Development and Implementation
   of an Initial Transportation
  Planning Process for Federal
  Land Management Agencies

        Lewis G. Grimm, P.E.
        Planning Team Leader
           FHWA - EFLHD
Transportation Planning Directive
(23 U.S.C. Section 204)

  In consultation with the Secretary of each
  appropriate Federal land management agency,
  the (DOT) Secretary shall implement
  transportation planning procedures for Federal
  lands and tribal transportation facilities that are
  consistent with the planning processes required
  under sections 134 and 135 (State and
  Metropolitan Transportation Planning
  regulations).
FLH/Federal-Aid Similarities & Differences
 Similarities
         FLH and Fed-Aid planners are responsible for the oversight of Title
          23 and 49 funds.
         They are also responsible for providing guidance to partner agencies
          interpreting federal regulations and implementing the planning
          process.

 Differences
         Geography
         Partner agencies’ missions
         Level of involvement in plans and TIP/STIP development

 The question is:
    How do we better coordinate the similarities and bridge the differences, as
     appropriate at the various levels of planning?
Why Now?
    New initiatives underway by FLH to promote long
     range planning
     – National, regional and unit (local) level planning
     – Demonstrate “real” benefits from specific project
       coordination
    Linkages with FLH management systems and
     Federal-aid requirements
     – GIS Applications and data integration
     – FLH CMS requirement and metro CMPs
    Common Bottom line
     – Limited resources requires better leverage of knowledge
       and funding across both programs
Integrated State/Regional/Local
  Transportation Planning Process
                                  Fed-Aid Stewardship          and Oversight Umbrella

                                                 Statewide Long Range
                                                  Transportation Plan*
  *Long-Range Plans
  (20-30 yr Horizon, MPO                            MPO Regional
  Is fiscally constrained or                     Transportation Plan*
  “reasonably available”)
                                                City/County General Plan
                                                Transportation Element*



                                                          Project
                                                          Planning and
                                                          Implementation




                                                                                        Public Involvement
                                             MPO Transportation Improvement
                                                                                        Integrated at each level
                                                     Program (TIP)**

     **Project Identification,                   Statewide Transportation
    Selection, & Programming                   Improvement Program (STIP)**
(4-6yr Horizon, fiscally constrained)
Proposed Multimodal Transportation Planning
    Process for FLMAs
                             FLHD Stewardship           and Oversight Umbrella

                                      National Transportation Plan*

                                       Regional Transportation
   *Long Range Plans                           Plan (RTP)*
(20-30 yr Horizon, not
 fiscally constrained or
‘reasonably available’)                  Unit Transportation Plan
                                          (NPS GMP or FWS CCP)*




                                             Project
                                             Planning and
                                             Implementation


                                                                                 **Project Identification,
                                                                                 Selection, &
                                                                                 Programming
                                       Regional Trans. Improvement               ( -6yr
                                                                                 (3-6yr Horizon,
                                            Program (RTIP)**                     fiscally constrained)
  Public Involvement                    National Transportation Improvement
  Integrated at each level                   Program (TIP)**
Fish & Wildlife Service Regions
Transportation Planning
Guidance for FLMAs
“Transportation planning with FLMAs needs to be
conducted in conjunction with governing FLMA
policies and with general comprehensive or master
planning for FLMA units. The coupling of U.S.
DOT regulations with FLMA policy and practices
has been undertaken to make FLMA transportation
planning unique, challenging, and beneficial to all
overseeing Departments and corresponding
agencies.”
Transportation Planning Guidance for Federal Land Management Agencies,
Final Draft for Review, 12-09-2011
Regional Long Range
Transportation Plan Elements
   Minimum 20-year horizon
   Process for updating every four to five years, or as
    determined to be appropriate by the agency
   Operational and management strategies
   Financial plan that demonstrates how the transportation plan
    can likely be implemented, indicates the identification of all
    public and private resources that are reasonably expected to
    be available to carry out the plan, and recommends any
    additional financing strategies for needed projects and
    programs.
LRTP Elements (Cont’d)

   Public involvement process
   Defined elements (as appropriate) of the respective FLMA’s
    national plan.
   For all regionally significant projects, the FLMA region or
    unit should consider all elements of the project and
    collaborate with appropriate stakeholders early in the
    planning process.
   Existing conditions review and future forecast of conditions
   Natural and cultural resource analyses and preservation /
    improvement strategies
Public Involvement

