no cost for construction loan money. Precision factory fabrication methods also deliver vastly better quality in construction. WHO BUYS THE PRODUCTS? Home builders or factory fabricators themselves. Independent research shows flooring brands are specified by 90% of production builders, 83% of panelizers, 94% of modular manufacturers and 80% of HUD-Code manufacturers. Siding is specified by 90% of production builders, 76% of panelizers, 91% of modular manufacturers, and 92% of HUD-Code manufacturers. These figures are representative for ALL products going into housing today. MODULAR BUILDING SYSTEM A modular home is the culmination of one type of building system. Modular homes actually begin as components; designed, engineered and assembled in the controlled environment. It is when these components come together on a building site and the final finish is completed by a builder, that the components become a home. Modular units are usually placed on conventional foundations, either crawlspaces or full basements, and are most commonly sold to builders representing customers with land or to third-party builders who own scattered lots. The builders are typically responsible for excavation, final grading, construction of a suitable foundation, and connection of utilities. Consequently, modular builders are subject to the same local regulation in these areas as site- builders. 7
  • 10. Efficiency begins with modern factory assembly line techniques. A house travels to workstations, with all the building trades represented. Work is never delayed by weather, subcontractor no-shows or missing material. Quality engineering and modular construction techniques significantly increase the energy efficiency of a modular home. Modular producers either provide a full line of services at the site as a so-called “turnkey operation,” or only provide a “rough-set” of site services. In the rough-set, the modular producer provides a crane and its rough-set crew removes the units or boxes from the trailer, places them on the foundation, and seals the home so that it is weather-tight, while a builder does the finishing and the remaining site work (e.g., porch, deck, garage and landscaping). The turnkey producer, on the other hand, not only sets the unit but also does the finishing activities at the site. Modular buildings that have already been inspected in-plant and certified according to state regulations and procedures are usually issued permits for site work by local enforcement agencies after local review of floor plans, elevations, plans for site-built construction and installation, and installation instructions. Local or state code officials defer to in-plant inspections and approvals but are responsible for inspecting work performed on site to determine whether it is in compliance with the applicable regulations. MODULAR COSTS The calculated sales price of the modular home is approximately 90% of that for the site-built home, primarily due to lower structure costs from prefabrication. The efficiencies of factory production are counterbalanced by the desire for modular producers to do more customizations to compete in a more upscale market, and the necessity to meet the requirements of varied local codes. Construction costs include labor and materials for both the structure and the foundation. For site-built homes, all labor and materials are consumed on site. For factory-built homes, most labor and materials are consumed in the factory. Modular homes are 85 – 95% complete when they leave the factory while manufactured homes are approximately 98% complete. Factory-incurred overhead costs are embedded in the structure costs or invoice price that the modular builder or manufactured home retailer pays to the producer. Profitability for modulars is slightly above the rate for site-built homes, consistent with the idea that only some of the lower production cost will flow through into selling prices. To some degree modular producers may set prices to “meet the competition” and translate lower production cost into higher margins. Finally, inasmuch as profit represents economic return on invested capital, persistent differences in profitability across sectors of the industry can be expected to the degree that capitalization requirements and capital/output ratios vary between sectors. All builders incur financing costs, but they are lower for modular and manufactured homes compared with site-built homes. Site-built homes can take three months or more to build and the builder’s carrying costs during this period can be substantial. Manufactured home producers, on the other hand, typically build units on direct order from the retailer in about five days. As a result, the financing cost of operation and inventory is minimal for the producer, and much of the cost of inventory is shifted to the retailer. The cost of the retailer inventory of models used to sell homes is financed by banks through “floor financing,” typically at 2% above prime, which is less expensive than construction loan financing for site builders. 8
