Contents:
Session Name

Description

Time

Registration & refreshments

Registration & refreshments

09:30

Welcome & Introduction

Welcome & Introduction

10:00

What are you interested in?

Project exemplars and your project ideas

10:10

Live Online Briefing

11:00

Lunch

Lunch

12:00

Project development process

Considerations for collaborative bids

12:45

Funding call documents

Aligning the project documents with your ideas

13:30

Refreshment Break

Refreshment Break

14:00

Developing your project

Putting the theory into practice

14:15

Discussion and Feedback

Discussion and Feedback

15:15

Close

15:30
3

Contents:
Session Name

Description

Time

Registration & refreshments

Registration & refreshments

09:30

Welcome & Introduction

Welcome & Introduction

10:00

What are you interested in?

Project exemplars and your project ideas

10:10

Live Online Briefing

11:00

Lunch

Lunch

12:00

Project development process

Considerations for collaborative bids

12:45

Funding call documents

Aligning the project documents with your ideas

13:30

Refreshment Break

Refreshment Break

14:00

Developing your project

Putting the theory into practice

14:15

Discussion and Feedback

Discussion and Feedback

15:15

Close

15:30
4
Welcome and introduction:
5
Welcome and introduction:

Who’s who today…

Malcolm Bodley

Catherine Bone

Nigel Ecclesfield

Angus Carpenter
6

Contents:
Session Name

Description

Time

Registration & refreshments

Registration & refreshments

09:30

Welcome & Introduction

Welcome & Introduction

10:00

What are you interested in?

Project exemplars and your project ideas

10:10

Live Online Briefing

11:00

Lunch

Lunch

12:00

Project development process

Considerations for collaborative bids

12:45

Funding call documents

Aligning the project documents with your ideas

13:30

Refreshment Break

Refreshment Break

14:00

Developing your project

Putting the theory into practice

14:15

Discussion and Feedback

Discussion and Feedback

15:15

Close

15:30
7

Project exemplars and your project ideas:

Aim of session:
By looking at last year’s call and projects we aim to give an
understanding of ;
- the types of projects JISC funds
- what worked well
- any major problems encountered
- the themes for this year’s call and your initial
ideas
8
Project exemplars and your project ideas:

Last year’s themes & projects:

1)

Last year’s call; the themes

2)

Last year’s projects;
what were funded
what we learnt (good & bad)
RSC Eastern Update September 2013

Last years call
Further Education and Skills: Development and Resources
Programme 2012 –2013
33 Resource and Development
Projects across the UK – 130
partners
Project Details http://bit.ly/17bK8QR
Resources from the
programme are available on
Jorum using the search tag
‘FEskills’
www.jorum.ac.uk

9
RSC Eastern Update October 2013

10

Exemplar Bids - KM Training (WBL)
Free resources for hairdressing, childcare, and more
Funding £21,800
• An online resource to support
e-learning for vocational,
education and training.
• Freely available resources for
the use of all learners,
apprentices, employers and
teachers.
• Travel and tourism, retail,
sports therapy, hospitality,
beauty, customer service.

www.education-net.org/
RSC Eastern Update October 2013

Exemplar Bids - Lagat Training (WBL)
Case study – moving to mobile devices in the workplace
Funding - £11,468
• Develop a Virtual Learning Library (VLL) of
resources specific to the occupational
areas in which we deliver
• Implement and use Tablets to improve
efficiency in staff delivery
• Develop an electronic web based induction
program

www.eeles643.co.uk/RSC/

11
RSC Eastern Update October 2013

Exemplar Bids - Bedford College (FE)
Moodle Grades @ Bedford College - Funding £99,070
• The Grade Tracker is a
module and block that
has been developed by
Bedford College to aid in
the tracking of
qualifications by staff
and students for their
courses.
• It was written for Moodle
1.9 and, after funding
from JISC regional, it is
being developed for
Moodle 2.x to be
released to the
community

12
RSC Eastern Update October 2013

Exemplar Bids - Consortium (FE & Skills)
Discover JISC Inclusion Consortium - Funding £129,500
• Project managed by JISC TechDis

• Partner driven project: The partner
providers were drawn from across
the FE & Skills sector
• Adaptation, repurposing or
contextualisation of existing
resources
• A Discover JISC project website is
planned to be launched by the end
of November 2013. The site will
include:
• Content for Teaching
• Teaching Techniques
• Case studies from project partners

13
RSC Eastern Update October 2013

Exemplar Bids - West Herts College (FE)
Verbal tagging project – Funding £5000
•

Audio feedback project to
provide a more efficient
procedure to mark and
assess learner work.

•

Utilised Microsoft Office
OneNote as a simple tool to
provide these verbal
comments to learners.

•

Training on audio feedback

•

Focus on sharing best
practice

•

Resources available on
Jorum

14
RSC Eastern Update October 2013

What we learnt - good
• A project must have very clear
objectives
• You can achieve a lot with a
small amount of funding
• Well organised consortiums
were successful in bidding and
achieving project outcomes
• Need a good Project Manager
with time to manage

15
RSC Eastern Update October 2013

What we learnt - bad
• Not allowing enough time to
write the bid
• Failing to identify risks
• Focusing on kit rather than
desired outcomes/objectives
• Writing a bid that is not
innovative
• Focusing on something that
is not easily shared

16
17
Project exemplars and your project ideas:

The themes of this year’s call:
Projects will be funded to:
1. Integrate new technologies in learning and teaching,
assessment and business activities
2. Overcome barriers to the adoption and use of
technology in the sector
3. Develop new uses for technology or innovative adaption
and rollout of technologies
The sorts of things Jisc is looking to fund include:
creating resources
creating augmented reality resources
developing new uses for technologies
developing apps
developing organisational/collaborative processes using digital technologies
developing
improving or adapting current technologies/resources
See more at: http://www.jiscrsc.ac.uk/news/2013/october/innovation-through-technology-fundingcall.aspx#sthash.dCyMcwr5.dpuf
18
Project exemplars and your project ideas:

Take your idea and develop
or

develop and idea
Everyone padlet an idea
& present brief explanation
19
Project exemplars and your project ideas:

Take your idea and develop
or

develop and idea
20
Project exemplars and your project ideas:

Everyone padlet an idea
& present brief explanation
21

Live Online Briefing:

Nigel Ecclesfield
22

Contents:
Session Name

Description

Time

Registration & refreshments

Registration & refreshments

09:30

Welcome & Introduction

Welcome & Introduction

10:00

What are you interested in?

Project exemplars and your project ideas

10:10

Live Online Briefing

11:00

Lunch

Lunch

12:00

Project development process

Considerations for collaborative bids

12:45

Funding call documents

Aligning the project documents with your ideas

13:30

Refreshment Break

Refreshment Break

14:00

Developing your project

Putting the theory into practice

14:15

Discussion and Feedback

Discussion and Feedback

15:15

Close

15:30
23

Considerations for collaborative bids:

Aim of session:
Project development stages will be covered with the intention that
this will make you more fully aware of all the areas you will need
to address; ultimately, making the bid writing experience a less
painful one!
24
Considerations for collaborative bids:

Why bid for funding?
25
Considerations for collaborative bids:

To gain a track record of
securing external funds one
needs to instil confidence in
the funder issuing the funds
To instil confidence in the
funder one needs a history of
successful project completion
Thus, getting the first project
funding to show this could be
the hardest?
26
Considerations for collaborative bids:

Collaboration
is key!!
But be explicit re:
- objectives
- roles &
responsibilities
27
Considerations for collaborative bids:
28
Considerations for collaborative bids:

Key project players
Finance
dept.

Project
partners
The Study group

Senior manager
(named PI)

The Researcher?

The Project manager
29
Considerations for collaborative bids:

Key tasks & time taken
Task

Days
Req.

Project period
Month 1
Week 1

Identify project team / roles & responsibilities
All parties sign-off
Establish project codes / finance
Recruit project researchers
Recruit project participants
Conduct activity 1
Conduct activity 2
Conduct activity 3
Review / analysis data
Draft report
Draft presentation
Agree report amendments with
team
Final report submitted

Week 2

Week 3

Month 2
Week 4

Week 1

Week 2

Week 3

Week 4

1
1
0.5
10
5
5
5
5
20
10
5
2
5

Monday

Mon/Tues

Where ‘planned’ ≈ ‘window’ allocated then a potential high risk.
Thus, good idea to assign some contingency days around those tasks!
http://www.jiscinfonet.ac.uk/tools/gantt-charts/
30
Considerations for collaborative bids:

So how much time to allocate…
Experience is essential here!
It can make or break:

project financials
project staff confidence
institutional reputation
project findings / impacts

One estimate for time allowance is the ‘Three point estimate’:
Most optimistic (MO)
Most likely (ML)
Most pessimistic (MP)

MO (4 * ML) MP
= Calc. allowance(A)
6

http://www.jiscinfonet.ac.uk/infokits/project-management/planning/estimating/
31
Considerations for collaborative bids:

Costing staff

There is no single right way!