 “FLMA agencies shall include reasonable and
 appropriate opportunities for public involvement
 in the development of their transportation plans.
 This action should be coordinated with state DOT
 and MPO activities where appropriate. Citizens
 and other interested parties shall be provided with
 a reasonable opportunity to comment on the long-
 range plans.”
 Transportation Planning Guidance for Federal Land Management Agencies,
 Final Draft for Review, 12-09-2011
Specific Actions for FLMAs
At a minimum, the public involvement plan component of any
   FLMA transportation plan should include the following :
   Documentation of the public involvement process
   Stakeholder plan to determine appropriate stakeholders
   Adequate public notice of public involvement activities and ample
    time for public review and comment at key decision points
   Early and continuous public involvement opportunities throughout
    the planning and programming process
   Explicit consideration and response to public comment
   Consideration of the needs of traditionally underserved population
    groups, including low‐income and minority citizens
Typical Public Involvement
Processes Being Employed
   State DOT coordination/collaboration using
    Statewide multimodal LRTP update processes
   MPO/RPO RTP development/update processes
   FLMA national and regional websites (NPS
    Planning, Environment, and Public Comment
    (PEPC) website, FWS Visitor Surveys, etc.)
   Federal Register Notices (Alaska LRTP)
   Outreach to “Friends Groups” and general public
    via brochures, e-mail, and social media sites
Experiences to Date

 Assessment of effectiveness still being
  determined
 No obvious “best” techniques have yet
  been identified
 Each FLMA unit, regional, and national
  planning and public involvement process is
  relatively unique to some degree
 Stay tuned for updates
Questions/Discussion

Contenu connexe

Tendances

Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
Donna Lum
 
Combined strategy day session
Combined strategy day sessionCombined strategy day session
Combined strategy day session
Dr Lendy Spires
 
Cycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity PresentationCycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity Presentation
directionsto2050
 
Analysis Of Plans
Analysis Of PlansAnalysis Of Plans
Analysis Of Plans
pipmonck
 

Tendances (11)

Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
 
SPAN IFMIS Project in Indonesia
SPAN IFMIS Project in IndonesiaSPAN IFMIS Project in Indonesia
SPAN IFMIS Project in Indonesia
 
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan ProposalDTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
 
Combined strategy day session
Combined strategy day sessionCombined strategy day session
Combined strategy day session
 
Cycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity PresentationCycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity Presentation
 
Final EIS Part 1
Final EIS Part 1Final EIS Part 1
Final EIS Part 1
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Point A to B - CalACT Spring 2009 presentation
Point A to B - CalACT Spring 2009 presentationPoint A to B - CalACT Spring 2009 presentation
Point A to B - CalACT Spring 2009 presentation
 
Analysis Of Plans
Analysis Of PlansAnalysis Of Plans
Analysis Of Plans
 
Investing the marginal dollar for Maternal and Newborn Health: Geographic acc...
Investing the marginal dollar for Maternal and Newborn Health: Geographic acc...Investing the marginal dollar for Maternal and Newborn Health: Geographic acc...
Investing the marginal dollar for Maternal and Newborn Health: Geographic acc...
 
Scarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation PlanScarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation Plan
 

En vedette

En vedette (8)

Ouellette rpo2012
Ouellette rpo2012Ouellette rpo2012
Ouellette rpo2012
 
Rural Approaches to Performance Measurement: Planning and Programming
Rural Approaches to Performance Measurement: Planning and ProgrammingRural Approaches to Performance Measurement: Planning and Programming
Rural Approaches to Performance Measurement: Planning and Programming
 
Service and Fare Equity
Service and Fare EquityService and Fare Equity
Service and Fare Equity
 
Belz rpo2012
Belz rpo2012Belz rpo2012
Belz rpo2012
 
Planning for Bicycling and Pedestrian Accommodations
Planning for Bicycling and Pedestrian AccommodationsPlanning for Bicycling and Pedestrian Accommodations
Planning for Bicycling and Pedestrian Accommodations
 
Lessons Learned from Irene: Regional Planning Commission Involvement in Recov...
Lessons Learned from Irene: Regional Planning Commission Involvement in Recov...Lessons Learned from Irene: Regional Planning Commission Involvement in Recov...
Lessons Learned from Irene: Regional Planning Commission Involvement in Recov...
 