  • 11. Modular manufacturers are in a similar position to that of manufactured home producers, but their period of construction is slightly longer and more complex due to the amount of customization and possible variation in local codes. Modular builders need fewer draws from the bank than site builders and are able to build a home over a shorter finance period, making it less expensive to borrow money for financing construction. MODULAR MULTIFAMILY BUILDINGS Although some might think that factory-built housing applies only to single-family homes, a number of builders are realizing time, and sometimes cost, savings with modular apartments. Modular multiple dwellings are available as customized buildings that look like site-built structures, assembled in a factory while earthwork, foundations, and utilities are prepared onsite. The scale and repetition that characterizes many multifamily buildings lends itself to an automated solution, especially in areas located near the factories. The controlled indoor environment and stable, experienced labor are conducive to assemblies with consistent quality, often at reasonable cost. Workers familiar with their product can more easily integrate unfamiliar materials and techniques with other trades working side-by-side. Also, the rapid building cycle of modular construction can reduce or eliminate jobsite and theft. Modular multiple dwellings consist of box-like sections stacked vertically and horizontally with a crane. Each box is approximately 14' wide by 50' long (this varies considerably), one-story high, and includes all partitions between a fully-framed floor and ceiling. Although companies accommodate various configurations, most are orders for side-by-side duplexes in two-story attached townhouses. Other arrangements include townhouse flats, duplexes over flats, and "quads" with two flats over two flats. Less common are apartment buildings with shared entrance halls. The numbers of modular multi-housing units, while still small, are growing. Multifamily projects accounted for 5 percent of the estimated 43,000 modular units shipped in 2004, said Thayer Long, assistant vice president of the Manufactured Housing Institute's National Modular Council. This market share has remained steady for several years, but its stability belies real growth in the overall number of units being made: 37,800 modular units were shipped in 2003, up from 35,000 in 2002. PROSPECTS FOR MODULAR HOUSING The nascent modular home building industry has the opportunity to garner an increasingly larger share of new housing both domestically and internationally over the next several decades. The principal drivers will be the application and improvement of industrialization concepts that have been successfully used in other industries to the process of home building. A study performed by Virginia Tech for HUD, “Industrializing the Residential Construction Site” (O’Brien, Wakefield, and Beliveau, July 2000), provides an excellent overview of what is going on in the home building industry in the United States and abroad, as well as manufacturing concepts successfully used in other industries. Industrialization concepts that have worked in other industries and that currently may be in use by production builders need to be considered. 9
  • 12. Examples include:  Just-in-time (JIT) manufacturing that includes effective supply chain management. Although the supply chain management that works well for GM is not applicable to individual small builders, several of those builders may form alliances to gain leverage. (Supply chain management is addressed in the Information Technology Roadmap.)  Flexible, agile, lean production systems.  Concurrent engineering and design for manufacturers that use various techniques and processes to enhance the manufacturability of the product.  Manufacturing requirements planning (MRP), manufacturing resource planning (MRP II), and enterprise resource planning systems (ERP), which are processes that are enabled by information technology.  Concurrent design, where communication among designers and the producers (construction foremen, site supervisors, trade contractors) can significantly improve the efficiency of production. Communication up the chain, from the people at the job site back to the designers and sales force, typically is inadequate at best.  Time and space-based scheduling that facilitates keeping track of who is where, doing what, and when. This type of scheduling is especially appropriate for construction activities, as crews move among sites. 10
  • 13. Housing Demand: Domestic & International “Affirm that, in the interest of affordable housing for the poor, it is necessary to promote cooperation among countries in order to popularise the use of adequate low-cost and sustainable building materials and appropriate technology for the construction of adequate low-cost housing and services within the reach of the poor.” The UN Declaration on Cities and Other Human Settlements in the New Millennium DOMESTIC The Commerce Department said that construction was started on new homes in February at an annualized rate of 2.2 million units. That was 15.8% higher than a year earlier and the fastest pace of residential construction starts in 21 years. Starts for single-family homes, the largest component of residential housing, reached an annual rate of 1.78 million units, a record. Even though many economists believe these numbers will ease in the months ahead as inventories of unsold homes start to pick up, it still is likely that 2005 could be the biggest year for home construction in decades. Why does the U.S. need so much new housing? The simple answer, of course is, rising demand. But what is behind the demand is worth considering. First and foremost, the demand for housing reflects two key demographic trends -- new household formations and immigration. Economists at Harvard University's Joint Center for Housing Studies believe that household formations in the current decade will outpace formations during the 1990s, when they estimate that 12.5 million households were formed.  