Buy-out = £45 hr-1

Remission

Working contract reduction

CPD

Directly recruited staff?

Other?
32
Considerations for collaborative bids:

Costings profile
Project code: RS1212
Project title: Cooking with eggs

Project value:
Project duration (months)

Mar-10
Actual
Income points
Income Total

3.5

Apr-10

Profile

Actual

3,000.00
0.00

6500

3,000.00

May-10
Profile

Actual

0.00
0.00

0.00

Cumulative Total

Profile

Actual

3,500.00
0.00

3,500.00

Project

Profile

Profile

6,500.00
0.00

6,500.00

6,500.00

Payroll
Project mgt (RS01)

150.00

150.00

150.00

450.00

Researcher

750.00

750.00

750.00

2,250.00

Project admin (RS01)

50.00

50.00

50.00

150.00

2,850.00

2,850.00

2,850.00

Payroll Total

0.00

950.00

0.00

950.00

0.00

950.00

0.00

Non-payroll

0.00
report production

0.00

0.00

1,000.00

1,000.00

dissemination workshop

0.00

0.00

1,151.00

1,151.00

consumables

0.00

0.00

150.00

150.00

contingency
Non-Payroll Total

0.00
0.00

Contribution (20%)
Balance

0.00

0.00
0.00

433.00
0.00

1,383.00

0.00

50.00
0.00

433.00
0.00

1,383.00

2,351.00

50.00

433.00
0.00

3,734.00

0.00

2,351.00

2,351.00

2,351.00

1,299.00

0.00

1,299.00

0.00

0.00
33
Considerations for collaborative bids:

Risk matrix

Probability = how likely
it is going to happen

Impact - if it happens
Proximity = fluctuating
risk
34
Considerations for collaborative bids:

How financial profiles help monitoring…
Project code: RS1212
Project title: Cooking with eggs

Project value:
Project duration (months)

Mar-10

Income Total

Profile

3,000.00

3,000.00

0.00

3.5

Apr-10

Actual
Income points

6500

Identify concern costs
early, re-profile projects
accordingly

3,000.00

Actual

May-10
Profile

Actual

0.00
0.00

0.00

Cumulative Total

Profile

Actual

3,500.00
0.00

3,500.00

Project

Profile

Profile

6,500.00
0.00

6,500.00

6,500.00

Payroll
Project mgt (RS01)
Researcher
Project admin (RS01)
Payroll Total

150.00
850.00
50.00
0.00

150.00

150.00

150.00

450.00

750.00

750.00

750.00

2,250.00

50.00
950.00

50.00
0.00

950.00

50.00
0.00

950.00

150.00
0.00

Non-payroll

2,850.00

2,850.00

2,850.00

0.00
report production
dissemination workshop
consumables
contingency

Non-Payroll Total
Contribution (20%)
Balance

000.00
000.00
150.00
000.00
0.00

433.00
0.00

0.00

0.00

1,000.00

1,000.00

0.00

0.00

1,151.00

1,151.00

0.00

0.00

150.00

150.00

0.00
0.00

0.00
0.00

433.00
1,383.00

0.00

50.00
0.00

433.00
0.00

1,383.00

2,351.00

50.00

433.00
0.00

3,734.00

0.00

2,351.00

2,351.00

2,351.00

1,299.00

0.00

1,299.00

0.00

0.00
35
Considerations for collaborative bids:

Progression profile (Gantt and milestone)
Assign RAG ratings for tasks following your
weekly / monthly(?) meetings with project staff.
Task

Days Req.
Week 1

Identify project team / roles & responsibilities
All parties sign-off
Establish project codes / finance
Recruit project researchers
Recruit project participants
Conduct activity 1
Conduct activity 2
Conduct activity 3
Review / analysis data
Draft report
Draft presentation
Agree report amendments with team
Final report submitted

1
1
0.5
10
5
5
5
5
20
10
5
2
5

Monday

Project period
Month 1
Week 2
Week 3

RAG
Week 4
36
Considerations for collaborative bids:

Project approvals / securities…

Institutional name
37
Considerations for collaborative bids:

The boring,
but essential bit!
38
Considerations for collaborative bids:

How to get funding …
•
•
•
•

read the guidance notes
clarity in how it meets / relates to the call
ensure it meets the scope
check the structure / format & include what is
asked for:
introduction/context
clear work plan
focussed research questions
detailed methodology (eg.
sample size, sampling method, data types and collection methods)
data analysis methods
evaluation plan
outcomes & outputs
dissemination plan
39
Considerations for collaborative bids:

How to get funding … cont.
• ensure the proposal is within page/word limit
• demonstrate staffing requirements are realistic
eg. staff have the skills and/or experience

• include sufficient information on:
management structure, governance, decision-making & funding
arrangements

• include partnership agreements where appropriate
• contains letter of commitment from all partners
40
Considerations for collaborative bids:

How to get funding … cont.
• review and reference previous work
- read previous bids
- read published and grey literature
• define the relationship to institutional and
national strategies
• identify benefits to the wider community
• provide full budget information
- include an institutional contribution, if permitted?
• commit the time to writing the bid
41
Considerations for collaborative bids:
Cover Sheet for Proposals
(All sections must be completed)
Business Intelligence

JISC Grant Funding 12/10

Name of Lead Institution:

College X

Name of Proposed Project:

Business intelligence lead strategic planning using
live data management.

Name(s) of Project Partners(s)

None

(except commercial sector – see below)

This project involves one or
Name(s) of any commercial partner company (ies)
more commercial sector partners
NO
Full Contact Details for Primary Contact:
Name:
Mr R Somebody
Position:
Vice principal
Email:
r.somebody@stu.ac.uk
Tel:
03603 975 303
Address:
College X,
Marble Road, Town X,
County, XX42 6YY
Length of
Project:

18 months

Project Start
Date:

February 2011

Project End
Date:

August 2012

Total Funding Requested from JISC:
Funding requested from JISC broken down across Financial Years (Aug-July)
Aug10 – July11
Aug11 – July12
£17,424

Total Institutional Contributions:

£32,423

£3000

Outline Project Description
A really strong summary of the project given!!
I have looked at the example FOI form at
Appendix A and included an FOI form in this bid

No

I have read the Funding Call and associated
Terms and Conditions of Grant at Appendix B

No
42
Considerations for collaborative bids:

Past experiences: eLearning capital fund

(Styles, 2007)

(n = 56)

(40%)
(37%)
(36%)
(34%)
(28%)
(27%)
(26%)

(5%)
43
Considerations for collaborative bids:

Past experiences: Learning & Teaching Innovation Grant
(Witt, 2010)

Bids
Sub’ed

Call 1
Call 2

Out of
Scope

Bids In
Scope

called
inter’w

Bids
funded

82
85

63
54

19
31

9
6

2
2

For bids submitted under Call 1, the 10 bids considered as In Scope but not called for
interview were failed mainly because:

- they did not address a recognised need (5 bids);
- they were not considered to be innovative (5 bids).
For bids submitted under Call 2, the 25 bids considered as In Scope but not called for
interview were failed mainly because:

- they did not address a recognised need (15 bids);
- they were not considered to be innovative (2 bids);
- they did not fit the vision & intended outcomes of the e-learning
programme (3 bids);
- they were not considered to be a realistic proposal given the
timescale & resources available (5 bids)
44
Considerations for collaborative bids:

Any questions?
45

Contents:
Session Name

Description

Time

Registration & refreshments

Registration & refreshments

09:30

Welcome & Introduction

Welcome & Introduction

10:00

What are you interested in?

Project exemplars and your project ideas

10:10

Live Online Briefing

11:00

Lunch

Lunch

12:00

Project development process

Considerations for collaborative bids

12:45

Funding call documents

Aligning the project documents with your ideas

13:30

Refreshment Break

Refreshment Break

14:00

Developing your project

Putting the theory into practice

14:15

Discussion and Feedback

Discussion and Feedback

15:15

Close

15:30
46

Funding call documents:

Aim of session:
By exploring the call’s documentation, we will start to identify
where the information and ideas taken from previous sessions
begins to fit / map to the call’s documentation requirements.
47
Funding call documents:

http://www.jisc.ac.uk/fundingopportunities/funding_calls/2013/10/innovation-through-technology
48
Funding call documents:

Project’s aims:
Proposals should describe how bidders will undertake
innovative projects in the use of technology in the sector, in line
with the FE and Skills Development and Resources Programme’s
aims, to:
3.

a.
b.
c.
d.

e.