Livability Analyses: Fine Scale
Livability Analyses: Fine ScaleLivability Analyses: Fine Scale
Livability Analyses: Fine Scale
 
Moving Towards Resilience in Vermont
Moving Towards Resilience in VermontMoving Towards Resilience in Vermont
Moving Towards Resilience in Vermont
 

Similaire à Grimm rpo2012

Incorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highwaysIncorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highways
BikeTexas
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
MelissaARC
 
Leo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development CommissionLeo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development Commission
Center for Planning Excellence
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4
Koniag
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
bunthy sros
 
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdfDILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
CDSCaviteDILG
 

Similaire à Grimm rpo2012 (20)

Incorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highwaysIncorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highways
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTP
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
 
Transportation Policy Project
Transportation Policy ProjectTransportation Policy Project
Transportation Policy Project
 
Project Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdfProject Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdf
 
Rural Planning Organizations: Rural Transportation Planning in Pennsylvania
Rural Planning Organizations: Rural Transportation Planning in PennsylvaniaRural Planning Organizations: Rural Transportation Planning in Pennsylvania
Rural Planning Organizations: Rural Transportation Planning in Pennsylvania
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
 
Ghandi p bill paterson ppt v 3
Ghandi p bill paterson ppt v 3Ghandi p bill paterson ppt v 3
Ghandi p bill paterson ppt v 3
 
Leo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development CommissionLeo Marretta, South Central Planning and Development Commission
Leo Marretta, South Central Planning and Development Commission
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Florida
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Florida
 
Statewide and Nonmetropolitan and Metropolitan Transportation Planning
Statewide and Nonmetropolitan and Metropolitan Transportation PlanningStatewide and Nonmetropolitan and Metropolitan Transportation Planning
Statewide and Nonmetropolitan and Metropolitan Transportation Planning
 
Evolution of MPO Planning in Florida: 1997-2008
Evolution of MPO Planning in Florida: 1997-2008Evolution of MPO Planning in Florida: 1997-2008
Evolution of MPO Planning in Florida: 1997-2008
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4
 
Program Logic
Program LogicProgram Logic
Program Logic
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning Framework
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
 
Rationalizing the Local Planning System and the Local Planning Structure.pptx
Rationalizing the Local Planning System and the Local Planning Structure.pptxRationalizing the Local Planning System and the Local Planning Structure.pptx
Rationalizing the Local Planning System and the Local Planning Structure.pptx
 
Rural Regional Transportation Plans (RRTP) in Tennessee
Rural Regional Transportation Plans (RRTP) in TennesseeRural Regional Transportation Plans (RRTP) in Tennessee
Rural Regional Transportation Plans (RRTP) in Tennessee
 
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdfDILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
 

Plus de RPO America

Plus de RPO America (20)

PEL implementation tools.pptx
PEL implementation tools.pptxPEL implementation tools.pptx
PEL implementation tools.pptx
 
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
 
Cheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewCheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL Overview
 
CARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityCARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural Mobility
 
BCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIBCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MI
 
Shared. Connected. Sustainable.
Shared. Connected. Sustainable.Shared. Connected. Sustainable.
Shared. Connected. Sustainable.
 
Microtransit and Digital Infrastructure
Microtransit and Digital InfrastructureMicrotransit and Digital Infrastructure
Microtransit and Digital Infrastructure
 
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Lowcountry Go Vanpool
Lowcountry Go VanpoolLowcountry Go Vanpool
Lowcountry Go Vanpool
 
Employment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionEmployment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia Region
 
EDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessEDDs and States: Collaborating for Success
EDDs and States: Collaborating for Success
 
Strengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsStrengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development Districts
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
The Future Started Yesterday
The Future Started Yesterday The Future Started Yesterday
The Future Started Yesterday
 
Brownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceBrownfields for Redeveloping Resilience
Brownfields for Redeveloping Resilience
 
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
 
CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase
 
CEDS 101 and Best Practices
CEDS 101 and Best Practices CEDS 101 and Best Practices
CEDS 101 and Best Practices
 
EDD Speed Networking and Listening Session
EDD Speed Networking and Listening SessionEDD Speed Networking and Listening Session
EDD Speed Networking and Listening Session
 

Dernier

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Dernier (20)