Growth has been due in part to many Gen-Xers establishing households at younger ages than even their baby-boomer parents did. Over the next 10 years, the Joint Center estimates that between 13.4 million and 14.5 million new households will be formed, depending on the level of immigration. The U.S. Census Bureau estimates that immigration is running at about 850,000 a year, but the Joint Center says the actual number is between 1.2 million and 1.3 million. If immigration comes in on the high side, household formations will begin to approach levels last seen "when the baby boomers stormed into adulthood in the 1970s," says Eric Belsky, the center's executive director.  Rising wealth is a second factor behind strong housing demand. As baby boomers come into their peak wealth years, a good percentage are buying second homes. According to a recent report by the National Association of Realtors, 2.82 million second homes were sold in 2004, up sharply from the previous year. Exactly how many of those homes were newly constructed is hard to know, although estimates range from 5% to 15%. 11
  • 14. Current Population Survey and the Housing Vacancy Survey  There's another, less-discussed factor fueling demand for new construction: The rapid replacement of unusable and undesirable homes. According to housing-industry economists, the U.S. housing stock is in the process of being rebuilt, as aging stock is torn down to make room for newer stock. The average age of an American home is about 33 years -- older than any previous time in U.S. history. The number of homes older than 50 years rose to 25.8 million in 2000 from about 18.8 million in 1990. The average age of the U.S. housing stock swayed between 23 and 27 years from 1940 to 1990, then started a persistent rise. As the housing stock ages, new construction starts "will be permanently elevated because we need to replace housing stock which is wearing out," says Fannie Mae economist David Berson. The Census Bureau is forecasting net removals will total about 450,000 annually between now and 2013. 12
  • 15. INTERNATIONAL  It is projected that the world population will rise from 5.7 billion in 1995 to 8.9 billion in 2050, growing at the rate of 1.3 % per annum in the period 1995-2000 to 0.3 % per annum in the period 2045-2050. The assumption is that there will be a massive fertility decline in the majority of countries, a scenario expected to produce ageing populations, i.e. populations in which the proportion of children is declining and that of older persons is increasing.  More than one billion of the world’s city residents live in inadequate housing, mostly in the sprawling slums and squatter settlements in developing countries. Such areas are regarded as one of the most visible expressions of human poverty. The lack of adequate housing in the cities of developing countries is one of the most pressing problems of the 21st Century, and the cost of providing adequate shelter for all is immense. Yet, the cost of doing nothing may be even greater, for the new urban slums are potential breeding places for social and political unrest. The global data on housing adequacy is rather limited, however, and what is considered adequate in one part of the world - or at one point of time - may not be regarded so elsewhere.  Almost two billion people currently live in urban regions of the developing world. This figure is projected to double over the next 30 years, at which time urban dwellers will account for nearly half the global population1. Moreover, most of these new urban dwellers are likely to be poor – resulting in a phenomenon termed as the ‘urbanization of poverty’. Slums are a physical and spatial manifestation of increasing urban poverty and intra-city inequality. However, slums do not accommodate all of the urban poor, nor are all slum dwellers always poor.  The global housing stock in cities amounts to 700-720 million units of all types. It is estimated that 20 to 40 million urban households are homeless. A significant number of those housed, however, cannot be regarded as living in adequate shelter. Worldwide, 18% of all urban housing units (some 125 million units) are non-permanent structures, and 25% (175 million units) do not conform to building regulations. Most deficient housing units are found in the cities of developing countries, with more than half of all less-than- adequate housing units located in the Asia and Pacific region. The number of people living in  inadequate shelter may be as high as 1.3 billion world-wide because most cannot afford otherwise. Acute shortages of adequate housing exacerbates the situation, as low supply tends to increase prices. Some 40-50% of urban residents in developing countries own heir dwellings, and another 20-30 % are legal tenants. 13
  • 16. Many cities also have large squatter settlements, where people rent rooms or whole units. In industrialized countries, higher prevalence of rental housing provides for a greater variety of demand and internal mobility. Nevertheless, some towns in the South have more than 70% of their housing stock as rental housing (such as in Kisumu, Kenya; Jinja, Uganda; or Conakry, Guinea).  Generally, a housing structure is considered durable when certain strong building materials are used for roof, walls and floor. Even though some houses may be built with materials classified as durable, the dwellers may still not enjoy adequate protection against weather and climate due to the overall state of a dwelling. Alternatively, a material may not look durable, in the modern sense, but is, in the traditional sense, when combined with skills of repair. Such cases are vernacular housing made of natural materials in villages, maintained by its residents annually.  