Improve the experiences of learners
Develop resources, tools, products and processes that will improve the
operational efficiency and effectiveness of providers
Increase the capacity and capability of providers and their workforces
Engage and support employers and other stakeholders to increase
their engagement in the work of the sector and use of
technology
Increase the accessibility of learning opportunities and extend
inclusion to meet learner, employer and community needs in
contexts such as employment, skills and progression
49
Funding call documents:

Project objectives:
Integrating new technologies: to integrate new technologies, software or
technology-related processes in learning and teaching, assessment and
business activities – such as marketing and initial assessment
Overcoming barriers to the adoption and use of technology in the sector:
to address identified barriers to the use of technology in organisations, to
report the results and develop resources which will assist other providers to
overcome those barriers and will sustain the use of technology and the
benefits to be gained by its use
Developing new uses for technology and / or the innovative adaption and
rollout of technologies: to develop products, process or resources, or to
adapt existing technologies in innovative ways

30. You will be asked to identify the primary objective
being delivered in your bid
50
Funding call documents:

Timeline / deadline for call:
The deadline for receipt of proposals in response to
this call is:
12:00 noon; Friday 6th December 2013
Notification: Late January 2014
Time left to develop bid:
Week beginning:
4th Nov.
11th Nov.
18th Nov.
25th Nov.
2nd Dec.

Wk. No.
1
2
3
4
5

Project timescales:
Start date:
February 2014
Duration:
up to 21 months
Complete by: 31st Oct. 2015
51
Funding call documents:

Eligibility criteria for call:
19. Proposals may be submitted by FE and skills providers funded
via the Department for Business, Innovation and Skills (BIS)
21. Proposals may be from a single FE or skills provider or from
consortia. Partnership arrangements are encouraged for
project types B & C (developed with other providers or
outside the sector, eg. HEIs, membership / professional
bodies, etc). The lead partner must meet the criteria in
paragraph 19 & funds can only be allocated through the lead
partner. Type A projects are not suitable for partners and
should only involve the lead organisation
22. Eligible organisations (see paragraph 19) may lead a proposal
in all of the three project types (ie project type A, B and C).
They may also be a partner in project type B and C projects.
52
Funding call documents:

Funding for call:
53
Funding call documents:

Project phases:
Successful projects will need to produce a detailed project plan within four weeks of
their start date. All project plans will need to include details of the following phases:
Initiation – bringing the people and other resources together to produce a plan, which
sets out how you will move from proposal to implementation
Development & production – implement your specifications to construct and
prepare for testing the resources or applications you have designed
Testing & roll-out – This phase focuses on the products of your project. You should
assess and explore the limits of your resources and roll out or disseminate them
within your organisation and to other providers
Evaluation & dissemination – a final report covering assessments of the project’s
outcomes; 1/ what was learned, 2/ how you’d do things differently, 3/ the next stages
of work, 5/ how you will ensure sustainability of the work and support for users
Capacity building – once you have evaluated your project you will need to consider
how it can help your organisation, other providers, practitioners and learners to
enhance their capacity to use technology
54
Funding call documents:

Project management:
54.

All projects will be managed following our project
management guidelines, which can be found at
jisc.ac.uk/research/running-a-jisc-project. You may find
these guidelines useful for writing your project proposal.
55
Funding call documents:

Project management…cont.:

http://www.jisc.ac.uk/fundingopportunities/projectmanagement/working/governance.aspx
56
Funding call documents:

Project communication:

Effective communications, both internal and external, are required in
all aspects of the project to help organise, inform and promote the
project to all those needing to know what is happening and to initiate
actions that take the project forward.
Our expectations regarding project communications, including any
guidance, will be provided during the course of the project as
appropriate.
Projects must work with the Jisc Marketing and Communications
team to ensure that any communication is in line with our
corporate standards and values.
57
Funding call documents:

Structure of proposals; proposal template:
58
Funding call documents:

Structure of proposals; template sections:
S1: contact details, project type & project objectives
S2: project description - how funding helps achieve project objective(s). Identify the
need for the outputs & how the resulting benefits will be realised. Address sustainability
and capacity building.
S3: work plan & outputs - attach high level work plan/Gantt chart, which identifies (a)
outputs, (b) sets out key activities, (c) dates/timescales. Type B and C projects (>£15,000)
should detail the work packages to be undertaken.
S4: engaging with the community & Jisc - describe how the project will involve external
organisations & work with Jisc, use other resources, evaluate the work, enhance the
project outcomes, achieve wide dissemination and embed outcomes.
S5: activity costs - completed by type A projects only (para 41 more info)
S6: budget - completed by type B & C projects only (para 42 more info)
S7: risk assessment - complete & attach a risk assessment (para 47 more info)
S8: project team - provide information on experience and capacity of the team including
any partners involved in the project.
S9: letters of support - attach letter(s) of support from partners / supportive org’s
describing how they / relevant staff will engage in the project
59
Funding call documents:

Structure of proposals; activity cost / budget:
Annex C

Example budget
template for type B & C
projects only
Type A projects have a
slightly different template
60
Funding call documents:

Structure of proposals ; activity cost / budget…cont.:
Lead organisations submitting bids should use their usual costing and pricing practices
but all costs should be clear and transparent, clarifying the number of days
individuals work on activities, to
- assist evaluators in determining value for money of proposals
Where HEI / commercial company are partners, activity costs should use institutional
costing practices and clearly identify partner contributions.
- bids should indicate contributions sought from Jisc

Staff costs:
- payroll costs (including on-costs) for all project staff supported by
audit trail (unless 100% staff)
- time estimated in numbers of hours / days per project year
converted to % FTE
- include daily charge out rates for any consultants used
61
Funding call documents:

Structure of proposals ; activity cost / budget…cont.:
Non-staff costs:
Travel & expenses - 1/ project staff travel & subsistence (include meeting attendance)
and other relevant meetings, dependent upon the project / Jisc requirements
Dissemination - the cost of all proposed project dissemination activities
Evaluation - cost of all proposed project formative or summative evaluation activities
Additional costs - item costs dedicated to the project (inc. consumables, recruitment provide details of these. Add additional rows to the budget template as required.
Overheads: Provide a breakdown of the overheads included in the project’s costs
Project partners: Funding for project partners, eg staff time, clearly identified under
relevant headings. Resources (eg. cash, in-kind) provided by partners clearly identified

Qualitative and quantitative benefits: Provide a summary of qualitative / quantitative
benefits expected from the project in order to inform the funding requested from Jisc
62
Funding call documents:

Structure of proposals; risk management:

http://www.jiscinfonet.ac.uk/infokits/risk-management/
63
Funding call documents:

http://www.jiscinfonet.ac.uk
/infokits/risk-management/
http://www.jisc.ac.uk/fundin
gopportunities/projectmanag
ement.aspx
64

Contents:
Session Name

Description

Time

Registration & refreshments

Registration & refreshments

09:30

Welcome & Introduction

Welcome & Introduction

10:00

What are you interested in?

Project exemplars and your project ideas

10:10

Live Online Briefing

11:00

Lunch

Lunch

12:00

Project development process

Considerations for collaborative bids

12:45

Funding call documents

Aligning the project documents with your ideas

13:30

Refreshment Break

Refreshment Break

14:00

Developing your project

Putting the theory into practice

14:15

Discussion and Feedback

Discussion and Feedback

15:15

Close

15:30
65

Putting the theory into practice:

Aim of session:
This session aims to get you pulling all the information and ideas
together, so that you leave today with;
- consolidated knowledge on the call’s requirements
- well developed project idea(s)
- considered / built new working relations / potential new
project partnerships
- have a good idea of where you are at and what you need
to do
66
Putting the theory into practice:

Time

Activity description

30 min

Develop project ideas
further
&
Record on the padlet wall

20 min

Present the idea so far to
the group &
Highlight what you plan to
do next

10 min

Group to discuss ideas /
thoughts and plans going
forward – where they
would like help, etc
67
Putting the theory into practice:

5
68
Putting the theory into practice:

4
69
Putting the theory into practice:

3
70
Putting the theory into practice:

2
71
Putting the theory into practice:

1
72
Putting the theory into practice:

Time up!
73

Contact:

Dr Angus I. Carpenter
email: tevims@hotmail.co.uk
skype: angus.carpenter
mobile: 07704 782028