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 

Grimm rpo2012

  • 1. Development and Implementation of an Initial Transportation Planning Process for Federal Land Management Agencies Lewis G. Grimm, P.E. Planning Team Leader FHWA - EFLHD
  • 2. Transportation Planning Directive (23 U.S.C. Section 204) In consultation with the Secretary of each appropriate Federal land management agency, the (DOT) Secretary shall implement transportation planning procedures for Federal lands and tribal transportation facilities that are consistent with the planning processes required under sections 134 and 135 (State and Metropolitan Transportation Planning regulations).
  • 3. FLH/Federal-Aid Similarities & Differences Similarities  FLH and Fed-Aid planners are responsible for the oversight of Title 23 and 49 funds.  They are also responsible for providing guidance to partner agencies interpreting federal regulations and implementing the planning process. Differences  Geography  Partner agencies’ missions  Level of involvement in plans and TIP/STIP development The question is:  How do we better coordinate the similarities and bridge the differences, as appropriate at the various levels of planning?
  • 4. Why Now?  New initiatives underway by FLH to promote long range planning – National, regional and unit (local) level planning – Demonstrate “real” benefits from specific project coordination  Linkages with FLH management systems and Federal-aid requirements – GIS Applications and data integration – FLH CMS requirement and metro CMPs  Common Bottom line – Limited resources requires better leverage of knowledge and funding across both programs
  • 5. Integrated State/Regional/Local Transportation Planning Process Fed-Aid Stewardship and Oversight Umbrella Statewide Long Range Transportation Plan* *Long-Range Plans (20-30 yr Horizon, MPO MPO Regional Is fiscally constrained or Transportation Plan* “reasonably available”) City/County General Plan Transportation Element* Project Planning and Implementation Public Involvement MPO Transportation Improvement Integrated at each level Program (TIP)** **Project Identification, Statewide Transportation Selection, & Programming Improvement Program (STIP)** (4-6yr Horizon, fiscally constrained)
  • 6. Proposed Multimodal Transportation Planning Process for FLMAs FLHD Stewardship and Oversight Umbrella National Transportation Plan* Regional Transportation *Long Range Plans Plan (RTP)* (20-30 yr Horizon, not fiscally constrained or ‘reasonably available’) Unit Transportation Plan (NPS GMP or FWS CCP)* Project Planning and Implementation **Project Identification, Selection, & Programming Regional Trans. Improvement ( -6yr (3-6yr Horizon, Program (RTIP)** fiscally constrained) Public Involvement National Transportation Improvement Integrated at each level Program (TIP)**
  • 7.
  • 8.
  • 9. Fish & Wildlife Service Regions
  • 10.
  • 11. Transportation Planning Guidance for FLMAs “Transportation planning with FLMAs needs to be conducted in conjunction with governing FLMA policies and with general comprehensive or master planning for FLMA units. The coupling of U.S. DOT regulations with FLMA policy and practices has been undertaken to make FLMA transportation planning unique, challenging, and beneficial to all overseeing Departments and corresponding agencies.” Transportation Planning Guidance for Federal Land Management Agencies, Final Draft for Review, 12-09-2011
  • 12. Regional Long Range Transportation Plan Elements  Minimum 20-year horizon  Process for updating every four to five years, or as determined to be appropriate by the agency  Operational and management strategies  Financial plan that demonstrates how the transportation plan can likely be implemented, indicates the identification of all public and private resources that are reasonably expected to be available to carry out the plan, and recommends any additional financing strategies for needed projects and programs.
  • 13. LRTP Elements (Cont’d)  Public involvement process  Defined elements (as appropriate) of the respective FLMA’s national plan.  For all regionally significant projects, the FLMA region or unit should consider all elements of the project and collaborate with appropriate stakeholders early in the planning process.  Existing conditions review and future forecast of conditions  Natural and cultural resource analyses and preservation / improvement strategies
  • 14. Public Involvement “FLMA agencies shall include reasonable and appropriate opportunities for public involvement in the development of their transportation plans. This action should be coordinated with state DOT and MPO activities where appropriate. Citizens and other interested parties shall be provided with a reasonable opportunity to comment on the long- range plans.” Transportation Planning Guidance for Federal Land Management Agencies, Final Draft for Review, 12-09-2011
  • 15. Specific Actions for FLMAs At a minimum, the public involvement plan component of any FLMA transportation plan should include the following :  Documentation of the public involvement process  Stakeholder plan to determine appropriate stakeholders  Adequate public notice of public involvement activities and ample time for public review and comment at key decision points  Early and continuous public involvement opportunities throughout the planning and programming process  Explicit consideration and response to public comment  Consideration of the needs of traditionally underserved population groups, including low‐income and minority citizens
  • 16. Typical Public Involvement Processes Being Employed  State DOT coordination/collaboration using Statewide multimodal LRTP update processes  MPO/RPO RTP development/update processes  FLMA national and regional websites (NPS Planning, Environment, and Public Comment (PEPC) website, FWS Visitor Surveys, etc.)  Federal Register Notices (Alaska LRTP)  Outreach to “Friends Groups” and general public via brochures, e-mail, and social media sites
  • 17. Experiences to Date  Assessment of effectiveness still being determined  No obvious “best” techniques have yet been identified  Each FLMA unit, regional, and national planning and public involvement process is relatively unique to some degree  Stay tuned for updates