Durability of building materials is to a very large extent subject to local conditions as well as to local construction and maintenance traditions and skills. Which materials are considered durable under local conditions has to be determined by local experts. This is also true for the common problem that dwellings in the semi-urban outskirts of cities of developing countries often follow rural construction patterns by using materials, which can be considered non-durable under urban conditions. In addition, compliance with local regulations and the quality of the location form part of the definition. These two indicators cannot be easily observed as they require specific knowledge about the legal condition and the land use plan as well as skills to determine hazardous areas.  Developing countries have the advantage of not being tied to heavy investments in technologies of the past. Therefore, instead of resting on the limited productivity of craftsmanship or before yielding to the seduction of impulsive technology transfers, they are invited to consider a full range of prospective options offered by “Reproduction”: research and development of innovative processes truly capable of simplifying the production, therefore avoiding long sequential operations of craftsmanship nature. Options generated through a double matrix between the available resources (materials and processes) and the basic strategies of industrialized building systems (Site Assembled Kits of Parts, Factory-Made Modules and Hybrids). (Sourced in part: United Nations Human Settlements Programme) 14
  • 17. Chapter 2 Proposal Alternative Use for Intermodal Containers: Habitats Even if the estimates of nearly 9% growth per year in empty containers were halved, global unfilled containers will approach a glut of 5,000,000 by 2010. While any number of methods will be employed to modulate excess supply, as long as the U.S. is faced with a trade deficit with Asia, empty containers will remain a reality. Given that inevitability, alternative redeployment of empty containers should be considered. The use of intermodal containers as habitats is one way of addressing the issues of an ever growing supply of empty containers, as well as, the ever growing demand for housing, both domestically and internationally. Three rather distinct approaches proposed here, of using containers as housing are representations of design work by LOT-EK Architects from New York City (pronounced LOW- tech – http://www.lot-ek.com/): 1. Domestic Projected Units Average Market Product (initial) Wholesale Price* Individual Home Owner Container Home Kit 200 $225,000 Live-Work Space Container Home System 50 $100,000/unit Student Housing Container Home System 50 $79,000/unit DOD Military Housing Container Home Kit 100 $110,00 a. Market Rate Homes – the following illustrations of Container Home Kits (CHK) is to answer a request for homes with a particular aesthetic appeal. The CHK will be available using 2–8 – 40’ containers either a in a compact or loft configuration. The structures can be arranged as townhouses or as one-off single family units. These homes can be marketed to individual home-owners, to builder/contractors, or to the Department of Defense (DoD’s Housing Privatization program) b. Multiple Units – the Container Housing System (CHS) uses multiple containers for a variety of apartment building configurations. These buildings will be marketed to builder/contractors, with a particular emphasis on Live-Work Space and Student Housing. * price estimates of the basic dwelling, excluding land, site prep, and transport 15
  • 18. Container Home Kit The CHK, Container Home Kit, combines multiple shipping containers to build affordable homes. Conceived as a kit of parts, the basic unit, a 40-foot- long shipping container, is transformed into an expandable module. The container functions as both the structure and shell for the habitat. Sections of its corrugated metal walls can be cut out without compromising its structural integrity. The resulting openings can be used to join containers side by side to make up larger spaces, or for vertical connections between them. The Container Home Kit is available in two lines: CHK compact and CHK loft, in configurations that range from 2 to 4 bedrooms using 4 to 8 containers. The houses are positioned on site on 2 parallel strips of concrete that are also used for pedestrian as well as car access through the lot. The houses built with this system are recyclable themselves as they can be disassembled and reassembled elsewhere. Container Housing System The CHS, Container Housing System, is designed to exploit the containers natural stack- ability, stretched geometry, and industrial/mechanical detail. The apartment units are placed side by side in two parallel lines, along the front and back of the building, leaving a gap in the middle, which becomes a circulation hallway on each floor. The containers with pierced floors and ceilings stack vertically to generate shafts for stairwells and mechanicals. In both cases, the interior finishes of the CHK or CHS will not betray the fact that these are homes built from retired shipping containers. 16