More Related Content

Viewers also liked

Evidence 3 - PPT - Top_tips_for_winning_bids_12July2011-Brunel
Evidence 3 - PPT - Top_tips_for_winning_bids_12July2011-BrunelEvidence 3 - PPT - Top_tips_for_winning_bids_12July2011-Brunel
Evidence 3 - PPT - Top_tips_for_winning_bids_12July2011-BrunelKerry Schutz
 
net:gain promotional presentation slides
net:gain promotional presentation slidesnet:gain promotional presentation slides
net:gain promotional presentation slidesnet_gain
 
Jenny Hill's Tips For Bid Writing
Jenny Hill's Tips For Bid WritingJenny Hill's Tips For Bid Writing
Jenny Hill's Tips For Bid WritingJenny Hill
 
Venue Contract Negotiation
Venue Contract NegotiationVenue Contract Negotiation
Venue Contract NegotiationScott Stedronsky
 
Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS
Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS
Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS Phillip A. Weston
 
Bid Writing Beginners Guide
Bid Writing   Beginners GuideBid Writing   Beginners Guide
Bid Writing Beginners GuideJerry Allen
 
Sap Contract Recruitment Consultant - London
Sap Contract Recruitment Consultant - LondonSap Contract Recruitment Consultant - London
Sap Contract Recruitment Consultant - Londondaniellewilkinson
 
Silent Auction Secrets: 5 simple changes to generate bigger bids
Silent Auction Secrets: 5 simple changes to generate bigger bidsSilent Auction Secrets: 5 simple changes to generate bigger bids
Silent Auction Secrets: 5 simple changes to generate bigger bids4Good.org
 
BIDS CPD Workshop Nov 2011
BIDS CPD Workshop Nov 2011BIDS CPD Workshop Nov 2011
BIDS CPD Workshop Nov 2011Barry McCulloch
 
Physician Contract from Recruitment to Retirement
Physician Contract from Recruitment to RetirementPhysician Contract from Recruitment to Retirement
Physician Contract from Recruitment to RetirementHealthcare_Pro
 
- Contract Recruitment Manager -
- Contract Recruitment Manager -- Contract Recruitment Manager -
- Contract Recruitment Manager -Matthew Gostelow
 
Contract and recruitment methods
Contract and recruitment methodsContract and recruitment methods
Contract and recruitment methodscallumharrison
 
Bid writing workshop: Lyndsey Michaels
Bid writing workshop: Lyndsey Michaels Bid writing workshop: Lyndsey Michaels
Bid writing workshop: Lyndsey Michaels EdenProjectWebTeam
 
Types of contract and recruitment methods
Types of contract and recruitment methodsTypes of contract and recruitment methods
Types of contract and recruitment methodsClaySkorski
 

Viewers also liked (14)

Evidence 3 - PPT - Top_tips_for_winning_bids_12July2011-Brunel
Evidence 3 - PPT - Top_tips_for_winning_bids_12July2011-BrunelEvidence 3 - PPT - Top_tips_for_winning_bids_12July2011-Brunel
Evidence 3 - PPT - Top_tips_for_winning_bids_12July2011-Brunel
 
net:gain promotional presentation slides
net:gain promotional presentation slidesnet:gain promotional presentation slides
net:gain promotional presentation slides
 
Jenny Hill's Tips For Bid Writing
Jenny Hill's Tips For Bid WritingJenny Hill's Tips For Bid Writing
Jenny Hill's Tips For Bid Writing
 
Venue Contract Negotiation
Venue Contract NegotiationVenue Contract Negotiation
Venue Contract Negotiation
 
Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS
Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS
Ritchie Bros Dubai February Unreserved auction - NO MINIMUM BIDS
 
Bid Writing Beginners Guide
Bid Writing   Beginners GuideBid Writing   Beginners Guide
Bid Writing Beginners Guide
 
Sap Contract Recruitment Consultant - London
Sap Contract Recruitment Consultant - LondonSap Contract Recruitment Consultant - London
Sap Contract Recruitment Consultant - London
 
Silent Auction Secrets: 5 simple changes to generate bigger bids
Silent Auction Secrets: 5 simple changes to generate bigger bidsSilent Auction Secrets: 5 simple changes to generate bigger bids
Silent Auction Secrets: 5 simple changes to generate bigger bids
 
BIDS CPD Workshop Nov 2011
BIDS CPD Workshop Nov 2011BIDS CPD Workshop Nov 2011
BIDS CPD Workshop Nov 2011
 
Physician Contract from Recruitment to Retirement
Physician Contract from Recruitment to RetirementPhysician Contract from Recruitment to Retirement
Physician Contract from Recruitment to Retirement
 
- Contract Recruitment Manager -
- Contract Recruitment Manager -- Contract Recruitment Manager -
- Contract Recruitment Manager -
 
Contract and recruitment methods
Contract and recruitment methodsContract and recruitment methods
Contract and recruitment methods
 
Bid writing workshop: Lyndsey Michaels
Bid writing workshop: Lyndsey Michaels Bid writing workshop: Lyndsey Michaels
Bid writing workshop: Lyndsey Michaels
 
Types of contract and recruitment methods
Types of contract and recruitment methodsTypes of contract and recruitment methods
Types of contract and recruitment methods
 

Similar to Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013

CDRC Masters Research Dissertation Programme - Call for Partners
CDRC Masters Research Dissertation Programme - Call for PartnersCDRC Masters Research Dissertation Programme - Call for Partners
CDRC Masters Research Dissertation Programme - Call for PartnersGuy Lansley
 
The CDRC Masters Research Dissertation Programme - Call for Sponsors
The CDRC Masters Research Dissertation Programme - Call for SponsorsThe CDRC Masters Research Dissertation Programme - Call for Sponsors
The CDRC Masters Research Dissertation Programme - Call for SponsorsGuy Lansley
 
How to generate a good cross-border project in the South Baltic Programme – s...
How to generate a good cross-border project in the South Baltic Programme – s...How to generate a good cross-border project in the South Baltic Programme – s...
How to generate a good cross-border project in the South Baltic Programme – s...Pomcert
 
14 so what now - tmca
14   so what now - tmca14   so what now - tmca
14 so what now - tmcaTim McAloone
 
IT492_2_Proposal (1).ppt
IT492_2_Proposal (1).pptIT492_2_Proposal (1).ppt
IT492_2_Proposal (1).pptdodet1
 
JISC BCE: Trialling of Collaborative Tools for BCE
JISC BCE: Trialling of Collaborative Tools for BCEJISC BCE: Trialling of Collaborative Tools for BCE
JISC BCE: Trialling of Collaborative Tools for BCEJISC BCE
 
Engineering council services dave clark march 17 seminar
Engineering council services dave clark march 17 seminar Engineering council services dave clark march 17 seminar
Engineering council services dave clark march 17 seminar Sheila Heard RCDP
 
Transitions Royal Academy of Engineering seminar Feb 2017 slides
Transitions Royal Academy of Engineering seminar Feb 2017 slidesTransitions Royal Academy of Engineering seminar Feb 2017 slides
Transitions Royal Academy of Engineering seminar Feb 2017 slidesSheila Heard RCDP
 
Optimización de recursos para lograr calidad y cantidad en la creación de MO...
 Optimización de recursos para lograr calidad y cantidad en la creación de MO... Optimización de recursos para lograr calidad y cantidad en la creación de MO...
Optimización de recursos para lograr calidad y cantidad en la creación de MO...eMadrid network
 
The MyRI project presentation
The MyRI project presentationThe MyRI project presentation
The MyRI project presentationRos Pan
 
European Research Funding for Non-European Researchers
European Research Funding for Non-European ResearchersEuropean Research Funding for Non-European Researchers
European Research Funding for Non-European ResearchersAlbert Schram
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio ManagementDiana Rusnakova
 
Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best PracticesSupportGCI
 
AUA and staff development for administration staff
AUA and staff development for administration staffAUA and staff development for administration staff
AUA and staff development for administration staffMelissa Bradley
 
CONFERENCE PROGRAMME 2009
CONFERENCE PROGRAMME 2009CONFERENCE PROGRAMME 2009
CONFERENCE PROGRAMME 2009Dr Andrew Clegg
 
Developing a Digital Futures Prospectus for HS2 Midlands
Developing a Digital Futures Prospectus for HS2 MidlandsDeveloping a Digital Futures Prospectus for HS2 Midlands
Developing a Digital Futures Prospectus for HS2 MidlandsDigital Birmingham
 
Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...
Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...
Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...Nomensa
 

Similar to Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013 (20)

Cook edmedia 2016
Cook   edmedia 2016Cook   edmedia 2016
Cook edmedia 2016
 
CDRC Masters Research Dissertation Programme - Call for Partners
CDRC Masters Research Dissertation Programme - Call for PartnersCDRC Masters Research Dissertation Programme - Call for Partners
CDRC Masters Research Dissertation Programme - Call for Partners
 
The CDRC Masters Research Dissertation Programme - Call for Sponsors
The CDRC Masters Research Dissertation Programme - Call for SponsorsThe CDRC Masters Research Dissertation Programme - Call for Sponsors
The CDRC Masters Research Dissertation Programme - Call for Sponsors
 
How to generate a good cross-border project in the South Baltic Programme – s...
How to generate a good cross-border project in the South Baltic Programme – s...How to generate a good cross-border project in the South Baltic Programme – s...
How to generate a good cross-border project in the South Baltic Programme – s...
 