  • 19. The CHK and CHS are the brainchildren of LOT-EK Architects, from NYC, which has worked in both the design and application of this technology for many years. The partners, Giuseppe Lignano and Ada Tolla, have adopted the container as a design signature, using it along with oil tanks, airplane fuselages and other industrial castoffs. In fact, LOT-EK is the most prominent of an emerging school of architects using inexpensive recycled containers as temporary or permanent homes, offices and galleries. 2. International Projected Units Average Market Product (initial) Wholesale Price* Shelter (developing nations) Container Home Kit 1250 $5,120 Multifamily Apartments Container Home 150 $8,000/unit System a. Shelter Habitats – a compact version of Container Home Kit (CHK), at approximately 59m (640 sq. ft.) is a suitable dwelling for either transitional or permanent housing. It would be targeted to nations looking to improve the problems of substandard housing. b. Multiple Units – in the developing world, including Eastern Europe, the Container Housing System (CHS) multi-container configurations, will marketed to apartment building developer/investors, again in those countries making a commitment to alleviate substandard housing. * price estimates of the basic dwelling, excluding land, site prep, and transport 17
  • 20. Create the Prototype LOT-EK is currently seeking financial and in-kind participation from General Electric for the development and production of a prototype of the Container Home Kit (CHK), 3X3 Loft design. The firm has a thorough and well-positioned architectural design concept (Step1 in the DFMA process below). Engineering, developing, and testing a prototype house using the standard structural and mechanical interfaces described previously would be the next phase of work. This would include testing in the field and evaluation of the factory manufacturing, field assembly, durability, and quality of the homes. LOT-EK estimates the cost of the prototype to be $250,000, with its completion between 90 – 120 days. The expense and execution can be absorbed or mitigated by exploiting GE’s cross- divisional access to material, including ISO containers, its engineering capabilities, as well as, its supply chain resources. Design concept Suggestions for Designs for assembly simplification of product structure Suggestions for more Selection of materials economic materials and processes and and processes early cost estimates Best engineering concept Detail design for Engineer for minimum manufacture manufacturing costs Prototype Typical steps in Design For Manufacturing and Assembly (DFMA) process Production 18
  • 21. Chapter 3 Implications A Sea of Boxes The problem of excess containers needs to be addressed from several different vantage points. One of many solutions for disposal is to use containers as structural building blocks. The efficiency with which intermodal containers are stacked, racked and transported can easily be transferred to their use as the shell and structure for an array of buildings, including housing. The following scene is being replicated around the world, as local resources, and that of shipping companies are being strained by keeping up with a flood of containers.  The NY/NJ port has seven terminals with more than 1,200 acres devoted to container storage. Empty boxes are flooding West Coast ports with very few exports to fill them. The turmoil generated by the trade imbalance has spread beyond the docks and into offices around the Portland area.  In Australia, the Nationwide News Pty Limited, Weekly Times, reported in January 2003 that, “At Sydney, there has been nearly a 50% increase in empty containers in the past six months and that has been replicated in other ports.” Shipping chief executive in Australia explained the reason behind this stacking, as the drought that beat the volume of agricultural products being exported. He added that the containers full of imports still come in at the same rate while the empties keep piling up on wharves of the port due to the insufficient exports that take up. It was found that sending empty containers back overseas was far expensive. It costs $300 to $650 to return a container to overseas markets, making it "easy to imagine the cost impact of having to send back 200,000 containers over the next year." 19
  • 22. Housing the Earth’s People Construction Growth by Region (Annual percentage changes) According to Global Insight International 1998-2003 2003-2008 construction is expected to grow by nearly 3% Asia -0.8 3.3 through 2008. Non-Japan Asia 3.2 5.1 Eastern Europe 2.1 3.5 With ongoing construction growth projected in Asia, Eastern Europe, the Middle East & Africa, and Middle East & Africa 0.0 3.2 with GE expecting to receive as much as 60% of its North America 3.8 2.7 revenue growth from emerging markets, these are South America -4.3 2.9 regions where GE can realize scalablity within Western Europe 1.3 1.8 opportunitic segments of the construction industry. WORLD TOTAL 1.2 2.6 Source: Global Insight Inc. Further analysis points to urban development as a specific area for growth, given the current projections for population migration over the next 20 years. The strains on poor and substandard infrastructures and its associated problems will create an incredible demand for scarce resources, thus creating the circumstances leading to further worldwide instability. Urban and rural development 1950-2030 For Less Developed regions and More Developed regions Source: Population Div ision, UN: World Population Prospects: The 2004 Revision and World Urbanization Prospects: The 2003 Revision. Note: More developed regions; they comprise all regions of Europe plus Northern America, Australia/New Zealand and Japan. Less developed regions; they comprise all regions of Africa, Asia (excluding Japan), Latin America and the Caribbean plus Melanesia, Micronesia and Polynesia. 20