14 so what now - tmca
14   so what now - tmca14   so what now - tmca
14 so what now - tmca
 
IT492_2_Proposal (1).ppt
IT492_2_Proposal (1).pptIT492_2_Proposal (1).ppt
IT492_2_Proposal (1).ppt
 
JISC BCE: Trialling of Collaborative Tools for BCE
JISC BCE: Trialling of Collaborative Tools for BCEJISC BCE: Trialling of Collaborative Tools for BCE
JISC BCE: Trialling of Collaborative Tools for BCE
 
Engineering council services dave clark march 17 seminar
Engineering council services dave clark march 17 seminar Engineering council services dave clark march 17 seminar
Engineering council services dave clark march 17 seminar
 
Transitions Royal Academy of Engineering seminar Feb 2017 slides
Transitions Royal Academy of Engineering seminar Feb 2017 slidesTransitions Royal Academy of Engineering seminar Feb 2017 slides
Transitions Royal Academy of Engineering seminar Feb 2017 slides
 
Optimización de recursos para lograr calidad y cantidad en la creación de MO...
 Optimización de recursos para lograr calidad y cantidad en la creación de MO... Optimización de recursos para lograr calidad y cantidad en la creación de MO...
Optimización de recursos para lograr calidad y cantidad en la creación de MO...
 
Project management
Project managementProject management
Project management
 
The MyRI project presentation
The MyRI project presentationThe MyRI project presentation
The MyRI project presentation
 
European Research Funding for Non-European Researchers
European Research Funding for Non-European ResearchersEuropean Research Funding for Non-European Researchers
European Research Funding for Non-European Researchers
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio Management
 
Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
 
AUA and staff development for administration staff
AUA and staff development for administration staffAUA and staff development for administration staff
AUA and staff development for administration staff
 
CONFERENCE PROGRAMME 2009
CONFERENCE PROGRAMME 2009CONFERENCE PROGRAMME 2009
CONFERENCE PROGRAMME 2009
 
Developing a Digital Futures Prospectus for HS2 Midlands
Developing a Digital Futures Prospectus for HS2 MidlandsDeveloping a Digital Futures Prospectus for HS2 Midlands
Developing a Digital Futures Prospectus for HS2 Midlands
 
Project initiation document
Project initiation documentProject initiation document
Project initiation document
 
Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...
Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...
Collaborate Bristol 2018: Innovate UK's GDS Journey to Digital Transformation...
 

More from JISC RSC Eastern

Jisc RSC Eastern Technical Managers forum 'Janet' presentation
Jisc RSC Eastern Technical Managers forum 'Janet' presentationJisc RSC Eastern Technical Managers forum 'Janet' presentation
Jisc RSC Eastern Technical Managers forum 'Janet' presentationJISC RSC Eastern
 
Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...
Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...
Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...JISC RSC Eastern
 
Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...
Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...
Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...JISC RSC Eastern
 
Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...
Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...
Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...JISC RSC Eastern
 
Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...
Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...
Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...JISC RSC Eastern
 
Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...
Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...
Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...JISC RSC Eastern
 
Jisc RSC Eastern forum 14th March 2014 Destiny Wireless Presentation
Jisc RSC Eastern forum 14th March 2014 Destiny Wireless PresentationJisc RSC Eastern forum 14th March 2014 Destiny Wireless Presentation
Jisc RSC Eastern forum 14th March 2014 Destiny Wireless PresentationJISC RSC Eastern
 
Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update
Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update
Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update JISC RSC Eastern
 
Jisc RSC Eastern LRMF 14th March 2014 - RSC Eastern Update
Jisc RSC Eastern LRMF 14th March 2014 - RSC Eastern UpdateJisc RSC Eastern LRMF 14th March 2014 - RSC Eastern Update
Jisc RSC Eastern LRMF 14th March 2014 - RSC Eastern UpdateJISC RSC Eastern
 
Jisc RSC Eastern LRMF Mobile users and handhelds
Jisc RSC Eastern LRMF Mobile users and handheldsJisc RSC Eastern LRMF Mobile users and handhelds
Jisc RSC Eastern LRMF Mobile users and handheldsJISC RSC Eastern
 
Jisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet Academy
Jisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet AcademyJisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet Academy
Jisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet AcademyJISC RSC Eastern
 
Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...
Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...
Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...JISC RSC Eastern
 
Rsc Eastern / Microsoft Briefing 19th March 2014 Freedom Communications
Rsc Eastern / Microsoft Briefing 19th March 2014 Freedom CommunicationsRsc Eastern / Microsoft Briefing 19th March 2014 Freedom Communications
Rsc Eastern / Microsoft Briefing 19th March 2014 Freedom CommunicationsJISC RSC Eastern
 
Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...
Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...
Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...JISC RSC Eastern
 
Jisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern update
Jisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern updateJisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern update
Jisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern updateJISC RSC Eastern
 
Jisc RSC Eastern e-Fair 2012 Jisc TechDis
Jisc RSC Eastern e-Fair 2012 Jisc TechDisJisc RSC Eastern e-Fair 2012 Jisc TechDis
Jisc RSC Eastern e-Fair 2012 Jisc TechDisJISC RSC Eastern
 
Jisc RSC Eastern eFair 2012 'Free enabling technologies'
Jisc RSC Eastern eFair 2012 'Free enabling technologies'Jisc RSC Eastern eFair 2012 'Free enabling technologies'
Jisc RSC Eastern eFair 2012 'Free enabling technologies'JISC RSC Eastern
 

More from JISC RSC Eastern (20)

Jisc RSC Eastern Technical Managers forum 'Janet' presentation
Jisc RSC Eastern Technical Managers forum 'Janet' presentationJisc RSC Eastern Technical Managers forum 'Janet' presentation
Jisc RSC Eastern Technical Managers forum 'Janet' presentation
 
Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...
Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...
Jisc RSC Eastern Digital Literacies event 30.04.14 "Introduction to Digital L...
 
Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...
Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...
Jisc RSC Eastern VLE forum 28/03/14 'Flippin' Mobiles - How do they effect on...
 
Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...
Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...
Learning Resources Managers forum 14/03/14 - LRC and e-Learning Primary Proje...
 
Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...
Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...
Jisc RSC Eastern Learning Resources Managers forum 14/03/14 - Mobile users an...
 
Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...
Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...
Jisc RSC Eastern Microsoft Briefing - Ridgian BI Jisc RSC Eastern 19th march ...
 
Jisc RSC Eastern forum 14th March 2014 Destiny Wireless Presentation
Jisc RSC Eastern forum 14th March 2014 Destiny Wireless PresentationJisc RSC Eastern forum 14th March 2014 Destiny Wireless Presentation
Jisc RSC Eastern forum 14th March 2014 Destiny Wireless Presentation
 
Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update
Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update
Jisc RSC Eastern e-Learning forum 14th March 2014 Eastern update
 
Jisc RSC Eastern LRMF 14th March 2014 - RSC Eastern Update
Jisc RSC Eastern LRMF 14th March 2014 - RSC Eastern UpdateJisc RSC Eastern LRMF 14th March 2014 - RSC Eastern Update
Jisc RSC Eastern LRMF 14th March 2014 - RSC Eastern Update
 
Jisc RSC Eastern LRMF Mobile users and handhelds
Jisc RSC Eastern LRMF Mobile users and handheldsJisc RSC Eastern LRMF Mobile users and handhelds
Jisc RSC Eastern LRMF Mobile users and handhelds
 
Jisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet Academy
Jisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet AcademyJisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet Academy
Jisc RSC Eastern / Microsoft Briefing Tablets in Education - Tablet Academy
 
Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...
Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...
Jisc RSC Eastern / Microsoft Briefing 19.03.14 How to achieve a successful CR...
 
Rsc Eastern / Microsoft Briefing 19th March 2014 Freedom Communications
Rsc Eastern / Microsoft Briefing 19th March 2014 Freedom CommunicationsRsc Eastern / Microsoft Briefing 19th March 2014 Freedom Communications
Rsc Eastern / Microsoft Briefing 19th March 2014 Freedom Communications
 
Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...
Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...
Jisc RSC Eastern Technical Managers Forum 5th February 2014 Oaklands College ...
 
Rsc update feb 2014
Rsc update feb 2014Rsc update feb 2014
Rsc update feb 2014
 
Janet feb2014
Janet feb2014Janet feb2014
Janet feb2014
 
Service level agreements
Service level agreementsService level agreements
Service level agreements
 
Jisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern update
Jisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern updateJisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern update
Jisc RSC Eastern Learning Resources Managers forum Nov 2013 RSC Eastern update
 
Jisc RSC Eastern e-Fair 2012 Jisc TechDis
Jisc RSC Eastern e-Fair 2012 Jisc TechDisJisc RSC Eastern e-Fair 2012 Jisc TechDis
Jisc RSC Eastern e-Fair 2012 Jisc TechDis
 
Jisc RSC Eastern eFair 2012 'Free enabling technologies'
Jisc RSC Eastern eFair 2012 'Free enabling technologies'Jisc RSC Eastern eFair 2012 'Free enabling technologies'
Jisc RSC Eastern eFair 2012 'Free enabling technologies'
 

Recently uploaded

Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

Jisc RSC Eastern - Tevims RSC bid writing workshop Nov 2013

  • 1. Bid Writing Workshop: Innovation through technology funding call Dr Angus I. Carpenter JISC RSC Eastern Anglia Ruskin University (Chelmsford campus) 07th Nov. 2013
  • 2. 2 Contents: Session Name Description Time Registration & refreshments Registration & refreshments 09:30 Welcome & Introduction Welcome & Introduction 10:00 What are you interested in? Project exemplars and your project ideas 10:10 Live Online Briefing 11:00 Lunch Lunch 12:00 Project development process Considerations for collaborative bids 12:45 Funding call documents Aligning the project documents with your ideas 13:30 Refreshment Break Refreshment Break 14:00 Developing your project Putting the theory into practice 14:15 Discussion and Feedback Discussion and Feedback 15:15 Close 15:30
  • 3. 3 Contents: Session Name Description Time Registration & refreshments Registration & refreshments 09:30 Welcome & Introduction Welcome & Introduction 10:00 What are you interested in? Project exemplars and your project ideas 10:10 Live Online Briefing 11:00 Lunch Lunch 12:00 Project development process Considerations for collaborative bids 12:45 Funding call documents Aligning the project documents with your ideas 13:30 Refreshment Break Refreshment Break 14:00 Developing your project Putting the theory into practice 14:15 Discussion and Feedback Discussion and Feedback 15:15 Close 15:30
  • 5. 5 Welcome and introduction: Who’s who today… Malcolm Bodley Catherine Bone Nigel Ecclesfield Angus Carpenter
  • 6. 6 Contents: Session Name Description Time Registration & refreshments Registration & refreshments 09:30 Welcome & Introduction Welcome & Introduction 10:00 What are you interested in? Project exemplars and your project ideas 10:10 Live Online Briefing 11:00 Lunch Lunch 12:00 Project development process Considerations for collaborative bids 12:45 Funding call documents Aligning the project documents with your ideas 13:30 Refreshment Break Refreshment Break 14:00 Developing your project Putting the theory into practice 14:15 Discussion and Feedback Discussion and Feedback 15:15 Close 15:30
  • 7. 7 Project exemplars and your project ideas: Aim of session: By looking at last year’s call and projects we aim to give an understanding of ; - the types of projects JISC funds - what worked well - any major problems encountered - the themes for this year’s call and your initial ideas
  • 8. 8 Project exemplars and your project ideas: Last year’s themes & projects: 1) Last year’s call; the themes 2) Last year’s projects; what were funded what we learnt (good & bad)
  • 9. RSC Eastern Update September 2013 Last years call Further Education and Skills: Development and Resources Programme 2012 –2013 33 Resource and Development Projects across the UK – 130 partners Project Details http://bit.ly/17bK8QR Resources from the programme are available on Jorum using the search tag ‘FEskills’ www.jorum.ac.uk 9
  • 10. RSC Eastern Update October 2013 10 Exemplar Bids - KM Training (WBL) Free resources for hairdressing, childcare, and more Funding £21,800 • An online resource to support e-learning for vocational, education and training. • Freely available resources for the use of all learners, apprentices, employers and teachers. • Travel and tourism, retail, sports therapy, hospitality, beauty, customer service. www.education-net.org/
  • 11. RSC Eastern Update October 2013 Exemplar Bids - Lagat Training (WBL) Case study – moving to mobile devices in the workplace Funding - £11,468 • Develop a Virtual Learning Library (VLL) of resources specific to the occupational areas in which we deliver • Implement and use Tablets to improve efficiency in staff delivery • Develop an electronic web based induction program www.eeles643.co.uk/RSC/ 11
  • 12. RSC Eastern Update October 2013 Exemplar Bids - Bedford College (FE) Moodle Grades @ Bedford College - Funding £99,070 • The Grade Tracker is a module and block that has been developed by Bedford College to aid in the tracking of qualifications by staff and students for their courses. • It was written for Moodle 1.9 and, after funding from JISC regional, it is being developed for Moodle 2.x to be released to the community 12
  • 13. RSC Eastern Update October 2013 Exemplar Bids - Consortium (FE & Skills) Discover JISC Inclusion Consortium - Funding £129,500 • Project managed by JISC TechDis • Partner driven project: The partner providers were drawn from across the FE & Skills sector • Adaptation, repurposing or contextualisation of existing resources • A Discover JISC project website is planned to be launched by the end of November 2013. The site will include: • Content for Teaching • Teaching Techniques • Case studies from project partners 13
  • 14. RSC Eastern Update October 2013 Exemplar Bids - West Herts College (FE) Verbal tagging project – Funding £5000 • Audio feedback project to provide a more efficient procedure to mark and assess learner work. • Utilised Microsoft Office OneNote as a simple tool to provide these verbal comments to learners. • Training on audio feedback • Focus on sharing best practice • Resources available on Jorum 14
  • 15. RSC Eastern Update October 2013 What we learnt - good • A project must have very clear objectives • You can achieve a lot with a small amount of funding • Well organised consortiums were successful in bidding and achieving project outcomes • Need a good Project Manager with time to manage 15
  • 16. RSC Eastern Update October 2013 What we learnt - bad • Not allowing enough time to write the bid • Failing to identify risks • Focusing on kit rather than desired outcomes/objectives • Writing a bid that is not innovative • Focusing on something that is not easily shared 16
  • 17. 17 Project exemplars and your project ideas: The themes of this year’s call: Projects will be funded to: 1. Integrate new technologies in learning and teaching, assessment and business activities 2. Overcome barriers to the adoption and use of technology in the sector 3. Develop new uses for technology or innovative adaption and rollout of technologies The sorts of things Jisc is looking to fund include: creating resources creating augmented reality resources developing new uses for technologies developing apps developing organisational/collaborative processes using digital technologies developing improving or adapting current technologies/resources See more at: http://www.jiscrsc.ac.uk/news/2013/october/innovation-through-technology-fundingcall.aspx#sthash.dCyMcwr5.dpuf
  • 18. 18 Project exemplars and your project ideas: Take your idea and develop or develop and idea Everyone padlet an idea & present brief explanation
  • 19. 19 Project exemplars and your project ideas: Take your idea and develop or develop and idea
  • 20. 20 Project exemplars and your project ideas: Everyone padlet an idea & present brief explanation
  • 22. 22 Contents: Session Name Description Time Registration & refreshments Registration & refreshments 09:30 Welcome & Introduction Welcome & Introduction 10:00 What are you interested in? Project exemplars and your project ideas 10:10 Live Online Briefing 11:00 Lunch Lunch 12:00 Project development process Considerations for collaborative bids 12:45 Funding call documents Aligning the project documents with your ideas 13:30 Refreshment Break Refreshment Break 14:00 Developing your project Putting the theory into practice 14:15 Discussion and Feedback Discussion and Feedback 15:15 Close 15:30
  • 23. 23 Considerations for collaborative bids: Aim of session: Project development stages will be covered with the intention that this will make you more fully aware of all the areas you will need to address; ultimately, making the bid writing experience a less painful one!
  • 24. 24 Considerations for collaborative bids: Why bid for funding?
  • 25. 25 Considerations for collaborative bids: To gain a track record of securing external funds one needs to instil confidence in the funder issuing the funds To instil confidence in the funder one needs a history of successful project completion Thus, getting the first project funding to show this could be the hardest?
  • 26. 26 Considerations for collaborative bids: Collaboration is key!! But be explicit re: - objectives - roles & responsibilities
  • 28. 28 Considerations for collaborative bids: Key project players Finance dept. Project partners The Study group Senior manager (named PI) The Researcher? The Project manager