  • 23. More than "one billion human beings still lack adequate shelter and are living in unacceptable conditions of poverty" (Habitat Agenda, paragraph 53). The vast majority of live in developing countries and -- as a result of the urbanization of poverty -- an increasing number live in urban areas. Sprawling informal settlements and slums of developing countries are fast becoming the most visual manifestations of poverty itself. According to UN-HABITAT, some 924 million people were living in slums and informal settlements by 2001. The objective of the Habitat Agenda, shelter policy is to create frameworks for efficient and effective shelter delivery systems, while emphasizing "the increased use and maintenance of existing stock through ownership, rental and other tenure options, responding to the diversity of needs." While the Habitat Agenda stresses that housing policies should pay attention to the role of the informal sector to housing policies, this sector lacks the wherewithal to mobilize the resources, both fiscal and technical, in order to affect fundamental change in housing these populations. Fundamental change is however possible through direct investments in construction projects for both housing and supportive infrastructure for the foreseeable future. In fact, Global Insight projects 2% and 3%, respectively in worldwide construction growth (U.S. dollars) between now and 2013, again with the bulk of that growth coming from emerging markets. (see Market Potential Indicators for Emerging Markets – 2004) According to the U.S. Census Department, the housing construction industry generated in excess of $232 billion in sales. Addressing the domestic housing sector with a focus on market niches, the use of container- based, modular home design, and advanced technological building systems, will yield sizable share of market over the near to mid-term. The following is an estimate for annualized sales by market segment, and shows how a modest number of units could quickly scale. These units represent a total of 54,300 TEU’s or the equivalent of 2.2% of the 2.5 million estimated empty intermodal containers around the world. $100 Millions $50 $0 Single Liv e/Work Military Student Emerge/M Emerge/Sh Units 200 50 100 50 150 12,500 Rev enues $45,000,000 $5,500,000 $11,000,000 $3,950,000 $1,200,000 $80,000,000 21
  • 24. Building the Homes of the 21st Century in Factories Housing can’t be built fast enough, using the current primary means of construction, to keep up with worldwide demand. Homes today are, for the most part, still being built in the same way they were in the 19th century. The Partnership for Advancing Housing Technology (PATH), administered by the Dept. of Housing and Urban Development (HUD) projects that factory-built housing, especially modular with become the predominate way to construct housing, both single and multi- family, accounting for as much as 90% within 20 years, as technology continues to improve. The PATH Mission points in this direction:  Increase energy efficiency  Improve durability  Raise quality  Ensure labor safety  Minimize environmental impact In order to achieve this, the currently ultra- fragmented housing sector must look to transfer the best business practices from industrial manufacturing to construction. One such innovation is the Whole House Building System which is predicated on a single on-site production facility utilizing high capacity hoisting, non-sequential building techniques and bulk material handling in order to streamline production. Improvements in housing technology will likely be the only way to maintain supply to meet the demands for new affordable homes, replace old structures, provide for disaster relief and transitional habitats in sufficient numbers. There will be a few players that will be able to deploy the resources, as well as have the economies of scale required to establish and operate such factories on a global scale. 22
  • 25. Chapter 4 Rationale Here, we will answer the question, why this proposition is timely, viable and scalable? Affordability 1) Modular housing is inherently less expensive then traditional stick-built housing, because of the economies of scale, systems and standards, optimum value engineering (OVE), etc. Savings with standard modular buildings can be offset with the travel and handling of over-sized modular sections. However, with the proposed LOT-EK modular structures, travel and handling are done in the same manner as any other intermodal containers. 2) The builder/contractor/developer of single family homes, being sold at market-rate, will either be able to pass along the savings to the consumer or retain a higher margin based on local market conditions. 3) Several base designs with a fairly limited package of upgrades will keep the domestic product moderately priced. 4) The products targeted for emerging markets must be priced to compete with locally derived, competitive housing. Use of local labor and locally sourced materials along with the installation of manufactured housing systems will allow for this product to be volume driven (even though market entry estimates are set a fairly low unit levels). Building Systems 1) The adaptation and application of manufacturing processes to home building, especially with modular dwellings will revolutionize the industry, by reducing waste, meeting increasingly important green standards, managing labor, etc. And only those players at the edge of innovation, as well as, with the capacity to scale-up operations will emerge as market leaders. 2) Standardize the Module Footprint and Interfaces – The premise is to have only a few basic module sizes, allow for some variations in appearance and configuration to provide some of customization consumers want. Potential benefits of standardizing are:  Reduces the number of components  Allows for interchangeability of parts or components from a variety of manufacturers  Reduces the onsite tasks to a rather simple and standardized assembly  Provides options, variety, and personalization  Simplifies the inspection and approval process as most of this is can be moved to factories 23