  • 29. 29 Considerations for collaborative bids: Key tasks & time taken Task Days Req. Project period Month 1 Week 1 Identify project team / roles & responsibilities All parties sign-off Establish project codes / finance Recruit project researchers Recruit project participants Conduct activity 1 Conduct activity 2 Conduct activity 3 Review / analysis data Draft report Draft presentation Agree report amendments with team Final report submitted Week 2 Week 3 Month 2 Week 4 Week 1 Week 2 Week 3 Week 4 1 1 0.5 10 5 5 5 5 20 10 5 2 5 Monday Mon/Tues Where ‘planned’ ≈ ‘window’ allocated then a potential high risk. Thus, good idea to assign some contingency days around those tasks! http://www.jiscinfonet.ac.uk/tools/gantt-charts/
  • 30. 30 Considerations for collaborative bids: So how much time to allocate… Experience is essential here! It can make or break: project financials project staff confidence institutional reputation project findings / impacts One estimate for time allowance is the ‘Three point estimate’: Most optimistic (MO) Most likely (ML) Most pessimistic (MP) MO (4 * ML) MP = Calc. allowance(A) 6 http://www.jiscinfonet.ac.uk/infokits/project-management/planning/estimating/
  • 31. 31 Considerations for collaborative bids: Costing staff There is no single right way! Buy-out = £45 hr-1 Remission Working contract reduction CPD Directly recruited staff? Other?
  • 32. 32 Considerations for collaborative bids: Costings profile Project code: RS1212 Project title: Cooking with eggs Project value: Project duration (months) Mar-10 Actual Income points Income Total 3.5 Apr-10 Profile Actual 3,000.00 0.00 6500 3,000.00 May-10 Profile Actual 0.00 0.00 0.00 Cumulative Total Profile Actual 3,500.00 0.00 3,500.00 Project Profile Profile 6,500.00 0.00 6,500.00 6,500.00 Payroll Project mgt (RS01) 150.00 150.00 150.00 450.00 Researcher 750.00 750.00 750.00 2,250.00 Project admin (RS01) 50.00 50.00 50.00 150.00 2,850.00 2,850.00 2,850.00 Payroll Total 0.00 950.00 0.00 950.00 0.00 950.00 0.00 Non-payroll 0.00 report production 0.00 0.00 1,000.00 1,000.00 dissemination workshop 0.00 0.00 1,151.00 1,151.00 consumables 0.00 0.00 150.00 150.00 contingency Non-Payroll Total 0.00 0.00 Contribution (20%) Balance 0.00 0.00 0.00 433.00 0.00 1,383.00 0.00 50.00 0.00 433.00 0.00 1,383.00 2,351.00 50.00 433.00 0.00 3,734.00 0.00 2,351.00 2,351.00 2,351.00 1,299.00 0.00 1,299.00 0.00 0.00
  • 33. 33 Considerations for collaborative bids: Risk matrix Probability = how likely it is going to happen Impact - if it happens Proximity = fluctuating risk
  • 34. 34 Considerations for collaborative bids: How financial profiles help monitoring… Project code: RS1212 Project title: Cooking with eggs Project value: Project duration (months) Mar-10 Income Total Profile 3,000.00 3,000.00 0.00 3.5 Apr-10 Actual Income points 6500 Identify concern costs early, re-profile projects accordingly 3,000.00 Actual May-10 Profile Actual 0.00 0.00 0.00 Cumulative Total Profile Actual 3,500.00 0.00 3,500.00 Project Profile Profile 6,500.00 0.00 6,500.00 6,500.00 Payroll Project mgt (RS01) Researcher Project admin (RS01) Payroll Total 150.00 850.00 50.00 0.00 150.00 150.00 150.00 450.00 750.00 750.00 750.00 2,250.00 50.00 950.00 50.00 0.00 950.00 50.00 0.00 950.00 150.00 0.00 Non-payroll 2,850.00 2,850.00 2,850.00 0.00 report production dissemination workshop consumables contingency Non-Payroll Total Contribution (20%) Balance 000.00 000.00 150.00 000.00 0.00 433.00 0.00 0.00 0.00 1,000.00 1,000.00 0.00 0.00 1,151.00 1,151.00 0.00 0.00 150.00 150.00 0.00 0.00 0.00 0.00 433.00 1,383.00 0.00 50.00 0.00 433.00 0.00 1,383.00 2,351.00 50.00 433.00 0.00 3,734.00 0.00 2,351.00 2,351.00 2,351.00 1,299.00 0.00 1,299.00 0.00 0.00
  • 35. 35 Considerations for collaborative bids: Progression profile (Gantt and milestone) Assign RAG ratings for tasks following your weekly / monthly(?) meetings with project staff. Task Days Req. Week 1 Identify project team / roles & responsibilities All parties sign-off Establish project codes / finance Recruit project researchers Recruit project participants Conduct activity 1 Conduct activity 2 Conduct activity 3 Review / analysis data Draft report Draft presentation Agree report amendments with team Final report submitted 1 1 0.5 10 5 5 5 5 20 10 5 2 5 Monday Project period Month 1 Week 2 Week 3 RAG Week 4
  • 36. 36 Considerations for collaborative bids: Project approvals / securities… Institutional name
  • 37. 37 Considerations for collaborative bids: The boring, but essential bit!
  • 38. 38 Considerations for collaborative bids: How to get funding … • • • • read the guidance notes clarity in how it meets / relates to the call ensure it meets the scope check the structure / format & include what is asked for: introduction/context clear work plan focussed research questions detailed methodology (eg. sample size, sampling method, data types and collection methods) data analysis methods evaluation plan outcomes & outputs dissemination plan
  • 39. 39 Considerations for collaborative bids: How to get funding … cont. • ensure the proposal is within page/word limit • demonstrate staffing requirements are realistic eg. staff have the skills and/or experience • include sufficient information on: management structure, governance, decision-making & funding arrangements • include partnership agreements where appropriate • contains letter of commitment from all partners
  • 40. 40 Considerations for collaborative bids: How to get funding … cont. • review and reference previous work - read previous bids - read published and grey literature • define the relationship to institutional and national strategies • identify benefits to the wider community • provide full budget information - include an institutional contribution, if permitted? • commit the time to writing the bid
  • 41. 41 Considerations for collaborative bids: Cover Sheet for Proposals (All sections must be completed) Business Intelligence JISC Grant Funding 12/10 Name of Lead Institution: College X Name of Proposed Project: Business intelligence lead strategic planning using live data management. Name(s) of Project Partners(s) None (except commercial sector – see below) This project involves one or Name(s) of any commercial partner company (ies) more commercial sector partners NO Full Contact Details for Primary Contact: Name: Mr R Somebody Position: Vice principal Email: r.somebody@stu.ac.uk Tel: 03603 975 303 Address: College X, Marble Road, Town X, County, XX42 6YY Length of Project: 18 months Project Start Date: February 2011 Project End Date: August 2012 Total Funding Requested from JISC: Funding requested from JISC broken down across Financial Years (Aug-July) Aug10 – July11 Aug11 – July12 £17,424 Total Institutional Contributions: £32,423 £3000 Outline Project Description A really strong summary of the project given!! I have looked at the example FOI form at Appendix A and included an FOI form in this bid No I have read the Funding Call and associated Terms and Conditions of Grant at Appendix B No
  • 42. 42 Considerations for collaborative bids: Past experiences: eLearning capital fund (Styles, 2007) (n = 56) (40%) (37%) (36%) (34%) (28%) (27%) (26%) (5%)
  • 43. 43 Considerations for collaborative bids: Past experiences: Learning & Teaching Innovation Grant (Witt, 2010) Bids Sub’ed Call 1 Call 2 Out of Scope Bids In Scope called inter’w Bids funded 82 85 63 54 19 31 9 6 2 2 For bids submitted under Call 1, the 10 bids considered as In Scope but not called for interview were failed mainly because: - they did not address a recognised need (5 bids); - they were not considered to be innovative (5 bids). For bids submitted under Call 2, the 25 bids considered as In Scope but not called for interview were failed mainly because: - they did not address a recognised need (15 bids); - they were not considered to be innovative (2 bids); - they did not fit the vision & intended outcomes of the e-learning programme (3 bids); - they were not considered to be a realistic proposal given the timescale & resources available (5 bids)
  • 44. 44 Considerations for collaborative bids: Any questions?
  • 45. 45 Contents: Session Name Description Time Registration & refreshments Registration & refreshments 09:30 Welcome & Introduction Welcome & Introduction 10:00 What are you interested in? Project exemplars and your project ideas 10:10 Live Online Briefing 11:00 Lunch Lunch 12:00 Project development process Considerations for collaborative bids 12:45 Funding call documents Aligning the project documents with your ideas 13:30 Refreshment Break Refreshment Break 14:00 Developing your project Putting the theory into practice 14:15 Discussion and Feedback Discussion and Feedback 15:15 Close 15:30
  • 46. 46 Funding call documents: Aim of session: By exploring the call’s documentation, we will start to identify where the information and ideas taken from previous sessions begins to fit / map to the call’s documentation requirements.
  • 48. 48 Funding call documents: Project’s aims: Proposals should describe how bidders will undertake innovative projects in the use of technology in the sector, in line with the FE and Skills Development and Resources Programme’s aims, to: 3. a. b. c. d. e. Improve the experiences of learners Develop resources, tools, products and processes that will improve the operational efficiency and effectiveness of providers Increase the capacity and capability of providers and their workforces Engage and support employers and other stakeholders to increase their engagement in the work of the sector and use of technology Increase the accessibility of learning opportunities and extend inclusion to meet learner, employer and community needs in contexts such as employment, skills and progression
  • 49. 49 Funding call documents: Project objectives: Integrating new technologies: to integrate new technologies, software or technology-related processes in learning and teaching, assessment and business activities – such as marketing and initial assessment Overcoming barriers to the adoption and use of technology in the sector: to address identified barriers to the use of technology in organisations, to report the results and develop resources which will assist other providers to overcome those barriers and will sustain the use of technology and the benefits to be gained by its use Developing new uses for technology and / or the innovative adaption and rollout of technologies: to develop products, process or resources, or to adapt existing technologies in innovative ways 30. You will be asked to identify the primary objective being delivered in your bid
  • 50. 50 Funding call documents: Timeline / deadline for call: The deadline for receipt of proposals in response to this call is: 12:00 noon; Friday 6th December 2013 Notification: Late January 2014 Time left to develop bid: Week beginning: 4th Nov. 11th Nov. 18th Nov. 25th Nov. 2nd Dec. Wk. No. 1 2 3 4 5 Project timescales: Start date: February 2014 Duration: up to 21 months Complete by: 31st Oct. 2015
  • 51. 51 Funding call documents: Eligibility criteria for call: 19. Proposals may be submitted by FE and skills providers funded via the Department for Business, Innovation and Skills (BIS) 21. Proposals may be from a single FE or skills provider or from consortia. Partnership arrangements are encouraged for project types B & C (developed with other providers or outside the sector, eg. HEIs, membership / professional bodies, etc). The lead partner must meet the criteria in paragraph 19 & funds can only be allocated through the lead partner. Type A projects are not suitable for partners and should only involve the lead organisation 22. Eligible organisations (see paragraph 19) may lead a proposal in all of the three project types (ie project type A, B and C). They may also be a partner in project type B and C projects.
  • 53. 53 Funding call documents: Project phases: Successful projects will need to produce a detailed project plan within four weeks of their start date. All project plans will need to include details of the following phases: Initiation – bringing the people and other resources together to produce a plan, which sets out how you will move from proposal to implementation Development & production – implement your specifications to construct and prepare for testing the resources or applications you have designed Testing & roll-out – This phase focuses on the products of your project. You should assess and explore the limits of your resources and roll out or disseminate them within your organisation and to other providers Evaluation & dissemination – a final report covering assessments of the project’s outcomes; 1/ what was learned, 2/ how you’d do things differently, 3/ the next stages of work, 5/ how you will ensure sustainability of the work and support for users Capacity building – once you have evaluated your project you will need to consider how it can help your organisation, other providers, practitioners and learners to enhance their capacity to use technology
  • 54. 54 Funding call documents: Project management: 54. All projects will be managed following our project management guidelines, which can be found at jisc.ac.uk/research/running-a-jisc-project. You may find these guidelines useful for writing your project proposal.
  • 55. 55 Funding call documents: Project management…cont.: http://www.jisc.ac.uk/fundingopportunities/projectmanagement/working/governance.aspx
  • 56. 56 Funding call documents: Project communication: Effective communications, both internal and external, are required in all aspects of the project to help organise, inform and promote the project to all those needing to know what is happening and to initiate actions that take the project forward. Our expectations regarding project communications, including any guidance, will be provided during the course of the project as appropriate. Projects must work with the Jisc Marketing and Communications team to ensure that any communication is in line with our corporate standards and values.
  • 57. 57 Funding call documents: Structure of proposals; proposal template:
  • 58. 58 Funding call documents: Structure of proposals; template sections: S1: contact details, project type & project objectives S2: project description - how funding helps achieve project objective(s). Identify the need for the outputs & how the resulting benefits will be realised. Address sustainability and capacity building. S3: work plan & outputs - attach high level work plan/Gantt chart, which identifies (a) outputs, (b) sets out key activities, (c) dates/timescales. Type B and C projects (>£15,000) should detail the work packages to be undertaken. S4: engaging with the community & Jisc - describe how the project will involve external organisations & work with Jisc, use other resources, evaluate the work, enhance the project outcomes, achieve wide dissemination and embed outcomes. S5: activity costs - completed by type A projects only (para 41 more info) S6: budget - completed by type B & C projects only (para 42 more info) S7: risk assessment - complete & attach a risk assessment (para 47 more info) S8: project team - provide information on experience and capacity of the team including any partners involved in the project. S9: letters of support - attach letter(s) of support from partners / supportive org’s describing how they / relevant staff will engage in the project
  • 59. 59 Funding call documents: Structure of proposals; activity cost / budget: Annex C Example budget template for type B & C projects only Type A projects have a slightly different template
  • 60. 60 Funding call documents: Structure of proposals ; activity cost / budget…cont.: Lead organisations submitting bids should use their usual costing and pricing practices but all costs should be clear and transparent, clarifying the number of days individuals work on activities, to - assist evaluators in determining value for money of proposals Where HEI / commercial company are partners, activity costs should use institutional costing practices and clearly identify partner contributions. - bids should indicate contributions sought from Jisc Staff costs: - payroll costs (including on-costs) for all project staff supported by audit trail (unless 100% staff) - time estimated in numbers of hours / days per project year converted to % FTE - include daily charge out rates for any consultants used
  • 61. 61 Funding call documents: Structure of proposals ; activity cost / budget…cont.: Non-staff costs: Travel & expenses - 1/ project staff travel & subsistence (include meeting attendance) and other relevant meetings, dependent upon the project / Jisc requirements Dissemination - the cost of all proposed project dissemination activities Evaluation - cost of all proposed project formative or summative evaluation activities Additional costs - item costs dedicated to the project (inc. consumables, recruitment provide details of these. Add additional rows to the budget template as required. Overheads: Provide a breakdown of the overheads included in the project’s costs Project partners: Funding for project partners, eg staff time, clearly identified under relevant headings. Resources (eg. cash, in-kind) provided by partners clearly identified Qualitative and quantitative benefits: Provide a summary of qualitative / quantitative benefits expected from the project in order to inform the funding requested from Jisc
  • 62. 62 Funding call documents: Structure of proposals; risk management: http://www.jiscinfonet.ac.uk/infokits/risk-management/
  • 64. 64 Contents: Session Name Description Time Registration & refreshments Registration & refreshments 09:30 Welcome & Introduction Welcome & Introduction 10:00 What are you interested in? Project exemplars and your project ideas 10:10 Live Online Briefing 11:00 Lunch Lunch 12:00 Project development process Considerations for collaborative bids 12:45 Funding call documents Aligning the project documents with your ideas 13:30 Refreshment Break Refreshment Break 14:00 Developing your project Putting the theory into practice 14:15 Discussion and Feedback Discussion and Feedback 15:15 Close 15:30
  • 65. 65 Putting the theory into practice: Aim of session: This session aims to get you pulling all the information and ideas together, so that you leave today with; - consolidated knowledge on the call’s requirements - well developed project idea(s) - considered / built new working relations / potential new project partnerships - have a good idea of where you are at and what you need to do
  • 66. 66 Putting the theory into practice: Time Activity description 30 min Develop project ideas further & Record on the padlet wall 20 min Present the idea so far to the group & Highlight what you plan to do next 10 min Group to discuss ideas / thoughts and plans going forward – where they would like help, etc
  • 67. 67 Putting the theory into practice: 5
  • 68. 68 Putting the theory into practice: 4
  • 69. 69 Putting the theory into practice: 3
  • 70. 70 Putting the theory into practice: 2
  • 71. 71 Putting the theory into practice: 1
  • 72. 72 Putting the theory into practice: Time up!
  • 73. 73 Contact: Dr Angus I. Carpenter email: tevims@hotmail.co.uk skype: angus.carpenter mobile: 07704 782028