  • 26. 3) Stakeholders can work with the national code bodies and selected state and local code offices to develop a streamlined approach to approvals and inspections. The goal is to move as much of the inspection process as possible into the factory. For example, modules manufactured under ISO 9000/14000 quality systems could be pre-approved or certified so that building inspection of each individual trade is not required. One inspector could handle sign-off on all systems assuming the certified modules were properly interfaced. This would apply internationally as well, especially when using ISO systems. 4) GE is well poised to be a leader in the industrialization of the home building process for several very obvious reasons, namely:  Resources (knowledge based, human, fiscal, engineering)  Vision to see that emerging markets will represent the lion’s share of its life-blood, and the commitment and dedication to pursue it.  Vertical and horizontal integration across divisions  Technological innovation Containers 1) Empty containers are abundant, will become even more so and remain so as long as the world maintains a trade imbalance with the leading export nations, who also are the leading container suppliers. 2) Intermodal containers are by their nature durable, maneuverable, modifiable and affordable, all of the elements that make them appropriate building blocks for housing. 3) Some ports in emerging markets may not have terminal yards that store a sufficient supply of suitable empty containers. Container transportation costs can be mitigated by using local labor for fabrication and construction. 4) With the emphasis on recycling, each container will be determined to be habitable and imposing little or no environmental impact. Demand 1) There is a nearly insatiable need, both domestically and internationally, for deliverable housing that is affordable, durable, attractive, safe, and environmentally friendly. The aggregate demand for quality housing throughout the world is in the millions of units. 2) Home building systems will allow for suppliers to keep up with demand by creating housing in a highly efficient manner. 3) Given the changing dynamics of the workplace, Live/work Space is becoming an alternative for many transitioning from the office, for artists and artisans, and for home- based entrepreneurs. 4) Quality student housing is required by America’s academic institutions not only for undergraduates, but also graduate students, faculty, administrators, support staff and young alumni who need housing close to campus. 24
  • 27. 5) The Department of Defense has a mandate to renovate and build new military housing on nearly all of the bases throughout the country. 6) Not everyone will be suited for, or in a position to acquire a home, as such the builder/contractor/developer of multifamily properties requires quality buildings for their tenants. Design 1) LOT-EK Architects have created a series of designs that will convert these steel boxes into eminently livable space, thus mitigating concerns about whether a prospective home- owner would find these designs aesthetically appealing, functional and affordable. 2) LOT-EK has designed a fairly wide variety of structures – container habitats are one of a long list of buildings using large industrial cast-offs. 3) The adaptability of these boxes allows for configurations ranging from a simple, yet elegant shelter to multi-unit apartment buildings that retain the same design elements over greater dimensions. 4) The concept of designing for manufacturing efficiency has been applied successfully in many industries for decades. The idea is to reduce the overall number of parts and the number of different kinds of parts, and to use parts that are easy to assemble and install, resulting in lower costs for materials and labor 25
  • 28. Conclusion The building of any business starts with a seed of an idea and a vision. Whether that vision can be transformed into a profitable entity calls on the confluence of elements that first and foremost answer the question, “is this doable?” We believe that the proposition just laid out not only can be doable, but in fact, must be doable for the following reasons:  The quality of life as we are accustom to in the developed world will be severely and adversely affected if we do not get a handle on our levels of waste – millions of empty and retired containers is a gross, untenable and ultimately unsustainable level of waste.  Again, our quality of life will be even further constrained unless we, in the developed world (in both the public and private sectors) are willing and able to re-orient the plane of wealth distribution. We enjoy a high level of a quality of life, while the majority of the world does not – this imbalance can only haunt us for generations, unless we make a concerted effort to invest in improving those quality-of-life fundaments presently enjoyed by a minority of the world’s population. Adequate shelter is one of those fundaments. If for no other reason, our own self interest should be a primary driver in this regard.  Americans will continue to require, into the foreseeable future, better and more affordable housing in ever increasing numbers, as older stock is retired and the demands for new development strain our abilities to deliver. Industrialized home building systems are really the only method to meet this level of demand – quality, quantity, durability, affordability and sensitivity (environmental). It really boils down to these three key elements that will drive, what at a conservative estimate, is a $146m business: create quality housing out of recycled and cast-off materials, and use technology-driven systems to efficiently do so. Our current plans call for prototyping as the first step to this process. We trust that GE/SeaCo, as well as, GE Modular Space will intend to be collaborative partners with LOT-Ek and ComLoc, Corp. in this initial step forward. 26
  • 29. Annualized Estimates (Year 1) Empty Containers Deployed Market Gross (TEU's) (1) % Mkt. TEU's Unit Type Segment (2) TEU/Unit Unit Size Unit Cost (3) Cost /Unit Price/Unit (4) Unit Sales Revenues 2,500,000 sq. ft. meters sq. ft. meters 0.10% 2,400 CHK Single family 12 1,960 -- $91.84 $180,000 $225,000 200 $45,000,000 0.01% 300 CHS Live/Work 6 960 -- $91.67 $88,000 $110,000 50 $5,500,000 0.03% 800 CHK Military 8 1,280 -- $68.75 $88,000 $110,000 100 $11,000,000 0.01% 200 CHS Student 4 640 -- $98.75 $63,200 $79,000 50 $3,950,000 Emerging 0.02% 600 CHS Mkts./Multi 4 640 59 $10.00 $108.47 $6,400 $8,000 150 $1,200,000 Emerging 2.00% 50,000 CHK Mkts./Shelter 4 640 59 $8.00 $86.78 $5,120 $6,400 12,500 $80,000,000 Totals 2.17% 54,300 13,050 $146,650,000 $100 $80 Notes: Millions (1) Estimated # of global empty containers $60 (2) Single family homes represented here are 3X3 Loft Units $40 (3) Estimated unit cost, a handle on actuals $20 will be derived from prototyping (4) Estimate of wholesale unit prices @ 25% gross margin $0 Emerging Emerging Single family Live/Work Military Student Mkts./Multi Mkts./Shelter Units 200 50 100 50 150 12,500 Revenues $45,000,000 $5,500,000 $11,000,000 $3,950,000 $1,200,000 $80,000,000
  • 30. Market Potential Indicators for Emerging Markets – 2004 Overall Market Market Market Market Growth Market Consumption Commercial Economic Market Country Potential Size Rate Intensity Capacity Infrastructure Freedom Receptivity Risk Index Countries Rank Index Rank Index Rank Index Rank Index Rank Index Rank Index Rank Index Rank Index Rank Index HONGKONG 21 1 10 80 1 100 12 54 2 98 2 92 1 100 2 88 1 100 SINGAPORE 24 1 5 84 9 57 10 62 3 92 9 69 2 60 1 100 2 80 S. KOREA 6 12 11 78 7 66 2 99 6 76 8 71 9 18 4 62 3 74 CHINA 1 100 7 82 24 1 11 59 14 38 24 1 12 8 11 49 4 73 ISRAEL 22 1 14 75 3 75 4 82 5 79 4 78 4 29 6 57 5 69 HUNGARY 23 1 22 50 2 76 1 100 4 81 5 78 5 24 3 64 6 68 CZECH REP. 20 2 21 51 17 51 3 97 1 100 3 83 6 24 5 62 7 67 INDIA 2 47 2 96 19 40 6 77 22 14 16 46 24 1 14 38 8 60 POLAND 10 5 23 34 5 67 5 80 7 66 7 73 18 4 8 56 9 50 CHILE 18 2 12 78 10 56 22 13 8 54 1 100 11 11 7 57 10 45 MEXICO 5 13 17 61 6 66 20 27 15 37 10 66 7 23 10 50 11 45 RUSSIA 3 37 15 73 22 28 15 53 11 41 21 21 15 6 15 32 12 42 THAILAND 14 4 8 82 21 38 13 54 16 33 12 61 8 22 12 47 13 42 MALAYSIA 17 3 1 100 23 15 18 42 12 38 19 33 3 46 9 52 14 40 TURKEY 9 8 13 75 14 54 9 67 9 47 18 38 13 7 16 26 15 39 EGYPT 13 5 3 90 4 74 8 70 19 22 23 14 19 4 17 25 16 35 INDONESIA 7 12 6 83 16 51 7 72 20 18 20 30 14 6 22 13 17 33 PHILIPPINES 11 5 9 82 13 54 17 47 24 1 13 57 10 17 20 23 18 31 ARGENTINA 12 5 4 84 12 55 19 39 10 41 15 52 21 3 24 1 19 29 BRAZIL 4 26 18 58 20 38 23 13 13 38 14 56 23 1 18 25 20 29 PERU 19 2 16 62 8 62 14 53 21 15 11 62 22 2 21 20 21 27 S. AFRICA 8 8 20 51 11 56 24 1 23 13 6 74 17 5 13 44 22 22 COLOMBIA 16 4 19 51 15 52 21 17 17 32 17 39 16 5 19 23 23 16 VENEZUELA 15 4 24 1 18 45 16 52 18 25 22 20 20 4 23 2 24 1 2
  • 31. 3
  • 32. DIMENSIONS AND MEASURES OF MARKET POTENTIAL Dimension Weight Measures Used Market Size 10/50  Urban population (million) -20031  Electricity consumption (billion kwh) - 20022 Market Growth Rate 6/50  Average annual growth rate of commercial energy use (%) - between years 1996-20011  Real GDP growth rate (%) - 20031 Market Intensity 7/50  GNI per capita estimates using PPP (US Dollars) - 20031  Private consumption as a percentage of GDP (%) - 20021 Market Consumption 5/50  Percentage share of middle-class in Capacity consumption/income (latest year available)1 Commercial 7/50  Telephone mainlines (per 100 habitants) - 20033 Infrastructure  Cellular mobile subscribers (per 100 habitants) - 20033  Number of PC's (per 100 habitants) - 20033  Paved road density (km per million people) - 20021  Internet hosts (per million people) - 20033  Population per retail outlet - (latest year available)4  Television sets (per 1000 persons) - 20031 Economic Freedom 5/50  Economic Freedom Index - 20045  Political Freedom Index - 20046 Market Receptivity 6/50  Per capita imports from US (US Dollars) - 20037  Trade as a percentage of GDP (%) - 20031 Country Risk 4/50  Country risk rating - 20048 Data used are those available for most recent year. 1 Source: World Bank, World Development Indicators - 2003 2 Source: U.S. Energy Information Administration, International Energy Annual - 2003 3 Source: International Telecommunication Union, ICT Indicators - 2003 4 Source: Euromonitor, European Marketing Data and Statistics - 2004 Source: Euromonitor, Asian Marketing Data and Statistics - 2004 5 Source: Heritage Foundation, The Index of Economic Freedom - 2004 6 Source: Freedom House, Survey of Freedom in the World - 2004 7 Source: U.S. Census Bureau Foreign Trade Division, Country Data - 2004 8 Source: Euromoney, Country Risk Survey - 2004 For more information on methodology index, refer to: "Measuring The Potential of Emerging Markets : An Indexing Approach" - S. Tamer Cavusgil Business Horizons, January-February 1997, Vol. 40 Number 1, 87-91.